Sl.No. Page No. Clause Name Clause No. RFP Text Query Bank's Response
1 7 Invitation to Bid 1.7 The bidder shall quote the best competitive
price in the commercial bid as Bank may or may
not opt for Reverse Auction. In case Bank does
not opt for Reverse Auction, the commercial
bid submitted by the Bidder will be opened to
decide the L1 price.
Request bank to clarify the selection of L1
vendor process in advance in order to avoid
any ambiguity. Request bank to declare the
process of selecting L1 bidder by commercial
bid or reverse auction should be explicitly
mentioned.
As per RFP
2 12 3. RFP Objective: The bidder also has to implement CKYCR in
RRBs, its subsidiaries, NSDL and CDSL. The
Bidder should be an OEM, authorized partner,
System Integrator, having project team
members and support personnel competent
enough to install, configure, customize,
maintain, training and support the proposed
solution.
Request bank to provide the scope of work &
use case for NSDL & CDSL with the approx
data size which need to be migrated to the
solution.Will be Shared with
Sucessful bidder.
3 14 4.2. Search and Download
of KYC record
b) The proposed solution should be capable to
download single / bulk records by entering
CKYC identifier and an authentication factor
(viz. date of birth / date of incorporation).
Request bank to clarify the scope for KYC
towards non individuals clients as of there in
no provision in CERSAI for the same.As per RFP and CERSAI
Guidelines
4 14 4.3. Update of KYC record d) The Proposed solution should be capable to
give SMS/email alert to
respective customer whose notification comes
to the branch. It should have
a workflow and all interaction with
www.ckycindia.in or the CKYCR system
should happen through secure FTP and SSL.
Request bank to clarify the scope of
providing SSL certificate is with Bidder or
bank would provide the same as needed.
Bank will provide the SSL
Certificate
5 17 10.Bid Prices 5 However, during the contract period if the
market price of product / services has been on
the lower side, the benefit will have to be
passed on to the Bank.
Request bank to remove this clause.
As per RFP
6 18 12. Timeline and Penalty
for delay in project
implementation
2 Penalty will be applicable for late delivery of the
customized software. 1% of the order value will
be deducted as penalty per week for failure to
achieve the milestones as indicated below;
maximum penalty would be 10% of the order
value.
Request bank to reduce the penatly as its
very stringent on the bidder`s part.
As per RFP
7 18 12. Timeline and Penalty
for delay in project
implementation
4.1 Phase of the Project:
Delivery of solution along with
Software Licenses
Duration /Schedule:
2 weeks from date of
Purchase order (PO)
Request bank to consider" Phase of the
Project:
Delivery of solution along with
Software Licenses
Duration /Schedule:
4 weeks from date of
Purchase order (PO)"
As per RFP
Request for Proposal for Implementation of Central KYC Registry Solution(CKYCR) RFP ref :BOI/HO/IT/CKYCR/1029 dated 04.10.2019
All interested bidders are hereby informed that the following changes / clarifications to be taken into account for Bid submission. This clarification / changes document duly signed by
authorised official of the Bidder to be submitted alongwith the Bid. Please note & comply accordingly. All other terms & conditions of the Bid remains unchanged. This changes /
clarifications are full & final and further queries will not be entertained by the Bank.
RFP - Implementation of Central KYC Registry Solution(CKYCR) :Queries received from Bidders -OUR REPLY/ CLARIFICATION / CHANGES TO RFP AS PER PRE BID MEETING ON
08/11/2019
8 18 12. Timeline and Penalty
for delay in project
implementation
4.2 Phase of the Project:
System Configuration, Installation,
Customizations, integration with
Bank’s applications and porting on
Production environment
Duration /Schedule:
2 weeks from date of
delivery of solution/ 4
weeks from date of
acceptance of PO
Request bank to consider" Phase of the
Project:
System Configuration, Installation,
Customizations, integration with
Bank’s applications and porting on
Production environment
Duration /Schedule:
3 weeks from date of
delivery of solution/ 7
weeks from date of
acceptance of PO"
As per RFP
9 18 12. Timeline and Penalty
for delay in project
implementation
4.3 Phase of the Project:
Use Acceptance Test (UAT)
Duration /Schedule:
6 weeks from the date of
acceptance of PO
Request bank to consider " Phase of the
Project:
Use Acceptance Test (UAT)
Duration /Schedule:
9 weeks from the date of
acceptance of PO
As per RFP
10 18 12. Timeline and Penalty
for delay in project
implementation
4.4 Phase of the Project:
Pilot implementation
Duration /Schedule:
8 weeks from the date of
acceptance of PO
Request bank to consider, " Phase of the
Project:
Pilot implementation
Duration /Schedule:
11 weeks from the date of
acceptance of PO"
As per RFP
11 18 12. Timeline and Penalty
for delay in project
implementation
4.5 Phase of the Project:
Go Live in all the zones.
Duration /Schedule:
14 weeks from the date of
acceptance of PO
Request bank to consider, " Phase of the
Project:
Go Live in all the zones.
Duration /Schedule:
20 weeks from the date of
acceptance of PO".
As per RFP
12 19 12. Timeline and Penalty
for delay in project
implementation
6 In case of pendency with regard to this activity,
a penalty of Rs.500/- or penalty imposed by
CKYC whichever is higher for each application,
will be levied and recovered from the amount
payable to the SI/Bidder.
Request bank to remove or reduce the
penalty for the mentioned point
As per RFP
13 19 12. Timeline and Penalty
for delay in project
implementation
8 The average account opened per day will be
around 25000 (approx.). The documents
pertaining to the accounts (Proof of Identity
and Proof of Address) will be uploaded to the
proposed solution. There are around 2 crores
legacy accounts for the period from
01/01/2017 to 30/06/2019.
Request bank to provide the clarity on
whether bank will provide the required
hardware as per the mentioned hardware
sizing,
Bank will provide the
hardware as per the
hardware sizing provided
by the vendor in bid.
14 19 12. Timeline and Penalty
for delay in project
implementation
9 Performance: Bidder/SI has to ensure proper
sizing of hardware based on the volume
provided on this RFP and in no case it should be
undersized or oversized. Sizing of the hardware
has to be done in such a way that the average
daily (8 am to 8 pm) CPU and Memory
utilization does not exceed 70%. In case it
exceeds, an amount of Rs.2,000/- for each such
occasion would be levied as penalty.
Request bank to remove or reduce the
penalty for the mentioned point
As per RFP
15 19 13. Penalties a) Penalty
due to
Absence of
Onsite
Engineer
i) During the Implementation period:
In the absence of the engineer, suitable
replacement is to be provided on immediate
basis. In case of absence of absolute absence
(when no replacement is provided), penalty
would be deducted @1% of the
Implementation Cost, for each day, up to a
maximum of 10%.
Request bank to reduce the penalty for the
mentioned point as the penalties mentioned
are very stringent on part of bidder.
As per RFP
16 19 13. Penalties a) Penalty
due to
Absence of
Onsite
Engineer
ii) If Bank avails Onsite Technical support:
In the absence of the engineer, suitable
replacement is to be provided on immediate
basis. In case of absolute absence (when no
replacement is provided), penalty would be
deducted @1% of the ATS Cost(payable
quarterly), for each day, up to a maximum of
10%.
