Reserve Study Transmittal Letter
Date: May 10, 2016To: Lois Alameda, Crystal Falls AssociationFrom: Browning Reserve Group (BRG)
Re: Crystal Falls Association; Update w/ Site Visit Review
Attached, please find the reserve study for Crystal Falls Association. To assist in your understanding of the study, and to highlight key information you may need quickly, we have listed below some of the important information contained in the study. At BRG our goal is to bring clarity from complexity, so should you have any questions, please do not hesitate to contact us anytime.
1. Where do I find the recommended reserve contribution for next year's budget?
This is found in Section III, “30 Year Reserve Funding Plan, Cash Flow Method.” $58,605 is the annual amount. Directly under the annual amount is the amount per ownership interest, per month, or other period, as applicable. $5.74 /Lot/month @ 851. For any other funding related issues, if any, see Section III, “30 Year Reserve Funding Plan, Cash Flow Method.”
2. Where do I find the status of the reserve fund, based on the Percent Funded calculation?
This is found for the 30-year term of the study in Section IV, “30 Year Reserve Funding Plan, Including Fully Funded Balance and % Funded.” For the year for which the study was prepared, 2017, the Association is 13.0% funded.
Based on the 30 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 30 years.
California statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded.
3. Where do I find the assumptions for interest and inflation factors?
While this information is in various places in the study, it can always be found in Section III, “30 Year Reserve Funding Plan, Cash Flow Method.” For this study the assumption is 2.50% for the interest rate and 2.50% for the inflation factor. Please be advised these rates estimate the values that will stand the test of time over the 30-year term of the study, not simply only next year.
P. O. Box 60125 / Sacramento, California 95860Phone (916) 393-0600 Fax (916) 393-0610 Toll Free (877) 708-0600
[email protected] / www.BrowningRG.com1106 5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Page Two
May 10, 2016 - Reserve Study
Crystal Falls Association - 1106
4. What pages from the reserve study get mailed to the members (homeowners)?
Please see the last section of the reserve study, "Member Distribution Materials." These are the last six pages (or more) of the study which can be removed, and copied, for distribution to the membership with the budget packet. This packet includes all state mandated disclosures related to the reserves and the reserve study. This section of the study is a stand-alone packet with it's own cover and table of contents.
5. What are the next steps?
This study meets the CA Civil Code Requirements for a site visit study every three years. The next site visit study will be due in three years. For the intervening two years, BRG proposes doing an Update Without Site Visit Study during the next two years at a nominal cost which will include the preparation of a reserve study and required disclosures including the “California Assessment and Reserve Funding Disclosure Summary,” which under law, must be presented to the association members each year.
Please read the two helpful sections entitled “Glossary” and “Notes to the Auditor.” The glossary explains common reserve study terms as well as BRG specific terminology. The Notes to the Auditor while intended to assist the auditor, has useful information for the casual reader on how year zero,
(2016) the current fiscal year is dealt with in the study.
Thank you for the opportunity to work with the Crystal Falls Association on this study.
1106 5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Published - May 10, 2016
Prepared for the 2017 Fiscal Year
P. O. Box 60125 / Sacramento, California 95860Phone (916) 393-0600 Fax (916) 393-0610 Toll Free (877) 708-0600
[email protected] / www.BrowningRG.com
Browning Reserve Group
Update w/ Site Visit Review
First Draft
RESERVE STUDY
© Browning Reserve Group 2016
Clarity from Complexity
1106
Version 5/10/2016 5:02:09 PM
5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls AssociationFirst Draft
Table of Contents
Section Report Page
Section I: Summary of Association Reserves 1
Section II: 30 Year Expense Forecast 5Detailed
Section III: 30 Year Reserve Funding Plan 17Cash Flow Method {c}
Section III-a: 30 Year Reserve Funding Plan 18Cash Flow Method - Ending Balances Chart
Section IV: 30 Year Reserve Funding Plan 19Fully Funded Balance and % Funded
Section IV-a: 30 Year Reserve Funding Plan 20Cash Flow Method - Percent Funded Chart
Section V: Reserve Fund Balance Forecast 21Component Method
Section VI: Component Listing 29Included Components
Section VI-b: Component Listing 78Excluded Components
Section VII: Tabular Component Listing 82Included Components
Section VII-a: Expenditures by Year 88- Next 4 Years
Section X: Auditor Notes 91
Section X-a: Supplementary Information for
Auditor93Component Method
Section XI: Glossary 98Reserve Study Terms
Addendum:
Member Distribution Materials See Page ii for Details
TOC - i
1106
Version 5/10/2016 5:02:09 PM
5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
© Browning Reserve Group 2016
Crystal Falls AssociationFirst Draft
Member Distribution Materials
The following Reserve Study sections, located at the end of the report, should be provided to each member.
Section Report
California: Member Summary
Assessment and Reserve Funding
Disclosure Summary[Civil Code §5570]
Section III: 30 Year Reserve Funding Plan Cash Flow Method {c}
TOC - ii
1106
Version 5/10/2016 5:02:09 PM
5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
© Browning Reserve Group 2016
Crystal Falls Association
Published - May 10, 2016
Prepared for the 2017 Fiscal Year
Update w/ Site Visit Review
First Draft
Section I
Reserve Study Summary
A Reserve Study was conducted of Crystal Falls Association (the "Association"). An Update With Site-Visit Review is a reserve study update in which the following tasks are performed:
development of a reserve component inventory (verification only, not quantification);
condition assessment based upon on-site visual observation;
life and valuation estimates;
fund status;
and a funding plan.
Crystal Falls Association is a Planned Development with a total of 851 Lotss.
Physical Inspection
Browning Reserve Group ("BRG") conducted a physical inspection of the Association. The inspection encompassed those major components that the Association is required to maintain. For this study components are determined to be major components if:
1. As of the date of the study, they have a remaining useful life of less than 30 years, and a value greater than $1,000.
2. Such additional components, if any, determined by the Board of Directors.
During the inspection, BRG utilized the services of our own construction cost estimator. In addition, independent contractors were retained to render opinions on selected components as indicated in Section VI, Included Component Listing.
Supplemental information to the physical inspection may have been obtained from the following sources:
1. Project plans where available.
2. Maintenance records of the reserve components where available.
3. Association board members, management and staff.
Summary of Reserves
For the first year of the Reserve Study, the reserve contribution is based upon the existing budget unless otherwise noted in “Section III, Reserve Funding Plan.” In addition BRG relied on the Association to provide an accurate Beginning Reserve Balance.
P. O. Box 60125 / Sacramento, California 95860Phone (916) 393-0600 Fax (916) 393-0610 Toll Free (877) 708-0600
[email protected] / www.BrowningRG.com
1106
Version 5/10/2016 5:02:09 PM © Browning Reserve Group 2016
5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Study - Update w/ Site Visit Review
Crystal Falls Association2
The status of the Association's reserves, as reflected in the following Reserve Study, is as follows:
1. The Expenditure Forecast of the following Reserve Study identifies the major components which the Association is obligated to repair, replace, restore or maintain, as determined in accordance with the criteria specified above, and specifies for each such component:
a. Its current estimated replacement cost;
b. Its estimated useful life; and
c. Its estimated remaining useful life.
2. It is estimated that the total cash reserves necessary to repair, replace, restore or maintain such major components (in the aggregate) during and at the end of their first remaining useful life is $313,304.
[For purposes of this calculation, “necessary” is defined as the Fully
Funded Balance (FFB) (Component Current Cost X Effective Age / Useful Life, including a provision for interest and inflation in future years.)]
3. The current amount of accumulated cash reserves actually set aside to repair, replace, restore, or maintain such major components as of the fiscal year ending December 31, 2017 is estimated to be $40,838, constituting 13.0% of the total expenditures anticipated for all such major components through their first end of useful life replacement.
4. Based upon the schedule of annual reserve contributions necessary to defray the cost of repairing, replacing, restoring or maintaining such major components in the years such expenditures are estimated to be required, it is estimated that annual reserve contributions in the initial amount of $58,605 [$5.74 per Lot per month (average)] for the fiscal year ending December 31, 2017 (the first full fiscal year following first distribution of this report) will be necessary in order to meet all such reserve expenditures when they are projected to come due.
Funding Assessment
Based on the 30 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 30 years.
California statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded.
Percent Funded Status
Based on paragraphs 1 - 3 above, the Association is 13.0% funded. The following scale can be used as a measure to determine the Association’s financial picture whereas the lower the percentage, the higher the likelihood of the Association requiring a special assessment, or other large increases to the reserve contribution in the future.
Percent Funded
30% 100%----------- Strong -------------------------------- Fair ------------------------------------ Poor --------------- 70%
Reserve Study - Update w/ Site Visit Review
Crystal Falls Association3
Methodology
The above recommended reserve contribution for the next fiscal year (and future fiscal years as outlined in Section III, Reserve Fund Balance Forecast) was developed using the cash flow method. This is a method of developing a reserve funding plan where the contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved.
Funding Goals
The funding goal employed for Crystal Falls Association is
Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than “Fully Funding.”
Limitations
The intention of the Reserve Study is to forecast the Association's ability to repair or replace major components as they wear out in future years. The Reserve Study is not an engineering report, and no destructive testing was performed. The costs outlined in the study are for budgetary and planning purposes only, and actual bid costs would depend upon the defined scope of work at the time repairs are made. Also, any latent defects are excluded from this report.
Statutory Disclosures
Compliance
The Reserve Study was conducted pursuant to Sections 5300 and 5550 of the California Civil Code.
Open Meeting
California Civil Code Section 5560 says (in part):
The (Reserve Funding) plan shall be adopted by the board of directors at an open meeting before the membership of the association as described in Article 2 (commencing with Section 4900) of Chapter 6. If the board of directors determines that an assessment increase is necessary to fund the reserve funding plan, any increase shall be approved in a separate action of the board that is consistent with the procedure described in Section 5605.
Supplemental Disclosures
General:
BRG has no other involvement(s) with the Association which could result in actual or perceived conflicts of interest.
Reserve Study - Update w/ Site Visit Review
Crystal Falls Association4
Personnel Credentials:
BRG is a licensed general building contractor in California, #768851, and the owner, Robert W Browning, holds the Reserve Specialist designation, #46 from the Community Associations Institute.
Completeness:
BRG has found no material issues which, if not disclosed, would cause a distortion of the Association's situation.
Reliance on Client Data:
Information provided by the official representative of the Association regarding financial, physical, quantity, or historical issues will be deemed reliable by BRG.
Scope:
This Reserve Study is a reflection of information provided to BRG and assembled for the Association's use, not for the purpose of performing an audit, quality/forensic analysis, health and safety inspection, or background checks of historical records.
Reserve Balance:
The actual beginning reserve fund balance in this Reserve Study is based upon information provided and was not audited.
Reserve Projects:
Information provided about reserve projects will be considered reliable. Any on-site inspection should not be considered a project audit, quality inspection, or health and safety review.
Component Quantities:
The Association warrants the previously developed component quantities are accurate and reliable.
