REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING CONSTRUCTION SERVICES THE ARIZONA BOARD OF REGENTS For and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR ASU JOC No. 2015 16000 RFQ JOB ORDER CONTRACTING DUE DATE/TIME: 1:00 PM, MST, APRIL 3, 2015 February, 2015 EDITION Time and Date of Pre-Submittal Conference 9:00 AM, MST, 03/09/15 Deadline for Inquiries 5:00 PM, MST, 03/18/15 Time and Date Set for Submittals 1:00 PM, MST, 04/03/15 Page 1 of 108 ASU JOC 2015 - 16000 RFQ

REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING CONSTRUCTION SERVICES

THE ARIZONA BOARD OF REGENTS

For and on behalf of

ARIZONA STATE UNIVERSITY

REQUEST FOR QUALIFICATIONS FOR

ASU JOC No. 2015 16000 RFQ

JOB ORDER CONTRACTING

DUE DATE/TIME: 1:00 PM, MST, APRIL 3, 2015

February, 2015 EDITION Time and Date of Pre-Submittal Conference 9:00 AM, MST, 03/09/15 Deadline for Inquiries 5:00 PM, MST, 03/18/15 Time and Date Set for Submittals 1:00 PM, MST, 04/03/15

Page 1 of 108 ASU JOC 2015 - 16000 RFQ

Page 2: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

TABLE OF CONTENTS SECTION 1 REQUEST FOR QUALIFICATIONS ............................................................................................................... 4

ARIZONA BOARD OF REGENTS REQUEST FOR QUALIFICATIONS (RFQ) ............................................................. 4

LEGAL ADVERTISEMENT ASU No. 2015 16000 RFQ .................................................................................................. 6

SECTION 2 GENERAL INSTRUCTIONS ........................................................................................................................... 7

SECTION 3 SPECIFICATION AND SCOPE SERVICES ................................................................................................. 11

SECTION 4 PROPOSAL FORMAT AND CONTENTS ..................................................................................................... 17

RFP CHECKLIST ........................................................................................................................................................... 17

COVER SHEET ............................................................................................................................................................. 17

TABLE OF CONTENTS ................................................................................................................................................. 17

TAB 1 ............................................................................................................................... LETTER OF INTRODUCTION ....................................................................................................................................................................................... 17

TAB 2 ..................................................................................................................... STATEMENT OF QUALIFICATIONS ....................................................................................................................................................................................... 18

TAB 3 ................................................................................................................................ ADDITIONAL INFORMATION ....................................................................................................................................................................................... 21

TAB 4 ................................................................................................................ FORMS AND ACKNOWLEDGEMENTS ....................................................................................................................................................................................... 21

SECTION 5 SELECTION PROCESS ................................................................................................................................ 23

SECTION 6 FINANCIAL PROPOSAL .............................................................................................................................. 26

SECTION 7 REGULATORY INFORMATION ................................................................................................................... 27

SECTION 8 ATTACHMENTS ............................................................................................................................................ 38

ATTACHMENT A ........................................................................................................................................................... 38

Standard Form of Agreement and Contractor General Conditions ....................................................................... 49

ATTACHMENT B ........................................................................................................................................................... 90

RFQ Checklist ........................................................................................................................................................ 90

ATTACHMENT C Performance and Payment Bond Form ............................................................................................ 91

ATTACHMENT D ........................................................................................................................................................... 93

Firm’s General Information .................................................................................................................................... 93

SECTION 9 EXHIBITS ....................................................................................................................................................... 94

EXHIBIT A ...................................................................................................................................................................... 94

JOC Project Request Form .................................................................................................................................... 94

EXHIBIT B ...................................................................................................................................................................... 95

Form of Job Order .................................................................................................................................................. 95

Page 2 of 108 ASU JOC 2015 - 16000 RFQ

Page 3: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

EXHIBIT C ..................................................................................................................................................................... 99

Pre-Construction Price Information Submittal – Division 1 .................................................................................... 99

Pre-Construction Price Information Submittal – Division 2 .................................................................................. 100

Pre-Construction Price Information Submittal – Division 3 .................................................................................. 101

EXHIBIT D ................................................................................................................................................................... 102

Division 1 General Requirements Construction – Division 1 Price Information Submittal .................................. 102

Division 1 General Requirements Construction – Division 2 Price Information Submittal .................................. 104

Division 1 General Requirements Construction – Division 3 Price Information Submittal .................................. 106

Document Listing ......................................................................................................................................................... 108

The Forms, Acknowledgements, and General Information and Instructions are part of the Request for Qualifications and the terms, conditions and criteria therein must be met by any Proposer. To find these items, go to: http://cfo.asu.edu/purchasing-forms.

Page 3 of 108 ASU JOC 2015 - 16000 RFQ

Page 4: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 1 REQUEST FOR QUALIFICATIONS

ARIZONA BOARD OF REGENTS REQUEST FOR QUALIFICATIONS (RFQ)

Arizona State University (ASU) extends an invitation to interested and qualified firms or individuals to submit formal sealed qualifications to provide job order contracting construction services for the ASU Job Order Contracting Program (ASU JOC Program) as described herein.

Proposals shall be marked as follows:

Submitting Firm:

Project Name: ASU JOC Program RFQ Project Number: 2015-16000 RFQ Attention: Gail Horney Time/Date Due: 1:00 PM, MST, April 03, 2015

Formal sealed qualifications need to be either hand delivered or express mailed and addressed and delivered to Purchasing and Business Services, University Services Building, Reception Desk in the Main Lobby to:

Express delivery:

Attention: Gail Horney RFQ Project Number: 2015-16000 RFQ Arizona State University, c/o Purchasing and Business Services 1551 S. Rural Road Tempe, Arizona 85281

Or, if mailed:

Attention: Gail Horney RFQ Project Number: 2015-16000 RFQ Arizona State University c/o Purchasing and Business Services PO Box 875212 Tempe, Arizona 85287-5212

Telegraphic, telephonic or telecopy (FAX) submittals or modifications of submittals will not be considered at this time. Proposals received after the time and date set for submittal will not be considered, and will be returned to the sender. Each Proposer is solely responsible for the delivery of its Proposal to the above location by the time and date specified. If a Proposer elects to submit its Proposal by mail, the Proposal must be received in ASU Purchasing and Business Services offices in the University Services Building by the time and date due. ASU is not responsible if U.S. Mail or ASU Mail Services fails to make a delivery on time. This proposal is open until 01:00 PM, MST, April 03, 2015, at which time a representative of Purchasing and Business Services will announce publicly only the names of those firms or individuals submitting qualifications. No other public disclosure will be made until after the award and execution of the contract. DIRECTIONS TO USB VISITOR PARKING AND BUILDING PROTOCOL For delivery of submittals, Purchasing and Business Services is in the University Services Building, 1551 S. Rural Road, Tempe AZ, 85281, located on the east side of Rural between Broadway Ave. and Apache Blvd. Visitors may park in USB Lot 45 located directly behind the building using the Pay by Space machine ($2.00 per hour). The meter will be

Page 4 of 108 ASU JOC 2015 - 16000 RFQ

Page 5: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

located near the main entry to USB to allow visitors to park their vehicles and easily access the machine on their way into the building. Warning: If you are attending a meeting, interviews, or similar meeting, please do not park in any reserved spaces. For example, 20 min loading, Human Resources 20 min parking, or Financial Services reserved spaces, etc. If your vehicle is ticketed or towed, you will be responsible for your vehicle. See the legal advertisement on Page 6 for information on the Pre-Submittal meeting. If you are visiting USB anywhere other than the Front Lobby, check in and obtain a visitor’s badge from the USB Reception Desk to wear while in the building. The receptionist will call to have you escorted to your meeting. RETURN OF PROPOSALS ASU will return any proposals that are left at the front desk after the scheduled opening date and time. ARIZONA STATE UNIVERSITY

Gail Horney __________________________ Gail Horney Senior Buyer, Construction Services Purchasing and Business Services [email protected]

Page 5 of 108 ASU JOC 2015 - 16000 RFQ

Page 6: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

LEGAL ADVERTISEMENT ASU No. 2015 16000 RFQ Project Description Job order contracting construction services for the ASU Job Order Contracting Program. Owner is seeking to contract with multiple construction contractors to provide job order contracting construction services. Formal sealed qualifications are due on or before 01:00 PM, MST, April 03, 2015. Pre-Submittal Conference A Pre-Submittal Conference is scheduled for 9:00 AM, MST, March 9, 2015 in the Memorial Union on the Tempe Campus, Room MU 220 (Turquoise). It is recommended that you park in the Fulton Center Parking, located on College and University. Cross University and walk south to the Memorial Union. Reference the ASU Parking Map at http://www.asu.edu/map. Attendance is highly recommended for those who desire to submit a Proposal. Companies will be limited to two (2) individuals per firm. Bring your business card for streamlined sign-in. Obtain a Copy of RFQ The Request for Qualifications instructions, a description of requested services, information on the Project and a description of the proposal and selection process is available at the Arizona State University Bid Board at http://asu.edu/purchasing/bids/construction_bids.html. Copies of the documents are available on the ASU Purchasing Construction bid board at http://www.asu.edu/purchasing/bids/construction_bids.html. ASU reserves the right to cancel this Request for Qualifications, to reject any or all Proposals, and to waive or decline to waive any irregularities in any submitted Proposals, or to withhold the award for any reason ASU may determine to be in ASU’s best interest. ASU also reserves the right to hold open any or all Proposals for a period of one hundred twenty (120) days after the date of opening thereof and the right to accept a Proposal not withdrawn before the scheduled opening date. All correspondence relating to this Project should be addressed to: Purchasing and Business Services ARIZONA BOARD OF REGENTS Attention: Gail Horney Title: Sr. Buyer By Mark Killian Arizona State University Chair PO Box 875212 Tempe, Arizona 85287-5212 By Greg Patterson Phone: (480) 727-2439 Secretary Facsimile: (480) 965-2234 Email address: [email protected] Publication Date: Daily Sun News on 02/19/2015 and in the East Valley Tribune 02/19/2015

Page 6 of 108 ASU JOC 2015 - 16000 RFQ

Page 7: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 2 GENERAL INSTRUCTIONS

All responses to the Job Order Contracting should follow the format and order described in the “Proposal Contents” sections below; this will allow a standard basis for evaluation. Failure to follow the instructions regarding format and order may result in rejection of your Proposal.

If the Proposer is a corporation or other legal entity, the Proposal must be signed by the legal name of the corporation followed by the name of the state of incorporation or organization and the legal signature of an officer or other person authorized to bind the corporation or other legal entity to a contract.

2.1 DEFINITION OF “PROPOSER” AND “PROPOSAL”

Wherever the word “Proposer” is used in this RFQ, it shall mean each or any of the individuals, firms, partnerships, joint ventures, corporations or other legal entities, submitting their qualifications under this RFQ. Wherever the word “Proposal” is used in this Request for Qualifications, it shall mean the statement of qualifications submitted by a Proposer.

2.2 LICENSE IN ARIZONA

All contractors engaged in ASU construction shall be licensed by the Registrar of Contractors in the State of Arizona for the types of work (construction) included in the project. Each Proposer must hold a current license of the appropriate category issued by the Arizona Registrar of Contractors at the time the Proposer submits its Proposal.

2.3 ARIZONA OFFICE

Proposers will be required to have an office in the State of Arizona. If one does not already exist, the selected firm shall establish an office in Arizona within 30 days after the date of Owner’s letter of intent to award contract. An office within the state is evidenced by a mailing address, telephone number, payment of utilities, registration with the Corporation Commission, and possession of appropriate business licenses.

2.4 ACCEPTANCE OF CONTRACT DOCUMENTS

A copy of the current ASU standard forms of contract documents can be accessed at the Internet addresses below. If you do not have access to the Internet contact the Buyer or Office Specialist listed in the RFQ document.

http://cfo.asu.edu/purchasing-forms

2.5 JOC DOCUMENTS AND FORMS

• 2015 JOC RFQ (Includes General Information & Instruction) Contractor General Conditions

Attachments • JOC Attachments

Exhibits • JOC Exhibits

• Standard Form Agreement Between Owner and Contractor

If selected as one of the JOC contractors for this proposal, the contractor agrees to execute the Master contract document. The Proposer understands that any exceptions taken to the form of contract documents that are not accepted and/or approved by ASU may be a basis for rejection of the Proposer’s Proposal as non-responsive. The Proposer also understands that ASU may make changes

Page 7 of 108 ASU JOC 2015 - 16000 RFQ

Page 8: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

in the standard form of contract documents and that therefore the form of contract documents presented to the successful Proposer may be different from the form of contract documents referred to above, in which case the successful Proposer will be given the opportunity to review the changes.

This Request for Qualifications, any addenda to this RFQ issued by ASU, and the Proposal of the successful Proposer are included in the contract documents.

2.6 TEAM APPROACH

ASU intends to form a team (consisting of ASU as the Owner, the JOC, the design professional, the JOC’s subcontractors and the design professional’s consultants) that will work well together in a cooperative and mutually supportive manner for the benefit of all the members of the team. The desire is a “team” or “win-win-win” arrangement. Team members will focus on this over-all objective and not on protecting their own individual interests. The following will be the team goal:

ASU sets goals for each project to ensure the completion of a quality Project meeting ASU’s needs, within ASU’s budget, within ASU’s time schedule, meeting ASU Project Guidelines at a reasonable and appropriate cost to ASU and, the JOC, and each subcontractor.

ASU considers a team approach to be a critical qualification for the JOC.

2.7 RESTRICTION ON COMMUNICATION

Proposers and members of their teams shall not communicate concerning this RFQ with the ASU Project Manager, Selection Committee members, students, or employees of ASU,

Proposers shall not submit or communicate in any way to ASU any information on fees, coefficients, price (hourly rates), man-hours or any other cost information. Arizona law prohibits ASU from considering any information on fees, price (hourly rates), man-hours or any other cost information during the Request for Qualifications competition. Accordingly, any Proposal that contains any information of this type will be deemed non-responsive, will not be considered and will be returned to the Proposer. This exclusion of information applies to the contractor’s formal sealed qualifications, to any interview and to all other aspects of the RFQ technical competition. A separate pricing form shall be submitted with the Proposal in a separate sealed envelope. ASU will only open these envelops after formal interviews have been conducted and the final list of Proposer rankings has been established. All Proposers who failed to advance in the process will have their un-opened pricing envelope returned at the conclusion of this RFQ/Pricing/Interview process. (See Section 6),

2.8 DELIVERY OF PROPOSAL IN RESPONSE TO THIS RFQ

Proposal must be delivered so it is received by ASU on or before the day and hour set for receipt of Qualifications. Proposals received after the appointed time will not be accepted.

2.9 WITHDRAWAL OF PROPOSALS

Proposals may be withdrawn either personally or by written request any time before the scheduled opening date and time, but not after.

2.10 PROPOSERS INTERESTED IN MORE THAN ONE PROPOSAL

No Proposer shall be permitted to submit more than one (1) Proposal for the JOC RFQ.

Page 8 of 108 ASU JOC 2015 - 16000 RFQ

Page 9: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

2.11 NO ASU OBLIGATION

This RFQ does not obligate ASU to pay any costs incurred in the preparation and submission of Proposals or in negotiating a contract with any Proposer.

2.12 INTERPRETATION OF RFQ DOCUMENTS BEFORE SUBMISSION

2.12.2 Informal Questions

If you have informal questions about technical information regarding this Request for Qualifications or if you have informal questions about the purchasing process, please contact the Buyer listed in Part I.

2.12.2 Formal Questions

All formal inquiries or requests for significant or material clarification or interpretation, or notification to the Owner of errors or omissions relating to this Request for Qualifications must be on the Submittal Inquiry Form, (See Section 4 Tab 4 Forms), directed by email in writing, to the Buyer list in Part I or to [email protected]

Note: ASU may answer informal questions orally. ASU makes no warranty of any kind as to the correctness of any oral answers and uses this process solely to provide minor clarifications rapidly. Oral statements or instructions shall not constitute an amendment to this RFQ. Proposers shall not rely on any verbal responses from ASU.

2.12.3 Interpretations and Addenda

Should a Proposer find any ambiguity, inconsistency or error in the RFQ or should the Proposer be in doubt as to its meaning, he or she shall at once notify the Buyer, in writing, who will send a written addendum by E-mail to all Proposers who are on record with the Buyer as having been sent a copy of the RFQ. Neither ASU nor its representatives will be responsible for oral instructions or information. Interpretation or correction of the RFQ will be made only by written addendum, which will be mailed or delivered to each Proposer of record. ASU is not responsible for any other explanations or interpretations of the RFQ.

If a Proposer on the Final List at the end of the competition should fail to receive any addendum or should fail to acknowledge receipt of same, the Proposer shall have the option of staying on the Final List under the terms of the RFQ including the addendum or of withdrawing from the Final List in which event the next most qualified Proposer will be added to the Final List. ASU is not responsible for assuring delivery of addenda to any Proposer. Addenda are always posted on the ASU Bid Board at www.asu.edu/purchasing/bids. Failure to receive addenda or failure to acknowledge receipt shall not constitute a basis for claim, protest or reissue of the Request for Qualifications.

The Proposers shall acknowledge receipt of addenda in the space provided on the RFQ Certification Form, (Referenced in Section 4 in Tab 4).

Requests must be submitted on a copy of the Submittal Inquiry Form, (Referenced in Section 4 in Tab 4), to this RFQ. All formal inquiries must be received by ASU on or before the Deadline for Inquires of 5:00 P.M., March 18 2015. Failure to submit inquiries by this deadline may result in the inquiry not being answered.

Page 9 of 108 ASU JOC 2015 - 16000 RFQ

Page 10: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

2.12.4 Proprietary Information

If a Proposer is submitting any information it considers proprietary, the Proposer must place it in a separate envelope and mark it “Proprietary Information”. If the Director of ASU Purchasing concurs, this information will not be considered public information. The Director of ASU Purchasing is the final authority as to the extent to which material is considered proprietary or confidential. ASU shall have no liability for disclosure or use of unmarked data. Unless identified, information submitted in a Proposal may be disclosed pursuant to applicable Arizona Public Records Law and other applicable Arizona Revised Statues.

2.12.5 Proposal Protests

ASU believes that it can best maintain its reputation for treating contractors and/or suppliers in a fair, honest, and consistent manner by conducting solicitations in good faith and by granting competitors an equal opportunity to win an award. If you feel that we have fallen short of these goals, you may submit a protest pursuant to the Arizona Board of Regents procurement procedures, Section 3-809, in particular Section 3-809C. This paragraph does not include all of the provisions of the Regents procedures, but it does tell you what you have to do to initiate a protest. First, you have to be an "interested party." An interested party" is an actual or prospective contractor submitting formal sealed qualifications whose direct economic interest may be affected by the issuance of a solicitation, the award of a contract, or by the failure to award a contract. Whether an actual prospective contractor has a direct economic interest will depend upon the circumstances in each case. At a minimum, the interest must be substantial and must be tangibly affected by the administrative action or proposed action concerned in the case. Second, you must submit the protest in a timely manner. In procurements requesting qualifications/proposals, protests based upon alleged errors, irregularities or improprieties in a solicitation that are apparent before the closing date for receipt of initial qualifications/proposals shall be filed before the closing date for receipt of initial qualifications/proposals. Protests concerning improprieties that do not exist in the initial solicitation, but that are subsequently incorporated into the solicitation, shall be filed by the next closing date for receipt of qualifications/proposals following the incorporation. In cases other than those just covered, protests shall be filed no later than ten (10) days after a contract is awarded in connection with the procurement action. Failure to file a protest in a timely manner shall be deemed a waiver of all rights. Third, and finally, your protest shall be in writing and shall include the following information: (1) The name, address, area code, telephone number, and fax number of the protestor; (2) The signature of the protestor or its representative;(3) Identification of the solicitation or contract number; (4) Detailed statement of the legal and factual grounds of the protest including copies of relevant documents; and (5) The response or relief requested. Protests should be directed to: Nichol Luoma, Director Tel: 480-965-6532 Purchasing Email: [email protected] Arizona State University PO Box 875212 Tempe AZ 85287-5212 Please note that as the Owner takes protests very seriously, we expect you to do so as well. Frivolous protests will not result in gain for your firm.

Page 10 of 108 ASU JOC 2015 - 16000 RFQ

Page 11: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 3 SPECIFICATION AND SCOPE SERVICES

NOTE: ASU reserves the right to cancel all agreements at their discretion. Requirements under this section also apply to and refer you to ABOR policies (Bidding and Source Selection Procedures) Section 3-803.

3.1 JOB ORDER CONTRACTING (JOC) OVERVIEW

3.1.1 A Job Order Contract (JOC) is a competitively procured, fixed-fee indefinite-quantity contract. It is

placed with a contractor(s) for the accomplishment of minor construction, emergency repair, rehabilitation and alteration services for the duration of the Project and a warranty period of two years. Ordering is accomplished by issuance of a Project Request Form (Exhibit A) and a Form of Job Order (Exhibit B) against the Master Contract. Under the JOC concept, the Contractor(s) furnishes management, labor, materials, and equipment needed to perform the work.

The primary purposes of the ASU JOC Program are:

• To provide Owner with the means to accomplish multiple projects at various ASU locations in

a short time frame. • To assure quality construction work. • To complete each project for a reasonable and appropriate price.

3.1.2 Job Order Contractor(s) are expected to know and follow both the ASU Facilities Development &

Management Project Guidelines (formerly known as the ASU Design Guidelines) revised May 2013; and, the Environmental Health Services Guidelines for Construction and Demolition. Include all aspects in your submittal of your methodology to meet the requirements of the ASU Project Guidelines - sustainability, signage, accessibility and so forth.

3.1.3 The ASU JOC Program is an indefinite quantity, job order contracting arrangement for such

construction services as Owner may request from time to time by issuance of a separate job order for each project. It is anticipated that there will be multiple projects, under multiple job orders at multiple ASU locations. Owner will issue a separate job order for each project. Each job order will describe the construction work to be provided by contractor for that project.

3.1.4 The work will be on real property at Arizona State University, including but not limited to:

• ASU at the Tempe Campus in Tempe, Arizona • ASU at the West Campus in Phoenix, Arizona • ASU at the Polytechnic Campus in Mesa, Arizona • ASU at the Downtown Phoenix Campus in Phoenix, Arizona • ASU at the Lake Havasu Campus in Lake Havasu, Arizona • Any ASU leased buildings in various locations

3.1.5 The amount to be paid by the Owner for the project under each job order is determined after final

scope is developed, subcontracts are signed, and the final price have been agreed upon. The total contract price for each job order will not exceed $1,999,999; and construction, alteration, rehabilitation, remodeling, renewal and renovation. To allow for change orders, the maximum initial amount of each job order will not exceed $1.8 million without prior approval.

3.1.6 Other JOC contractors with cooperative contracts may be used but require CPMG management

approval and must provide a service not available within the selected finalist capability or capacity.

3.1.7 Job Order Contracting will consist of three (3) methods for pricing a Job Order Request against the contract. The Owner will determine which method will be used for a particular request. The methods include:

Page 11 of 108 ASU JOC 2015 - 16000 RFQ

Page 12: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

A. Unit Price Method: Pricing using a Unit Price Book (UPB). The University is providing an Excel JOC Spreadsheet, (Exhibit E), to the Contractor to prepare the total cost estimate. This method utilizes the following Cost Data books RSMeans CostWorks, as published annually with quarterly updates by Construction Market Data, with local location factors applied to an electronic version of the RSMeans CostWorks Software for the Year of the contract.

Means Facility Construction Cost Data (Computer CD Version)***

a. Facilities Construction Cost Data Book b. Facilities & Commercial Renovation Cost Data Book c. Facilities Maintenance and Repair Cost Data Book

*** Computer CD Version Normalized to Phoenix Zip Code 850, Updated quarterly with inflation data

B. Three Bid Method: Pricing consists of obtaining a maximum of three quotes, unless

otherwise approved by Owner, from a list of pre-qualified subcontractors for each trade, selecting the lowest quote.

1. For each CSI division on the JOC Cost Proposal and Schedule of Values, the following

scale shall be used when receiving subcontractor bids for work:

$0 - $18,000 One (1) Subcontractor Bid Required $18,001 - $50,000 Two (2) Subcontractor Bid Required $50,001 - $999,999 Three (3) Subcontractor Bid Required

2. Self-Perform Work: Proposer may self-perform any or all work. The proposed self-

performed work is subject to the requirements listed below. a. The self-performed work then requires the proposers Bid plus a minimum of two

additional Bids form pre-qualified contractors approved by Owner prior to bid solicitation.

b. Any self-performed work must be submitted, reviewed and approved by Owner’s Representative prior to the bidding process.

3. Quote Evaluation and Selection

a. All bids will be opened by the JOC Contractor. b. Self-performed work bids shall comply with procedures established in Section

2.6.13 of the General Conditions and delivered to ASU Purchasing sealed. Selection of the successful subcontractors bid will be decided by the Owner’s Representative in accordance with Section 2.6.9.4.3 of the Contractor General Conditions.

C. Unit Pricing / Three Bid Method: Pricing using a combination of the two methods above or

other unit pricing methods as approved by the University.

3.1.8 Submitting JOC contractors are submitting an RFQ package and pricing submittal on all three project range sizes indicated below. If a submitting contractor wishes to submit on only certain project range sizes he must so note on his qualification submittal and the separate pricing submittal.

• Project Range Size One: $0K – $350,000 • Project Range Size Two: $351,001 - $1,000,000 • Project Range Size Three: $1,000,001M - $1,999,999M

Page 12 of 108 ASU JOC 2015 - 16000 RFQ

Page 13: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Typical project examples by project range.

Project Range Size One: $0 - $350,000:

• Construction cost averages $300K; • Average Construction duration 60 days; • Office/classroom suite renovation; • Localized demo mechanical, electrical or fire protection changes; • New ceilings, light fixtures; removal and relocation of wall systems; • Coordination with FFE, audio visual and datacom; • New carpet installation; • Painting and patching. • ADA requirements • Coordination for asbestos removal; • Asbestos Remediation will be done by ASU

Project Range Size Two: $350,001 - $1,000,000:

• Construction cost averages $750K; • Average Construction duration of 120 days; • Numerous office/classroom suite renovations, modification to building wings, or lab

renovations; and Modifications to building systems (mechanical, electrical, fire protection or fire alarm systems);

• Multiple sites for asbestos coordination; • Significant removal or replacement of wall and ceiling systems; • Installation of FFE concurrent with construction; • Raised floor, specialties floor systems or clean room systems; • Laboratory fume hoods and associated components; • Process piping included; • Datacom, with audio visual included; • Shutdowns required for connections. • ADA requirements • Coordination for asbestos removal; • Asbestos Remediation will be done by ASU

Project Range Size Three: $1,000,001 - $1,999,999.99

• Construction cost averages $1.5M; • Average Construction duration of 180 days; • Preconstruction included; • May include all of $301K - $1,999,999.99M items above; • Significant building systems, modification or replacement; • Numerous suite renovations, modification to building wing, or lab renovation; Modifications to

building systems (mechanical, electrical, fire protection or fire alarm systems); • Installation of FFE concurrent with construction; • Raised floor, specialties floor systems or clean room systems; • Laboratory fume hoods and associated components; • Process piping included; • Datacom, with audio visual included; • Shutdowns required for connections. • Multiple lab renovations; • Modifications to building exterior and/or hardscape; • Campus utilities modification; • Requires extensive coordination with building/campus occupants. • ADA requirements

Page 13 of 108 ASU JOC 2015 - 16000 RFQ

Page 14: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

• Coordination for asbestos removal; • Asbestos Remediation will be done by ASU

3.2 INVESTIGATION OF CONDITIONS

Before proposing, contractor shall examine the campuses and local area and fully determine the conditions under which you will operate in performing the work under this contract. No allowance will be made subsequently for failure to do so. Contractor shall satisfy himself as to the general nature of the work and the general and local conditions. Contractor shall gain full knowledge as to transportation, demolition and disposal, handling and storage of materials, parking, etc. in the area which will have a bearing on the performance of his work and the contract for which he submits his proposal.

Any failure by the Contractor to acquaint himself with all the available information shall not relieve him from any responsibility for performing his work properly or from any agreed upon price.

No additional compensation shall be allowed for conditions reasonably ascertainable by Contractor prior to submission of his proposal which allegedly increase proposer’s costs to perform the work due to such conditions not having been known to exist or anticipated by him when submitting his proposal.

Contractors are cautioned that certain work locations may have hour restrictions (Owner Restrictions, City of Tempe, City of Phoenix, City of Mesa and/or et al) and other locations where ASU work is requested under this contract, and such applicable restrictions will be strictly enforced.

3.3 INSURANCE AND BONDING REQUIREMENTS

Insurance and Bonding Requirements vary from project to project. Each contractor will provide to ASU within ten (10) calendar days of final selection the insurance certificate and a statement of the firms bonding capability. When selected for a project, the contractor will meet insurance and bonding requirements of the specific project within two (2) days and no later than five (5) business days. Projects over $50,000 will require project specific insurance and bonding. Find specific insurance and bonding requirement in Section 7.

3.4 INSURANCE

Note: If Project occurs in the City of Phoenix, insurance requirements are different. See Section 7.3.2.

3.5 JOC CONTRACT DURATION

The term of the contract will be three (3) years extendable at the option of the University for two (2) additional one-year periods. The maximum term will be five (5) years.

3.6 EXPECTATIONS

The University does not guarantee a minimum Contract Sum under this Contract, and the Job Order Contractor, in accepting this contract, does not expect a minimum contract sum.

University will have the right to elect to perform work of the types included in the JOC Program itself or to have other contractors perform the work. The submitting contractor will be responsible for furnishing all labor, materials, transportation and services required for General, Electrical, Mechanical, Fire Life Safety and Civil/Utility work on construction projects (less than $2,000,000.00 in construction cost) in accordance with plans and specifications to be issued on a project by project basis.

Pre-construction services are typically projected to begin at Schematic Design. Pre-construction services include, among others:

Page 14 of 108 ASU JOC 2015 - 16000 RFQ

Page 15: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

• Milestone conceptual estimating and dynamic conceptual estimating of construction costs during the design process to prepare cost estimates that accurately forecast the guaranteed maximum price.

• Scheduling • Constructability reviews, systems reviews and value engineering. • Active participation in all meetings and other contractor designated activities. • Value Engineering, developing ways of reducing costs without reducing the overall integrity and

intent of the scope or functionality of the project design. • Communicating information on a timely basis to ASU, the design professional, the design

professional’s consultants and any early selected subcontractors • Interacting with ASU, the design professional, the design professional’s consultant’s and any early

selected subcontractors on a “team”, “win-win-win” or “partnering” basis • Pre-selection of subcontractors using a qualification based selection process. • Solicitation of sub-contractor bids as required. • Preparing a proposed guaranteed maximum price and required accompanying information and

negotiating a mutually-satisfactory final guaranteed maximum price.

