REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT PLANT AT SBI RESIDENTIAL COLONY, NERUL, NAVI MUMBAI Ref: GITC/CGM(IT-OPS)/EST/396 Dated: 02/06/2017 The Asst. General Manager (Estate) State Bank of India Ground floor, ‘C’ Wing, Plot no: 8,9,10, Global IT Centre Sector 11, CBD Belapur Navi Mumbai - 400 614

REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

REQUEST FOR PROPOSAL:

MAINTENANCE OF

SEWAGE TREATMENT PLANT

AT SBI RESIDENTIAL COLONY,

NERUL, NAVI MUMBAI

Ref: GITC/CGM(IT-OPS)/EST/396 Dated: 02/06/2017

The Asst. General Manager (Estate)

State Bank of India

Ground floor, ‘C’ Wing,

Plot no: 8,9,10, Global IT Centre

Sector – 11, CBD Belapur

Navi Mumbai - 400 614

Page 2: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 2

INDEX

PART 1 - Invitation to Bid 03

PART 2 - Disclaimer 04

PART 3 - Schedule of Events 05

PART 4 - Notice Inviting Tender 06

PART 5 - Tender conditions 08

PART 6 - Terms & Conditions of the Contract 13

PART 7 - Scope of work 17

Annexure – I BOQ : Bill of Quantities 19

Annexure – II Minor Repairs / Faults 20

Annexure – III Major Repairs / Breakdowns 20

Annexure – IV Letter of Undertaking 21

Annexure – V Basic Information of Applicant 22

Page 3: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 3

PART 1 : INVITATION TO BID

State Bank of India (hereinafter referred to as “SBI” / “The Bank”) is having its

Office at Ground Floor, ‘C’ Wing, GITC, Plot No 8, 9, 10, Sector – 11, CBD

Belapur, Navi Mumbai.

In order to provide services in operation and maintenance of Sewage Treatment

Plant on daily basis at SBI Staff Residential Colony, Nerul, Navi Mumbai, the

Bank proposes to invite Tenders from reputed and established venders

(hereinafter referred to as “Bidder” or “Contractor”) to undertake Operation and

Maintenance Contract for Sewage Treatment Plant.

The Bidding documents are to be downloaded from the Bank’s Websites

https://www.sbi.co.in and the bid is to be submitted to the office of (Name &

Address of office):

Asst. General Manager (Estate)

State Bank of India

Ground floor, ‘C’ Wing, GITC,

Plot no: 8,9 10,

Sector – 11, CBD Belapur

Navi Mumbai - 400 614

▪ Please note that all the information’s / documents desired are provided.

Incomplete information may lead to non-consideration of the proposal.

▪ Tender process shall be carried out in regular two bid system [Technical bid &

Commercial bid].

▪ All Technical Bids must be accompanied by Earnest Money Deposit (EMD) as

specified in the Bid document. Otherwise, the bid will be rejected.

▪ Bank reserves the right to change the dates mentioned in this RFP document,

which will be communicated to the bidders through the Bank’s websites

https://www.sbi.co.in link Procurement News.

▪ The information provided by the bidders in response to this RFP document will

become the property of SBI and will not be returned. SBI reserves the right to

amend, rescind or reissue this RFP and all amendments will be advised to the

bidders and such amendments will be binding on them.

Page 4: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 4

PART 2 :DISCLAIMER

The information contained in this Request for Proposal (RFP) document or

information provided subsequently to Bidder(s) or applicants whether verbally or

in documentary form by or on behalf of State Bank of India (Bank), is provided to

the Bidder(s) on the terms and conditions set out in this RFP document and all

other terms and conditions subject to which such information is provided.

This RFP is neither an agreement nor an offer and is only an invitation by Bank to

the interested parties for submission of bids. The purpose of this RFP is to

provide the Bidder(s) with information to assist the formulation of their proposals.

This RFP does not claim to contain all the information each Bidder may require.