Browning Reserve Group
Crystal Falls Association
Section II
30 Year Expense Forecast - DetailedFirst Draft
Prepared for the 2017 Fiscal Year
Reserve Component 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030Remaining
Life
Useful /
Cost
Replacement
Current
See Section VI-b for Excluded Components
Paving01000 -
100 - Asphalt: Sealing 12,195 Sq. Ft. Clubhouse Parking
2,439 5 1 2,500 2,828 3,200
110 - Asphalt: Sealing 2,596 Sq. Ft. Gym Building Parking
519 5 1 532 602 681
120 - Asphalt: Sealing 5,031 Sq. Ft. Basketball Ct & Tennis Parking
1,006 5 1 1,031 1,167 1,320
200 - Asphalt: Ongoing Repairs 12,195 Sq. Ft. Clubhouse Parking (2%)
793 5 1 812 919 1,040
210 - Asphalt: Ongoing Repairs 2,596 Sq. Ft. Gym Building Parking (2%)
169 5 1 173 196 221
220 - Asphalt: Ongoing Repairs 5,031 Sq. Ft. Basketball Ct & Tennis Parking (2%)
327 5 1 335 379 429
300 - Asphalt: Overlay w/ Interlayer 12,195 Sq. Ft. Clubhouse Parking
21,341 25 17
310 - Asphalt: Overlay w/ Interlayer 2,596 Sq. Ft. Gym Building Parking
4,585 25 17
320 - Asphalt: Overlay w/ Interlayer Road to Upper Lake
14,000 25 22
340 - Asphalt: Overlay w/ Interlayer 5,031 Sq. Ft. Basketball Ct & Tennis Parking
8,885 25 17
820 - Striping All Parking Areas
1,005 5 1 1,030 1,165 1,319
6,414 7,257 8,211Total 01000 - Paving 55,069
Concrete02000 -
220 - Walkways 1,250 Sq. Ft. Clubhouse (3%)
600 5 0 679 768600
300 - Driveways 6,835 Sq. Ft. Barn Entrance Drive (3%)
5,000 15 0 5,000
5,600 679 768Total 02000 - Concrete 5,600
Painting: Exterior03000 -
132 - Surface Restoration 4,466 Sq. Ft. Barn
4,019 5 2 4,223 4,778 5,406
136 - Surface Restoration Clubhouse Railings
3,501 5 4 3,864 4,372 4,947
454 - Wood Fencing 82 Lin. Ft. Corral Perimeter
492 5 1 504 571 646
504 4,223 3,864 571 4,778 4,372 646 5,406 4,947Total 03000 - Painting: Exterior 8,012
Painting: Interior03500 -
104 - Building 5,079 Sq. Ft. Clubhouse
7,111 10 4 7,849 10,047
2016 to 2030© Browning Reserve Group 2016 51106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030Remaining
Life
Useful /
Cost
Replacement
Current
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
7,849 10,047Total 03500 - Painting: Interior 7,111
Structural Repairs04000 -
200 - Wood: Siding & Trim 2,148 Sq. Ft. Fitness Building
17,184 40 35
210 - Wood: Siding & Trim 4,240 Sq. Ft. Clubhouse
38,160 40 15
232 - Wood: Siding & Trim 4,466 Sq. Ft. Barn (5%)
1,786 10 12 2,403
550 - Bridge Maintenance Upper Lake Spillway
1,270 5 4 1,402 1,586 1,794
826 - Floating Dock Lower Lake
16,280 20 12 21,895
960 - Awnings Barn Shade Shelters
5,465 15 8 6,659
961 - Awnings 2 Barn Shade Shelters (2016 Only)[nr:1]
1,754 1 0 1,754
996 - Miscellaneous Barn PVC Pipe
3,920 20 13 5,404
1,754 1,402 6,659 1,586 24,297 5,404 1,794Total 04000 - Structural Repairs 85,819
Decking/Balconies04500 -
100 - Wood 364 Sq. Ft. Clubhouse Upper Level
18,200 20 6 21,106
320 - Railing: Wood 181 Lin. Ft. Clubhouse
5,792 25 15
21,106Total 04500 - Decking/Balconies 23,992
Roofing05000 -
400 - Pitched: Dimensional Composition 36 Squares- Clubhouse
12,600 25 21
410 - Pitched: Dimensional Composition Gym Bldg Pump House
750 25 5 849
412 - Pitched: Dimensional Composition 99 Squares- Barn
32,175 25 21
500 - Pitched: Dimensional Composition 11 Squares- Gym Building
5,500 25 23
700 - Gutters / Downspouts 220 Lin. Ft. Clubhouse
1,760 30 26
712 - Gutters / Downspouts 282 Lin. Ft. Barn
2,651 25 21
720 - Gutters / Downspouts 54 Lin. Ft. Gym Building
481 30 26
849Total 05000 - Roofing 55,916
Rehab08000 -
100 - General Barn
3,900 15 10 4,992
226 - Restrooms Clubhouse Upper Level
3,320 20 2 3,488
230 - Kitchen Clubhouse Lower Level
5,190 20 11 6,810
236 - Kitchen Clubhouse Upper Level
7,725 20 12 10,389
240 - Clubhouse Lower Floor Decorating
10,045 20 2 10,554
2016 to 2030© Browning Reserve Group 2016 61106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030Remaining
Life
Useful /
Cost
Replacement
Current
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
242 - Clubhouse Upper Floor Decorating
3,863 15 7 4,592
246 - Restrooms Clubhouse Lower Level
3,500 20 13 4,825
248 - Restrooms 2 Clubhouse Upper Level (50%)
3,795 20 2 3,987
250 - General Office
4,030 20 11 5,288
18,029 4,592 4,992 12,097 10,389 4,825Total 08000 - Rehab 45,368
Gate Equipment11000 -
780 - Pedestrian Gate Lower Lake Access
6,650 30 20
Total 11000 - Gate Equipment 6,650
Recreation14000 -
290 - Exercise: Miscellaneous Equip. Gym Building (50%)
2,760 8 4 3,047 3,712
900 - Miscellaneous Barn Horse Tack (20%)
1,100 5 3 1,185 1,340 1,516
1,185 3,047 1,340 3,712 1,516Total 14000 - Recreation 3,860
Tennis Court17000 -
100 - Reseal 5,000 Sq. Ft. Tennis Court
4,000 7 7 4,755 5,652
500 - Resurface 5,000 Sq. Ft. Tennis Court
10,000 21 21
550 - Fixtures Tennis Court Net
532 5 0 602 681532
532 602 4,755 681 5,652Total 17000 - Tennis Court 14,532
Basketball / Sport Court17500 -
200 - Seal & Striping 3,510 Sq. Ft. Basketball Court
2,106 7 7 2,503 2,976
400 - Overlay 3,510 Sq. Ft. Basketball Court
7,020 20 20
900 - Basketball Standard Basketball Court
500 5 0 566 640500
904 - Miscellaneous Court Surfaces (2016 Only)[nr:1]
14,000 20 0 14,000
14,500 566 2,503 640 2,976Total 17500 - Basketball / Sport Court
23,626
Landscaping18000 -
340 - Irrigation: Pumps Pump House (50%)
3,150 5 1 3,229 3,653 4,133
3,229 3,653 4,133Total 18000 - Landscaping 3,150
Lakes / Ponds18500 -
330 - Aeration Heads / Diffusers Lower Lake
4,190 10 7 4,981
334 - Aeration Heads / Diffusers Third Aerator
1,290 10 3 1,389 1,778
620 - Pump / Motor Lower Lake Drain
880 5 3 948 1,072 1,213
2016 to 2030© Browning Reserve Group 2016 71106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030Remaining
Life
Useful /
Cost
Replacement
Current
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
911 - Miscellaneous Lower Lake Weir Gate Valve
25,168 35 31
914 - Miscellaneous Lower & Upper Lake Maintenance
30,000 2 1 30,750 32,307 33,942 35,661 37,466 39,363 41,355
990 - Miscellaneous Floating Dock
6,570 5 0 7,433 8,4106,570
6,570 30,750 34,644 41,376 40,641 1,072 37,466 8,410 39,363 44,347Total 18500 - Lakes / Ponds 68,098
Fencing19000 -
110 - Chain Link: 6' 80 Lin. Ft. Basketball Court Backstops (50%)
600 35 10 768
112 - Chain Link: 6' 1,730 Lin. Ft. Upper Lake Perimeter
29,410 35 20
120 - Chain Link: 8' 1,259 Lin. Ft. Clubhouse & Lake Perimeter (15%)
3,588 5 4 3,961 4,481 5,070
130 - Chain Link: 10' 300 Lin. Ft. Tennis Courts
7,200 30 15
324 - Wood: 4' 78 Lin. Ft. Barn East Perimeter
1,794 18 4 1,980
340 - Wood: 6' 80 Lin. Ft. Barn East Perimeter
2,880 18 10 3,687
540 - Metal 2,000 Lin. Ft. Corral Fencing (10%)
3,400 6 5 3,847 4,461
542 - Metal 835 Lin. Ft. Barn Perimeter
33,400 30 5 37,789
543 - Metal Barn Perimeter (2016 Only)[nr:1]
1,754 1 0 1,754
1,754 5,941 41,636 4,481 4,455 4,461 5,070Total 19000 - Fencing 84,026
Retaining Wall19500 -
120 - Wood: 1' 40 Lin. Ft. Lower Lake
1,600 25 7 1,902
1,902Total 19500 - Retaining Wall 1,600
Lighting20000 -
100 - Exterior: Misc. Fixtures Barn Security Lighting
1,105 15 9 1,380
1,380Total 20000 - Lighting 1,105
Signage21000 -
792 - Monument Community Entrance
1,400 20 15
Total 21000 - Signage 1,400
Office Equipment22000 -
100 - Computers, Misc. Office Equipment
2,500 5 3 2,692 3,046 3,446
2,692 3,046 3,446Total 22000 - Office Equipment 2,500
Mechanical Equipment23000 -
200 - Furnace Clubhouse Lower Level
880 20 10 1,126
202 - Furnace Clubhouse Upper Level
880 20 5 996
2016 to 2030© Browning Reserve Group 2016 81106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030Remaining
Life
Useful /
Cost
Replacement
Current
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
996 - Swamp Cooler 3 Clubhouse
7,770 12 7 9,236
996 9,236 1,126Total 23000 - Mechanical Equipment
9,530
Furnishings24000 -
100 - Office Desk, Chair Clubhouse (50%)
1,700 12 4 1,876
102 - Tables 3 Clubhouse Lower Level
1,485 20 5 1,680
110 - Chairs 123 Clubhouse
6,150 12 5 6,958
130 - Tables 13 Clubhouse
1,885 12 3 2,030
2,030 1,876 8,638Total 24000 - Furnishings 11,220
Safety / Access24600 -
520 - Card Readers Lower Lake Access Control
3,500 10 6 4,059
700 - Security System Alarms & Cameras
3,865 6 3 4,162 4,827
701 - Security System Alarms & Cameras (2016 Only)[nr:1]
1,040 1 0 1,040
720 - Security System Park (50%)
4,378 6 5 4,953 5,744
1,040 4,162 4,953 4,059 4,827 5,744Total 24600 - Safety / Access 12,783
Flooring25000 -
200 - Miscellaneous 217 Sq. Yds. Clubhouse Upper Level
8,680 15 7 10,318
210 - Carpeting 10 Sq. Yds. Clubhouse Office Lower Level
350 10 1 359 459
600 - Vinyl 52 Sq. Yds. Clubhouse Lower Level
2,080 12 1 2,132 2,867
604 - Vinyl 19 Sq. Yds. Clubhouse Upper Level Restrooms (50%)
380 7 2 399 475
2,491 399 10,318 475 459 2,867Total 25000 - Flooring 11,490
Outdoor Equipment26000 -
100 - Tot Lot: Play Equipment Upper Lake
5,000 18 7 5,943
102 - Tot Lot: Play Equipment Lower Lake
5,000 15 7 5,943
200 - Pedestal Grill BBQ 3 Lower & Upper Lakes
1,170 20 3 1,260
202 - Pedestal Grill BBQ 2 Lower & Upper Lakes
780 20 5 882
210 - Barbecue Lower Lake Near Clubhouse
400 5 2 420 475 538
300 - Picnic Table: Wood 5 Lower & Upper Lakes (40%)
1,430 7 5 1,618 1,923
310 - Wood Benches 11 Lower Lake
5,500 12 6 6,378
480 - Drinking Fountain Clubhouse
775 15 9 968
2016 to 2030© Browning Reserve Group 2016 91106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030Remaining
Life
Useful /
Cost
Replacement
Current
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
420 1,260 2,500 6,378 12,362 968 2,461Total 26000 - Outdoor Equipment 20,055
Appliances27000 -
200 - Refrigerator Clubhouse Lower Level
1,100 12 4 1,214
204 - Refrigerator Clubhouse Lower Level
800 12 4 883
208 - Refrigerator Clubhouse Upper Level
880 12 4 971
276 - Oven: Wall Clubhouse Lower Level
1,600 12 2 1,681 2,261
280 - Cook Top Stove Clubhouse Upper Level
500 12 3 538
284 - Cook Top Stove Clubhouse Lower Level
550 12 5 622
300 - Dishwasher Clubhouse Lower Level
850 10 2 893 1,143
2,574 538 3,069 622 1,143 2,261Total 27000 - Appliances 6,280
Miscellaneous30000 -
442 - Miscellaneous Horse- Harley
695 24 6 806
446 - Miscellaneous Horse- Cowgirl
1,280 24 8 1,560
700 - Tools Barn Maintenance Shop (20%)
720 2 1 738 775 815 856 899 945 993
810 - Tractor 1983 Case 480 LL
18,200 15 5 20,592
812 - Tractor Kubota Tractor
20,862 15 12 28,057
830 - Vehicle 2002 Ford Ranger
6,620 10 1 6,786 8,686
7,524 775 21,406 806 856 1,560 899 9,631 28,057 993Total 30000 - Miscellaneous 48,377
Undesignated32000 -
100 - Miscellaneous Reserve Items
1,100 1 1 1,128 1,156 1,185 1,214 1,245 1,276 1,308 1,340 1,374 1,408 1,443 1,479 1,516 1,554
1,128 1,156 1,185 1,214 1,245 1,276 1,308 1,340 1,374 1,408 1,443 1,479 1,516 1,554Total 32000 - Undesignated 1,100
31,750 52,039 26,801 48,471 28,262 126,067 45,106 93,251 15,017 57,828 22,481 86,187 76,945 64,914 34,301Total Expenditures Inflated @ 2.50%
618,270Total Current Replacement Cost
2016 to 2030© Browning Reserve Group 2016 101106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
Paving01000 -
100 - Asphalt: Sealing 12,195 Sq. Ft. Clubhouse Parking
3,621 4,097 4,635
110 - Asphalt: Sealing 2,596 Sq. Ft. Gym Building Parking
771 872 987
120 - Asphalt: Sealing 5,031 Sq. Ft. Basketball Ct & Tennis Parking
1,494 1,690 1,912
200 - Asphalt: Ongoing Repairs 12,195 Sq. Ft. Clubhouse Parking (2%)
1,177 1,331 1,506
210 - Asphalt: Ongoing Repairs 2,596 Sq. Ft. Gym Building Parking (2%)
250 283 321
220 - Asphalt: Ongoing Repairs 5,031 Sq. Ft. Basketball Ct & Tennis Parking (2%)
485 549 621
300 - Asphalt: Overlay w/ Interlayer 12,195 Sq. Ft. Clubhouse Parking
32,473
310 - Asphalt: Overlay w/ Interlayer 2,596 Sq. Ft. Gym Building Parking
6,976
320 - Asphalt: Overlay w/ Interlayer Road to Upper Lake
24,102
340 - Asphalt: Overlay w/ Interlayer 5,031 Sq. Ft. Basketball Ct & Tennis Parking
13,520
