City of Saint John
Request for Proposal 2021-091003P
ENGINEERING SERVICES: "LAKEWOOD HEIGHTS AREA – INFLOW AND INFILTRATION STUDY"
SAINT JOHN, NB
Sealed proposals, hand delivered or couriered, addressed to Monic MacVicar, CCLP, CPPB, Procurement Specialist, 1st Floor, Municipal Operations Complex, 175 Rothesay Avenue, Saint John, N.B., E2J 2B4, and marked on the envelope:
"PROPOSAL 2021-091003P
LAKEWOOD HEIGHTS AREA – INFLOW AND INFILTRATION STUDY"
will be received until 4:00 p.m. Local Time, Thursday, April 15, 2021, for Engineering Services for the above noted project, as per the Request for Proposal.
Proposals will be opened in the office of the Manager of Supply Chain Management, 1st Floor, Municipal Operations Complex, 175 Rothesay Avenue, immediately following the proposal submission deadline.
The lowest cost or any proposal not necessarily accepted. Proposals will NOT be opened publicly due to the on-going pandemic. Monic MacVicar, CCLP, CPPB Procurement Specialist Supply Chain Management
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 2 of 19
SCOPE OF WORK for Proposal 2021-091003P
Lakewood Heights Area - Inflow and Infiltration Study
1. GENERAL: The City has prepared this document for Consulting Engineering firms wishing to provide their services to the City of Saint John. This request for proposals is to be used as a guide, in combination with good engineering judgment and standard engineering practices and is not intended to be a complete procedural document. It reflects basic standards the consultant is to adhere to when preparing a proposal or carrying out work for the City. All Engineers working on this project for the City must be a current member, licensee or holder of a certificate of authorization with APEGNB. All Engineering companies working on this project for the City must have a current certificate of authorization with APEGNB. The consultant shall in all matters act as a faithful advisor to the City. The consultant shall keep the City informed on all matters related to design and all other important aspects forming part of the scope of work. The consultant must aggressively and proactively manage the project in the best interest of the City of Saint John. The consultant will oversee and manage the entire project on behalf of Utilities & Infrastructure Services. The proposal shall clearly explain the anticipated structure of project management during each phase. The consultant shall be aware of and follow any orders, policies, directives, standards and guidelines issued by any governmental authority, governing all or any part of the work under this RFP.
2. PROJECT DESCRIPTION: The overall project involves the study of the sanitary system that feeds the Hickey Road Sanitary Lift Station, including but not limited to all tributary sanitary systems. See the drawings in Appendix A which shows the study limits. The purpose of the Lakewood Heights Area - Inflow and Infiltration Study is to investigate and identify all sources of inflow and infiltration into the sanitary sewer systems in Lakewood Heights and adjacent subdivisions that drain into the Hickey Road Sanitary Lift Station. The study shall identify and prioritize all minor and major remedial measures required for the system, as well as determine and comment on the capacity of the sanitary system based on existing and future levels of development, evaluate rehabilitation options of the sewer system, including cost estimates, and make recommendations on the preferred option(s). The City of Saint John will plan improvements to the system based on the recommendations provided by the Consultant therefore the recommendations must be actionable items. Also, the Consultant shall re-calibrate the City's existing sewer model (using Bentley SewerGEMS) based on the findings from the study as well as determine the capacity gained in the sanitary system upon the completion of each remedial measure.
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 3 of 19
3. PROFESSIONAL SERVICES REQUIRED: The Consultant will oversee and manage the entire project. The proposal of work shall clearly explain the anticipated structure of the project management and technical services provided during each phase of the project. 3.1 Project Start-Up Meeting Following award of the project, the Consultant and City of Saint John will have a start-up meeting to outline the proposed schedule and deliverables. 3.2 Review Existing Documentation The Consultant will undertake a review of the history and development of the area and the contributing sewer sheds. This review should include but not be limited to the following: current sewer videos, lift stations, sanitary sewers, combined sewers, overflows, diameter, length and slopes of pipe and sewer modelling (using Bentley SewerGEMS). 3.3 Field Investigation
The inflow/infiltration study and flow monitoring involve a large degree of thorough and comprehensive field investigation. These field investigations often affect each other (example smoke testing and manhole inspection), which can affect the overall project efficiency. The proposal shall clearly state the order of the field investigations and the schedule and duration for each component. It may be impossible to complete the field work as a result of weather, or there may be advantages to conducting investigations during wet or dry weather periods. Therefore, the Consultant shall identify in the proposal the schedule of work for each stage of the project. The schedule should emphasize the work to be performed in the field and the ideal field conditions to perform the investigations. The work schedule shall be agreed upon with the City Engineer. Some sanitary sewers within the project zone have been videoed during the past few years (as outlined on the drawings in Appendix A). Any additional sewer video work required for this project shall be completed by the Consultant and shall be paid as per the unit prices provided in the proposal. The successful Consultant shall review all sewer videos, including those videos already done and any additional videos to be completed by the Consultant, as part of the review of existing documentation for this project.
3.4 Health and Safety Sewers contain harmful gases, bacteria, micro-organisms, high humidity, odour and insufficient oxygen supply. Health and safety are extremely important and must not be compromised when performing work around sewers. When working on a project for the City of Saint John all parts of the Health and Safety Act must be followed. The Consultant must be aware of Part XVII of the Health and Safety Act giving the requirements to be met when working in areas deemed to be a confined space. Any person entering a confined space must be aware of the regulations and be trained in health and safety requirements for confined space entry. As stated in the National Guide to Sustainable Municipal Infrastructure, the Consultant shall take all necessary preventive measures when dealing with raw sewerage. The Consultant team shall demonstrate qualifications and proven experience for personnel required to work around raw sewage (Hepatitis A and B, and Tetanus as a minimum).
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 4 of 19
3.5 Reports (After Award)
The Consultant shall provide six copies of the draft report and six copies of the final report. The final report, which includes all text, drawings, maps and sketches, shall also be made available in electronic form. INFLOW/INFILTRATION STUDY
This study includes smoke testing, manhole inspection, video inspection (as required) and flow monitoring for the sanitary sewer sheds contributing to the Hickey Road Sanitary Lift Station. Some video inspection of this area has been previously completed and those results shall be considered and incorporated into the report produced for this study.
SMOKE TESTING
Method of Work
• Consultant shall furnish all materials, equipment, labor, traffic control, supervision, and
perform all work necessary for smoke testing as required. • If dye testing is required, it shall be performed by the consultant and is incidental to the
required work. • The proposal shall be based on 25,865 lineal meters of sewer main smoke testing.
Staff Qualifications
• Interested Consultants shall include with their submissions qualifications of all staff involved
in the smoke testing. These qualifications should indicate that the key personnel have related experience, training and inoculations for the performance of this task. The Consultant team shall demonstrate qualifications, proven experience, and inoculations for personnel required to work around raw sewage (Hepatitis A and B, and tetanus as a minimum).
Final Reporting/Deliverables
• The findings of the smoke testing program should be documented in a tabular format and a
graphical format using a CAD-based system drawing. Hard copy drawings as well as an electronic version should be provided to the City of Saint John within the final report.
MANHOLE INSPECTIONS
Method of Work
• Consultant shall furnish all materials, equipment, labour, traffic control, supervision and perform all work necessary for manhole inspection as required.
• The proposal shall be based on 430 manhole inspections. • The Consultant shall use the City’s existing structure identification numbering when
reporting on structures.
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 5 of 19
Staff Qualifications
• Interested Consultants shall include with their submissions qualifications of all staff
involved in the manhole inspections. These qualifications should indicate that the key personnel have related experience, training and inoculations for the performance of these tasks. The Consultant team shall demonstrate qualifications, proven experience and inoculations for personnel required to work around raw sewage (Hepatitis A and B, and tetanus as a minimum).
Coordination
• Project coordination meetings with City of Saint John staff and the Consultant's representatives are to be held on an as-required basis. The Consultant's representative(s) at all coordination meetings shall be an experienced individual familiar with all aspects of manhole inspections and up-to-date on all field related activities.
Scope of Work for Manhole Inspection
• The manhole inspection should be performed during wet conditions and a high
groundwater table. • A detailed assessment should be made of both the structural and the hydraulic state-of-
repair of each manhole and specific deficiencies should be noted. • Presence of sediments in manholes and traces of surcharge in manholes should be noted. • All infiltration should be identified (at benching, risers, laterals and cover) • Survey field work shall include opening all chamber and manhole lids, and taking all
necessary invert elevations, survey shots, measurements and photos as required to collect all pertinent information such as pipe material and diameter.
Final Reporting/ Deliverables
• The results from the manhole study should be presented in both tabular format as well as graphical format. Hard copy drawings as well as an electronic version should be provided to the City of Saint John within the final report.
VIDEO INSPECTION
Sewer videos have been completed as per the drawings in Appendix A. Additional video inspections may be required to fully assess the extent and sources of inflow and infiltration. The Consultant will provide video work under the unit price for video inspection. The Consultant will be required to be available the day the video inspection is performed to ensure the video inspection is being performed correctly so the required information is being collected. Scope of Work
• The proposal shall be based on 17,600 lineal meters of sanitary sewer video inspection. • If the sewers cannot be videoed due to debris or protruding laterals, the Consultant shall
provide drawings to the City's Engineer identifying the problem and the location. The City will determine at that time if the City will be able to complete the necessary sewer flushing and/or root/lateral cutting or if the flushing and/or root/lateral cutting will be completed by the Consultant under the unit price provided.
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 6 of 19
• All CCTV work shall be done in accordance with the City of Saint John General Specifications. The CCTV work shall conform to the current National Association of Sewer Service Companies (NASSCO) - Pipeline Assessment Certification Program (PACP) standards. The camera operator shall be a PACP certified operator.
• Investigate existing infrastructure by reviewing all digital and paper records available from the City.
• Review Service Cards and compare the service laterals to the information from the sewer videos.
• The Consultant shall be responsible for coordinating and paying for any outstanding video inspections.
• The Consultant is required to be available the day the video inspection is performed to ensure that the video inspection is being performed correctly and the required information is being collected.
Final Reporting/ Deliverables
• The CCTV work shall be presented in the format as outlined in the City of Saint John General Specifications.
• The results from the video inspection undertaken by the Consultant and the video inspection previously completed by the City should be presented in both tabular format as well as graphical format. Hard copy drawings as well as an electronic version and any additional videos should be provided to the City of Saint John within the final report package (i.e. complete videos)
• The pipe report must summarize the condition of the existing pipe work based on the consultant’s review of the videos and should contain full size plans showing all existing infrastructure, including the known sewer service laterals and the location and nature of each deficiency noted in the report. All pipes to be clearly labeled with their size and material. The Consultant shall include a cover letter explaining the process and the results based on their thorough review of the videos. The letter should detail anything special of note (ie joints leaking groundwater into pipe) for the different video sites. This report may be combined with the manhole inspection report as long as clarity can be maintained.
FLOW MONITORING
Scope of Work The Consultant will be required to undertake, but not be limited to, the following tasks, in order to fully achieve the City of Saint John flow monitoring objectives.