Each Bidder should conduct its own investigations and analysis and should check

the accuracy, reliability and completeness of the information in this RFP and

where necessary obtain independent advice. Bank makes no representation or

warranty and shall incur no liability under any law, statute, rules or regulations as

to the accuracy, reliability or completeness of this RFP. Bank may in its absolute

discretion, but without being under any obligation to do so, update, amend or

supplement the information in this RFP. No contractual obligation whatsoever

shall arise from the RFP process until a formal contract is signed and executed

by duly authorized officers of the Bank with the selected Bidder.

The Bank reserves the right to accept or reject any Bid/ offer received in part or in

full, and to cancel the bidding process and reject all Bids at any time prior to

contract of award, without thereby incurring any liability to the affected Bidder or

Bidders or any obligation to inform the affected Bidder or Bidders of the grounds

for the Bank’s action. Bank reserves the right to reject any Bid on security and /

or other considerations without assigning any reason.

Bank reserves the right to cancel the entire Bidding / procurement process at any

stage without assigning any reason whatsoever.

Page 5: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 5

PART – 3 : SCHEDULE OF EVENTS

Tenders can be downloaded from

website free of cost

From 03/06/2017

Last date for requesting

clarification, if required

Up to 6:00 pm on 07/06/2017

All communications regarding points /

queries requiring clarifications shall be

given in writing to The Asst. General

Manager (Estate) at above mentioned

address

Pre-bid meeting at the above

mentioned address

From 1.00 pm to 2.00 pm on

09/06/2017

Clarifications to queries raised at

pre-bid meeting to be provided

By 12/06/2017

Last date of submission of

Technical and Commercial Bids

3.00 pm on 28/06/2017

Opening of Technical Bids 3.30 pm on 28/06/2017

Authorized representatives of vendors

may be present during opening of the

Technical Bids. However Technical

Bids would be opened even in the

absence of any or all of the vendor’s

representatives.

Address for communication and

submission of Bid.

Email :[email protected];

[email protected];

Mobile : 9764440492

[email protected]

Mobile : 9950999476

AGM (Estate) – 022-27561060

022-27577388

The Asst General Manager (Estate),

State Bank of India,

Ground Floor, ‘C’ Wing,

GITC, Plot no: 8,9,10

Sector – 11, CBD Belapur,

Navi Mumbai- 400 614

Page 6: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 6

~

PART – 4 : NOTICE INVITING TENDER

Sealed Tenders in two bid system, technical bid and price bid, are invited from

reputed, established and financially sound Contractors for “Maintenance of STP”

at SBI Staff Residential Colony, Nerul, Plot No.1 & 2, Sector – 13, Nerul (East),

Navi Mumbai – 400 706.

Issuing of Tenders to Bidders Will be available at our website free of cost:

https://www.sbi.co.in (procurement news)

Validity of Tender offers 90 days from the date of opening

Earnest Money Deposit

Rs.10000/- (Rupees Ten Thousand Only) by way of

Bank Draft or Pay Order issued by any bank other

than SBI, payable at Mumbai / Navi Mumbai in

favor of “State Bank of India, Estate Dept., Belapur”

should accompany the Tender.

➢ Tenders without EMD are liable to be

rejected.

➢ EMD of unsuccessful bidders will be

returned immediately.

➢ EMD of successful bidder will be returned

after submission of the Performance Bank

Guarantee and after Submission of Service Level

Agreement (SLA)

➢ Those having valid NSIC certificate for

exemption of EMD may submit the proof.

Security Deposit

The successful Bidder shall have to submit the

Security Deposit equivalent to 3 months contract

value within 15 days of the receipt of the work order.

The Security Deposit shall be in the form of Bank

guarantee issued by any bank other than SBI and

shall be retained by the Bank till the end of contract

period. No interest shall be payable on the Security

Deposit.

Page 7: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 7

Contract Period

Initial period of contract is one year. After the initial

period of one year of contract, it may be renewed on

the same terms and conditions for a further period of

one year upto the changed amount of minimum

labour wages, at the discretion of the Bank

Page 8: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 8

Part – 5 : TENDER CONDITIONS

5.1 INTRODUCTION

Brief Scope of Work :

5.1.1 Providing round the clock service to operate the Sewage Treatment

Plant (STP) by providing 3 (Three) Semi-skilled operators in 3

(Three) shifts. The STP comprises of mechanical equipments and

pipelines and electrical installations. Details of equipments are as

under : Raw sewage transfer pump, sludge recycle pump, PSF feed

and backwash pump, Bucket screen, Surface aerator, Pressure

sand filter, ultra violet console, Level control switches,

interconnecting pipe lines & valves etc., Electrical work including

MCC/ Starters / Push buttons, Cables, Earthing etc for above

equipments with oiling, greasing, glands etc complete.

