Request for Information #6 Subject: Questions to Bid Package Issue Date: February 12, 2014 Project Name: Peppertree Apartments Distribution: All Plan Holders In reference to: Ruiz Brothers Construction Request for Information Issued on February 12, 2014. Questions and Answer: Q. The answer to question number four on Request for Information #3 is saying tenants may be on site during construction. At job walk on February 6th it was stated that building would not be tenant occupied. Will building be tenant occupied during construction? A. No, all units at Peppertree will be vacated and the entire building will not be occupied. Bidders should assume normal and standard practices for safety during construction per page A-0.2 in the General Note(s).

Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Request for Information #6

Subject: Questions to Bid Package

Issue Date: February 12, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

In reference to: Ruiz Brothers Construction – Request for Information Issued on

February 12, 2014.

Questions and Answer:

Q. The answer to question number four on Request for Information #3 is saying

tenants may be on site during construction. At job walk on February 6th it was

stated that building would not be tenant occupied. Will building be tenant occupied

during construction?

A. No, all units at Peppertree will be vacated and the entire building will not be

occupied. Bidders should assume normal and standard practices for safety during

construction per page A-0.2 in the General Note(s).

Page 2: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Request for Information #7

Subject: Questions to Bid Package

Issue Date: February 12, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

In reference to: Dreyfuss – Addenda 11 Question Questions and Answer:

Q. Per Addenda 11, is the new medicine cabinet recessed or wall/surface mounted? A. Wall/surface mounted; please refer to the new medicine specification below.

NEW SPECIFICATION – Medicine Cabinet 30X26 OAK SURF MNT TRI-VIEW MEDI CAB Zenith® Surface Mount Tri-View Mirror Medicine Cabinet - 30W x 26H x 4-1/2"D Oak Finish - Oak Frame - Wood Body - Two Adjustable Wood Shelves UNSPSC #: 30161801 Manufacturer Part #: K30 Reminder: All bathroom medicine cabinets are to be replaced per specification listed above.

Page 3: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

 

Free,  Next-­Day  Delivery*Website  Help:  1-­877-­694-­4932    |      Email:  [email protected]      |      Phone  Orders:  1-­800-­431-­3000

User  name   Password   Log  OnNew  User?  Register  Here   |  Forgot  Passw ord?          Remember  Me  

78x84  White  3-­1/2"Vertical...HDS  Part  #  703057

30X26  WHT  SURF  MNTTRI-­VIEW...HDS  Part  #  404443

24X26  OAK  SURF  MNTTRI-­VIEW...HDS  Part  #  404456

24  x  26  WHT  SURFMNT...HDS  Part  #  404442

24X26  SURF  MNTBEVELED  TRI...HDS  Part  #  404441

16X20  SURF  MNT  OAKWOOD...HDS  Part  #  404439

Enlarge

1-­9 $76.99

10+ $71.59 Free  Shipping  (lower  48  states)Next-­Day  Delivery*Hassle-­Free  Returns

QTY

1   +  Cart   +  Add  to  List  

Check  Stock

30X26  OAK  SURF  MNT  TRI-­VIEWMEDI  CABHD  Supply  Part  #:  404461Zenith®  Surface  Mount  Tri-­View  Mirror  Medicine  Cabinet  -­  30W  x  26H  x  4-­1/2"D  -­  Oak  Finish-­  Oak  Frame  -­  Wood  Body  -­  Two  Adjustable  Wood  Shelves

45  GALLON  HVY  DTYTRASH  BAG...HDS  Part  #  119060

102x48  White  3-­1/2"...HDS  Part  #  703061

59x60  White  3-­1/2"Vertical...HDS  Part  #  703075

Scott  Bath  Tissue"Case  Of  80"HDS  Part  #  531505

ABRASIVE  NYLONSCRUBBING...HDS  Part  #  117217

SCOTT  RAGS  IN  A  BOX"PKG  OF...HDS  Part  #  117397

PRODUCT  DETAILS

Make  &  Model

Material/Color/Finish

Specifications

Product  DetailsZenith®  Surface  Mount  Tri-­View  Mirror  Medicine  Cabinet  -­  30W  x  26H  x  4-­1/2"D  -­  Oak  Finish-­  Oak  Frame  -­  Wood  Body  -­  Two  Adjustable  Wood  Shelves

Seasons  GoldKeating

Customers  WithSimilar  InterestsAlso  Viewed

Home /  30X26  OAK  SURF  MNT  TRI-­VIEW  MEDI  CAB

Customers  Who  Viewed  This  Item  Also  Viewed

Customers  Who  Viewed  This  Item  Ultimately  Purchased

Page 4: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

2/12/2014 30X26  OAK  SURF  MNT  TRI-­VIEW  MEDI  CAB  |  HD  Supply

http://hdsupplysolutions.com/shop/p/30x26-­oak-­surf-­mnt-­tri-­view-­medi-­cab-­p404461 2/2

Dimensions

Product  Features

Certification  &  Standards

Make  &  Model  

UNSPSC 30161801

Manufacturer  Part  Number K30

Material/Color/Finish  

Color  /  Finish Oak

Shelf  Material  Type Adjustable  Wood

Specifications  

Country  of  Origin USA

Dimensions  

Depth 6.8  in

Height 29.8  in

Weight 26.0  lb

Width 33.5  in

Product  Features  

Brand Zenith

TAABAA Yes

Product  Type Wood  Tri-­View

Type Surface

FOB No

UPC  Code 043197000903

Certification  &  Standards  

ADA  Approved No

UL  Listed No

GSA  Approved Yes

Brushed  NickelToilet  PaperHolderHDS  Part  #412314

SeasonsAnchor  PointBrushed  NickelToilet  PaperHolderHDS  Part  #818249

Aspen  BrushedNickel  ToiletPaper  HolderHDS  Part  #400677

Franklin  BrassSomerset  SatinNickel  ToiletPaper  HolderHDS  Part  #110705

Wingits  OvalSatin  NickelToilet  PaperHolderHDS  Part  #822756

Tub  Grab  BarHDS  Part  #604020

 Website  Help:  1-­877-­694-­4932  Email:  [email protected]  Phone  Orders:  1-­800-­431-­3000  Join  Us