Request bank to provide the no. of onsite
support resources required for the
application proposed with details of no. of
resources required per shift & no. of Shits
required.Also request bank to reduce the
penalty for the mentioned point as the
penalties mentioned are very stringent on
part of bidder.
Will be Shared with
Sucessful bidder.
17 19 13. Penalties a) Penalty
due to
Absence of
Onsite
Engineer
iii) For Facility Management Services:
In absence of the required number of
manpower as per the Purchase
order, Rs.300/- will be deducted for the
absence of per engineer per day.
Maximum penalty in this case will be 10% of
the FMS cost.
Request bank to provide the no. of Facility
Management resources required for the
application proposed with details of no. of
resources required per shift & no. of Shits
required. Also request bank to reduce the
penalty for the mentioned point as the
penalties mentioned are very stringent on
part of bidder.
Will be Shared with
Sucessful bidder.
18 20 13. Penalties b) Penalty
Due to
downtime
The Bank expects an uptime of 99.5% for the
complete solution on monthly basis. In case the
uptime is not maintained with the uptime as
stipulated, Bank shall charge the penalties as
under:
Request bank to reduce the penalty for the
mentioned point as the penalties mentioned
are very stringent on part of bidder. As per RFP
19 20 15. Location to be covered: The application being procured will be installed
at Data Center in Mumbai and Disaster
Recovery (DR) Site, Bengaluru. Application
should be installed separately for RRBs, NSDL,
CDSL. However, the Bank reserves the right to
change locations/add new locations as per
Bank’s requirement. Web based applications
should be available at the branches of Bank of
India and its sponsored RRBs and other
locations as mentioned in this RFP.
Request bank to provide the DC & DR adress
for the implementation of RRB`s,NSDL, CDSL
Will be Shared with
Sucessful bidder.
20 22 16. Training d) Bidder should provide eLearning module which
can be integrated with Banks’ eLearning
module.
Request bank to provide the scope for
elarning solution, As bank is aware elearning
is the vast soution request bank to freeze the
scope & provide the row for quoting the
same in commercials.
Will be Shared with
Sucessful bidder.
21 23 18. Disaster Recovery – DR The servers in the DR site will be of same
configuration as that of the production and it
should be able to support 100% of the load, of
the production CKYC system. Also it should be
able to work in the High availability mode.
Request bank to clarify whether bank will
provide the load balancer or any other
middleware required for HA.As per RFP
22 25 20. Technical Bid (TB): 3. 13) Insolvency Report from bank Request bank to clarify the mentioned point
& also provide the format from the same.Insolvency Report should
be obtained from the bank
where the bidder has their
accounts.
23 29 29. Software Licensing In case of any license issue, vendor has to
provide alternate license without any extra cost
to the Bank
Request bank to provide the clarity on the
mentioned point. As per RFP
24 33 41. No Price Variations: Prices quoted by the Bidder shall be fixed
during the Bidder’s performance of the
Contract and shall not be subject to variation
on any account, including exchange rate
fluctuations, changes in taxes, duties, levies,
charges etc. A Bid submitted with an adjustable
price quotation will be treated as
nonresponsive and will be rejected.
Any customization after Go live will be
charged
As per RFP
25 36 3. Commercial Bids: a) Thereafter the Bank reserves the right of
selection of Vendor either by Opening of
Commercial Bids of vendors (who are found
eligible after evaluation of Technical Bids) or
proceed with the selection of Vendor through
On Line Reverse Auction.
Request bank to clarify the selection of L1
vendor process in advance in order to avoid
any ambiguity. Request bank to declare the
process of selecting L1 bidder by commercial
bid or reverse auction should be explicitly
mentioned.
As per RFP
26 37 47. Capability of the Software The solution should be capable/ scalable to
take care of future requirement and to align
with other business processes linked with loan
processing, Trade Finance etc.
request bank to clarify the scope for the
mentioned point & any future efforts at the
bidder part would be at the mutually agreed
commercials.
As per RFP
27 37 47. Capability of the Software The software should also be capable of
accepting data from other applications for
uploading the same as metadata in Workflow
so that manual data entry job is minimized.
request bank to clarify the scope for the
mentioned point & any future efforts aat the
bidder part would be at the mutually aagreed
commercials.
As per RFP
28 39 52. Delivery and Documents: Bank is having Enterprise License agreement
with Microsoft. Bank reserves the right to
provide the following if the same is offered by
the Bidder as part of the Deliverables. However,
Bidder has to quote in the Commercial Bid for
such deliverables. It will be taken into
consideration while computing the total Bid
Version 2012,2016
Request bank to consider directly procuring
from the vendors for any hardware and
softwares such as OS, DB etc as bank will be
having rate contract with the respective
OEM`s.As per RFP
29 40 52. Delivery and Documents: While IPR for base software will be with the
OEM, bank will enter into an Escrow
arrangement for customized version.
Request bank to consider paying the cost to
ESCROW arrangementBank will pay the ESCROW
arrangement cost
30 40 53. Payment Terms: Milestone:
On Successful installation and customization of
the solution, UAT signoff and training.
Payment:
35%
Request bank to consider,"Milestone:
On Successful installation and customization
of the solution, UAT signoff and training.
Payment:
40%"
As per RFP
31 53. Payment Terms: Milestone:
Upon completion of Pilot Phase
Payment:
15%
Request bank to consider,"Milestone:
Upon completion of Pilot Phase
Payment:
20%"
As per RFP
32 40 53. Payment Terms: Milestone:
After 2 months of Successful Go live in all zones
Payment:
35%
Request bank to consider,"' After 2 months
of Successful Go live in all zones
Payment:
40%"
As per RFP
33 45 56. Liquidated Damages: 32.2.d) Part of week will be considered as full week. Request bank to remove the mentioned
clauseAs per RFP
34 45 56. Liquidated Damages: 32.2.g) A penalty of Rs.2000/- per day will be levied for
every downtime exceeding 4 hours due to
software error
Request bank to reduce the penalty for the
mentioned point as the penalties mentioned
are very stringent on part of bidder.As per RFP
35 47 59. Warranty: Software Where the Bank is having License agreement
with any OEM for supply of RDBMS/OS license
the following shall be applicable:
Request bank to consider directly procuring
from the vendors for any hardware and
softwares such as OS, DB etc as bank will be
having rate contract with the respective
OEM`s.
As per RFP
36 48 59. Warranty: 1 Bidder has to quote the price in Commercial Bid
which shall be taken into consideration for
arriving at L1 vendor.
Request bank to consider directly procuring
from the vendors for any hardware and
softwares such as OS, DB etc as bank will be
having rate contract with the respective
OEM`s.
As per RFP
37 48 59. Warranty: 2 The Bank reserves the right to procure the
license directly from the OEM.
Request bank to consider directly procuring
from the vendors for any hardware and
softwares such as OS, DB etc as bank will be
having rate contract with the respective
OEM`s.
