47
Commercial in Confidence Requirements to Current and Future Small Arms Commercial in Confidence Prepared by: Rolf Hezel Authorized by: Wolfgang Bantle 8.5.2007

Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Requirements to Current and Future Small Arms

Commercial in Confidence

Prepared by: Rolf Hezel Authorized by: Wolfgang Bantle

8.5.2007

Page 2: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

SA80

Requirements to Current and Future small arms

41 Weapon Family

XM 320

IAR

Conclusion

Table of Contents

Page 3: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

07/96 Request for tender by MoD for reliabilitygrowth investigation

11/96 Contract awarded by MoD

12/96 - 04/97 Reliability growth investigation at HK-O

06/97 Presentation of results at Abbey Wood

SA80 Reliability Growth Investigation

Page 4: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

1. Weapon Measurement 4 Weapons

2. Barrel Measurement

3. Evaluation with Various Ammunition

4. Firing at Different Temperations

5. Test Report

6. Design Proposels

SA80 Reliability Growth Investigation

Page 5: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

07/97 Request for tender to modify aninitial quantity of weapons

09/97 Tender submitted to MoD

01/98 - 06/98 Further discussions with MoD

07/98 Presentation of proposal at Warminster

07/98 Modification of 100 IWs & 100LSWs is agreed and work starts

01/99 100 IWs & 100 LSWs delivered toMoD on schedule

SA80 Reliability Growth Investigation

Page 6: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Firing Cycle Rounds Fired1) 30 rpm for 40 sec (20)2) 10 rpm for 6 min (60)3) 30 rpm for 1 min (30)4) 10x 4 round bursts in 1 min (40)

Total: 150 rounds in 8 minutes 40 seconds

Battle Field Mission IW

Page 7: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Firing Cycle Rounds Fired1) 60 rpm for 3 mins (180)2) 0 rpm for 1 min (0)3) 60 rpm for 3 mins (180)4) 0 rpm for 2 mins (0)5) 60 rpm for 2.5 mins (150)6) 0 rpm for 10 mins (0)7) 30 rpm for 10 mins (300)8) 0 rpm for 2 mins (0)9) 60 rpm for 2.5 mins (150)Total: 960 rounds in 36 minutes

Battle Field Mission LSW

Page 8: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Alaska, February 1999Reliability Results

Perc

enta

ge R

eliab

ility

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

SA80 IW ModifiedReliability 96%

SA80 LSW ModifiedReliability 86%

SA80 LSW UnmodifiedReliability 5%

SA80 IW UnmodifiedReliability 22%

Page 9: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Kuweit Trials, June 1999Reliability Results

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

SA80 IW ModifiedReliability 97.8% SA80 LSW Modified

Reliability 87%

SA80 IW UnmodifiedReliability 22%

Perc

enta

ge R

eliab

ility

SA80 LSW UnmodifiedReliability 2%

Page 10: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

03-05/00 Negotiations concerning quantity production

SA80 Project Timelines

Reliability to high?

Page 11: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

06/00 SA80 go ahead by Defence Secretary

10/00 - 01/01 SA80 contract negotiations between MOD and HK

01/01 150 IW‘s and 150 LSW‘s Standard ProductionWeapons delivered to MoD on time

02/01 SA80 Main Contract, issued by MoD

02/01 ISRD - Trial Alaska

03/01 ISRD - Trial Brunei

SA80 Project Timelines

Page 12: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Trust !

Page 13: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

SA80 ISRD Trials Kuwait

Page 14: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Trials 2001Reliability Results SA80 IW/LSW

IW LS W

IW

IW IW

LS W

LS W LS W

100% 100%90%

98%89%

100%95%

94%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Alaska B runei K uw ait W arminster Perc

enta

ge R

eliab

ility

IW LSW

IW LSW

IW LSW

IW LSW

Page 15: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Page 16: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Golden Triangle

Procurement Agency

User

Industry

Page 17: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Requirements to Current and Future

Small Arms

Lethality

CLS

Reliability

ModularityInteroperability

Special Requirements

Page 18: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

UGL 40mm x 46 - Trajectory Comparison LV vs. MV

Lethality

Effect on Trajectory

0

1

2

3

4

5

6

7

0 20 40 60 80 100 120 140 160 180Range(m)

Hei

ghto

fTra

ject

ory

(m)

Projectile Weight

LV – 180g

MV – 180g / 250g

Page 19: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Energy 5.56mm x 45

Lethality

Energy versus Range

0

200

400

600

800

1000

1200

1400

1600

1800

0 100 200 300 400 500 600

Range [m]

Ener

gy [J

] Barrel 10"Barrel 14,5 "Barrel 16,5 "Barrel 20 "