SERVICESCustom  ProductsDelivery  ServicesOnline  SolutionsProfessional  TrainingProperty  ImprovementSpecial  Orders

RESOURCESEmergency  PreparednessideallygreenLegislationMSDS/SDSTrade  Show s

ABOUT  USCareersContact  UsHD  Supply  CanadaLocationsOur  CompanyOur  History

HELPApply  for  CreditEmail  UsFAQsForgot  Passw ordRequest  a  CatalogWebsite  Help

POPULARPRODUCTSBatteriesHotel  SuppliesPaper  ProductsWaste  DisposersWater  Heaters

 Request  a  Catalog

*  On  most  orders  to  most  areas.©  2008  -­  2014.  HDS  IP  Holding,  LLC.  All  Rights  Reserved.  Any  reproduction  of  this  w ebsite  in  w hole  or  part,  or  any  unauthorized  use  w ithout  express  permission  by  HDSIP  Holding,  LLC  is  prohibited  by  and  w ill  constitute  a  violation  of  the  copyright  law s  of  the  United  States.  HD  Supply  Facilities  Maintenance  and  HD  Supply  FacilitiesMaintenance  logo  are  trademarks  of  HDS  IP  Holding,  LLC.

Terms  of  Sale  Terms  of  Use  California  Privacy  Privacy  Statement  Return  Policy  Catalog  Icons  &  Fine  Print  En  Español

Page 5: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Request for Information #11

Subject: Questions to Bid Package

Issue Date: February 14, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

In reference to: Misc. Items – Request for Information Issued on February 14, 2014.

Questions and Answer:

Q. RFI 1209-005 R1 (REVISED): It appears from your answer that you want both the

Solar Hot Water and the Photovoltaic Systems. Please provide information on size

(DC kW) of Photovoltaic System wanted? Also please provide approximate area

available for the Photovoltaic system. If area is limited than more efficient

(meaning more expensive) panels are required

A. Photovoltaic size (CSI system): 4.25kW, Available Area: 425 SF, 100% offset of

common area load only, average monthly SCE bill $69.57 for common area

Q. Exhaust Fan Specification

A. To clarify RFI # 9, # 10 & Addenda 10, the Panasonic FV-08VK3 80CFM @ 0.25SP,

Energy Star rated or equal (per Addenda 10) is the bathroom exhaust fan to include in the

base bid.

Page 6: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Request for Information #3

Subject: Questions to Bid Package

Issue Date: February 11, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

In reference to: Dreyfuss Construction - Job Walk, Feb. 06, 2014

Questions and Answer:

Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with

new fencing per plans, Trex or equal. Sheet A1.1 Note #10: (E) 6’ high wood fence

enclosure, remove & replace as required, see detail 1/A1.1 which calls out 1x6 cedar

wood fence boards. Can you confirm what fence materials to use Trex or Cedar?

Can you confirm the framing & posts materials that are to be use as some are rotted

out at the base?

A. Materials used for 1st Floor Patios and 2

nd Floor privacy screen between Unit 10 & Unit

11 shall be a composite wood (i.e. Trex) or equivalent.

Q. Title Sheet: Note #20: Inspect the existing Fire Sprinkler System for compliance

with current codes & upgrade as required. Replace all (E) Fire Sprinkler heads

with code compliant heads. Install (N) CO detectors in Each Unit. Install (N) CO

detectors in each unit. Install (N) CO detectors in Each Unit. Provide 5 Year

Certificate of good working condition & compliance. CAN YOU CONFIRM

WHAT SCOPE THE 5 YEAR WARRANTY IS FOR THE FIRE SPRINKLER

SYSTEM OR THE CO DETECTORS?

A. Bidders shall have a fire sprinkler company conduct an on-site inspection and evaluation

of the fire sprinkler system and identify and replace all ‘Central brand”, model GB

sprinkler heads and provide 5 year testing or certification of the fire sprinkler system only

per the Physical Needs Assessment.

Q. Title Sheet Note #24: Install new Bumper Guard at Carport Walls per Plans. Can

you confirm wood specs & location at stalls #12 - #18 is fully installed, stalls #8 – 11

does not show any Bumper Guards, see A-1.1 Note #14?

A. Owner removes “Bumper Guards” per A-1.1, Note#14. Bids shall exclude this item from

the base bid.

Page 7: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. Title Sheet: Note #27: Temporary Pedestrian Protection shall be provided as

required by CBC Section 3306. Please confirm if this is a requirement or a standard

note.

B. Yes, requirement. Tenants who may be on site during construction will need to be

protected and bidders should assume normal and standard practices for safety such as

barriers, signage, etc. But the code reference is generally addressing protection at the

public way such as sidewalks and driveways and at adjacent properties. See also General

Notes on Sheet A-0.2.

Q. A-0.2: Note #16, 17, & 18 Draft Stop requirements. Can you confirm if this note

relates to only the new scope of framing & the existing construction already

complies?

A. This is a generic note that applies to new framing. We do not believe the building

inspector will require adding any new draft stops in existing areas.