5.1.2 Arrange for testing of treated water from the reputed Laboratory

every month and charges to be borne by contractor. Testing report

should contain following parameters-

Sr. No Test Parameter

1 PH

2 Total Suspended Solids

3 Dissolved Oxygen

4 Chemical Oxygen Demand

5 BOD 3 days 27 degree Centigrade

6 Oil & Grease

In addition to these Test parameters, report on other additional

parameters may be required as per government guidelines/

statutory instructions from time to time.

5.1.3 Arrange for repair of equipments / pipes / electrical installations etc.

The cost inclusive of materials and labour will be reimbursed as per

prior approval from the Bank.

Area of Work:

Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector –

13, Nerul (East), Navi Mumbai – 400 706.

The Bidder should visit the premises to get a brief knowledge about the

area and nature of various works.

Page 9: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 9

5.2 ELIGIBILITY CRITERIA

5.2.1 This is a open tender and bids will be accepted from vendors agreeable to

provide the services as mentioned in para 5.1 above.

5.2.2 The Bidder should have a minimum 5 years of experience as STP

Operator or the agencies involved in managing and setting up of STP or

experience in maintenance of STP / plumbing as on 01-04-2017 in the

field of maintenance. The bidder should furnish previous work orders /

Satisfactory Completion certificates for establishing the experience which

should include the work of maintenance. Bidder having experience in the

field of maintenance will be preferred.

5.2.3 Average turnover for last three year should be minimum of Rs. 3 lacs (as

on 31-03-2016). Audited / certified Balance sheets (by Chartered

Accountant) of last three years are to be enclosed as proof.

5.2.4 The minimum value of maintenance contract in Commercial / Residential

buildings during the last 5 years, should be –

Atleast One single contract of Rs.8 lacs in the last 5 years

(or)

Atleast Two contracts of Rs.5 lacs in the last 5 years

(or)

Atleast Three contracts of Rs.4 lacs in the last 5 years

5.2.5 Contractor should be based at Mumbai / Navi Mumbai or Thane districts or

atleast should have a branch office.

5.2.6 The contractor should have all mandatory registrations – PAN, Service

Tax, EPF, ESIC, extant labour laws etc

5.3 BIDDING DOCUMENTS

Bid documents need to be submitted in 2 separate envelopes super

scribed Technical Bid / Commercial Bid for “Maintenance Contract for

STP” at SBI – Staff Colony, Nerul”, sealed & coupled together as per the

procedure narrated below. The tenders should be dropped in the Tender

Box located at the given address. Bidders may also submit the Tender by

post so as to reach at Estate Dept. on or before scheduled date and time.

Bank shall not be responsible for any postal delay. Each paper of Tender

documents should be stamped & signed by the authorized official of the

company with a seal of the company.

Page 10: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 10

5.3.1 First envelope (Technical Bid) should contain:

Self-attested photocopies of the following documents serially numbered

and stamped and signed on each page. Bids with conditions and non

submission of the required documents will be rejected which please

note.

1. Pay Order/Banker’s cheque / Bank Draft for ‘Earnest Money

Deposit’ (EMD) valid for 90 days.

2. Basic Information of the Applicant

3. Letter of Undertaking

4. Proof that the contractor is based at Mumbai / Navi Mumbai or

Thane districts or atleast has a branch office.

5. Service Tax Registration.

6. E.S.I.C. Registration or workmen's compensation policy

7. PAN card

8. Audited Balance Sheet for the years 2013-2014, 2014-2015,

and 2015-2016, establishing the turnover criteria.

9. Satisfactory Completion Certificate or Purchase Order/ LOI as

Documentary evidence for value of relevant executed

Maintenance contracts in commercial / residential buildings

during the last 7 years, mentioning the period of contract, value

of the contract in Rupees & contact details of that Organisation.