If ASU and the contractor agree on a guaranteed maximum price, and ASU receives the required approvals, ASU and contractor will enter into an agreement that will cover Pre-construction, Construction, and warranty services for the Project.

NOTE: The above descriptions of the proposed services are, for purposes of brevity, not intended to be a full description of the scopes of work of anticipated projects. Prospective proposers are encouraged to attend the scheduled Pre-Submittal Conference to obtain more detailed information, including answers to questions. (See Legal Advertisement, Part I, Pre-Submittal Conference, for further information.)

3.7 BASIS OF AWARD

Subjective judgment on the part of the Owner is implicit in the course selection process. The application of the selection procedures to the areas of primary consideration permits placing technical considerations above pricing submittals and other weighted factors in the best interests of the university. Therefore, the Owner reserves the right to award to other than the lowest price submittals and other weighted factors in the best interests of the university.

3.8 COOPERATIVE PURCHASING AGREEMENTS

The University of Arizona, Northern Arizona University, and Arizona State University are all state universities governed by the Arizona Board of Regents. Unless reasonable objection is made in writing as part of your response to this solicitation, the Board or either of the other two Universities may purchase goods and/or services from any agreement resulting from this solicitation.

The University has entered into Cooperative Purchasing Agreements with The Maricopa County Community College District and with Maricopa County, in accordance with A.R.S. Sections 11-952 and 41-2632. Under these Cooperative Purchasing Agreements, and with the concurrence of the successful proposer, the Community College District and/or Maricopa County may access an Agreement resulting from a solicitation done by the University. If you do not want to grant such access to the Maricopa County Community College District and or Maricopa County, please state so in your proposal. In the absence of a statement to the contrary, the University will assume that you do wish to grant access to any Agreement that may result from this Request for Proposal.

Arizona State University is also a member of the Strategic Alliance for Volume Expenditures ($AVE) cooperative purchasing group. $AVE includes the State of Arizona, many Phoenix metropolitan area

Page 15 of 108 ASU JOC 2015 - 16000 RFQ

Page 16: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

municipalities, and many K-12 unified school districts. Under the $AVE Cooperative Purchasing Agreement, and with the concurrence of the successful contractor under this solicitation, a member of $AVE may access an Agreement resulting from a solicitation done by the University. If you do not want to grant such access to a member of $AVE, please state so in your proposal. In the absence of a statement to the contrary, the University will assume that you do wish to grant access to any Agreement that may result from this Request for Proposal.

Any agency utilizing the ASU 2015 Job Order Contract RFQ will be responsible for contracting with an awarded contractor.

3.9 ASU JOC Contract Management - Post Contract Awards

3.9.1 The JOC multiple contract awards workload will be managed by committee consisting of Capital

Programs Management (CPMG), Office of the University Architect (OUA) and Purchasing and Business Services.

3.9.2 The committee will include members that will be unbiased in their selections with no direct responsibility

for the delivery of said project to the university customer base.

3.9.3 Each project submitted to the committee for award to a JOC contract will be submitted using the “JOC Project Request Form” (Exhibit A). The information provided will be used to assess the appropriate JOC Contractors to perform the designated work requested.

3.9.4 The appropriate JOC contractors will be evaluated based on the experience in performing the Project

Type, Complexity, ASU Current Workload / ASU Current Project Schedules, previous ASU Project Contractor Evaluation forms and ASU total estimated cost of projects previously awarded.

3.9.5 The committee’s responsibility shall be to balance the estimated cost of all work evenly across all JOC

contractors while ensuring that the JOC contractor selections, per project are in the best interest for the University.

Page 16 of 108 ASU JOC 2015 - 16000 RFQ

Page 17: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 4 PROPOSAL FORMAT AND CONTENTS

• The total length of Tabs 1-4 below should not exceed the maximum pages identified in each category (double-sided sheets) of text and graphics in single column format with a font size of no less than 10 points. Section dividers or blank pages don’t count toward the page limitations. This limit excludes mandatory ASU Certifications and Forms. Submit the following:

• One (1) clearly marked hardcopy “original” in 8.5” x 11”, non-binding form. No metal or plastic

binding; may use folder or clip for easy removal of proposal.

• Two (2) additional copies on CD or Thumb Drive in PDF format, PC readable, no passwords, labeled with vendor name and proposal number and less than 5 MB. Each electronic copy needs to be on a separate CD or Thumb Drive. Confidential information should be on a separate CD or Thumb Drive and clearly marked.

• One document for complete submittal on each disk. All required signed Certification Forms and

documents are to be included in your PDF document.

• Check and play all CD’s before submitting. (Company marketing materials not recommended and compress photos, etc. in smaller size formats as necessary) For assistance in compressing your document size to 5 MB or less, refer to the document, Tips to Reduce Document Size for Submittals, located in Miscellaneous Construction Documents on the Purchasing Forms Page at http://cfo.asu.edu/purchasing-forms ) We prefer that you use paper sleeves for the CDs, instead of the plastic covers.

Note: Proposer should use recycled paper and double-sided copying for the production of all printed and photocopied proposal documents. Furthermore, the documents should be clearly marked to indicate that they are printed on recycled content (minimum 30% post-consumer waste paper).

Proposals must be received by ASU on or before the day and hour set for receipt of Proposals.

ASU is seeking a firm with Job Order Contracting construction phase skills and experience as specified in this RFQ. ASU will be evaluating prior experience that is relevant to the project Scope of Services listed in Part II. All of the following selection criteria are important to ASU. The criteria are listed in order of their relative importance with the more important criteria listed first.

The Proposal must include a response to each of the following items starting at Section 1 below. The information and outline below shows how your proposal should be organized and index tabbed.

RFQ CHECKLIST

See Attachment B

COVER SHEET

Include Attachment D, Firm’s General Information, behind cover sheet.

TABLE OF CONTENTS

TAB 1 LETTER OF INTRODUCTION

Two Pages Maximum

Page 17 of 108 ASU JOC 2015 - 16000 RFQ

Page 18: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

A. Provide a Table of Contents for your statement of qualifications. B. Place each major section after an indexed tab.

TAB 2 STATEMENT OF QUALIFICATIONS

(Prepare a statement of qualifications as outlined below)

A. General Information – One Page Maximum

1) All firm’s must submit required information using Firm’s General Information, which

includes: a) Basic Company Information b) Company Name c) Address d) Telephone Number e) Fax Number f) Email Address g) Name of Primary Contact h) Number of Years in Business i) License(s) Held by the Firm j) Identify which class of work your firm is submitting qualifications for: General

Construction, Mechanical, Fire Life Safety, Electrical, or Civil/Utility. k) If the firm has more than one office, provide specific information about the parent

company and administering branch office. Indicate the type of ownership (corporation, Limited Liability Company, sole proprietorship, etc).

B. Prime Firm Project Experience – Three Page Maximum

1) Identify at least three and no more than five comparable projects in which the firm served

as either JOC contractor, Construction Manager at Risk, or General Contractor. The listed projects must demonstrate, through previously completed work, that the firm has developed expertise to provide design phase (pre-construction) and construction services.

For each project listed, please provide:

a) A description of the project. b) The role of the firm on the project (specify whether Job Order Contractor,

Construction Manager at Risk or General Contractor. If applicable, identify the percent of work self-performed. Also specify services provided during design phase, i.e. cost estimating, scheduling, value engineering, etc.)

c) The original construction budget per the Job Order, actual bid or GMP amount, and the final construction amount. If final construction amount is greater than Job Order price/bid/GMP amount, differentiate between Owner-requested Change Orders and those attributable to other factors.

d) The original project schedule by listing Design Phase Start Date, Construction Start Date, Substantial Completion Date, and Final Completion Date. Compare the contractual dates with actual respective dates. Explain any differences between original and actual project schedule milestones.

e) The name and role of individuals from the proposed team who worked on each project listed in this section.

f) The name and current phone number of the Owner’s Project Manager or other representative for the project.

Page 18 of 108 ASU JOC 2015 - 16000 RFQ

Page 19: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

NOTE: A higher evaluation weighting will be applied to those firms who can substantiate successful demonstrated experience on:

• Comparable projects utilizing a JOC delivery method. • Similar projects with institutions of higher education. • Projects at similar climates and elevations. • Comparable projects which were completed 5 or fewer years ago. • Projects that were sustainably designed and constructed and/or LEED® certified.

2) Provide a list of your job order contracts, for the last five years. Include date of contract,

contracting agency, agency contact information, and value of contract for each contract in the list. If your firm has no JOC experience, provide a description of your philosophy and experience partnering as a member of a team consisting of the owner, owner’s customers, the design professional and the contractor.

C. Prime Team Member Experience – Three Page Maximum

1) Provide information about the firm’s personnel resources (average size of workforce,

position classifications, experience, training, location(s) of personnel). 2) Describe your plan for personnel recruitment, particularly during periods of booming

construction. 3) Identify the specific individuals from your firm who are proposed to be assigned to this

project. Clearly identify the following specific individual(s) responsible for the following roles:

a) The person who will be responsible for day-to-day management of the project, and

coordination and communication with the University during all phases of design and construction.

b) The person(s) who will lead the pre-construction phase. c) The persons who will lead the construction phase the person who will manage the

project on-site during the construction phase d) The person(s) who will lead the project documentation effort e) The LEED® Accredited Professional who will champion sustainable design

4) Project Team: List the primary individuals to be assigned to the ASU JOC projects and

identify their positions on the project team. Include a resume (1/2 page maximum per person) describing the applicable qualifications and experience of each individual. List examples of their experience on similar projects and/or projects these individuals have worked on together, identifying project size, schedule and complexity, as well as their specific role.

5) For each key person identified, list their length of time with the firm and at least five

comparable projects in which they have played a primary role. If a project selected for a key person is the same as one selected for the firm in Item B (Prime Firm Project Experience) above, provide just the project name and the role of the key person. For other projects provide the following:

a) Description of project b) Role of the person c) Contractor method (i.e. Design-bid-build, CM@Risk, Design-Build, JOC) d) Project’s original contracted construction cost and final construction cost e) Construction start and completion dates f) Project owner g) Reference information (current name with telephone number for each project listed)

Page 19 of 108 ASU JOC 2015 - 16000 RFQ

Page 20: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

NOTE: A higher evaluation weighting will be given to personnel with JOC experience.

D. Contract Management Plan – Two Page Maximum

1) Provide a statement of your plan for performing and managing the work. 2) What personnel will be used? 3) How will you prepare job order cost quotations and invoices? (i.e. what

programs/software are used, etc.) 4) How do you plan to ensure prompt responses to job order requests? 5) How do you ensure your firm completes the closeout process in a timely manner? 6) How is your warranty process managed once a project has reached Substantial

Completion? 7) What is your plan for responding to and performing multiple job orders at the same time? 8) What limitations will you have geographically or in the number of simultaneous job

orders? 9) Provide a statement of your history for submitting claims and change orders. Provide

specific information, i.e., type of claim, date, reason, amount, and outcome. 10) Provide other pertinent information that will help ASU evaluate your firm and its

capabilities.

E. Quality Management Plan – Two Page Maximum

1) How do you set goals and monitor the performance of your company? 2) If contracted for pre-construction services, how does your firm work with design

professionals to ensure constructability of the design? 3) How do you inspect the work to ensure quality? 4) How do you stay on schedule? What means and methods does your company use to

ensure projects are completed according to contractual dates? 5) Provide an example of how your company has provided value added services at little or

no cost to the client on previous projects. 6) What is your complaint and dispute resolution procedure? 7) Provide other pertinent information that will help ASU evaluate your firm and its

capabilities.

F. Subcontractor Selection and Management Plan – Two Page Maximum

1) Attached to this Request for Qualifications is the Arizona State University general subcontractor selection plan (General Conditions ARTICLE 2.6.9 – Subcontractors and Subcontracts). Describe how you intend to implement this subcontractor selection plan including your recommendations for subcontractor trades to be selected by qualifications only versus qualifications and bids; and discuss the benefit that your subcontractor selection plan provides to ASU and to the project.

2) Describe how your firm will manage the subcontractor selection process to ensure you are able to contract subcontractors in a timely manner for any Job Order work that may be awarded to your firm and provide a minimum of 3 bids per division of work.

3) How does your company ensure financial responsibility? How does your firm hold subcontractors accountable for any mistakes? How will you ensure acceptable quality for work performed by subcontractors? How do you communicate this with the ASU Project Manager?

4) How will you address controversies and claims related to work performed by subcontractors?

5) Provide other pertinent information that will help ASU evaluate your subcontractor management capabilities.

Page 20 of 108 ASU JOC 2015 - 16000 RFQ

Page 21: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

G. Safety – Three Page Maximum

1) Provide an overview of your firm’s safety management plan. 2) Provide an overview of your firm’s safety training program. 3) Provide a letter from your firm’s insurance company stating the Workers’ Compensation

Experience Modification Rate (EMR) for the past three (3) years. The letter shall be on the insurance company’s letterhead and shall be signed by an appropriate individual employed by the insurance company.

H. Financial Information, Insurance, Other Selection Criteria – Five Page Maximum

1) Provide a letter from your financial institution indicating the range of credit available to

your firm (i.e., credit in the low nine figures or credit line exceeding five figures) or your firm’s latest annual financial report.

2) Provide a letter from your financial institution and/or officers of major suppliers, indicating confidence in your firm’s stability and payment history.

3) Provide a letter from your bonding company indicating the ability to bond job orders under the contract, and your current bonding capacity.

4) Provide a letter from insurance company stating your firm’s current insurance limits, including General Liability, Auto Liability, and Worker’s Compensation.

5) Indicate whether or not these limits can be raised or adjusted.

I Other Selection Criteria – One Page Maximum

1) This section selection criteria includes:

a) Evaluation of Current and Anticipated Workload b) Results from reference checks. c) Past ASU performance.

TAB 3 ADDITIONAL INFORMATION

One Page Maximum

Include additional relevant information such as literature, slicks, pictures, and other pertinent supporting printed data (if any). Firms are not required to submit anything for this section, but they may if desired.

TAB 4 FORMS AND ACKNOWLEDGEMENTS

(All Forms Required)

Sign, date and return all Forms listed below with your proposal. You can retrieve the most current forms in Construction Forms “CM@Risk RFQ Forms” at the following site http://cfo.asu.edu/purchasing-forms . You will also need to acknowledge the areas referenced on Form 1 and submit with your proposal.

PRE-SUBMITTAL INQUIRY FORM REFERENCE FORMAT RFQ CERTIFICATION ANTI-LOBBYING CERTIFICATION CONFLICT OF INTEREST CERTIFICATION FEDERAL DEBARRED LIST CERTIFICATION LEGAL WORKER CERTIFICATION VETERAN’S PREFERENCE CERTIFICATION

Page 21 of 108 ASU JOC 2015 - 16000 RFQ

Page 22: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SUPPLIER SUSTAINABILITY QUESTIONNAIRE SERVICE PROVIDER ACKNOWLEDGEMENT ARIZONA STATE UNIVERSITY FATCA Compliant Substitute W-9 (Only Required If Awarded Contract) THE SUPPLIER SUSTAINABILITY QUESTIONNAIRE

The ASU Project Guidelines (formerly known as ASU Design Guidelines) are available under Facilities at: https://cfo.asu.edu/fdm-design-professionals.

The EH & S Guidelines for construction, Renovation and Demolition are located: http://www.asu.edu/ehs/documents/ehs-cpmg-guidelines.pdf . The EH & S Safety Information and Guidelines are located: http://www.asu.edu/uagc/EHS/documents/service_provider_jobsite_safety_manual.pdf

Page 22 of 108 ASU JOC 2015 - 16000 RFQ

Page 23: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 5 SELECTION PROCESS

5.1 TECHNICAL PROPOSAL

A Selection Committee will evaluate the Proposals submitted in response to this RFQ. The evaluation will be to determine the qualifications of the Proposer to perform the Job Order Contracting Services (JOC) for the designated Project Size for which your firm is submitting.

In making its Short List Interview determination, the Selection Committee will evaluate the Technical Proposal, client references, and additional information received or obtained by the Selection Committee. The Committee may request or obtain additional information at any time during the selection process through interviews, presentations, correspondence, and visitation of completed projects or otherwise.

5.2 EVALUATION

• Proposers are cautioned to submit enough information to enable the evaluation committee to fully

ascertain each proposer’s capability to do all of the requirements contemplated by this solicitation. • It is anticipated that the Project Team will be different for each project size. • All commitments made in the proposal documents may become part of the resultant contract. The

data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.

• The proposer is hereby advised that his proposal is presumed to represent his best efforts to respond to the solicitation. Apparent inconsistencies between promised performance and proposed financial proposals shall be fully explained by the proposer.

5.2.1 Evaluation of all Submittals

THE EVALUATION CRITERIA FOR THIS RFQ IS BASED ON A WEIGHTED POINT SYSTEM, AND THE MAXIMUM POINTS FOR EACH, ARE AS FOLLOWS, (ALSO LISTED IN SECTION 4 WITH THE PROPOSAL FORMAT AND CONTENT):

Criteria A) General Information B) Prime Firm Project Experience C) Prime Team Member Experience D) Contract Management Plan E) Quality Management Plan F) Subcontractor Management Plan G) Safety H) Financial Information such as Insurance, Bonding and Builders Risk Etc. All firms will be ranked in order from highest to lowest based on the above point system. The top firms will be invited back for the short list interviews.

All firms that do not proceed to the next phase of selection will have their Financial Proposals returned by purchasing un-opened after all JOC contracts have successfully been awarded.

Page 23 of 108 ASU JOC 2015 - 16000 RFQ

Page 24: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

5.3 INTERVIEWS

5.3.1 It is the desire of the Selection Committee to learn more about the Proposers, especially their

ability to provide JOC services and construction phase services of exceptional quality to an institutional client. The Selection Committee will interview each Proposer on the short list so that they may present their credentials, comparable past work and any ideas they wish to share with the Selection Committee.

5.3.2 The Selection Committee would also desire to have the Team/s that each company is

proposing to be part of the interview process and to meet the personnel being proposed to implement the contract on behalf of the company being interviewed. It is not the desire of the Selection Committee to be presented only by principals of the organization.

5.3.3 The interviews will usually last forty-five minutes, but not more than one hour, including thirty

minutes for the interview, and fifteen minutes for questions from the Committee. This time limit will be strictly enforced. No more than six representatives of the Proposer’s team + one computer/presentation equipment operator may be present. The prospective JOC Project Manager/s who will be responsible for the project day to day and serve as the main contact with ASU and the prospective Construction Superintendent/s must both attend.

5.3.4 The format of the presentation is at the discretion of the Proposer but must address the

organization and experience of the team, experience of individuals assigned to the project, describe comparable projects by the team members and/or the firm and address any questions that may be asked by Selection Committee members during the interview.

5.3.5 The order in which the Proposers appear before the Selection Committee will be determined by

lot. A projection screen may be available; any additional equipment shall be the responsibility of the Proposer.

5.3.6 The Selection Committee will grade each presentation based on the same evaluation criteria at

proposal time. Each Proposer will be re-ranked from the highest to the lowest. After all interviews have been conducted all the proposers will be ranked. The financial proposals submitted with the RFQ will be opened and based on financial proposals the rankings will be reorganized from lowest financial proposal to highest.

5.3.7 The final determination of successful Notice of Intent to Award will be based on the Universities

needs and the make-up of the firms and their qualifications to perform in the three project range sizes.

5.4 NOTICE OF INTENT TO AWARD OR REJECTION OF PROPOSALS

The next step will be for ASU to issue a notice of intent to award. ASU reserves the right to cancel this Request for Qualifications, to reject any or all Proposals, and to waive or decline to waive any irregularities in any submitted Proposals, or to withhold the award for any reason it may determine in the best interest of ASU. Unless ASU gives written notice otherwise, all Proposals will be held open for a period of ninety (90) days after the date of opening thereof, and ASU will have the right during this ninety (90) day period to accept any Proposal not withdrawn before the scheduled opening date.

Page 24 of 108 ASU JOC 2015 - 16000 RFQ

Page 25: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

5.5 CONTRACT

5.5.1 An ASU Procurement Officer and CPMG will execute a Master Contract for Job Order

Construction services with the highest ranked person or firm(s) at a compensation rate based on Financial Proposal submitted in this RFQ. If the Procurement Officer and CPMG are unable to obtain a contract with the person or firm considered to be the most qualified the RFQ submittal will be deemed unqualified. The Procurement Officer and CPMG will then proceed with the next most qualified person or firm in sequence until an agreement is reached or a determination is made to reject all Proposals.

5.5.2 Using the ASU Standard Form of Job Order Contracting, the contractor will submit a proposed

Project Price. When ASU and the JOC agree upon the final price, ASU will issue a purchase order indicating a Notice to Proceed. If negotiations for a price are not successful, ASU may terminate the pre-construction services contract and proceed with the Project with a different contractor selected by ASU.

5.6 REGULATIONS

5.6.1 Should negotiations result in a contract, the agreement will be subject to all the provisions of the

Arizona Board of Regents University Procurement Code and will include all the terms, clauses, and conditions required by the University Procurement Code.

5.6.2 Delivery of Contract: Promptly after ASU receives satisfactory bonds and insurance policies or

certificates ASU will electronically deliver to the successful Proposer two copies of the form of contract documents to be executed by the successful Proposer. This form of contract documents will be ASU’s then current form of contract documents. The successful Proposer shall execute and return to ASU two copies of the contract documents within ten (10) business days after receipt of the contract documents. Failure to return the executed copies of the contract documents may result in rejection of the successful Proposer’s Proposal and withdrawal of the notice of intent to award.

Page 25 of 108 ASU JOC 2015 - 16000 RFQ

Page 26: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 6 FINANCIAL PROPOSAL

The Evaluation Committee will review the short listed firms Pricing Proposal (Submitted with the RFQ See Sections 6.1 and 6.2), (Exhibits C and D).

• The burden of proof of financial and price credibility rests solely with the proposer. Any significant

inconsistency, if unexplained, raises fundamental issue of the proposer understands of the project management and resources required and/or his ability to perform the contract. This may be grounds for rejection of the proposal, or a basis for determination of non-responsibility.

• Additional clarification of these requirements can be obtained from information provided in each

section of the financial proposals requirements presented below, as well as the evaluation factors for award identified in Basis for Award above.

6.1 PRICING INFORMATION SUBMITTAL

Price Information Submittals: Must be submitted, in a separate sealed envelope labeled, Price Information Submittals. The rates will be submitted in (Exhibit D) of the Price Information Submittal

6.1.1 Pre-Construction Services

During a Pre-Construction Phase (if warranted) the JOC will submit the estimated hours of the personnel it deems necessary to perform the services on a specific project. The hourly rates will be submitted in (Exhibit C) of the Price Information Submittal.

6.1.2 Job Order Services

The Job Order Contracting will consist of three methods for pricing a Job Order Request against the contract. The Owner will determine which method will be used for a particular request.

A. R.S.Means Unit Price Books

B. Non pre-priced consisting of obtaining a minimum of one (1) quote and a maximum of three

(3) quotes except self-performed work which increases the number to two (2) in each category.

C. Combination of the two methods or any other method that may be required due top special

circumstances

The JOC will submit (Exhibit D) of the Price Information Submittal a Fee percentage (%) rate for providing the services as requested based on a sliding Job Order Construction cost for the work. The JOC shall also submit his General Requirement pricing structure.

The following costs are not eligible for reimbursement pursuant to this Contract and shall not be included in any JOC cost proposal, unless otherwise authorized by the Owner in writing in advance.

A. Cellular telephones B. Work vehicles C. Mileage D. Team building exercises E. Safety rewards F. Meals/entertainment G. Travel expenses,

Page 26 of 108 ASU JOC 2015 - 16000 RFQ

Page 27: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 7 REGULATORY INFORMATION

7.1 BONDS

JOC Contractor shall provide a written commitment to furnish satisfactory performance and Payment bonds for each individual project, each in an amount equal to one hundred percent (100%) of the full amount of the work order. These bonds are not to be expressly limited as to the time in which action may be instituted against the surety company for possible non-performance of the contractor.

Proposers are advised that all contracts awarded as a result of this solicitation will require a written commitment from the Contractor to maintain a bond in the amount of the project up to $1,999,999.00 and a written commitment from the Contractor’s bonding agent to provide immediate notice to the Owner should such available capacity become impaired. See Attachment C.

If the Contractor is unable to maintain $1,999,999 in available bonding capacity, he shall state the limit he can maintain in the proposal. Available bonding capacity of less than $1,999,999 may not eliminate Contractor from consideration, but may render Contractor ineligible for larger projects.

7.2 DELIVERY OF INSURANCE POLICIES, BONDS, OR CERTIFICATES AND EXECUTION OF

CONTRACT DOCUMENTS

Selected JOC contractors must provide to ASU, within five (5) business days of receiving the intent to award, the required insurance certificates in a form satisfactory to ASU. Certificates must reference the ASU Project Number and ASU Project Name. The policy shall be endorsed to include the following additional insured language: “The State of Arizona, its departments, agencies, boards, commissions, universities and its officers, officials, agents, and employees as additional insureds with respect to liability arising out of the activities performed by or on behalf of the Contractor”. Failure to provide the requested insurance may result in rejection of the successful Proposer’s Proposal and withdrawal of the notice of intent to award.

7.2.1 Contractors insurance Requirements

1. The Contractor shall not commence Work until it obtains all required insurance and delivers

satisfactory proof thereof to the Owner. The Contractor shall not permit Subcontractors to commence Work until applicable insurance requirements have been complied with by Subcontractor.

2. Insurance coverage assuring the adequacy of the Contractor’s performance and warranty

obligations shall be maintained for the full warranty period and any specific guarantee or warranty available by law.

7.3 MINIMUM SCOPE AND LIMITS OF INSURANCE.

7.3.1 Insurance Requirements: Without limiting any liabilities or any other obligation of the Contractor,

the Contractor shall purchase and maintain (and cause its subcontractors to purchase and maintain), in a company or companies lawfully authorized to do business in the State of Arizona, and rated at least A- VII in the current A.M. Best’s, the minimum insurance coverage below. Minimum requirements are subject to change based on scope of work and contract awarded.

Contractor and subcontractors shall procure and maintain until all of their obligations have been discharged, including any warranty periods under the contract, are satisfied, insurance against claims for injury to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees or subcontractors.

Page 27 of 108 ASU JOC 2015 - 16000 RFQ

Page 28: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

The insurance requirements herein are minimum requirements for the contract and in no way limit the indemnity covenants contained in the contract. The University in no way warrants that the minimum limits contained herein are sufficient to protect the Contractor from liabilities that might arise out of the performance of the work under the contract by the Contractor, its agents, representatives, employees or subcontractors, and Contractor is free to purchase additional insurance.

Contractor shall provide coverage with the limits of liability not less than those stated below:

7.3.2 Commercial General Liability Insurance: The policy shall be an occurrence form policy and

shall include coverage for bodily injury, broad form property damage (including completed operation), personal injury (including coverage for contractual and employee acts), and blanket contractual products. Said policy shall be endorsed to contain a severability of interest provision, and shall not contain any provision which would serve to eliminate third-party action over claims. DP shall maintain coverage through Final Completion for DP and all Sub-consultants engaged in the performance of services under this Agreement.

. All Projects Not ASU Projects In Phoenix . Downtown Phoenix

• Each Occurrence $1,000,000 $1,000,000 • General Aggregate $2,000,000 $5,000,000 • Products – Completed Operations Aggregate $1,000,000 $1,000,000 • Personal and Advertising Injury $1,000,000 $1,000,000 • Blanket Contractual Liability – Written and Oral $1,000,000 $1,000,000 • Fire Legal Liability $ 50,000 $50,000

Contractor shall maintain coverage through Final Completion for Contractor and cause its Subcontractors engaged in the performance of services under this Agreement to do the same. Contractor shall maintain coverage through the full warranty period specified herein for Contractor and cause its Subcontractors that perform services at the Project Site after Final Completion to do the same, during the full warranty period.

7.3.3 Worker's Compensation Insurance: Contractor shall procure and maintain worker's

compensation insurance to cover obligations imposed by federal and state statutes having jurisdiction of the Contractor, its employees, or both, engaged in the performance of services under this Agreement. Contractor shall maintain coverage through Final Completion for all employees engaged in the performance of services under this Agreement, and shall maintain coverage through the full warranty period specified herein for all employees that perform services at the Project Site after Final Completion, and during the full warranty period.

Worker’s Compensation Statutory

Employer’s Liability Each Accident $1,000,000 Disease – Each Employee $1,000,000 Disease – Policy Limit $1,000,000

The policy shall contain a waiver of subrogation against the State of Arizona, the Arizona Board of Regents, Arizona State University, City of Phoenix and their officers, officials, agents, and employees for losses arising from work performed by or on behalf of the Contractor.

This requirement shall not apply to: Separately, each contractor or Subcontractor that is exempt under A.R.S. 23-901, and when such contractor or Subcontractor executes the appropriate waiver (Sole Proprietor/Independent Contractor) form.

Page 28 of 108 ASU JOC 2015 - 16000 RFQ

Page 29: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

7.3.4 Business Automobile Liability Insurance: Contractor shall procure and maintain commercial/Business automobile liability insurance with a minimum, combined single limit for bodily injury and property damage of not less than $1,000,000 each accident with respect to the Contractor’s owned, hired, or non-owned vehicles assigned to or used in performance of the services.

If Hazardous Materials or waste is to be transported, the Commercial Automobile Liability insurance shall be endorsed with the MCS-90 endorsement in accordance with applicable legal requirements.

Contractor shall maintain coverage through Final Completion for Contractor and cause its Subcontractors engaged in the performance of services under this Agreement to do the same. Contractor shall maintain coverage through the full warranty period specified herein for Contractor and cause its Subcontractors that perform services at the Project Site after Final Completion to do the same, during the full warranty period.

7.3.5 Builder’s Risk Insurance: Contractor shall provide and maintain, until written notice of

Substantial Completion from the Owner, a Builder’s All Risk Insurance Policy, which will protect the interests of the Owner and contractors of all tiers against loss as specified below. This policy shall provide coverage for 100% of the insurable value of the Work, including any Owner furnished work. The insurance shall provide replacement cost coverage for all real and personal property incorporated into the Work including engineered and Project specific false works and formings, while at the Project Site, off-site, or in transit. Coverage shall be extended to include soft costs (such as reasonable compensation for Design Professional, Owner and contractors’ services and expenses required as a result of an insured loss, excluding any Liquidated Damages), extra expense, and expediting expense.