Q. A-0.2: Note #19, A-E: Fire Blocking requirements. Can you confirm if note relates

to only the new scope of framing & the existing construction already complies?

A. Fire blocking should be added in any new framing at locations listed in the note. It may

be required by inspectors in some existing locations if opened up and visible during the

work. Bidders should anticipate this.

Q. A-1.1: Note #17 – Confirm scope of work & quantities for the parking stall concrete

wheel stops. Please confirm the scope of work includes the removal of all (E)

concrete wheel stops & replace with (19) new 4’ concrete wheel stops.

A. Replace curb stops at each parking space located in the Carport (10) with new 4 foot

concrete curb stop (exclude Parking space #7). And install new 4 foot concrete curb stop

in guest parking space #1 and #2 (2). A total of twelve (12) new 4 foot concrete curb

stops shall be included in the base bid. Remove existing concrete wheel stops and

provide a new concrete wheel stop for each parking space per plan Sheet A-1.1.

Q. A-1.1: Note #19 – Trash Enclosure gates frames to remain & new Hardi-Board face

& trim is required. A-3.1 Note #13 & Detail 6/A-3.1 stated to remove & replace

Trash Enclosure Gates. Can you confirm the frame & gate shall be removed, stucco

patched & (2) new metal frames & gates installed is required in the base bid?

A. Bidder should be prepared to refurbish and service the existing frames as required so they

work properly when finished. Replace all damaged and improperly working hardware

and install the Hardiplank and Harditrim per detail 6/A-3.1.

Q. A-1.1: note #20 – Remove & Replace (E) Exterior light fixtures. (IN COVERED

GARAGES). Can you confirm the light fixture specification at theses (5) locations?

A. All (E) light fixtures are to remain in place. Provide plastic cover for each exterior light

fixture in covered garage in base bid.

Page 8: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. A-1.1: Note #11 – AC Condenser pads (E) or (N)? Can you confirm if the (E) are to

be re-used & the new units can fit on the (E) Pads with the appropriate clearances?

A. We believe the existing concrete pads can be reused, but bidders should advise the Owner

if some may need replacement and if they are proposing this as part of their base bid.

Q. A-2.1 Note #1: Remove (E) Stairs & Replace with steel stairs per 7/A0.8 with

painted warning stripe. Can you confirm if the base contract is steel stair system

per plans? Can you confirm there will be an add alt for a revised scope of work for

the treads to have precast or stone finish with intraoral warning stripes on each.

A. Base bid shall include a steel stair system.

Q. A-2.1 Note #7: Can you confirm that all the elastomeric coatings are to be removed

along with the (E) Plywood sub-surface shall be removed & replaced?

A. Remove and replace the existing system. See spec on Sheet A-0.3.

Q. A-2.2: Note #3: Remove (E) Countertop & Cabinets & replace with 34” Height

Accessible countertop with base & wall cabinets. Can you confirm the entire

kitchen cabinets Base & Upper in the Unit #2 & 3 will be removed & replaced with

new?

A. Entire new cabinets and countertops in the accessible units No’s 2 and 3.

Q. A-2.2: Note #5: (E) Pole & Shelf to remain. CAN YOU CONFIRM IF UNIT #6

BEDROOM CLOSET SHOULD HAVE A NEW POLE & SHELF.

A. Not required per plans.

Q. A-5.1/4: Guard Rail Posts Connection. Please clarify the sheet metal flashing &

waterproofing details for this application. Please clarify the stucco finish details for

this application.

A. Project architect will provide a modified detail.

Q. M-1.0 Note #5: Unit #6 & Community Room, please issue a spec for Exhaust Fans

EF-1 & EF-2.

A. Panasonic FV-08VK3 80CFM @ 0.25SP, Energy Star rated or equal per Addenda 10.

Q. Per the Site Walk please confirm the landscape & irrigation scope of work for the

Base Contract?

A. Owner request to set aside $7,500 for additional landscape and irrigation, the type and

location of landscape and irrigation to be determined.

Q. Addenda #3 Table #1 Peppertree Unit Inventory identifies some of the window

treatment as competed. At the walk there was a statement that all Windows &

Sliding Doors will have new treatment as 3 ½” Curved Vertical Blinds. Please

confirm this scope of work.

A. All windows and sliding doors as to be replaced per “Unit Inventory.” For windows and

sliding doors that need to be replaced, it should be replaced with 3 ½” Curved Vertical

Blinds.

Page 9: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. Can you confirm if the Bathroom light fixtures are to be removed & replaced as

stated on the site walk? Please include a specified fixture.

A. All (E) bathroom light fixtures are to be removed and replaced with Seasons Anchor PT

3LT Vanity Chrome or equivalent (Manufacturer Part No. 324337/UNSPSC #39111536)

per Addenda 11.

Q. Can you confirm if the removal & replacement of the Entry Doors Frames are to be

included in the base contract or an add alt?

A. Entry door frame replacement shall be included in the base bid.

Q. Can you confirm the Solar System Design criteria as discussed on the site walk?

A. Refer to Addenda 10 and see revised Plumbing Plan page 5.0 for additional work at the

laundry room and description of the design build solar hot water system.

Q. Can you confirm if the Trash Enclosure CMU Walls & Stucco are to be raised & the

new gates as part of the base bid or as an add alt? Please issue a scope & sketch.

A. Project architect will provide a modified detail.

Q. Can you confirm the Path of Travel to the Laundry room as discussed due to the

Peppertree encroachment into the required ADA Width requirement?

A. Owner shall review and request approval from City of Simi Valley Building & Safety

prior to start of rehabilitation.