820 - Striping All Parking Areas
1,492 1,688 1,910
9,290 52,970 10,511 24,102 11,892Total 01000 - Paving
Concrete02000 -
220 - Walkways 1,250 Sq. Ft. Clubhouse (3%)
983 1,112869
300 - Driveways 6,835 Sq. Ft. Barn Entrance Drive (3%)
7,241
8,110 983 1,112Total 02000 - Concrete
Painting: Exterior03000 -
132 - Surface Restoration 4,466 Sq. Ft. Barn
6,116 6,920 7,829
136 - Surface Restoration Clubhouse Railings
5,597 6,332 7,164
454 - Wood Fencing 82 Lin. Ft. Corral Perimeter
730 826 935
730 6,116 5,597 826 6,920 6,332 935 7,829 7,164Total 03000 - Painting: Exterior
Painting: Interior03500 -
104 - Building 5,079 Sq. Ft. Clubhouse
12,861
12,861Total 03500 - Painting: Interior
Structural Repairs04000 -
200 - Wood: Siding & Trim 2,148 Sq. Ft. Fitness Building
210 - Wood: Siding & Trim 4,240 Sq. Ft. Clubhouse
55,267
232 - Wood: Siding & Trim 4,466 Sq. Ft. Barn (5%)
3,075
2031 to 2045© Browning Reserve Group 2016 111106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
550 - Bridge Maintenance Upper Lake Spillway
2,030 2,297 2,599
826 - Floating Dock Lower Lake
960 - Awnings Barn Shade Shelters
9,644
961 - Awnings 2 Barn Shade Shelters (2016 Only)[nr:1]
996 - Miscellaneous Barn PVC Pipe
55,267 2,030 3,075 9,644 2,297 2,599Total 04000 - Structural Repairs
Decking/Balconies04500 -
100 - Wood 364 Sq. Ft. Clubhouse Upper Level
34,585
320 - Railing: Wood 181 Lin. Ft. Clubhouse
8,389
8,389 34,585Total 04500 - Decking/Balconies
Roofing05000 -
400 - Pitched: Dimensional Composition 36 Squares- Clubhouse
21,163
410 - Pitched: Dimensional Composition Gym Bldg Pump House
412 - Pitched: Dimensional Composition 99 Squares- Barn
54,041
500 - Pitched: Dimensional Composition 11 Squares- Gym Building
9,705
700 - Gutters / Downspouts 220 Lin. Ft. Clubhouse
3,345
712 - Gutters / Downspouts 282 Lin. Ft. Barn
4,452
720 - Gutters / Downspouts 54 Lin. Ft. Gym Building
913
79,656 9,705 4,258Total 05000 - Roofing
Rehab08000 -
100 - General Barn
7,230
226 - Restrooms Clubhouse Upper Level
5,716
230 - Kitchen Clubhouse Lower Level
236 - Kitchen Clubhouse Upper Level
240 - Clubhouse Lower Floor Decorating
17,293
242 - Clubhouse Upper Floor Decorating
6,651
246 - Restrooms Clubhouse Lower Level
248 - Restrooms 2 Clubhouse Upper Level (50%)
6,533
250 - General Office
2031 to 2045© Browning Reserve Group 2016 121106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
36,193 7,230Total 08000 - Rehab
Gate Equipment11000 -
780 - Pedestrian Gate Lower Lake Access
10,897
10,897Total 11000 - Gate Equipment
Recreation14000 -
290 - Exercise: Miscellaneous Equip. Gym Building (50%)
4,523 5,510
900 - Miscellaneous Barn Horse Tack (20%)
1,716 1,941 2,196
1,716 4,523 1,941 7,706Total 14000 - Recreation
Tennis Court17000 -
100 - Reseal 5,000 Sq. Ft. Tennis Court
6,718 7,986
500 - Resurface 5,000 Sq. Ft. Tennis Court
16,796
550 - Fixtures Tennis Court Net
872 986770
770 872 23,514 986 7,986Total 17000 - Tennis Court
Basketball / Sport Court17500 -
200 - Seal & Striping 3,510 Sq. Ft. Basketball Court
3,537 4,205
400 - Overlay 3,510 Sq. Ft. Basketball Court
11,503
900 - Basketball Standard Basketball Court
819 927724
904 - Miscellaneous Court Surfaces (2016 Only)[nr:1]
724 12,322 3,537 927 4,205Total 17500 - Basketball / Sport Court
Landscaping18000 -
340 - Irrigation: Pumps Pump House (50%)
4,676 5,291 5,986
4,676 5,291 5,986Total 18000 - Landscaping
Lakes / Ponds18500 -
330 - Aeration Heads / Diffusers Lower Lake
6,376 8,161
334 - Aeration Heads / Diffusers Third Aerator
2,276
620 - Pump / Motor Lower Lake Drain
1,372 1,553 1,757
911 - Miscellaneous Lower Lake Weir Gate Valve
914 - Miscellaneous Lower & Upper Lake Maintenance
45,649 47,960 50,387 52,938 55,618 58,434 61,39243,449
990 - Miscellaneous Floating Dock
10,766 12,1809,515
52,964 52,024 1,372 47,960 10,766 50,387 56,768 67,799 66,595 1,757 61,392Total 18500 - Lakes / Ponds
Fencing19000 -
2031 to 2045© Browning Reserve Group 2016 131106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
110 - Chain Link: 6' 80 Lin. Ft. Basketball Court Backstops (50%)
112 - Chain Link: 6' 1,730 Lin. Ft. Upper Lake Perimeter
48,192
120 - Chain Link: 8' 1,259 Lin. Ft. Clubhouse & Lake Perimeter (15%)
5,736 6,490 7,343
130 - Chain Link: 10' 300 Lin. Ft. Tennis Courts
10,428
324 - Wood: 4' 78 Lin. Ft. Barn East Perimeter
3,088
340 - Wood: 6' 80 Lin. Ft. Barn East Perimeter
5,750
540 - Metal 2,000 Lin. Ft. Corral Fencing (10%)
5,174 6,000 6,958
542 - Metal 835 Lin. Ft. Barn Perimeter
543 - Metal Barn Perimeter (2016 Only)[nr:1]
10,428 5,174 5,736 48,192 3,088 6,000 6,490 5,750 14,301Total 19000 - Fencing
Retaining Wall19500 -
120 - Wood: 1' 40 Lin. Ft. Lower Lake
Total 19500 - Retaining Wall
Lighting20000 -
100 - Exterior: Misc. Fixtures Barn Security Lighting
1,999
1,999Total 20000 - Lighting
Signage21000 -
792 - Monument Community Entrance
2,028
2,028Total 21000 - Signage
Office Equipment22000 -
100 - Computers, Misc. Office Equipment
3,899 4,412 4,991
3,899 4,412 4,991Total 22000 - Office Equipment
Mechanical Equipment23000 -
200 - Furnace Clubhouse Lower Level
202 - Furnace Clubhouse Upper Level
1,631
996 - Swamp Cooler 3 Clubhouse
12,422
12,422 1,631Total 23000 - Mechanical Equipment
Furnishings24000 -
100 - Office Desk, Chair Clubhouse (50%)
2,524 3,394
102 - Tables 3 Clubhouse Lower Level
2,753
2031 to 2045© Browning Reserve Group 2016 141106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
110 - Chairs 123 Clubhouse
9,358 12,585
130 - Tables 13 Clubhouse
3,6722,730
2,730 2,524 9,358 2,753 3,672 3,394 12,585Total 24000 - Furnishings
Safety / Access24600 -
520 - Card Readers Lower Lake Access Control
5,196 6,651
700 - Security System Alarms & Cameras
6,492 7,5285,598
701 - Security System Alarms & Cameras (2016 Only)[nr:1]
720 - Security System Park (50%)
6,661 7,725 8,958
5,598 5,196 6,661 6,492 7,725 6,651 7,528 8,958Total 24600 - Safety / Access
Flooring25000 -
200 - Miscellaneous 217 Sq. Yds. Clubhouse Upper Level
14,943
210 - Carpeting 10 Sq. Yds. Clubhouse Office Lower Level
588
600 - Vinyl 52 Sq. Yds. Clubhouse Lower Level
3,856
604 - Vinyl 19 Sq. Yds. Clubhouse Upper Level Restrooms (50%)
564 671
564 588 14,943 671 3,856Total 25000 - Flooring
Outdoor Equipment26000 -
100 - Tot Lot: Play Equipment Upper Lake
9,270
102 - Tot Lot: Play Equipment Lower Lake
8,608
200 - Pedestal Grill BBQ 3 Lower & Upper Lakes
2,065
202 - Pedestal Grill BBQ 2 Lower & Upper Lakes
1,446
210 - Barbecue Lower Lake Near Clubhouse
609 689 779
300 - Picnic Table: Wood 5 Lower & Upper Lakes (40%)
2,286 2,717
310 - Wood Benches 11 Lower Lake
8,578
480 - Drinking Fountain Clubhouse
1,402
609 8,578 2,286 9,296 2,065 1,402 10,716 2,717 779Total 26000 - Outdoor Equipment
Appliances27000 -
200 - Refrigerator Clubhouse Lower Level
1,633 2,196
204 - Refrigerator Clubhouse Lower Level
1,188 1,597
208 - Refrigerator Clubhouse Upper Level
1,306 1,757
2031 to 2045© Browning Reserve Group 2016 151106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045
See Section VI-b for Excluded ComponentsCrystal Falls Association
30 Year Expense Forecast - Detailed
First Draft
Prepared for the 2017 Fiscal Year
276 - Oven: Wall Clubhouse Lower Level
3,040
280 - Cook Top Stove Clubhouse Upper Level
974724
284 - Cook Top Stove Clubhouse Lower Level
837 1,126
300 - Dishwasher Clubhouse Lower Level
1,463
724 4,127 837 1,463 3,040 974 5,550 1,126Total 27000 - Appliances
Miscellaneous30000 -
442 - Miscellaneous Horse- Harley
446 - Miscellaneous Horse- Cowgirl
700 - Tools Barn Maintenance Shop (20%)
1,096 1,151 1,209 1,271 1,335 1,402 1,4731,043
810 - Tractor 1983 Case 480 LL
29,823
812 - Tractor Kubota Tractor
40,635
830 - Vehicle 2002 Ford Ranger
11,119
1,043 1,096 1,151 29,823 12,328 1,271 1,335 42,037 1,473Total 30000 - Miscellaneous
Undesignated32000 -
100 - Miscellaneous Reserve Items
1,633 1,674 1,716 1,759 1,802 1,848 1,894 1,941 1,990 2,039 2,090 2,143 2,196 2,2511,593
1,593 1,633 1,674 1,716 1,759 1,802 1,848 1,894 1,941 1,990 2,039 2,090 2,143 2,196 2,251Total 32000 - Undesignated
150,368 28,740 136,517 17,281 78,940 120,179 194,977 100,976 102,140 33,371 100,386 72,155 131,557 43,536 111,850Total Expenditures Inflated @ 2.50%
2031 to 2045© Browning Reserve Group 2016 161106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section III
30 Year Reserve Funding Plan Cash Flow MethodFirst Draft
Prepared for the 2017 Fiscal Year
2016 2017 2018 2019 2020 2021 2022 2023 20252024
12,781 37,478 40,838 75,079 90,708 129,013 71,124 95,688 133,23874,105Beginning Balance
31,750 52,039 26,801 48,471 28,262 126,067 45,106 93,251 57,82815,017Inflated Expenditures @ 2.5%
60,000 58,605 60,305 62,054 63,854 65,706 67,611 69,572 73,66671,590Reserve Contribution
5.88 5.74 5.91 6.08 6.25 6.43 6.62 6.81 7.217.01Lots/month @ 851
-2.3% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9%2.9%Percentage Increase
1 -4,173 -4,173 -695 0 0 0 0 0 00Special Assessments / Other
620 967 1,431 2,047 2,713 2,471 2,059 2,096 3,5292,560Interest Pre Tax @ 2.50%
37,478 40,838 75,079 90,708 129,013 71,124 95,688 74,105 152,606133,238Ending Balance
Kubota tractor installment plan.1)
2026 2027 2028 2029 2030 2031 2032 2033 20352034
152,606 210,408 207,379 215,922 239,217 296,515 240,223 308,240 357,238271,476Beginning Balance
22,481 86,187 76,945 64,914 34,301 150,368 28,740 136,517 78,94017,281Inflated Expenditures @ 2.5%
75,802 78,000 80,262 82,590 84,985 87,450 89,986 92,596 98,04495,281Reserve Contribution
7.42 7.64 7.86 8.09 8.32 8.56 8.81 9.07 9.609.33Lots/month @ 851
2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9%2.9%Percentage Increase
0 0 0 0 0 0 0 0 00Special Assessments / Other
4,482 5,158 5,226 5,619 6,614 6,626 6,771 7,157 9,1707,762Interest Pre Tax @ 2.50%
210,408 207,379 215,922 239,217 296,515 240,223 308,240 271,476 385,512357,238Ending Balance
2036 2037 2038 2039 2040 2041 2042 2043 20452044
385,512 375,616 292,703 305,942 321,470 410,243 436,704 495,826 596,611499,799Beginning Balance
120,179 194,977 100,976 102,140 33,371 100,386 72,155 131,557 111,85043,536Inflated Expenditures @ 2.5%
100,887 103,813 106,824 109,922 113,110 116,390 119,765 123,238 130,490126,812Reserve Contribution
9.88 10.17 10.46 10.76 11.08 11.40 11.73 12.07 12.7812.42Lots/month @ 851
2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9%2.9%Percentage Increase
0 0 0 0 0 0 0 0 00Special Assessments / Other
9,397 8,251 7,391 7,746 9,034 10,456 11,513 12,292 15,14813,536Interest Pre Tax @ 2.50%
375,616 292,703 305,942 321,470 410,243 436,704 495,826 499,799 630,400596,611Ending Balance
© Browning Reserve Group 2016 171106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section III-a
30 Year Reserve Funding Plan Cash Flow Method - Ending BalancesFirst Draft
Prepared for the 2017 Fiscal Year
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
Years
Fu
nd
Bala
nce
© Browning Reserve Group 2016 181106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section IV
30 Year Reserve Funding Plan Including Fully Funded Balance and % FundedFirst Draft
Prepared for the 2017 Fiscal Year
Year
Beginning
Balance
Fully Funded
Balance
Percent
Funded
Reserve
Contribution
Special Assessments
& Other Contributions Interest
Ending
Balance@ 2.50%
Inflated
Expenditures
2016 12,781 288,182 13.0% 31,750 60,000 -4,173 620 37,478
2017 37,478 313,304 13.0% 52,039 58,605 -4,173 967 40,838
2018 40,838 321,730 23.3% 26,801 60,305 -695 1,431 75,079
2019 75,079 357,586 25.4% 48,471 62,054 0 2,047 90,708
2020 90,708 373,689 34.5% 28,262 63,854 0 2,713 129,013
2021 129,013 412,330 17.2% 126,067 65,706 0 2,471 71,124
2022 71,124 353,144 27.1% 45,106 67,611 0 2,059 95,688
2023 95,688 376,956 19.7% 93,251 69,572 0 2,096 74,105
2024 74,105 353,545 37.7% 15,017 71,590 0 2,560 133,238
2025 133,238 411,307 37.1% 57,828 73,666 0 3,529 152,606