As per RFP
38 48 59. Warranty: For Middleware/DB component, OEM/SI
should provide same level of support as for the
software/application including patch/bug
fix/Telephonic chats etc
Request bank to provide more clairty on the
mentioned point.As per RFP
39 48 60. Delivery Period: The required software is to be delivered within
2 weeks from the date of the acceptance of
purchase order. The Installation and
Commissioning of the application, if any shall
be completed within 2 weeks from the date of
delivery. For any delay in delivery, installation
and commissioning beyond 2+2 weeks from the
date of Purchase Order issued by the Bank, the
Bank reserves the right to charge Liquidated
Damages at the rate defined above.
Request bank to consider the implemntation
time line of atleast 20 weeks from the date of
PO.
As per RFP
40 48 61. System Maintenance Standard:1 The bidder / Bidder has to ensure on-site/off-
site support (without any extra cost) for
resolving all software related issues, including
re-installation of Software and other
applications supplied or configured for the
proposed solution under this RFP, due to any
reason what-so-ever, during warranty and ATS
period (or such other extended period as per
the contract terms and paid maintenance will
commence only thereafter).
Request bank to provide the no. of onsite
support & facility management resources
required for the application proposed with
details of no. of resources required per shift
& no. of Shits required.Will be Shared with
Sucessful bidder.
41 55 77.
Installation/Commissioning
of Hardware/Software:
The bidder/SI is responsible for all unpacking
and installation of Products. The bidder/SI will
test all hardware/system operations and
accomplish all adjustments necessary for
successful and continuous operation of the
hardware/software at all installation sites.
Request bank to provide the clarity on the
mentioned point
As per RFP
42 67 Pre-Eligibility Criteria 6 The Bidder should have experience of already
successfully implementing the proposed CKYCR
Solution in at least 2 Scheduled Commercial
Bank/RRB in India out of which 1
implementation should be working for atleast 6
months with integration in Finacle CBS.
Request bank to consider, "The Bidder
should have experience of already
successfully implementing the proposed
CKYCR Solution in at least 2 Scheduled
Commercial Bank/RRB in India out of which 1
implementation should be working for
atleast 6 months with integration in any
Industry standard CBS application like
FInacle/Bancs/Flexcube etc."
As per RFP
43 68 Pre-Eligibility Criteria 7 The Bidder should have direct support office at
Mumbai and Bangalore should be able to
provide support and maintenance for the
offered solution. Documentary proof (Office
registration details etc.) to be submitted along
with the bid.
Request bank to consider setting up support
office in Bangalore with in 3 months from
the PO provided by the bank to bidder.
As per RFP
44 13 Scope of work 4
Also the solution should have the capability to
import the scanned documents from Document
Management system to the software or export
the scanned documents from the software to
Document Management System with a proper
reference.
What will the mode of integration with DMS?Will be Shared with
Sucessful bidder.
45 13 Scope of work 4
The accounts are opened through CBS (Finacle)
and the respective details also will be updated
in Finacle. The proposed solution should
download the account details automatically
from Finacle via SFTP or through any other
mode (any other secured mode if available).
What will be the mode of integration with
CBS? What are the other means possible?
Who will host the SFTP?
Will be Shared with
Sucessful bidder.
46 14 4.1, upload of KYC Record b For an individual record, the signature and
photograph should be cropped separately and
uploaded.
Who will perform this activity of cropping? Cropping should be done
from the application itself
47 14 4.1, upload of KYC Record b For an individual record, the signature and
photograph should be cropped separately and
uploaded.
If vendor is expcted to do, how will scanned
images come to vendor? Please confirm
Cropping should be done
from the application itself
48 14 4.1, upload of KYC Record b For an individual record, the signature and
photograph should be cropped separately and
uploaded.
Is it onsite or vendor premises? Kindly
confirm
Cropping should be done
from the application itself
49 18 Timeline and Penalty for
delay in project
implementation
2 Penalty will be applicable for late delivery of the
customized software. 1% of the order value will
be deducted as penalty per week for failure to
achieve the milestones as indicated below;
maximum penalty would be 10% of the order
value.
We request bank to reduce the penalty
0.01% to maximum cap of 1%.As per RFP
50 18 Timeline and Penalty for
delay in project
implementation
4, Delivery of
solution
along with
Software
Licenses
2 weeks from date of Purchase order (PO)
We request bank increase the duration
delivery timeline from 2 weeks to 4 weeksAs per RFP
51 19 Timeline and Penalty for
delay in project
implementation
6 In case of pendency with regard to this activity,
a penalty of Rs.500/- or penalty imposed by
CKYC whichever is higher for each application,
will be levied and recovered from the amount
payable to the SI/Bidder.
We request bank to reduce the penalty from
Rs.500 to Rs. 100 As per RFP
52 25 20, Technical Bid (TB) 13 Insolvency Report from BankRequest bank to kindly clarify on what they
mean by insolvency report from Bank and
from which bank are we suppose to get this
report?
Insolvency Report should
be obtained from the bank
where the bidder has their
accounts.
53 25 20, Technical Bid (TB) 13 Insolvency Report from Bank
Should this report be from the Banks where
our solution is currently implemented. Kindly
confirm.
Insolvency Report should
be obtained from the bank
where the bidder has their
accounts.
54 36 3. Commercial Bids:
a
The Technical Bids will be evaluated as per
eligibility criteria. Thereafter the Bank reserves
the right of selection of Vendor either by
Opening of Commercial Bids of vendors (who
are found eligible after evaluation of Technical
Bids) or proceed with the selection of Vendor
through On Line Reverse Auction.
On what are all condition bank will go for
reverse auction or Vise versaAs per RFP
55 38 48. Commercial Evaluation
Process through Reverse
Auction3
Bidders should note that the indicative
commercial bid is considered for the purpose of
conducting ‘Reverse auction process only. The L-
1 Bidder will be decided only later, on
finalization of prices through Reverse auction.
Our understanding is that, L1 will be decided
based on Reverse auction only & not based
on Indicative bid quoted by bidder as per
Annexure L
As per RFP
56 40 Payment Terms
1On Successful installation and customization of
the solution, UAT signoff and training (35%).
Is 35% will be calculated on TCO or T1. Please
confirm
35% will be calculated as
per the Purchase Order
issued.
57 82 Facility Management
Table T2, Facility Managementwhat will be the payment terms for T2.
Kindly confirm
Facility Managemnet Cost
will be made quarterly in
arrears upon submission of
physical invoice
58 67 Eligibility Criteria
6
The Bidder should have experience of already
successfully implementing the proposed CKYCR
Solution in at least 2 Scheduled Commercial
Bank/RRB in India out of which 1
implementation should be working for atleast 6
months with integration in Finacle CBS.
As per eligibility criteria solution has to
beimplemented at 2 scheduled commercial
bank out of which one is working for atleast
6 month.
Whereas in Annexure Y (Page no 119, point
no 1), it is mentioned software should have
been implemented in at least 2 schedule
commercial bank.
Hence we request bank to relax this clause to
considered one installations should be live at
least for last 6 months
As per RFP
59 84 Annexure L - Terms &
Conditions:
Wherever Bank would like to avail the services
of manpower after first year, Bank shall
consider an increase of 4% in price every year.