Page 20: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Muzzle Velocity 5.56mm x 45

Lethality

Velocity versus Range

0

100

200

300

400

500

600

700

800

900

1000

0 100 200 300 400 500 600

Range [m]

Vel

ocity

[m/s

] Barrel 10"Barrel 14,5 "Barrel 16,5 "Barrel 20"

Page 21: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Energy 7,62mm x 51

Lethality

Energy versus Range

0

500

1000

1500

2000

2500

3000

3500

0 100 200 300 400 500 600 700 800

Range [m]

Ener

gy[J

]

Barrel 12"Barrel 16"Barrel 20"

Page 22: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Muzzle Velocity 7,62mm x 51

Lethality

Velocity versus Range

0

100

200

300

400

500

600

700

800

900

0 100 200 300 400 500 600 700 800

Range [m]

Velo

city

[m/s

]

Barrel 12"Barrel 16"Barrel 20"

Page 23: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Battlefield Mission for Individual- Light Support Weapon

Lethality

100 150

960

0

100

200

300

400

500

600

700

800

900

1000

Rou

nds

6.6 8,6 36

Minutes

SA80 IW

SA80 LSW

NATO

Page 24: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Weapon Weight

Lethality

Requirement

0 Kg or less

Page 25: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Accuracy Requirement

Lethality

SA80

Sniper Rifle

Assault Rifle

100m

11.84cm

1 MOA

11.84cm

2.96cm

4 MOA

4 MOA

Page 26: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

B runei

Alaska

K uw ait

W arminster

Climatic Scenarios

Special Requirements

Page 27: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Over the Beach Test

Special Requirements

1. Bolt hold open, magazine with 1 round inserted.

2. Weapon immersed in water 0.5m below surface.

3. Bolt closed (under water).

4. Weapon permitted to drain for 2 seconds

maximum

5. Chambered round fired.

Page 28: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

41 Series Meeting the Challenge

HK416

HK417

HK416 / 6.8

Page 29: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Key Features

Meeting the Challenge

Gas SystemBarrel Nut

Firing Pin Safety

Page 30: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Key Features

Meeting the Challenge

Enhanced Buttstock

Gas Block

Free Floating Rail System

Page 31: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Modularity HK416

Meeting the challenge

10“

14,5

16.5“

20“

Page 32: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Modularity HK417

Meeting the challenge

12“

16“

20“

Page 33: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Modular Accessories - UGL

Meeting the challenge

Page 34: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Modular Accessories

Meeting the challenge

2 Stage Trigger System Handle Grip V1/ V2

Safety BFA Harris Bipod Interface

Page 35: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Meeting the challenge

Modular Accessories

Sling Adapter Cocking Lever

MFAS - Tool Rear Sight

Page 36: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

02/05 Contract Award

11/05 Delivery of 60 XM320´s and 60 DNS´s

12/05 LUE

03/06 PPT

07/06 PQT

09/06 (06/07) OT

04/07 Milestone C

XM320

Project Timelines

Page 37: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

06/07 Procurement of 60 Trials Weapons

06/07 OT

10/07 Procurement Phase

XM320

Project Timelines

Page 38: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

XM320

Build Standard 1/2005

Page 39: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

XM320

Weapon Modifications

Page 40: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

XM320

Build Standard 2007

Page 41: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Battlefield Mission

IAR

100 150

960

800

0

100

200

300

400

500

600

700

800

900

1000

Roun

ds

6.6 8,6 36 20Minutes

SA80 IW

SA80 LSW IAR

NATO

Page 42: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

IAR - Battlefield Mission – Thermal Image

IAR

423°C82°C196°C

Page 43: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Customer Feedback to Industry

Define Key user requirements

Identify Testing

Requirements Provide CLEAR Program objective

Funding $$$ Compare Life Cycle Costs

Recognition of Costsfor Trials Weapon

Realistic Timelines

Customers

Page 44: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Industry Feedback to Customer

CLS proposal

Incorporate latest

TechnologyRisk Plan

Cost saving measures

Life Cycle Costs

Cost for trials weapons

Realistic Timelines

Industry

Page 45: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Golden Triangle

Procurement Agency

User

Industry

Page 46: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in Confidence

Final Point

We All owe our best efforts and cooperation to continuallystrive to improve upon the equipment that is relied upon to

protect our way of life every day!

No Compromise!

Page 47: Requirements to Current and Future Small Arms...06/00 SA80 go ahead by Defence Secretary 10/00 - 01/01 SA80 contract negotiations between MOD and HK 01/01 150 IW‘s and 150 LSW‘s

Commercial in ConfidenceCommercial in Confidence

Requirements to Current and Future Small Arms