2026 152,606 428,240 49.1% 22,481 75,802 0 4,482 210,408
2027 210,408 483,475 42.9% 86,187 78,000 0 5,158 207,379
2028 207,379 476,481 45.3% 76,945 80,262 0 5,226 215,922
2029 215,922 480,517 49.8% 64,914 82,590 0 5,619 239,217
2030 239,217 498,761 59.5% 34,301 84,985 0 6,614 296,515
2031 296,515 550,658 43.6% 150,368 87,450 0 6,626 240,223
2032 240,223 486,748 63.3% 28,740 89,986 0 6,771 308,240
2033 308,240 547,821 49.6% 136,517 92,596 0 7,157 271,476
2034 271,476 501,909 71.2% 17,281 95,281 0 7,762 357,238
2035 357,238 579,073 66.6% 78,940 98,044 0 9,170 385,512
2036 385,512 597,025 62.9% 120,179 100,887 0 9,397 375,616
2037 375,616 575,264 50.9% 194,977 103,813 0 8,251 292,703
2038 292,703 478,454 63.9% 100,976 106,824 0 7,391 305,942
2039 305,942 477,793 67.3% 102,140 109,922 0 7,746 321,470
2040 321,470 478,192 85.8% 33,371 113,110 0 9,034 410,243
2041 410,243 551,420 79.2% 100,386 116,390 0 10,456 436,704
2042 436,704 560,174 88.5% 72,155 119,765 0 11,513 495,826
2043 495,826 600,530 83.2% 131,557 123,238 0 12,292 499,799
2044 499,799 583,516 102.2% 43,536 126,812 0 13,536 596,611
2045 596,611 658,869 95.7% 111,850 130,490 0 15,148 630,400
191106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
© Browning Reserve Group 2016
Crystal Falls Association
Section IV-a
30 Year Reserve Funding Plan Cash Flow Method - Percent FundedFirst Draft
Prepared for the 2017 Fiscal Year
0
10
20
30
40
50
60
70
80
90
100
110
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
Years
Perc
en
t Fu
nd
ed
© Browning Reserve Group 2016 201106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section V
Reserve Fund Balance Forecast Component MethodFirst Draft
Prepared for the 2017 Fiscal Year
Reserve ComponentCurrent
Repl. Cost
Useful
Life
Remaining
Life
Estimated
Future
Replacement
Costs
Per
Year
% Per Year
Straight Line
2017
2017 Fully
Funded
Balance
2016 Fully
Funded
Balance
Line Item
Contribution
based on
Cash Flow Method
01000 - Paving
2,500 500 0.86% 5042,439 2,500100 - Asphalt: Sealing
12,195 Sq. Ft. Clubhouse Parking5 1 1,951
532 106 0.18% 107519 532110 - Asphalt: Sealing
2,596 Sq. Ft. Gym Building Parking5 1 415
1,031 206 0.35% 2081,006 1,031120 - Asphalt: Sealing
5,031 Sq. Ft. Basketball Ct & Tennis Parking5 1 805
812 162 0.28% 164793 812200 - Asphalt: Ongoing Repairs 12,195 Sq. Ft. Clubhouse Parking (2%)
5 1 634
173 35 0.06% 35169 173210 - Asphalt: Ongoing Repairs
2,596 Sq. Ft. Gym Building Parking (2%)5 1 135
335 67 0.12% 68327 335220 - Asphalt: Ongoing Repairs 5,031 Sq. Ft. Basketball Ct & Tennis Parking (2%)
5 1 262
32,473 1,299 2.23% 1,30821,341 7,875300 - Asphalt: Overlay w/ Interlayer
12,195 Sq. Ft. Clubhouse Parking25 17 6,829
6,976 279 0.48% 2814,585 1,692310 - Asphalt: Overlay w/ Interlayer
2,596 Sq. Ft. Gym Building Parking25 17 1,467
24,102 964 1.66% 97114,000 2,296320 - Asphalt: Overlay w/ Interlayer
Road to Upper Lake25 22 1,680
13,520 541 0.93% 5458,885 3,279340 - Asphalt: Overlay w/ Interlayer
5,031 Sq. Ft. Basketball Ct & Tennis Parking25 17 2,843
1,030 206 0.35% 2081,005 1,030820 - Striping
All Parking Areas5 1 804
Sub-total [01000 - Paving] 83,486 4,366 7.50% 4,39755,069 21,55617,826
02000 - Concrete
600 120 0.21% 121600 123220 - Walkways
1,250 Sq. Ft. Clubhouse (3%)5 0 600
5,000 333 0.57% 3365,000 342300 - Driveways
6,835 Sq. Ft. Barn Entrance Drive (3%)15 0 5,000
Sub-total [02000 - Concrete] 5,600 453 0.78% 4575,600 4655,600
© Browning Reserve Group 2016 211106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve ComponentCurrent
Repl. Cost
Useful
Life
Remaining
Life
Estimated
Future
Replacement
Costs
Per
Year
% Per YearStraight Line
2017
2017 Fully
Funded
Balance
2016 Fully
Funded
Balance
Line Item
Contribution
based on
Cash Flow Method
Crystal Falls Association
Reserve Fund Balance Forecast Component Method
First Draft
Prepared for the 2017 Fiscal Year
03000 - Painting: Exterior
4,223 845 1.45% 8514,019 3,296132 - Surface Restoration
4,466 Sq. Ft. Barn5 2 2,412
3,864 773 1.33% 7793,501 1,435136 - Surface Restoration
Clubhouse Railings5 4 700
504 101 0.17% 102492 504454 - Wood Fencing 82 Lin. Ft. Corral Perimeter
5 1 394
Sub-total [03000 - Painting: Exterior] 8,592 1,718 2.95% 1,7318,012 5,2363,505
03500 - Painting: Interior
7,849 785 1.35% 7917,111 5,102104 - Building
5,079 Sq. Ft. Clubhouse10 4 4,266
04000 - Structural Repairs
0 0 0.00% 017,184 2,642200 - Wood: Siding & Trim 2,148 Sq. Ft. Fitness Building
40 35 2,148
55,267 1,382 2.37% 1,39238,160 25,424210 - Wood: Siding & Trim
4,240 Sq. Ft. Clubhouse40 15 23,850
2,403 185 0.32% 1861,786 153232 - Wood: Siding & Trim
4,466 Sq. Ft. Barn (5%)10 12 137
1,402 280 0.48% 2821,270 521550 - Bridge Maintenance
Upper Lake Spillway5 4 254
21,895 1,095 1.88% 1,10316,280 7,509826 - Floating Dock
Lower Lake20 12 6,512
6,659 444 0.76% 4475,465 2,988960 - Awnings
Barn Shade Shelters15 8 2,550
0 0 0.00% 01,754 0961 - Awnings
2 Barn Shade Shelters (2016 Only)[nr:1]1 0 1,754
5,404 270 0.46% 2723,920 1,607996 - Miscellaneous Barn PVC Pipe
20 13 1,372
Sub-total [04000 - Structural Repairs] 93,029 3,656 6.28% 3,68285,819 40,84338,578
04500 - Decking/Balconies
21,106 1,055 1.81% 1,06318,200 13,991100 - Wood
364 Sq. Ft. Clubhouse Upper Level20 6 12,740
8,389 336 0.58% 3385,792 2,612320 - Railing: Wood
181 Lin. Ft. Clubhouse25 15 2,317
Sub-total [04500 - Decking/Balconies] 29,495 1,391 2.39% 1,40123,992 16,60315,057
© Browning Reserve Group 2016 221106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve ComponentCurrent
Repl. Cost
Useful
Life
Remaining
Life
Estimated
Future
Replacement
Costs
Per
Year
% Per YearStraight Line
2017
2017 Fully
Funded
Balance
2016 Fully
Funded
Balance
Line Item
Contribution
based on
Cash Flow Method
Crystal Falls Association
Reserve Fund Balance Forecast Component Method
First Draft
Prepared for the 2017 Fiscal Year
05000 - Roofing
21,163 847 1.45% 85312,600 2,583400 - Pitched: Dimensional Composition
36 Squares- Clubhouse25 21 2,016
849 34 0.06% 34750 646410 - Pitched: Dimensional Composition
Gym Bldg Pump House25 5 600
54,041 2,162 3.72% 2,17732,175 6,596412 - Pitched: Dimensional Composition 99 Squares- Barn
25 21 5,148
9,705 388 0.67% 3915,500 677500 - Pitched: Dimensional Composition
11 Squares- Gym Building25 23 440
3,345 111 0.19% 1121,760 301700 - Gutters / Downspouts
220 Lin. Ft. Clubhouse30 26 235
4,452 178 0.31% 1792,651 543712 - Gutters / Downspouts
282 Lin. Ft. Barn25 21 424
913 30 0.05% 31481 82720 - Gutters / Downspouts
54 Lin. Ft. Gym Building30 26 64
Sub-total [05000 - Roofing] 94,467 3,750 6.45% 3,77855,916 11,4278,927
08000 - Rehab
4,992 333 0.57% 3353,900 1,599100 - General Barn
15 10 1,300
3,488 174 0.30% 1763,320 3,233226 - Restrooms
Clubhouse Upper Level20 2 2,988
6,810 340 0.59% 3435,190 2,660230 - Kitchen
Clubhouse Lower Level20 11 2,336
10,389 519 0.89% 5237,725 3,563236 - Kitchen Clubhouse Upper Level
20 12 3,090
10,554 528 0.91% 53210,045 9,781240 - Clubhouse
Lower Floor Decorating20 2 9,041
4,592 306 0.53% 3083,863 2,376242 - Clubhouse
Upper Floor Decorating15 7 2,060
4,825 241 0.41% 2433,500 1,435246 - Restrooms
Clubhouse Lower Level20 13 1,225
3,987 199 0.34% 2013,795 3,695248 - Restrooms
2 Clubhouse Upper Level (50%)20 2 3,416
5,288 264 0.45% 2664,030 2,065250 - General
Office20 11 1,814
Sub-total [08000 - Rehab] 54,925 2,906 4.99% 2,92745,368 30,40827,268
11000 - Gate Equipment
10,897 363 0.62% 3666,650 2,499780 - Pedestrian Gate
Lower Lake Access30 20 2,217
© Browning Reserve Group 2016 231106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve ComponentCurrent
Repl. Cost
Useful
Life
Remaining
Life
Estimated
Future
Replacement
Costs
Per
Year
% Per YearStraight Line
2017
2017 Fully
Funded
Balance
2016 Fully
Funded
Balance
Line Item
Contribution
based on
Cash Flow Method
Crystal Falls Association
Reserve Fund Balance Forecast Component Method
First Draft
Prepared for the 2017 Fiscal Year
14000 - Recreation
3,047 381 0.65% 3842,760 1,768290 - Exercise: Miscellaneous Equip.
Gym Building (50%)8 4 1,380
1,185 237 0.41% 2391,100 677900 - Miscellaneous
Barn Horse Tack (20%)5 3 440
Sub-total [14000 - Recreation] 4,231 618 1.06% 6223,860 2,4451,820
17000 - Tennis Court
4,755 594 1.02% 5994,000 586100 - Reseal
5,000 Sq. Ft. Tennis Court7 7 500
16,796 763 1.31% 76910,000 488500 - Resurface
5,000 Sq. Ft. Tennis Court21 21 455
532 106 0.18% 107532 109550 - Fixtures
Tennis Court Net5 0 532
Sub-total [17000 - Tennis Court] 22,083 1,464 2.52% 1,47514,532 1,1831,487
17500 - Basketball / Sport Court
2,503 313 0.54% 3152,106 308200 - Seal & Striping
3,510 Sq. Ft. Basketball Court7 7 263
11,503 548 0.94% 5527,020 360400 - Overlay
3,510 Sq. Ft. Basketball Court20 20 334
500 100 0.17% 101500 103900 - Basketball Standard
Basketball Court5 0 500
0 0 0.00% 014,000 0904 - Miscellaneous
Court Surfaces (2016 Only)[nr:1]20 0 14,000
Sub-total [17500 - Basketball / Sport Court] 14,506 961 1.65% 96823,626 77115,098
18000 - Landscaping
3,229 646 1.11% 6503,150 3,229340 - Irrigation: Pumps
Pump House (50%)5 1 2,520
© Browning Reserve Group 2016 241106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve ComponentCurrent
Repl. Cost
Useful
Life
Remaining
Life
Estimated
Future
Replacement
Costs
Per
Year
% Per YearStraight Line
2017
2017 Fully
Funded
Balance
2016 Fully
Funded
Balance
Line Item
Contribution
based on
Cash Flow Method
Crystal Falls Association
Reserve Fund Balance Forecast Component Method
First Draft
Prepared for the 2017 Fiscal Year
18500 - Lakes / Ponds
4,981 498 0.86% 5024,190 1,718330 - Aeration Heads / Diffusers
Lower Lake10 7 1,257
1,389 139 0.24% 1401,290 1,058334 - Aeration Heads / Diffusers
Third Aerator10 3 903
948 190 0.33% 191880 541620 - Pump / Motor Lower Lake Drain
5 3 352
0 0 0.00% 025,168 3,685911 - Miscellaneous
Lower Lake Weir Gate Valve35 31 2,876
30,750 15,375 26.43% 15,48730,000 30,750914 - Miscellaneous
Lower & Upper Lake Maintenance2 1 15,000
6,570 1,314 2.26% 1,3246,570 1,347990 - Miscellaneous
Floating Dock5 0 6,570
Sub-total [18500 - Lakes / Ponds] 44,637 17,516 30.10% 17,64368,098 39,09926,958
19000 - Fencing
768 22 0.04% 22600 457110 - Chain Link: 6'
80 Lin. Ft. Basketball Court Backstops (50%)35 10 429
48,192 1,377 2.37% 1,38729,410 13,781112 - Chain Link: 6' 1,730 Lin. Ft. Upper Lake Perimeter
35 20 12,604
3,961 792 1.36% 7983,588 1,471120 - Chain Link: 8'
1,259 Lin. Ft. Clubhouse & Lake Perimeter (15%)5 4 718
10,428 348 0.60% 3507,200 3,936130 - Chain Link: 10'
300 Lin. Ft. Tennis Courts30 15 3,600
1,980 110 0.19% 1111,794 1,532324 - Wood: 4' 78 Lin. Ft. Barn East Perimeter
18 4 1,395
3,687 205 0.35% 2062,880 1,476340 - Wood: 6'
80 Lin. Ft. Barn East Perimeter18 10 1,280
3,847 641 1.10% 6463,400 1,162540 - Metal
2,000 Lin. Ft. Corral Fencing (10%)6 5 567
37,789 1,260 2.16% 1,26933,400 29,670542 - Metal
835 Lin. Ft. Barn Perimeter30 5 27,833
0 0 0.00% 01,754 0543 - Metal
Barn Perimeter (2016 Only)[nr:1]1 0 1,754
Sub-total [19000 - Fencing] 110,651 4,754 8.17% 4,78984,026 53,48550,180
19500 - Retaining Wall
1,902 76 0.13% 771,600 1,246120 - Wood: 1' 40 Lin. Ft. Lower Lake
25 7 1,152
20000 - Lighting
1,380 92 0.16% 931,105 529100 - Exterior: Misc. Fixtures Barn Security Lighting
15 9 442
© Browning Reserve Group 2016 251106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve ComponentCurrent
Repl. Cost
Useful
Life
Remaining
Life
Estimated
Future
Replacement
Costs
Per
Year
% Per YearStraight Line
2017
2017 Fully
Funded
Balance
2016 Fully
Funded
Balance
Line Item
Contribution
based on
Cash Flow Method
Crystal Falls Association
Reserve Fund Balance Forecast Component Method
First Draft
Prepared for the 2017 Fiscal Year
21000 - Signage
2,028 101 0.17% 1021,400 431792 - Monument
Community Entrance20 15 350
22000 - Office Equipment
2,692 538 0.93% 5422,500 1,538100 - Computers, Misc.