Bidder should note that while quoting total
Price for Manpower for 5 years, it should be
inclusive of the aforementioned increase of 4%
Whether we need to include 4% cost
increase per year & quote or bank will pay
additional 4% on our quoted price; For E.g., If
we quote Rs.10,00,000 for Facility manger as
yearly cost per person, whether Bank will Pay
10 lac + 4 % for 2nd year as salary? Please
confirm! If not, please explain with
illustration
Provide the ATS cost
including the 4% increase
every year.
60 109 Functional Specification Annexure X Data capturing page of proposed solution given
for branch users should validate PAN and
Aadhaar number from NSDL and UIDAI sites
and same facilities to be available for other
OVDs in public domain as and when they
become available.
Bank has to share the API's for PAN and
Aadhaar validation.
Will be Shared with
Sucessful bidder.
61 110 Functional Specification Annexure X The proposed solution should be capable of
validating the Aadhaar by using banks existing
bio-metric device
Is bidder responsible to develop e-KYC
solution? Which device will be used for E-
KYC?
Bank is already having e-
kyc facility.Details will be
shared with the successful
bidder.
62 110 Functional Specification Annexure X The proposed solution should be capable of
validating the Aadhaar by using banks existing
bio-metric device
Which device will be used for E-KYC?Will be Shared with
Sucessful bidder.
63 109 Functional Specification Annexure X
The proposed solution should be capable to
work on Virtual Cloud Model which supports
windows 2012 and above, RedHat Linux.
Is it public or private cloud?
Private Cloud
64 112 Functional Specification Annexure X The proposed solution should be capable of
using existing scanners (Flatbed or ADF)
available at branches as per description of
CKYCR uploading requirement.
Please specify the make and model of
available scanners? Solution should support all
type of scanners.
65 116 Functional Specification Annexure X The Software application should integrate
previous data and history of previous vendor in
their system/application
Please elaborate on history of previous
vendor in Bidder's system/application.Will be Shared with
Sucessful bidder.
66 119 Bidders Capability/Marking
Methodology: Max Marks-
100
Annexure Y 10 Marks for PSU banks with Financle
integration
We request bank to relax this clause as, 10
Marks for PSU banks/ Scheduled
Commecials Banks with Financle integrationAs per RFP
67 119 Bidders Capability/Marking
Methodology: Max Marks-
100
Annexure Y Credentials on past exeperience……... in Finanle
CBS, 25 Marks
What needs to be done to score full 25
marks? Please confirmMax 25 marks based on
the reference documents
submitted with respect to
implementation
68 119 Bidders Capability/Marking
Methodology: Max Marks-
100
Annexure Y Credentials on past exeperience……... in Finanle
CBS, 25 Marks
Distribution of 25 marks is not clear. Please
clarify the sameMax 25 marks based on
the reference documents
submitted with respect to
implementation
69 119 Bidders Capability/Marking
Methodology: Max Marks-
100
Annexure Y Credentials on past exeperience……... in Finanle
CBS, 25 Marks
If we have 2 imlementaions in PSUs with
Finacle, how much marks we will be get.
Please confirmMax 25 marks
71
General Query
What is the number of existing branches and
what will be expected number of branch
with in the 5 years?
Already mentioned in the
RFP
72
General Query What will be expected number of users and
concurrent user with in the 5 years of time?
Will be Shared with
Sucessful bidder.
7413 Scope of Work 4 Legacy account
Kindly clarify the process for existing legacy
accounts
Will be Shared with
Sucessful bidder.
75
13 Scope of work
Bidders have to ensure that the proposed
solution should comply with the latest CKYCR
guidelines 2016 including amendments. Bidder
has to carry out customization changes in
software in case of regulatory requirements, in
future, at no extra cost to the Bank. The CKYCR
has to be implemented in Bank of India
branches, RRBs, its subsidiaries, NSDL, CDSL.
After Go Live any customization will be
charged. As per RFP
76
14 Update of KYC record 4.3
The Proposed solution should be capable to
give
SMS/email alert to respective customer whose
notification comes to the branch. It should have
a workflow and all interaction with
www.ckycindia.in or the CKYCR system should
happen through secure FTP and SSL.
Will Bank share the workflow? Will be Shared with
Sucessful bidder.
77
19
Timeline and Penalty for
delay in project
implementation
11
Performance: Bidder/SI has to ensure proper
sizing of hardware based on the volume
provided
on this RFP and in no case it should be
undersized or oversized. Sizing of the hardware
has to be
done in such a way that the average daily (8 am
to 8 pm) CPU and Memory utilization does not
exceed 70%. In case it exceeds, an amount of
Rs.5,000/- for each such occasion would be
levied as penalty
Request bank to remove this point as the
volume said by bank is conditional and it
depends on customer. If we
assume there is volume is unpredictable then
this clause will not work.
As per RFP
78
66 Annexure F 7
The Bidder should have direct support office at
Mumbai and Bangalore should be able to
provide support and maintenance for the
offered
solution. Documentary proof (Office
registration details etc.) to be submitted along
with the bid.
We as a vendor have clients in Bangalore for
which we have support team and
developers as well. Right now we are
planning to move into
a better office from existing one. Request the
bank to kindly consider.
As per RFP
79
19 Penalties 12
In the absence of the engineer, suitable
replacement is to be provided on immediate
basis. In case of absence of absolute absence
(when no replacement is provided), penalty
would be deducted @1% of the
Implementation Cost, for each day, up to a
maximum of 10%.
Revise fines and penalties As per RFP
80
19 Penalties 13a2
In the absence of the engineer, suitable
replacement is to be provided on immediate
basis. In case of absolute absence (when no
replacement is provided), penalty would be
deducted @1% of the ATS Cost, for each day,
up to a maximum of 10%.
Request you to relax fines and penalties As per RFP
81
20 Penalties 13a3
In absence of the required number of
manpower as per the Purchase order, Rs.300/-
will be deducted for the absence of per
engineer per day. Maximum penalty in this case
will be 10% of the FMS cost.
Request you to relax fines and penalties As per RFP
82
Penalties 13b
Uptime Penalties- < 99.5% up to 99%- Rs 2000 <
99% up to 98%- Rs 5000 < 98% up to 97%- Rs
10000 < 97%- Rs 15000
Request you to relax fines and penalties As per RFP
8319 Penalties b)
The Bank expects an uptime of 99.5% for the
complete solution on monthly basis
Requesting the Bank to kindly consider
uptime % as 99.5 % uptime is too high As per RFP
8421 Training 15 (a)
Management of servers, storage, database and
security Vendor has no work in managing this point As per RFP
8521 Training 15 (c) Business Process Management
There is no scope of BPM in CKYCR process.
Kindly remove this clause Not mentioned in the RFP
87
21 Training 15 (c) Program coding Kindly clarify the following point with
locations and why vendor will share this. As per RFP
88
21 Training 15 (d) Lodging and Boarding at Training Centre for the
Trainer shall be provided by the Bank.