The insurance obtained under this Section 7.3.5 shall insure against “all risks” of direct physical loss or damage, including, without duplication of coverage, collapse, earthquake, flood, testing and startup, and ensuing damage as a result of faulty workmanship or material or both.

The policy shall name the State of Arizona, Arizona Board of Regents, and Arizona State University as loss payee for all covered losses as their interests may appear [Add: City of Phoenix if “All ASU Jobs” was Contractor’s election]. The policy shall be endorsed waiving the carrier’s right of recovery under subrogation against the Owner, Contractor and Subcontractors, for losses covered under the Builder’s Risk policy.

The Contractor shall be responsible for the deductible on each loss and shall retain responsibility for any loss not covered by the Builder’s Risk policy. The Contractor shall be solely responsible for any required notice to or consent of the insurer providing the Builder’s Risk coverage regarding a) a covered event or occurrence and b) occupancy of the Work, or a portion thereof, by the Owner. This insurance shall not cover any contractor’s equipment, including, but not limited to machinery, tools, equipment, or other personal property owned, rented, or used by the Contractor or Subcontractors in the performance of their work on the Work, which will not become a part of the Work to be accepted by the Owner.

7.3.6 Additional Insurance and Waiver of Subrogation Requirements: The policies required are

(Commercial General Liability), (Business Automobile Liability), (Builder’s Risk Insurance) shall include, or be endorsed to include, the following provisions:

The State of Arizona, the Arizona Board of Regents, Arizona State University, City of Phoenix and their officers, officials and employees wherever additional insured status is required. Such

Page 29 of 108 ASU JOC 2015 - 16000 RFQ

Page 30: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

additional insured shall be covered to the full limits of liability purchased by the Contractor, even if those limits of liability are in excess of those required by this Contract.

The policies required are (Workers’ Compensation Insurance), (Commercial General Liability), (Business Automobile Liability) shall include, or be endorsed to include, the following provisions:

The policy shall contain a waiver of subrogation against the State of Arizona, the Arizona Board of Regents, Arizona State University, City of Phoenix and their officers, officials, and employees for losses arising from work performed by or on behalf of the.

The Contractor’s insurance coverage shall be primary insurance with respect to all other available sources, except for Worker’s Compensation insurance. Any self-insurance or other insurance carried by the State of Arizona, the Arizona Board of Regents, and Arizona State University, City of Phoenix their officers, or employees, if any, shall be excess and not contributory to the insurance provided by the Contractor.

Coverage provided by the Contractor shall not be limited to the liability assumed under the indemnification provisions of this Contract.

7.3.7 Proof of Insurance: Contractor shall provide to the Owner certificates of insurance (ACORD form

or equivalent approved by the Owner) evidencing the coverages required herein as proof that the policies providing the required coverages are in full force and effect prior to the Contractor’s performing any work on the premises of the Owner. The certificates for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. All of the above conditions shall be clearly shown on each certificate. Such certificates shall identify this Job Order Number or be an annual or periodic certificate stating that it covers any and all projects or work performed for ASU by the Contractor during said period. Coverage afforded under the policies will not be canceled, terminated or materially altered until at least thirty (30) days' prior written notice has been provided by the Contractor to the Owner as evidenced by a return receipt signed by the Owner. Certificates of insurance should be addressed as follows:

ASU Project Number and/or PO Number

Purchasing and Business Services PO Box 85287

Tempe, AZ 85287-5212

Owner has the right to request and to receive, within ten (10) working days, copies of any or all of the policies and/or endorsements required in this Agreement. Owner shall not be obligated to review same or to advise Contractor of any deficiencies in such policies and endorsements, and such receipt shall not relieve Contractor from, or be deemed waiver of, Owner's right to insist on strict fulfillment of Contractor’s obligations under this Agreement. Certificates can be emailed to [email protected].

7.3.8 Failure to Provide or Maintain Insurance: Failure on the part of the Contractor to procure or

maintain the required insurance shall constitute a material breach of this Agreement upon which the Owner may immediately terminate this Agreement, or at its discretion procure new or renew such insurance and pay all premiums in connection therewith, and all monies so paid by the Owner shall be repaid by the Contractor to the Owner upon demand, or the Owner may offset the cost of such premiums together with interest at the statutory legal rate against any money due the Contractor from the Owner. Costs for coverages maintained by the Contractor in excess of those required hereunder shall not be charged to the Owner.

7.3.9 Authorization to Obtain Information: The Owner may, and the Contractor hereby authorizes the

Owner to, request and receives directly from insurance companies utilized by the Contractor, in

Page 30 of 108 ASU JOC 2015 - 16000 RFQ

Page 31: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

meeting the insurance requirements any and all information reasonably considered necessary in the sole discretion of the Owner.

7.3.10 Waiver: Contractor and its insurers providing the coverages required above shall and do hereby

waive all rights of recovery against the State of Arizona, the Arizona Board of Regents, Arizona State University, and their officers and employees [Add: City of Phoenix if “All ASU Jobs” was Contractor’s election].

7.3.11 Claim Reporting: Any failure to comply with the claim reporting provisions of the policies or any

breach of a policy warranty shall not affect coverage afforded under the policy to protect Owner.

7.3.12 Self-insurance: The policies specified herein may provide coverage which contains deductibles or self-insured retentions. Such deductibles and/or self-insured retentions shall not be applicable with respect to the coverage provided to Owner under such policies. The Contractor shall be solely responsible for deductible and/or self-insured retention, and Owner, at its option, may require the Contractor to secure the payment of such deductible or self-insured retention by a surety bond or an irrevocable and unconditional letter of credit.

7.3.13 Cancellation of Insurance: In the event any insurance coverage required in their Section 6 for

the Work is canceled, reduced, or terminated, Contractor agrees to provide notice to Owner and replace the insurance without any lapse of protection to Owner. If such coverage is not replaced, or Contractor fails to meet any of the requirements for insurance listed above, Owner may at its option immediately terminate the Agreement between Owner and Contractor, or in Owner’s discretion, procure or renew such missing insurance coverage and pay the premiums therefore. Any such premium amounts paid by Owner shall be repaid by Contractor upon demand, or Owner if not paid, may offset the premium cost plus interest at the legal rate from Contractor’s Final Payment under the Agreement. Except for the Builder’s Risk coverage, the Owner's exercise of its option to occupy and use completed portions of the Work shall not relieve the Contractor of its obligation to maintain insurance required under the insurance provisions of this Agreement until the date of Final Completion and/or the expiration of the warranty period.

7.3.14 Contractual Obligations: The stipulation of insurance coverages in this Section 7, or elsewhere,

shall not be construed to limit, qualify, or waive any liabilities or obligations of Contractor, assumed or otherwise, under this Agreement.

7.4 HISTORIC PRESERVATION

No Historic Preservation issues are anticipated on these projects. ASU will coordinate with Arizona’s State Historic Preservation Office (SHPO) should any issues arise. For more information refer to the Project Guidelines. The link is on the last page of this document.

7.5 CONFLICT OF INTEREST.

In accordance with Arizona Revised Statutes (“A.R.S.”) § 38 511, Owner may cancel this Agreement within three (3) years after the execution of this Agreement without penalty or further obligation, if any person significantly involved in initiating, negotiating, securing, drafting, or creating this Agreement on behalf of Owner, at any time while this Agreement or any extension thereof is in effect, is an employee or agent of any other party to this Agreement in any capacity or a consultant to any other party with respect to the subject matter of this Agreement.

7.6 SMALL BUSINESS AND SMALL DISADVANTAGED BUSINESS

The Owner, the Contractor, and each Subcontractor shall include small businesses and Disadvantaged/Diversity business enterprises in the design, engineering and construction of the Project so long as this would result in services that are comparable in quality and would not result in a material

Page 31 of 108 ASU JOC 2015 - 16000 RFQ

Page 32: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

increase in costs of the Project. The ASU goal is 15% small business and 15% diversity businesses on each construction project. While we recognize that a strict percentage or dollar amount is not mandated, we ask you to make every effort to meet these goals.

a. A Disadvantaged business is a business that is a Woman Owned Business [WBE], or is a Minority

Owned Business [MBE], Veteran or is a Handicapped Veteran Owned Business (HV), or is a Disadvantaged/Disabled owned Business [DBE]. A diversity business can be a large business. Firms can either be certified or can self-certify.

b. An Arizona Small Business can either be certified or can self-certify that they either have less than

One Hundred (100) employees or were under $4,000,000 in revenue in the previous year; or a business can have Federal certification as a Small Business.

Quarterly Reports need to be emailed to the ASU Project Manager and to [email protected]. ASU provides the form. Quarterly reports showing efforts made to meet goals are required.

7.7 COMPLIANCE AND LEGAL WORKER REQUIREMENTS

7.7.1 The parties shall comply with all applicable state and federal statutes and regulations governing

equal employment opportunity, non-discrimination, and immigration. The aforesaid provisions shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor shall post in conspicuous places, available for employees and applicants for employment, notices to be provided by the Owner, setting forth the provisions of this nondiscrimination clause and shall insert this provision in all subcontracts hereunder, except subcontracts for standard commercial supplies or raw materials.

7.7.2 Contractor warrants that it is in compliance with all federal immigration laws and regulations that

relate to its employees. Pursuant to Arizona Revised Statutes § 41-4401, the Contractor warrants that it is in compliance with the state law requirement that employers in Arizona verify the employment eligibility of employees, hired after December 31, 2007, through the federal E-verify program or any successor program. Contractor shall be responsible for all costs associated with compliance with such programs. Contractor shall flow-down each of the warranty requirements of this section to all Subcontractors, and the Contractor shall require each Subcontractor to warrant compliance with the provisions of this section. This section is not applicable where the Contractor is a governmental entity nor is the Contractor required to pass this provision through to Subcontractors and sub-subcontractors who are governmental entities.

7.7.3 A breach of any of the warranties required under this Section shall be deemed a material breach of

this Agreement subject to penalties, including termination for cause. 7.7.4 In addition to other audit provision contained in this Agreement, the Owner retains the right to audit

and inspect the papers of any Contractor or Subcontractor’s employees who perform Work to ensure that the Contractor or Subcontractor is complying with the warranty requirements of this Section.

7.7.5 Contractor shall make a good faith effort to ensure that not less than fifteen percent (15%) of the

Work performed under this Agreement is performed by a small business as defined in A.R.S. § 41-1001. The Contractor shall report to the Owner the dollar value of the Work performed under this provision. Upon Owner’s request, documentation evidencing Contractor’s compliance with this provision shall be furnished in a form acceptable to Owner as a condition precedent to Final Payment.

Page 32 of 108 ASU JOC 2015 - 16000 RFQ

Page 33: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

7.8 VETERAN’S PREFERENCE

Contractor agrees to provide preference in initial employment for U.S. veterans by: • Adding points to the raw score of a numerically scored screening instrument, or • Hiring a veteran if, at the conclusion of the search process, a veteran is one of a number of

comparably qualified candidates.

For purposes of this certification, “veteran” means: an honorably separated person (honorable or general discharge) who served on active duty (not active duty for training) in the Armed Forces:

• During any war declared by Congress; • During the period April 28, 1952 through July 1, 1955; • For more than one hundred eighty (180) consecutive calendar days, any part of which

occurred after January 31, 1955, and before October 15, 1976; • During the Gulf War period beginning August 2, 1990, and ending January 2, 1992; or • For more than one hundred eighty (180) consecutive calendar days, any part of which

occurred during the period beginning September 11, 2001, and ending on the date prescribed by Presidential proclamation or by law as the last day of Operation Iraqi Freedom; or

• In a campaign or expedition for which a campaign medal has been authorized, such as El Salvador, Lebanon, Granada, Panama, Southwest Asia, Somalia, and Haiti.

Medal holders and Gulf War veterans who originally enlisted after September 7, 1980, or entered on active duty on or after October 14, 1982, without having previously completed 24 months of continuous active duty, must have served continuously for 24 months or the full period called or ordered to active duty. Effective on October 1, 1980, military retirees at or above the rank of major or equivalent, are not entitled to preference unless they qualify as disabled veterans.

7.9 AIR POLLUTION EMERGENCY PROCLAMATION

In accordance with an executive order titled ‘Air Pollution Emergency Proclamation’ modified by the Governor of Arizona on July 16, 1996, ASU requests that all products used in the performance of any contract that results from this solicitation be of low or no-content of reactive organic compounds to the maximum extent possible.

7.10 WASTE CONTAINERS

Contractors using waste containers must use and order them through ASU Grounds Maintenance Department. Anytime a waste container is ordered a review will be done at that time to see if a metal recycling container would also be applicable and if so, would be provided to the project at no charge as long as this container is not contaminated with other refuse.

7.11 WEAPONS, EXPLOSIVE DEVICES AND FIREWORKS.

Owner prohibits the use, possession, display or storage of any weapon, explosive device or fireworks on all land and buildings owned, leased, or under the control of Owner or its affiliated or related entities, in all Owner residential facilities (whether managed by Owner or another contractor), in all Owner vehicles, and at all Owner or Owner affiliate sponsored events and activities, except as provided in A.R.S. § 12 781 or unless written permission is given by the Chief of the Owner Police Department or a designated representative. Notification by Contractor to all persons or entities who are employees, officers, subcontractors, consultants, agents, guests, invitees or licensees of Contractor (“Contractor Notification Parties”) of this policy is a condition and requirement of this Agreement. Contractor further agrees to enforce this contractual requirement against all Contractor Notification Parties. Owner’s policy may be accessed through the following web page: http://www.asu.edu/aad/manuals/pdp/pdp201-05.html.

Page 33 of 108 ASU JOC 2015 - 16000 RFQ

Page 34: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

7.12 CAMPUS DELIVERIES AND MALL ACCESS

Venders and contractors should familiarize themselves with the ASU parking, campus delivery options and loading zones. Not all campus buildings are directly accessible and some require venders to unload at lots or loading areas that may not be directly adjacent to the delivery or work location. As a result venders and contractors must then transport goods by using electric style golf carts, dolly or other manual device across pedestrian malls. Many campuses include features and pedestrian malls that may have limited access for vender vehicles and carts. Walk-Only Zones prohibit access to all wheeled traffic during enforcement time and deliveries or work requiring vehicular or cart access may need to be arranged outside of the restricted hours. For details about parking permits, vender permits, loading zones, mall access, and pedestrian mall restrictions, visit parking.asu.edu. For additional information, go to http://walk.asu.edu/.

7.13 TOBACCO-FREE UNIVERSITY

ASU is tobacco-free. For details visit www.asu.edu/tobaccofree.

7.14 SUSTAINABILITY

Sustainability is a very important aspect of the program and this project is expected to comply with the new sustainability guidelines that have been incorporated into ASU’s Project Guidelines. In addition, ASU has its own Sustainable Advisory Committee and the Design Team and contractor will meet with this committee to address compliance to the guidelines.

Arizona State University is dedicated to acquiring products and services that meet Sustainability requirements for the purpose of judging Sustainability the following description applies:

A. A process of current or developing business practices and technologies that restore and enhance

the environment by supplying products and services that have a lesser or reduced effect on human health and the environment when compared with competing products or services that serve the same purpose. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance or disposal of the product or service.

7.15 GREEN PURCHASING REQUIREMENTS/SPECIFICATIONS

In order to reduce the adverse environmental impact of our purchasing decisions we are committed to buy goods and services from manufacturers and suppliers who share our environmental concern and commitment. Green purchasing is the method wherein environmental and social considerations are taken with equal weight to the price, availability and performance criteria that we use to make purchasing decisions.

Proposer/Bidder shall use environmentally preferable products and materials where economically feasible. Environmentally preferable products have a less or reduced effect on human health and the environment when compared to other products that serve the same purpose. If two products are equal in performance characteristics and the pricing is within 5%, the university will favor the more environmentally preferable product.

If you are citing environmentally preferred product claims, you must provide proper certification or detailed information on environmental benefits, durability and recyclable properties.

Page 34 of 108 ASU JOC 2015 - 16000 RFQ

Page 35: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

The university and the supplier may negotiate during the contract term to permit the substitution or addition of Environmentally Preferable Products (EPPs) when such products are readily available at a competitive cost and satisfy the university’s performance needs.

Unless otherwise specified, bidders/proposers and contractors shall use recycled paper and double-sided copying for the production of all printed and photocopied documents. Furthermore, the documents shall be clearly marked to indicate that they are printed on recycled content (minimum 30% post-consumer waste) paper.

Proposer/Bidder shall provide packaging/packing materials that meet at least one of, and preferably, all of the following criteria:

• Made from 100% post-consumer recycled materials; • Be recyclable; • Reusable; • Non-toxic; • Bio-degradable

Note: The Supplier Sustainability Questionnaire must be completed and returned with your Bid/Proposal.

7.16 ASU SUSTAINABILITY MANDATES

The university believes colleges and universities must exercise leadership in their communities and throughout society by modeling ways to minimize global warming emissions ASU further believes that colleges and universities that exert leadership in addressing climate change will stabilize and reduce their long-term energy costs, attract excellent students and faculty, attract new sources of funding, and increase the support of alumni and local communities.

7.16.1 ASU Sustainable Facility Policies

Since President Michael Crow became president in 2002, ASU has instituted the following environmentally-friendly policies affecting university facilities:

• All new campus construction will be built to at least the U.S. Green Building Council’s LEED

Silver standard or equivalent. • Adopt an energy-efficient appliance purchasing policy requiring purchase of ENERGY STAR

certified products in all areas for which such ratings exist. • Begin purchasing or producing at least 15% of the institution’s electricity consumption from

renewable sources. • Adopt measures to reduce waste.

7.16.2 Arizona State Sustainable Facility Policies

ASU is also subject to mandates from legislative, gubernatorial, and other state entities. Arizona Governor Janet Napolitano has issued three executive orders since 2004, each of which requires specific actions by ASU facilities managers.

• Executive Order 2004-28: Implementation of 5% Water Use Reduction Plan. The order

required state agencies to reduce water use by 5% between FY 04 and FY 05.This executive order also reiterates HB 2276, which requires state agencies to install, when reasonable to do so, water free urinals when constructing new buildings.

• Executive Order 2005-05: Implementing Renewable Energy and Energy Efficiency in New

State Buildings. Requires that new, state-funded facilities be designed and constructed to

Page 35 of 108 ASU JOC 2015 - 16000 RFQ

Page 36: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

derive at least 10% of their energy from renewable resources and; that all new buildings include new energy-efficient standards and; that all new state-funded buildings meet or exceed LEED Silver certification.

• Executive Order 2007-03: Improving Air Quality. Requires that all state agencies: cease the

use of leaf blowers, gasoline powered lawn mowers, and all other pollution causing landscape maintenance equipment; use only low emission gas cans; to require buyers of state agency lands to mitigate pollutants; to mitigate construction pollutants and suppress construction dust; to give incentives to bidders that use equipment retrofitted with diesel retrofit kits, newer clean diesel technologies, biodiesel, or other fuels known to be cleaner than petroleum diesel.

• The Arizona Corporation Commission voted Oct. 31, 2006, to require that 15 percent of the

state’s energy production will come from renewable energy resources by 2025.

7.17 Other Opportunities with Arizona State University not related to this solicitation.

7.17.1 Connect your business with an affluent, educated audience through a business partnership with the ASU Alumni Association. The Association is the touchstone for the University’s 300,000 alumni and provides valuable connections between them and a wide variety of businesses. By doing business with the University, the largest university in the United States, your company can stand above the competition.

ASU alumni represent a responsive target market for your product or service.

• Alumni live worldwide. • 70 percent of alumni reside in Arizona. • More than 190,000 alumni live in Maricopa County. • 11 percent of alumni reside in California. • 75% of ASU alumni are under the age of 45. • More than 64% of ASU alums graduated since 1984. • More than one-third hold post-graduate degrees. • More than 70 percent of ASU alumni are actively employed. • 30 percent of alumni earn between $60,000 and $90,000 annually. • 25 percent of ASU alumni earn more than $90,000 annually.

Specific partnership opportunities exist in a variety of areas.

• Advertise in the quarterly ASU Magazine, mailed to more than 260,000 homes around the world. ASU Magazine is the largest circulation magazine in the Southwest. The rate card is available for download. http://www.asu.edu/alumni/

• Sponsor one of the Association’s many programs and events and receive recognition and access to targeted audiences. Events include: Founder’s Day in March, Senior Send off in April, Homecoming in the Fall, Travel shows, Career Fairs and many more! Costs from $500 to $2500.

• Create a unique partnership with us to suit your needs. • Establish benefits for ASU alumni by offering targeted discounts and services. • Advertise on this Web site or on our 55 Chapter/Club websites or in our electronic

newsletters, sent out to more than 80,000 people monthly. Cost is $1000 per mo per each advertising venue.

Contact Rhonda McClintock at 480-965-5051 or [email protected] today to start doing business with the Sun Devil nation.

Sun Devil Sports Marketing

Sun Devil Sports Marketing is the exclusive marketing and corporate sponsorship partner for Arizona State University Athletics and manages all corporate marketing opportunities

Page 36 of 108 ASU JOC 2015 - 16000 RFQ

Page 37: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

surrounding Sun Devil Athletics, including on-premise signage, TV, radio, print, internet, premium hospitality, event marketing and promotions. If you are interested in partnering with ASU Athletics, please contact Becky Parke at 480-727-0623 or at [email protected].

Arizona PBS Delivers…

Eight / Arizona PBS, delivers award-winning, educational, cultural and current events programming to approximately 1.5 million viewers each week. Become an Eight sponsor.

• Eight delivers – reach. Comparable to other TV channels, well beyond cable channels

and way beyond the top local radio stations and print media. Eight / KAET reaches 85 percent of the people of Arizona.

• Eight delivers – quality audience. Business leaders, decision makers, high income households, educated citizens & boomers and spenders with disposable income.

• Eight delivers – marketing benefits: • Build brand awareness by linking your business with high-quality programs • Generate community goodwill through support of public television • Promote your offerings to a broad audience at an affordable price • Market your brand in an environment free of commercial clutter • Eight delivers – multiple media platforms: • 3 TV Channels – Eight HD, Eight Life & Eight World • Eight Magazine – 50,000 households each month • Web views – www.azpbs.org (100,000 unique visitors a month) • E-Marketing – 40,000 email addresses … and more. Contact: Janine Haley, Eight Corporate Support at 602-496-6202 or [email protected]

Page 37 of 108 ASU JOC 2015 - 16000 RFQ

Page 38: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 8 ATTACHMENTS

ATTACHMENT A – STANDARD FORM OF AGREEMENT AND GENERAL CONDITIONS

Page 38 of 108 ASU JOC 2015 - 16000 RFQ

Page 39: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

ARIZONA STATE UNIVERSITY STANDARD FORM AGREEMENT

BETWEEN OWNER AND XXXXXXXXXXX

For Job Order Contracts January __, 2015 Edition, as amended February, 2015

Page 39 of 108 ASU JOC 2015 - 16000 RFQ

Page 40: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Table of Contents STANDARD FORM AGREEMENT BETWEEN OWNER AND CONTRACTOR ...................................... 41

ARTICLE 1 SCOPE OF WORK ........................................................................................................... 41 ARTICLE 2 CONTRACT DOCUMENTS ............................................................................................. 41 ARTICLE 3 INTERPRETATION AND INTENT ................................................................................... 42 ARTICLE 4 OWNERSHIP OF DOCUMENTS ..................................................................................... 43 ARTICLE 5 CONTRACT TIME ............................................................................................................ 43 ARTICLE 6 CONTRACT PRICE .......................................................................................................... 45 ARTICLE 7 PROCEDURE FOR PAYMENT ....................................................................................... 45 ARTICLE 8 TERMINATION FOR CONVENIENCE............................................................................. 46 ARTICLE 9 REPRESENTATIVES OF THE PARTIES; AUTHORITY .................................................. 46 ARTICLE 10 BONDS AND INSURANCE .............................................................................................. 47 ARTICLE 11 SUPPLEMENTAL INFORMATION .................................................................................. 47

Page 40 of 108 ASU JOC 2015 - 16000 RFQ

Page 41: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

STANDARD FORM AGREEMENT BETWEEN OWNER AND CONTRACTOR This “AGREEMENT” is made this day of , in the year 20 by and between Arizona Board of Regents, for and on behalf of Arizona State University ("Owner"), and (contractor’s full legal name)_ ("Contractor"), located at __(address)___, (each a “Party” or collectively the “Parties”). The terms of this Agreement are to be construed consistently with the other Contract Documents enumerated in Article 2 of this Agreement. In consideration of the mutual promises of the parties, the Owner and the Contractor agree as set forth herein: ARTICLE 1 SCOPE OF WORK 1.1 The Contractor shall perform all needed services and furnish all labor, materials, equipment, tools, supplies and other items necessary to satisfactorily complete all work, deliverables, and services in connection with the following project described as: [INSERT] (the “Project”), located at the following site: various locations at Arizona State University, in strict accordance with the Construction Documents, to be prepared by a registered design professional ("Design Professional" or "DP"), and all other Contract Documents (collectively “Scope of Work, “Project Work” or “the Work”). ARTICLE 2 CONTRACT DOCUMENTS 2.1 The “Contract Documents” are comprised of the following. In the event of a conflict in the

Contract Documents, the Contract Documents will be applied in the following order of precedence:

a) This Agreement with all Exhibits and Attachments, b) Job Orders as issued for specific projects, as subsequently modified by any Change

Orders or Amendments, if any. c) ASU Design Guidelines and Technical Standard, current as of the date of each issued

project-specific Job Order, d) Each project-specific Job Order’s Plans and Specifications (“Construction

Documents”) as subsequently modified by any addenda, e) Owner’s Request for Proposal (“RFQ”) including all Addenda, Exhibits and

Clarifications. f) The Contractor’s proposal submission, as required by the RFP, including any

clarifications and revisions of the submission. g) Owner’s Request for Qualifications (“RFQ”) including all Addenda, Exhibits and

Clarifications.

Page 41 of 108 ASU JOC 2015 - 16000 RFQ

Page 42: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

h) The Contractor’s qualifications submission, as required by the RFQ, including any clarifications and revisions of the submission.

i) The following supplemental documents: i. Performance Bond per Arizona Board of Regents Policy 3-804E, for each

project-specific Job Order project, ii. Payment Bond per Arizona Board of Regents Policy 3-804E, for each project-

specific Job Order project, iii. Certificates of Insurance: General Liability, Workers Compensation, Automobile

Liability and Builder's Risk, for each project-specific Job Order, iv. List of Subcontractors, provided at award of each project-specific Job Order, v. Notification and Confirmation of Asbestos/Lead/PCB Containing Building

Material on the ASU Campus, for each awarded project-specific Job Order, vi. Construction Permit for each awarded project-specific Job Order, as applicable,

j) The following Documents Files: i. ASU JOC 2015 Project Tracking 2.0 Rev 1 – Master Excel Spreadsheet ii. ASU JOC 2015 Project Tracking 2.0 Rev 1 – Working Example

k) Any other Contract Documents as separately identified on each awarded Job Order, if any.

Construction Permit for each awarded project-specific Job Order, as applicable

ARTICLE 3 INTERPRETATION AND INTENT 3.1 The Contract Documents are complementary and must be interpreted in harmony so as to

avoid conflict or ambiguity, with words and phrases interpreted consistent with construction and design industry standards.

3.2 Terms, words and phrases used in the Contract Documents shall have the meanings as

defined in the “Exhibit A – Contractor General Conditions” or if not specifically defined, their ordinary and common meaning.

3.3 The Contract Documents form the entire Agreement between Owner and Contractor and by

incorporation herein are as fully binding on the parties as if set forth herein. No oral representations or other agreements have been made by the parties except as specifically stated in the Contract Documents.

3.4 Generally, the Drawings indicate dimensions, positions and details of construction; the

Specifications establish criteria and quality for materials and standards for workmanship. All Work shall be performed in a workmanlike manner and all materials used shall be new and of the highest quality and of the type best adapted to their purpose unless otherwise specified.

Page 42 of 108 ASU JOC 2015 - 16000 RFQ

Page 43: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

3.5 The Agreement may only be changed by written modifications, and the Contractor

understands and agrees that if the Contractor proceeds with any work upon verbal request only, Contractor is agreeing by his conduct that such work, or change in the work, constitutes a minor change.

3.6 The intent of the Contract Documents is to include all items and services necessary for the

proper execution and completion of the Work. The Contract Documents are complementary, and what is required by any one shall be as binding as if required by all. Work not covered in the Contract Documents but deemed necessary for the proper completion of the Work by the Design Professional will be required of Contractor unless it is inconsistent with the Contract Documents, or is not reasonably inferable therefrom as being necessary to produce the intended results. Words and abbreviations, which have well known technical or trade meanings, are used in the Contract Documents in accordance with such recognized meanings.

ARTICLE 4 OWNERSHIP OF DOCUMENTS

4.1 The Owner, through this Agreement with the Contractor or its separate agreement(s) with the Design Professional, has and shall continue to have ownership of all drawings, specifications, and other documents and electronic data furnished by Design Professional. Minor design services may be required for some Job Orders that require design services the Contractor shall seek the services of an Arizona registered/licensed professional to prepare plans for permitting.

4.2 The Owner shall also have ownership of documents or electronic data similar to those described in Article 4.1 above created by or in the possession of Contractor as well as any estimates, schedules, value engineering submissions, or other work product or deliverable furnished by Contractor to Owner.

ARTICLE 5 CONTRACT TIME 5.1 Owner and Contractor mutually agree that time is of the essence with respect to the dates

and times set forth in the Contract Documents. Contractor understands that the time(s) for completion(s) set forth in these documents are essential to the Owner and a material consideration for this Agreement.

5.2 The Work and Contract Time shall commence only if and when directed in written Notice to

Proceed signed by the Owner, unless the Parties mutually agree otherwise in writing.

Page 43 of 108 ASU JOC 2015 - 16000 RFQ

Page 44: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

5.3 This Agreement shall be in effect for the time period [INSERT] through [INSERT], or the

completion date of Construction Services to be rendered under this Agreement, whichever is later. Provided however, the Owner reserves the sole right to terminate this Agreement at any time and offer a new agreement to the Contractor, utilizing the Contractor’s RFP submittal resulting from the [INSERT RFP DESCRIPTION].

5.4 Substantial Completion. Substantial Completion of the Work (the Substantial Completion

Date), as defined herein, shall be achieved no later than the date identified on each issued project-specific Job Order, subject to adjustments in accordance with the Contract Documents by amendment or change order.