Office Equipment5 3 1,000
23000 - Mechanical Equipment
1,126 56 0.10% 57880 496200 - Furnace
Clubhouse Lower Level20 10 440
996 50 0.09% 50880 722202 - Furnace
Clubhouse Upper Level20 5 660
9,236 770 1.32% 7757,770 3,982996 - Swamp Cooler
3 Clubhouse12 7 3,238
Sub-total [23000 - Mechanical Equipment] 11,358 876 1.51% 8829,530 5,2004,338
24000 - Furnishings
1,876 156 0.27% 1581,700 1,307100 - Office Desk, Chair
Clubhouse (50%)12 4 1,133
1,680 84 0.14% 851,485 1,218102 - Tables
3 Clubhouse Lower Level20 5 1,114
6,958 580 1.00% 5846,150 4,203110 - Chairs
123 Clubhouse12 5 3,588
2,030 169 0.29% 1701,885 1,610130 - Tables
13 Clubhouse12 3 1,414
Sub-total [24000 - Furnishings] 12,545 989 1.70% 99711,220 8,3377,248
24600 - Safety / Access
4,059 406 0.70% 4093,500 1,794520 - Card Readers Lower Lake Access Control
10 6 1,400
4,162 694 1.19% 6993,865 2,641700 - Security System
Alarms & Cameras6 3 1,933
0 0 0.00% 01,040 0701 - Security System
Alarms & Cameras (2016 Only)[nr:1]1 0 1,040
4,953 825 1.42% 8314,378 1,496720 - Security System
Park (50%)6 5 730
Sub-total [24600 - Safety / Access] 13,174 1,925 3.31% 1,93912,783 5,9305,102
© Browning Reserve Group 2016 261106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve ComponentCurrent
Repl. Cost
Useful
Life
Remaining
Life
Estimated
Future
Replacement
Costs
Per
Year
% Per YearStraight Line
2017
2017 Fully
Funded
Balance
2016 Fully
Funded
Balance
Line Item
Contribution
based on
Cash Flow Method
Crystal Falls Association
Reserve Fund Balance Forecast Component Method
First Draft
Prepared for the 2017 Fiscal Year
25000 - Flooring
10,318 688 1.18% 6938,680 5,338200 - Miscellaneous
217 Sq. Yds. Clubhouse Upper Level15 7 4,629
359 36 0.06% 36350 359210 - Carpeting
10 Sq. Yds. Clubhouse Office Lower Level10 1 315
2,132 178 0.31% 1792,080 2,132600 - Vinyl 52 Sq. Yds. Clubhouse Lower Level
12 1 1,907
399 57 0.10% 57380 334604 - Vinyl
19 Sq. Yds. Clubhouse Upper Level Restrooms (50%)7 2 271
Sub-total [25000 - Flooring] 13,208 958 1.65% 96511,490 8,1637,122
26000 - Outdoor Equipment
5,943 330 0.57% 3335,000 3,417100 - Tot Lot: Play Equipment
Upper Lake18 7 3,056
5,943 396 0.68% 3995,000 3,075102 - Tot Lot: Play Equipment
Lower Lake15 7 2,667
1,260 63 0.11% 631,170 1,079200 - Pedestal Grill BBQ
3 Lower & Upper Lakes20 3 995
882 44 0.08% 44780 640202 - Pedestal Grill BBQ 2 Lower & Upper Lakes
20 5 585
420 84 0.14% 85400 328210 - Barbecue
Lower Lake Near Clubhouse5 2 240
1,618 231 0.40% 2331,430 628300 - Picnic Table: Wood
5 Lower & Upper Lakes (40%)7 5 409
6,378 532 0.91% 5355,500 3,289310 - Wood Benches 11 Lower Lake
12 6 2,750
968 65 0.11% 65775 371480 - Drinking Fountain
Clubhouse15 9 310
Sub-total [26000 - Outdoor Equipment] 23,414 1,745 3.00% 1,75720,055 12,82611,010
© Browning Reserve Group 2016 271106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve ComponentCurrent
Repl. Cost
Useful
Life
Remaining
Life
Estimated
Future
Replacement
Costs
Per
Year
% Per YearStraight Line
2017
2017 Fully
Funded
Balance
2016 Fully
Funded
Balance
Line Item
Contribution
based on
Cash Flow Method
Crystal Falls Association
Reserve Fund Balance Forecast Component Method
First Draft
Prepared for the 2017 Fiscal Year
27000 - Appliances
1,214 101 0.17% 1021,100 846200 - Refrigerator
Clubhouse Lower Level12 4 733
883 74 0.13% 74800 615204 - Refrigerator
Clubhouse Lower Level12 4 533
971 81 0.14% 82880 677208 - Refrigerator Clubhouse Upper Level
12 4 587
1,681 140 0.24% 1411,600 1,503276 - Oven: Wall
Clubhouse Lower Level12 2 1,333
538 45 0.08% 45500 427280 - Cook Top Stove
Clubhouse Upper Level12 3 375
622 52 0.09% 52550 376284 - Cook Top Stove
Clubhouse Lower Level12 5 321
893 89 0.15% 90850 784300 - Dishwasher
Clubhouse Lower Level10 2 680
Sub-total [27000 - Appliances] 6,803 582 1.00% 5866,280 5,2284,562
30000 - Miscellaneous
806 34 0.06% 34695 564442 - Miscellaneous Horse- Harley
24 6 521
1,560 65 0.11% 651,280 929446 - Miscellaneous
Horse- Cowgirl24 8 853
738 369 0.63% 372720 738700 - Tools
Barn Maintenance Shop (20%)2 1 360
20,592 1,373 2.36% 1,38318,200 13,680810 - Tractor 1983 Case 480 LL
15 5 12,133
28,057 1,870 3.21% 1,88420,862 5,702812 - Tractor
Kubota Tractor15 12 4,172
6,786 679 1.17% 6836,620 6,786830 - Vehicle
2002 Ford Ranger10 1 5,958
Sub-total [30000 - Miscellaneous] 58,538 4,389 7.54% 4,42148,377 28,39923,998
32000 - Undesignated
1,128 564 0.97% 5681,100 1,128100 - Miscellaneous
Reserve Items1 1 550
Totals 735,844 58,183 313,304 100.00% 58,605618,270
[A] [B]
13.03%Percent Funded
[EndBal]
[B]
288,182
13.01%
[EndBal]
[A]
© Browning Reserve Group 2016 281106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section VI
Component Listing Included ComponentsFirst Draft
Prepared for the 2017 Fiscal Year
Paving01000 -
100 - Asphalt: Sealing
12,195 Sq. Ft. Clubhouse Parking 12,195 Square Feet
$0.200
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $2,439Total Cost/Study
Cost /SqFt
1
Replacement Year 2017 $2,500Future CostSummary
This is to prepare the surface and apply a single coat asphalt emulsion product. If a second coat is desired the cost is generally 10% to 20% higher.
In 2016, the paving has a dried out appearance and needs sealing.
2012- Per client, seal coat may be applied utilizing in-house labor.
110 - Asphalt: Sealing
2,596 Sq. Ft. Gym Building Parking 2,596 Square Feet
$0.200
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $519Total Cost/Study
Cost /SqFt
1
Replacement Year 2017 $532Future CostSummary
This is to prepare the surface and apply a single coat asphalt emulsion product. If a second coat is desired the cost is generally 10% to 20% higher.
In 2016, the paving has a dried out appearance and needs sealing.
2012- Per client, seal coat may be applied utilizing in-house labor.
© Browning Reserve Group 2016 291106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Paving01000 -
120 - Asphalt: Sealing
5,031 Sq. Ft. Basketball Ct & Tennis Parking
5,031 Square Feet
$0.200
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,006Total Cost/Study
Cost /SqFt
1
Replacement Year 2017 $1,031Future CostSummary
This is to prepare the surface and apply a single coat asphalt emulsion product. If a second coat is desired the cost is generally 10% to 20% higher.
2012- Per client, seal coat is applied utilizing in-house labor.2009- Overlaid, the paving should be sealed as soon as is practical.
200 - Asphalt: Ongoing Repairs
12,195 Sq. Ft. Clubhouse Parking (2%) 12,195 Square Feet
$3.25 $39,634
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
2.00% $793Total Cost/Study
Cost /SqFt Qty * $/SqFt
1
Replacement Year 2017 $812Future CostSummary
This is for miscellaneous repairs including crackfill, skin patching and minor dig out & fill. Cracks 1/4" or wider should be filled when observed.
© Browning Reserve Group 2016 301106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Paving01000 -
210 - Asphalt: Ongoing Repairs
2,596 Sq. Ft. Gym Building Parking (2%) 2,596 Square Feet
$3.25 $8,437
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
2.00% $169Total Cost/Study
Cost /SqFt Qty * $/SqFt
1
Replacement Year 2017 $173Future CostSummary
This is for miscellaneous repairs including crackfill, skin patching and minor dig out & fill. Cracks 1/4" or wider should be filled when observed.
220 - Asphalt: Ongoing Repairs
5,031 Sq. Ft. Basketball Ct & Tennis Parking (2%)
5,031 Square Feet
$3.25 $16,351
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
2.00% $327Total Cost/Study
Cost /SqFt Qty * $/SqFt
1
Replacement Year 2017 $335Future CostSummary
This is for miscellaneous repairs including crackfill, skin patching and minor dig out & fill. Cracks 1/4" or wider should be filled when observed.
© Browning Reserve Group 2016 311106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Paving01000 -
300 - Asphalt: Overlay w/ Interlayer
12,195 Sq. Ft. Clubhouse Parking 12,195 Square Feet
$1.75
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $21,341Total Cost/Study
Cost /SqFt
17
Replacement Year 2033 $32,473Future CostSummary
This is to apply a geotextile interlayer to the existing asphalt surface and overlay with a minimum of 1.5" of new hot mix asphalt. Generally this includes edge grinding and utility box extensions.
2009- $30,050 total was expended for the paving overlay and repair project.
310 - Asphalt: Overlay w/ Interlayer
2,596 Sq. Ft. Gym Building Parking 2,596 Square Feet
$1.77
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $4,585Total Cost/Study
Cost /SqFt
17
Replacement Year 2033 $6,976Future CostSummary
This is to apply a geotextile interlayer to the existing asphalt surface and overlay with a minimum of 1.5" of new hot mix asphalt. Generally this includes edge grinding and utility box extensions.
2009- $30,050 total was expended for the paving overlay and repair project.
320 - Asphalt: Overlay w/ Interlayer
Road to Upper Lake 1 Lump Sum
$14,000
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $14,000Total Cost/Study
Cost /LS
22
Replacement Year 2038 $24,102Future CostSummary
This is to apply a geotextile interlayer to the existing asphalt surface and overlay with a minimum of 1.5" of new hot mix asphalt. Generally this includes edge grinding and utility box extensions.
2016- $13,979 was expended to overlay and seal in 2013 per client. Added as a component of the reserve study.
© Browning Reserve Group 2016 321106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Paving01000 -
340 - Asphalt: Overlay w/ Interlayer
5,031 Sq. Ft. Basketball Ct & Tennis Parking
5,031 Square Feet
$1.77
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $8,885Total Cost/Study
Cost /SqFt
17
Replacement Year 2033 $13,520Future CostSummary
This is to apply a geotextile interlayer to the existing asphalt surface and overlay with a minimum of 1.5" of new hot mix asphalt. Generally this includes edge grinding and utility box extensions.
2009- $30,050 total was expended for the paving overlay and repair project.
820 - Striping
All Parking Areas 1 Lump Sum
$1,005
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,005Total Cost/Study
Cost /LS
1
Replacement Year 2017 $1,030Future CostSummary
This is to restripe the clubhouse, fitness building, basketball court and tennis court parking areas to match existing plan.
© Browning Reserve Group 2016 331106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Concrete02000 -
220 - Walkways
1,250 Sq. Ft. Clubhouse (3%) 1,250 Square Feet
$16.00 $20,000
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
3.00% $600Total Cost/Study
Cost /SqFt Qty * $/SqFt
0
Replacement Year 2016 $600Future CostSummary
This is to repair, replace or grind failed concrete flatwork to remove abrupt elevation changes and maintain functionality. Since the concrete useful life exceeds the scope of this study, this component provides for repair only and not full replacement.
In 2016, abrupt surface elevation shifts were observed on the walk leading from the parking lot to the clubhouse.
2016- $600 is anticipated for clubhouse walkway. 2008- $13,291 expended for improvements.
300 - Driveways
6,835 Sq. Ft. Barn Entrance Drive (3%) 6,835 Square Feet
$24.38 $166,667
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
3.00% $5,000Total Cost/Study
Cost /SqFt Qty * $/SqFt
0
Replacement Year 2016 $5,000Future CostSummary
This is to enclose the existing driveway with a wood border and cover the concrete with decomposed granite.
2016- $5,000 anticipated expenditure to complete the driveway rehab per client.
© Browning Reserve Group 2016 341106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Painting: Exterior03000 -
132 - Surface Restoration
4,466 Sq. Ft. Barn 4,466 Square Feet
$0.900
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $4,019Total Cost/Study
Cost /SqFt
2
Replacement Year 2018 $4,223Future CostSummary
This is to prepare, power wash, sand, scrape, caulk and paint with a 100% premium acrylic paint.
2009- $2,767 was expended.
136 - Surface Restoration
Clubhouse Railings 1 Lump Sum
$3,501
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $3,501Total Cost/Study
Cost /LS
4
Replacement Year 2020 $3,864Future CostSummary
This is to prepare, power wash, sand, scrape, caulk and paint with a 100% premium acrylic paint.
2016- $3,501 was expended to paint railings from reserves in 2015. Per client 5/5/2016 phone conversation, fund this painting from reserves. This component had been previously excluded from reserves.
© Browning Reserve Group 2016 351106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Painting: Exterior03000 -
454 - Wood Fencing
82 Lin. Ft. Corral Perimeter 82 Linear Feet
$6.00
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $492Total Cost/Study
Cost /l.f.
1
Replacement Year 2017 $504Future CostSummary
This is to prepare and paint the wood fencing.
In 2016, this fencing exhibits raw exposed wood and needs paint maintenance.
Painting: Interior03500 -
104 - Building
5,079 Sq. Ft. Clubhouse 5,079 Square Feet
$1.40
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $7,111Total Cost/Study
Cost /SqFt
4
Replacement Year 2020 $7,849Future CostSummary
This is to prepare and paint all interior spaces including restrooms. Some surfaces are stain and others are paint. Minor touchup should be performed on an ongoing basis. Touchup is from operating funds.
2006- $6,000 was expended.
© Browning Reserve Group 2016 361106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Structural Repairs04000 -
200 - Wood: Siding & Trim
2,148 Sq. Ft. Fitness Building 2,148 Square Feet
$8.00
40
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $17,184Total Cost/Study
Cost /SqFt
35
Replacement Year 2051 $40,781Future CostSummary
This is to replace siding and wood trim. The actual scope of the work will depend on what is found after the existing siding is removed. Includes primer and paint on all new wood surfaces.
2016- Replacement scope revised from 10% per 10 years to 100% per 40 years.
210 - Wood: Siding & Trim
4,240 Sq. Ft. Clubhouse 4,240 Square Feet
$9.00
40
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $38,160Total Cost/Study
Cost /SqFt
15
Replacement Year 2031 $55,267Future CostSummary
This is to replace siding and wood trim. If properly sealed from moisture and pest intrusion, siding may last the life of the building. The actual scope of the work will depend on what is found after the existing siding is removed.
In 2016, some siding and trim are in poor condition exhibiting splitting and checking which is indicative of inadequate paint maintenance.
2016- Replacement scope revised from 5% per 10 years to 100% per 40 years.2008- $3,144 expended for clubhouse (lower).
Picture shows where the roofer's nails, referred to as shiners, have penetrated thru the overhang sheathing causing damage.
© Browning Reserve Group 2016 371106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Structural Repairs04000 -
232 - Wood: Siding & Trim
4,466 Sq. Ft. Barn (5%) 4,466 Square Feet
$8.00 $35,728
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
5.00% $1,786Total Cost/Study
Cost /SqFt Qty * $/SqFt
12
Replacement Year 2028 $2,403Future CostSummary
This is to replace siding and wood trim. If properly sealed from moisture and pest intrusion, siding may last the life of the building. The actual scope of the work will depend on what is found after the existing siding is removed.
2009- $1,300 was expended.
550 - Bridge Maintenance
Upper Lake Spillway 1 Lump Sum
$1,270
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,270Total Cost/Study
Cost /LS
4
Replacement Year 2020 $1,402Future CostSummary
This is for general maintenance of the Upper lake spillway metal frame bridge including paint and minor repair. This component provides for wood deck and railing repair in conjunction with painting. Since the core bridge structure useful life exceeds the scope of this thirty year study, this component is for minor maintenance only and not full replacement.
In 2016, the railing appears to have been recently replaced. No cost provided to BRG.
Wood deck 32'x3'Wood railings 93 linear feet
2010- Repairs were completed.
© Browning Reserve Group 2016 381106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Structural Repairs04000 -
826 - Floating Dock
Lower Lake 1 Lump Sum
$16,280
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $16,280Total Cost/Study
Cost /LS
12
Replacement Year 2028 $21,895Future CostSummary
This is to replace the Lower lake dock with a 20' T shape floating dock.
