RES in Bosnia and HerzegovinaStatus and Development

NREAP

of Bosnia and Herzegovina

1

Page 2: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

• Team BiH

‣ Minela Pita, MOFTER

‣ Naida Taso, GIZ

‣ Zoran Podanin, SERC

‣ Gordan Cahtarevic, FBiH Government

‣ Almir Ajanovic, Enova

‣ Fethi Silajdzic, Enova

Page 3: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

• B&H was obliged to prepare the NREAP in 2006 when the decision to establish the Energy Community was enacted

• B&H defined/confirmed NREAP targets in acc. w/ Directive 2009/28/EC, in March 2016 by decision of Ministerial Council of B&H

• The NREAP defines mandatory targets for RES and its share in energy consumption in 2020

• The target for B&H is set at 40% of RES participation

• The baseline year is 2009, the share of RES in final consumption was already 34%

• Expected total adjusted energy consumption in 2020: 4.852 (ktoe)

• Expected amount of RES energy corresponding to 2020 target: 1.940 (ktoe)

• Three main sectors are:

‣ heating and cooling,

‣ electricity,

‣ transport

• In 2016 the total share of RES should be 36,7% which is in acc. w/ estimated trajectory = no available data about real situation

• Currently no official targets beyond 2020

3

Page 4: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

4

Estimated trajectory

Table for calculating the share of RES for each sector in total energy consumption (ktoe)

Overall for 2020 and estimated trajectory for RES in total

Page 5: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

5

Page 6: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

• RES electricity support scheme on entity level• FIT support for RES development for projects up to

10 MW• For different RES projects and different project sizes

there are different FIT values• In order to get FIT the project needs to enter the

quotas• Qutoas different for different RES projects• Guaranteed price consists of:

‣ Reference price (to be estimated each year)‣ Tariff coefficient or premium (depends on type and size of

RES)

6

Page 7: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

7

Excerpt from FIT in the Federation of B&H

Page 8: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

8

Excerpt from FIT in

Republika Srpska

Page 9: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

9

Overview of RES support

scheme for B&H

Page 10: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

• RES integration issues

‣ Network regulation in acc. w/ connection rules, the network costs mostly to be carried by project developer, in some cases impact on project feasibility

‣ Balancing requirements currently only in RS = how to manage for run/off/river SHPP

10

Page 11: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

• The regulation defines the FIT consisting of:

‣ Reference price (to be paid by stated owned energy utilities)

‣ Tariff coefficient or premium (in acc. w/ Decision on remuneration by all energy consumers)

• Currently in the Federation B&H the remuneration amounts to 0,1 pf/kWh or 0,05 Eurocent/kWh = some 4 mil. Euro in the pot

• In RS the current remuneration is 0,25 pf/kWh or 0,13 Eurocent/kWh = some 10 mil. Euro in the pot

• In the Federation B&H there is a System Operator managing the RES system

• In RS the state owned energy utility plays the role of the System Operator

• In order to achieve NREAP targets (which are partly included in the quotas)the remuneration will need to be increased

11

Page 12: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

12

Overview of production from RES supported by FIT until 2020

Page 13: RES in Bosnia and Herzegovina Status and Developmentrekk.hu/downloads/events/BiH_SEERma_country intro.pdf · 2016-11-18 · NREAP in Bosnia-Herzegovina • B&H was obliged to prepare

NREAP in Bosnia-Herzegovina

• Key barriers

• Quota regulation

• Feed in tariff budget cap

• Network connection

• Administration

• Regulatory changes in recent years

• Introduction of quotas

• Establishing RES system operator in FB&H

• Introduction of balancing obligation for RES in RS

• Provision of bank guarantee for tender bids in RS

13