Q. Can you confirm if the existing Mailbox location need to be relocated as it is in the

sloped area of the new concrete walkway & should required a level landing?

A. The walk is all new concrete and should be designed with a slope of 2% maximum per

plans so the mailbox can be placed back in its existing location on the new walk.

Q. Additional Inspections required by the Physical Needs Assessment (PNA) are they

required to be in the base bid:

A. Yes, professional inspections shall be included in the base bid per Addenda 8 (includes

roofing, electrical and fire inspector).

Page 10: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Addenda

Number: 13

Date: February 11, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

Copy to:

The following revisions and/or clarifications shall be made part of the Bid Documents issues for

this project, and shall be taken into consideration when submitting bid proposals. Receipt of this

addendum shall be noted in the proposal. It is incumbent upon the contractor to notify

subcontractors and/or material suppliers regarding changes herein.

Bid Proposal Deadline Extended to Tuesday, February 18, 2014 by 5:00 PM (PST)

The deadline for Peppertree Apartment bid proposals has been extended. Bid proposal for

Peppertree are now due on Tuesday, February 18th

by 5:00 (PST).

Page 11: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal
Page 12: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Request for Information #3

Subject: Questions to Bid Package

Issue Date: February 11, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

In reference to: Dreyfuss Construction - Job Walk, Feb. 06, 2014

Questions and Answer:

Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with

new fencing per plans, Trex or equal. Sheet A1.1 Note #10: (E) 6’ high wood fence

enclosure, remove & replace as required, see detail 1/A1.1 which calls out 1x6 cedar

wood fence boards. Can you confirm what fence materials to use Trex or Cedar?

Can you confirm the framing & posts materials that are to be use as some are rotted

out at the base?

A. Materials used for 1st Floor Patios and 2

nd Floor privacy screen between Unit 10 & Unit

11 shall be a composite wood (i.e. Trex) or equivalent.

Q. Title Sheet: Note #20: Inspect the existing Fire Sprinkler System for compliance

with current codes & upgrade as required. Replace all (E) Fire Sprinkler heads

with code compliant heads. Install (N) CO detectors in Each Unit. Install (N) CO

detectors in each unit. Install (N) CO detectors in Each Unit. Provide 5 Year

Certificate of good working condition & compliance. CAN YOU CONFIRM

WHAT SCOPE THE 5 YEAR WARRANTY IS FOR THE FIRE SPRINKLER

SYSTEM OR THE CO DETECTORS?

A. Bidders shall have a fire sprinkler company conduct an on-site inspection and evaluation

of the fire sprinkler system and identify and replace all ‘Central brand”, model GB

sprinkler heads and provide 5 year testing or certification of the fire sprinkler system only

per the Physical Needs Assessment.

Q. Title Sheet Note #24: Install new Bumper Guard at Carport Walls per Plans. Can

you confirm wood specs & location at stalls #12 - #18 is fully installed, stalls #8 – 11

does not show any Bumper Guards, see A-1.1 Note #14?

A. Owner removes “Bumper Guards” per A-1.1, Note#14. Bids shall exclude this item from

the base bid.

Page 13: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. Title Sheet: Note #27: Temporary Pedestrian Protection shall be provided as

required by CBC Section 3306. Please confirm if this is a requirement or a standard

note.

B. Yes, requirement. Tenants who may be on site during construction will need to be

protected and bidders should assume normal and standard practices for safety such as

barriers, signage, etc. But the code reference is generally addressing protection at the

public way such as sidewalks and driveways and at adjacent properties. See also General

Notes on Sheet A-0.2.

Q. A-0.2: Note #16, 17, & 18 Draft Stop requirements. Can you confirm if this note

relates to only the new scope of framing & the existing construction already

complies?

A. This is a generic note that applies to new framing. We do not believe the building

inspector will require adding any new draft stops in existing areas.

Q. A-0.2: Note #19, A-E: Fire Blocking requirements. Can you confirm if note relates

to only the new scope of framing & the existing construction already complies?

A. Fire blocking should be added in any new framing at locations listed in the note. It may

be required by inspectors in some existing locations if opened up and visible during the

work. Bidders should anticipate this.

Q. A-1.1: Note #17 – Confirm scope of work & quantities for the parking stall concrete

wheel stops. Please confirm the scope of work includes the removal of all (E)

concrete wheel stops & replace with (19) new 4’ concrete wheel stops.

A. Replace curb stops at each parking space located in the Carport (10) with new 4 foot

concrete curb stop (exclude Parking space #7). And install new 4 foot concrete curb stop

in guest parking space #1 and #2 (2). A total of twelve (12) new 4 foot concrete curb

stops shall be included in the base bid. Remove existing concrete wheel stops and

provide a new concrete wheel stop for each parking space per plan Sheet A-1.1.

Q. A-1.1: Note #19 – Trash Enclosure gates frames to remain & new Hardi-Board face

& trim is required. A-3.1 Note #13 & Detail 6/A-3.1 stated to remove & replace

Trash Enclosure Gates. Can you confirm the frame & gate shall be removed, stucco

patched & (2) new metal frames & gates installed is required in the base bid?

A. Bidder should be prepared to refurbish and service the existing frames as required so they

work properly when finished. Replace all damaged and improperly working hardware

and install the Hardiplank and Harditrim per detail 6/A-3.1.

Q. A-1.1: note #20 – Remove & Replace (E) Exterior light fixtures. (IN COVERED

GARAGES). Can you confirm the light fixture specification at theses (5) locations?

A. All (E) light fixtures are to remain in place. Provide plastic cover for each exterior light

fixture in covered garage in base bid.