2013- $6,500 was expended. 2008- $5,500 was expended.
960 - Awnings
Barn Shade Shelters 1 Lump Sum
$5,465
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $5,465Total Cost/Study
Cost /LS
8
Replacement Year 2024 $6,659Future CostSummary
This is for the horse sun shelter structures.
2016- $1,754 was expended to build two shade shelters. 2011- Added as a reserve study component.2009- $4,640 was expended to place in service.
961 - Awnings
2 Barn Shade Shelters (2016 Only) 2 Items
$877
1
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00%
Treatment [nr:1]
$1,754Total Cost/Study
Cost /Itm
0
Replacement Year 2016 $1,754Future CostSummary
This is for the $1,754 expended to build two shade shelters.
996 - Miscellaneous
Barn PVC Pipe 1 Lump Sum
$3,920
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $3,920Total Cost/Study
Cost /LS
13
Replacement Year 2029 $5,404Future CostSummary
This is for the barn waterers freeze-proof flex pipe.
2011- Added as a reserve study component.2009- $3,285 was expended to replace the PVC pipe.
© Browning Reserve Group 2016 391106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Structural Repairs04000 -
Decking/Balconies04500 -
100 - Wood
364 Sq. Ft. Clubhouse Upper Level 364 Square Feet
$50.00
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $18,200Total Cost/Study
Cost /SqFt
6
Replacement Year 2022 $21,106Future CostSummary
This is to perform major repairs and replace the clubhouse upper level wood deck. Aggressive wood sealing may extend this component's life.
320 - Railing: Wood
181 Lin. Ft. Clubhouse 181 Linear Feet
$32.00
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $5,792Total Cost/Study
Cost /l.f.
15
Replacement Year 2031 $8,389Future CostSummary
This is to repair and replace the wood railing.
Clubhouse upper level- 82 linear feetLower deck- 38 linear feetWalkway to upper clubhouse- 61 linear feet
2009- Clubhouse walkway to upper clubhouse placed in service. 2006- Clubhouse lower deck railing placed in service.
© Browning Reserve Group 2016 401106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Roofing05000 -
400 - Pitched: Dimensional Composition
36 Squares- Clubhouse 36 Squares
$350
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $12,600Total Cost/Study
Cost /Sqrs
21
Replacement Year 2037 $21,163Future CostSummary
This is to reroof with a dimensional composition roofing product. Composition roofs should be regularly inspected and repaired as indicated to ensure maximum life.
2016- $11,138 was expended in 2012 to replace per client 4/5/2016.2012- Roofing is to be replaced.
410 - Pitched: Dimensional Composition
Gym Bldg Pump House 1 Squares
$750
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $750Total Cost/Study
Cost /Sqrs
5
Replacement Year 2021 $849Future CostSummary
This is to reroof the 8' x 10' structure with a dimensional composition roofing product. Composition roofs should be regularly inspected and repaired as indicated to ensure maximum life.
© Browning Reserve Group 2016 411106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Roofing05000 -
412 - Pitched: Dimensional Composition
99 Squares- Barn 99 Squares
$325
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $32,175Total Cost/Study
Cost /Sqrs
21
Replacement Year 2037 $54,041Future CostSummary
This is to reroof with a dimensional composition roofing product. Composition roofs should be regularly inspected and repaired as indicated to ensure maximum life.
2016- $30,304 was expended in 2012 to reroof per client 4/5/2016.
500 - Pitched: Dimensional Composition
11 Squares- Gym Building 11 Squares
$500
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $5,500Total Cost/Study
Cost /Sqrs
23
Replacement Year 2039 $9,705Future CostSummary
This is to reroof the 25' x 38' building with a dimensional composition roofing product. Composition roofs should be regularly inspected and repaired as indicated to ensure maximum life.
2016- $9,143 was expended in 2014 per client 4/5/2016. Replacement estimate reduced from $9,143 to $5,500 to compensate for extra sheathing replacement that should not be required for the next reroof. No work scope was provided by client.
© Browning Reserve Group 2016 421106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Roofing05000 -
700 - Gutters / Downspouts
220 Lin. Ft. Clubhouse 220 Linear Feet
$8.00
30
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,760Total Cost/Study
Cost /l.f.
26
Replacement Year 2042 $3,345Future CostSummary
This is to replace the clubhouse gutters and downspouts in conjunction with reroofing.
2016- $1,269 was expended to replace the gutters and downspouts during the 2012 reroof per client 4/5/2016.
712 - Gutters / Downspouts
282 Lin. Ft. Barn 282 Linear Feet
$9.40
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $2,651Total Cost/Study
Cost /l.f.
21
Replacement Year 2037 $4,452Future CostSummary
This is to replace the gutters and downspouts.
2016- $2,535 was expended to replace gutters and downspouts during the 2012 reroof per client 4/5/2016.2010- $1,328 expended for gutters on east side of barn.
© Browning Reserve Group 2016 431106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Roofing05000 -
720 - Gutters / Downspouts
54 Lin. Ft. Gym Building 54 Linear Feet
$8.90
30
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $481Total Cost/Study
Cost /l.f.
26
Replacement Year 2042 $913Future CostSummary
This is to replace the gutters and downspouts. Cost estimate includes a premium due to small job size.
2016- $454 was expended to replace gutters and downspouts during the 2012 reroof per client 4/5/2016.2008- The roofing system was originally scheduled for replacement and continues to be deferred.
Rehab08000 -
100 - General
Barn 1 Lump Sum
$3,900
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $3,900Total Cost/Study
Cost /LS
10
Replacement Year 2026 $4,992Future CostSummary
This is for a general barn interior rehab including wood partitions, cabinets, countertops, staining, etc. Association input will further define this component.
2016- $3,500 was expended for barn doors in 2013 per client 4/5/2016.2012- Per client, the majority of work is expected to take place in the workshop.
© Browning Reserve Group 2016 441106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Rehab08000 -
226 - Restrooms
Clubhouse Upper Level 1 Lump Sum
$3,320
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $3,320Total Cost/Study
Cost /LS
2
Replacement Year 2018 $3,488Future CostSummary
This is for rehab, cosmetic in nature, including partition wood repairs, décor, small cabinet repairs, etc. Extensive repairs may require new accessibility features per local building code. Association input will further define this component.
230 - Kitchen
Clubhouse Lower Level 1 Room
$5,190
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $5,190Total Cost/Study
Cost /Rm
11
Replacement Year 2027 $6,810Future CostSummary
This is to rehab the clubhouse lower kitchen including 17 linear feet of used oak cabinets, counter tops, décor, etc. Association input will further define this component.
2007- $4,093 was expended.
© Browning Reserve Group 2016 451106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Rehab08000 -
236 - Kitchen
Clubhouse Upper Level 1 Room
$7,725
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $7,725Total Cost/Study
Cost /Rm
12
Replacement Year 2028 $10,389Future CostSummary
This is to rehab the clubhouse upper kitchen including 27 linear feet of used cabinets, cabinet re-facing, Formica counter tops, appliance installation, etc. Association input will further define this component.
2008- $35,768 expended for extensive rehab.
240 - Clubhouse
Lower Floor Decorating 1 Lump Sum
$10,045
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $10,045Total Cost/Study
Cost /LS
2
Replacement Year 2018 $10,554Future CostSummary
This is for general clubhouse interior rehab including wall coverings, lighting, fans, décor, etc. Association input will further define this component.
© Browning Reserve Group 2016 461106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Rehab08000 -
242 - Clubhouse
Upper Floor Decorating 1 Lump Sum
$3,863
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $3,863Total Cost/Study
Cost /LS
7
Replacement Year 2023 $4,592Future CostSummary
This is for general clubhouse interior rehab including wall coverings, lighting, fans, décor, etc. Association input will further define this component.
2008- $35,768 expended for rehab.
246 - Restrooms
Clubhouse Lower Level 1 Lump Sum
$3,500
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $3,500Total Cost/Study
Cost /LS
13
Replacement Year 2029 $4,825Future CostSummary
This is to rehab and redecorate the restroom including items such as, fixtures, lighting, flooring, etc. Association input will further define this component.
2009- $7,431 expended for the clubhouse restroom addition.
© Browning Reserve Group 2016 471106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Rehab08000 -
248 - Restrooms
2 Clubhouse Upper Level (50%) 2 Room
$3,795 $7,590
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
50.00% $3,795Total Cost/Study
Cost /Rm Qty * $/Rm
2
Replacement Year 2018 $3,987Future CostSummary
This is to rehab and redecorate the restroom including items such as, fixtures, lighting, flooring, etc. Association input will further define this component.
In 2016, the men's room flooring has been replaced and the room rehabbed. The women's room remains not rehabbed.
2015- $7,582 was expended.
250 - General
Office 1 Lump Sum
$4,030
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $4,030Total Cost/Study
Cost /LS
11
Replacement Year 2027 $5,288Future CostSummary
This is for a general interior rehab. Association input will further define this component.
In 2016, the floor entering the restroom feels in need of structural modification.
2007- $3,208 was expended.
© Browning Reserve Group 2016 481106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Gate Equipment11000 -
780 - Pedestrian Gate
Lower Lake Access 1 Lump Sum
$6,650
30
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $6,650Total Cost/Study
Cost /LS
20
Replacement Year 2036 $10,897Future CostSummary
This is to replace the lower lake pedestrian gate that controls access from the clubhouse to the lake. Minor gate hardware repairs are from operating. Proximity card reader replacement is provided for within another component.
Recreation14000 -
290 - Exercise: Miscellaneous Equip.
Gym Building (50%) 1 Lump Sum
$5,520 $5,520
8
Quantity Unit of Measure
% Included
Useful Life Remaining Life
50.00% $2,760Total Cost/Study
Cost /LS Qty * $/LS
4
Replacement Year 2020 $3,047Future CostSummary
This is to replace miscellaneous exercise equipment of which some is donated.
2016- $1,856 was expended in 2015 per client.
© Browning Reserve Group 2016 491106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Recreation14000 -
900 - Miscellaneous
Barn Horse Tack (20%) 1 Lump Sum
$5,500 $5,500
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
20.00% $1,100Total Cost/Study
Cost /LS Qty * $/LS
3
Replacement Year 2019 $1,185Future CostSummary
This is to periodically replace assorted horse tack on a percentage basis.
5- adult saddles2- juvenile saddles8- bridles & bits30- mats
2011- Per client, set replacement at 20% of $4,875 every 5 years beginning in 2013.2010- $400 was expended.2009- $500 was expended.
Tennis Court17000 -
100 - Reseal
5,000 Sq. Ft. Tennis Court 5,000 Square Feet
$0.800
7
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $4,000Total Cost/Study
Cost /SqFt
7
Replacement Year 2023 $4,755Future CostSummary
This is to reseal and restripe the 100' x 50' tennis court surface. Resurfacing is provided for within another components.
2016- $14,000 is anticipated to seal, stripe and resurface the basketball and tennis courts.
© Browning Reserve Group 2016 501106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Tennis Court17000 -
500 - Resurface
5,000 Sq. Ft. Tennis Court 5,000 Square Feet
$2.00
21
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $10,000Total Cost/Study
Cost /SqFt
21
Replacement Year 2037 $16,796Future CostSummary
This is to resurface the 100' x 50' tennis court surface utilizing a fabric interlayer overlay, color coat and striping. Seal coating and restriping are provided for within other components.
2016- $14,000 is anticipated to seal, stripe and resurface the basketball and tennis courts.
550 - Fixtures
Tennis Court Net 1 Items
$532
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $532Total Cost/Study
Cost /Itm
0
Replacement Year 2016 $532Future CostSummary
This is to replace the net and maintain the net posts.
2016- $532 is anticipated.
© Browning Reserve Group 2016 511106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Basketball / Sport Court17500 -
200 - Seal & Striping
3,510 Sq. Ft. Basketball Court 3,510 Square Feet
$0.600
7
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $2,106Total Cost/Study
Cost /SqFt
7
Replacement Year 2023 $2,503Future CostSummary
This is to crack seal, seal and restripe the 45' x 78' court.
2016- $14,000 is anticipated to seal, stripe and resurface the basketball and tennis courts.
400 - Overlay
3,510 Sq. Ft. Basketball Court 3,510 Square Feet
$2.00
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $7,020Total Cost/Study
Cost /SqFt
20
Replacement Year 2036 $11,503Future CostSummary
This is to overlay the surface with new hot asphalt.
2016- $14,000 is anticipated to seal, stripe and resurface the basketball and tennis courts. A work scope was not provided by client.
© Browning Reserve Group 2016 521106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Basketball / Sport Court17500 -
900 - Basketball Standard
Basketball Court 1 Lump Sum
$500
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $500Total Cost/Study
Cost /LS
0
Replacement Year 2016 $500Future CostSummary
This is to maintain the basketball hoops, nets and boards. Court surface and small backstop fencing are provided for within other components.
904 - Miscellaneous
Court Surfaces (2016 Only) 1 Lump Sum
$14,000
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00%
Treatment [nr:1]
$14,000Total Cost/Study
Cost /LS
0
Replacement Year 2016 $14,000Future CostSummary
This is to seal, stripe and resurface the courts.
Landscaping18000 -
340 - Irrigation: Pumps
Pump House (50%) 1 Lump Sum
$6,300 $6,300
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
50.00% $3,150Total Cost/Study
Cost /LS Qty * $/LS
1
Replacement Year 2017 $3,229Future CostSummary
This is to repair, replace and maintain the park irrigation system. Since not all equipment will fail simultaneously, this component provides for one half replacement every five years.
2- pump-motors2- AMTROL, Well-X-Trol pre-pressurized pump tanksAssociated- pipes, fittings, controls, etc.
© Browning Reserve Group 2016 531106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Lakes / Ponds18500 -
330 - Aeration Heads / Diffusers
Lower Lake 1 Lump Sum
$4,190
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $4,190Total Cost/Study
Cost /LS
7
Replacement Year 2023 $4,981Future CostSummary
This is to repair, replace and maintain the lower lake environmental aeration/destratification system. Diffuser and air stone cleaning should be performed in accordance with vendor recommendations.
1- Leeson 3 h.p. pump2- Aeration heads
2014- $934 was expended for a pump. 2011- The pump was rebuilt.2006- $3,354 was expended.
334 - Aeration Heads / Diffusers
Third Aerator 1 Items
$1,290
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,290Total Cost/Study
Cost /Itm
3
Replacement Year 2019 $1,389Future CostSummary
This is to repair, replace and maintain the lake's third aerator.
2009- $1,135 was expended.
620 - Pump / Motor
Lower Lake Drain 1 Items
$880
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $880Total Cost/Study
Cost /Itm
3
Replacement Year 2019 $948Future CostSummary
This is to repair, replace and maintain the lower lake 3/4 h.p. motor.
2009- $737 expended for lake motor replacement. 2006- $1,975 was expended.
© Browning Reserve Group 2016 541106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Lakes / Ponds18500 -
911 - Miscellaneous
Lower Lake Weir Gate Valve 1 Lump Sum
$25,168
35
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $25,168Total Cost/Study
Cost /LS
31
Replacement Year 2047 $54,111Future CostSummary
This is to replace the weir gate valve.