10. List of skilled / semi skilled workmen employed for Operation of

STP with name, skill set & years of experience.

The Technical Proposal should NOT contain any price information. Such

proposal, if received, will be rejected.

Note: Original documents need not be submitted with the bid offer. However, the

bidder should provide the original documents at the time of verification by the

Bank. Bank may seek additional documents / information, if required, for

ascertaining the eligibility of the Bidder.

5.3.2 After scrutinizing the Technical Bid parameters, Bidders who qualify will be

shortlisted. Bidders who fulfil the requirements of Technical Bid will

only qualify for opening of 2nd Envelope i.e. Commercial Bid.

5.3.3 Second envelope (Commercial Bid) should contain "Bill of Quantities"

specifying their price. The price quoted should contain a single sheet as

per Annexure - BOQ on the Bidder’s letter head wherein the Base Price is

only to be mentioned under the signature and seal of the Bidder,

Service Taxes, (or other similar Tax imposed by the Government in

lieu of Service Tax).

Page 11: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 11

Note: Base Price should include minimum wages, EPF, ESIC, Bonus,

Escalation on account of increase in minimum wages during the

contract period of initial one year, include Profit, lump sum payment

towards the cost such as Insurance, PPE (personal protective

equipment), tools required, etc.

5.4 Documents constituting the Bid

The Bidder is expected to examine all instructions, forms, terms and

specifications in the Bidding Document. Failure to furnish all information

required in the Bidding Document or to submit a Bid not substantially

responsive to the Bidding Document in every respect will be at the

Bidder’s risk and may result in the rejection of the bid at the discretion of

the Bank.

5.5 Clarification / Amendment of Bidding Document

5.5.1 Bidder requiring any clarification of the Bidding Document may notify the

Bank in writing at the address or by e-mail indicated as per time and date

mentioned in Schedule of Events (Part 3).

5.5.2 A pre-bid meeting is scheduled as per time and date mentioned in

Schedule of Events (Part 3).

5.5.3 Text of queries raised (without identifying source of query) and response of

the Bank together with amendment to the bidding document, if any, will be

notified on Bank’s website. No individual clarification will be sent to the

bidders. It is the responsibility of the bidder to check the website before

final submission of bids.

5.5.4 Relaxation in any of the terms contained in the Bid, in general, will not be

permitted, but if granted, the same will be notified on Bank’s Website.

5.5.5 All bidders must ensure that such clarifications / amendments have been

considered by them before submitting the bid. Bank will not take

responsibility for any omissions by bidder.

5.5.6 At any time prior to the deadline for submission of Bids, the Bank, for any

reason, whether, at its own initiative or in response to a clarification

requested by a prospective Bidder, may modify the Bidding Document, by

amendment.

5.5.7 In order to enable bidders reasonable time in which to take amendments

into account in preparing the bids, the Bank, at its discretion, may extend

the deadline for submission of bids.

Page 12: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 12

5.6 The EMD may be forfeited :

a. If a Bidder withdraws or amends its bid during the period of Bid validity

specified herein; or

b. If a Bidder makes any statement or encloses any form which turns out

to be false/incorrect at any time prior to signing of contract; or

c. In case of a successful Bidder, if the Bidder fails:

(i) To sign the contract with the Bank within a period of 30 days; or

(ii) To furnish Security / Performance Guarantee to the Banks.

5.7 OTHER CONDITIONS:

5.7.1 Successful Bidder will have to enter into an agreement with the Bank. The

format of the agreement shall be designed drafted based on the Terms &

Conditions / Clauses mentioned in this RFP document. However, Bank

reserves the right to add / delete any other Clauses in this Agreement.

The successful Bidder should forward a letter specifically indicating the

names of their personnel who will be providing services. Along with the

letter, the following data should also be provided:-

b. The Contractor has to submit the Bio-data & Experience certificate for all

their personnel who will be providing services in this contract.

Bank reserves the right to reject any persons to be employed by the

Contractor at the discretion of the Bank. Once the contract is awarded, if

they wish to change any of the above personnel, the maintenance

contractor will inform the Bank in writing and obtain the Bank’s prior

approval, one week in advance. After the contract is awarded, the

Contractor will carry out the work without raising any preconditions

regarding the functioning of Sewage Treatment Plant. Irrespective of

existing condition of the equipment, circuits, cables, plumbing lines, etc.,

the Contractor should carry out all maintenance / rectification works that

are necessary to make the system fully operational.