• Study and investigate project area (sewer shed), • Review existing information (mapping, pump run times, maintenance reports, etc.) • Determine appropriate locations for flow monitoring to occur, • Provide flow monitoring locations to the City so the City can get the sewer lines
around the proposed locations flushed prior to installation, using either City forces or the unit rate for sewer flushing provided by the Consultant,
• Provide, install and calibrate flow monitoring devices, • Provide, install and calibrate rain gauge device, • Maintain correct operation of flow monitoring and rain gauge devices, • Retrieve data on a regular basis (including preliminary interpretation of data as
general QA/QC), • Remove flow monitoring and rain gauge devices,
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 7 of 19
• Analyze data, • Report, • Calibrate existing sanitary sewer and storm water model based on flow meter data, • Liaise with City Staff through completion of study.
The Consultant shall indicate in their proposal the number of flow monitoring sites required and provide the rationale for selecting the sites. The proposal shall include a minimum of 12 (twelve) flow meters and 1 (one) rain gauge as a minimum. If the Consultant believes more or less flow meters are required, that should be detailed in the proposal however, to ensure a fair bid process, all Consultants shall provide for twelve (12) flow meters in their submission. If it is determined through the proposal submission process that more or less flow meters will be required based on the Consultant’s plan, prior to award of the contract adjustments may be made based on the unit price provided for a reduction or addition of flow meters. The proposal shall allow for the flow meters to remain in place for four (4) weeks. Additional flow meters and additional weeks for installed flow meters included in the proposal will be paid for as per the financial proposal. Method of Work
The Consultant shall furnish all materials, equipment, labour, traffic control, supervision, and perform all work necessary for flow monitoring of the sanitary sewer lines as required.
Portable Flow Monitoring Services
• The Consultant shall install, calibrate and remove flow monitoring units at various
locations within the Hickey Road SLS sanitary sewer shed. • The Consultant shall install, calibrate and remove a rain gauge unit within the Hickey
Road SLS sanitary sewer shed. • The Consultant shall be able to provide at all times adequate flow monitoring units
capable of measuring either depth and velocity or discharge directly (use of primary devices such as weir plates or devices that result in substantial reductions in flow capacity in the system is not acceptable).
• The Consultant shall ensure that the flow monitoring units will not cause operational concerns such as, but not limited to, flow interference or obstruction, reduced hydraulic capacity, etc.
• The Consultant shall provide site servicing and maintenance on an as-required basis. Maintenance twice every week is a minimum for this project.
• At the end of the flow monitoring timeline and when an acceptable amount of data has been obtained, the Consultant shall remove all equipment from the site and confirm that it has been done to City of Saint John satisfaction.
Staff Qualifications
Interested Consultants shall include with their submissions qualifications of all staff involved in the performance of the flow meter installations and data analysis. These qualifications should indicate that the key personnel have related experience, training and inoculations for the performance of these tasks.
Coordination
Project coordination meetings with City of Saint John staff and the Consultant's representatives are to be held on an as-required basis. The Consultant's representative(s) at all coordination
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 8 of 19
meetings shall be experienced individuals familiar with all aspects of the installation and operation of the flow monitoring units and up-to-date on all field related activities.
Installation
The Consultant shall be fully responsible for installing the flow monitoring units at each location to accurately measure the flows. The Consultant team shall demonstrate qualifications, proven experience and inoculations for personnel required to work around raw sewage (Hepatitis A and B, and tetanus as a minimum).
• The Consultant shall provide all necessary equipment and appropriately trained personnel to install each flow monitoring unit. Equipment shall include, but not be limited to:
• vehicular and safety equipment required for field operations, • continuous gas and oxygen detectors, • voice activated two-way communications equipment, • confined space ventilation equipment, • rescue breathing equipment (positive pressure), • signage and traffic control, and • mobile generator (for on-site electrical supply).
• All personnel shall be familiar with Occupational Health and Safety Requirements and have WHMIS training.
• The Consultant shall install flow meters in optimum locations to obtain accurate and representative results and retrieve data that will comply with objectives. If the Consultant concludes that a site is unsuitable (because of manhole benching, hydraulic conditions, etc.) an alternative site shall be sought by the Consultant to achieve the original objective. Depth and velocity readings are to be confirmed during the installation using alternate measurement devices (tape measure, electromagnetic flux velocity meter, etc.) to ensure equipment accuracy.
• Any equipment mounted in the manhole shall be securely fastened. The mounting apparatus shall include a release mechanism to allow for equipment removal for servicing and maintenance.
Site Conditions
The Consultant shall perform their own assessment of all matters related to the structural integrity of manholes and sewers, and the flow conditions and air quality at the flow monitoring sites and shall be responsible for worker safety during performance of duties.
Equipment Specifications
• The Consultant shall guarantee that all flow monitoring instruments are adequate to satisfactorily achieve the objectives in monitoring a specific site. Then Consultant shall guarantee that data is both representative and accurate.
• Equipment must measure and store, as a minimum, the instantaneous flow and the open conduit depth (even during surcharge conditions). The flow monitoring equipment must have the following minimum requirements:
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 9 of 19
• Velocity (if applicable) measurement range of -1.0 to 6.0 m/s (minimum), with a measurement accuracy of 2% or less and a resolution of 0.005 m/s or less,
• Depth measurement range (with accurate velocity measurement) of 0.05 to 3.0 m (minimum), with a measurement accuracy of +/- 0.008 m or less,
• Flow measurement resolution should be equal to or less than 0.01 L/s, • Meters should be capable of a measurement and storage frequency of 5
minutes or less, • Low profile or non-contacting flow measurement device so as to reduce the
likelihood of initiating a flow obstruction or the accumulation of debris.
• A data recovery of 80% or better at each flow monitoring site must be guaranteed on the entire monitoring period. If 80% data recovery is not realized, the proponent will extend the flow monitoring program at no cost until this benchmark is met.
• The Consultant will inspect flow meter installations twice weekly (minimum) to ensure proper meter performance (check for accumulation of solids, check battery capacity and confirm the depth and velocity readings, etc.). All safety procedures (confined space entry, etc.) that are required for meter installation will be adhered to during the inspections.
Final Reporting/Deliverables • Supply a Standard Form for each site, including, but not limited to:
• Calibration measurements. • Summary of verification work performed at each flow monitoring location.
This summary shall include the results of all verification readings taken for both depth and velocity. Comparison readings with the instrument measurements shall be presented and the corresponding measurement error.
• Location and characteristics of each site.
• As the objectives may vary based on the monitoring sites, the Consultant shall be able to provide the following information, in order to achieve the goals for each monitoring site:
Raw Data Analysis • QA/QC of the flow data including a thorough review of other data (depth,
velocity, etc.) • Reconstruction of lost data if possible (using data from previous period when
meter was working properly) • Analysis of the system surcharge dynamics (using depth and velocity data if
available, utilization of a computer model is preferred for managing data)
Report • Instantaneous flow data (table format) • Daily average flow data (table format) • Precipitation overlays from rain gauge and nearby climate stations • Graphs of data (instantaneous flow and daily average flow) for the entire
monitoring period with climatic overlay
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 10 of 19
Data Analysis • Comparison of the weather and groundwater conditions to "normal" conditions • Comparisons of the flow data to precipitation events (rainfall and/or snowmelt)
and, if applicable, groundwater levels and/or nearby surface water level fluctuations
• Comparison of measured flows to estimates of theoretical population flows at meter locations (using NBDELG guidelines)
• Estimates of infiltration and inflow
• Final summary report shall be prepared and presented to the City of Saint John.
• Technical specifications on flow monitoring devices used shall be provided.
• All data prepared during program shall be provided in both hard copy and electronic format.
STUDY REPORT
In addition to the information requested in each section above, the report shall also identify and prioritize all minor and major remedial measures required for the system, as well as determine and comment on the capacity of the sanitary system based on existing and future levels of development. The Consultant shall evaluate rehabilitation options of the sewer system in the report, including cost estimates, and make recommendations on the preferred option(s). The Consultant's recommendations shall be actionable items as the City of Saint John will plan improvements to the system based on the recommendations provided. The report shall also include a table which outlines the capacity gained in the sanitary system upon the completion of each remedial measure. MODEL OF THE WASTEWATER COLLECTION SYSTEM
The current model (to be provided to the successful Proponent) was produced using Bentley SewerGEMS. The Consultant shall calibrate and update the model with the information collected in this study.
PROVEN EXPERIENCE
Interested Consultants are to provide a list of the staff experience on similar projects.
PUBLIC NOTIFICATION
The Consultant shall be responsible for distributing project information letters to all residents and businesses within the work zones advising them of the nature of the work and schedule.
4. METHOD OF PAYMENT:
Upon award of the contract, the City will execute an agreement with the successful engineering firm for the work to be performed. Payment of fees shall be in accordance with the terms of the Request For Proposal at the rates submitted and accepted in the Consultant’s proposal, not to exceed the Recommended Minimum Hourly Rates (as contained in The Association of
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 11 of 19
Consulting Engineering Companies - New Brunswick fee guideline) to a maximum of the upset fee. The Consultant shall invoice the City on a monthly basis for the work performed in accordance with the engineering services agreement. The Consultant shall provide a status report with each invoice outlining in detail the scope of the work completed during that month. Payments will not be processed unless the invoice is signed by an authorized representative of the company, accompanied by a status report in the proper timed based format (hourly rate x hours worked). Engineering fees are not based on a percentage of the construction costs; therefore, the approved upset prices will not be changed due to the final construction costs being different from the current budget estimate. A change in the fees may be considered only if the scope of the engineering work is changed at the request of the City's Engineer.
Upset prices (including HST) will be included in the proposal of this project beyond which no additional payments will be considered unless authorized in writing by the City. The total price stated must also include $40,000 + HST for an engineering contingency for unforeseen work. No part of this contingency shall be expended without the written direction of the City's Engineer, and any part not so expended shall be deducted from the contingency allowance.
5. TERMINATION OF CONTRACT:
The City will reserve the right to terminate the contract with the Engineering Firm at any time during the course of the work. In such an event, payment will be made only for the work completed up to the time of termination.
The City of Saint John does not, by virtue of any proposal request, commit to an award of this bid, nor does it commit to accepting the proposal submitted, but reserves the right to award this proposal in a manner deemed to be in the best interest of the City.
6. CONTENT OF PROPOSAL:
The Consultant shall confirm a clear understanding of the work to be undertaken as described in the Scope of Work. The proposal must demonstrate that the Consultant and its team have recent and significant experience with this type of work. When noting examples of experience gained on similar projects, the proposal must also note which current staff members worked on that project and what their role was. The proposal must specifically address all requirements of the work and any matters related to its successful implementation. The proposal must indicate what role each of the Consultant's team will be carrying out for the project. The Consultant may not substitute the project team members noted in the proposal without permission of the client. When proposing a schedule, the Consultant must also indicate that their workload is such that they will have time to complete the project as promised. If the Consultant is very busy, they should either decline the work or propose a longer schedule at the time of the RFP submission.
The proposal shall include the following sections:
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 12 of 19
A. TECHNICAL PROPOSAL:
• Table of Contents • Work Plan and Schedule • Project Team • Experience with similar projects
B. FINANCIAL PROPOSAL:
The Consultant shall submit the Financial Proposal in a separate sealed envelope, properly identified, which contains:
• Maximum or Upset Fee for overall scope of work • Include a contingency allowance of $40,000 • All costs are to be subtotaled (including contingency allowance)
with the 15% HST component identified separately and added to arrive at a total cost.