Requesting Bank to also bear travelling and
food cost for far away locations. As per RFP
89
39 Delivery and Documents: 51
Enterprise wide licenses of the solution – to
cover branches of Bank of India and its
sponsored RRBs.
RRB's will be provided access centrally. As per RFP
90
40 Delivery and Documents:
Any gaps identified during product
demonstration, functional requirements
specifications study, system testing, user
acceptance testing, business process re-
engineering and pilot implementation should
be
included by the bidder as implementation
efforts.
Bank will not pay the bidder any additional
charges for all such customizations. Bidder shall
take up all such amendments as required by the
Bank on a priority basis and shall inform the
Bank the timelines for completions
Any customization after Go live will be
charged As per RFP
91
77 Terms & Conditions Annexure-J
Wherever Bank would like to avail the services
of manpower after first year, Bank shall
consider an increase of 4% in price every year.
Bidder should note that while quoting total
Price for Manpower for 5 years, it should be
inclusive of the aforementioned increase of 4%
The increase will be decided by the vendor. As per RFP
92
80 Manufacturers’
Authorization Form (b)
Following such termination, furnishing at no
cost to the Bank, the blueprints, design
documents,
operations manuals, standards, source codes
and specifications of the Products, if requested.
If termination is done by bank Blueprints,
design documents and Source codes will not
be provided
AS per RFP
93
82 Terms & Conditions
Table T2:
Facility
Managemen
t
Six Months onsite experienced support
(Support personnel should be BE/MCA and 1
year experience in the CKYCR-software supplied
to the Bank.)
Kindly check with bank As per RFP
94
114 CKYCR Related
Requirements 58
The Successful bidder has to provide 24/7
online support to Bank and if required the
engineer has to visit Bank’s premises to resolve
the issue
Can the bank kindly consider revising the
criteria to 12*6 support as per the bank's
working hours
As per RFP
95
115 CKYCR Related
Requirements 68
During the contract period, if OEM of OS/DB
solution announces regarding the End of
Support the successful bidder has to migrate
the solution to the newer version of OS/DB
without additional cost to the Bank.
The migration will have costing per man
days. As per RFP
96
118 Annexure-Y (Bidders 3
Site Visit and Customer Feedback (This section
will be based on the visit by Bank Officials to
Reference site. Technical Committee
comprising of Bank Officials not exceeding 5
members will visit one of the reference sites
where the
proposed solution supplied by the PSP and
implemented by SI. The marks will be based on
the feedback received on the application,
implementation and maintenance during the
visit.)
We as a vendor have clients outside Mumbai
and if bank decides for onsite visit for the
same purpose the travelling cost will be
mutually shared.
As per RFP
97
29 Software Licensing 28
Bidder would be required to provide cost of
Enterprise wide (unlimited/unrestricted)
licenses for implementing end to end solution
as per the
requirement of the Bank with right to use the
software for any number of branches of the
Bank.. There shall not be any other restrictions
like number of installations, site, processors
etc.
There should not be any licensing restriction for
implementing it to all the branches or linked to
any of the business processes. Also the
licensing must include all licenses required for
high
availability, disaster recovery, distributed
deployment model as desired by Bank. Licenses
should be perpetual
The insurance shall be in an amount equal to
110 percent of the value of the Products from
“Warehouse to final destination” on “All Risks”
basis including Theft, War Risks and Strikes,
valid for a period not less than 3 months after
installation and commissioning and issue of
acceptance certificate by the Bank.
There shall not be any other restrictions like
number of installations, site, processors etc.
Kindly relax this point As per RFP
98
30 Insurance 31
The insurance shall be in an amount equal to
110 percent of the value of the Products from
“Warehouse to final destination” on “All Risks”
basis including Theft, War Risks and Strikes,
valid for a period not less than 3 months after
installation and commissioning and issue of
acceptance certificate by the Bank.
Request the bank to kindly remove the
clause. As per RFP
99
39 Delivery and Documents: 51
Enterprise wide licenses of the solution – to
cover branches of Bank of India and its
sponsored RRBs.
No of sites where the solution needs to be
installed. As per RFP
100
40 Delivery and Documents: 51
All copies should be delivered in hard & soft
media. Source code for customized application
and documentation of the CKYCR solution shall
be the property of the Bank from the start of
the contract period. Bank would guarantee that
it
would not use the source code for commercial
purposes and would be willing to sign suitable
legal documents in case the vendor/bidder so
desires.
Kindly confirm the Escrow cost will be bare
by the bank.
Bank will pay the ESCROW
arrangement cost
101
40 Payment Terms 521. On Successful installation and customization
of the solution, UAT signoff and training.
Request you to reconsider only on
installation and not on customization. As per RFP
102 40 Payment Terms 52 2. 15 %Upon completion of Pilot Phase 20% on UAT and Pilot Phase As per RFP
103
40 Payment Terms 523. After 2 months of Successful Go live in all
zones
As post go live the solution can be extended
to multiples branches. It will be on the
banks discretion on making
particulars zones live. In case of deal from
the Bank on getting a particular zone live
the payment for the solution should not be
holded
/delayed to the solution provided. Consider
40% on 2months of successful Go Live in all
zones
10% after 1 year from Go Live
As per RFP
104
40 Payment Terms 52
4. After a period of 1 year from Go live or
against furnishing a performance Bank
Guarantee of a
scheduled commercial Bank (other than Bank
of India) for the equal amount.
10% after 1 year from Go Live As per RFP
105
45 Liquidity Damages 56
If the Vendor fails to deliver any or all of the
Products or any customization or perform the
Services within the time period(s) specified in
the
Contract or subsequently in change request,
the Bank shall, without prejudice to its other
remedies under the Contract, and unless
otherwise extension of time is agreed upon
without the application of Liquidated Damages.
Customization of the solution shall be taken
up post mutual discussion and after
understanding the feasibility
of the same. If the same isn’t feasible in the
existing environment LD
As per RFP
106
47 Warranty 58
Warranty should not become void if Bank buys
any other supplemental software from a third
party and installs them with this software in the
application supplied under this RFP, if any.
However, the warranty will not apply to such
supplemental software items installed.
In case any 3rd party software will be
installed in the server without the
permission of the vendor the warranty shall
become void.
As per RFP
107
55Installation/Commissioning
of Hardware/Software 77
The bidder/SI is responsible for all unpacking
and installation of Products. The bidder/SI will
test all
hardware/system operations and accomplish all
adjustments necessary for successful and
continuous operation of the
hardware/software at all installation sites.
Unpacking and installation of
Products like hardware Os, database and
other applications is the
responsibility of the Bank.
Request you to kindly remove this clause.
As per RFP
108
69 Eligibility Criteria 15Bidder/SI is not reported under SMA-2 or NPA,
if enjoying credit facilities from any Bank/FI. Request you relax SMA-2 As per RFP
109
74 Annexure J
Unit price of (Item 6 + Item 7 + Item 8)>=12% of
(Item 1 + Item 2) Total ATS cost for RRBs will be
calculated as = Unit Price*4 (Total
RRBs)*4(years
As per market standards kindly increase the
ATS to 18% As per RFP
110
75 Terms and Conditions
Six Months onsite experienced support
(Support personnel should be BE/MCA and 1
year experience in the CKYCR-software supplied
to the Bank.)