2016- $25,168 was expended in 2012 to replace the valve per client at the site visit meeting.
914 - Miscellaneous
Lower & Upper Lake Maintenance 1 Lump Sum
$30,000
2
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $30,000Total Cost/Study
Cost /LS
1
Replacement Year 2017 $30,750Future CostSummary
This is to reclaim the beach sand, maintain the weir, clear the lower lake inlet and remove tulles.
2015- $31,246 was expended. 2013- $15,000 was expended.2011- $32,000 was expended for lower lake inlet clean out.2010- $2,700 was expended for upper lake.
© Browning Reserve Group 2016 551106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Lakes / Ponds18500 -
990 - Miscellaneous
Floating Dock 1 Lump Sum
$6,570
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $6,570Total Cost/Study
Cost /LS
0
Replacement Year 2016 $6,570Future CostSummary
This is for miscellaneous expenses.
2016- $6,569 was expended for the dock in 2013 per client.
Fencing19000 -
110 - Chain Link: 6'
80 Lin. Ft. Basketball Court Backstops (50%)
80 Linear Feet
$15.00 $1,200
35
Quantity Unit of Measure
% Included
Useful Life Remaining Life
50.00% $600Total Cost/Study
Cost /l.f. Qty * $/l.f.
10
Replacement Year 2026 $768Future CostSummary
This is to periodically replace the basketball court backstop 6' chain link fencing on a percentage basis.
2012- Deferred per client.
© Browning Reserve Group 2016 561106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Fencing19000 -
112 - Chain Link: 6'
1,730 Lin. Ft. Upper Lake Perimeter 1,730 Linear Feet
$17.00
35
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $29,410Total Cost/Study
Cost /l.f.
20
Replacement Year 2036 $48,192Future CostSummary
This is to replace the Upper lake perimeter 6' chain link fencing.
2008- $740 was expended.
120 - Chain Link: 8'
1,259 Lin. Ft. Clubhouse & Lake Perimeter (15%)
1,259 Linear Feet
$19.00 $23,921
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
15.00% $3,588Total Cost/Study
Cost /l.f. Qty * $/l.f.
4
Replacement Year 2020 $3,961Future CostSummary
This is to periodically replace the clubhouse and lower lake perimeter 6' to 8' chain link fencing including three strand barbed wire on a percentage basis.
2008- $3,129 was expended.
© Browning Reserve Group 2016 571106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Fencing19000 -
130 - Chain Link: 10'
300 Lin. Ft. Tennis Courts 300 Linear Feet
$24.00
30
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $7,200Total Cost/Study
Cost /l.f.
15
Replacement Year 2031 $10,428Future CostSummary
This is to replace the tennis court 10' chain link fencing.
324 - Wood: 4'
78 Lin. Ft. Barn East Perimeter 78 Linear Feet
$23.00
18
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,794Total Cost/Study
Cost /l.f.
4
Replacement Year 2020 $1,980Future CostSummary
This is to replace the barn east perimeter painted 4' fencing including discarded fence material removal and disposal. Painting is provided for within another component.
2008- Partially replaced and painted.
© Browning Reserve Group 2016 581106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Fencing19000 -
340 - Wood: 6'
80 Lin. Ft. Barn East Perimeter 80 Linear Feet
$36.00
18
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $2,880Total Cost/Study
Cost /l.f.
10
Replacement Year 2026 $3,687Future CostSummary
This is to replace the barn east perimeter 6' wood fencing including discarded fence material removal and disposal. This fence is a standard 1"x6" dog ear picket on 4"x4" wood posts.
In 2012, the fence was propped up in areas.
540 - Metal
2,000 Lin. Ft. Corral Fencing (10%) 2,000 Linear Feet
$17.00 $34,000
6
Quantity Unit of Measure
% Included
Useful Life Remaining Life
10.00% $3,400Total Cost/Study
Cost /l.f. Qty * $/l.f.
5
Replacement Year 2021 $3,847Future CostSummary
This is for ongoing horse corral 4' metal (pipe) fencing repair and maintenance. Since the overall fence life exceeds thirty years, this component provides for periodic repairs only and not full replacement.
© Browning Reserve Group 2016 591106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Fencing19000 -
542 - Metal
835 Lin. Ft. Barn Perimeter 835 Linear Feet
$40.00
30
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $33,400Total Cost/Study
Cost /l.f.
5
Replacement Year 2021 $37,789Future CostSummary
This is to replace the barn perimeter 4' painted metal (pipe) fencing. Aggressive paint maintenance may extend this component's life. Painting is provided for within another component.
543 - Metal
Barn Perimeter (2016 Only) 1 Lump Sum
$1,754
1
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00%
Treatment [nr:1]
$1,754Total Cost/Study
Cost /LS
0
Replacement Year 2016 $1,754Future CostSummary
This is for the $1,754 expended. No work scope provided to BRG.
Retaining Wall19500 -
120 - Wood: 1'
40 Lin. Ft. Lower Lake 40 Linear Feet
$40.00
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,600Total Cost/Study
Cost /l.f.
7
Replacement Year 2023 $1,902Future CostSummary
This is to replace the lower lake 1' retaining wall comprised of 2" x 12" lumber.
Note the retainer wall behind the barbecue.
© Browning Reserve Group 2016 601106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Lighting20000 -
100 - Exterior: Misc. Fixtures
Barn Security Lighting 1 Lump Sum
$1,105
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,105Total Cost/Study
Cost /LS
9
Replacement Year 2025 $1,380Future CostSummary
This is to replace and upgrade the barn security lighting.
2010- $908 was expended.
Signage21000 -
792 - Monument
Community Entrance 1 Items
$1,400
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,400Total Cost/Study
Cost /Itm
15
Replacement Year 2031 $2,028Future CostSummary
This is to repair, replace and refurbish the custom identity monument.
© Browning Reserve Group 2016 611106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Office Equipment22000 -
100 - Computers, Misc.
Office Equipment 1 Lump Sum
$2,500
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $2,500Total Cost/Study
Cost /LS
3
Replacement Year 2019 $2,692Future CostSummary
This is to replace miscellaneous office equipment.
1- Computer & monitor ($2,012 in 2010)2- PrintersMiscellaneous- software, etc. ($250 Website in 2009)
2015- $1,240 was expended.2013- $1,840 was expended.
Mechanical Equipment23000 -
200 - Furnace
Clubhouse Lower Level 1 Items
$880
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $880Total Cost/Study
Cost /Itm
10
Replacement Year 2026 $1,126Future CostSummary
This is to replace the clubhouse lower level Dayton heater.
2006- Unit was replaced.
© Browning Reserve Group 2016 621106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Mechanical Equipment23000 -
202 - Furnace
Clubhouse Upper Level 1 Items
$880
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $880Total Cost/Study
Cost /Itm
5
Replacement Year 2021 $996Future CostSummary
This is to replace the clubhouse upper level Dayton heater.
996 - Swamp Cooler
3 Clubhouse 3 Items
$2,590
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $7,770Total Cost/Study
Cost /Itm
7
Replacement Year 2023 $9,236Future CostSummary
This is to repair, replace and maintain the swamp coolers. These systems include a motor, water pump and drip pans, and with ongoing maintenance, this component's life may be extended.
2012- Per client, the three swamp coolers were replaced for approximately $7,000. No replacement date was given.2007- $230 expended for pump replacement.
Furnishings24000 -
100 - Office Desk, Chair
Clubhouse (50%) 1 Lump Sum
$3,400 $3,400
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
50.00% $1,700Total Cost/Study
Cost /LS Qty * $/LS
4
Replacement Year 2020 $1,876Future CostSummary
This is to periodically replace office furniture on a percentage basis.
1- 2-drawer file cabinets2- Desks3- Desk chairs5- 4-drawer file cabinets
© Browning Reserve Group 2016 631106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Furnishings24000 -
102 - Tables
3 Clubhouse Lower Level 3 Items
$495
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,485Total Cost/Study
Cost /Itm
5
Replacement Year 2021 $1,680Future CostSummary
This is to replace large 8'x3' wood tables.
110 - Chairs
123 Clubhouse 123 Items
$50.00
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $6,150Total Cost/Study
Cost /Itm
5
Replacement Year 2021 $6,958Future CostSummary
This is to replace the folding chairs.
130 - Tables
13 Clubhouse 13 Items
$145
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,885Total Cost/Study
Cost /Itm
3
Replacement Year 2019 $2,030Future CostSummary
This is to replace the folding tables.
2007- $949 was expended for eight tables.
© Browning Reserve Group 2016 641106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Safety / Access24600 -
520 - Card Readers
Lower Lake Access Control 1 Lump Sum
$3,500
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $3,500Total Cost/Study
Cost /LS
6
Replacement Year 2022 $4,059Future CostSummary
This is to replace the Lower lake pedestrian gate JTA 100 PC based proximity card reader and, software, electric latch, lockset and miscellaneous reader hardware. This gate controls access from the clubhouse to the lake. Proximity card replacement is from operating.
2016- $6,647 was expended in 2012 per client 4/5/2016. This component does not consider hard wiring or components other than replaceable, compartmentalized items.
700 - Security System
Alarms & Cameras 1 Lump Sum
$3,865
6
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $3,865Total Cost/Study
Cost /LS
3
Replacement Year 2019 $4,162Future CostSummary
This is to replace various security system components including video monitors, cameras, recorders, etc.
2016- $1,040 was expended for barn security. $2,000 was expended in 2015 for cameras per client. 2012- $2,500 is the anticipated expenditure. Association provided cost and scope of work will further define this component. 2011- the association was in the process of installing surveillance systems (burglar alarms at maintenance, barn, clubhouse and fitness).
701 - Security System
Alarms & Cameras (2016 Only) 1 Lump Sum
$1,040
1
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00%
Treatment [nr:1]
$1,040Total Cost/Study
Cost /LS
0
Replacement Year 2016 $1,040Future CostSummary
This is for the $1,040 expended for barn security.
© Browning Reserve Group 2016 651106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Safety / Access24600 -
720 - Security System
Park (50%) 1 Lump Sum
$8,755 $8,755
6
Quantity Unit of Measure
% Included
Useful Life Remaining Life
50.00% $4,378Total Cost/Study
Cost /LS Qty * $/LS
5
Replacement Year 2021 $4,953Future CostSummary
This is to replace various security system components including video monitors, cameras, recorders, etc.
2016- $8,755 was expended in 2015 per client 4/5/2016. Added as a component of the reserve study.
Flooring25000 -
200 - Miscellaneous
217 Sq. Yds. Clubhouse Upper Level 217 Square Yard
$40.00
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $8,680Total Cost/Study
Cost /SqYd
7
Replacement Year 2023 $10,318Future CostSummary
This is to replace the upper level flooring. 2008- $35,768 total was expended as part of the rehab project.
© Browning Reserve Group 2016 661106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Flooring25000 -
210 - Carpeting
10 Sq. Yds. Clubhouse Office Lower Level 10 Square Yard
$35.00
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $350Total Cost/Study
Cost /SqYd
1
Replacement Year 2017 $359Future CostSummary
This is to replace the carpeting.
In 2016, this flooring is in poor condition.
2008- $35,768 total was expended as part of the rehab project.
600 - Vinyl
52 Sq. Yds. Clubhouse Lower Level 52 Square Yard
$40.00
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $2,080Total Cost/Study
Cost /SqYd
1
Replacement Year 2017 $2,132Future CostSummary
This is to replace the clubhouse lower level and shuffle game area vinyl tile flooring.
© Browning Reserve Group 2016 671106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Flooring25000 -
604 - Vinyl
19 Sq. Yds. Clubhouse Upper Level Restrooms (50%)
19 Square Yard
$40.00 $760
7
Quantity Unit of Measure
% Included
Useful Life Remaining Life
50.00% $380Total Cost/Study
Cost /SqYd Qty * $/SqYd
2
Replacement Year 2018 $399Future CostSummary
This is to replace the vinyl flooring.
Outdoor Equipment26000 -
100 - Tot Lot: Play Equipment
Upper Lake 1 Items
$5,000
18
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $5,000Total Cost/Study
Cost /Itm
7
Replacement Year 2023 $5,943Future CostSummary
This is to replace the tot lot play equipment.
2008- $1,300 was expended for a new play equipment.
© Browning Reserve Group 2016 681106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Outdoor Equipment26000 -
102 - Tot Lot: Play Equipment
Lower Lake 1 Items
$5,000
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $5,000Total Cost/Study
Cost /Itm
7
Replacement Year 2023 $5,943Future CostSummary
This is to replace the tot lot play equipment.
2008- $1,300 was expended for a new play equipment.
200 - Pedestal Grill BBQ
3 Lower & Upper Lakes 3 Items
$390
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,170Total Cost/Study
Cost /Itm
3
Replacement Year 2019 $1,260Future CostSummary
This is to replace the pedestal dual grill BBQ's. Includes shipping and installation.
2015- $137 was expended.
© Browning Reserve Group 2016 691106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Outdoor Equipment26000 -
202 - Pedestal Grill BBQ
2 Lower & Upper Lakes 2 Items
$390
20
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $780Total Cost/Study
Cost /Itm
5
Replacement Year 2021 $882Future CostSummary
This is to replace the pedestal single grill BBQ's. Includes shipping and installation.
210 - Barbecue
Lower Lake Near Clubhouse 1 Lump Sum
$400
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $400Total Cost/Study
Cost /LS
2
Replacement Year 2018 $420Future CostSummary
This is to maintain and paint the 5'x8' fixed masonry barbeque located near the clubhouse.
© Browning Reserve Group 2016 701106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Outdoor Equipment26000 -
300 - Picnic Table: Wood
5 Lower & Upper Lakes (40%) 5 Items
$715 $3,575
7
Quantity Unit of Measure
% Included
Useful Life Remaining Life
40.00% $1,430Total Cost/Study
Cost /Itm Qty * $/Itm
5
Replacement Year 2021 $1,618Future CostSummary
This is to periodically replace various picnic tables on a percentage basis.
2- Upper3- Lower
2008- $1,200 was expended.
310 - Wood Benches
11 Lower Lake 11 Items
$500
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $5,500Total Cost/Study
Cost /Itm
6
Replacement Year 2022 $6,378Future CostSummary
This is to periodically repair and maintain the Lower lake fixed wood benches located at the main beach and tennis & basketball courts.
1- 6'x12' no back3- w/ backs7- 4'x12' no backs
2008- $100 was expended.
© Browning Reserve Group 2016 711106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Outdoor Equipment26000 -
480 - Drinking Fountain
Clubhouse 1 Items
$775
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $775Total Cost/Study
Cost /Itm
9
Replacement Year 2025 $968Future CostSummary
This is to replace the clubhouse wall mounted drinking fountain.
2010- Unit was replaced.
Appliances27000 -
200 - Refrigerator
Clubhouse Lower Level 1 Items
$1,100
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,100Total Cost/Study
Cost /Itm
4
Replacement Year 2020 $1,214Future CostSummary
This is to replace the Whirlpool refrigerator.