Page 14: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. A-1.1: Note #11 – AC Condenser pads (E) or (N)? Can you confirm if the (E) are to

be re-used & the new units can fit on the (E) Pads with the appropriate clearances?

A. We believe the existing concrete pads can be reused, but bidders should advise the Owner

if some may need replacement and if they are proposing this as part of their base bid.

Q. A-2.1 Note #1: Remove (E) Stairs & Replace with steel stairs per 7/A0.8 with

painted warning stripe. Can you confirm if the base contract is steel stair system

per plans? Can you confirm there will be an add alt for a revised scope of work for

the treads to have precast or stone finish with intraoral warning stripes on each.

A. Base bid shall include a steel stair system.

Q. A-2.1 Note #7: Can you confirm that all the elastomeric coatings are to be removed

along with the (E) Plywood sub-surface shall be removed & replaced?

A. Remove and replace the existing system. See spec on Sheet A-0.3.

Q. A-2.2: Note #3: Remove (E) Countertop & Cabinets & replace with 34” Height

Accessible countertop with base & wall cabinets. Can you confirm the entire

kitchen cabinets Base & Upper in the Unit #2 & 3 will be removed & replaced with

new?

A. Entire new cabinets and countertops in the accessible units No’s 2 and 3.

Q. A-2.2: Note #5: (E) Pole & Shelf to remain. CAN YOU CONFIRM IF UNIT #6

BEDROOM CLOSET SHOULD HAVE A NEW POLE & SHELF.

A. Not required per plans.

Q. A-5.1/4: Guard Rail Posts Connection. Please clarify the sheet metal flashing &

waterproofing details for this application. Please clarify the stucco finish details for

this application.

A. Project architect will provide a modified detail.

Q. M-1.0 Note #5: Unit #6 & Community Room, please issue a spec for Exhaust Fans

EF-1 & EF-2.

A. Panasonic FV-08VK3 80CFM @ 0.25SP, Energy Star rated or equal per Addenda 10.

Q. Per the Site Walk please confirm the landscape & irrigation scope of work for the

Base Contract?

A. Owner request to set aside $7,500 for additional landscape and irrigation, the type and

location of landscape and irrigation to be determined.

Q. Addenda #3 Table #1 Peppertree Unit Inventory identifies some of the window

treatment as competed. At the walk there was a statement that all Windows &

Sliding Doors will have new treatment as 3 ½” Curved Vertical Blinds. Please

confirm this scope of work.

A. All windows and sliding doors as to be replaced per “Unit Inventory.” For windows and

sliding doors that need to be replaced, it should be replaced with 3 ½” Curved Vertical

Blinds.

Page 15: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. Can you confirm if the Bathroom light fixtures are to be removed & replaced as

stated on the site walk? Please include a specified fixture.

A. All (E) bathroom light fixtures are to be removed and replaced with Seasons Anchor PT

3LT Vanity Chrome or equivalent (Manufacturer Part No. 324337/UNSPSC #39111536)

per Addenda 11.

Q. Can you confirm if the removal & replacement of the Entry Doors Frames are to be

included in the base contract or an add alt?

A. Entry door frame replacement shall be included in the base bid.

Q. Can you confirm the Solar System Design criteria as discussed on the site walk?

A. Refer to Addenda 10 and see revised Plumbing Plan page 5.0 for additional work at the

laundry room and description of the design build solar hot water system.

Q. Can you confirm if the Trash Enclosure CMU Walls & Stucco are to be raised & the

new gates as part of the base bid or as an add alt? Please issue a scope & sketch.

A. Project architect will provide a modified detail.

Q. Can you confirm the Path of Travel to the Laundry room as discussed due to the

Peppertree encroachment into the required ADA Width requirement?

A. Owner shall review and request approval from City of Simi Valley Building & Safety

prior to start of rehabilitation.

Q. Can you confirm if the existing Mailbox location need to be relocated as it is in the

sloped area of the new concrete walkway & should required a level landing?

A. The walk is all new concrete and should be designed with a slope of 2% maximum per

plans so the mailbox can be placed back in its existing location on the new walk.

Q. Additional Inspections required by the Physical Needs Assessment (PNA) are they

required to be in the base bid:

A. Yes, professional inspections shall be included in the base bid per Addenda 8 (includes

roofing, electrical and fire inspector).

Page 16: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

RFI #9

RFI 1209-035:

1. Are we replacing the fire sprinkler heads like for like? If so what type of

fire sprinklers (heads) are installed currently?

A. No. ‘Central brand”, model GB sprinkler heads are currently installed.

Bidders should assume a total of 81 total interior sprinklers heads and 34

exterior sprinkler heads. However, field verification will be required of the

selected general contractor confirming final replacement count.

Photo A

Page 17: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

RFI #9

RFI 1209-023R1:

Q. The previous RFI requested information about the existing exhaust fan. It is

unclear if your response indicated the model of new or the existing fan. Does your

response provide the model number of the existing fan, if not please provide model

number of the existing fan so we can determine the amount of work needed for the

new fans. Also, do you want the old duct and vents for the existing exhaust fan

replaced?

A. No, a model number of existing fan is not included in previous RFI. However, we

have provided a picture (Photo B) of the existing Boran bathroom exhaust fans. No,

existing duct and vents are to remain.

Photo B

Page 18: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Request for Information #9

Subject: Questions to Bid Package

Issue Date: February 14, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

In reference to: Staples Construction Company – Request for Information Issued on

February 13, 2014.

Questions and Answer:

Q. RFI 1209-027: Note 12, on the Title Sheet states “remove portions of the concrete

walkways per plan.” Plans don’t show portions of walkways to be replaced. If all

or portions of sidewalks are to be repaired, provide specification and locations of

where this work should take place.