• Billing Rate Summary (hourly billing rates for all key personnel).
All sub-consultants such as flow monitoring, video inspection, survey, smoke testing and others shall have their fees identified and included in the appropriate part of the proposal. Additional Funding Submissions In addition to the Financial Proposal above, unit prices shall be submitted for the following in the Consultant’s financial breakdowns. These unit prices will be used if additional work is required (Contingency) or if work is to be removed from the contract (Credit).
• Smoke testing ($/lineal metre) • Manhole inspection ($/each) • Flow meter ($/meter/month) • Meter rental and monitoring of an installed flow meter ($/week) • Video inspection ($/lineal metre) • Root & service lateral cutting ($/hr) • Sewer flushing ($/hr) *
*The Consultant shall be responsible for removal and proper disposal of all debris and other foreign material removed during the flushing operation. Disposal shall be at the Lancaster Wastewater Treatment Facility. The Consultant will be paid for travel time for the flusher truck between the work site and the disposal site. The Consultant shall have a water truck at their disposal and make effective use of it to convey water to the flusher truck. The City will not pay the Consultant for the time involving demobilization and remobilization required to refill the flusher truck.
7. EVALUATION CRITERIA: For the purposes of this proposal call, submissions will be evaluated on the following criteria:
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 13 of 19
◆ QUALITY AND COMPLETENESS - Has the proposal addressed all of the needs raised? Is the proposal presented in an organized and professional manner? (Criteria weight = 10 points)
◆ CONSULTANT'S EXPERIENCE - Has the proposal demonstrated a level of expertise with
the requirements of this project? (Include references for projects of a similar nature.) (Criteria weight = 20 points)
◆ EXPERIENCE OF EMPLOYEES / SUB-CONSULTANTS - Has the
proposal demonstrated a level of expertise for the employees of the company and sub-consultants listed? (Include resumes for staff and sub-contractors required) (Criteria weight= 35 points)
◆ METHODOLGY - Does the approach to the project outlined in the proposal address, in a
realistic sense, set attainable goals and is it in keeping with the City's expectations for the project? (Criteria weight= 75 points)
◆ VALUE ADDED - What additional information, technology, process or options has the
Consultant included in their proposal? Is there value added to the Consultant's response for this additional information? (Criteria weight = 10 points)
◆ COST - Cost will be a factor, however not the only factor to be considered. (Criteria
weight= 50 points)
Consultants are advised that proposals will be evaluated solely on the basis of information submitted in accordance with the request for proposals. The City reserves the right, if deemed necessary, to short-list the proposals and to request an additional verbal presentation from each short-listed proponent. The Consultant may supplement their presentation with a summary in written format to clarify points raised during the process.
8. INSURANCE REQUIREMENTS:
The Consulting Engineering Firm shall obtain and keep in force, during the full duration of this contract, an Errors and Omissions Liability policy with a minimum limit of two million dollars, and two million dollars per claim. The policy shall include a clause stating that thirty days notice of cancellation of this policy will be given to the City of Saint John, by the insurers. Provide evidence of this policy.
The Consultant must provide proof of current coverage from WorkSafeNB prior to the start of the work. The Consultant shall provide evidence of the following insurance coverage: General Liability with minimum limits of two million dollars per occurrence. The policy shall include:
• operations of the Consultants in connection with this project; • products and completed operations coverage: • contractual liability with respect to this project; • the City of Saint John added as an additional named insured;
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 14 of 19
• a cross liability clause; • non-owned automobile; • thirty days notice of cancellation of this policy will be given to the City of Saint John, by
the insurers; • Standard automobile insurance for owned automobiles with at least the minimum limits
allowed by law.
9. FORMALITY CLAUSE:
In order for the City of Saint John to consider any proposal submission as a legally binding offer, on behalf of the Consultant, it is necessary for the Consultant to communicate this formality to the City in the form of an offer which contains the original signature of the individual or representative of the firm who is authorized to act on behalf of the Consultant. In order to meet this requirement, all proposal submissions to the City of Saint John must be prefaced with a covering letter which contains an original signature of the individual authorized by the Consultant to submit proposals on their behalf. The covering letter must be on official company letterhead, be dated and be addressed to the attention of the City of Saint John representative specified in the request for proposal document. Additionally, it must make reference in the body of the letter to the request for proposal number and project title, as well as to the fact that the enclosed documents constitute a formal proposal offer and finally, the letter must contain the original signature as indicated. Failure to include the required covering letter as a preface with your proposal will be grounds for immediate rejection on the basis that it is not formal.
10. STANDARD TERMS AND CONDITIONS:
Addenda
Periodically, the City of Saint John is required to issue notification of changes or corrections to a Proposal document by way of addenda. Normally these notifications will have direct bearing on the cost of a project and will influence bidding. Therefore, it is important that the City have assurances that Proponents have in-fact received the notification(s). Proponents are responsible for obtaining all addenda issued by the City. Addenda may be obtained from the City’s website (www.saintjohn.ca) under the City Menu, option “Tenders and Proposals”. Proponents are required to sign and include all addenda with their Proposal submission. Failure to include a copy of all signed addenda with the Proposal submission may result in rejection of the Proposal regardless of whether or not the changes noted in the addendum are included in the Proposal submission.
Review of Proposals
The evaluation committee may invite proponents to meet with the review committee to make an
oral/visual presentation in support of their proposal. The City will provide the meeting venue at
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 15 of 19
its cost. The proponent shall bear its own costs related to such meeting.
Additional Information from Proponents
The City of Saint John reserves the right during evaluation of the bids to seek further information from any proponent and to utilize that information in evaluation and award without becoming obligated to seek further information from any other proponents.
Clarification of Bids
The City of Saint John reserves the right in its sole discretion to clarify any bid after close of bidding without becoming obligated to clarify any other bid.
Negotiation
The City reserves the right in its sole discretion to negotiate the final terms and conditions of the engagement contract with the most probable candidate for award prior to award of the engagement.
Inconsistency between Paper and Electronic Form
If there is any inconsistency between the paper form of a document issued by or on behalf of the City to proponents and the digital, electronic or other computer readable form, the paper form of the document prevails.
Acceptance, Revocation and Rejection of Proposals
The proposal constitutes an offer which shall remain open and irrevocable until 90 days after the date of the proposal opening.
Reserved Rights
The City reserves the right to:
a) Reject an unbalanced Proposal. For the purpose of this section, an unbalanced Proposal is a Proposal containing a unit price which deviates substantially from, or does not fairly represent, reasonable and proper compensation for the unit of work bid or one that contains prices which appear to be so unbalanced as to adversely affect the interests of the City. The City reserves the right to use Proposals submitted in response to other like or similar Requests for Proposals as a guideline in determining if a bid is unbalanced.
b) Amend or modify the scope of a project, and/or cancel or suspend the Bid Solicitation at any
time for any reason.
c) Require proponents to provide additional information after the Closing Date for the Bid Solicitation to support or clarify their bids.
d) Not accept any or all bids.
e) Not accept a bid from a bidder who is involved in litigation, arbitration or any other similar
proceeding against the City.
f) Reject any or all bids without any obligation, compensation or reimbursement to any bidder
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 16 of 19
or any of its team members.
g) Withdraw a Bid Solicitation and cancel or suspend the Bid Solicitation process.
h) Extend, from time to time, any date, any time period or deadline provided in a Bid Solicitation (including, without limitation, the Bid Solicitation Closing Date), upon written notice to all bidders.
i) Assess and reject a bid on the basis of:
i. information provided by references; ii. the bidder's past performance on previous contracts; iii. information provided by a bidder pursuant to the City exercising its clarification
rights under the Bid Solicitation process; iv. the bidder's experience with performing the type and scope of work specified
including the bidder's experience; v. other relevant information that arises during a Bid Solicitation process.
j) Waive formalities and accept bids which substantially comply with the requirements of the
Bid Solicitation.
k) Verify with any bidder or with a third party any information set out in a bid.
l) Disqualify any bidder whose bid contains misrepresentations or any other inaccurate or misleading information.
m) Disqualify any bidder who has engaged in conduct prohibited by the Bid Solicitation documents.
n) Make changes including substantial changes to the bid documents provided that those changes
are issued by way of an addendum in the manner set out in the Bid Solicitation documents.
o) Select any bidder other than the bidder whose bid reflects the lowest cost to the City.
p) Cancel a Bid Solicitation process at any stage.
q) Cancel a Bid Solicitation process at any stage and issue a new Bid Solicitation for the same or similar deliverable.
r) Accept any bid in whole or in part.
And these reserved rights are in addition to any other express rights or any other rights which may be implied in the circumstances and the City shall not be liable for any expenses, costs, losses or any direct or indirect damages incurred or suffered by any bidder or any third party resulting from the City exercising any of its express or implied rights under a Bid Solicitation.
Limitation of Liability and Waiver In every Bid Solicitation, the City shall draft the documents such that each bidder, by submitting a bid, agrees that:
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 17 of 19
a) Neither the City nor any of its employees, agents, advisers or representatives will be liable, under any circumstances, for any claims arising out of a Bid Solicitation process including but not limited to costs of preparation of the bid, loss of profits, loss of opportunity or any other claim.
b) The bidder waives any claim for any compensation of any kind whatsoever including
claims for costs of preparation of the bid, loss of profit or loss of opportunity by reason of the City's decision to not accept the bid submitted by the bidder, to award a contract to any other bidder or to cancel the Bid Solicitation process, and the bidder shall be deemed to have agreed to waive such right or claim.
Proposal Debrief
Immediately following the City's acceptance of a Proposal submitted, Supply Chain Management shall send a written notification of award to all unsuccessful proponents disclosing the name of the successful proponent and providing a brief explanation rationalizing the City's selection:
i. For all Requests for Proposals valued at Fifty Thousand Dollars ($50,000.00) or less, the written notification of award will be the only form of debriefing offered by the City;
ii. In the case of Requests for Proposals valued in excess of Fifty Thousand Dollars ($50,000.00), Supply Chain Management may, in addition to the notification of award and upon written request from any proponent, provide a more detailed oral debriefing either by phone or in person, as required by the proponent. During this debriefing, Supply Chain Management may disclose information such as the total price of the successful proponent and may discuss an overview of the process as well as the strengths and weaknesses of the requesting proponent's proposal.
iii. The written request referred to paragraph (ii) shall be submitted to the Office of the Purchasing Agent no later than fifteen (15) business days after the notification of award is issued.
iv. The acceptance of the successful Proposal shall not be discussed during a debriefing.
11. SUBMITTALS:
When preparing the Agreement for Engineering Services, the Consultant is required to submit a "Business Corporation Act Certificate" to the Engineer.
12. INQUIRIES:
All inquiries regarding this request for proposals shall be submitted in writing via email, by 4:00 p.m. Local Time on Tuesday, April 6th, 2021, to the attention of:
Monic MacVicar, CCLP, CPPB Procurement Specialist Supply Chain Management Email: [email protected]
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 18 of 19
Responses to inquiries will be in writing and distributed by facsimile/email to all Consultants registered as having received the Terms of Reference as of the date the response is prepared. The source of the question will not be identified in the response. Verbal information shall not be binding upon the City. Inquiries after the above deadline will not receive a response.