5.7.2 Decision of Bank in regard to interpretation of the Tender Conditions,

Terms & Conditions, Scope of Work, Agreement, Payment terms, etc. shall

be final and binding on the Contractor. In case of any dispute between the

Contractor and the Bank, the Bank shall have the right to decide. However

all matters of jurisdiction shall be subjected to courts in Mumbai.

5.7.3 Bank reserves its right to reject any or all the Tenders / bids without

assigning any reasons therefore and the Bank’s decision shall be final and

binding.

5.7.4 No deviation of any kind will be allowed in Tender conditions, Scope of

work, Terms & Conditions, Payment Terms, etc. after the tendering

process are over.

Page 13: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 13

PART – 6 : TERMS & CONDITIONS OF THE CONTRACT

6.1 MANPOWER, WAGES, ETC.

▪ The Contractor should ensure to comply with all the provisions of Labour

Act / State / Central Govt. agreed procedures. The Contractor shall be

solely responsible for compliance to provisions of Various labour and

industrial laws and all statutory obligations such as minimum wages as per

Central Govt. rules ,allowances, compensations, EPF, Bonus, gratuity,

ESIC, etc. relating to workers provided to the Bank. The Bank shall have

no liability in this regard.

▪ The Contractor shall ensure to get the Police verification for all the

manpower deployed by them and the contractor should ensure that

the manpower deputed should bear good moral character.

▪ All personnel provided by the Contractor will be on the payrolls of the

Contractor / Company and there will be no Employee and Employer

relationship between the personnel engaged by the Contractor and the

Bank.

▪ That the Contractor will not sub-contract or permit any other person to

perform any of the work or services agreed to without prior permission

from the Bank.

▪ The Contractor shall ensure the availability of a reliever for weekly off and

a substitute is provided if a person is absent. The Contractor should

arrange for replacing his workmen to give weekly off to his workmen as

per the labour rules.

▪ Contractor’s personnel or their family members shall not be allowed to stay

/ reside at site.

▪ The operator should be well mannered and properly behaved.

6.2 SAFETY, SECURITY, ETC.

That the Bank shall not be liable for any compensation in case of any fatal injury /

death caused to any of the Contractor’s employees while performing /

discharging their duties or otherwise. The contractor shall alone be fully

responsible for safety and security & insurance or life insurance of their personnel

who is working on the operation and maintenance works.

▪ In no case, safety norms shall be violated. Even in case of urgency, when

temporary rectification is done, etc. no such compromise is allowed as

regards to safety provisions.

▪ The Contractor agrees that its personnel shall comply with security

regulations in effect from time to time at Bank's Residential Colony and

externally for materials belonging to SBI at all times. The Contractor alone

Page 14: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 14

shall be fully responsible for safety and security & insurance or life

insurance of their personnel who are working at site.

▪ The Contractor should issue a valid Company Identity cards to all their

staff personnel who will be providing services under this contract.

▪ The personnel of contractor shall report to the Security Reception of M1

Tower in-gate while entering & exiting the premises. All personnel of

Contractor will be subjected to a thorough physical checking while coming

and leaving the colony. Those persons so deputed will sign in the Register

for arrival and departure at the site.

6.3 PAYMENT TERMS

▪ Payment of AMC shall be made post monthly basis after effecting

necessary deductions like TDS, penalty for shortcomings etc.

▪ Proof of ESIC and EPF contribution made by the contractor to their

employees shall be submitted along with the monthly bills.

▪ There would be no increase in rates payable to the Contractor during the

Contract period. In-case of renewal after the initial contract period the

minimum wages component only will be revised considering the

changes in the Central Govt. minimum wages, if any. For eg. If there

is a variation of 5% in the labour wages at the time of renewal from

the wages prevailing at the time of tender finalisation, only the labour

wages will be considered proportionately.

▪ Payment of wages to all the workers engaged by the contractor should be

through an Account maintained with any Scheduled Commercial Bank.