A. All concrete walks around the building are to be removed and replaced as shown on A-

1.1 (new concrete has a stippled pattern)

Q. RFI 1209-028: Sheet M2.0 Note 4 states reconnect to existing gas and condensate

and repair or replaced as needed. Since these units are occupied during bid time

and verification can’t take place whether repair or replacement is require, please

provide an allowance for this work.

A. Yes, $750 an allowance for inspection of existing gas and condensate lines.

Q. RFI 1209-029: Sheet A4.1, fixture schedule calls for ceiling fans. Fans are not

shown on the drawings. Please provide number and/or location of the fans.

A. One ceiling fan is shown per unit in the Living/Dining area. See Unit Plans Sheet A-2.2.

11 new fans total.

RFI 1209-030:

Q. Are we replacing the fire sprinkler heads like for like? If so what type of fire

sprinklers (heads) are installed currently?

A. No. ‘Central brand”, model GB sprinkler heads are currently installed (see Photo

A). Bidders should assume a total of 81 total interior sprinklers heads and 34 exterior

Page 19: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

sprinkler heads. However, field verification will be required of the selected general

contractor confirming final replacement count of sprinklers heads.

1. To bring a fire sprinkler system up to code that was installed in the 90’s would

take a lot of work. A 5-Year fire sprinkler inspection is the way of keeping a fire

sprinkler system up to compliance. This does not mean it is at current code but

it is acceptable with the AHJ and in compliance at the time of inspection. Please

clarify that we are doing a 5-Year to bring the system up to compliance not

bringing the fire sprinkler system up to current code?

A. Bidders shall have a fire sprinkler company conduct an on-site inspection and

evaluation of the fire sprinkler system to meet the 5-year “compliance”.

2. What was the original design of the fire sprinkler system? Eg. NFPA 13? NFPA

13R? *this information is being requested from a fire sprinkler subcontractor

that states they this information to bid the project correctly.

A. NFPA 13

Q. RFI 1209-004 R1: Detail 7 on A-0.9 doesn’t show a railing of curb stop. What are

the dimensions of the railing and a curb stop?

A. No rails are required on Curb Ramps.

Q. RFI 1209-005 R1: It appears from your answer that you want both the Solar Hot

Water and the Photovoltaic Systems. Please provide information on size (DC kW)

of Photovoltaic System wanted? Also please provide approximate area available for

the Photovoltaic system. If area is limited than more efficient (meaning more

expensive) panels are required

A. Photovoltaic size (CSI system): 3.693, Available Area: 120 SF +/-, 100% offset of

common area load only, average monthly SCE bill $69.57 for common area

Q. RFI 1209-006 R1: It appears from your response to RFI 1209-006 that Sheet A-1.1

included with Addenda 2 is obsolete. Why was this sheet included with Addenda 2?

Is there some work on this Addenda 2 Sheet A-1.1 that makes precedence over the

Sheet A-1.1 which was included in the bid documents.

A. In reference to sheet A-1.1, all Keynotes (#1-23) should be addressed with the

exception of Keynote #16. Bidders shall exclude only Keynote #16 as this work has been

completed per Addenda 2 (A). Addenda 2 (B) & (C) are to be included in the base bid.

Q. RFI 1209-009 R1: Floor base can be reused but there will be a gap left by the

thickness differential between the existing ceramic tile and the new VCT. Does the

owner want us to remove and reinstall the existing base or fill the gap with an

additional molding or caulking? Removal and reinstalling of the existing base is not

recommended, base will normally be broken during removal. It is our

recommendation that the owner request that the base be removed and replaced with

new materials.

A. Removal of existing base and installation of painted MFD or vinyl/rubber top-set.

Page 20: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. RFI 1209-011 R1 and 012 R1: Rough openings for retrofit windows and doors is the

inside measurement of the existing window or door frame which sticks past the

existing drywall surface. Would the owner like vinyl trim or wood trim to fill the

gap between the new vinyl window frame and the existing drywall? Vinyl trim is

less expensive.

A. Owner prefers vinyl.

Q. RFI 1209-014 R1: What fire rating do you want on the Entry Doors, 20 minute? 60

minute? Other?

A. 20-minute

Q. RFI 1209-019 R1: There is no way to accurately determine what electrical work is

required without an extensive inspection. Can you provide an owner allowance for

this work?

A. Yes, $500 for electrical inspection.

Q. RFI 1209-022 R1: Keynote 36 on A-2.2 states “electrical receptacles shall be

installed so that no point measured horizontally along the floor line in any wall

space is more than 6 feet from a receptacle outlet.” Is this requirement for all room

including hallways and bathrooms? The electrical plans only show new outlets in

the Community Room and Unit 6. Will we be required to install new circuitry and

outlets to meet this Keynote 36 requirement in all other units, if so please provide

locations of new receptacles for all other apartments for which you want new

receptacles.

A. This was a “blanket” plan check comment that applies to the new rooms. We do not

believe the City wants this throughout if the building does not comply. Not required in

halls and bathrooms.

Q. RFI 1209-023 R1: the previous RFI requested information about the existing

exhaust fan. It is unclear if your response indicated the model of new or the existing

fan. Does your response provide the model number of the existing fan, if not please

provide model number of the existing fan so we can determine the amount of work

needed for the new fans. Also, do you want the old duct and vents for the existing

exhaust fan replaced?

A. No, a model number of existing fan is not included in previous RFI. However, we have

provided a picture (Photo B) of the existing Boran bathroom exhaust fans. No, existing

duct and vents are to remain.