5.4.1 Interim milestones and/or Substantial Completion of identified portions or phases of the Work

shall be achieved as identified on each issued project-specific Job Order, subject to adjustments in accordance with the Contract Documents.

5.5 Final Completion. Final Completion of the Work (the Final Completion Date), as defined

herein, shall be achieved no later than the date identified on each issued project-specific Job Order, subject to adjustments in accordance with the Contract Documents by amendment or change order.

5.6 Liquidated Damages. Contractor understands and acknowledges that if Substantial

Completion is not achieved by the Substantial Completion Date, Owner will suffer damages which are difficult to accurately quantify and ascertain. The Contractor agrees that if the Contractor should fail to achieve Substantial Completion by the date set forth in Article 5.4, as extended by any Change Orders, the Contractor agrees to pay and will pay Owner, in addition to all other sums the Contractor may be obligated to pay pursuant to the Contract Documents, the sum identified in each project-specific Job Order as liquidated damages for each calendar day that Substantial Completion extends beyond the scheduled Substantial Completion Date. In addition, if Final Completion is not attained within the time period defined by Article 5.5 above, Contractor shall pay Owner the sum identified in each project-specific Job Order as additional liquidated damages for each calendar day that Final Completion extends beyond the required date. The liquidated damages provided for herein are the Parties’ best estimate of Owner’s damages for the failure to complete the Project within the time periods required by this Agreement and are not a penalty. Payment of liquidated damages shall be in lieu of all liability for any and all extra costs, losses, expenses, claims, penalties and any other damages, whether special or consequential, and of whatsoever nature incurred by Owner which are occasioned by any delay in Contractor achieving Substantial Completion or Final Completion on or after the established dates.

Page 44 of 108 ASU JOC 2015 - 16000 RFQ

Page 45: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

These sums for Substantial Completion liquidated damages and Final Completion liquidated

damages may be withheld from the balance of the Contract Price as it becomes due. Should liquidated damages exceed the Contract Price due or to become due, then the Contractor shall pay the Owner the difference within three (3) days of receipt of written demand.

ARTICLE 6 CONTRACT PRICE 6.1 Subject to increases and decreases for project-specific Job Order Change Orders in

accordance with the Contract Documents, the Owner shall pay to the Contractor a Contract Price as identified in each project-specific Job Order, in progress payments as provided in the Contract Documents, not to exceed $1,999,999.00 per project-specific Job Order (ABOR 3-804).

ARTICLE 7 PROCEDURE FOR PAYMENT 7.1 Progress Payments. Contractor shall separately submit to Owner on the last business day

of each month Contractor’s Application for Payment, for each project-specific Job Order, based on the percentage of Work completed as agreed to by the Owner, in accordance with Section 6 of the “Exhibit A – Contractor General Conditions”.

7.2 Record Keeping and Finance Controls. With respect to all Work performed by Contractor,

its Subcontractors and Consultants under this Agreement, the Contractor, its Subcontractors and any Consultants, shall keep full and detailed accounts and exercise such controls as may be necessary for proper financial management, using accounting and control systems in accordance with generally accepted accounting principles, and subject to approval by the Owner. During performance of the Work and for five (5) years after Final Payment, the Contractor shall retain and shall also require all Subcontractors and any Consultants to retain for review and/or audit by the Owner all correspondence, meeting minutes, memoranda, electronic media, books, accounts, reports, files, time cards, material invoices, payrolls, and evidence of all communications, direct and indirect costs and all other matter related to the Work. Upon request by the Owner, a legible copy or the original of any or all such records shall be produced by the Contractor at any time during or after the Work as the Owner may request. The Contractor shall submit to the Owner upon request all payrolls, reports, estimates, records and any other data concerning Work performed or to be performed and concerning materials supplied or to be supplied, as well as Subcontractor or any Consultant payment applications or invoices and such Subcontractor’s or any Consultant’s progress payment checks. The requirements of this Article shall be provided for in all contracts between the Contractor and its Subcontractors and any Consultants employed by the Contractor.

Page 45 of 108 ASU JOC 2015 - 16000 RFQ

Page 46: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

ARTICLE 8 TERMINATION FOR CONVENIENCE 8.1 This Agreement may be terminated for the convenience of Owner as provided for in Section

12.1 of the “Exhibit A – Contractor General Conditions”. ARTICLE 9 REPRESENTATIVES OF THE PARTIES; AUTHORITY 9.1 Owner’s Representatives. 9.1.1 Owner designates [INSERT], as its Senior Representative (“Owner’s Senior

Representative”), which individual has the authority and responsibility set forth in the Contract Documents, including the authority and responsibility for avoiding and resolving disputes under Section 11 of the “Exhibit A – Contractor General Conditions”.

9.1.2 Owner designates To Be Identified in each project-specific Job Order, as its Project

Management Representative (“Project Manager” or “Representative”), which individual has the authority and responsibility set forth in the Contract Documents.

9.2 Contractor’s Representatives. 9.2.1 Contractor designates (name, title, company name and address – or To Be Identified in

each project-specific Job Order), as its Senior Representative (“Contractor’s Senior Representative”), which individual has the authority and responsibility set forth in the Contract Documents, including the authority and responsibility for avoiding and resolving disputes under Section 11 of the “Exhibit A – Contractor General Conditions”.

9.2.2 Contractor designates (To Be Identified in each project-specific Job Order), as its Project

Management Representative (“Representative”), which individual has the authority and responsibility set forth in the Contract Documents.

9.2.3 Contractor designates (To Be Identified in each project-specific Job Order), as its

“Construction Superintendent”, which individual has the authority and responsibility set forth in the Contract Documents.

9.2.4 Contractor’s Representatives and Construction Superintendent, as approved by the Owner,

shall not be replaced without the Owner’s prior written approval. 9.2.5 Contractor warrants and shall ensure that only representatives who are authorized to legally

bond Contractor will sign documents associated with this Agreement.

Page 46 of 108 ASU JOC 2015 - 16000 RFQ

Page 47: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

ARTICLE 10 BONDS AND INSURANCE 10.1 Prior to, and as a condition for the execution of each project-specific Job Order, the

Contractor to perform Work, Contractor shall procure, deliver and maintain Performance and Payment Bonds and insurance coverage as provided in Section 14.28 of the “Exhibit A – Contractor General Conditions” and the RFQ.

ARTICLE 11 SUPPLEMENTAL INFORMATION 11.1 This Agreement constitutes the complete and integrated agreement between the Owner and

the Contractor, and it supersedes all prior negotiations, representations or agreements, either written or oral.

11.2 IN WITNESS WHEREOF, the parties hereto have executed this Agreement in two (2)

duplicate originals, any one of which shall be adequate proof of this Agreement, as of the date written above.

CONTRACTOR: OWNER: Contractor Company Name Arizona Board of Regents By Its Authorized Representative For and on behalf of

Arizona State University (Signature) (Signature) (Printed Name) (Printed Name) (Title) (Title) (Date) (Date)

Page 47 of 108 ASU JOC 2015 - 16000 RFQ

Page 48: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Exhibit A

Contractor General Conditions (January 2015 Edition)

Page 48 of 108 ASU JOC 2015 - 16000 RFQ

Page 49: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Contractor General Conditions

TABLE OF CONTENTS

GENERAL CONDITIONS TO THE CONSTRUCTION CONTRACT SECTION 1 GENERAL ........................................................................................................................... 50

SECTION 2 CONTRACTOR SERVICES AND RESPONSIBILITIES .................................................... 53

SECTION 3 DESIGN PROFESSIONAL’S SERVICES AND RESPONSIBILITIES ............................... 68

SECTION 4 OWNER’S SERVICES AND RESPONSIBILITIES ............................................................. 69

SECTION 5 HAZARDOUS MATERIALS AND SITE CONDITIONS ...................................................... 69

SECTION 6 PROGRESS PAYMENTS ................................................................................................... 71

SECTION 7 COMPLETION AND FINAL PAYMENT ............................................................................. 75

SECTION 8 INDEMNIFICATION ............................................................................................................ 77

SECTION 9 TIME AND DELAY .............................................................................................................. 78

SECTION 10 CHANGES TO CONTRACT SCOPE, PRICE, TIME AND TERMS ................................... 79

SECTION 11 REQUESTS FOR CONTRACTUAL ADJUSTMENTS AND DISPUTE RESOLUTION ..... 81

SECTION 12 STOP WORK AND TERMINATION ................................................................................... 82

SECTION 13 CONSTRUCTION BY OWNER OR BY OTHER CONTRACTORS ................................... 85

SECTION 14 MISCELLANEOUS ............................................................................................................. 85

Page 49 of 108 ASU JOC 2015 - 16000 RFQ

Page 50: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

GENERAL CONDITIONS TO THE CONSTRUCTION CONTRACT SECTION 1 GENERAL 1.1 Mutual Obligations.

1.1.1 Owner and Contractor commit, at all times, to cooperate fully with each other, and proceed on the basis of trust, confidence, and good faith to permit each party to realize the benefits expected and afforded under the Contract Documents, which benefits include the satisfactory and timely completion of the Project and performance of all obligations required by the Contract Documents.

1.2 Basic Definitions.

1.2.1 “Addenda” means clarifications or changes in the Work provided to bidders in writing prior to the public bid on the Agreement.

1.2.2 “Allowances” are items set forth on “Exhibit C – Cost of the Work – Schedule of Values” to the Agreement

as an estimate for the cost of that item of work and to the extent that the Cost of the Work for that item is lesser or greater than the estimate the Job Order Cost will be reduced or increased by change order.

1.2.3 “Contract Documents” or “Contract” are those documents noted under Article 2 of the Construction

Agreement Between Owner and Contractor, and also include, but are not limited to, the Agreement, amendments, project-specific Job Orders, change orders, these General Conditions, any supplementary or special conditions referenced in the Agreement and any other items stipulated to as being included in the Contract Documents, including the complete design as accepted by the Owner.

1.2.4 “Contract Price” for each Job Order is the amount stated in the project-specific Job Order, including

authorized adjustments thereto, for the performance of the Work under that Job Order.

1.2.5 “Construction Documents” are the plans and specifications prepared by the Design Professional for the project-specific Job Order, approved by the Owner, and incorporated into the Agreement by reference after such approval, to be used to construct the Project. All modifications to the Construction Documents must be approved by the Owner prior to incorporation into the Agreement. This definition includes the terms Project Specification and Project Manual as well.

1.2.6 “Construction General Conditions”, used in non-pre-priced (Unit Price book) Job Order method, means

all on-site Project-specific job costs of Contractor not itemized elsewhere in the Contract Documents but specifically excludes, without limitation, the following: a) bonds, b) insurance, c) items which are included in the Contractor’s Fee, such as:

(1) Home (off-site) Expenses, (2) Overhead & Profit, (3) Home Office Personnel such as Corporate Executive, Project Executive & Project Director, (4) Home Office Staff Transportation & Travel Costs, (5) Home Office Accounting & Contract Forms, (6) Legal Expenses, (7) Project Staff Moving Expenses, (8) Off-site Staff Training & Education (unless pre-authorized by Owner, in writing), (9) Pre-Mobilization Office Space, (10) Off-site Equipment & Supplies, (11) Field Office PCs and Commercial Software Purchase/License, (12) Forms,

Page 50 of 108 ASU JOC 2015 - 16000 RFQ

Page 51: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

(13) Estimating & Value/Constructability Analysis, (14) Warranty Coordination, (15) Contractor Yard not Dedicated to Project, (16) Contractor Association Fees, Licenses & Memberships, (17) Cost over Contract Price, (18) Corrective Work, (19) Bonuses, (20) Cost of Living Allowance, (21) Marketing Expenses, (22) Corporate Sponsorships and Entertainment, and (23) Promotional or Celebratory Expenses the Contractor incurs while performing and

completing the Project.

Owner will not pay for Contractor’s travel, lodging, meal expenses, and/or subsistence.

Contractor’s allowable labor rates and burdened labor rates within rates or part of Construction General Conditions are restricted to the rates set forth in the RFP response.

Construction General Conditions are restricted to the rates set forth in the RFP response. All variances or additions must be approved by the Owner.

Construction General Conditions-type charges may not be listed in the Subcontractors’ Schedule of Values, nor will such charges be paid by the Owner.

Construction General Conditions shall be submitted by the Contractor during the Project negotiation process based on actual cost or negotiated amounts, as agreed to by Owner.

All excluded expenses the Contractor incurs while performing and completing the Project are not reimbursable as Construction General Conditions, and must be paid out of the Contractor’s Fee proposed during the RFP process.

1.2.7 “Contingency” or “Construction Contingency” means that part of the Contract Price the Contractor may

use during the Construction Phase as provided in these General Conditions at Section 7.10, to cover legitimate unforeseen construction expenses, or expenses otherwise agreed by Owner and Contractor, subject to Owner’s approval, after Contract Price has been accepted. Contingency may not be used to cover the cost of any work on the Project after issuance of the Certificate of Final Completion. All unused Contingency will be returned to Owner in last pay application.

1.2.8 “Contractor” means the Contractor and all persons working for or on behalf of the Contractor, for this

Project.

1.2.9 “Contractor’s Coefficient” is a numerical factor that represents Contractor cost of items found in the Unit Price Book. The Contractor’s Coefficient is only used in the Unit Price Method and is Not a Requirement of this JOC Contract.

1.2.10 “Day” means calendar day unless specifically otherwise provided herein or by law.

1.2.11 “Design Professional” (DP) is a representative of the Owner for the Project as provided in the Contract

Documents, whose Agreement is with the Owner, and a) who is a qualified professional properly licensed in the State of Arizona to furnish applicable design and construction administration services, and b) is not the Agent of the Owner except for the approval and certification of Contractor progress payment applications, and Substantial Completion, if so designated. For purposes of this Agreement only, the term also includes individuals employed by any state university who render such services in connection with the Project.

Page 51 of 108 ASU JOC 2015 - 16000 RFQ

Page 52: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

1.2.12 “Direct Construction Cost” is the sum of all applicable Construction General Conditions costs, Subcontractor costs, costs of self-performed work (if approved in writing in advance by Owner), Allowances and Contingencies.

1.2.13 “Fee” includes all direct and indirect costs of Contractor providing Project Management (including off-site management), supervision and support for the completion of the Work. The Fee is restricted to the rates set forth in the Contractor’s submission to the RFP

1.2.14 “Final Completion” is the date certified by the DP and Owner as 100% completion of all Work described

by or reasonably inferred from the Project Criteria and Contract Documents, including but not limited to:

a) Punch Lists b) Close-Out Documents c) Owner training/start up activities.

1.2.15 “General Requirements” are the fixed direct labor costs, pre-construction direct labor costs, and other unit

prices for various construction services set forth in Contractor’s qualifications submission set forth on the forms set forth in Exhibit C and D to the RFQ.

1.2.16 “Hazardous Materials” are defined as any materials, wastes, substances and chemicals deemed to be

hazardous under applicable Legal Requirements (including and environmental laws or regulations), for which the handling, remediation, or disposal are regulated by applicable Legal Requirements (including any environmental laws or regulations). Where applicable, the term Hazardous Waste shall have the meaning provided for in Section 1004 of the Solid Waste Disposal Act (42 USC, Section 6903) as may be amended from time to time.

1.2.17 “Home Office” is defined as the Contractor’s offices not on ASU’s campus.

1.2.18 “Indirect Construction Cost” is the sum of all applicable insurance costs, bond costs and applicable sales

or use taxes, and excludes Fee.

1.2.19 “Legal Requirements” include all regulations, policies, procedures and practices of the Arizona Board of Regents and the Owner and all applicable rules, laws, codes, ordinances and regulations of any government or quasi-government entity, federal, state and local having jurisdiction over the Work, the practices involved in the Work, or any work performed.

1.2.20 “Modifications” means Agreement or project-specific Job Order change orders or amendments signed by

the Owner, or other written amendments signed by both the Owner and the Contractor at or after the execution of the Agreement and/or project-specific Job Order(s), or the DP's written interpretations or directions for minor changes in the Work. A “minor change” is defined as one having no impact on cost or time or the Owner’s approved design intent, as determined by the Owner.

1.2.21 “Project” means all components of the improvements to be constructed for the Owner, regardless of

whether the Work is all or only a portion, under a specific Job Order.

1.2.22 “Punch List” are those minor items of Work identified and listed by Design Professional and agreed to by Owner to be completed by Contractor after Substantial Completion and prior to Final Completion, which do not prevent the Project from being fully used for the purpose for which it is intended and which will not prevent the issuance of a certificate of occupancy.

1.2.23 “Site” is the land and other areas on which the Project is located.

1.2.24 “Subcontractor” (of any tier) is an entity or person who performs a portion of the Work, on- or off- site,

directly on behalf of the Contractor, including any materials, workers and suppliers, and shall include all employees, agents and authorized representatives of such entities or persons.

Page 52 of 108 ASU JOC 2015 - 16000 RFQ

Page 53: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

1.2.25 “Substantial Completion" is the date certified by the DP and Owner on which the Contractor’s Work, or an agreed upon portion of the Work, is sufficiently complete, as determined by the Owner’s issuance of a Certificate of Substantial Completion, so that Owner can fully occupy and utilize the Project, or a portion thereof, for the purposes for which it is intended. In order to achieve Substantial Completion, all Work must be complete except for items included on the approved Punch List. As part of Substantial Completion all required inspections, State Fire Marshal and State Elevator certificates, Boiler inspection, ACC inspection for natural gas lines, and preliminary test and balance of the mechanical system must be obtained or completed, as applicable.

1.2.26 “Unit Price Book” is, in the case of Job Orders for new construction, the most recent annual edition of the

R.S. MeansTM Facilities Construction Cost Data book; in the case of Job Orders for repair or remodeling, the most recent annual edition of the R.S. MeansTM Facilities Repair & Remodeling Cost Data book and the Facilities & Commercial Renovation Cost Date Book. All books will be the Computer CD Version and normalized for the Phoenix area Zip Code 850.

1.2.27 “Work” is comprised of all activities required in order to complete the Project as defined by the Project

Criteria and Contract Documents, as specified for each project-specific Job Order, including procuring and furnishing all materials, equipment, services, and labor reasonably inferable from the Contract Documents, or from prevailing trade usage and custom.

1.3 Mutual Understanding.

Owner and Contractor agree that these provisions set forth their mutual understanding and agreement regarding the Agreement, General Conditions or subjects addressed therein.

SECTION 2 CONTRACTOR SERVICES AND RESPONSIBILITIES 2.1 General Services.

2.1.1. The Contractor shall interact and cooperate fully with the Owner and Design Professional during the project. The Contractor covenants with the Owner to furnish its best skill and judgment and to cooperate with the Design Professional in furthering the interests of the Owner.

2.1.2. The Contract Documents do not create any contractual relationship between the Design Professional and

the Contractor or any separate contractors, consultants, Subcontractors of any sub-tier or suppliers on the Project; nor shall anything contained in the Contract Documents be deemed to give any third party any claim or right of action against the Owner, the Design Professional or Contractor which does not otherwise explicitly exist in the Contract Documents.

2.1.3. The Contractor shall only use duly licensed Subcontractors in connection with the Work, as submitted with

the bidding documents. Any changes to subcontractors must be approved in writing by Owner.

2.1.4. The organization of the Specifications into division, section, and article, and the arrangement of Drawings shall not obligate or control the Contractor in dividing performance of the Work among Subcontractors, or in establishing the extent of the Work to be performed by any one trade.

2.1.5. The Contractor covenants with the Owner to furnish its best skill and judgment and to cooperate with the

Design Professional in furthering the interests of the Owner. The Contractor agrees to furnish efficient business administration and superintendence and to use its best efforts to timely complete the Work in an expeditious and economical manner consistent with the interest of the Owner.

2.1.6. The Contractor shall be responsible for laying out its own Work and for any damage which may occur to

work of any other contractor because of the Contractor's own errors or inaccuracies. The Contractor shall

Page 53 of 108 ASU JOC 2015 - 16000 RFQ

Page 54: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

also be responsible for unloading, uncrating, storing and handling all materials and equipment to be erected or placed by it, whether furnished by the Contractor or others.

2.1.7. The Contractor, Subcontractors and Suppliers shall be responsible for taking all appropriate field

measurements prior to fabrication and installation of any item. Such measurements shall be taken sufficiently in advance so as to avoid any delay or potential delay. Failure to adhere to this provision shall render such delays the responsibility of the Contractor.

2.1.8. Unless otherwise specifically mentioned, all anchors, bolts, screws, fittings, fillers, hardware, accessories,

wiring, conduit, ductwork, trim and other parts required for or in connection with any item or material to make a complete, serviceable, finished and first quality installation shall be furnished and installed as part of the item whether or not expressly called for by the Drawings or Specifications.

2.1.9. All materials shall be shipped and stored and handled in a manner that will afford protection and ensure

their being in factory-new condition at the time they are incorporated in the Work. After installation, they shall be properly protected against damage or deterioration until Final Completion of the Project.

Any part of the Work damaged during installation or prior to final acceptance of Work shall be repaired so as to be unnoticeable and to be equal in quality, appearance, serviceability and other respects to an undamaged item or part of the Work. Where this cannot be fully accomplished, the damaged item or part shall be replaced. After installation, all exposed surfaces and parts of an item or of the Work shall be cleaned in a manner that will not damage the finish or any of the parts of the item, so that the completed work is left in first class condition, free of all defects. All damaged or defaced Work shall be repaired or replaced to the Owner's satisfaction at the expense of Contractor.

2.1.10. Contractor shall keep the Site free from debris, trash and construction waste to permit Contractor to perform

its construction services efficiently, safely, and so as not to interfere with the use of any adjacent land areas, including the reasonable aesthetic appearance of the jobsite and all storage/staging areas. Contractor shall also be responsible for and take precautions and measures to fully secure, safeguard and protect the Work during the Construction Phase. Unless previously released of responsibility by Owner, that Contractor responsibility to secure, safeguard and protect shall continue until Final Completion and final acceptance.

2.1.11. Upon Substantial Completion of the Work, or a portion of the Work, Contractor shall remove all debris,

materials, waste, equipment, machinery and tools from the Work so as to permit Owner to safely occupy the Work or a portion of the Work for the use in which it is intended. If the Contractor fails to clean up at the completion of the work, the Owner may do so and the cost thereof shall be charged to the Contractor.

2.1.12. Work Hours. Unless otherwise provided in the Task Order, Work shall be performed during regular

working hours. Notwithstanding the foregoing, in the event of emergency or when required to complete, the Work may be performed on night shifts, overtime, weekends, or holidays, provided that permission to do so has been obtained from the Owner and confirmed in writing by the Owner twenty-four (24) hours prior to the commencement of such Work. The Contractor will not be entitled to additional compensation for Work performed outside of regular working hours, except to the extent such compensation is approved by the Owner in advance. If so approved, such compensation shall in such event cover only the direct cost of the premium portion of the time involved and not overhead and profit. In no event will the Contractor be entitled to additional compensation for Work performed outside regular hours where occasioned by delays, need for repairs, or other causes attributable to the Contractor or its Subcontractors, or to concurrent delay. Notwithstanding the foregoing and unless overtime has been requested by the Owner, the Contractor shall bear all costs of standby contractors, if any. In the event the Contractor performs any of the Work on night shifts, overtime, weekends, or holidays, the Contractor shall comply with all laws, ordinances, codes, rules, and regulations applicable thereto (including, without limitation, those relating to noise).

2.2 Consultation During Project Development.

Page 54 of 108 ASU JOC 2015 - 16000 RFQ

Page 55: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

In addition to the services of the Contractor listed throughout this Agreement, Contractor’s Pre-Construction Services may include but not be limited to: Development of a Project Management Plan, Provide Value Analysis, Constructability and Bid ability Reviews, Cash Flow Projections, Estimating/Price Guarantees, and Subcontractor Bid Package Timing and Strategy. These services may include, but not be limited to, review of design; advice on Site use, improvements, selection of materials, building systems and equipment; long lead items, and recommendations on construction feasibility, availability of materials and labor, local construction activity as it relates to work schedules, and time requirements for installation and construction.

Should Pre-Construction services be required, Owner shall pay Contractor a Pre-Construction Phase Fee for the Pre-Construction services, as negotiated and authorized per project-specific Job Order.

2.3 Progress and Scheduling.

2.3.1 For each project-specific Job Order issued, the Contractor shall prepare and submit to the Owner and the DP a Schedule of Values allocating the Contract Price among the various portions of the Work, by Division, for purposes of progress payments. The Schedule of Values shall be substantially equivalent to AIA Forms G702 and G703, or as specified by Owner, see Exhibit F of the RFQ. In addition, the Contractor shall submit a construction progress schedule for the Work as part of each Job Order Proposal, in full accordance with the requirements and provisions located in the Contract Documents.

2.3.2 The Contractor shall also furnish the Owner and DP with a Narrative Report corresponding with each

monthly update which shall include a description of current and anticipated problem areas, delaying factors and their impact, fragmentary networks (fragment) of delays, and an explanation of corrective action taken or proposed. If the Project is behind schedule in any month, the Contractor's Narrative Report shall indicate precisely what measures it will take in the next thirty days (30) to put the Work back on schedule.

2.3.3 The Contractor shall be responsible to prepare, submit and maintain the schedules and Narrative Reports

indicated above, and the failure to do so may be considered a material breach of this Contract. Any additional or unanticipated cost or expense required to maintain the schedules shall be solely the Contractor's obligation and shall not be charged to the Owner.

2.3.4 The Contractor shall employ and supply a sufficient force of workers, material and equipment, and shall

prosecute the Work with such diligence so as to maintain the rate of progress indicated on the Progress Schedule, to prevent work stoppage, and to ensure completion of the Project within the Contract Time.

2.3.5 Upon Owner’s request, as a condition precedent to Final Invoice, the Contractor shall, after Substantial

Completion of the work has been achieved, submit a final Contractor's Construction Schedule which accurately reflects the manner in which the project was constructed and includes actual start and completion dates for all activities on the Construction Schedule.

2.3.6 The date of commencement of the Work under each Job Order is the date established in the Notice to

Proceed. 2.4 Legal Requirements.

2.4.1 Contractor shall perform all Work in accordance with all applicable Legal Requirements, and the Contract Documents, and otherwise shall provide all notices applicable to the Work.

2.5 Government Approvals and Permits.

2.5.1 Unless otherwise provided in the Contract Documents, Contractor has the responsibility to obtain and pay for all necessary permits, approvals, licenses, government charges, and inspection fees required for the prosecution of the Work, and shall immediately deliver copies to the Owner and DP. Contractor shall follow all of Owner’s permitting and inspection procedures. The Contractor shall be responsible for complying with

Page 55 of 108 ASU JOC 2015 - 16000 RFQ

Page 56: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

all applicable Federal, State and local laws, codes, notice requirements, and regulations applicable to the site and prosecution of the Work. Contractor shall be responsible for and pay any costs associated with or arising from any non-compliance.

2.5.2 The Contractor shall pay all taxes for and related to the Work or its portion thereof which are legally in force

at the time the Job Order proposal is submitted, whether or not yet effective. 2.6 Construction and Superintendence by the Contractor.

2.6.1 The Contractor shall supervise and direct the Work of its employees and Subcontractors and coordinate the Work with the activities and responsibilities of the Owner and the Design Professional so as to complete the Work in accordance with the Owner’s objectives of cost, time and quality as set forth in the Contract Documents. The Contractor shall perform all construction work, services and activities efficiently and with the requisite expertise, skill, quality and competence necessary to satisfy the requirements of the Contract Documents.

2.6.1.1 Contractor acknowledges that neither the Owner nor any of their respective agents, employees,

successors, or assigns shall control the day-to- day operations of the Contractor and shall not determine construction means, methods, techniques or procedures, or safety precautions and programs in connection with the Work. Contractor agrees that neither the Owner nor any of their respective agents, employees, successors, or assigns shall be responsible for the failure of the Contractor to perform the Work in accordance with the Contract or with the laws, ordinances, rules, permit conditions, regulations, or lawful orders of any governmental agency having regulatory authority over the manner, methods, or means of performance of the Work.

2.6.2 The Contractor shall competently and thoroughly direct and superintend all of the Work and shall be solely

responsible for all construction safety, means, methods, sequences and techniques of construction. It shall coordinate and schedule all Work under this Agreement, the performance of all its employees, Subcontractors, and Suppliers, and the timely procurement of all necessary labor, materials, equipment, supplies, and all else needed to do the Work. The Contractor shall establish an on-site organization with lines of authority in order to carry out the overall plans for completion of the Work.

2.6.3 The Contractor shall employ a competent Owner-approved Superintendent and necessary assistants, who

shall be in attendance at the Project Site during the progress of the Work. The Superintendent and Representative shall represent the Contractor and all communications given to the Representative shall be binding on the Contractor. All such communications shall be confirmed in writing.

2.6.4 The Contractor shall at all times enforce strict discipline and good order among its employees and its

Subcontractors’ employees, and shall not allow employment on the Work of any unfit person or anyone not skilled in and capable of performing the task assigned to them. In addition, if the Contractor receives written notice from the Owner to dismiss any unskilled or unfit subcontractors or employees or one who is a hindrance to proper or timely execution of the Work, the Contractor shall dismiss those subcontractors or employees and agrees to replace those dismissed without delay to the Project and at no additional cost to the Owner.

2.6.5 The Contractor shall be responsible to the Owner for the acts and omissions of the Contractor’s employees,

Subcontractors of all tiers, their agents and employees, and any other persons performing any of the Work or furnishing materials under a contract with the Contractor.

2.6.6 The Contractor shall not be relieved from its obligation to perform the Work in accordance with the Contract

Documents either by the activities or duties of the Design Professional in its administration of this Agreement, or by inspections, tests or approvals required or performed by persons other than the Contractor. Nothing contained in this paragraph shall preclude the Contractor from asserting any rights it may have under this Agreement in the event of unreasonable delays to the Contractor in the conducting of

Page 56 of 108 ASU JOC 2015 - 16000 RFQ

Page 57: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

any inspections, test, approvals, or other actions by the Design Professional upon which the Contractor is dependent.

2.6.7 The Contractor shall schedule, notice, conduct, take, and distribute minutes of weekly progress meetings at

which the Owner, Design Professional, and Contractor can discuss jointly such matters as procedures, progress, and problems.

2.6.8 The Owner reserves the right to award other contracts related to the Project, or to perform certain work

itself. Any such other work may or may not be known to the Owner or disclosed to the Contractor prior to execution of a project-specific Job Order. The Contractor shall afford the Owner and such other contractor’s reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall properly coordinate its Work with theirs in such manner as the Owner or Design Professional may direct. The Contractor shall also assure at its own cost reasonable access of other contractors to their site and their work.