6.4 SPARES

▪ Cost of spares required for routine maintenance of STP like gland packing,

star wicers etc. shall be borne by Bank. However, monthly demand of

materials has to be projected by the Contractor to Caretaker Office.

▪ In case of any materials are not available in the stock for preventive /

breakdown maintenance, the Contractor should immediately arrange for

purchase of the materials from the market after obtaining approval from

Bank. The cost of such material purchased by the contractor shall be

borne by the Bank as per the terms stated below.

Only handling charges which include transportation cost shall be paid by

the Bank over and above the actual material cost. Handling Charges shall

be a maximum of 10% of the value of material purchased as per bills

submitted by the contractor. Any taxes payable on such handling charges

claimed by the contractor shall be borne by the Contractor himself. All

purchase bills of the materials supplied by the contractor should be in the

Page 15: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 15

name of ‘State Bank of India, Belapur’. Bank reserves the right to verify the

reasonableness of the prices.

▪ All necessary components required for the breakdown maintenance of all

equipment shall be arranged by the Contractor at the market rate and

same shall be reimbursed by Bank as stated above, along with

acknowledgement of having done the work from Caretaker.

6.5 DELAY IN WORKS & PENALTY

▪ If any of the preventive / breakdown maintenance are not carried out by

the Contractor in time or absenteeism of their workmen or non-

performance of duties, Bank will arrange to carry out this work through any

other contractor at their will and deduct the expenses (decided by the

Bank) from the AMC bill.

▪ In case of absenteeism of the contractor workmen, the proportionate

amount shall be deducted in the monthly AMC bill.

▪ If the Contractor does not fulfil the minimum requirement of the

manpower, then the labour charges as per the Central Wages

prevailing at that time shall be deducted from the monthly AMC bill. If

the contractor fails to fill the vacancies on account of attrition of

labour within one month, then double the labour charges shall be

deducted.

▪ While executing the maintenance / breakdown works, Contractor has to

take necessary precautions to avoid any damage to Bank’s property. In

case of any property damage, the Contractor has to repair/replace the

same at no extra payment. If the Contractor fails to repair/replace, then the

same work shall be carried out through other agency and the expenditure

incurred shall be debited from the AMC amount payable to the Contractor.

DESCRIPTION PENALTY

AMOUNT

All minor repairs/faults, complaints, etc. as per Annexure-II

need to be addressed and rectified within 6 hrs. In-case of non-

compliance of timelines, the Bank shall impose penalty of

500/-

per case

per day

All major repairs/faults as per Annexure-III need to be

responded by the Contractor personnel within 2 hrs and

necessary rectification has to be carried out within 12 hours * .

In-case of non-compliance of timelines, the Bank shall impose

penalty of

2500/-

per case

per day

Page 16: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 16

Any irregularities, unsafe practices, etc. noticed / informed by

the Bank should be rectified by the Contractor within 24 hrs

from the time of intimation. If the contractor fails to do so, the

Bank shall impose a penalty of

2000/-

per case

Sewage Treatment Plant: The Contractor shall ensure that

breakdown of all electrical equipment & panels are attended

within 6 hrs from lodging of the complaint. If the contractor fails

to do so, the Bank shall impose a penalty of

2000/-

per case

per day

* If the estimated time is more than 12 hrs then the Contractor has to provide

alternate solution within 06 hrs. However, the complete rectifications have to be

completed within 24 hours.

6.6 TERMINATION OF THE CONTRACT

The Bank reserves the right to terminate the agreement in case of breach of

any terms and conditions of this agreement by the Contractor, with 24 hours

notice. The Bank also reserves its right, to claim damages for such

breaches and the decision of the bank in this regard shall be final. Bank

can terminate the agreement if the services provided by the Contractor are

found to be dis-satisfactory. Either party can terminate the agreement by

giving 90 days notice in writing to the other. Bank will automatically

terminate the contract if the penalty is imposed or recurrence of the

deficiencies in services.

6.7 FORCE MAJEURE

Neither party shall be liable for delay in performing obligations if the delay or

failure is due to any of the following force majeure i.e. Act of God or any

Government Act, fire, earthquake, explosion, strikes/ Bandh, civil commotion or

anything beyond the control of either party. The party shall use all reasonable

endeavours to minimize any such delay.