Q. RFI 1209-031

Subject: Hardware Group

Reference: Sheet A4.1 / Group A

Information Requested:

1. Sheet A4.1, hardware group A states latch set to match existing drawing A2.2;

keynote 22, states “remove door knob and replace with lever hardware. Which

direction should we take with the hardware?

Page 21: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

A. Hardware should be installed as follows:

New lever hardware for all new exterior hinged doors (Hardware Group B).

New lever hardware for all interior doors in all Units, the Community Room and

accessible units 2 and 3 (Hardware Group B)

Hardware Group A is for interior doors in Unit 6 that are to match existing

New lever hardware for the exterior fiberglass utility doors at the Laundry Room and

Electrical closets (Hardware Group C).

Q. RFI 1209-032

Subject: Bid Checklist

Reference: “Note on Sheet 11 of 15

Information Requested: 1. On the second page of the Bid Checklist, third item down it states “Able to perform

and complete the work within four weeks of the Notice to Proceed.”

a. Would you revise the Bid Checklist so it states “four months” or

b. Do you want us to correct it on the current bid checklist and cross it out and

make the correction when we turn in the bid?

A. Yes, on “Bid Checklist” please delete “four weeks” on the current “Bid Checklist”

and include “four months”.

Page 22: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Request for Information #10

Subject: Questions to Bid Package

Issue Date: February 14, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

In reference to: A Bates GC Inc. – Request for Information Issued on February 13, 2014.

Questions and Answer:

Q. Please confirm Note #36, A-2.2, receptacles every 6’ horizontally

A. This was a “blanket” plan check comment that applies to the new rooms. We do not

believe the City wants this throughout if the building does not comply. Not required in

halls and bathrooms.

Q. Is the contractor responsible to allow for and include in the bid for any code

requirements or code upgrades that are not addressed in the plans, addendums or

RFI's?

A. Yes, $500 for electrical inspection.

Q. Does the contractor have to meet Title 24 and Electrical code specifications? (Not

including management office)

A. Yes, $500 for electrical inspection.

Q. Who is supplying exhaust fans in bathrooms?

A. Bidders shall supply the exhaust fans in the bathroom and shall include material and labor

in the base bid. Please refer to RFI #9 - Photo B of existing fan needing to be replaced.

.

Page 23: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Request for Information #3

Subject: Questions to Bid Package

Issue Date: February 11, 2014

Project Name: Peppertree Apartments

Distribution: All Plan Holders

In reference to: Dreyfuss Construction - Job Walk, Feb. 06, 2014

Questions and Answer:

Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with

new fencing per plans, Trex or equal. Sheet A1.1 Note #10: (E) 6’ high wood fence

enclosure, remove & replace as required, see detail 1/A1.1 which calls out 1x6 cedar

wood fence boards. Can you confirm what fence materials to use Trex or Cedar?

Can you confirm the framing & posts materials that are to be use as some are rotted

out at the base?

A. Materials used for 1st Floor Patios and 2

nd Floor privacy screen between Unit 10 & Unit

11 shall be a composite wood (i.e. Trex) or equivalent.

Q. Title Sheet: Note #20: Inspect the existing Fire Sprinkler System for compliance

with current codes & upgrade as required. Replace all (E) Fire Sprinkler heads

with code compliant heads. Install (N) CO detectors in Each Unit. Install (N) CO

detectors in each unit. Install (N) CO detectors in Each Unit. Provide 5 Year

Certificate of good working condition & compliance. CAN YOU CONFIRM

WHAT SCOPE THE 5 YEAR WARRANTY IS FOR THE FIRE SPRINKLER

SYSTEM OR THE CO DETECTORS?

A. Bidders shall have a fire sprinkler company conduct an on-site inspection and evaluation

of the fire sprinkler system and identify and replace all ‘Central brand”, model GB

sprinkler heads and provide 5 year testing or certification of the fire sprinkler system only

per the Physical Needs Assessment.

Q. Title Sheet Note #24: Install new Bumper Guard at Carport Walls per Plans. Can

you confirm wood specs & location at stalls #12 - #18 is fully installed, stalls #8 – 11

does not show any Bumper Guards, see A-1.1 Note #14?

A. Owner removes “Bumper Guards” per A-1.1, Note#14. Bids shall exclude this item from

the base bid.

Page 24: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. Title Sheet: Note #27: Temporary Pedestrian Protection shall be provided as

required by CBC Section 3306. Please confirm if this is a requirement or a standard

note.

B. Yes, requirement. Tenants who may be on site during construction will need to be

protected and bidders should assume normal and standard practices for safety such as

barriers, signage, etc. But the code reference is generally addressing protection at the

public way such as sidewalks and driveways and at adjacent properties. See also General

Notes on Sheet A-0.2.

Q. A-0.2: Note #16, 17, & 18 Draft Stop requirements. Can you confirm if this note

relates to only the new scope of framing & the existing construction already

complies?

A. This is a generic note that applies to new framing. We do not believe the building

inspector will require adding any new draft stops in existing areas.

Q. A-0.2: Note #19, A-E: Fire Blocking requirements. Can you confirm if note relates

to only the new scope of framing & the existing construction already complies?

A. Fire blocking should be added in any new framing at locations listed in the note. It may

be required by inspectors in some existing locations if opened up and visible during the

work. Bidders should anticipate this.

Q. A-1.1: Note #17 – Confirm scope of work & quantities for the parking stall concrete

wheel stops. Please confirm the scope of work includes the removal of all (E)

concrete wheel stops & replace with (19) new 4’ concrete wheel stops.