13. ATTACHMENTS:
• Drawings: Overview Map - Inflow and Infiltration Study Lakewood Area - Inflow and Infiltration Study Bon Accord Area - Inflow and Infiltration Study Silverstone Street Area - Inflow and Infiltration Study Heather Way Area - Inflow and Infiltration Study
NOTE – Full scale drawings are available for pick up at 175 Rothesay Ave.
14. OTHER RELEVANT DOCUMENTS:
• City of Saint John General Specifications
15. SUBMISSION OF PROPOSALS: Consultants shall deliver six (6) copies of the Technical Proposal and supporting information and six (6) copies of the Financial Proposal no later than 4:00pm, Local Time, Thursday, April 15, 2021 clearly indicating the Consultant's name and address and marked "Proposal: 2021-091003P, Lakewood Heights Area - Inflow and Infiltration Study", to the attention of:
Monic MacVicar, CCLP, CPPB Procurement Specialist Supply Chain Management City of Saint John 175 Rothesay Avenue, 1st Floor Saint John, NB, E2J 2B4
Please note that:
1. Late proposals or proposals submitted by facsimile will be rejected. 2. The City assumes no responsibility for improperly addressed or delivered
proposals. 3. The City of Saint John does not, by virtue of this proposal call, commit to an
award of this bid, nor does it commit to accepting the lowest or any proposal submitted, but reserves the right to award this proposal in any manner deemed to be in the best interest of the City.
4. The Financial Proposal is to be submitted in the Consultant's package in a separate sealed envelope, clearly marked as "Financial Proposal: 2021-091003P, Lakewood Heights Area - Inflow and Infiltration Study", with the Consultant's name and address.
5. Consultants must propose on the entire project - incomplete proposals will be
Scope of Work Lakewood Heights Area – Inflow and Infiltration Study Page 19 of 19
rejected.
Immediately following the closing time, proposal packages will be opened in the office of the Manager of Supply Chain Management. Only the names and addresses of the proponents will be made public at this time. No other information about the proposals will be disclosed at that time. Proposals will then be forwarded to an evaluation committee for review and recommendation.
3
3
3
3
3
3
3
3
3
3
3
3
33
3
33
3
333
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3333
33
33
33
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3 3
3
3
33
3
3
3
3
33
3
3
3
33
33
3333
33
33
33
3
33 33
3
3
3
33
3
33
3
33
3
33
3
33
3
3
3
3
33
3
333
33
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
333
3333
33
3
3
3
3
3333 3 3
3
3333
3
3
33
33
33
3
3
3
3
333
333 33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
33
3
333
33
33
3
3
3
3
3
3 3 3
3
33
3
3
3
3
3
3
3
333
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
33
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33 3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
3
3
3
33
3
3
3
3
333
3
33
3
33
33
3
3 3 3
3
3
3 3
33
33
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
33
3
3
33
3
3
3
3
3
3
33
3
3 33
33
33
3
3
3
3
3
3
33
3
3
33
3
3
33
33
33
33
33
3
3
3
3
3
3
333
3
3
3
3
3
3
33
333
33
3
3
3
33
3
3
3
3
33
3
3
3
3
33
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
33
3
3
33
3
3
3
3 3
33
3
3
33
333
33
3
3
3
33
3
3
333
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
3
33
3
33
3
3
3
3
33
3
33
3
33
333
3
3
3
3
3
33
3
3
3
3 3
33
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
33
33
3
3
3
3
3333
33
3 3
3
3
3
3
3
33
333
3
33
33
33
3
3
3
3
3
33
3 3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
333
33
33
33
33 3
3
3
33
3
3
33
3
33
3
3 3
3
33
3
3
33
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
33
33
33
3
3
33
3
3
3 3
3
3
33
3
33 333
3
3
3
333
33
3
3
3
3
3
3
3
3
3
3333333
3
333
3
3
333 3
3
33
3
3
3 3
3
3
3
3
3
3
3
3
3
33
3
333
3 33
3
33
3
3
3
3
333
3
3
3
3
3
3
3
3
3
3
3
33
3
33
3
3
3
3
3
3
3
3
3
33
33 3
333
3
3
33
33
33
3
3
3
3
3
3
3
3
3
3
33
33
3
3
3
3
3
3
33 3
3
3
3
33
3
3
33
33 3
3
3
333
3
33
33
333
3
3
3
3
3
33
3
3
3
3
3
3
3
33
33
33
33
3
333
3
3
3
3
3
3 3 3
3
33
3
333
3 3
3
33
3
3
3
3
3
3
3
3
3
3
3
33
33
33
3
33
3
3
3
3
3
3
3
3
3
33
33
3
3
3
3
3
333
3
3
3
3
3
3333
3
3
3333
33 3
3
3
3
3
3
3 3
3
333
3 3
3
3
33
3
33
3 3
33 3
3
3
3
33
3
3
3 33
3 3
33
3
33
3
3 3 3 3
3
3
3
3
33
3
3
3
3
33 3 3
33
3
333
3 33
33
3
33
3
33 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
33
3
3 33
3
3
3333
3333
33
3
33
3 33
3
33 3
3
3
3
333
3
3333
3
3
33
3
33
3
3
3
3
3
3 3
3
3
3
3
33
3
3
33
33
3 3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3 3
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3 3
3
3
3
33
33 3
3
3
3
33
3
3
3
3
33
3333
3
333
3 3
33
3
33
3
33
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
33
3
33
3333
3
333
3
3 3 3
3
333
3
3
3
3 33
3
3
33
33
3
33
3
3
33
3
3
33
3
3
3
3
3
3
33
3
3
3
3
3 33
3
3
3
3
3
3
33
33
33
3
3
333
3
3
3
3
3
3
3
3
33
33
3
3
3
3
3
3
3
3
3
3
3
33
33
3
3
3
3
3333 3
3
33
3
3
3
3333
3 33
3
3
3
3
3
3
33 33
3
3
3
33
33
33
3
3
3
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3
3333333
3
3
33
33
3
3
33
33
33
3
333
3
33
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
33
33
3
33
33
3
3
3
3
3
3
3
3
3
3
33
3
3
33
3
3
3
3
3 3
3
33
3
3
333
33
3
33
333
3
3
3333
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
33
3
3 3
3
3
3
3
333
3
333
3
3
33
333
33
3
3 3333
3
3333
3
3
33
33
3
33
3
3 33
33
3
3
3
3
3
3
3
3
3
3
3
3
33
333
33
33
3
3
3
3
33
33
3
3
3
3
3
3 3
3
3
33
3
3
33
3
3
33
3
33
33 3
33
33
3
3
333
3
33
33
33
3
3
3
3
3
3 3
3
3
3
3
3
33 333 3
33
33
33
33
3
333
3
3
3
3
3
33
3
33
333
33
3
3
333
3 3
33
3 33
3
3
3
3
33
3
3
3
3
3
3
33
33
3
33
33
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33 3
3
33
3
3
333
33
3
33
33
3
3
33
33
3
3 33
3
3
3
3
3
3
333
3
33
33
33
333
33
3333
3
33
3
3
3
33
33
3
3
3
3
3
3
3
3
3
3
33
3
3
3
33
3
33
3
3
3
33
3
3
3
3
3
3
33
3
33
33
3
3
3
3 333
333
3
33
3
33
3
3
3
3 3
3
3
33
3
3
3
3
3
33
33 33
3
33
3333 333
3
3
3
3
3
3
3
3
333
3
33
333
3
3
3
3 3
333
3
3
3
3
33
33
33
3
3
3
3
3
33
3
3
3
3
3
33
3
3
33
3
3333
3
3
3
3
3
3
3 33 33
3
3
33
3
33
3
3
33
3
3
333 3
33
3
33
3
3
3
33
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3 3
3
3
3
3
3
3
3
33
3
3
3
3
33
3 3
33
33
3
333
3
3
3
3
3
33
3
3
3
33
3
3
3
3
3
33
3
3
3
3
3
3333 3
3
3
3
33
3
3
3
3
33
3
333
3
33
33
33
3
33
33
3
3
33
3
33
3
3
3
3
3
33
33
3
33
3
3
3
3
3
3
3 3
3
333
3
3
33
33
33
33
333
33
3
3
3
3
333
33
3
3
3
3
3
3
33
33
3
33
3
33
3
33
3
3
3
33
3
3
33
3
3
3
3
3
3
3
3
33 33
3
3
3
33
33
3
3
3
3
33
3
3
3
3 3
3
3
3 3
33
3
3
3
33
3
3 3 3
3
3
3
33
3
333
3 3
3
3
3
3
3
3
3
3
3
3 3
3
33
3
3
3
33
33
3
3
33
3
3
33
3
3
3
3
3
3 33
3
3
333
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3 3
3
3
3
3333
3
333
3
3
3
3
3
3
3
33
3
3 3
3
3 3
3 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
33
3
3
3
3
3
3
33
333
3
3
3
3
3
3
3
3
3
3
33
33
33
33
33
3
3
3
3
3
3
333
3
3333
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3 3 3
3
3
3
3
3
3
3 3
3
3
33
3
3
3
3
3
3
33
3
33 3
3
3
3
3
33
3
33
3
3
33
3
3
3
333
33
33
33
3
3
3
3
3
3
3 33
3
33
333
3 3
33
3 33
3
3
3
3
3
33
33
333
33 3
3
3 3 3
3
3
33
3
33
3 3
3
3
33
333
333
33 3
33
3
3
3
33
3
3
3
3
3
3
33
3
3
3
3
33
3
3
3
33
33
3
3
3
3
3
3
33
3
3
33
3 3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3 3
3
3
33
3
3 3 3
3
3
3
33
333