BE or MCA As per RFP
111
75 Facility Management Table 2 Customization (100 person-days during the
contract period)
After 100 days each day will cost 7500 per
person per day
As per RFP. After 100 days
unit price will be
considered. Refer Pg.75
112
76 Terms and Conditions
Implementation charges should cover
integration with the existing applications of the
Bank as well as the applications that may
require integration during the contract period.
Kindly clarify the number of solutions and
required scope of integration with CKYC
solution.
As per RFP
113
77 Terms and Conditions
Sizing of hardware for implementation of
CKYCR solution should be for enterprise wide
licenses
and certified by the application OEM. The
bidder should ensure that the neither the sizing
is oversized nor undersized.
Kindly clarify the volume for legacy records
and future account to be opened on
daily basis. Also clarify if the bank has a
separate storage server or the same needs to
be shared by the bidder as well.
Will be Shared with
Sucessful bidder.
114
84 Terms and Conditions
Wherever Bank would like to avail the services
of manpower after first year, Bank shall
consider an increase of 4% in price every year.
Bidder should
note that while quoting total Price for
Manpower for 5 years, it should be inclusive of
the aforementioned increase of 4%
Kindly revise the same to 15% year on tear As per RFP
115
109CKYCR Related
Requirements
The Proposed solution should support for
scheduling bulk upload / download activities as
per bank’s requirement with all integrated
systems via Straight Through Processing-STP.
The customization in the proposed solution for
any such activities in future has to be done
within ATS cost only
Customization will be charged separately As per RFP
116
111Annexure X/ Functional
Specification 2
The proposed solution should be capable to
work on Virtual Cloud Model which supports
windows
2012 and above, RedHat Linux
Application is .net framework based. Will run
on windows
2012 and on Redhat Linux
As per RFP
117
111Annexure X/ Functional
Specification 5
Data capturing page of proposed solution given
for branch users should validate PAN and
Aadhaar number from NSDL and UIDAI sites
and same facilities to be available for other
OVDs in public domain as and when
they become available
system does not support UIDAI references or
APIs As per RFP
118
112Annexure X/ Functional
Specification 7
The system should be capable of capturing data
of new / legacy account of individual and legal
entities
This feature is not implemented at cersai end
and hence not a part of our system. In future
enhancements can be made as per template
of CKYCR
As per RFP
119
112Annexure X/ Functional
Specification 8
The system should check the names of
customers with the data base of Central KYC
Registry, as per bank’s requirement
CERSAI gives a feature of searching by ckyc
id, pan and aadhar and driving license
number and not by name. This feature is not
available in our system
As per RFP
120
112Annexure X/ Functional
Specification 13
The proposed should be capable of identifying
the records automatically which are to be
uploaded to CKYCR server.
The cbs file generation is manual work and
records upload is handled via automation in
our system
As per RFP
121
112Annexure X/ Functional
Specification 14
The proposed solution should be capable of
validating the Aadhaar by using banks existing
bio-metric device
Aadhaar validation is taken place during
account opening and in the account opening
application. The required is not a apart of
CKYC. Request you to remove the point
As per RFP
122
113Annexure X/ Functional
Specification 15
The Proposed solution should be capable of
mapping a new account to an existing customer
automatically using business rules configured in
the system. Such rules should be flexible and
highly parameterized in the proposed solution.
The rules can be added, changed or removed
by Bank at any point of time and in case of
customization required every time in the
solution then there will not be any cost to
Bank for this change Request
NA in our system As per RFP
123
114Annexure X/ Functional
Specification 16
The Proposed solution should be capable of
picking up unlimited address types and number
of address along with contact numbers and
email details. Address change of the customer
through this solution should be maintained in a
user friendly and readable manner with the
account linkage
As per CERSAI, currently in application you
can store 3 address types only – permanent,
corresponding and jurisdiction address As per RFP
124
114Annexure X/ Functional
Specification 18
The Proposed solution should be capable of
providing details to Bank and other monitoring
authorities for progress/pendency of the work
of screening/scrutiny of the work under
correspondence with the field functionaries
Clarification needed As per RFP
125
116Annexure X/ Functional
Specification 26
The proposed solution should be capable of
using existing scanners available at branches as
per description of CKYCR uploading
requirement
In case in future there are new scanners?
Solution should be
compatible with all the
scanners
126
116Annexure X/ Functional
Specification 33
If any value of particular field as per CKYCR
template is not available in Bank’s Core Banking
Solution, the branch user will fill the required
additional details in the proposed solution. So
the proposed application should have
sufficient data entry / upload module to accept
the gap data for a single / multiple customers at
a time
Clarification needed as we should know the
data which will be partial or full Will be Shared with
Sucessful bidder.
127
117Annexure X/ Functional
Specification 36
The Proposed solution should be capable of
downloading customer data/document based
on unique ID given by CKYCR of the
customer/legal entities without human
intervention (integrate with Bank’s in house
software / Core Banking Solution /Existing KYC
AML system as per the Bank’s requirement)
This will be provided with an additional cost
as we have API in place which can be
connected with bank’s cbs and other systems As per RFP
128
117Annexure X/ Functional
Specification 37
System should digitally sign the zip folder
before upload as per requirements of CKYCR. NA in our system As per RFP
129
117Annexure X/ Functional
Specification 39
As and when the new requirements arise from
verticals/CKYCR ,system should be capable of
providing the necessary dashboards like
probable
match ,New Customer, Notification
Management and Replicate Modification etc.
Clarification needed As per RFP
130
118Annexure X/ Functional
Specification 44
The proposed solution should be capable to
generate reports in multiple formats – PDF,
RTF, HTML, CSV and XSL/XLSX. User can
configure the columns and print settings -
header, footer etc
Work Flow of the solution will be discussed
with the bank and pre decided prior to
deployment. Any change in Workflow post
go live should be considered in Change
Request. Request you to kindly consider
As per RFP
131
118Annexure X/ Functional
Specification 45
End users should be capable of scheduling the
report generation by specifying the frequency /
timings in the proposed solution
Our development team will configure as and
when required or at the time of delivery. This
not configurable by the user
As per RFP
132
119Annexure X/ Functional
Specification 48
The proposed solution should have the ability
to delete or modify or remove the configured
workflows, if they become redundant or
obsolete as per bank’s requirement and there
should be sufficient logs for every action.
Details of the payment made to cersai is
updated in CKYC application. As Cersai A/c of
the bank for payment are not linked to the
application. Request remove.
As per RFP
133
119Annexure X/ Functional
Specification 51
The proposed solution should be capable of
storing customer data and photograph as per
bank’s requirement
It gets stored in database at bank side As per RFP
134
121Annexure X/ Functional
Specification 54
The bidder should either provide the source
code itself with necessary documentation or
arrange to keep it under escrow arrangement.
IPR is Adroit. Escrow Agreement charges will
be barred by Bank As per RFP
135
121Annexure X/ Functional
Specification 55
The application should support multiple
database platforms like Oracle, SQL Server etc.