6.8 BUSINESS TERMINATION

In the event that the contractor shall close conducting business in the

normal course or wind up, make a general assignment for the benefit of

creditors, suffer or permit the appointment of a receiver for its business or

shall avail itself or become subject to any proceeding under any Act or

statute of any country or state relating to insolvency or protection of rights

of creditors, then (at the option of the Bank notwithstanding clause 1.0 of

the agreement) this agreement shall terminate and be of no further force

and effect and any property or rights of such other party tangible or

intangible shall forthwith be returned to it.

Page 17: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 17

6.9 If the Bank does not avail of certain service(s) mentioned in the Scope of

work, then the Bank shall not pay for that/those service(s). The Bank shall

have the right, during performance of the maintenance contract to change

the scope of the maintenance contract.

6.10 The Contractor must provide one common mobile phone with active

connection for the use of maintenance personnel to enable the Bank’s

personnel to communicate with them. No additional charges shall be paid

for provision of mobile phone and monthly bills. The maintenance

personnel should be able to communicate in local language & Hindi

PART – 7 : SCOPE OF WORK

7.1.1 The Contractor shall carry out all repairs and maintenance services as

agreed to with the help of semi-skilled persons who are totally familiar with

the work they are required to perform like operation of motors /

Instruments, timely greecing of machine parts and lubrication of Motors /

Instruments with Oil, Timely replacement of wicers etc and submission of

water testing report on monthly basis.

7.1.2 Manpower is to be deployed as mentioned in para 7.1.1 on all the days of

the year (including Holidays and Sundays) for 24 hours (comprising of

three shifts) for daily preventive / breakdown maintenance of STP. The

Contractor personnel should be available in the premises throughout the

entire working hours. However, if the maintenance contractor feels that

more expertise is required to carry out the above work, they may deploy

additional experts at their discretion. Bank will not pay any additional

amount for the additional manpower. However, in-case of major

breakdown Bank may consider reimbursing the cost of the manpower on

case to case basis. The Contractor shall also carry out the repairs /

maintenance on holidays as well as on Sundays.

7.1.3 The STP operators should be present as per below chart on all the working

days, including Sundays and Bank holidays, etc.

Manpower in Shift wise Operation Total Manpower

01 nos. in 1st, 2nd and 3rd shift on all days 3 nos.

7.1.4 The Contractor shall maintain the STP to keep them in working condition,

every day.

7.1.5 The Contractor personnel shall maintain the complaint registers,

preventive/breakdown maintenance registers, etc. After completion of

Page 18: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 18

every preventive (Routine) maintenance work as per the frequency, a

report may be submitted to the competent authority of Bank.

7.1.6 The scope of work covers the maintenance of complete STP including

maintenance/repairs of all other equipment not covered here but forms a

part of the STP.

7.1.7 The Contractor’s personnel shall work in close co-ordination with colony

caretaker and Bank employees and also while dealing with the Bank’s

employee the contractor’s personnel shall be courteous.

7.1.8 The contractor personnel shall take all pre-monsoon and other seasonal

precautions, to protect the STP. In case of any expenditure towards

purchase of materials in carrying such precautions, the Bank shall be

consulted beforehand.

7.1.9 The Contractor workmen are required to perform the duties without waiting

for specific directions/intimations from the Bank. The contractor shall also

provide repairs and maintenance service in response to oral including

telephonic notice by the Bank whenever necessary. No supervision will be

provided by the Bank for any works. The Contractor is solely responsible

to ensure that no accident / damages occur to the installations / personnel

during the maintenance work.

7.1.10 All debris resulted out of performing the work has to be removed out of

Bank’s premises and disposed as directed by CIDCO/NMMC authorities

immediately after completion of the job. No bills will be considered before

such site clearance. If any repair is carried out, the waste created during

such repairs shall be immediately removed out of site by the contractor.

7.1.11 Quarterly cleaning of All the Tanks and immediate disposal of waste as

per NMMC/CIDCO norms.

NOTE: All the above mentioned scope of works is indicative and not exhaustive.

Bank reserves the right to add / delete any work under the scope of work.