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
3
33
3
3
3
3
33
3
3
3
33
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
333
3
333
3
3
3
3
3
3
3
3
3
3
3
33
33
3
3
3
3
3
3
3
3
3
3
333
3
33
3
3
333
3
3 33
3 33
3 3
3 3 3
3 3
3
3 3
3
3
3
3
3
3
3
3
33
3
3
3
33
3
3
3
3
3
3
33
33
3
3 333
3
3
3
33
3
333
3333
33
3
33
3
3
3
33
3
3
333
333
3 3
3
3
3
3
3
33
3
3
33
3
33
3
3
3
33
3
33
3
3
3333
33
3
3
3
3
3
3
3
33
3
3
3
3
33
33
33
33
3
3
33
3
3
3
3
3
33
3 33
33
3
3 3
3 3
3
33
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3 3
33
3
3
3
3
3
33
33
3
3
3
33
3
3 3
3
3
3
3
3
33
333
3
3
3
3 3
3
3
3
33
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
33
333
3
33
33
3
3
33 3
3
3
3
3
3
33
3
3
333
3
3
3
333 3
3
3333
3
3
3
3
3
3
33
3
33
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
33
33
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
33
33
3
3
3
3
3 3
3
3
3
3 3
3
3
3
33
33
3
33 333
3
3
3
3
3
33
333
3
3
3 33
3
3
Daw
n PlaceEveleigh C
ourt
Falcon Crescent
Morning Side C
ourt
Boyaner C
rescent
Wya
tt Cre
scent
Sunnybrook Terrace
Oak
hill
Cre
scen
t
Eagle Boulevard
Eugene's W
ay
Cham
plain Drive
Dolly Drive
Om
ega Drive
Dresden AvenueM
ount
ain
Vie
w D
rive
McA
llister Drive
Gle
n R
oad
David S
treet
Belgian Road
Myl
es D
rive
Lakewood Avenue
Ken
ning
ton
Str
eet
Skyline Drive
Wes
tmor
land
Roa
d
Kappa Avenue
Eastw
ood Drive
Sonya Court
Norman Driv
e
Westbrook Avenue
Reading Crescent
Sum
mit D
rive
Del C
ourt
Byron Street
Wildw
ood Street
Gerard Street
Glengarry Drive
Strathorne Avenue
Bing Avenue
Roatan Way
Willie Avenue
Lynn Avenue
East Stre
et
Sigm
a Street
Morley Crescent
Shillington R
oad
McN
amara D
rive
Rosedale Crescent
McGregor Place
Hea
ther
Way
Mountain Road
Roxbury Drive
High Drive
Lensdale Crescent
Woods AvenueLakefield C
ourt
Candace S
treet
Berm
uda Court
Harm
ony Drive
Gar
nett
Roa
d
Charles S
treet East
York
Stre
et
Comm
erce Drive
Dianne Street
Grandvie
w Avenue
Lomond C
ourt
Mosaic D
rive
Mystery Lake D
rive
Cornell Stre
et
Upl
and
Roa
d
Josselyn Court
Bruce Lane
McN
amara C
ourt
Casey
Cre
scen
t
Clint Drive
Muriel A
venue
Longview Court
Ann Street E
ast
Reba Road
MacN
aughton Drive
Palm
er Street
Inverness
Place
Silver Crescent
Col
ter S
treet
Cresthill S
treet
Parkhill Drive
Braem
ar Drive
Thomas R
oad
Highmeadow Drive
Morgan Road
Bev
erly
Driv
e
Crescent Avenue
Lamda Avenue
Creighton A
venue
Kervin Road
Bon A
ccord Drive
Ganong R
oad
Josselyn Road
Will
ow R
oadw
ay
Riley D
rive
Silverstone S
treet
Kerr R
oad
Keith Court
Huxtable S
treet
Lakeview D
rive
Kel
ton
Str
eet
Loch Lomond Road
Knox Court
Hickey Road
John T. McM
illan Avenue
Fish
Hat
cher
y R
oad
Old Lake Trail
Coldbr
ook C
resc
ent
Vist
a Rid
ge C
resc
ent
Elgin Road
Alpine Street
Golden Grove
Road
McLeod R
oad
Pauline S
treet
McLaughlin R
oad
Car
lile
Cre
scen
t
PaulineStreet Lift
Station
Hickey RoadLift Station
York StreetLift Station
McAllisterDrive LiftStation
Private LiftStation
Overview Map
Inflow and Infiltration Study
March 15, 2021
Scale: 1:4,000
Lift Station
Storm SewerSanitary SewerStorm Manhole
Storm Catch Basin Type Two
Storm Catch Basin Type One
Sanitary Manhole
Study Limits
Previously Videoed Sanitary Sewer
3
3
3
3
3
3
33
3
3333 333
33
3
3
3
3
3
33
3
33
3
3
33
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
3
3
3
3
33
33
33
33
33
3
3
33
3
33
33
3
3
3
33
3
3
3
3
3
33
3
3
3
33
3
3
3
33
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
33
3
3
3
3
3
3
3
33
3
3
3
33
3
33
3 3
3 333
3 3
3
3
3
33
3
3 3
3
33
3
33
3
33
33
3
3
3
3
333
3
3
3
3
3
3
3 33
333
3
3 3
3
3
3
3
3
33
33
33
33
3
3
33
3
3
3
3
33
3
3
3
3
3
3
3 3
3 33
33
3
33
3 3 3
3
3
3
3
33
3
3
33 33
33
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
333
3
3
3
3
33
3
33
3
33
33
3
3
3
3
3
33 3
33
333
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3 3 3 3
33 3
33
3
3
3
3
3 33
3
3
3
3
3
33
3
3
3
3
33
33
3
3 3
3
3
3
33
33 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33 3 3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
333
3
3
3
3
3
33
3
333
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
33
3
3333
3
3
3
3
3
3
3
33
3
3
3
3
3
33
3
3
33
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3
3
3
3
3 3
33 3
3
3
3
3
3
3
33
3
3
3
3 3
3
3
3
3
3
3
3
33
3
3
3
33
3
3
3
3 3
3
3
3
3
33
3
33
3
3
333333
3
3
3
3
3
33
333
3
3
3 33 3
33
3
3
33
3
33
3
33
3
3
3
3
333
33
3 3
3
3
3
33
3
33
3 3
33
3
3
3
3
3
3
3
33
3
3
3
33
3
33
3
33
3 33 3
3
33
3 3
3
33
3
3
3
3 3
3 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3 33
3
3
3
33
3
3
3
3
33
3
3
3
3
33
33
3
3
3
3
3333
3
3
3
3
33
3
3
33
3
33
3
3
33
3
33
3
3
3
3
3
3 33
3
3
3
3
3
3
3
3
3
33
3
3
3
33
3
3
3
3 3
33
33
3
3 3
33
3
56
119
287279
220 308246238
255
1800
298
111
94
378
36
102
26
295
54
87
37
46
303
316
101141133
311 319
324 330
157
79
71
62
254
149
204176
229
160
103
16
63
290
31
194
113 163
161
164156
171
148 180
187
338
142
178
152
172
173
160
327
346
47
47
141
149
157
165
181
168
186
124 136222212
228 234204196192
5
191 197 201 205 213 227 229 237
28
24
20
16
12
8 4
7
9
15
17
19
15 11 7
2
4
6
8
10
12
14
16
18
187
197
131
145
10 20 30 50 60
298 304
24
2111
49
44
409 415 419 425 429 435 439 443 449
408 414
365
418 424 428 434 446
365
1110
25
22
10
14
31
11
15
34
23
27
30
26
1918
25
21
17
812
14
22
57
53
47
60
68
38
42
46
50
58
62
63
13
72
48
9781
47
37
110
50
235
347
266262
196
124
275
55
188
132
311305297285
160 166 174 178 186 204 210 226 230 236 246 252
173 181 189 199 205 223 231
21
253251
262
1
274 282 292298
302
308
301297293281275
190
197 233
311
309
288
217
212 218
30
5 9 15 19 23 27 35 43 47 51
6 10 14 18 22 26 30 34 38 42 46 50
366360
361
260206
36
24
28
1
3
155
1674
25
1734
1895
17
403812
46
175
44
347
60
114
14 18 22 26 30 34 38
2
45413733
7
812
104988674
7
52
41
6
187
1610
377
170
182
15 19 23
168
42
34
1620
158
24
9
15
19
27
5
350
71
89
210
1608
59
54
24
88
158
15795
25
39
118
59
26
187
169
209
191
123
188
1654
196
265
95
26
108
19
35191
179
124
1597
60
56
95
110
247
118
15
40
180
65
94
29
138
1713
44
103
1628
135
118
161
22
1583
165
70
100
17
1577
72
201
192
68
124
22
65
37
187
151
175 207
135
66 8472
47
95
170
1813
1825
49
127
137
149
202
230
62
18
65
37
146
172
181
31
1638
182
75
327
180
102
67
36
36
53
83
156
104
1642
74
164
100
70
55
43
86
131
46
40
86
66
1605
212
171
85
1891
1611
153
64
206
440
1627
1643
259
5
228
247239221213
1861663
1
64
78
1801
222
73
154
85
27
147
69
57
203195
1857
136
161
132
1660
1881
11
165
34
65128
49
148
115
26
124
238
1664
199
56
75
86
22
11627
11
113
61
22
102
140
52
162
179
39
131
1909
54
227
198
62
204
85
1648
150
148
86
133
107
78
197
79
6
84
1691
1673
31
237
83
13
94
16
3
84
7 11 43393735 41 45
404642
48
19
Dol
ly D
rive
David Street
Lake
woo
d A
venu
e
Loch
Lom
ond
Roa
d
Summit Drive
Will
ie A
venu
e
Bin
g A
venu
e
Lensdale Crescent
Woods A
venue
McNamara Drive
Cha
rles
Str
eet E
ast
Dia
nne
Str
eet
Mosaic Drive
Cor
nell
Str
eet
McNamara Court
Clin
t Driv
e
Ann
Str
eet E
ast
Reb
a R
oad
Palmer Street
Cre
scen
t Ave
nue
Willow
Roadw
ay
Riley Drive
Huxtable Street
Lakeview Drive
Fis
h H
atch
ery
Roa
d
Pauline Street
Pauline StreetLift
Station
200 PVC
150 PVC
150
PVC
900
CON
C
150
PVC
100
PVC
150
PVC
UNK
250PVC
150 UNK
UN
K
200PVC
200
CON
C
100
PVC
200
PVC
200CONC
450 CONC
250PVC
200PVC
200PVC
150
PVC
250PVC