. System supports sql server or oracle
depending on the requirement As per RFP
136
121Annexure X/ Functional
Specification 58
The Successful bidder has to provide 24/7
online support to Bank and if required the
engineer has to visit Bank’s premises to resolve
the issue
Support is required during
Banking Hours. Request you to relax the
point of 24*7
As per RFP
137
121Annexure X/ Functional
Specification 60
Bidder should provide 1 year warranty and
adequate support to Bank for 4 year without
any extra cost for al supplied software, if any
incase of such requirement from Bank for these
RFP requirements.
ATS will be charged As per RFP
138
122Annexure X/ Functional
Specification 68
During the contract period, if OEM of OS/DB
solution announces regarding the End of
Support the successful bidder has to migrate
the solution to the newer version of OS/DB
without additional cost to the Bank.
Solution shall be deployed on latest version
of OS/DB. As per RFP
139
122Annexure X/ Functional
Specification 80
There should not be any dependency on
CERSAI server for view option for CKYC ID
generated from all financial Institutions
The dependency will always be there. As per RFP
140
123Annexure X/ Functional
Specification 81
There should be a system to update already
generated CKYC ID from other institutions in
the software (application)
NA in our system As per RFP
141 123Annexure X/ Functional
Specification 82
Probable match data reconciliation should not
be time consuming and all the matches should
. It will be displayed on a separate page
within application and not in excel format As per RFP
142
123Annexure X/ Functional
Specification 86
Application software should monitor advance
payment made to CERSAI, amount getting
deducted with each CKYC ID generated and
balance amount available
Details of the payment made to cersai is
updated in CKYC application. As Cersai A/c of
the bank for payment are not linked to the
application. Request remove.
As per RFP
143
123Annexure X/ Functional
Specification 88
Option to generate record “DATE and Customer
ID wise for CKYC Download list” from CERSAI. The format is date and ckyc id wise As per RFP
144
124 Other Requirements 3The solution should support for workflow
management and configuration
Work Flow of the solution will be discussed
with the bank and pre decided prior to
deployment. Any change in Workflow post
go live should be considered in Change
Request. Request you to kindly consider
As per RFP
145
15 Cost of RFP 7
Bank will follow the guidelines issued by
Govt. of India for MSME units registered with
NSIC under single point registration scheme
Kindly clarify that Micro & Small Units
registered with MSME - Govt. of India are
exempted from submission of EMD and
Tender Fees.
As per RFP
146 67 Pre-Eligibility Criteria 4 The Bidder should submit a certificate in
support of ISO 9001:2008 compliance
(Manufacturer’s Quality Management
Standards) and ISO 27001 compliance
(information security)
We are OEM of c-KYC solution. Being product
company , ISO 9001:2008 compliance
(Manufacturer’s Quality Management
Standards) is applicable. Kindly Modify the
clause to The Bidder should submit a
certificate in support of ISO 9001:2008
compliance (Manufacturer’s Quality
Management Standards).
As per RFP
147
67 Pre-Eligibility Criteria 6
The Bidder should have experience of already
successfully implementing the proposed CKYCR
Solution in at least 2 Scheduled Commercial
Bank/RRB in India out of which 1
implementation should be working for atleast 6
months with integration in Finacle CBS.
The cKYC is a standard process defined by
regulator CERSAI and applicable to all banks
operational in India Region.” Hence modify
the clause to “ Bidder should have
experience of successfully implementing
the proposed cKYC Solution in at least 2
Scheduled Banks in India out of which 1
As per RFP
148 68 Pre-EligibilityCriteria 11All the components of the proposed solution
should be owned by Bidder or Authorized
Kindly ask Self-certification signed by
Company Secretary of OEM As per RFP
149
40 Payment Terms 53
On Successful installation and customization of
the solution,
UAT signoff and training. – 35%
Kindly change payment Term - On Successful
installation and customization of the
solution, UAT signoff and training. – 80%
As per RFP
150
13 Scope of Work 4
4.1. Upload of KYC record 4.2. Search and
Download of KYC record 4.3. Update of KYC
record
Kindly confirm, in addition to Annexure X -
Functional Specification, the bidder also
needs to respond to the requirement
mentioned in section 4
As per RFP
151
15 Bid 8 Rs 5,00,000/-(Five Lakhs)
Would request the bank to relax the Bid
security amount considering the scope of
work and would suggest limiting the Bid
security amount up to 2 Lakhs
As per RFP
152
22 Training 16
d) Bidder should provide an eLearning module
which can be integrated with Banks’ eLearning
module.
By eLearning module, kindly explain the
requirement and scope that the bank is
looking for
As per RFP
153
23 Disaster Recover y – DR 18
• To give a DR plan for the solution
proposed. The servers in the DR site will be of
the same configuration as that of the
production and it should be able to support
100% of the load, of the production CKYC
system. Also, it should be able to work in the
High availability mode.
• The solution should be capable of
automatically replicating all data from DC to DR.
Kindly clarify, the bidder shall recommend
hardware sizing on Active-Active or
ActivePassive mode
Active-Active
154
24 Technica 25 Insolvency Report from bank
Kindly confirm, is it acceptable for the bank if
the bidder submit the audited statement or a
letter issued by our Chartered Accountant as
this document are equivalent to prove the
solvency of the bidder
Insolvency Report should
be obtained from the bank
where the bidder has their
accounts.
155
24 l Bid 25
RFP including all Annexures with company
stamp & signed by authorized signatory on all
pages
Bidder also needs to sign, seal & submit the
RFP document, addendums & Annexures
floated by the bank as part of our Technical
response. Kindly confirm
AS per RFP
156
24 25
The TB must be submitted in structured
manner. No brochures, leaflets, etc. should be
submitted in loose form. Documents
comprising the Technical Proposal Envelope,
should contain following:
Bidder needs to follow the format defines in
section 20 to structure the technical
response, kindly confirm our understanding
As per RFP
157
29 Softwar e Licensing 29
Bank, in future, as and when it proposes to
implement account opening workflow through
any online mode like TAB, mobile, account
opening through KIOSK, through website etc,
software should have the capability to support
the same in future (in any mode, account will
be opened and updated in Finacle, same
process will be followed).
Kindly confirm our understanding, the bank
will be maintaining the core customer
database in finacle only or also in any of the
listed applications.
As per RFP
158
41 Termination 55
Bidder understands and seeks clarity that
termination will be limited to instances of a
material breach. Under such circumstances,
the bidder shall be paid for all goods and
services rendered until the date of
termination.
As per RFP
159
40 Delivery Period 60
The required software is to be delivered within
2 weeks from the date of the acceptance of
purchase order.
The delivery of the application is inter-
depended on multiple stakeholders like
Bank, CERSAI, the required Infrastructure,
other pre-requisites..etc, considering the
readiness of the listed sources, the bidder
shall be able to deploy the application in a 2-
week span. Kindly confirm our understanding
As per RFP
160
68 Eligibilit y criteria 7
The Bidder should have direct support office at
Mumbai and Bangalore should be able to
provide support and maintenance for the
offered solution. Documentary proof (Office
registration details etc.) to be submitted along
with the bid.