2.6.8.1 Upon request of the Contractor, the Owner will provide the Contractor with a copy of Drawings,

Specifications, Schedules or other needed data relating to such other contracts or work as may be necessary to meet Contractor’s duty to coordinate. The Contractor shall thoroughly examine these documents and shall within three (3) business days of completing such examination notify the Owner in writing of any conflicts with the Work to be performed by the Contractor. In no event shall such notice be given by Contractor so late as to interfere with or delay the Work to be performed by the Contractor. Failure of the Contractor to request, review, or provide written notice as provided above shall constitute a waiver of any objections or claims the Contractor may otherwise have as a result of the necessity to coordinate the Contractor’s Work with other activities.

2.6.8.2 Should the Contractor sustain any damage through any act or omission of any other such

contractor or Subcontractor, Contractor shall have no claim or cause of action against the Owner for such damage and hereby waives any such claim. The Contractor does not waive any claim or cause of action against any other contractor or Subcontractor to recover any and all damages sustained by reason of the acts or omissions of such other contractor or Subcontractor. The phrase “act or omission” as used in this section shall be defined to include, but not be limited to, any delay on the part of any such other contractor or Subcontractor, whether due to negligence, gross negligence, inadvertence or any other cause.

2.6.8.3 Should the Contractor cause damage to the Work or property of any other contractor or

Subcontractor of the Owner, the Contractor shall upon receiving due notice of damage promptly attempt to settle with such other contractor by agreement, repair or otherwise to resolve the dispute. If any such separate contractor sues or initiates a proceeding against the Owner on account of any damage alleged to have been caused the Contractor or its Subcontractors, the Owner shall notify the Contractor who shall at its own cost defend such proceedings, or pay the costs of the Owner defending such proceedings, and if any judgment or award against the Owner arises therefrom the Contractor shall pay or satisfy it and shall reimburse the Owner for all attorney’s fees and court or other costs which the Owner has incurred in connection with the matter.

2.6.9 Subcontractors and Subcontracts.

2.6.9.1 The Contractor shall supply with its proposal to the Owner a written list of all proposed

subcontractors and suppliers. The Owner will reply to the Contractor in writing stating whether the Owner or the DP, after due investigation, has any objection to any such proposed subcontractor or supplier. The Contractor shall not employ any subcontractor or supplier against whom the Owner or the DP has reasonable objection.

2.6.9.2 All work performed for the Contractor by a subcontractor shall be pursuant to an appropriate

written agreement which specifically binds the subcontractor to all applicable terms and conditions of the Contract Documents, but no contractual relationship shall exist between any subcontractor or

Page 57 of 108 ASU JOC 2015 - 16000 RFQ

Page 58: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

supplier of any tier and the Owner, unless the Owner invokes the assignment provisions of the following subsection. Upon request, the Contractor shall provide fully executed copies of any subcontracts and purchase orders to the Owner.

2.6.9.3 The Contractor hereby assigns to the Owner (and its assigns) all its interest in any subcontracts

and purchase orders now existing or hereinafter entered into by the Contractor for performance of any part of the Work, which assignment will be effective upon termination of the Contract by the Owner and only as to those subcontracts and purchase orders which the Owner assumes in writing. All subcontracts and purchase orders shall provide that they are freely assignable by the Contractor to the Owner and its assigns. Such assignment is part of the consideration to the Owner for entering into this agreement with the Contractor and may not be withdrawn prior to Final Completion.

2.6.9.4 Subcontractor Selection. The Contractor’s selection of any Subcontractor must comply with ABOR

Policy 3-804B, (3), (h), ((1)) and ((2)) and must be based on qualifications alone, or on a combination of qualifications and price selection, but shall not be based on price alone.

2.6.9.4.1 Pre-Construction Phase. If it is or will be to the advantage of Owner or the Project to

select certain subcontracting trades to participate in the design process during the Pre-Construction Phase, as well as provide Construction Services during the Construction Phase, then the following procedures will apply:

a) JOC Contractor prequalifies Subcontractors from the trades needed in the Pre-

Construction Phase. b) Upon acceptance of the Owner, a Request for Qualifications (RFQ) is requested

from pre-qualified Subcontractors by the JOC Contractor. The RFQ will request additional qualification information in addition to pricing information, such as labor rates and overhead and profit factors.

c) The Statement of Qualifications (SOQ) from the Subcontractors will be reviewed by a committee consisting of JOC Contractor, Owner and design team members. The qualification and pricing information will be scored by a pre-determined weighted scoring system.

d) The committee will develop a list of firms that will be interviewed. e) The Subcontractors will be interviewed and ranked, and the highest ranked

Subcontractor will be selected to provide the services.

2.6.9.4.2 Construction Phase. The Contractor shall, with the assistance of the Owner and Design Professional, prepare the necessary and appropriate bidding information, bidding forms, and pre-qualification criteria for bidders; develop Subcontractor interest; establish bidding schedules; advertise for bids; and conduct pre-bid conferences to familiarize bidders with the bidding documents and management techniques and with any special systems, materials, or methods. The Contractor shall review all potential Subcontractors with the Owner and Design Professional and obtain Owner’s approval of the pre-qualification of any Subcontractor in accordance with the Owner approved Subcontractor Selection Plan. If the Contractor becomes aware prior to any bid date that less than three (3) pre-qualified Subcontractors plan to bid any portion of any Bid Package or that anticipated bids from previously approved or pre-qualified Subcontractors are likely to exceed the current Schedule of Values or estimate of Construction Cost, the Contractor shall promptly notify the Owner.

2.6.9.4.3 ABOR Policies. The Contractor’s selection of any Subcontractor must comply with

ABOR Policy 3-804B (3), (h), ((1)) and ((2)) and must be based on qualifications alone, or on a combination of qualifications and price selection, but shall not be based on price alone. The Contractor shall receive and open bids when advertised, prepare a bid analysis, conduct pre-award conferences, and notify the Owner and Design

Page 58 of 108 ASU JOC 2015 - 16000 RFQ

Page 59: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Professional concerning which bids from pre-qualified Subcontractors will be accepted and awarded. The Owner and Design Professional shall be notified of the time and place of all bid openings and shall be permitted to attend such openings with their representatives and guests. When the Contractor proposes to accept a subcontract bid other than the low bid, the Contractor must justify such action in writing and obtain written approval from Owner before making the subcontract award. Once approved by Owner, no Subcontractor may be replaced by Contractor without Owner’s prior approval and any change in cost to Contractor will not be a responsibility of Owner and there will be no increase in price by reason of such change of cost. Within ten (10) calendar days after award, one fully executed subcontract for work or services on the Job Order project shall be furnished to Owner together will all special or supplementary conditions applicable to the subcontract work.

For Subcontractors selected in this manner, the Contractor must establish to the Owner’s satisfaction that the Subcontractor’s price submission is reasonable and appropriate, by following the procedures outlined above.

2.6.10 Contractual Relationships

2.6.10.1 Nothing contained in the Contract shall create any contractual relationship between the Owner

and any Subcontractor. However, the Owner reserves the right to reject any subcontractor proposed by the Contractor.

2.6.11 Award of Subcontracts and other Contracts for Portions of the Work

2.6.11.1 Division of Work. The Contractor shall, prior to execution of the Contract, designate and distinguish in writing to the Owner those portions of the Work to be performed by Subcontractors and the Contractor's own forces.

2.6.11.2 Proposed Subcontractors. The Contractor shall, prior to the start of the Work, furnish in writing

to the Owner for review the names of person or entities (including those who are to furnish materials or equipment) proposed for the design, if any, and management portion of the Work.

2.6.12 Sub-Contractual Relations

2.6.12.1 Subcontractors Subject to Contract. By an appropriate written Agreement, the Contractor shall

require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by the terms of the Contract, and to assume toward the Contractor all the obligations and responsibilities which the Contractor assumes toward the Owner, except with respect to the ADR provisions of this Contract. The Contractor shall require its Subcontractors to enter into similar agreements with their Subcontractors, except with respect to the ADR provisions of this Contract. The Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract, copies of this Contract to which the Subcontractor will be bound, except with respect to the ADR provisions of this Contract. Each Subcontractor shall similarly make copies of this Contract available to their Subcontractors.

2.6.12.2 Terms to be Included in Subcontracts. All Work performed for the Contractor by a Subcontractor

shall be pursuant to a written agreement between the Contractor and the Subcontractor. The Contractor will ensure that each such subcontract contains provisions requiring:

A. that the Work be performed and guaranteed in accordance with the requirements of this

Agreement;

Page 59 of 108 ASU JOC 2015 - 16000 RFQ

Page 60: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

B. submission to the Contractor of Applications for Payment under each subcontract in the manner prescribed by the Owner, and reasonable time to enable the Contractor to apply for payment in accordance with Section 6;

C. that the Subcontractor pay sub-subcontractors in accordance with A.R.S. § 34-221; D. that the Subcontractor purchase and maintain insurance and comply with all insurance

provisions as required by the RFQ. If any subcontractor is unable to comply with this paragraph the Contractor shall request a waiver of this requirement in writing, and shall provide justification for a waiver. If the Owner grants the request it shall not constitute a waiver of the Owner’s right to strict performance of this contract, including the insurance requirements for all other subcontractors. No waiver of a subcontractor’s insurance requirements will be effective unless it is in writing.

E. that the Subcontractor consents to an assignment of the subcontract from the Contractor to the Owner in the event of termination of the Contractor by the Owner.

F. that the Subcontractor complies with all safety requirements.

2.6.13 Contractor Self-Performance.

2.6.13.1 The Contractor must disclose to the Owner, upon initiation of Pre-Construction services, any portions of the Work that are to be considered for potential self-performance. If the Contractor indicates it desires to self-perform any portion of the construction work, the following procedures will be followed:

2.6.13.1.1 For pre-priced work (Unit Price Book Method), the proposal must indicate which

divisions is self-performed work. All quantities and prices shall be verified by Owner and DP.

2.6.13.1.2 For non-pre-priced work, a bid package for each portion of the construction work as

to which Contractor will self-perform work will be prepared in the same manner and content as bid packages for Subcontractors in other trades. Contractor will submit a proposed price for each of these portions of the construction work. This proposed price shall include labor rates, and certify that sub-sub trades and materials will be bid with a minimum of three pre-qualified bidders. Overtime for self-performed work shall be approved by Owner in writing in advance.

a) The Contractor will proceed in the following manner: There will be a normal

Subcontractor bid competition for selection of the Subcontractor to perform this portion of the construction work, in accordance with the procedures in Section 2.6.9.4.1, except that, notwithstanding any other provision of the Contractor Pre-Construction Services Contract Documents to the contrary. i. The Contractor’s price submission will be the Contractor’s bid for that

portion of the work in the Subcontractor bidding process. ii. The Contractor must obtain bids for that portion of the construction

work from a minimum of two other pre-qualified Subcontractors approved by Owner prior to bid solicitation.

iii. The bids for that portion of the construction work must be delivered to Owner in sealed envelopes rather than the Contractor

iv. The Owner will open and decide which Subcontractor bid to accept, in accordance with Section 2.6.9.4.3.

2.7 Inspections.

2.7.1 Inspections, tests, measurements, or other acts of the Owner and/or the DP are for the purpose of assisting the Owner and/or the DP in determining that the Work, materials, rate of progress, and quantities comply with the Contract Documents and/or Contractor's requests for payment. These acts or functions shall not

Page 60 of 108 ASU JOC 2015 - 16000 RFQ

Page 61: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

relieve the Contractor from performing the Work in full compliance with contract requirements nor relieve the Contractor from any of the quality, compliance and responsibility for the Work assigned to it by the Contract Documents. No inspection by the Owner and/or the DP shall constitute or imply acceptance or waiver of rights.

2.7.2 The Contractor shall at all times allow the Owner, Design Professional, or any other designated

representatives access to the construction work, including materials being fabricated or stored off site, to observe progress and inspect the quality of work and conformance to the Construction Documents.

2.7.3 Any Work required to be inspected by the Design Professional and/or the Owner prior to being covered,

which is covered up without prior inspection or without prior consent of the Design Professional and/or the Owner, must be uncovered by the Contractor, if requested by the Design Professional or the Owner, and then recovered at no cost to Owner, notwithstanding the provisions of the following Section.

2.7.4 Nonconforming Work or materials may be rejected and Contractor shall correct such rejected Work without

additional compensation, even if the Work or materials have been previously inspected or accepted by the Owner and/or the DP or even if the Owner and/or the DP failed to observe the unsuitable Work or materials.

2.7.5 Contractor shall follow the inspection procedure outlined in the “Inspection Procedure” document, located

under “Inspections” at: https://cfo.asu.edu/fdm-bldg-permit-requirements

Contractor shall advise the Owner and Design Professional of any additional inspections required by other entities, including but not limited to any Authority Having Jurisdiction (AHJ), and shall follow those entities’ required inspections procedures. Failure to provide such notice to the Owner, the Design Professional, or any other entity requiring inspection, shall make the Contractor solely responsible for all consequences, including back charges for subsequent re-inspection, of non-inspection and any required access to or uncovering of such Work.

2.8 Daily Log.

2.8.1 The Contractor shall maintain a daily log of construction activities for each calendar day of the Contract Time, using a form pre-approved by the Design Professional and/or the Owner. In that log the Contractor shall document all activities at the Work Site, including, but not limited to: a) Weather conditions showing the high and low temperatures during work hours, the amount of

precipitation received on the job Site, and any other weather conditions which adversely affect Work at the Site;

b) Soil conditions which adversely affect Work at the Site; c) The hours of operation by Contractor and individual Subcontractor personnel; d) The number of Contractor and Subcontractor personnel present and working at the Site, by subcontract

and trade, and updated schedule activity number; e) The equipment active or idle at the Site; f) A description of the Work being performed at the Site by updated schedule activity number; g) Any delays, disruptions or unusual or special occurrences at the Site; h) Materials received at job Site; and i) A list of all visitors at the Site. j) Any other relevant information deemed relevant as to activities on the Site that day.

2.8.2 The Contractor shall provide copies of the daily logs to the Owner on a weekly basis. The daily log shall not

constitute written notice to the Owner of any event or occurrence when such notice is required by the Contract Documents.

2.8.3 Any changes affecting previously approved Work shall require prior written approval of the Owner.

Page 61 of 108 ASU JOC 2015 - 16000 RFQ

Page 62: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

2.9 Communications.

2.8.1 All project notices, requests, instructions, modifications, approvals, and claims must be in writing, unless expressly specified otherwise in the Agreement.

2.9.2 Copies of all such communications from the Contractor to the DP shall be delivered to the Owner.

2.9.3 Communications will be deemed to have been made if delivered in person, emailed, or if mailed to the

address designated in the Contract or otherwise agreed upon by the parties. 2.10 Drawings and Specifications.

2.10.1 The Contractor shall study and compare the Construction Documents prior to beginning work on each phase or portion of the Work and immediately report any material error, inconsistency, conflict, ambiguity, or omission that is discovered to the Design Professional and Owner.

2.10.2 Notice of Errors. The Contractor warrants that he has carefully reviewed the Agreement, and all

documents pertaining to the Work, and that he is satisfied as to the feasibility and correctness of the Agreement to perform the Work within the Contract Time. The Contractor shall immediately report to the Owner any errors, inconsistencies, or omissions discovered in the Contract Documents prior to submitting its Proposal. Any error, inconsistency, or omission which could have been discovered prior to submitting its Proposal are waived unless reported in written form to the Owner before submitting its Proposal. If the Contractor performs any construction activity containing an error, inconsistency, or omission that the Contractor recognized or should have recognized through the exercise of reasonable diligence, without reporting such error, inconsistency, or omission to the Owner, the Contractor shall assume responsibility for such performance and shall bear the costs for correction.

2.10.3 The Construction Drawings are intended to show general arrangements, design and extent of Work and are

not intended to serve as Shop Drawings. Where required, the Contractor shall perform no portion of the Work without having Shop Drawings, Product Data or Samples approved; any Work performed in violation of this provision will be solely at the Contractor’s risk regardless of Design Professional’s and/or Owner’s knowledge of such Work being performed.

2.10.4 In the event of any conflict or ambiguity, the Construction Documents shall be interpreted as being

complementary, requiring delivery by Contractor of a complete Project, or designated portion thereof. Any requirement occurring in any one of the Construction Documents is as binding as though occurring in all Construction Documents. In the event of any conflict or ambiguity, perceived or real, the Contractor shall request an interpretation by the Design Professional before performing the Work. Generally, the Specifications address quality, types of materials and contractual conditions while the Drawings show placement, sizes, and fabrication details of materials. In the event a conflict is discovered in the Construction Documents, the priorities stated below shall govern and control:

a) Addenda shall govern over all other Construction Documents; b) Subsequent addenda shall govern over prior addenda, but only to the extent modified; c) In case of conflict between Drawings and Specifications, the Specifications shall govern; d) Conflicts within the Drawings:

1) Schedules, when identified as such, shall govern over all other portions of the Drawings. 2) Specific notes shall govern over all other notes and all other portions of the Drawings, except the

schedules described in 2.10.4.d.1 above. 3) Larger scale drawings shall govern over smaller scale drawings. 4) Figured or numerical dimensions shall govern over dimensions obtained by scaling.

e) Conflicts within the Specifications: These General Conditions shall govern over all sections of the Specifications except for specific modifications thereto that may be stated in Special Conditions or addenda. No other section of the Specifications shall modify these General Conditions; and

Page 62 of 108 ASU JOC 2015 - 16000 RFQ

Page 63: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

f) In the event provisions of codes, safety orders, Construction Documents, referenced manufacturer's specifications or industry standards are in conflict, the more restrictive or higher quality shall govern.

2.10.5 In the event of conflict between Owner’s Technical Standards and/or Design Guidelines, and the Drawings

and Specifications, Contractor shall promptly call the conflict to the attention of Owner and Design Professional and use of such Drawing by Contractor deferred until resolution of the conflict to Owner’s satisfaction.

2.10.6 If the Construction Documents are not complete as to any minor detail of a required construction system or

with regard to the manner of combining or installing of parts, materials, or equipment, but there exists an accepted trade standard for good and skillful construction, such detail shall be deemed to be an implied requirement of the Construction Documents in accordance with such standard. That is to say, a) “minor detail” shall include the concept of substantially identical components, where the price of each such component is small even through the aggregate cost or importance is substantial, and shall include a single component which is incidental, even though its cost or importance may be substantial, and b) the quality and quantity of the parts or materials so supplied shall conform to trade standards and be compatible with the type, composition, strength, size, and profile of the parts or materials otherwise set forth in the Construction Documents.

2.10.7 Examination of Site. The Contractor warrants that he has visited and examined the character of the Site

and any existing structures and has satisfied himself as to the nature of the Work and all matters which could in any way affect the Work. The Contractor warrants that he has reviewed the geotechnical report, if any, included in the Contract Documents or otherwise made available to Contractor. The Contractor shall take field measurements and verify field conditions and shall compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing the Work. Errors, inconsistencies, or omissions discovered shall be reported to the Owner prior to submitting its Proposal. Any error, inconsistency, or omission which could have been discovered by the Contractor prior to submitting its Proposal are waived unless reported in written form to the Owner before submitting its Proposal. The accuracy of grades, elevations, dimensions, or locations on work installed by other contractors is not guaranteed by the Owner. The Contractor shall verify the accuracy of all grades, elevations, dimensions, and locations relating to the Work. In cases of interconnection of the Contractor's Work with other work, it shall verify at the Site all dimensions relating to such other work. Any error due to the Contractor's failure to verify the accuracy of such grades, elevations, location, or dimensions shall be promptly rectified by the Contractor without any additional cost to the Owner.

2.10.8 Compliance with Law. If the Contractor observes that portions of the Project are at variance with

Applicable Law, the Contractor shall promptly notify the Owner in writing, and necessary changes shall be accomplished by appropriate modification of the Work. If the Contractor performs Work it knows or should know to be contrary to Applicable Law, without such notice to the Owner, the Contractor shall assume full responsibility for such Work and shall bear all damages, losses, costs, and expenses attributable thereto.

2.10.9 Contractor Compliance with Contract Documents. The Contractor shall perform the Work in accordance

with the Contract Documents and in a first class and workmanlike manner. In the event that the Contractor fails to do so, the Owner may withhold payments to protect the Owner from loss, regardless of whether payment has previously been made for the Work in question.

2.11 Submittals, Drawings, and Shop Drawings.

2.11.1 The Contractor shall maintain at the Site, for the use of the Owner and of the Design Professional, one copy of all Drawings, Specifications, bulletins, addenda, amendments or change orders, field orders, approved Shop Drawings, approved Submittals, supplementary instructions, requests for information, catalog data, manufacturers' operating and maintenance instructions, certificates, warranties, guarantees and other contract related documents and their modifications, if any, in good order and marked daily by the Contractor

Page 63 of 108 ASU JOC 2015 - 16000 RFQ

Page 64: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

to record all approved changes made during construction. All of these shall be turned over to the Design Professional by the Contractor at the time of Substantial Completion for the purpose of the Design Professional assembling and correlating the material for use by the Owner.

2.11.2 The Contractor shall submit to the Design Professional, with such promptness as to cause no delay in its

Work or in the work of any other contractor, all Submittals and Shop Drawings as are required by the Construction Documents, or are necessary to illustrate details of the Work.

2.11.3 Each Submittal and Shop Drawing must be accompanied by a Contractor transmittal letter containing a list

of the titles and numbers of the Shop Drawings. Each series shall be numbered consecutively for ready reference. Each Submittal and Shop Drawing shall be marked with the following information:

A. Date of Submission B. Name of Project C. Location of Project D. Branch of Work (Specification Section) E. Project Number F. Name of Submitting Contractor G. Name of Subcontractors H. Revision Number

2.11.4 Submittals identified by Owner shall be submitted to Owner for its review concurrent with review of same by

Design Professional. During Construction Phase Contractor shall promptly provide Owner with an electronic copy of all approved submittals.

2.11.5 All Subcontractor Submittals and Shop Drawings shall be reviewed by the Contractor prior to being

submitted to the Design Professional and each shall bear a written statement by the Contractor that the Submittals and Shop Drawings are consistent with the Construction Documents and other Contract Documents or if not totally consistent shall bear a written statement indicating all variances from the Construction Documents and other applicable Documents. Any Submittals or Shop Drawings submitted without the statements will be returned for resubmission; the Submittals or Shop Drawings will be considered as not having been submitted, and any delay caused thereby shall be the Contractor’s sole responsibility. This review by Contractor of Subcontractor Submittals and Shop Drawings shall not be construed as Contractor approval of the design therein except that it shall be a representation that the letter accompanying the Submittal or Shop Drawings does indicate all variations from the Construction Documents and other Contract Documents as required by Section 2.11.6.

2.11.6 The Contractor shall include with Submittals and Shop Drawings, a letter to the Design Professional, with

concurrent copy to the Owner, indicating all variances from the Design Professional's Drawings and Specifications. Failure to so notify the Design Professional of such variances will be grounds for subsequent rejection of the related Work or materials. If, in the opinion of the Design Professional, the variances are not acceptable, the Contractor must furnish the item as specified or as indicated on the Construction Drawings.

2.11.7 It is the Contractor's obligation and responsibility to check all of its Submittals and Shop Drawings and to be

fully responsible for them and for coordination with connecting Work. Submittals and Shop Drawings shall indicate in detail all parts of an item of Work, including erection and setting instructions and engagements with Work of other trades or other separate contractors.

2.11.8 By approving or submitting Submittals and/or Shop Drawings, the Contractor thereby represents that it has

determined and verified availability, field measurements, field construction criteria, materials, catalog numbers and similar data, or will do so, and that it has checked and coordinated each Submittal and/or Shop Drawing with the requirements of the Work and of the Contract Documents. If any specified material item or part is not available, the Contractor shall so indicate to the DP.

Page 64 of 108 ASU JOC 2015 - 16000 RFQ

Page 65: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

2.11.9 The Design Professional shall review and approve Submittals and Shop Drawings and return them to the Contractor as identified in each project-specific Job Order. For scheduling purposes, the Contractor must assume a review period of at least ten (10) business days, unless otherwise specified in writing for each Submittal or set of Shop Drawings, and at least ten (10) business days, unless otherwise specified in writing for resubmittals, except for complex submittals identified by the Design Professional as having significant deficiencies, wherein the resubmittal turnaround time will be within twenty (20) business days, unless otherwise specified in writing. If review and approval are delayed beyond the days specified, the Design Professional shall notify the Contractor and the Owner in writing stating the reason for the delay. Approval shall not relieve the Contractor from the responsibility for variances from the drawings and specifications, unless it has been called to the Design Professional's attention, in writing, at the time of submission. Any modification will be approved only if it is in the interest of the Owner to effect an improvement in the Work and does not increase the Contract Price or Contract Time. Any such modification is subject generally to all other provisions of the Construction Documents, and is without prejudice to any and all rights under any surety bond.

2.11.10 If the Design Professional returns a Submittal or Shop Drawing to the Contractor with the notation

“rejected”, “revise and resubmit”, or “approved as noted”, the Contractor, so as not to delay the Work, shall promptly resubmit a Submittal or Shop Drawing conforming to the requirements of the Construction Documents and indicating in writing on the Submittal or Shop Drawing and on the transmittal what portions of the resubmittal have been altered in order to meet with the approval of the Design Professional. Any other differences between the resubmittal and the prior submittal shall also be indicated by Contractor on the Shop Drawing and on the resubmittal as a special note.

2.11.11 No extension of contract time will be granted to the Contractor because of its failure to submit Submittals or

Shop Drawings in ample time to allow for review, possible resubmittals and approval. Fabrication of Work shall not commence until the Contractor has received written approval. The Contractor shall furnish prints of its approved Submittals and Shop Drawings to all the Subcontractors whose work is in any way related to the Work. Only prints bearing this approval will be allowed on the Site.

2.12 Product Samples, Tests, and Certificates.

2.12.1 The Contractor shall furnish Product Samples of all items requested or required by the Specifications. Product Samples shall be properly identified and submitted with such promptness as to cause no delay in Work or in the work of any other contractor and to allow time for consideration by the DP and the Owner. The DP and/or Owner will review Product Samples in accordance with Sections 2.11 above.

2.12.2 Each Product Sample must be accompanied by a letter of transmittal containing the following information:

A. Date of Submission B. Name of Project C. Location of Project D. Branch of Work (Specification Section Number) E. Project Number F. Name of Submitting Contractor G. Name of Subcontractor

2.12.3 The Contractor shall furnish to the DP a certificate stating that material or equipment submitted complies

with Contract Documents. If a certificate originates with the manufacturer, the Contractor shall endorse it and submit it to the DP together with a statement of compliance in its own name.

2.12.4 No tests, inspections or approvals performed or given by the Owner or the Design Professional or others

acting for the Owner or any agency of Federal, State or Local government nor any acts or omissions by the Owner or the Design Professional in administering this Agreement shall relieve the Contractor from its duty to perform the Work in accordance with the Contract Documents and all applicable law or regulation or code.

Page 65 of 108 ASU JOC 2015 - 16000 RFQ

Page 66: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

2.12.5 Unless the Design Professional is authorized at the time of submittal to return samples at the Contractor's expense, rejected samples will be destroyed.

2.12.6 After delivery of materials by Contractor, the Design Professional may make such tests, as it deems

necessary, with samples required for such tests being furnished by and at the cost of the Contractor. Any test is for the benefit of the Owner and shall not relieve Contractor of the responsibility for providing quality control measures to assure that Work performed strictly complies with the Construction Documents. No test shall be construed as implying acceptance of materials, work, workmanship, equipment, accessories or any other item or thing.

2.12.7 Materials, workmanship, equipment or accessories may be rejected on the basis of the test results even

though general approval has been previously given. If items have been incorporated in Work, the Design Professional shall have the right to cause their removal and replacement by items meeting Construction Document requirements, with the cost therefore being borne by the Contractor and not the Owner, or to demand and secure appropriate reparation to or price adjustment for the benefit of Owner from the Contractor.

2.13 As-Built Drawings.

2.13.1 Prior to Final Payment, the Contractor shall complete and turn over to the Design Professional the As-Built Drawings kept current at the Project Site by Contractor. Those As-Built Drawings shall consist of a set of drawings which clearly indicate all field changes that were made during contract performance to adapt to field conditions, changes resulting from amendments or change orders and all buried and concealed installation of piping, conduit and utility services. All buried and concealed items both inside and outside the facility shall be accurately located on the As-Built Drawings as to depth and in relationship to not less than two permanent features such as interior or exterior wall faces. The As-Built Drawings shall be clean and all changes, corrections, and dimensions shall be given in a neat and legible manner in a contrasting color. Contractor shall also provide an electronic file of the As-Built Drawings to Owner in digital form pre-approved by Owner.

2.13.2 With respect to any changes or corrections in the Work which are made subsequent to Substantial

Completion, such revisions shall be submitted to the Design Professional for approval prior to Final Payment.

2.14 Contractor’s Responsibility for Project Safety.

2.14.1 Contractor recognizes the importance of performing its work in the safest manner possible so as to prevent damage, injury or loss to (a) all individuals at or in the vicinity of the Work, whether working or visiting the Project or Campus; (b) all work, including materials and equipment incorporated or stored on- or off-Site; and (c) all property adjacent to the Site. On that basis Contractor assumes responsibility for implementing and monitoring all safety precautions and programs related to the performance of the Work and will submit a Safety Plan complete form to Owner and Design Professional at the time of issuance of the Notice to Proceed with the Work, upon Owner request. Contractor shall, prior to commencing construction, designate a safety manager with the necessary qualifications and experience to supervise the implementation of the plan and the monitoring of all safety precautions and programs related to the Work. The safety manager shall make routine daily inspections of the Work Site, and shall hold at least weekly safety meetings with Contractor’s personnel and Subcontractors.

2.14.2 Contractor and its Subcontractors shall comply with all Legal Requirements relating to safety, as well as any

Owner specific safety requirements set forth in the Contract Documents. Contractor will immediately report, in writing, to Owner’s Representative and all government or quasi-government authorities having jurisdiction over matters involving the Work, any injury, loss, damage or accident occurring at the Site of the Work.

Page 66 of 108 ASU JOC 2015 - 16000 RFQ

Page 67: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

2.14.3 Contractor’s responsibility for safety under Section 2.14 is not intended to in any way relieve Contractor’s Subcontractors (of any tier) from applicable obligations and responsibilities for complying with all Legal Requirements, including those related to health and safety matters, and their taking all necessary measures to implement and monitor all safety precautions and programs to guard against injury, losses, damages or accidents resulting from their performance of the Work.