200PVC
250
DI
UNK
200
CON
C
UNK
200
CON
C
250
PVC
250PVC
200
PVC
250
PVC
450
CONC
200 PVC
450CONC
200
CON
C
200
PVC
200PVC
200 PVC
200
PVC
250 PVC
200
PVC
CON
C
250
PVC
200CO
NC
300
PVC
250PVC
250 PVC
250
CON
C
375 PVC
UNK
200
PVC
200
PVC
250 PVC
200 CON
C
250 PVC
200CO
NC
250PVC
UNK
375
PVC
250
CONC
200
CON
C
250PVC
250
PVC
600CONC
200 CONC
UN
K
100 PVC
600
CON
C
UN
K
150
PVC
375PVC
450 CONC
200
CONC
250PVC
250
PVC
450 CONC
UN
K
200 CONC
100
PVC
900 CON
C
375PVC
375
PVC
600 CONC
450CONC
200 PVC
300 CONC
200PVC
150 PVC
200PVC250PVC
300
PVC
250PVC
200
PVC
UNK
200CO
NC
200
PVC
200CONC
450PVC
450 CON
C
200 PVC
375
PVC
250
PVC
200
PVC
250PVC250
PVC
300CONC
375
CON
C
250
PVC
250
PVC
250
PVC
250CONC
300CONC
250
PVC
250
PVC
250PVC
450
CONC
250PVC
375
UNK
375
CON
C
200PVC
250PVC
250PVC
250PVC
200 PVC
250
PVC
250
PVC
250PVC
200
CON
C
UNK
UNK
250
PVC
150 PPVCP
250
PVC
300 CONC
300
CON
C
150 DI
450CONC
450CONC
450
CONC
250
PVC
450 PVC
300CO
NC
CONC
450
CON
C
250PVC
150CONC
250
PVC
300 CSP
150
CON
C60
0 CO
NC
250 P
VC
450 PVC
250 PVC
200PVC
200 CONC
200
CON
C
450CONC
300
AC
525 C
ONC
250 UNK
200 CONC
450 PVC
600CO
NC
300 CI
200
PVC
200 PVC
450 PVC
200PVC
450 CONC
150 PV
C
375 PVC
300 PVC200 PVC
450
CONC
200
PVC
200
PVC
750
CON
C
200 PVC
200
PVC
200 PVC
750
CON
C75
0CO
NC
375 PVC
250
CON
C
200 PVC
200
PVC
375
CON
C
900 CON
C
1200
CO
NC
300CONC
375 PVC
200 CONC
200 PVC
450
CONC
450 CONC
200 CONC
300 PVC
300
AC
200 UNK
600 CONC
300
PVC
300 CONC
200PVC
450 CONC
150PPVCP
300 PVC
200 UNK
250
CONC
300 CONC
200 PVC
150PPVCP
300 PVC
375
CON
C
300
PVC
200
UN
K200 PVC
200 UN
K
150 PPVCP
375 CONC
250 CONC
300 PVC
150 PPVCP
300 PVC
200 PVC
300 CONC
150PPVCP
250 AC
Lakewood Area
Inflow and Infiltration Study
March 15, 2021
Scale: 1:2,000
Lift Station
Storm SewerSanitary SewerStorm Manhole
Storm Catch Basin Type Two
Storm Catch Basin Type One
Sanitary Manhole
Study Limits
Previously Videoed Sanitary Sewer
33
3
3
3
33
3
3
3
3
3
3
3
33
3
3
3
33
3
33
3 3
3 333
3 3
3
3
33
33
3
3
3
333
3
3
3
3
3
3 3
3
3 3
3
3
3
3
33
33
33
3
3
33
3
3
3
3
33
3
3
3
3
3
3
3 3
3 33
33
3
33
3 3 3
3
3
3
3
33
3
3
33 33
33
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
333
3
3
3
3
33
3
33
3
33
33
3
3
3
3
3
33 3
33
333
3
3
3
3
33
3333
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3 3 3 3
33 3
33
3
3
3
3
3
3
3
33
33
3
3
3
333
3
33
3
3
33
3
3
3
3
3
3
3
3
3
33
3 3
3
3
33
3
3
3
3
3
333
3
33
3
3
3
3
3
3
33
3
3
3
33
3
3
3
3
33
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
33 3
33 3 3
3
3
3 3
3
3
3
3
3
3
3
3
3
33
3
3
3
33
3
3
33
3 3
3
3
33
3
33
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
33
3
3
33
3
33
3
33
3 3
33
3
3 33
3
3 3
3
3
3
33
33 3
3
3
3
3
3
3
3
3
3
3
33
3
333
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
3
33
3333
3
33
3
3
333
33
33
33
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33 3 3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3333
3
3
3
3
3
33
3
333
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
33
3
3333
3
3
3
3
3
3
3
33
3
3
3
3
3
33
3
3
33333
3
3
3
3 3
33
3
3
33
3
333
3
3
33
3
33
3
3
3
3
3
3
3
3
3
3
3
3 33
3
3
3 3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3 3
33 3
3
3
3
3
3
3
33
3
3
3
3 3
3
3
3
3
3
3
3
3
33
3
3
3
3 3
3
3
3
3
33
3
33
3
3
333333
3
3
3
3
3
33
333
3
3
3 33 3
33
3
3
33
3
33
3
33
3
3
3
3
333
33
3 3
3
3
3
33
3
33
3 3
33
3
3
3
3
3
3
3
33
3
3
3
33
3
33
3
33
3
3
3
3
3
3
33
3
33
3
3
3
3
333
3
3 3
3
3
3 33 3
3
33
3 3
3
33
3
3
3
3
3
3
3 3
3
3 3
3
3
3
3
3
3
3
33
3
3
333
33
3
3
333
3
3
3
3
33
3
3
33
3
3
3
3
3
333
33
3
3
33
3
3
3
3
3
33
3333
3
3
3
3
3 3
3
3
3 3
3
3
3
33
3
3
3
3 3
3
3 3
3
3
3 3
3
3
33
3
3
33
3
33
3
3
3
33
3
3
3
3
3
3
3
3
3
3
33
3
33
3
3
3
3
3
3
33
3
3
3
3
3
33
3
33
3
33
33
333
3
3
33 33
3
33
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3 33
3
3
3
33
3
3
3
3
33
3
3
3
3
33
33
3
3
3
3
3333
3
3
3
3
33
3
3
33
3
33
3
3
33
3
33
3
33
3
3
3 33
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
33
33
3
33
3
33
3
3
3
33
3
33
3
3
33
33
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
33
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3333
3
33
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
33
33
3
3
3
3 3
33
3
121
21 27
101141133 157149
31
113 163 171 187
47191 197 201 205 227 229 237
16
12
8 4
7
9
15 11 7
2
4
6
8
10
12
14
35
32
1711
41
17
18
5
81536
1596
1666
23
29
62
1559
47
20
38
98
59
3
4
16
18
20
132 136
131 135
100
114
130
131
105
33
20
22
7
11
16
19
15
36
66
58 62
70
6763
5955
3
63
67
27
4
83
4
7
8
1115
19
23
22
16
8 20
2428
27 31
32
14
1012
38
9
2
55
211 215
216
203 207 219 223
196 200 204 208 212 220 224228
51
31
35
39
43
47
55
59
63
34
38
42
46
50
54
8
12
16
20
24
28
31
7
11
15
19
23
27
36 40 44 48 52
41 45 49 53
40
44
48
52
47
8
16
3
15
39
35
28
22
24
20
12 32
11
15
19
23
27
35
41
27
48
56
65
6068
72
9
1198
9781
26
1411
1595
301 Bldg. 1
30
25
1392 40
44
54
64
72
78
84
92
1419
100 112 118106
1395
19
33
37
11 15 21 27 33
37
3632
20
57
65
73
79
8797 105 113
85
26
46
1509
2
31
1510
24412437
1210
1548
1204
17
1676
1299
140
145
144 148 152 156 160 164 168 172 176 180 184 188 192
183179175171167163159155151
8 12
19 23 27
282420
16 20 24
12
54 50 46 42
57 53 49 45 41 37 33 29
11
15
19
23
23 27 31 35 39
43
47
55
59
63
67
71
70
66
62
54
36322824
9
11
1516
8
20
19
24681012
14
16
1820
22
24 19 17 13 9
4440363228242016124
7
11
15
9 19 41 45
191187
1433
25
35
34
6
1231
1610
130770
6866
64
60
5856
6163
65
67
73
54
8
5
12
4
8
12
16
20
2423
19
15
9
51
64
35
1620
1421
1016 22
9
40
191
195
1487
1491
31
60
32
22
26
30
19
23
27
31
34
38
42
35
39
43
54
55
1766
56
2443
301 Bldg. 2
301 Bldg. 3
1506
1376
1233
1495
1265
1400
1386
1550
1520
1440
77
1608
25
60
1628
1583
1577
37 65
1638
1642
66
7352
1394
83
16
3
84
7 11 43393735 41 45
1670
404642
76
22
84
88
Cor
nell
Str
eet
Om
ega
Driv
e
Sun
nybr
ook
Terr
ace
Jillian Court
Heather Way
Kap
pa A
venu
e
Loch
Lom
ond
Roa
d
Norm
an Drive
Hic
key
Roa
d
Car
olin
e C
ourt
Bin
g A
venu
e
Hollybrook Court
Edi
nbur
gh A
venu
e
Str
atho
rne
Ave
nue
Roata
n W
ay
Eas
t Str
eet
Sigma Street
Hig
h D
rive
McG
rego
r P
lace
Oak
hill
Cre
scen
t
Lakefield Court
Crescent Avenue
Mosaic Drive
Lomond Court
Thomas Road
MacNaughton Drive
Inverness Place
Kerr Road
Lam
da A
venu
e
Shillington Road
Bon Accord Drive
Ganong Road
Old Lake Trail
Pauline Street
Pauline StreetLift
Station
150PVC
300PVC
1200CONC
UNK
300 CONC
UN
K
UN
K
300 CONC
250 PVC
250PVC
250
PVC
UNK
200CONC
200PVC
300 PVC
UN
K
250 PVC
250PVC
250 PVC
250 PVC
250PVC
300 CONC
200PVC
250
DI
UNK
300PVC
250
PVC
250PVC
250
PVC
UNK
200 PVC
250
PVC
250
PVC
450 CONC
250
PVC
UN
K
200 U
NK
200
PVC
200
PVC
UNK
250 PVC
250
PVC
250 PV
C
200
PVC
200
PVC
600
CON
C
200
CON
C
600 PVC
200PVC
UNK
200PVC
200 PVC UN
K
UN
K
300
CON
C
525CONC
300PVC
250PVC
450 CONC
250
PVC
250
PVC
UNK
200PVC
200
PVC
UN
K
375 CONC
600CONC
UNK
200
PVC
200
UNK
300
PVC
450PVC
CONC
200 DI
250UNK
200
PVC
1050
CSP
250PVC
250 PVC
250
PVC
450
CONC
200
PVC
250PVC
200 PVC
200PVC
250
PVC
UNK
250PVC
UN
K
300
PVC
UN
K
200PVC
200PVC
200 CONC
250
PVC
525
CONC
250PVC25
0PV
C
200
PVC
UNK
300CONC
200PVC
200
PVC
250PVC
200
CONC
250PVC
300CONC
250PVC
200PVC
375PVC
300CONC
300
CON
C
200PVC
250CONC
250
PVC
300
CON
C
450PVC
200
PVC
300CONC
100 PPVCP
375
CON
C
200PVC
250PVC
375
PVC
UN
K
200
PVC
UN
K
375
CON