The bidder would like to understand, other
than the listed documentary proof what is
the other acceptable proof bidder can
submit to suffice this requirement and is it
acceptable for the bank if the bidder submit
a selfcertification letter on the support
location as a proof for this requirement,
kindly confirm
As per RFP
161 Page No.
67
Annexure-F Sl No. 6 The Bidder should have experience of already
successfully implementing the proposed CKYCR
Solution in at least 2 Scheduled Commercial
Bank/RRB in India out of which 1
implementation should be working for atleast 6
months with integration in Finacle CBS.
The Bidder request the Bank to kindly modify
the clause as "The Bidder should have
experience of already successfully
implementingthe proposed CKYCR Solution
in at least 2 Scheduled Commercial Bank /
RRB / Cooperative Bank in India out of which
1 implementation should be working for
atleast 6 months."
As per RFP
162 Page No.
68
Annexure-F Sl No. 7 The Bidder should have direct support office at
Mumbai and Bangalore should be able to
provide support and maintenance for the
offered solution. Documentary proof (Office
registration details etc) to be submitted along
with the bid.
We have existing support office at Mumbai.
We can setup the support office in Bangalore
with in 2 months of receipt of PO and
relevant self-declaration signed by
authorized signatory should suffice the
requirement. Kindly clarify.
As per RFP
163 - General - - The Bidder would request the Bank to kindly
clarify that the requisite Network
Connectivity between Bank's DC & DR &
Branches will be the responsibility of the
Bank.
Will be Shared with
Sucessful bidder.
164
19
Timeline and Penalty for
delay in project
implementation
12,6
In case of pendency with regard to this activity,
a penalty of Rs.500/- or penalty imposed by
CKYC whichever is higher for each application,
will be levied and recovered from the amount
payable to the SI/Bidder.
Request bank to revisit the penalty imposed
by CKYC as at present there is no penalty
structure available from CKYC
As per RFP
165
Insolvency Report from bank Please provide us the format for the same.
Insolvency Report should
be obtained from the bank
where the bidder has their
accounts.
166
74 Annexure J 7
CKYCR - ATS for 4 years after expiry of warranty
period of 1 year for RRBs and subsidiaries Total
Cost for 4 years for 3 RRBs (Unit price *12)
Bank has 5 subsidiaries we are required to
quote only for 3 RRB’s. Require clarification
on the quote
Already mentioned in the
RFP. Refer Price
Bid(Annexure -L).
167
109 Functional Specification 4
Closure of all VAPT / IS AUDIT observation for
The proposed setup &
Within Time frame stipulated by Bank without
any additional cost to the Bank
Is bank expecting any specific performance
& Security testing criterion?
SAST, DAST reports are
required for Go-Live
168
109 Functional Specification 5
Data capturing page of proposed solution given
for branch users should
Validate PAN and Aadhaar number from NSDL
and UIDAI sites and same
Facilities to be available for other OVDs in
public domain as and when they
Become available
Whether any existing Bank APIs available for
NSDL and UIDAI which could be used by
CKYCR solution?
Will be Shared with
Sucessful bidder.
169
110 Functional Specification 7
The system should be capable of capturing data
of new / legacy account of
Individual and legal entities as per template of
CKYCR
Is Legacy accounts data available as per
CERSAI guidelines?
Will be Shared with
Sucessful bidder.
170
110 Functional Specification 13
The Proposed solution should be capable of
identifying the records
Automatically which are to be uploaded to
CKYCR server
Is records to be identified from Bank's core
system?
If core system is available ,whether they
provide necessary services to fetch
data/docs? How many core systems are
available?
Will be Shared with
Sucessful bidder.
171
111 Functional Specification 16
The Proposed solution should be capable of
picking up unlimited address
types and number of address along with
contact numbers and email details.
Address change of the customer through this
solution should be maintained in
A user friendly and readable manner with the
account linkage.
What is the maximum number of addresses
which needs to be captured?
As per RFP
172
111 Functional Specification 17
The Proposed solution should be capable of
capturing any future field or
Requirement by CKYC Registry, Regulators or
Banks, from time to time.
Will these changes be raised as a Change
Request?
As per RFP
173
111 Functional Specification 22
The Proposed solution should be capable to
give SMS/email alert to respective
customer whose notification comes to the
branch. It should have a workflow
and all interaction with www.ckycindia.in or
the CKYCR system should happen
through secure FTP and SSL. Bank’s SMS and
Email Gateway details will be
disclosed separately with Successful Bidder
Please mention the significance of workflow
in notification provided to customer?
As per RFP
174
111 Functional Specification 25
The proposed solution should have ability to
integrate and pick up images from
other application such as CBS (Core Banking
Solution), DMS (Document
Management M RFP – Centralized KYC Registry
Solution (CKYCR) Private &
Confidential Page 112 System), Tablet Banking,
FI Gateway, Banking
Correspondent / and online account opening
system / Internet Banking etc.
data as per bank’s requirement.
Will bank provide API for these systems
except DMS?
As per RFP
175
112 Functional Specification 34
The Proposed solution should be capable to
identify Deduping of customer at
The time of on boarding
1. Will the Bank provide a unique identifier
for the
Customer ?
2. Is the Deduping expected based on the
Customer ID ?
Will be Shared with
Sucessful bidder.
176
115 Functional Specification 56
The licenses for the proposed application
should be enterprise wide and there
should not be any restrictions in issuing
licenses based on no. of users , no. of
branches, no. of channels integrated ,no. of
uploading /downloading
Documents or transactions or files and asset
size of the Bank etc.
Will Bank bear the cost for hardware
upgradation as increase in number of users
(beyond initial estimation) ?
As per RFP
177
116 Functional Specification 66
The Software application should integrate
previous data and history of
Previous vendor in their system/application.
Will these data be provided as per format
shared by TCS?
As per RFP
178
116 Functional Specification 71
The system must be scalable to initially for a
minimum 25000 customers per
day and going forward without any limitation to
accommodate new branches/
Offices/software’s/use and also for handling
bulk volumes of legacy data.
Can Bank provide an approximate estimation
regarding volumes and usage?
As per RFP
179
116 Functional Specification 72
The proposed CKYCR software should meet the
present/future Government/
Regulatory/CERSAI.
Will these changes be raised as a Change
Request?
As per RFP
180
117 Functional Specification 79
A path to be given in which documents are
scanned and kept at the time of
data entry for account opening, which can be
auto fetched at the time of
importing of record on to CERSAI portal.
Will bank provide document type,customer
id as per CERSAI specified format?
As per RFP
181
117 Functional Specification 80
There should not be any dependency on
CERSAI server for view option for
CKYC ID generated from all financial institutions
As of now CERSAI not providing these
services. Requesting Bank to drop this point
from RFP.
As per RFP
182
117 Functional Specification 81
There should be a system to update already
generated CKYC ID from other
Institutions in the software (application)
As of now CERSAI not providing these
services. Requesting Bank to drop this point
from RFP.
As per RFP
183
117 Functional Specification 83
There should be an intimation to us for every
update published by CERSAI
is this point talking about the transaction
level updates shared by CERSAI (RES0, RES1)
?
As per RFP