2.14.4 Protection of persons and property. The Contractor shall take reasonable precautions for safety of,

and shall provide reasonable protection to prevent damage, injury, or loss to:

2.14.4.1 Employees on the Work and other persons who may be affected thereby;

2.14.4.2 The Work and materials and equipment to be incorporated therein, whether in storage on or off the Site, under care, custody, or control of the Contractor or the Contractor's Subcontractors;

2.14.4.3 Other property at the Site or adjacent thereto, such as trees, shrubs, lawns, walks,

pavements, roadways, structures, and utilities not designated for removal, relocation, or replacement in the course of construction;

2.14.4.4 Construction or operations by the Owner or other contractors.

2.14.5 Contractor Liability. The Contractor shall promptly remedy damage and loss to any property caused in

whole or in part by the Contractor or Subcontractor, or by anyone for whose acts they may be liable.

2.14.6 Accident Reports. Contractor shall report in writing within one (1) working day of the Contractor’s knowledge, to the Owner, all accidents arising out of or in connection with the Work which cause death, personal injury, or property damage, giving full details and statements of any witnesses. In addition, if death or serious personal injuries or serious damages are caused, the accident shall be reported immediately by telephone or messenger to the Owner.

2.14.7 Risk of Loss. Contractor shall be fully responsible for, and shall bear the full risk of loss of all

Contractor's tools, equipment, materials, and other property. 2.15 Warranty.

2.15.1 Contractor warrants to Owner that the construction, including all materials and equipment furnished as part of the Work, shall be new, unless otherwise specified in the Contract Documents, of good quality, in conformance with the Contract Documents and free of defects in materials and workmanship. Contractor’s warranty obligation excludes defects caused by abuse, alterations, or unreasonable failure to maintain work by persons other than Contractor, Contractor’s Subcontractors, or others under Contractor’s control. Nothing in this warranty by Contractor shall limit any manufacturer’s warranty, which provides Owner with greater warranty rights than set forth in this Section 2 or the Contract Documents.

2.15.2 Contractor will provide Owner with all manufacturers’ warranties and Operation and Maintenance Manuals

upon the date of Substantial Completion of the Work. Contractor shall provide Owner a two-(2) year warranty for all portions of the Work which warranty will commence upon Substantial Completion of the Work. All statutory, special, or other warranties, express or implied, related to latent defects, or as noted in the Contract Documents, will remain in force and are not limited or superseded by this provision.

2.15.3 The Warranties identified herein do not limit or control other remedies available to Owner at law or their

limitation periods, if any. 2.16 Correction of Defective Work.

2.16.1 If any portion of the Work is covered over by Contractor or its Subcontractor contrary to the request of the Design Professional or Owner or as required by the Construction Documents or the applicable building

Page 67 of 108 ASU JOC 2015 - 16000 RFQ

Page 68: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

standards or codes if requested in writing by the Design Professional or Owner, that Work or portion thereof must be promptly uncovered for observation at the Contractor’s own expense.

2.16.2 If any portion of the Work, other than those portions required to be inspected by the Design Professional,

the Owner or others, prior to being covered, has been covered over, the Design Professional or Owner may request that it be uncovered for observation. If such portion of the Work is found to be in accordance with the requirements of the Construction Documents, the cost of uncovering it shall be charged to the Owner as an amendment or change order. If such portion of the Work is found not to be in compliance with the requirements of the Contract Documents, the Contractor shall bear such costs to uncover and remove and replace or repair.

2.16.3 Unless a specific written waiver of such non-conformance has been provided to the Contractor, Contractor

agrees to promptly correct any Work that is found not to be in conformance with the Contract Documents, whether previously inspected by the Owner’s representatives or not. This obligation of Contractor shall continue for a period of two (2) years from the date of Substantial Completion. Nothing in this section shall waive any other rights or remedy that the Owner may have under Arizona law.

2.16.4 Contractor, upon receipt of written notice from Owner that the Work is not in conformance with the Contract

Documents, shall, within seven (7) days (except in the case of an emergency or item on the schedule critical path, which will require immediate response) commence correction of such nonconforming Work, including the correction, removal or replacement of the nonconforming Work and any damage caused to any other parts of the Work affected by the nonconforming Work. In the event Contractor fails to commence the necessary corrective steps within seven (7) days of the Notice, Owner, in addition to any other remedies provided under the Contract Documents, may at the end of the seven (7) day period commence to correct or cause the correction of such nonconforming Work with its own or other forces. Contractor shall be responsible for all costs and expenses that Owner incurs in remedying any such Work not in conformance with the Contract Documents, including at Owner’s sole discretion, any of its own staff time costs and all Design Professional or other fees incurred. Owner will notify Contractor of its intent to make such corrections at or before the commencement of the corrective work.

2.16.5 The two-year warranty period referenced in Section 2.15 applies only to the Contractor’s obligation to

correct Work not in compliance with the Construction Documents, and shall not constitute a period of limitations with respect to any other rights or remedies Owner may have with respect to Contractor’s other obligations under the Contract Documents. Contractor acknowledges that, for purposes of statutes of limitations, Owner is an instrumentality of the State of Arizona, acting in its sovereign capacity.

SECTION 3 DESIGN PROFESSIONAL’S SERVICES AND RESPONSIBILITIES 3.1 The Design Professional is the individual or legal entity identified in the Contract Documents and/or otherwise

designated by the Owner who is retained by the Owner to design and/or oversee the Project. For purposes of this Agreement only, the term also includes individuals employed by Arizona State University who render such services in connection with the Project.

3.2 The DP shall have the right, responsibility and authority to carry out the specific duties required of the DP, as

described herein and in the Agreement(s) between the DP and the Owner, including any amendments thereto. Any such amendments shall be in writing and furnished to the Contractor.

3.3 The DP will visit the site as it is deemed by the DP or Owner to be appropriate in order to advise the Owner as

to the quality and progress of the construction. The Contractor shall cooperate with the DP in all respects in this regard, including attending meetings as requested.

3.4 The Design Professional will be the initial interpreter of the intent and requirements of the Construction

Documents. The Design Professional shall render written initial interpretations with reasonable promptness following a written request from the Owner or the Contractor in that regard. These initial interpretations shall be consistent with the intent of the Contract Documents.

Page 68 of 108 ASU JOC 2015 - 16000 RFQ

Page 69: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

3.5 The Design Professional will timely review and approve or take other appropriate action upon the Contractor’s

submittals, such as Shop Drawings, Product Data and Samples, for conformance with the Construction Documents. Such action shall be taken with reasonable promptness as specified so as to cause no delay. The Design Professional’s approval of a specific item or component shall not indicate approval of an assembly of which the item is a component.

3.6 Following consultation with the Owner, the Design Professional will take appropriate action to facilitate issuance

of amendments or change orders and may authorize minor changes in the Work as defined in Section 10.3. 3.7 The Design Professional and Owner will each have authority to reject any Work which does not conform to the

Contract Documents and to require special inspection or testing but may take such action only after consultation with the other. However, neither the authority to act given to the Design Professional and the Owner under this subparagraph nor any decision made by them in good faith either to exercise or not exercise such authority shall give rise to any duty or responsibility by them to the Contractor, any Subcontractor, any of their agents or employees, or any other person performing any of the Work.

3.8 Based on its observations of the Work and evaluation of Payment Applications the Design Professional will

have the responsibility to determine the amounts owed to the Contractor from time to time under and in accordance with Section 6 of these General Conditions and Applicable Law.

SECTION 4 OWNER’S SERVICES AND RESPONSIBILITIES 4.1 Owner shall, throughout the performance of the Agreement, cooperate with Contractor and perform Owner’s

responsibilities, obligations and services in a timely manner so as not to delay or interfere with Contractor’s performance of its obligations under the Contract Documents.

4.2 Owner’s Representative shall be responsible for processing and delivery of Owner-supplied information and

approvals or rejections in a timely manner to permit Contractor to fulfill its obligations under the Contract Documents. Owner’s Representative shall also provide Contractor with reasonably prompt notice if and when it observes any failure on the part of Contractor to fulfill its contractual obligations, including errors, omissions or defects in the Contractor’s performance of its Work. Failure of the Owner or its representatives to notify the Contractor hereunder shall not reduce, change, lessen or alleviate in any way, the duties and obligations of Contractor under the Contract Documents.

4.3 Owner is responsible for all work performed at the Project by parties under the Owner’s control other than

Contractor or Design Professional. Owner shall contractually require such parties to cooperate with, and coordinate their activities with Contractor so as not to unreasonably interfere with Contractor’s ability to complete its Work in a timely manner, consistent with the Contract Documents.

SECTION 5 HAZARDOUS MATERIALS AND SITE CONDITIONS 5.1 Hazardous Materials.

5.1.1 It is the sole responsibility of the Contractor to properly remove and dispose of any Hazardous Materials in the Project identified as such in the Contract Documents by the Owner. Contractor, upon encountering any Hazardous Materials not identified in the Contract Documents, shall stop Work immediately in the affected area and notify Owner and, if required by applicable rules, all governmental or quasi-governmental entities with jurisdiction over the Project. Owner has responsibility to take the necessary measures required to properly remove and dispose of Hazardous Materials not identified in the Contract Documents as being the responsibility of the Contractor.

5.1.2 Contractor will be entitled, in accordance with the provisions of these General Conditions, to an adjustment

in the Contract Price or Contract Time(s) of performance, or both, to the extent that the Contractor’s costs

Page 69 of 108 ASU JOC 2015 - 16000 RFQ

Page 70: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

or time of performance have been adversely and materially impacted by the presence of unforeseen or undisclosed Hazardous Materials.

5.1.3 Owner is not responsible for Hazardous Materials introduced to the Site by Contractor, Subcontractors (of

any tier) or anyone else for whom the Contractor is responsible unless provision of such Hazardous Materials are called for in the Contract Documents, or has called for the removal of any such Hazardous Materials.

5.1.4 Contractor agrees to indemnify, defend and hold harmless Owner and others under Owner’s control, and

the officers, directors, employees and agents of each of them, from and against all claims, losses, liabilities, costs and expenses, including but not limited to attorney’s fees and expenses, arising out of or resulting from Contractor’s importation, improper handling, storage, abatement, removal or disposal of any Hazardous Materials by Contractor.

5.1.5 Releases of Hazardous Substances. Upon any release of any hazardous substance in connection with the

Work, (including any Hazardous Materials), whether relating to a pre-existing condition, or acts, or omissions of the Contractor. Contractor shall take immediate action reasonably necessary to contain the release. Owner may elect to have Contractor control and carry out any containment, clean-up, removal and remediation activity needed, provided that if the release is not a result of any action or inaction by the Contractor (or its Subcontractors). Owner will be responsible to pay Contractor for such Contractor containment activities in accordance with Section 10.1 of these General Conditions, including allowance of additional Contract Time thereunder.

5.1.6 Prior to award of a Job Order, the Contractor is required to review and sign the Notification and

Confirmation of Asbestos/Lead/PCB Containing Building Material on the ASU Campus. 5.2 Site Conditions.

5.2.1 The Contractor shall thoroughly acquaint himself with all available information concerning the conditions of the Work and is responsible for correctly and fully estimating the difficulty and cost of successfully performing the Work.

5.2.2 The Contractor acknowledges that it has thoroughly examined the site, plans and specifications, boring data

and all other soils information and as-built data made available and by submission of the project-specific Job Order proposal herein avows that it has satisfied itself as to the character, quality and quantity of surface and subsurface materials or existing obstacles to be encountered. The Contractor acknowledges that boring data and other soils information and as-built data made available is only a general indication of materials and/or conditions likely to be found adjacent to holes bored or in existing structures or facilities or other areas. If the Contractor determines that the information is erroneous, inadequate or ambiguous, it shall immediately report its conclusions to the Owner in writing. If the Contractor determines that the information is erroneous, inadequate, or ambiguous, and after reporting its conclusions to the Owner, remains dissatisfied or uninformed, the Contractor shall refrain from submitting a project-specific Job Order proposal, or if the Contractor does submit a proposal, the Contractor shall be deemed to have waived any claim it may have as the result of the alleged erroneous, inadequate, or ambiguous information.

5.3 Unforeseen Project Site Conditions.

5.3.1 Contractor shall immediately provide written notice to Owner apprising Owner of unforeseen conditions encountered, including: a) Subsurface or latent physical conditions encountered at the site which differ materially from those

indicated in the Contract Documents and which were not known by the Contractor or could not have been discovered by careful examination and investigation of the information available at bid time and the site, and which could adversely affect the timely performance of the Work or its cost or;

Page 70 of 108 ASU JOC 2015 - 16000 RFQ

Page 71: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

b) Unknown and unexpected physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered in the locale or generally recognized as inherent in the sort of work provided for in the Contract Documents. The Contractor shall not disturb or modify such conditions without Owner’s prior written consent.

5.3.2 The DP and/or the Owner shall within ten (10) days or such other reasonable time as necessary, investigate

the conditions discovered. If the DP and/or the Owner find that conditions are so materially different as to support an equitable adjustment in the Contract Price or the Contract Time, this will be done by written Change Order or Amendment. If the DP and/or the Owner determine that no Change Order or Amendment will be issued, the Contractor shall continue with the Work at no additional cost.

5.3.3 No claim by the Contractor for an increase in the Contract Price or Contract Time hereunder shall be

allowed without proper advance notice and an adequate opportunity for the Owner to investigate.

5.3.4 In no event shall the Contract Time or Contract Price be adjusted for conditions that could have and should have been identified by the Contractor through its investigations or survey of existing conditions prior to bid submission.

5.3.5 If Owner determines Contractor has no entitlement to an adjustment in Contract Price or Contract Time for

what Contractor contends is an unforeseen Project Site condition, Contractor may only proceed in pursuit of its position or claim in accordance with the provisions of Section 10 of these General Conditions.

5.4 Archaeological Conditions.

5.4.1 If in the course of performing the Work, the Contractor, any Subcontractor or other persons or entities under the control of Contractor, encounters any Native American burial site or other archeological artifacts are disturbed, the Contractor shall notify Owner and suspend any work or activity in the vicinity of the burial site or artifact. Owner will determine with reasonable preemption what action, if any, needs to be taken and advise Contractor how to proceed or to adjust the Work. Any claim or need for adjustment in Contract Time or Contract Price will be handled under Section 5.3.2 above.

SECTION 6 PROGRESS PAYMENTS 6.1 Schedule of Values.

The Schedule of values, after acceptance by the Owner, shall be used as a basis for reviewing the Contractor’s Payment Applications as set forth in Section 2.3.1.

6.2 Application for Payment.

6.2.1 Contractor shall submit to the Owner an itemized application requesting payment for Work completed, or reasonably projected to be completed by the end of the month, in accordance with the Schedule of Values, substantiating the Contractor’s right to payment, including any documentation that Owner may reasonably require, such as copies of requisition from Subcontractors (“Payment Application”).

6.2.2 Submission of Payment Applications.

6.2.2.1 Each project-specific Job Order shall be invoiced and paid separately. Payments on account of

the project-specific Job Order Contract Price will be made monthly as Work progresses, as evidenced by the percent complete identified in the Schedule of Values, as submitted with each Payment Application. Payment Applications, covering labor, material, equipment, supplies, and other items completed, delivered or suitably stored on site during a period ending on the last calendar day of each month, shall be submitted to the DP and the Owner by the Contractor on the Owner’s Contractor Payment Application Form within five (5) days after end of the period.

Page 71 of 108 ASU JOC 2015 - 16000 RFQ

Page 72: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Payment Applications shall be notarized, shall be supported by such data substantiating the Contractor's right to payment as the Owner or the DP may require.

6.2.2.2 All Payment Applications must include the following information. Failure to include this

information may cause the Payment Application to be rejected and may result in delayed payments.

CPMG Project Name CPMG Project Number CPMG Contract Number University Purchase Order Number Vendor Name University Vendor Number Unique Invoice Number

6.2.3 Notwithstanding any provision of this Agreement to the contrary, The University may withhold, in whole

or in part, payment to the extent necessary to protect itself from loss on account of inadequate or defective work which has not been remedied, or resolved in a manner satisfactory to the Project Manager, and/or due to Contractor’s failure to comply with this Section 6. The amount withheld shall not be subject to payment of interest by the University.

6.2.4 Payment for Changes. Payment Applications may not include requests for payment for changes in

the Work that have not been properly authorized in accordance with Section 10 of these General Conditions.

6.2.5 Identifying Changes in the Schedule-of-Values. Each change shall be listed separately in the

Contractor’s Schedule-of-Values. Changes shall be listed by Potential Change Order number, by trade or Subcontractor and include a line item for the Contractor’s Fee associated with the change.

6.2.6 Disputes with Subcontractors. Payment Applications may not include requests for payment of

amounts the Contractor does not intend to pay to a Subcontractor because of a dispute or other reason.

6.2.7 Payment for Stored Materials. Progress Payment shall be made when due to Contractor on account of materials and equipment delivered and suitably stored at the Site for subsequent incorporation in the Work. Payment may be similarly made to Contractor for materials and equipment suitably stored off the Site, conditioned upon the Contractor furnishing satisfactory evidence to the Owner that (a) title to the materials and equipment will pass to the Owner upon payment for same; and (b) there are no claims of third parties; and (c) the materials and equipment are adequately insured for full replacement value plus delivery; and (d) such other matters as the Owner may reasonably request in order to protect its interests.

6.2.7.1 The Contractor warrants that title to all construction work included in an Payment Application shall

pass to the Owner no later than the time of payment therefore. The Contractor further warrants and represents to Owner that upon submittal of an Payment Application, all construction work for which Payment Application have been previously issued and payments received from the Owner shall, to the best of the Contractor’s knowledge, information and belief, be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor, its Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor, materials and equipment relating to the Work.

6.2.8 Lien Waivers. The Contractor warrants that title to all Work covered by a Payment Application will

pass to the Owner no later than the time of payment. The Contractor also warrants that upon submittal of a Payment Application all Work for which payments have been received from the Owner shall be free and clear of liens, claims, security interests, or encumbrances in favor of the Contractor, Subcontractors, or other persons or entities making a claim by reason of having provided labor,

Page 72 of 108 ASU JOC 2015 - 16000 RFQ

Page 73: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

materials, or equipment relating to the Work. All Payment Applications shall include lien waivers executed by the Contractor providing labor, equipment, or materials for the Work in the form set forth in A.R.S. § 33-1008. The Contractor shall indemnify, defend, and hold harmless the indemnitee (the Owner) against any lien by any Subcontractor, Sub-Subcontractor, vendor, supplier, manufacturer or other entity or person supplying labor, equipment, or materials related to the Work.

6.2.9 Accounting. The Contractor shall keep full and detailed accounts and exercise such control as may be

necessary for proper financial management under this contract; the accounting and control system shall be satisfactory to the Owner. The Contractor shall provide access and cooperate fully in the review of all project records. At a minimum, Contractor shall afford access to Owner, its accountants, auditors, and any other designated agents, to the Contractor’s records books, correspondence, instructions, drawings, payroll records, receipts, subcontracts, proposals, purchase orders, vouchers, memoranda and other data relating to this Project as required by the Owner. The Contractor shall preserve these records for a period of three (3) years after final payment, or such longer time as may be required by law.

6.3 Recommendation for Payment.

6.3.1 Timing for Recommendation. Payment Applications shall be submitted to the Design Professional with a copy to Owner. The Design Professional, within seven (7) days after receipt of Contractor Payment Application, and no later, will either issue to Owner (a) a certificate of approval for payment of such amount as is invoiced in the payment application, or (b) specific written findings setting forth those items in detail in the estimate of the Work in the Payment Application that are not approved for payment under the Agreement. All items in the Payment Application not made the subject of the written detailed finding of the Design Professional on non-approval shall be deemed approved.

6.3.1.1 The issuance of a Certificate for Payment will constitute a representation by the DP to the Owner,

based on DP’s observations at the site and the data comprising the Payment Application, that the Work is in accordance with the Contract Documents (subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to the results of any subsequent tests required by or performed under the Contract Documents, to minor deviations from the Contract Documents correctable prior to completion, and to any specific qualifications stated in his certificate); and that the Contractor is entitled to payment in the amount certified. However, by issuing a Certificate of Payment, the DP shall not thereby be deemed to represent that the DP has made any examination to ascertain how or for what purpose the Contractor has used the monies previously paid on account of the Contract Price.

6.3.2 Recommendation Subject to Later Evaluation. The recommendation of the Design Professional, if

utilized, and the decision of the Owner to make a payment is subject to later evaluation of the Work for conformance with the Contract, including after Substantial Completion.

6.4 Decisions to Withhold Recommendation.

6.4.1 Payment may be withheld in whole or in part to protect the Owner on account of:

a) Unsatisfactory job progress as determined by the Owner. b) Defective Work or materials not remedied. c) Disputed Work or materials. d) Claims or other encumbrances filed or reasonable evidence indicating probable filing of

claims or other encumbrances by Subcontractors or Suppliers, or others. e) Failure of the Contractor to make payment to Subcontractors or Suppliers within seven (7)

days after receipt of each progress payment. f) A reasonable doubt as determined by the Owner that the Work can be completed for the

unpaid balance of the Contract Price or within the Contract Time.

Page 73 of 108 ASU JOC 2015 - 16000 RFQ

Page 74: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

g) The Contractor's failure to perform any of its contractual obligations under the Contractor Documents, or any other agreement with the Owner.

h) Deficiencies or claims asserted by Owner against Contractor arising from any other project.

The Owner may also decide not to recommend payment or, because of subsequently discovered evidence or subsequent observations, may nullify the whole or a part of a recommendation previously issued, to such extent as may be necessary in the Owner's opinion to protect the Owner from loss.

6.4.2 When the reasons for withholding payment are removed, the Design Professional and/or the Owner will

certify payment and payment amounts previously withheld will be made in accordance with this Section. 6.5 Payment. Within fourteen (14) days following the receipt of the Design Professional certificate of approval for

payment and the written detailed findings of items not approved, if any, the Owner shall pay the amount due on the Payment Application to the Contractor

6.6 Contingencies. If required in any Job Order, the Contract Price shall include a contingency, to cover legitimate

unforeseen construction expenses, or expenses agreed to by Owner, after Contract Price has been accepted. Contingency may not be used to cover the cost of any work on the Project after issuance of the Certificate of Final Completion. At the completion of the project-specific Job Order, all unused contingency shall be returned to Owner, via a deductive change order.

6.7 Allowances. If required by any Job Order, the Contract Price shall include an Allowance or Allowances. The

Contractor's price for the Work shall include all of the Contractor's costs associated with such Allowance or allowances. If the actual costs to the Contractor for any given Allowance is different than the estimate included in the Contract Price, the Contract Price shall be adjusted prior to final payment either upward or downward, as the case may be, in accordance with Section 10 of this Agreement

6.8 Payments to Subcontractors.

6.8.1 Required Payments. In accordance with A.R.S. § 34-221(E), the Contractor shall pay each Subcontractor, within seven (7) days of receipt of payment from the Owner, out of the amount paid to the Contractor on account of such portion of the Work. The amount o f each Subcontractor payment shall reflect the payments to the Contractor on account of such Subcontractor's portion of the Work. The Contractor shall, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to sub-subcontractors in the same manner.

6.5.2 No Obligation to Oversee Payments. The Owner shall have no obligation to pay or to see to the payment

of money to a Subcontractor.

6.5.3 Payment Not Acceptance of Work. A payment recommendation, a progress payment, or partial or entire use or occupancy of the Project by the Owner shall not constitute acceptance of Work not in accordance with the Agreement.

6.9 Failure of Payment.

6.9.1 If the Contractor, for any reason not the fault of the Contractor, is not paid any undisputed amount within fourteen (14) days after the date payment is due, the Contractor may, upon seven (7) additional days’ notice to the Owner, stop the Work until payment of the amount owing has been received. Notwithstanding the preceding, the Contractor shall not stop the Work during the pendency of a dispute which has been submitted to alternative dispute resolution pursuant to this Agreement, nor shall the Contractor stop the Work if the Owner makes payment of any amounts not in dispute within seven (7) days after the Contractor's notice of nonpayment is received by the Owner.

Page 74 of 108 ASU JOC 2015 - 16000 RFQ

Page 75: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

6.10 Substantial Completion.

6.10.1 Defined. Substantial Completion is the stage of completion of the Work or area of Work when that portion of the Project or Work for which the Job Order Contractor is responsible is fully usable by the Owner for its intended purpose, without inconvenience to, or risk of harm to, the Owner or the public. The authority to determine whether the Contractor has achieved Substantial Completion is determined by the Owner, whose decision shall be final and binding.

6.10.2 Certificate of Substantial Completion. When the Contractor considers that the Work, or a portion thereof

which the Owner agrees to accept separately, is substantially complete, the Contractor shall prepare and submit to the Owner a comprehensive list of items to be completed or corrected. All Owner training, Record Documents, Operation and Maintenance Manuals, warranties, guarantees, reports, and information required for the Owner to operate the facility in accordance with Article 9.8.1 shall be provided in the quantities specified. The Contractor shall, in the time frame indicated in the Contract Documents, complete and correct all items on the list, unless a longer time is granted by the Owner in writing. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Upon receipt of the list, the A/E, if utilized, assisted by the Owner, will make an inspection to determine whether the Work or designated portion thereof is substantially complete. If the inspection discloses any item, whether or not included on the list, which is not in accordance with the requirements of the Contract Documents, the Contractor shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by the Owner. The Contractor shall then submit a request for another inspection by the A/E, if utilized, assisted by the Owner, to determine Substantial Completion. When the Work or designated portion thereof is substantially complete, the A/E, if utilized, will prepare a certificate which shall (1) establish the date of Substantial Completion, (2) establish responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, and damage to the Work, and (3) shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate of Substantial Completion (Certificate). The Certificate shall be submitted to the Owner and Contractor for their written acceptance of responsibilities assigned to them in such Certificate.

SECTION 7 COMPLETION AND FINAL PAYMENT 7.1 Substantial Completion.

7.1.1 When the Contractor requests a Substantial Completion Inspection for the Work or a designated portion thereof, the DP and the Owner shall determine the validity of the request. A list of items to be completed or corrected shall be prepared by the Contractor and presented to the Owner and the DP with the request for inspection (“Punch List”). By submitting a request for Substantial Completion Inspection the Contractor thereby certifies that it has performed a thorough inspection of the Project in preparing the list of items to be completed or corrected, has consulted with its subcontractors, and that the remaining incomplete or defective work shall be completed within thirty (30) days of submission of the request. The Owner or the DP or both shall evaluate the Contractor's request and list of uncompleted items and, if appropriate in their judgment, add to or delete items from the list necessary to complete the work. The failure to include items on any punch list shall not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. By submitting a request for Substantial Completion Inspection, the Contractor thereby certifies that the remaining incomplete or defective Work required by the Contract Documents shall be completed within thirty (30) days.

7.1.2 If the DP and/or the Owner, on the basis of Substantial Completion inspection, determine that the Work has

been substantially completed in accordance with the Contract Documents, then the DP will prepare a Certificate of Substantial Completion, which shall establish the date of Substantial Completion; shall state the responsibilities of the Contractor for remaining punch list items, maintenance, heat and utilities, security,

Page 75 of 108 ASU JOC 2015 - 16000 RFQ

Page 76: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

and damage to the work; and shall fix the time, not to exceed thirty (30) days, within which the Contractor shall complete the punch list. The Certificate of Substantial Completion shall be submitted by the DP to the Owner and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate. The Project shall not be deemed substantially complete until the Certificate is issued irrespective of Owner occupancy. The Contractor shall reimburse the Owner, via a deductive Change Order, any and all re-inspection costs, including trip charges, beyond the second inspection for Substantial Completion.

7.1.3 At the Owner’s written request, Project Closeout Documents normally required for submission by the

Contractor to the Owner for Substantial Completion may include, but are not limited to:

A. Fire Marshal Acceptance Alarm/Sprinkler and State Fire Marshal Acceptance Report B. State Elevator Inspection Report C. Insurance Carrier Certificate for Boiler Inspection D. Preliminary Balance Report E. Preliminary As-Builts F. Attic Stock G. Substantial Completion Project Inspection H. Punch list Issued I. Certificate of Substantial Completion J. Schedule of Required Maintenance

7.2 Final Completion and Final Payment.

7.2.1 Completion of all outstanding Work items noted in the Substantial Completion Punch List for the Work, or relevant portion thereof and other Agreement requirements as required in order for Owner to certify Final Completion. Requirements for this certification also include, but are not limited to, equipment operating training for Owner and submission and approval by Owner of all Record and Close Out Documents and copy of all Contractor General Conditions and Purchase Orders not previously provided, completion of test and balance report and all commissioning reports, as applicable.

7.2.2 Conditions Precedent to Final Payment. Final Payment shall not become due until such time as Contractor

submits to the Owner:

A. An affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or the Owner’s property might be responsible or encumbered (less amounts withheld by the Owner) have been paid or otherwise satisfied by Contractor;

B. A certificate evidencing that insurance required by the Contract Documents to remain in force after Final Payment is currently in effect and will not be canceled or allowed to expire until at least thirty (30) calendar days’ prior written notice has been given to the Owner;

C. Consent of Surety to Final Payment; D. Unconditional waivers of lien in statutory form from all Subcontractors, material suppliers, or other

persons or entities having provided labor, materials and equipment relating to the Work; E. If required by the Owner, other data establishing payment or satisfaction of obligations, such as

receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract Documents;

F. All Project warranty documents, including special manufacturers warranties; G. Final Subcontractor List; H. All approved Submittals and Shop Drawings (electronic copy); I. Schedule of Required Maintenance; J. Operation and Maintenance Manuals (1 electronic copy and 3 hard copies); K. As-Builts (1 electronic copy and 3 hard copies); L. Any required Owner training provided by Contractor; M. Final Test & Balance Report sealed by professional, if applicable; N. Commissioning completed and reports received, if applicable;

Page 76 of 108 ASU JOC 2015 - 16000 RFQ

Page 77: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

O. All ASU keys have been returned, and the key return form has been signed by ASU Building Access Services and submitted to the ASU Project Manager; and

P. Any other items identified by Owner, which are listed in Owner’s Final Project Completion Checklist and agreed to by Contractor in Contract Documents, to be received by Owner.

7.2.3 If, after Substantial Completion of the Work has been achieved, Final Completion is materially delayed

through no fault of the Contractor, or by the issuance of additional change orders or change directives by the Owner, the Owner may at its sole discretion, upon request of the Contractor, and without terminating the project-specific Job Order, make payment to Contractor of the balance due for that portion of the Work fully completed.