C
200 CONC
UNK
250
PVC
375
CONC
300 CONC
250
CON
C
375
CON
C
150
PVC
250PVC
200
PVC
200 PVC
300CO
NC
300 UNK
200 PVC
250PVC
200 PVC
250 AC
300 CSP
375PVC
150
CON
C
300PVC
200CONC
375U
NK
600
CON
C
600
CON
C
250 UNK
UN
K
200
PVC
750 CON
C
300
CONC
250 PVC
250
PVC
450CONC
375PVC
375
PPVC
P
525 C
ONC
600
UNK
300
PVC
200
PVC
200
PVC
300
UNK
375 PVC
300CONC
200
PVC
300 CONC
CONC
300 UNK300 CO
NC
600CO
NC
200 PVC
375 CONC
UN
K
450 PVC
200
PVC
200 PVC
200
PVC
200
PVC
750
CONC
375 PVC
300CONC
200PVC
200PVC
300 PVC
300
AC
300
PVC
300PVC
375 UNK
200
PVC
300
PVC
250
CON
C
450
CONC
200 CONC
375 PVC
375
PVC
375 CONC
300 PVC
200 PVC
450 CONC
200 CONC
200
UN
K
375 CONC
200 PVC
1200
CO
NC
375 UN
K
200 PVC
375 CONC
200
UN
K
1050 CONC
300 PVC
200
PVC
200
PVC
450 PVC
200 UNK
200 AC
450 CONC
300 CONC
200 CONC
450CONC
300
PVC
375
CON
C
450
CON
C
600
CON
C
200
PVC
375 CONC
300
CON
C
200PVC
200 PVC
375CONC
300
CON
C
200PVC
375
CON
C
450
CON
C
600 CONC
200 PVC
200PVC
200
PVC
200
PVC
200 UN
K
300 CONC
375 CONC
750
CON
C
200 PVC 375 CONC
300
PVC
200 PVC
Bon Accord Area
Inflow and Infiltration Study
March 15, 2021
Scale: 1:2,000
Lift Station
Storm SewerSanitary SewerStorm Manhole
Storm Catch Basin Type Two
Storm Catch Basin Type One
Sanitary Manhole
Study Limits
Previously Videoed Sanitary Sewer
33
3
3
33
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3 3
3
3
3
33
3 3
3 3
3
3
33
3
3
33
3
3
33
3
3
3
3
3
3
3 3
3
3
33
3
3
3
3
33
3 33
3
3
3
3
3
3
3
33 3
33
3
3
3
3
3
3
33
33
3
3
3
3
333
3
3 3
3
33
3
3
3
33
3
3
3 3
3
3
33
3 3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
33
3
3
3
3
333
3
3
3
3 3
333
3
3
3
3
3
3
33
3
3
3
3
3
3
3
333
3
33
3
3
3
3
3
3
3
3
3
33
3
3
3
33
3
3
3
3
33 3
3
3
33
3
3
3
3
3
3
3
3
3
33
3
33
3
33
3
3
3
3
3333
3
3
3
3
3
3
3
3
3 3
3
33
3
3
3
33
33
3
3 3
3
3
33
3
3
3
3
3
3
3
3
3
3
33
3
33
3
3 3
3 3
3
3
3
3
3
3
3
3 3
3
3
3
3
3 3
3
3
3
33 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
33
3
33
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
33
3
3
3
33
3 3
3
3
3
3
3
3
3
3
3
3
3
3 33
3 3
33
3
3 33
33
33 3
3
3
3
333
33
3
3
3
33
33
3
3
3
33
3
3
3
3
3
333
3
3
33
3
3
3
3
3
3
3
3
3
3
33
3
3
33
33
3
3 3
3
33
3
3
3
33
3
3
33
3
3
3
3
3
3
3
3
3
3
33
3
33
3
3
3
3
33
3
3
3 3
3
3
3
33
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3 3
3
3
3
3
333
33 3
3
3
3
33
3 3
3
3
33
333
3
3 3
33
3
33 3
3
3
3
3
3 3
3
33
3
33 3
3
3
3
3
33
3
3
3
33
3 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3 3
3
3
3
33
3
3
3
3
3
3
3
33
3
3
3
33
3
3
3
33
3
33
33
33
3 3
3 3
3
3
3
33
3
3
3
33
3
33
3
3 3
33
33
33
3
333
3
3
3
3
3
33
3
33
3
33
33
3
3
3
3
3
3
3
3 3
3
33
3
33
3
3 3
3
3
33
3
3
3333
3
3 3
333
33
3
3
3
3
3
3
33
3
33
3
3
3
33
3
3
3
3
3
33
3
3333
33
33
33
3
3
3
3
3
33
333
3
333
3
33
3
3
33
3
3
33
3
3
33
3
3 3
3
3
3
333
3
3
3
3
3
3
3
3
3
33
3
33
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3 3
33
33
33
33
3
33
3
3
3
3
3
3
3 3
3
3 3
33
3
3
3
33
333
3
3
33
3
333 3
33
33
3
3
3
3
33
3
3
33
3
333
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3 333
33
3333
3
3333
3
3 3
3
3
3 3
33
3
33
3
3
3
33
3
3
33
3 33
33
3
3
3
3
333
3
3
33 3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3 3
3
3
3
3
3
3
33
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
333
3
3
3
3
3 333
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
33
3
3
3
3
3
3
33
33
3
3
3
3
3
3
3
3
3
3
3
33
3
3
33
3
33
3
33
3
3
3
3
3
3
3
33
3
3
33
3
3
3
3
33
33
3
33
3
33
3
3
3
33
3
33
3
3
33
33
33
3
3
3
3
33
3
3
3
3
3
3
3
333
3
3
3
3
3
3
3
33 3
3
3
3
3
33
33
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
33
333
333
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
33
33
333
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
21
27
62
38
701703
705
707709
711713
801803
807809
813
817
901 905 911
100
114130
131105
33
66
58
62
7067
63
59
55
3
7
11
15103
104
107108
111112
115116
119120
123124
127
128
131132
135136
141140
144
147
148
20
9 2
55
1190
1315
1719
21
1
3
5
7
9
11
23 27 2931
130
10
65
9
100
84
47
1198
138
1411
1147
85
1501
815
550
402
502
408412418
506
510
514
518
522
902
906
912
916
920
812808
802
712
708
704
602 606 610616
77
1392
40
44
54
64
1395
11
19
33
37
11
15
21
27
33
3736
32
20
57
65
73
26
46
31
221219
217
215
213211
209
205203
201
1180
501505509515
3
181
153
1197
2429
87
1210
35
72
1204
139
1299
1183
1015
132
44
40
32
28
24
20
16
12
4
1115
9
19
41
45
25
35
34
6
1231
85
8121620
24
23
1915 9
1120
11001160
1414
116 110 104
20
308
304212
206
630
12
8
555
4
191
100
1385
525
222630
19232731
343842
3943
56
242541
35
32
36
40
44
1167
80
73125
106
31
1103
80
176
1203
54
117
1376
83
20
1009
999
11107
4
1021
89
1265
14001386
96
99
126
1350
66
57
977
116
65
5
8
46
7
2
7
10
10
14
12
4
9
4
5
12
10
7
8
16
6
19
67
11
9
14
64
6
57
11
16
13
17
29
144
12
21
8
9
15
77
11
937
11
835
830
840
784
799
850
1513
27
2523
21
1917
22
50
Eug
ene'
s W
ay
McA
llister Drive
Myl
es D
rive
Strathorne Avenue
Champlain Driv
e
Westbrook Avenue
Mountain View D
rive
Bon A
ccor
d Driv
e
McGregor Place
Lynn Avenue
Garnett R
oad
Lom
ond
Cou
rt
Inverness Place
Josselyn Court
Bruce Lane
Casey C
rescent
Mac
Nau
ghto
n D
rive
Colter S
treet
Josselyn Road
Silv
erst
one
Str
eet
Hig
hmea
dow
Driv
e
Car
lile
Cre
scen
t
Loch Lomond Road
Hickey Road
Hickey RoadLift Station
Private LiftStation
Forest HillsLift Station
450 CONC
750 CONC
UN
K
WOOD
300
CON
C
UNK
150
PVC
250PVC
50 HDPE
250
PVC
300CO
NC
UN
K
250UNK
250
PVC
250PVC
250
PVC
200 PVC
250
PVC
250
PVC
30 PVC
300 C
ONC
200 PVC
250UNK
200 PVC
200 CONC
200
PVC
UNK
200PVC
200
PVC
150 PVC
250UNK
200PVC
450
UN
K
UN
K
250
PVC
600
CON
C
600 CONC
750
UN
K
UN
K
750U
NK
200CONC
UNK
250PVC
150
PVC
250 UN
K
200
PVC
250 PVC
250 PVC
300 CONC
300
PVC
UNK
450CO
NC
250 UNK
450
CON
C
UNK
200UNK
UNK
250PVC
200PVC
UNK
200PVC
450 PVC
300
CONC
200
PVC
250UNK
UNK
750 CONC
250 PVC
CON
C30
0 CO
NC
200
PVC
450
CON
C
450CO
NC
375UNK
375UNK
200PVC
1050 CSP
250 PVC
300 PVC
300
CONC
150
PVC
300 PVC
250
PVC
65 PVC
UNK
UNK
150
PVC
200
PVC
300 CONC
75 PV
C
300 P
VC
250 PVC
300CONC
750 P
VC
200PVC
250
CON
C
300 CONC
750 CONC
UN
K
300
PVC
UN
K
250 PVC
200
PVC
250PVC
CONC
250PVC
250CO
NC
600
CON
C
250
PVC
250
PVC
300
UN
K
UN
K
300 CONC
200
PVC
250
PVC
PVC
375
CONC 300CONC
250
PVC
375CONC
200 PVC
250PVC
150 PVC
450UNK
250PVC
250PVC
200
CONC300
CON
C
300
CON
C
375PVC
450
CON
C
300 CONC
200
UNK
200PVC
300
PVC
250PVC
450
CONC
300
CON
C
450 CONC
300CONC
100
PPVC
P
200
PVC
600
CON
C
375
UNK
UNK
200
UN
K
250
PVC
100PVC
250
PVC
250
PVC
525
UN
K
UNK
300
UN
K
250
PVC
250 PVC
300CONC
375
CONC
375UNK
200
UN
K
300 CONC
375CONC
250UNK
150 PVC
200 PVC
250
PVC
450 UNK
375 PVC
300PVC
200
PVC
300PVC
200 UNK
UNK
350 CI
250PVC
300CONC
250
PVC
525
UNK
200
CONC
300 CONC
750CONC
600 CONC
375
UN
K
375 CON
C
250
UN
K
750
CONC
300
CON
C
200 PVC
300CONC
750
CON
C
300 CONC
200PVC
250
PVC
250 PVC
200PVC
300 UNK
200
PVC
300CONC
200 PVC
250
PVC
375 CONC
375PPVCP
450 UNKU
NK
250
PVC
300PVC
200 PVC
200
PVC
250 PVC
375
CON
C
200PVC
200 UNK
375
CON
C
250 UNK
450 CONC
600CONC
375 UN
K
200
PVC
250 P
VC
UN
K
UNK
375 P
VC
750 C
ONC
150PVC
300 PVC
375 UNK
200 PVC
200 PVC
450 CONC
450 PVC
200 PVC
450
CON
C
750 CONC
600 CONC
UNK
300
PVC
200 UNK
200 PVC
200 PVC
200 P
VC
200 PVC
375
CON
C
450 CONC
200 UNK
200PVC
200 PVC
200
PVC
600 PVC
200
PVC
375 PVC
200 PVC
200 UNK