A. Replace curb stops at each parking space located in the Carport (10) with new 4 foot

concrete curb stop (exclude Parking space #7). And install new 4 foot concrete curb stop

in guest parking space #1 and #2 (2). A total of twelve (12) new 4 foot concrete curb

stops shall be included in the base bid. Remove existing concrete wheel stops and

provide a new concrete wheel stop for each parking space per plan Sheet A-1.1.

Q. A-1.1: Note #19 – Trash Enclosure gates frames to remain & new Hardi-Board face

& trim is required. A-3.1 Note #13 & Detail 6/A-3.1 stated to remove & replace

Trash Enclosure Gates. Can you confirm the frame & gate shall be removed, stucco

patched & (2) new metal frames & gates installed is required in the base bid?

A. Bidder should be prepared to refurbish and service the existing frames as required so they

work properly when finished. Replace all damaged and improperly working hardware

and install the Hardiplank and Harditrim per detail 6/A-3.1.

Q. A-1.1: note #20 – Remove & Replace (E) Exterior light fixtures. (IN COVERED

GARAGES). Can you confirm the light fixture specification at theses (5) locations?

A. All (E) light fixtures are to remain in place. Provide plastic cover for each exterior light

fixture in covered garage in base bid.

Page 25: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. A-1.1: Note #11 – AC Condenser pads (E) or (N)? Can you confirm if the (E) are to

be re-used & the new units can fit on the (E) Pads with the appropriate clearances?

A. We believe the existing concrete pads can be reused, but bidders should advise the Owner

if some may need replacement and if they are proposing this as part of their base bid.

Q. A-2.1 Note #1: Remove (E) Stairs & Replace with steel stairs per 7/A0.8 with

painted warning stripe. Can you confirm if the base contract is steel stair system

per plans? Can you confirm there will be an add alt for a revised scope of work for

the treads to have precast or stone finish with intraoral warning stripes on each.

A. Base bid shall include a steel stair system.

Q. A-2.1 Note #7: Can you confirm that all the elastomeric coatings are to be removed

along with the (E) Plywood sub-surface shall be removed & replaced?

A. Remove and replace the existing system. See spec on Sheet A-0.3.

Q. A-2.2: Note #3: Remove (E) Countertop & Cabinets & replace with 34” Height

Accessible countertop with base & wall cabinets. Can you confirm the entire

kitchen cabinets Base & Upper in the Unit #2 & 3 will be removed & replaced with

new?

A. Entire new cabinets and countertops in the accessible units No’s 2 and 3.

Q. A-2.2: Note #5: (E) Pole & Shelf to remain. CAN YOU CONFIRM IF UNIT #6

BEDROOM CLOSET SHOULD HAVE A NEW POLE & SHELF.

A. Not required per plans.

Q. A-5.1/4: Guard Rail Posts Connection. Please clarify the sheet metal flashing &

waterproofing details for this application. Please clarify the stucco finish details for

this application.

A. Project architect will provide a modified detail.

Q. M-1.0 Note #5: Unit #6 & Community Room, please issue a spec for Exhaust Fans

EF-1 & EF-2.

A. Panasonic FV-08VK3 80CFM @ 0.25SP, Energy Star rated or equal per Addenda 10.

Q. Per the Site Walk please confirm the landscape & irrigation scope of work for the

Base Contract?

A. Owner request to set aside $7,500 for additional landscape and irrigation, the type and

location of landscape and irrigation to be determined.

Q. Addenda #3 Table #1 Peppertree Unit Inventory identifies some of the window

treatment as competed. At the walk there was a statement that all Windows &

Sliding Doors will have new treatment as 3 ½” Curved Vertical Blinds. Please

confirm this scope of work.

A. All windows and sliding doors as to be replaced per “Unit Inventory.” For windows and

sliding doors that need to be replaced, it should be replaced with 3 ½” Curved Vertical

Blinds.

Page 26: Request for Information #6 Responses... · 2018-09-11 · Q. Title Sheet: Note #19: Remove and replace the wood fencing at 1st Floor Patios with new fencing per plans, Trex or equal

Q. Can you confirm if the Bathroom light fixtures are to be removed & replaced as

stated on the site walk? Please include a specified fixture.

A. All (E) bathroom light fixtures are to be removed and replaced with Seasons Anchor PT

3LT Vanity Chrome or equivalent (Manufacturer Part No. 324337/UNSPSC #39111536)

per Addenda 11.

Q. Can you confirm if the removal & replacement of the Entry Doors Frames are to be

included in the base contract or an add alt?

A. Entry door frame replacement shall be included in the base bid.

Q. Can you confirm the Solar System Design criteria as discussed on the site walk?

A. Refer to Addenda 10 and see revised Plumbing Plan page 5.0 for additional work at the

laundry room and description of the design build solar hot water system.

Q. Can you confirm if the Trash Enclosure CMU Walls & Stucco are to be raised & the

new gates as part of the base bid or as an add alt? Please issue a scope & sketch.

A. Project architect will provide a modified detail.

Q. Can you confirm the Path of Travel to the Laundry room as discussed due to the

Peppertree encroachment into the required ADA Width requirement?

A. Owner shall review and request approval from City of Simi Valley Building & Safety

prior to start of rehabilitation.

Q. Can you confirm if the existing Mailbox location need to be relocated as it is in the

sloped area of the new concrete walkway & should required a level landing?

A. The walk is all new concrete and should be designed with a slope of 2% maximum per

plans so the mailbox can be placed back in its existing location on the new walk.

Q. Additional Inspections required by the Physical Needs Assessment (PNA) are they

required to be in the base bid:

A. Yes, professional inspections shall be included in the base bid per Addenda 8 (includes

roofing, electrical and fire inspector).