7.2.4 Acceptance of Final Payment by the Contractor shall constitute a waiver of all affirmative claims by the

Contractor in connection with the project-specific Job Order and performing of the Project. The making of the Final Payment by the Owner shall constitute a waiver of claims by the Owner, except those arising from (a) liens, claims, security interests and encumbrances arising out of the Work after Final Payment; (b) latent defects which the Owner becomes aware of after Final Payment; or (c) the terms of warranties required by the Contract Documents and other rights provided under Arizona law.

SECTION 8 INDEMNIFICATION 8.1 Proprietary Rights, Patent and Copyright Infringement.

8.1.1 Contractor shall defend any action or proceeding brought against Owner based on any assertion or claim that the Work, or any part thereof, or the operation thereof or use of the Work or any part thereof, constitutes infringement of any third party proprietary rights, trademark, patent or copyright, now or hereafter issued (“Proprietary Rights”. Owner agrees to give prompt notice in writing to Contractor of any such action or proceeding and to provide authority, information and assistance in the defense of same. Contractor shall defend, indemnify and hold harmless Owner from and against all damages and costs, including attorney’s fees, awarded against Owner or Contractor in any such action or proceeding. Contractor further agrees to keep Owner informed of all developments in the defense of such actions or proceedings.

8.1.2 In the event that Owner is enjoined from the operations or use of the Work, or any part thereof in connection

with any claim of infringed proprietary rights, Contractor shall at its sole expense take reasonable steps to procure the right or license to operate or use the Work. If Contractor cannot so procure the aforesaid right within a reasonable time, Contractor shall then, promptly, at Contractor’s option and at Contractor’s expense and in consultation with owner, (a) modify the Work so to avoid infringement of any Proprietary Rights; or (b) replace said Work with Work that does not infringe or violate any such Proprietary Rights.

8.1.3 Sections 8.1.1 and 8.1.2 above shall not be applicable to any action or proceeding based on infringement or

violation of a Proprietary Right (a) relating solely to a particular process or the product of a particular manufacturer specified by Owner and such processes or products are something other than that which has been offered or recommended by Contractor to Owner; or (b) arising from modifications to the Work by Owner or its agents after acceptance of the Work.

8.1.4 In addition to the other obligations of the Contractor under this Section 8.1, Contractor will be responsible

for delays and for increases in the cost of the work associated with or arising out of any claim of infringed Property Rights.

8.2 General Indemnity.

8.2.1 Contractor shall indemnify, defend, save and hold harmless the State of Arizona, the Arizona Board of Regents, and Arizona State University and their officers, officials, agents, and employees (hereinafter referred to as “Indemnitee”) from and against any and all claims, actions, liabilities, damages, losses, or expenses (including court costs, attorneys’ fees, and costs of claim processing, investigation and litigation)

Page 77 of 108 ASU JOC 2015 - 16000 RFQ

Page 78: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

(hereinafter referred to as “Claims”) for bodily injury or personal injury (including death), loss or damage to tangible or intangible property or financial loss incurred by the Indemnitee caused, or alleged to be caused, by the negligence, acts or omissions of Contractor or any of its owners, officers, directors, agents, employees or Subcontractors, arising out of or in any way related to the performance of the Work or this Agreement, or defects in the Work, or any materials supplied. This indemnity includes any claim or amount arising out of or recovered under the Workers’ Compensation Law or arising out of the failure of such contractor to conform to any federal, state or local law, statute, ordinance, rule, regulation or court decree. It is agreed that Contractor will be responsible for primary loss investigation, defense and judgment costs where this indemnification is applicable. In consideration of the award of this contract, the Contractor agrees to waive all rights of subrogation against the State of Arizona, the Arizona Board of Regents, Arizona State University, and their officers, officials, agents and employees for losses arising from the Work performed by the Contractor for the State of Arizona.

SECTION 9 TIME AND DELAY 9.1 The Contractor and Owner both recognize and acknowledge that any time limits set forth in the Contract

Documents for performance of the work are of the essence of this Agreement. Contractor agrees that it will commence performance of the Work, achieve Substantial and Final Completion of the Work, and achieve any interim Milestones for Substantial Completion in compliance with all contractual time requirements.

9.2 It also is agreed that time is of the essence of each and every part of the Contract Documents and of the

Specifications wherein a definite and certain length of time is fixed for the performance of any act or activity whatsoever. Where, under the Contract Documents additional time is allowed for the completion of any Work, the new time limit fixed by such extension shall also be of the essence of this Agreement.

9.3 Failure of the Contractor to achieve the completion dates for Substantial or Final Completion set forth in the

Agreement will result in the assessment of Liquidated Damages as required by the Agreement. The per day amount for Liquidated Damages provided for in the project-specific Job Order shall be paid for each and every calendar day that the Contractor is not in full compliance with the time(s) stipulated in the Agreement for completing the Work. The Liquidated Damages per day amount is fixed and agreed upon by and between the Contractor and Owner because of the impracticality and extreme difficulty of fixing and ascertaining the actual damages the Owner would in such event sustain. Any such sums may be withheld by the Owner from Final Payment due hereunder.

9.4 If the Contractor is delayed in the performance of the Work and such delay actually and directly delays a timely

achievement of a critical path activity, element or component, due to acts, omissions, conditions, events, or circumstances beyond its reasonable control or prevention and due to no legal fault of its own or those for whom Contractor is responsible under the terms of the Contract Documents, the time for Substantial Completion of the Work, and to the extent applicable, any interim milestones or Substantial Completion dates for portions of the Work shall be extended by written amendment or change order for the amount of time attributable to such events or circumstances. By way of example only, such acts, omissions, conditions, events, and circumstances which would entitle Contractor to an extension of the Contract Time(s), include acts or omissions of Owner, or anyone under Owner’s control, including changes made by separate contractors in the Work by Owner, unforeseeable Project Site conditions, wars, floods, labor disputes, unusual delay in transportation and unusually adverse weather conditions.

9.5 Notice of any delay in performance of the Work which Contractor attributes to the Owner shall be made by

Contractor in writing to the Design Professional and Owner immediately but in no event later than twenty-four (24) hours after discovery of the event giving rise to the delay. The Contractor shall then provide additional details concerning the delay in writing to the Design Professional and the Owner within seven (7) calendar days from the delay notice. Failure to satisfy each of these time requirements shall absolutely bar any and all later delay claims. The detailed notice shall indicate the cause of the delay, and the anticipated length of the delay in reasonable detail, the probable effect of such delay upon the progress and Cost of the Work, and possible

Page 78 of 108 ASU JOC 2015 - 16000 RFQ

Page 79: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

mitigation plans. If the cause of the delay is continuing, the Contractor must give written notice every month at the same time it submits the updated progress Narrative Report to the DP.

9.6 Within fifteen (15) calendar days after the elimination of any such delay, the Contractor shall, unless the time is

extended and contract signed by the Owner, submit further documentation concerning the delay and, if appropriate, a formal written request requesting an extension of time for such delay and any compensation sought for the delay. The written request for time extension shall state the cause of the delay, the number of days of extension requested and the compensation sought and provide a fully documented analysis of the critical path schedule, including a “fragnet” and any other data demonstrating a delay in the critical path of the Work or individual milestone or the overall Project completion. If the Contractor does not timely comply with the notice and documentation requirements set forth in this Section, the Contractor’s claim for delay is barred.

9.7 In the event the Contractor gives notice to the Owner of compensable delay alleging that the Owner is

responsible for the delay as to which the notice was given and the delay is unreasonable under the circumstances and was not within the contemplation of the Owner and Contractor when they entered into the project-specific Job Order, the Owner will enter into negotiations with Contractor as to Contractor’s damages, if any.

9.8 It is agreed that no time extensions shall be granted nor delay damages paid unless the delay is clearly

demonstrated by the updated Construction Schedule current as of the month the change was issued or the delay occurred and which delay cannot be mitigated, offset, or eliminated through such actions as revising the intended sequence of work or other reasonable means.

SECTION 10 CHANGES TO CONTRACT SCOPE, PRICE, TIME AND TERMS 10.1 Changes.

10.1.1 After the Agreement is signed, modifications to the Agreement, modifications to any project-specific Job Order, including modifications to Contract Price, the Contract Time(s), Scope of Work, or terms and conditions of the Agreement may only be made by a written amendment or change order.

10.1.2 The Contractor shall not proceed with the Work on any change involving an increase or decrease in cost or

time without receiving prior written authorization from the Owner. Contractor must proceed in accordance with the procedures set forth in this Section 10. The Owner’s right to make changes in the Work shall not invalidate this Agreement, relieve the Contractor of any responsibility, or require the Owner give notice to the surety. Any other requirement of notice to the surety of a change in the Work shall be the sole responsibility of the Contractor. If the Contractor proceeds with any change involving an increase or decrease in cost or time without written authorization from Owner as required by this paragraph, the Contractor hereby waives all rights or claims Contractor may have in connection with or as a result of the change.

10.1.3 An amendment or change order is a written instrument issued after execution of the Agreement signed by

the Owner and Contractor, stating their agreement upon the following, as applicable: a) Scope of the change in the Work; b) The amount of the adjustment, if any, to the Contract Price; c) The extent of the adjustment, if any, to the Contract Time(s) for performance set forth in the Contract

Documents; and d) Changes to the terms and conditions of the Agreement.

10.1.4 All changes in the Work authorized by an amendment or change order shall be performed under the

applicable terms of the Contract Documents, and Owner, and Contractor shall negotiate in good faith and as expeditiously as possible on the appropriate adjustments, if any, in Contract Time or Contract Price. No Contract Price adjustment on account of a change order shall include the Contractor’s or Subcontractor’s

Page 79 of 108 ASU JOC 2015 - 16000 RFQ

Page 80: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

profit, fee, home office overhead or a formula allocation of indirect costs except as allowed in Section 10.4.1 below unless otherwise specifically allowed under these General Conditions.

10.2 Change Directives.

10.2.1 A change directive is a written order, prepared on the Owner’s Construction Change Directive (CCD) form, and signed by Owner, directing a change in the Work at a point in time prior to agreement on an adjustment in Contract Price or the Contract Time(s) of performance or both. By issuance of a written change directive, Owner, at any time, may make any such changes within the general scope of the Agreement or issue additional instructions, require additional or modified Work, or direct deletion of Work. Upon receipt of a change directive, the Contractor shall promptly proceed with the change in the Work and promptly advise the Owner of the Contractor’s agreement or disagreement with the proposed method of adjustment for Contract Price or the Contract Time or both.

10.2.2 Owner and Contractor shall negotiate, in good faith and as expeditiously as possible, the appropriate

adjustments resulting from the change in Work, and agreement reached shall be effective immediately and memorialized by preparation and execution of an appropriate amendment or change order.

10.3 Minor Changes in the Work.

10.3.1 Design Professional may make minor changes in the Work consistent with the intent of the Contract Documents providing such changes do not involve an adjustment in the Contract Price or Contract Time(s) of performance and do not materially affect or alter the design, quality, or performance. The Design Professional shall promptly inform Owner, in writing, of any such changes, and verify that Contractor has recorded such changes on the As-Built Documents.

10.4 Price, Time, or Scope of Work Adjustment.

10.4.1 The cost of or credit to the Owner resulting from a change in the Work shall be by the same methods as defined in the RFQ Section 3.1.7 and determined by the Owners representative at time of issuance of a new task assignment to the Agreement.

The amount Owner pays Contractor for subcontracted work will be the same amount Contractor pays for subcontracted work.

10.4.1.1 Submitted utilizing the Owner’s ASU JOC 2015 Project Tracking 2.0 Rev 1 – Master Excel

Spreadsheet (Exhibit E to the RFQ), and limited to items directly allocable to the change in the Work:

1. Contractor’s General Requirements quantities as negotiated on each Job Order plus 1

above; the parties agree that this mark-up shall fully cover all Contractor overhead and supervision;

2. Contractor’s Fee, at the rate established in RFQ response. This sum shall exclude the

cost attributable to bonds, insurance and taxes. The Parties hereby agree that this fee includes all Contractor overhead and profit on subcontractor work;

3. Insurance and bond premiums, not to exceed amount submitted in the RFQ

documents as awarded, unless backup is provided to and deemed sufficient by Owner justifying a different rate;

4. Construction Sales tax at full value;

Page 80 of 108 ASU JOC 2015 - 16000 RFQ

Page 81: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

10.4.2 Any dispute regarding the pricing methodology or cost of a change shall not relieve the Contractor of the obligation to proceed with work on the change directed by the Owner. The cost or credit to the Owner shall be promptly determined by the Owner on the basis of the preceding subsection of these General Conditions and in no event later than ten (10) calendar days after the Work directed has been performed.

10.4.3 An Owner approved written amendment or change order shall be full and final settlement of all entitlement

claims for direct, indirect, delay, disruption, inefficiency, productivity and any other consequential costs related to items covered or affected, as well as for related delays. Any such claim not presented by the Contractor for inclusion in the amendment or change order prior to signature is irrevocably waived.

10.4.4 In the event that Owner and the Contractor disagree upon whether Contractor is entitled to be paid for any

amendment, change order or change directive services required of Contractor by Owner, or as to amount of compensation in the event of any other disagreements over the Scope of Work or proposed changes to the Work, Owner and Contractor agree to resolve all such disagreements consistent initially with Section 11 of these General Conditions and thereafter if not resolved, in accordance with Section 12. As part of the negotiation process, Contractor shall furnish Owner and Design Professional with a good faith estimate of the costs to perform the disputed services or work in accordance with Owner’s interpretations. If the parties are unable to agree, and Owner expects Contractor to promptly perform the services in accordance with Owner’s or Design Professional’s interpretations of the documents, Contractor shall proceed to perform the disputed services, conditioned upon Owner issuing a written order to Contractor directing Contractor to proceed and specifying Owner’s or Design Professional’s interpretation of the services that are to be performed.

10.4.5 The requirements set forth above as to Contractor providing detailed, itemized pricing on Subcontractor

change orders is fully applicable to change orders from Contractor to Subcontractor where there are no comparable amendments or change orders between Owner and Contractor.

10.5 Emergencies.

10.5.1 In any emergency affecting the safety of persons or property, Contractor shall promptly act, at its discretion, to prevent threatened damage, injury or loss. Any increase in the Contract Price or Contract Time(s) of performance or both claimed by Contractor on account of emergency work shall be determined as provided in this Section.

SECTION 11 REQUESTS FOR CONTRACTUAL ADJUSTMENTS AND DISPUTE RESOLUTION 11.1 Dispute Avoidance and Resolution.

11.1.1 The parties are fully committed to interacting and working with each other through the course of the Project, and agree to communicate regularly with each other at all times, including attending construction status meetings, so as to avoid, eliminate, or minimize any disputes, disagreements, claims, or controversies relating to the Project, (hereinafter “Disputes”). To the extent Disputes arise during the course of the Project that are not otherwise resolved by applicable portions of this Agreement, both Contractor and Owner agree to timely resolving such Disputes in an amicable, professional, and expeditious manner at the lowest possible level so as to avoid unnecessary costs, delays, and disruptions to the Work. To this end, the Contractor’s Representative shall refer the Dispute to the Owner’s Representative by written notice of same, not more than seven (7) calendar days from the occurrence of the event which gives rise to the Dispute, or not more than seven (7) calendar days from the date that the Contractor knew or should have known of the matter, provided however, a request for adjustment based on time or delay must proceed under Section 9, and a request for adjustment to Contract Price or Contract Time must proceed under Section 10.

11.1.2 In the event a Dispute cannot be resolved through Contractor’s Representative and Owner’s Representative

in accordance with Section 11.1.1, the Contractor’s Senior Representative and Owner’s Senior

Page 81 of 108 ASU JOC 2015 - 16000 RFQ

Page 82: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Representative shall meet within forty-eight (48) hours of such field level failure to attempt to resolve the Dispute. The parties agree that prior to any meetings between the Senior Representatives; they will timely exchange with each other all relevant documents and information that will assist the Senior Representatives in resolving the Dispute. The Senior Representatives shall have seven (7) calendar days from the time they first met to resolve the Dispute. If the Senior Representatives, after meeting in good faith, determine that the Dispute cannot be resolved by them on terms satisfactory to both parties, the parties agree that the sole remedy for Contractor to pursue the Dispute is to submit the Dispute to Owner in accordance with the applicable provisions of the Arizona Board of Regents’ Policy Section 3-809.

11.1.3 The parties understand and agree that the process set forth in Section 11.1, 11.2, and in ABOR Policy

Section 3-809, provide the sole and exclusive remedy to resolve a Dispute. The parties further understand and agree that asserting the Dispute in accordance with Section 12.1.1 and 11.1.2 is integral and essential to the parties’ ability to perform their obligations under this Agreement. Failure to properly utilize the procedures in Section 11.1.1 and 11.1.2 exposes the non-utilizing party to damages which are difficult to accurately quantify and ascertain. The Parties agree that failure to properly utilize the procedures in Section 11.1.1 and 11.1.2 will require the non-utilizing party to pay the other party ten thousand and 00/100 Dollars ($10,000.00) as liquidated damages, and not as a penalty. The damages awarded pursuant to this section shall be in addition to and not in lieu of other damages provided for under this Agreement.

11.2 Administrative Hearing Process.

11.2.1 Contractor and Owner agree that all other parties involved in the Project can be made parties to the administrative process called for by Arizona Board of Regents’ Policy Section 3-809 and to this end, both Contractor and Owner will include appropriate provisions in all contracts they execute with other parties in connection with the Project requiring attendance and participation by those other parties in any such administrative proceeding.

11.2.2 Unless otherwise agreed in writing, the Contractor shall carry on the Work and maintain its progress during

the course of any unresolved Dispute, and the Owner shall continue to make payments as they fall due to the Contractor in accordance with the Contract Documents.

11.3 CONSEQUENTIAL DAMAGES.

EXCEPT AS OTHERWISE PROVIDED FOR HEREIN, NEITHER THE OWNER NOR THE CONTRACTOR SHALL BE LIABLE TO THE OTHER FOR ANY CONSEQUENTIAL LOSSES OR DAMAGES ARISING OUT OF BREACH OF CONTRACT, INCLUDING BUT NOT LIMITED TO LOSS OF PROFITS.

11.4 Decisions of Design Professional or Owner.

Any failure of the Design Professional or Owner to make a decision within the time limits set forth herein shall not be construed as acquiescence in all or in any part of the Contractor’s claim for relief.

SECTION 12 STOP WORK AND TERMINATION 12.1 Owner’s Right to Stop Work or Terminate for Convenience.

12.1.1 Owner at any time may, without cause and for its convenience, order Contractor in writing to stop or suspend its Work, for a period not to exceed sixty (60) calendar days in that event. Contractor may seek an adjustment of the Contract Price or Contract Time(s) of performance or both under Section 10 of the General Conditions to the extent that its work has been adversely impacted by any such suspension or stoppage of work by Owner, unless actions, omissions or inactions of the Contractor are the cause of the Owner stopping or suspending the Work.

Page 82 of 108 ASU JOC 2015 - 16000 RFQ

Page 83: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

12.1.2 Upon seven (7) calendar day’s written notice to Contractor, Owner may, without cause and without prejudice to any other right or remedy of Owner, elect to terminate the Agreement for convenience of the Owner. In such case Contractor shall be paid (without duplication of any items): a) for completed and accepted Work executed in accordance with Contract Documents prior to the effective date of the termination, including fair and reasonable sums for overhead and profit on such Work; b) for expenses sustained prior to termination in performing services and furnishing labor, materials and equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; c) for all claims, costs, losses and damages incurred in settlement of terminated contracts with such Subcontractors, suppliers and others and d) for reasonable expenses directly attributable to termination.

12.1.3 Upon receiving a Notice of Termination for Convenience, the Contractor shall proceed as follows: a) stop

work as specified in the Notice, b) place no further subcontracts on purchase orders, c) terminate all subcontracts to the extent they relate to the Work terminated, d) assign to the Owner all rights of the Contractor under terminated subcontracts, in which case Owner shall have the right to settle or to pay any termination settlement proposal arising out of these terminations, and e) submit complete termination inventory schedules to Owner no later than one hundred twenty (120) calendar days from date of the Notice of Termination.

12.2 Owner’s Right to Perform and Terminate for Cause.

12.2.1 If Contractor persistently fails to (a) provide a sufficient number of skilled workers; or the materials required by the Construction Documents or both; (b) comply with applicable Legal Requirements; (c) pay, without cause, its Subcontractors or suppliers; (d) prosecute the Work with promptness and diligence to ensure that the Work is completed by the Contract Time(s) as may be from time to time adjusted; or (e) otherwise perform the Work and its obligations in compliance with the Contract Documents, Owner shall have the right, in addition to any other rights and remedies provided in the Contract Documents or by law, after seven (7) days written notice of default to Contractor and Contractor’s failure to cure within trial period, to (i) perform and furnish through itself or through others it selects any such labor, materials, or Work, and to deduct the cost thereof from any monies due or to become due to Contractor under the Contract Documents; or (ii) terminate the Agreement with Contractor for all or any portion of the Work, enter upon the premises and take possession, for the purpose of completing the Work, of all materials, equipment scaffolds, tools, appliances, and other items thereon, all of which Contractor hereby transfers, assigns and sets over to Owner for such purpose, and to employ any person or persons to complete the Work and provide all of the required labor, services, materials, equipment and other items; or (iii) both. Upon exercising its right to Terminate for Cause for any reason set forth above, Owner, at its discretion, may also exercise the right to have each or any of Contractor’s Subcontractor and supply agreements assigned by Owner, or Owner’s nominee, provided however, Owner should have no responsibility or liability for acts or omission of Contractor under such Agreements and the sole recourse of Subcontractors on pre-termination events shall be against Contractor.

12.2.2 In the event of such termination for cause, Contractor shall not be entitled to recover any further payment

until the Work is completed and shall then only be entitled to be paid for all Work performed prior to its date of default minus costs incurred by Owner to complete the Project exceeding the Contract Price as described below. In the event Owner’s cost and expense of completing Contractor’s Work shall exceed the Contract Price, then Contractor or its surety shall promptly pay the difference to Owner. Such costs and expense shall include, not only the cost of completing the Work to the satisfaction of Owner and of performing and furnishing all labor, services, tools, equipment and other items required in the Contract Documents, but also losses, damages, costs and expense, including consultant and attorney’s fees and expenses incurred in connection with the re-procurement and defending claims, arising from or related to Contractor’s default.

12.2.3 Contractor agrees that in the event that Owner terminates the Agreement for cause and such termination is

ultimately determined to be improper or wrongful, the Termination for Cause will be automatically and retroactively converted to a Termination for Convenience and the provisions of Section 12.1 of these General Conditions shall apply.

Page 83 of 108 ASU JOC 2015 - 16000 RFQ

Page 84: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

12.2.4 The parties agree that if Contractor institutes or has instituted against it a proceeding under the United States Bankruptcy Code, such event may impair or frustrate Contractor’s performance of its obligations under the Contract Documents. Accordingly, if such event of default occurs, Owner shall be entitled to request Contractor, its trustee or other successor, to provide adequate assurance of future performance and Contractor agrees such request must be complied with. If Contractor fails to comply with such request within ten (10) days after receiving notice of the request, Owner, in addition to any other rights and remedies provided by the Contract Documents, or by law, shall be entitled to terminate the Agreement. Owner shall thereupon be entitled to perform and furnish through itself or through others any such labor, materials or equipment necessary for the completion of the Work and necessary to maintain the Contract Time(s) of performance, and to deduct the costs from any monies due or to become due Contractor under the Contract Documents pending receipt of adequate assurances of performance and actual performance in accordance herewith. In the event of any such bankruptcy proceedings, the Agreement shall terminate if Contractor rejects the Agreement or if there has been a default under the Contract Documents, and Contractor is unable to give adequate assurances that it will perform as provided in the Contract Documents or otherwise is unable to comply with the requirements for assuming the Agreement under the applicable provisions of the Bankruptcy Code.

12.3 Contractor’s Right to Stop Work and Terminate for Cause.

12.3.1 Contractor may, in addition to any other rights afforded it under the Contract Documents or by applicable law, either stop work or terminate the Agreement for cause upon Owners failure to timely pay an amount in excess of $100,000 dollars properly due to Contractor under any Contractor Application for Payment. In this regard Contractor shall provide Owner with written notice indicating that such non-payment condition has occurred, and that it is Contractor’s intention to only stop work or terminate the Agreement if the non-payment condition is not cured within seven (7) calendar days from Owner’s receipt of Contractor’s notice. In the event that Contractor elects to only stop work, it may nonetheless later indicate its intention to terminate the Agreement by providing Owner with written notice that Contractor will terminate the Agreement within seven (7) calendar days from receipt of Contractor’s notice; unless the alleged cause of termination is cured in the interim.

12.3.2 In the event Contractor properly and lawfully elects to stop work under Section 12.3.1 for non-payment and

then resumes work, Contractor shall be entitled to make a claim for adjustment to the Contract Price and Contract Time(s) of performance to the extent Contractor has been adversely impacted by the stoppage of work. In the event that Contractor elects to terminate the Agreement on the basis permitted under Section 12.3.1, Contractor shall be entitled to recover the same costs it would be permitted to recover had Owner terminated this Agreement for its convenience under Section 12.1 of these General Conditions.

12.4 Termination.

12.4.1 If the Agreement is terminated for any of the reasons set forth above, Contractor’s agreements with its Subcontractors and suppliers, at Owner’s option and without further action by Contractor, be assigned to Owner; provided however, that Owner shall have no liability for any pre-existing acts or omissions or default by Contractor under such agreements and the sole recourse of such Subcontractors and suppliers for any such events shall be against Contractor.

Page 84 of 108 ASU JOC 2015 - 16000 RFQ

Page 85: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 13 CONSTRUCTION BY OWNER OR BY OTHER CONTRACTORS 13.1 Owners Right to Perform Construction.

13.1.1 The Owner reserves the right to perform any of the Work related to the Project with the Owner's own forces, which include persons or entities under separate contracts not administered by the Owner. The Owner further reserves the right to award other contracts in connection with other portions of the Project or other construction or operations on the Site.

13.2 Mutual Responsibility.

13.2.1 Coordination with Owner's Forces. The Contractor shall afford the Owner's own forces, and other contractor’s working on the Project, reasonable access to the Site to introduce and/or store their materials and equipment and to perform their activities. The Contractor shall connect and coordinate the Contractor's construction and operations with Owner’s forces and/or other contractors working on the Project as required by the Contract or as reasonably necessary.

13.2.2 Defects in Other Work. If part of the Contractor's Work depends upon construction or operations by the

Owner's own forces or other contractors, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Owner apparent discrepancies or defects in such other construction that would render it unsuitable for proper execution and results. Failure of the Contractor to so report shall constitute an acknowledgment that the Owner's own forces or other contractors' completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable.

13.2.2 Damage to Other Work. The Contractor shall promptly remedy damage caused by the Contractor to

the completed or partially completed Project or to the property of the Owner or other contractors. SECTION 14 MISCELLANEOUS 14.1 Assignment Prohibited. Neither Contractor nor Owner may without the written consent of the other, assign,

transfer, or sublet any portion or part of the Work or the obligations required by a party under the Contract Documents.

14.2 Successorship. The provisions of these General Conditions and the other Contract Documents shall be binding upon the parties, their employees, agents, heirs, successors and assigns.

14.3 Severability. If any provision or any part of a provision of the Contract Documents shall be finally determined

to be superseded, invalid, illegal, or otherwise unenforceable pursuant to applicable laws by any authority having jurisdiction, such determination shall not impair or otherwise affect the validity, legality, or enforceability of the remaining provision or parts of the provision of the Contract Documents, which shall remain in full force and effect as if the unenforceable provision or part were deleted.

14.4 No Waiver. The failure of either Contractor or Owner to insist, in any one or more instances, on the

performance or timely performance of any of the obligations required by the Contract Documents, shall not be construed as a waiver or relinquishment of such obligation or right with respect to any other performance or obligation.

14.5 Headings. The headings used in these General Conditions or used in any other Contract Document are for

ease of reference only and shall not in any way be construed to limit or alter the meaning of any provision. 14.6 Notice. Whenever the Contract Documents require that notice be provided to the other party, notice will be

deemed to have been validly given (a) if delivered in person to the individual intended to receive such notice; (b)

Page 85 of 108 ASU JOC 2015 - 16000 RFQ

Page 86: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

if delivered or sent by registered or certified mail, postage prepaid to the address indicated in the Agreement; (c) if transmitted by facsimile, by the time stated in a machine generated confirmation that notice was received at the number of the intended recipient.

14.7 Non-Appropriation; Non-Availability of Funds. If Owner’s performance under this Agreement or funds

available for this Project and/or Work are dependent upon (i) the appropriation or allocation of funds by the Arizona Legislature, and if the Legislature fails to appropriate or allot funds necessary for performance of the Project and/or Work, (ii) the sale of bonds or other similar instruments, and if such bonds or other instruments are not sold or proceeds are not available, or (iii) third party gifts, donations or grants, and if such gifts, donations or grants are not received in whole or in part by Owner; then Owner may provide notice of this to the Contractor, and either a) cancel this Agreement without further obligation of Owner except as set forth at the end of this paragraph, or b) delay the Project and/or Work for a period of up to six (6) months (without cost to the Owner), after which date if no such funds are legally available for performance of this Agreement, Owner may cancel this Agreement without further obligation of Owner, except as set forth at the end of this paragraph.

14.8 Conflict Of Interest. In accordance with Arizona Revised Statutes (“A.R.S.”) § 38 511, Owner may cancel this

Agreement within three (3) years after the execution of this Agreement without penalty or further obligation, if any person significantly involved in initiating, negotiating, securing, drafting, or creating this Agreement on behalf of Owner, at any time while this Agreement or any extension thereof is in effect, is an employee or agent of any other party to this Agreement in any capacity or a consultant to any other party with respect to the subject matter of this Agreement.

14.9 Compliance and Legal Worker Requirements

14.9.1 The parties shall comply with all applicable state and federal statutes and regulations governing equal employment opportunity, non-discrimination, and immigration. The aforesaid provisions shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor shall post in conspicuous places, available for employees and applicants for employment, notices to be provided by the Owner, setting forth the provisions of this nondiscrimination clause and shall insert this provision in all subcontracts hereunder, except subcontracts for standard commercial supplies or raw materials.

14.9.2 Contractor warrants that it is in compliance with all federal immigration laws and regulations that relate to its

employees. Pursuant to Arizona Revised Statutes § 41-4401, the Contractor warrants that it is in compliance with the state law requirement that employers in Arizona verify the employment eligibility of employees, hired after December 31, 2007, through the federal E-verify program or any successor program. Contractor shall be responsible for all costs associated with compliance with such programs. Contractor shall flow-down each of the warranty requirements of this section to all Subcontractors, and the Contractor shall require each Subcontractor to warrant compliance with the provisions of this section. This section is not applicable where the Contractor is a governmental entity nor is the Contractor required to pass this provision through to Subcontractors and sub-subcontractors who are governmental entities.