200 P
VC
200 PVC
450 UNK
250 PVC
300
UN
K
300
PVC
50 PVC
200 PVC
250
PVC
375 PVC
300
PVC
450 PVC
500
PE
200 PVC
200
PVC
300 UNK
300
CON
C
375 CONC
300PVC
200 UNK
300 P
VC
250 PVC
300 AC
300 PVC
300 CON
C
300 CONC
300CONC
200
PVC
250 CONC
200 PVC
450 CONC
900 CONC
300 CONC
375 CONC
450 CONC
750 CONC
100 PVC
200
PVC
375
CON
C
200
PVC
450 CONC
200 PVC
300
PVC
65 PVC
75 PVC
200
PVC
300 CI
150 PVC
375 UNK
150 PVC
Silverstone Street Area
Inflow and Infiltration Study
March 15, 2021
Scale: 1:2,000
Lift Station
Storm SewerSanitary SewerStorm Manhole
Storm Catch Basin Type Two
Storm Catch Basin Type One
Sanitary Manhole
Study Limits
Previously Videoed Sanitary Sewer
3
3
3
3 33
33
3
3
3
3
3
3
3
3
3
3
33
3
3
3
333
3
33
3 3
333
3
3
3
3
3
3
3
3
3
3
3
3 3
3 3
3
3
3
3
3
3
3
3 3
3
3
3
3
3 3
3
3
3
3
3
3 33
3
33
3
3
3
3
3
3
33 3
3
3
3
3
3
3
3
3
33
3
33
3
3
3
3
33
3
3
3
3
3
3
3
3
333
33
33
33
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
33
33
3
3
33
3
3
33
3
3
3
33
3 3
3
3
3
3
3
3
3
3
3
3
3 33
3 3
33
3
3 33
33
33 3
3
3
3
333
33
3
3
3
33
33
3
3
3
33
3
3
3
3
3
333
3
3
33
3
3
3
3
3
3
3
3
3
3
33
3
3
3
33
33
3
33
3333
3
33
33
3
33 3
3
33
333
3
3 3
3
3
3
3
3
3
3
3
333
3
3
33
3
3
3
3
3
3
3
33
3
3
3
33
33
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3 3
3
3
3
33
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3 3
3
3
3
3
3
3 3
3
3
3
3
3333
33
3
3
33
3
3
3
3
3
3
3
3 3
3
33
3
33
3
3 3
3
3
33
3
3
3
3
3
3
33
3
3
33 3
33
3
33
33
3
3
3
3
33
3
3
333
3
3
3
3
333
33
3
3
33
3
3
333
3
3
3333
3
33
3 3
3
33
33
33
3
3
3
3
3
3
3 33
33
3
3
33
3
333
3
3
33
3
3
3
3
3
3
3
3
3
33 3
3
3
3
3
3
3333
33
3 3
3
3
33
3
3
3
3 3 3
3
33
3
3
3
3
3
33
33
33
3
33
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
33
3
3 3
3
33
3
3
3
3
3
33
3
3
3
3
3
33
33
33
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
3
33
333
3
3
3
3
3
3
3
3
3
3
333
3
33
3
3
33
3
3
33
3
3
33
3
3 3
3
3
3
333
3
3
3
3
3
3
3
3
3
33
3
33
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3 3
33
33
33
33
3
33
3
3
3
3
3
3
3 3
3
3 3
33
3
3
3
33
333
3
3
33
3
333 3
3
33
33
3
3
3
3
33
3
3
33
3
333
3
3
3
3
3 3
33
3
3
3
3
3
33
3
3
3
3
3
3 3
33
3
33
3
3
3
3
3
3
3
3
3
33
3
3
3
3 333
33
3333
3
3333
33
3
33
3 3
33
3
3
3
3
33
3 3
3
33
3
33
3
33
3
3
3
33
3
3
33
3
3 33
33
3
3
3
33
3
3
3
3
3
3
3 3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
3
3
3
3
3
33
3 3
33
33
3
3
3
3
3
33
3
3
3
33
3
3
3
3
3
3
3
3
3
33
33
3
33
3
33
3
3
3
33
3
33
3
3
33
33
3
3
3
3
33
3
3
33
3
3
3
3
3
3
3
3
3
3
3
33
3
33
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
33
333
333
3
3
3
3
3
3
3
33
3
3
3
3
3
3
3
3
3
3
3
3
3
33
33
333
3
3
3
3
3
3
3
3
33
33
3
3
3
35
32
12
17
17001826
11
41
17
18
1531
5
8
1536
1807
1842
1816
1858
1785
1596
1905
1666
23
29
1557
1845
6
1823
1523
1559
1834
151777
47
20
16 18 2014
27
4
8
3
4
7
8
11
15
19
23
22
14
31
51
3135 39 43 47
5559
6334 38 42 46
5054
8
12
16
20
24
28
31
7
11
15
19
23
27
36
40
44
48
52
41
45
49
53
1519
3
35
2
22
18
7
15
19
23
27
6
10
14
286
292
30 40
5060
7080
100110
120130
44
43
51
55
63
71
75
59
67
39
56
60
64
72
3
8
11
15
1920
23
24
27
28
3132
28
22 24
20
12
32
11
15
19
23
27
35
41
27
48
208
174
168
164
158
152
146
140
26
1501
1595
301 Bldg. 1
30
25
154 150 146 140 136 130 126118 114 108 104 96
88 84 78 72 68 64 62 5854 50
42 3830
31394145515963697381859197103109113119125129137
161
175
179 209 213 219 223 229 233 241 245 251 263 281
268262256250246242
232224216208200190
186
182
178
174
168
162
160
5
305
255
63
45 51 5767 73 79
83 89 95 101 107 111117
127133
185191197201207211219223229235241247251
236 228 222 218 212
1510
35
1815
1676
26 16
4
5
15
19
2420
16
12
8
4
7
15
19
2124
20
16
12
8
45
9
15
19
23
2728
24
20
16
12
8
4
99 95 9187
23
3
7
11
15
19
98
8
12
16
11
7
3 4
8
12
15
27
20
31
24
35
28
19
23
8
16
20
24
12
66
70
62
54
50
46
42
7975
71
69
65
61
57
53
49
45
41
37
33
29
39
43
47
51
55
5963
64
60
56
52
3
7 11 15 19 23
83
23
27
31
35
39
43
4755
59 6367
71
7066
6254
36
32
28
249 11
15
16
820
16
12
8
4
3
9
11
1115
12
8
4
15
19
2
46
8
10
12
14 16 18 22 24
19
1715
13
11
9
1610
1720
70
6664
60
61
6567
54
16
12
51
4
6
8
10
1620
259
263
267
273
277
281
21
17
119
5
31
2725
16
20
242
6
10
14
307309
311
1710
303
299
1799
10
16
22
1414
1865
269 273
1385
1766
301 Bldg. 2
301 Bldg. 3
31
1376
1490
60
1628
66
1533
1500
1670
Daw
n P
lace
Eveleigh C
ourt
Falcon C
rescent
Loch Lomond Road
Morning S
ide Court
Boyaner Crescent
Wyatt Crescent
Sunnybrook Terrace O
akhi
ll C
resc
ent
Eagle Boulevard
Om
ega
Driv
e
Jilli
an C
ourt
Hea
ther
Way
Kappa Avenue
Eastw
ood Drive
Laur
ie C
ourt
Caroline Court
Hol
lybr
ook
Cou
rt
East Street
Sig
ma
Str
eet
Shi
lling
ton
Roa
d
Bruce Lane
High Drive
Grandview Avenue
Cre
sthi
ll S
tree
t
Thom
as Road
Lamda Avenue
Ker
r R
oad
Hickey Road
Hickey Road LiftStation
200 UNK
450
CON
C
300
CONC
UNK
1050 CONC
300PVC
UN
K
200PVC
UNK
450PVC
UNK
250PVC
UNK
200
PVC
UNK
UN
K
UNK
300PVC
200
PVC
UNK
UN
K
250PVC
250
PVC
250
PVC
UNK
250
PVC
200
PVC
250
PVC
UN
K
UNK
300
PVC
UNK
250PVC
UNK
UNK
250
PVC
250
PVC
UNK
250PVC
UN
K
UN
K
300
PVC
250PVC
250PVC
UNK
250PVC
UN
K
UNK
200 PVC
250 PVC
250 PVC
450
CON
C
UN
K
UNK
250PVC
UNK
250PVC
UNK
250PVC
250 PVC
UNK
750
UN
K
250
PVC
UNK
250CONC
750U
NK
250PVC
UNK
250 PVC200 PVC
250PVC
200 PVC
UNK
375
UN
K
UNK
UNK
300
PVC
250PVC
250 PVC
UNK
200 PVC
250PVC
UNK
UNK
UN
K
375 C
ONC
UN
K
300
CONC
200
PVC
UN
K
UN
K
UN
K
300 PVC
UNK
UNK
450 PVC
UNK
200
PVC
UN
K
UNK
250 CONC
200 PVC
UNK
1050 CSP
200
PVC
300 UNK
250
PVC
250 PVC
200PVC
250 PVC
UNK
UNK
UN
K
250PVC
200
PVC
150 UNK
UNK
200 AC
200
UNK
200 AC
200 AC
250PVC
200 PVC
200 PVC
300 CONC
200
PVC
250
PVC
200
AC
250
UN
K
200
PVC
250PVC
250 PVC
UN
K
250
PVC
250
PVC
250PVC
300CONC
300 PVC
200
AC
300
PVC
250PVC
UNK
200
PVC
250
PVC
200
PVC
250
PVC
250PVC
UNK
UNK
250 CONC
250PVC
250
PVC
250
PVC
200
PVC
1200CONC
250CONC
375 PVC
250
CON
C
375 CONC
250PVC
200
PVC
250PVC
UNK
250PVC
UNK
450
PVC
250
PVC
450
CONC
250PVC
450 CONC
200 PVC
250PVC
375PVC
UNK
UNKUNK
200 PVC
250PVC
UNK
450CONC
UNK
UNK
500
CON
C
UNK
UNK
250
PVC
200
CONC
750 CONC
200
PVC
900 CONC
300CONC
UNK
UNK
250
PVC
200 PVC
UNK
200
AC
300PVC
200
PVC
375UNK
250PVC
UNK
200PVC
375
PVC
600 UNK
200
PVC
200 PVC
300 UNK
200
PVC
200 PVC
300
CON
C
250 AC
CONC
250 CONC
250
PVC
UNK
450 CONC
250 PVC
200 PVC
200 PVC
525 CONC
UNK
300
CON
C
200 PVC
200PVC
300PVC
375
UNK
200
PVC
250
PVC
200 PVC
UN
K
200 PVC
200
CON
C
375 PVC
UN
K
UN
K
300
CONC
375 PVC
350 AC
200 UNK
600
CONC
450 CONC
375 UNK
375 PVC
200 PVC375PVC
375
CONC
375
PVC
200
PVC
200PVC
375 CONC
525
CONC
250 CONC
375
CON
C
300 C
ONC
UNK
200 PVC
250 PVC
200 CON
C
200 PVC
200 PVC
900
CON
C
300 PVC
375 CONC
200 AC
600
CONC
300 AC
300 CONC
200PVC 300 CONC
150
UN
K
450
CONC
200
PVC
250 AC
375
CON
C
250
PVC
450 CONC
200 PVC
375 CON
C
525 CON
C
200 AC
900
CONC
600 CONC
900 CONC
200
PVC
375CONC
300 CON
C
300 CONC
375 CON
C
750 CONC
UN
K
200
AC
300
CON
C450 AC
200PVC
1200
CO
NC
300
CONC
1500 CONC
300 PVC
450 CONC
200 PVC
200
PVC
300 CON
C
1200 CONC
375 CONC200 AC
200PVC
300CO
NC
200
PVC
500
PE
GeoEye, Maxar
Heather Way Area
Inflow and Infiltration Study
March 15, 2021
Scale: 1:2,000
Lift Station
Storm SewerSanitary SewerStorm Manhole
Storm Catch Basin Type Two
Storm Catch Basin Type One
Sanitary Manhole
Study Limits
Previously Videoed Sanitary Sewer