However, the Contractor has to ensure smooth and safe working of all the

equipment in the system.

Page 19: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 19

Annexure – I

BOQ : BILL OF QUANTITIES

Particulars BASE PRICE **

[Excluding S. Tax]

Annual Cost of Manpower Requirement [3 semi skilled

workers working in 3 (three) shifts] along with all cost and

expenses.

** The prices quoted are inclusive of minimum wages (Central Govt.),

EPF, ESIC, Bonus, and all other statutory dues including escalation

on account of increase in minimum wages during the contract

period of initial one year, including profit, lump sum payment

towards the cost such as Insurance, personal protective equipment,

tools required, Uniform to workers, Water testing charges, material

cost, Quarterly cleaning of All the Tanks, etc and all items mentioned

in this RFP documents. Service tax (or such other tax, if

implemented, in place of service tax) will be paid extra and on actual

basis. It will be the sole responsibility of the bidder to bid, after

considering all the expenses, costs and statutory dues towards

workers, suppliers or any third party, including government

authorities. The price would be net payable charges by the Bank

(other than Service tax) (or other similar Tax imposed by the

Government in lieu of Service Tax).

Page 20: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 20

ANNEXURE – II

MINOR REPAIRS / FAULTS (ILLUSTRATIVE)

1. Repairs of pump, Motor bearing, Starters, Electrical Switches, pipelines

(with STP) & resolving the same.

2. Replacement of gland packing, wicers, nut bolts due to wear & tear on

regular and preventive basis. Regular / preventive cleaning of pipelines to

prevent chocking.

3. Quarterly cleaning of All the Tanks and immediate disposal of waste as

per NMMC/CIDCO norms.

ANNEXURE – III

MAJOR REPAIRS / BREAKDOWNS

1. Replacement of foot valve and repairs of electrical motors in case of

breakdown.

Note: The above mentioned lists of minor / major repairs are illustrative and any

other repairs which are not specified in the lists shall be analysed on case to case

basis, at the discretion of the Bank.

Page 21: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 21

Annexure - IV

LETTER OF UNDERTAKING

(Letter of Undertaking has to be in the Company letter head, duly signed & stamped by the authorized signatory) To Assistant General Manager (Estate) State Bank of India Ist floor, GITC, Plot no: 8,9 10, Sector – 11, CBD Belapur Navi Mumbai - 400 614 RFP :MAINTENANCE OF SEWAGE TREATMENT PLANT AT SBI RESIDENTIAL COLONY, NERUL, NAVI MUMBAI We hereby state that we unconditionally accept all the terms and conditions of the contract, tender conditions, payment terms, scope of work as mentioned in the Tender document I/ We submit all the Certificates and documents as mentioned in the Checklist of the Eligibility Criteria and General Conditions for Empanelment. I / We declare that the information and documents submittedby us are true to the best of our knowledge. I / we also understand that if any of the information is found incorrect / incomplete, I/ we am / are liable to be disqualified. I/ We l agree and authorize the Bank to obtain the confidential report from our clients and to verify the work executed by us. I/ We confirm that all the Rules prevailing in the state, the Labour Laws, Risk Insurance obligations, State & Central Govt. statutory requirements are complied by us. We understand that State Bank of India reserves the right to accept or reject any or all bids without assigning any reason whatsoever thereof. Dated this _____day of _____________2017. Yours faithfully, (Signature of the Bidder with stamp) authorized to sign Proposal for and on behalf of

Page 22: REQUEST FOR PROPOSAL: MAINTENANCE OF SEWAGE TREATMENT ... · Sewage Treatment Plant, SBI Staff Residential Colony, Plot No.1 & 2, Sector – 13, Nerul (East), Navi Mumbai – 400

RFP : Maintenance of STP at SBI Colony, Nerul

Page | 22

Annexure-V

Basic Information of the Applicant

1 Name of the applicant/ Organisation:

2 Address of the office in Mumbai or Navi Mumbai or Thane Districts:

3 Cell no:

Telephone No:

Fax no:

E mail address:

4 Name of the Proprietor/Partners/Directors of the organisation

5 Income Tax PAN No.

6 Service tax No.

7 EPF /ESIC Registration No.

Signature of the applicant