14.9.3 A breach of any of the warranties required under this Section shall be deemed a material breach of this

Agreement subject to penalties, including termination for cause.

14.9.4 In addition to other audit provision contained in this Agreement, the Owner retains the right to audit and inspect the papers of any Contractor or Subcontractor’s employees who perform Work to ensure that the Contractor or Subcontractor is complying with the warranty requirements of this Section.

14.9.5 Contractor shall make a good faith effort to ensure that not less than fifteen percent (15%) of the Work

performed under this Agreement is performed by a small business as defined in A.R.S. § 41-1001. The Contractor shall report to the Owner the dollar value of the Work performed under this provision. Upon Owner’s request, documentation evidencing Contractor’s compliance with this provision shall be furnished in a form acceptable to Owner as a condition precedent to Final Payment.

Page 86 of 108 ASU JOC 2015 - 16000 RFQ

Page 87: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

14.10 Assignment of Overcharge Claims. The Owner and Contractor recognize that in actual economic practice

overcharges resulting from antitrust violations are in fact borne by Owner. Therefore, the Contractor hereby assigns to Owner any and all claims for such overcharges that may vest in Contractor during performance of the Project and for three (3) years after final acceptance. The Contractor in all subcontracts shall require all Subcontractors to likewise assign all claims for overcharges to the Owner.

14.11 Sexual Harassment. The Contractor shall comply with the Owner’s current policy regarding sexual

harassment. The Owner prohibits sexual harassment by any person on Owner’s premises or at any Owner-affiliated functions or facilities.

14.12 Modification of Agreement. The Contract Documents may not be changed, altered, or modified in any way

except in writing (by amendment or change order) and signed by a duly authorized representative of both parties.

14.13 Veteran's Preference. Contractor agrees to provide preference in initial employment for U.S. veterans by:

• Adding points to the raw score of a numerically scored screening instrument, or • Hiring a veteran if, at the conclusion of the search process, a veteran is one of a number of comparably

qualified candidates.

For purposes of this certification, “veteran” means: an honorably separated person (honorable or general discharge) who served on active duty (not active duty for training) in the Armed Forces: • During any war declared by Congress; • During the period April 28, 1952 through July 1, 1955; • For more than one hundred eighty (180) consecutive calendar days, any part of which occurred after

January 31, 1955, and before October 15, 1976; • During the Gulf War period beginning August 2, 1990, and ending January 2, 1992; or • For more than one hundred eighty (180) consecutive calendar days, any part of which occurred during the

period beginning September 11, 2001, and ending on the date prescribed by Presidential proclamation or by law as the last day of Operation Iraqi Freedom; or

• In a campaign or expedition for which a campaign medal has been authorized, such as El Salvador, Lebanon, Granada, Panama, Southwest Asia, Somalia, and Haiti.

Medal holders and Gulf War veterans who originally enlisted after September 7, 1980, or entered on active duty on or after October 14, 1982, without having previously completed 24 months of continuous active duty, must have served continuously for 24 months or the full period called or ordered to active duty. Effective on October 1, 1980, military retirees at or above the rank of major or equivalent, are not entitled to preference unless they qualify as disabled veterans.

14.14 Nondiscrimination. The Parties will comply with all applicable state and federal laws, rules, regulations, and

executive orders governing equal employment opportunity, immigration, and nondiscrimination, including the Americans with Disabilities Act. If applicable, the parties will abide by the requirements of 41 CFR §§ 60-1.4(a), 60 300.5(a), and 60 741.5(a). These regulations prohibit discrimination against qualified individuals based on their status as protected veterans or individuals with disabilities, and prohibit discrimination against all individuals based on their race, color, religion, sex, or national origin. Moreover, these regulations require that covered prime contractors and subcontractors take affirmative action to employ and advance in employment individuals without regard to race, color, religion, sex, national origin, protected veteran status or disability.

14.15 Equal Opportunity Clause. The Provisions of Section 202 of Executive Order 11246 are incorporated herein

by reference and will be applicable to this Agreement unless this Agreement is exempted under the rules, regulations or orders of the Secretary of Labor.

Page 87 of 108 ASU JOC 2015 - 16000 RFQ

Page 88: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

14.16 Anti-Kickback. In compliance with FAR 52.203-7, Owner has in place and follows procedures designed to

prevent and detect violations of the Anti-Kickback Act of 1986 in its operations and direct business relationships.

14.17 Gratuities. Owner may, by written notice to the Contractor, cancel this Agreement if it is found by Owner that

gratuities, in the form of entertainment, gifts or otherwise, were offered or given by the Contractor, or any agent or representative of the Contractor, to any officer or employee of the State of Arizona with a view toward securing a contract or securing favorable treatment with respect to the awarding or amending, or the making of any determinations with respect to the performing of such contract. If Owner cancels this Agreement pursuant to this provision, Owner will be entitled, in addition to any other rights and remedies, to recover or withhold the amount of the cost incurred by Contractor in providing such gratuities.

14.18 Governing Law and Venue. This Agreement will be governed by the laws of the State of Arizona without

regard to any conflicts of laws principles. Owner’s obligations hereunder are subject to the regulations/policies of the Arizona Board of Regents. Any proceeding arising out of or relating to this Agreement will be conducted in Maricopa County, Arizona. Each party waives any objection it may now or hereafter have to this venue or to convenience of forum.

14.19 Arbitration in Superior Court. In the event of litigation, as required by A.R.S. § 12-1518, the parties agree to

make use of arbitration in all contracts that are subject to mandatory arbitration pursuant to rules adopted under A.R.S. § 12-133.

14.20 Assignment of Anti-Trust Overcharge Claims. In actual economic practice overcharges resulting from anti-

trust violations are in fact borne by the ultimate purchaser; therefore, Contractor hereby assigns to Owner any and all claims for such overcharges.

14.21 Records. To the extent required by A.R.S. § 35-214, Contractor will retain all records relating to this

Agreement. Contractor will make those records available at all reasonable times for inspection and audit by Owner or the Auditor General of the State of Arizona during the term of this Agreement and for a period of five (5) years after the completion of this Agreement. The records will be provided at Arizona State University, Tempe, Arizona, or another location designated by Owner on reasonable notice to Contractor.

14.22 ASU Names and Marks. Contractor will not use any names, service marks, trademarks, trade names, logos,

or other identifying names, domain names, or identifying marks of Owner (the “ASU Marks”), without in each case, the prior written consent of Owner. Contractor’s use of any ASU Marks must comply with Owner’s requirements, which can be found at http://commguide.asu.edu/, as they may be amended from time to time, including using the ® indication of a registered trademark where applicable. All of Contractor’s uses of the ASU Marks and all goodwill therefrom, will inure to the benefit of Owner.

14.23 Weapons, Explosive Devices and Fireworks. Owner prohibits the use, possession, display or storage of any

weapon, explosive device or fireworks on all land and buildings owned, leased, or under the control of Owner or its affiliated or related entities, in all Owner residential facilities (whether managed by Owner or another contractor), in all Owner vehicles, and at all Owner or Owner affiliate sponsored events and activities, except as provided in A.R.S. § 12 781 or unless written permission is given by the Chief of the Owner Police Department or a designated representative. Notification by Contractor to all persons or entities who are employees, officers, subcontractors, consultants, agents, guests, invitees or licensees of Contractor (“Contractor Notification Parties”) of this policy is a condition and requirement of this Agreement. Contractor further agrees to enforce this contractual requirement against all Contractor Notification Parties. Owner’s policy may be accessed through the following web page: http://www.asu.edu/aad/manuals/pdp/pdp201-05.html.

14.24 Tobacco-Free University. ASU is tobacco-free. For details visit www.asu.edu/tobaccofree .

Page 88 of 108 ASU JOC 2015 - 16000 RFQ

Page 89: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

14.25 Debarment and Suspension. Contractor warrants to Owner that neither Contractor nor any of Contractor’s

employees, contractors, subcontractors, or agents, either directly or indirectly or through subcontractors, have been suspended, excluded from participation in, or penalized by any Federal or State procurement, nonprocurement or reimbursement program. Contractor affirms that it has confirmed the above statement by checking the List of Parties Excluded From Federal Procurement and Nonprocurement Programs (http://epls.arnet.gov) within 180 days prior to commencing Services or providing Deliverables. Contractor will provide immediate written notice to Owner upon the subsequent exclusion of Contractor or any of Contractor’s employees, contractors, subcontractors, or agents, or upon learning of any investigation or proposed action that could result in such exclusion.

14.26 Independent Contractor Status. Contractor will be an independent contractor. Neither Contractor, nor any of

Contractor’s employees, agents, or subcontractors, or their employees or subcontractors, will be employees, agents, partners, or joint venturers of Owner, and Owner will not provide any employee benefits to any of them, including but not limited to worker’s compensation coverage. Owner will not make deductions from any amounts payable to Contractor for taxes. Taxes for any amounts paid to Contractor will be the sole responsibility of Contractor.

14.28 Insurance. Contractor agrees to purchase and maintain the bonds and insurance coverage in at least the

minimum amounts set forth in the RFQ. Contractor acknowledges and agrees that any failure to meet such requirements will be construed as a material breach of this Agreement.

Page 89 of 108 ASU JOC 2015 - 16000 RFQ

Page 90: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

ATTACHMENT B

RFQ Checklist The acknowledgement of the Sections of the RFQ is required for this proposal (please mark off each Section to acknowledge understanding of what is being requested and that you have submitted the proposal document in the proper format):

Section 1 Request for Qualification

Section 2 General Instructions

Section 3 Specifications and Scope of Services

Section 4 Proposal Format and Contents, (All Tab’s)

Section 5 The Selection Process

Section 6 Sealed Financial Proposal

Section 7 Regulatory Information

Section 8 Attachment A and B

Section 9 Exhibits A through D

After carefully reviewing all the terms and conditions, the authorized undersigned agrees to furnish such goods/services in accordance with the specifications/scope of work: Firm (CO.) Name By (Signature) By Date

Phone # Email Address Fax#

This Document is the first document of the proposal before the ‘Letter of Introduction’.

Page 90 of 108 ASU JOC 2015 - 16000 RFQ

Page 91: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

ATTACHMENT C Performance and Payment Bond Form

SECTION 00050 ARIZONA BOARD OF REGENTS PERFORMANCE BOND PURSUANT TO BOARD OF REGENTS POLICY 3-804E

(Penalty of this bond must be 100% of the Contract Amount) KNOW ALL MEN BY THESE PRESENTS: That, (hereinafter called the Principal), as Principal, and a corporation organized and existing under the laws of the State of , with its principal office in the City of (hereinafter called the Surety), as Surety, are held and firmly bound unto the Arizona Board of Regents, (hereinafter called the Obligee), in the amount of Dollars ($ ), for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the day of , 20__, to construct and complete a certain work described as which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein.

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform and fulfill all the undertakings, covenants, terms, conditions and agreements of said contract during the original term of said contract and any extension thereof, with or without notice to the Surety and during the life of any guaranty required under the contract, and shall also perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all duly authorized modifications of said contract that may hereafter be made, notice of which modifications to the Surety being hereby waived; then the above obligation shall be void, otherwise to remain in full force and effect and Surety shall be obligated to perform if Principal fails to perform.

PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Board of Regents Policy Section 3-804E, and all liabilities on this bond shall be determined in accordance with the provisions of the section, to the same extent as if copied at length herein.

The prevailing party in a suit on this bond, including any appeal thereof, shall recover as a part of his judgment such reasonable attorneys' fees as may be fixed by a judge of the Court. Witness our hands this day of , 20__. PRINCIPAL SEAL SURETY SEAL By: BY:

Bond Number Agent Name & Telephone Bonding Company & Telephone Agent Address Bonding Company Address

Page 91 of 108 ASU JOC 2015 - 16000 RFQ

Page 92: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 00050 ARIZONA BOARD OF REGENTS PAYMENT BOND PURSUANT TO BOARD OF REGENTS POLICY 3-804E

(Penalty of this bond must be 100% of the Contract Amount) KNOW ALL MEN BY THESE PRESENTS: That, (hereinafter called the Principal), as Principal, and a corporation organized and existing under the laws of the State of , with its principal office in the City of (hereinafter called the Surety), as Surety, are held and firmly bound unto the Arizona Board of Regents, (hereinafter called the Obligee), in the amount of Dollars ($ ), for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the day of , 20__, to construct and complete a certain work described as which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein.

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall promptly pay all monies due to all persons supplying labor or materials to him/her or his/her subcontractors in the prosecution of the work provided for in said contract, then this obligation shall be void, otherwise to remain in full force and effect.

PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Board of Regents Policy Section 3-804E, and all liabilities on this bond shall be determined in accordance with the provisions of the section, to the same extent as if copied at length herein.

The prevailing party in a suit on this bond, including any appeal thereof, shall recover as a part of his judgment such reasonable attorneys' fees as may be fixed by a judge of the Court. Witness our hands this day of , 20__. PRINCIPAL SEAL SURETY SEAL BY: BY: Bond Number Agent Name & Telephone Bonding Company & Telephone Agent Address Bonding Company Address

Page 92 of 108 ASU JOC 2015 - 16000 RFQ

Page 93: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

ATTACHMENT D

Firm’s General Information COMPANY NAME: ADDRESS: PHONE: FAX: NAME OF PRIMARY CONTACT: EMAIL ADDRESS: NAME OF AUTHORIZED CONTRACT SIGNER(S): YEARS IN BUSINESS UNDER ABOVE NAME: CONTRACTOR LICENSE NO: CLASS: STATE: OTHER LICENSE(S) HELD BY FIRM: BONDING COMPANY: AGENT: CHECK AREAS OF SPECIALTY: CIVIL/UTILITY [ ] ELECTRICAL [ ] FIRE LIFE SAFETY [ ] GENERAL CONSTRUCTION [ ] MECHANICAL [ ] CHECK ALL THAT APPLY: BUSINESS TYPE [ ] SOLE PROPRIETORSHIP [ ] PARTNERSHIP [ ] CORPORATION [ ] STATE OF INCORPORATION DIVERSITY BUSINESS OWNER DESIGNATION [ ] WOMEN-OWNED [ ] WOMEN-OWNED MINORITY-OWNED [ ] MINORITY-OWNED [ ] DISABLED BUSINESS OWNER [ ] DISABLED VETERAN [ ] DISADVANTAGED [ ] NON-PROFIT GOVERNMENT EDUCATION ORGANIZATION SIZE CLASSIFICATION [ ] INDIVIDUAL [ ] SMALL - AZ (LESS THAN $4M GROSS/YR OR LESS THAN100 FTE) [ ] LARGE [ ] SMALL - FEDERAL (LESS THAN $8M GROSS/YR) [ ] NONE OF THE ABOVE SPECIFIC PARENT COMPANY INFORMATION, NOT ALREADY LISTED ON FORM:

Page 93 of 108 ASU JOC 2015 - 16000 RFQ

Page 94: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

SECTION 9 EXHIBITS

EXHIBIT A JOC Project Request Form

Part I – Responsible Party Information

To: From: Address: Phone: Fax: email: Part II – JOC Project Information

Project No.: Project Name: Project Description:

Number of pages (including this cover page). Project description may be expanded and supplemental information is included on additional pages. Desired Start on Construction: Desired Construction Completion: Part III – Confirmation that J.O.C. requirements are met utilizing the ASU JOC Contract

Is your project anticipated to be more than $5,000? Yes No Is your project anticipated to be less than $1,600,000? Yes No Project shall not exceed $1, 999,999 including change orders per the ASU procurement rules. What is your project’s funding mechanism/status? Part IV – Items to consider (If you have any questions; please contact the contract administrator @ )

Will you need design services under this J.O.C. contract? Yes No Do you believe a permit is required prior to starting construction? Yes No * Once a job order proposal has been negotiated and approved a purchase order will be generated for the

project. No additional contracts are required. The in-place contract with the University is all that is required. Part V – Signature

ISSUED BY: DATE: Please respond to this request within 24 hours of receipt. Any request received on Friday will be responded

to before close of business the first working day thereafter. Please cc: Contract Administrator

Page 94 of 108 ASU JOC 2015 - 16000 RFQ

Page 95: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

EXHIBIT B

Form of Job Order JOB ORDER Job Order Number: Date:

To: Job Order Contracting Contractor (“Contractor”) From: Arizona Board of Regents for and on behalf of Arizona State University (“Owner”) Re: Job Order Project Number: Job Order Project Name: This Job Order is issued pursuant to the Agreement (Job Order Contracting Construction Services) Between Owner and Contractor (Job Order Contracting), dated , 20 , and the other JOC Contract Documents. This Job Order is the Notice to Proceed with the subject Job Order Project on the below Job Order Beginning Date. The terms of this Job Order are as follows: Part I - Scope of Job Order Work Full street or physical address of each location at which Job Order Work will be done under this Job Order:

1. Description of the Scope of Job Order Work : 2. Job Order costs may be determined by one of three (3) methods or by combination of methods. The determination as to which method will be used is at the discretion of the Owner in concert with the Contractor at the time a prospective Job Order project is identified to the Contractor

A. Unit Price Method: Pricing using a Unit Price Book (UPB). The University will provide an Excel spreadsheet, Exhibit E, to the Contractor to prepare the total cost estimate. This method utilizes the following Cost Data books RSMeans CostWorks, as published annually with quarterly updates by Construction Market Data, with local location factors applied to an electronic version of the RSMeans CostWorks Software for the Year of the contract.

Means Facility Construction Cost Data (Computer CD Version)*** a. Facilities Construction Cost Data Book b. Facilities & Commercial Renovation Cost Data Book c. Facilities Maintenance and Repair Cost Data Book

*** Computer CD Version Normalized to Phoenix Zip Code 850, Updated quarterly with inflation data

B. Three Bid Method: Pricing consists of obtaining a maximum of three quotes, unless otherwise

approved by Owner, from a list of pre-qualified subcontractors for each trade, selecting the lowest quote.

Page 95 of 108 ASU JOC 2015 - 16000 RFQ

Page 96: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

1. For each CSI division on the JOC Cost Proposal and Schedule of Values, the following scale shall be used when receiving subcontractor bids for work:

$0 - $18,000 1 Subcontractor Bid Required $18,001 - $50,000 2 Subcontractor Bid Required $50,001 - $999,999 3 Subcontractor Bid Required

2. Self-Perform Work: Proposer may self-perform any or all work. The proposed self-performed

work is subject to the requirements listed below. a. The self-performed work then requires the proposers Bid plus a minimum of two

additional Bids form pre-qualified contractors approved by Owner prior to bid solicitation.

b. Any self-performed work must be submitted, reviewed and approved by Owner’s Representative prior to the bidding process.

3. Quote evaluation and selection a. All bids will be opened by the JOC Contractor. b. Self-performed work shall comply with procedures established in Section 2.6.13 of the

General Conditions and delivered to ASU Purchasing sealed. Selection of the successful subcontractors bid will be decided by the Owner’s Representative in accordance with Section 2.6.9.4.3 of the Contractor General Conditions.

C. Unit Pricing / Three Bid Method: Pricing using a combination of the two methods above or

other unit pricing methods as approved by the University.

3. Description, Unit of Measurement, and price of tasks (Other Tasks) and their prices (Other Prices) not

included in the Owner Standard Task and Price Data Base or the Means UPB, if any: Task Description Unit of Measurement Unit Cost a. b. c. d.

4. A list of Drawings and Specifications for the Project is attached as Attachment 2.

JOB ORDER Job Order Number: Date:

Part II - Specific Information 1. Job Order Price $ 2. Schedule Job Order Beginning Date:

(Date construction must start)

3. Substantial Completion

Job Order Substantial Completion Date (Date of Owner Occupancy)

4. Liquid Damages

Liquidated Damages per Day if Substantial Completion is not achieved by the agreed upon date. Damages are assigned on a project per project basis based on the criticality of the project and agreed upon by JOC Contractor,

$

5. Final Completion Date

Job Order Final Completion Date: (Date construction is complete (including, without limitation, all

deficiency, incomplete or correction items (Job Order Punch List))

Page 96 of 108 ASU JOC 2015 - 16000 RFQ

Page 97: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

If there are more than sixty (60) days between the Beginning Date and the Final Completion Date or if Owner has requested a Job Order Progress Schedule, a Job Order Progress Schedule is attached as Attachment 3, or, if not attached, Contractor is to submit a Job Order Progress Schedule on or before the date to the right and when approved by Owner, this Job Order Progress Schedule will be attached as Attachment 3.

Part III - Points of Contact Owner Representative Address

Phone Number

Name & Title

Fax Number

Owner Principal Representative Address

Phone Number

Name & Title

Fax Number

Contractor Principal Representative Address

Phone Number

Name & Title

Fax Number

Site Manager Address

Phone Number

Name & Title

Fax Number

Design Professional

Company Name

Name

Address

Phone Number

Title

Fax Number

Part IV - Other Requirements A Notice Concerning Environmental Matters and Hazardous Substances in the Job Order Work Area is attached as Attachment 4. The following checked items are required. The requirements for each are in the Operating Manual

Submittals

Shop Drawings

Samples

Product Data

Page 97 of 108 ASU JOC 2015 - 16000 RFQ

Page 98: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Part V – Approvals

Owner Representative Signature Date

Owner Signature Signature Date

JOC Contractor Representative Signature Date

Advantage Area/Org Signature Date

Page 98 of 108 ASU JOC 2015 - 16000 RFQ

Page 99: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

EXHIBIT C Pre-Construction Price Information Submittal

JOC Fee Schedule

By size of project, under $350,000

Staff Total Direct Labor Cost

Project Director (__________) Site Manager (__________) Senior Project Manager (__________) Project Manager (__________) Project Superintendent (__________) Senior Estimator (__________) Estimator (__________) Scheduler (__________) Administrative Support (__________)

Page 99 of 108 ASU JOC 2015 - 16000 RFQ

Page 100: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Pre-Construction Price Information Submittal

JOC Fee Schedule By size of project, under $350,001 to $1,000,000

Staff Total Direct Labor Cost

Project Director (__________) Site Manager (__________) Senior Project Manager (__________) Project Manager (__________) Project Superintendent (__________) Senior Estimator (__________) Estimator (__________) Scheduler (__________) Administrative Support (__________)

Page 100 of 108 ASU JOC 2015 - 16000 RFQ

Page 101: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Pre-Construction Price Information Submittal

JOC Fee Schedule

By size of project, over $1,000,001 to $1,999,999

Staff Total Direct Labor Cost

Project Director (__________) Site Manager (__________) Senior Project Manager (__________) Project Manager (__________) Project Superintendent (__________) Senior Estimator (__________) Estimator (__________) Scheduler (__________) Administrative Support (__________)

Page 101 of 108 ASU JOC 2015 - 16000 RFQ

Page 102: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

EXHIBIT D

Division 1 General Requirements Construction – Price Information Submittal

JOC Fee Schedule

By size of project, under $350,000 (___)%

General Requirements Staff Unit of Unit Fixed Total Direct Measure Price Burden Labor Cost

Project Director Hrs (______) (______) (__________) Site Manager Hrs (______) (______) (__________) Senior Project Manager Hrs (______) (______) (__________) Project Manager Hrs (______) (______) (__________) Project Superintendent Hrs (______) (______) (__________) Superintendent Assistant Hrs (______) (______) (__________) Senior Estimator Hrs (______) (______) (__________) Estimator Hrs (______) (______) (__________) Scheduler Hrs (______) (______) (__________) Safety Director (SWWP) Hrs (______) (______) (__________) Product Submittals/Admin Hrs (______) (______) (__________) O&M Manuals/Admin Hrs (______) (______) (__________) Construction Docs./Printing Hrs (______) (______) (__________) Construction Services Unit of Unit Fixed Total Direct Measure Price Burden Labor Cost Reimbursable Dust Control Permits Acre (______) NESHAP Permits Ea (______) Construction Equipment Tractors/Backhoe Day (______) Forklifts/10,000 Lbs Day (______) Cranes/20 Ton Day (______) Submittals / Documents As-Builts – Paper Sheet (______)

Page 102 of 108 ASU JOC 2015 - 16000 RFQ

Page 103: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

As-Builts – Mylar Sheet (______) As-Builts – CADD Sheet (______) Temporary Facilities / Components Street Cleaning Hrs (______) Water Truck W/Driver Day (______) Dust Control/Water/ Laborer Hrs (______) (______) (__________) Survey Crew Hrs (______) Dumpster W/2 dumps Ea (______) Cont. Proj. Clean/Laborer Hrs (______) (______) (__________) Final Project Clean/Laborer Hrs (______) (______) (__________) Temporary Fences LF/Mo (______) Temporary Gates Ea (______) Site Trailer Mo (______) Provide a specific breakdown and dollar value on all Items included in Fixed Burden List additional items, with rates, that applies for consideration and evaluation with your qualifications.

Page 103 of 108 ASU JOC 2015 - 16000 RFQ

Page 104: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Division 2 General Requirements Construction – Price Information Submittal

JOC Fee Schedule

By size of project, under $350,001 to $1,000,000 (___)%

General Requirements Staff Unit of Unit Fixed Total Direct Measure Price Burden Labor Cost

Project Director Hrs (______) (______) (__________) Site Manager Hrs (______) (______) (__________) Senior Project Manager Hrs (______) (______) (__________) Project Manager Hrs (______) (______) (__________) Project Superintendent Hrs (______) (______) (__________) Superintendent Assistant Hrs (______) (______) (__________) Senior Estimator Hrs (______) (______) (__________) Estimator Hrs (______) (______) (__________) Scheduler Hrs (______) (______) (__________) Safety Director (SWWP) Hrs (______) (______) (__________) Product Submittals/Admin Hrs (______) (______) (__________) O&M Manuals/Admin Hrs (______) (______) (__________) Construction Docs./Printing Hrs (______) (______) (__________) Construction Services Unit of Unit Fixed Total Direct Measure Price Burden Labor Cost Reimbursable Dust Control Permits Acre (______) NESHAP Permits Ea (______) Construction Equipment Tractors/Backhoe Day (______) Forklifts/10,000 Lbs Day (______) Cranes/20 Ton Day (______) Submittals / Documents As-Builts – Paper Sheet (______) As-Builts – Mylar Sheet (______) As-Builts – CADD Sheet (______)

Page 104 of 108 ASU JOC 2015 - 16000 RFQ

Page 105: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Temporary Facilities / Components Street Cleaning Hrs (______) Water Truck W/Driver Day (______) Dust Control/Water/ Laborer Hrs (______) (______) (__________) Survey Crew Hrs (______) Dumpster W/2 dumps Ea (______) Cont. Proj. Clean/Laborer Hrs (______) (______) (__________) Final Project Clean/Laborer Hrs (______) (______) (__________) Temporary Fences LF/Mo (______) Temporary Gates Ea (______) Site Trailer Mo (______) Provide a specific breakdown and dollar value on all Items included in Fixed Burden List additional items, with rates, that applies for consideration and evaluation with your qualifications.

Page 105 of 108 ASU JOC 2015 - 16000 RFQ

Page 106: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Division 3 General Requirements Construction – Price Information Submittal

JOC Fee Schedule

By size of project, over $1,000,001 to $1,999,999 (___)%

General Requirements Staff Unit of Unit Fixed Total Direct Measure Price Burden Labor Cost

Project Director Hrs (______) (______) (__________) Site Manager Hrs (______) (______) (__________) Senior Project Manager Hrs (______) (______) (__________) Project Manager Hrs (______) (______) (__________) Project Superintendent Hrs (______) (______) (__________) Superintendent Assistant Hrs (______) (______) (__________) Senior Estimator Hrs (______) (______) (__________) Estimator Hrs (______) (______) (__________) Scheduler Hrs (______) (______) (__________) Safety Director (SWWP) Hrs (______) (______) (__________) Product Submittals/Admin Hrs (______) (______) (__________) O&M Manuals/Admin Hrs (______) (______) (__________) Construction Docs./Printing Hrs (______) (______) (__________) Construction Services Unit of Unit Fixed Total Direct Measure Price Burden Labor Cost Reimbursable Dust Control Permits Acre (______) NESHAP Permits Ea (______) Construction Equipment Tractors/Backhoe Day (______) Forklifts/10,000 Lbs Day (______) Cranes/20 Ton Day (______) Submittals / Documents As-Builts – Paper Sheet (______) As-Builts – Mylar Sheet (______) As-Builts – CADD Sheet (______)

Page 106 of 108 ASU JOC 2015 - 16000 RFQ

Page 107: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Temporary Facilities / Components Street Cleaning Hrs (______) Water Truck W/Driver Day (______) Dust Control/Water/ Laborer Hrs (______) (______) (__________) Survey Crew Hrs (______) Dumpster W/2 dumps Ea (______) Cont. Proj. Clean/Laborer Hrs (______) (______) (__________) Final Project Clean/Laborer Hrs (______) (______) (__________) Temporary Fences LF/Mo (______) Temporary Gates Ea (______) Site Trailer Mo (______) Provide a specific breakdown and dollar value on all Items included in Fixed Burden List additional items, with rates, that applies for consideration and evaluation with your qualifications.

Page 107 of 108 ASU JOC 2015 - 16000 RFQ

Page 108: REQUEST FOR QUALIFICATION JOB ORDER CONTRACTING ... · request for qualification . job order contracting construction services . the arizona board of regents . for and on behalf of

Document Listing ASU JOC 2015 - RFQ Request for Qualifications JOC 2015 ASU JOC 2015 Attachments A – D Attachment A – ASU JOC 2015 Standard Form of Agreement and General Conditions Attachment B – RFQ Checklist Attachment C – Performance & Payment Bond Attachment D – Firms General Information ASU JOC 2015 Exhibits A – D Exhibit A – ASU JOC 2015 Project Request Form Exhibit B – ASU JOC Form of Job Order Exhibit C – ASU JOC Pre-Construction Price Information Submittal

Exhibit D – ASU JOC Divisions 1-3 General Requirements Construction – Price Information Submittals

ASU JOC 2015 Exhibit E (separate attachments located on bid board http://www.asu.edu/purchasing/bids/construction_bids.html ) Excel Project Tracking Spreadsheets ASU JOC 2015 Project Tracking 2.0 Rev 1 – Master Excel Spreadsheet ASU JOC 2015 Project Tracking 2.0 Rev 1 – Working Example

Page 108 of 108 ASU JOC 2015 - 16000 RFQ