204 - Refrigerator
Clubhouse Lower Level 1 Items
$800
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $800Total Cost/Study
Cost /Itm
4
Replacement Year 2020 $883Future CostSummary
This is to replace the Roper refrigerator.
© Browning Reserve Group 2016 721106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Appliances27000 -
208 - Refrigerator
Clubhouse Upper Level 1 Items
$880
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $880Total Cost/Study
Cost /Itm
4
Replacement Year 2020 $971Future CostSummary
This is to replace the Frigidaire refrigerator.
276 - Oven: Wall
Clubhouse Lower Level 1 Items
$1,600
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,600Total Cost/Study
Cost /Itm
2
Replacement Year 2018 $1,681Future CostSummary
This is to replace the GE double oven.
© Browning Reserve Group 2016 731106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Appliances27000 -
280 - Cook Top Stove
Clubhouse Upper Level 1 Items
$500
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $500Total Cost/Study
Cost /Itm
3
Replacement Year 2019 $538Future CostSummary
This is to replace the Monogram counter top stove.
284 - Cook Top Stove
Clubhouse Lower Level 1 Items
$550
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $550Total Cost/Study
Cost /Itm
5
Replacement Year 2021 $622Future CostSummary
This is to replace the counter top stove.
© Browning Reserve Group 2016 741106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Appliances27000 -
300 - Dishwasher
Clubhouse Lower Level 1 Items
$850
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $850Total Cost/Study
Cost /Itm
2
Replacement Year 2018 $893Future CostSummary
This is to replace the GE automatic dishwasher.
Miscellaneous30000 -
442 - Miscellaneous
Horse- Harley 1 Items
$695
24
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $695Total Cost/Study
Cost /Itm
6
Replacement Year 2022 $806Future CostSummary
This is to replace the horse.
2010- $600 was expended.
446 - Miscellaneous
Horse- Cowgirl 1 Items
$1,280
24
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,280Total Cost/Study
Cost /Itm
8
Replacement Year 2024 $1,560Future CostSummary
This is to replace the horse.
2008- $1,050 was expended.
© Browning Reserve Group 2016 751106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Miscellaneous30000 -
700 - Tools
Barn Maintenance Shop (20%) 1 Lump Sum
$3,600 $3,600
2
Quantity Unit of Measure
% Included
Useful Life Remaining Life
20.00% $720Total Cost/Study
Cost /LS Qty * $/LS
1
Replacement Year 2017 $738Future CostSummary
This is to periodically replace various tools as needed.
1- Air Compressor ($1,500 in 2012) 1- Hedge Trimmer1- Weed Whacker 1- Cement Mixer1- Chain Saw Assorted Hand Tools
2008- $600 was expended.
810 - Tractor
1983 Case 480 LL 1 Items
$18,200
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $18,200Total Cost/Study
Cost /Itm
5
Replacement Year 2021 $20,592Future CostSummary
This is to replace the Case 480 LL tractor.
1994- Placed in service.
812 - Tractor
Kubota Tractor 1 Items
$20,862
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $20,862Total Cost/Study
Cost /Itm
12
Replacement Year 2028 $28,057Future CostSummary
This is to replace the Kubota model# YTH1542XP tractor.
2016- $20,862 contract to purchase signed in March 2013. Monthly payment is $347.71 for 60 payments beginning March, 2013 and ending February, 2018. Payments are provided for within the funding plan.
© Browning Reserve Group 2016 761106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Included Components
First Draft
Prepared for the 2017 Fiscal Year
Miscellaneous30000 -
830 - Vehicle
2002 Ford Ranger 1 Items
$6,620
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $6,620Total Cost/Study
Cost /Itm
1
Replacement Year 2017 $6,786Future CostSummary
This is to replace the 2002 Ford Ranger with a used truck. This component assumes no residual value. Fuel, oil, insurance, registration, tires and regular maintenance are from operating.
2011- Added as a reserve study component. 2010- Placed in service.2010- $4,336 was expended.
Undesignated32000 -
100 - Miscellaneous
Reserve Items 1 Lump Sum
$1,100
1
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,100Total Cost/Study
Cost /LS
1
Replacement Year 2017 $1,128Future CostSummary
This is for unanticipated reserve component repairs.
2010- $81 expended for fence repair and $177 for toilet replacement.2008- $550 expended for wiring update for clubhouse (extra circuits).
© Browning Reserve Group 2016 771106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section VI-b
Component Listing Excluded ComponentsFirst Draft
Prepared for the 2017 Fiscal Year
Painting: Exterior03000 -
130 - Surface Restoration
2,148 Sq. Ft. Fitness Building 2,148 Square Feet
$1.20
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $2,578Total Cost/Study
Cost /SqFt
1
Replacement Year N/A N/AFuture CostSummary
This is to prepare, power wash, sand, scrape, caulk and paint with a 100% premium acrylic paint.
2012- Per client, this painting is performed with in house labor and funded from operating, so exclude this component from reserves.
134 - Surface Restoration
4,240 Sq. Ft. Clubhouse 4,240 Square Feet
$1.10
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $4,680Total Cost/Study
Cost /SqFt
1
Replacement Year N/A N/AFuture CostSummary
This is to prepare, power wash, sand, scrape, caulk and paint with a 100% premium acrylic paint. Siding repairs typically performed in conjunction with the painting cycle are provided for within another component.
In 2016, although funded from operating, the clubhouse is in great need of exterior painting.
2012- Per client, this painting is performed with in house labor and funded from operating, so exclude this component from reserves.
150 - Stain
364 Sq. Ft. Clubhouse Upper Level Deck 364 Square Feet
$1.66
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $603Total Cost/Study
Cost /SqFt
1
Replacement Year N/A N/AFuture CostSummary
This is to prepare, power wash, sand, scrape, caulk and paint with a premium full body stain.
2012- Per client, this painting is performed with in house labor and funded from operating, so exclude this component from reserves.
152 - Stain
172 Sq. Ft. Clubhouse Lower Deck 172 Square Feet
$1.66
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $285Total Cost/Study
Cost /SqFt
1
Replacement Year N/A N/AFuture CostSummary
This is to prepare, power wash, sand, scrape, caulk and paint with a premium full body stain.
2012- Per client, this painting is performed with in house labor and funded from operating, so exclude this component from reserves.
© Browning Reserve Group 2016 781106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Excluded Components
First Draft
Prepared for the 2017 Fiscal Year
Painting: Exterior03000 -
406 - Railings
835 Lin. Ft. Barn Perimeter Fencing 835 Linear Feet
$9.00
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $7,515Total Cost/Study
Cost /l.f.
0
Replacement Year N/A N/AFuture CostSummary
This is to prepare and paint the barn perimeter 4' metal fencing.
2012- Per client during reserve site visit meeting, this painting is performed with in house labor and funded from operating, so exclude this component from reserves.2011- $7,086 was expended.2007- $700 was expended.
Painting: Interior03500 -
100 - Building
1,987 Sq. Ft. Gym Building 1,987 Square Feet
$1.10
8
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $2,193Total Cost/Study
Cost /SqFt
3
Replacement Year N/A N/AFuture CostSummary
This is to prepare and paint the building interior spaces including floors, walls and ceilings.
2012- Per client, this painting is performed with in house labor and funded from operating, so exclude this component from reserves.
102 - Building
Barn 1 Lump Sum
$760
2
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $760Total Cost/Study
Cost /LS
1
Replacement Year N/A N/AFuture CostSummary
This is to prepare and paint as needed.
2- Restrooms2- Rooms15- StallsBeams, etc.
2012- Per client, this painting is performed with in house labor and funded from operating, so exclude this component from reserves.2007- $378 was expended.
Fencing19000 -
990 - Post & Cable
Park Perimeter 1 Lump Sum
$1,131
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,131Total Cost/Study
Cost /LS
2
Replacement Year N/A N/AFuture CostSummary
This is for ongoing park perimeter post and cable fence maintenance and painting. This fence is comprised of 26 wood posts, 57 painted metal posts and 418 linear feet of cable. Wood post replacement is provided for within another component.
2012- This component was excluded from the study per client direction. It is anticipated that the post and cable will be replaced with rocks.2011- Per client direction, this component is returned to the study.2009- $152 expended for wooden post repair.2008- This component was excluded from the study per client direction.
© Browning Reserve Group 2016 791106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Excluded Components
First Draft
Prepared for the 2017 Fiscal Year
Fencing19000 -
994 - Post & Cable
26 Park Perimeter Posts (33%) 26 Items
$126 $3,272
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
33.33%
Treatment [nr:3]
$1,091Total Cost/Study
Cost /Itm Qty * $/Itm
2
Replacement Year N/A N/AFuture CostSummary
This is to replace the park perimeter post and cable fence's wood posts with metal posts. This fence is comprised of 26 wood posts, 57 painted metal posts and 418 linear feet of cable. The wood posts appear to be replaced in an ongoing fashion as opposed to full one-time complete replacement.
2012- This item was excluded from the study per client direction.2011- Per client direction, this component is returned to the study.2008- This item was excluded from the study per client direction.
Retaining Wall19500 -
124 - Wood: 4'
69 Lin. Ft. Lower Lake Bulkhead 69 Linear Feet
$226
25
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $15,613Total Cost/Study
Cost /l.f.
3
Replacement Year N/A N/AFuture CostSummary
This is to replace the Lower lake 4' bulkhead wall comprised of 2"x12" lumber. Walls over 3' in height require engineering. This bulkhead wall is failing and should be inspected and replaced soon. The association should solicit replacement bids to further define this component.
2008- Per client, exclude this component.
Mechanical Equipment23000 -
600 - Water Heater
Barn 40 US Gallon 1 Items
$993
15
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $993Total Cost/Study
Cost /Itm
2
Replacement Year N/A N/AFuture CostSummary
This is to replace the 40 gallon water heater.
2011- Per client, exclude this component.
602 - Water Heater
Clubhouse 1 Items
$773
12
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $773Total Cost/Study
Cost /Itm
2
Replacement Year N/A N/AFuture CostSummary
This is to replace the clubhouse water heater.
2011- Per client, exclude this component.
© Browning Reserve Group 2016 801106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Component Listing Excluded Components
First Draft
Prepared for the 2017 Fiscal Year
Audio / Visual24500 -
300 - PA System
Clubhouse 1 Lump Sum
$629
10
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $629Total Cost/Study
Cost /LS
2
Replacement Year N/A N/AFuture CostSummary
This is to replace the public address system including mics, stands and miscellaneous equipment. Replacement was previously scheduled for 2007.
2008- Per client 12/2018, exclude this component.
Miscellaneous30000 -
880 - Boat
2 Lower LakeLower LakeLower Lake
2 Items
$883
5
Quantity Unit of Measure
% Included
Useful Life Remaining Life
100.00% $1,766Total Cost/Study
Cost /Itm
1
Replacement Year N/A N/AFuture CostSummary
This is to replace the paddle boats.
2008- Per client, exclude this component from reserves.
© Browning Reserve Group 2016 811106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section VII
Component Tabular Listing First Draft
Prepared for the 2017 Fiscal Year
Included Components
Current
Replacement Cost
Useful
Life
Remaining
Life Quantity
Cost/
U of MComponent LocationTreatment
Paving01000 -
100 - Asphalt: Sealing 12,195 $.20/SqFt5$2,439 1 Clubhouse Parking
110 - Asphalt: Sealing 2,596 $.20/SqFt5$519 1 Gym Building Parking
120 - Asphalt: Sealing 5,031 $.20/SqFt5$1,006 1 Basketball Ct & Tennis Parking
200 - Asphalt: Ongoing Repairs 12,195 $3.25/SqFt5$793 1 (2%) Clubhouse Parking
210 - Asphalt: Ongoing Repairs 2,596 $3.25/SqFt5$169 1 (2%) Gym Building Parking
220 - Asphalt: Ongoing Repairs 5,031 $3.25/SqFt5$327 1 (2%) Basketball Ct & Tennis Parking
300 - Asphalt: Overlay w/ Interlayer 12,195 $1.75/SqFt25$21,341 17 Clubhouse Parking
310 - Asphalt: Overlay w/ Interlayer 2,596 $1.77/SqFt25$4,585 17 Gym Building Parking
320 - Asphalt: Overlay w/ Interlayer 1 $14,000/LS25$14,000 22 Road to Upper Lake
340 - Asphalt: Overlay w/ Interlayer 5,031 $1.77/SqFt25$8,885 17 Basketball Ct & Tennis Parking
820 - Striping 1 $1,005/LS5$1,005 1 All Parking Areas
Concrete02000 -
220 - Walkways 1,250 $16.00/SqFt5$600 0 (3%) Clubhouse
300 - Driveways 6,835 $24.38/SqFt15$5,000 0 (3%) Barn Entrance Drive
Painting: Exterior03000 -
132 - Surface Restoration 4,466 $.90/SqFt5$4,019 2 Barn
136 - Surface Restoration 1 $3,501/LS5$3,501 4 Clubhouse Railings
454 - Wood Fencing 82 $6.00/l.f.5$492 1 Corral Perimeter
Painting: Interior03500 -
104 - Building 5,079 $1.40/SqFt10$7,111 4 Clubhouse
Structural Repairs04000 -
200 - Wood: Siding & Trim 2,148 $8.00/SqFt40$17,184 35 Fitness Building
210 - Wood: Siding & Trim 4,240 $9.00/SqFt40$38,160 15 Clubhouse
232 - Wood: Siding & Trim 4,466 $8.00/SqFt10$1,786 12 (5%) Barn
550 - Bridge Maintenance 1 $1,270/LS5$1,270 4 Upper Lake Spillway
826 - Floating Dock 1 $16,280/LS20$16,280 12 Lower Lake
960 - Awnings 1 $5,465/LS15$5,465 8 Barn Shade Shelters
961 - Awnings 2 $877/Itm1$1,754 0 [nr:1] Barn Shade Shelters (2016 Only)
© Browning Reserve Group 2016 821106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Current
Replacement Cost
Useful
Life
Remaining
Life Quantity
Cost/
U of MComponent LocationTreatment
Crystal Falls Association
Component Tabular Listing
First Draft
Prepared for the 2017 Fiscal Year
Included Components
Structural Repairs04000 -
996 - Miscellaneous 1 $3,920/LS20$3,920 13 Barn PVC Pipe
Decking/Balconies04500 -
100 - Wood 364 $50.00/SqFt20$18,200 6 Clubhouse Upper Level
320 - Railing: Wood 181 $32.00/l.f.25$5,792 15 Clubhouse
Roofing05000 -
400 - Pitched: Dimensional Composition
36 $350/Sqrs25$12,600 21 Clubhouse
410 - Pitched: Dimensional Composition
1 $750/Sqrs25$750 5 Gym Bldg Pump House
412 - Pitched: Dimensional Composition
99 $325/Sqrs25$32,175 21 Barn
500 - Pitched: Dimensional Composition
11 $500/Sqrs25$5,500 23 Gym Building
700 - Gutters / Downspouts 220 $8.00/l.f.30$1,760 26 Clubhouse
712 - Gutters / Downspouts 282 $9.40/l.f.25$2,651 21 Barn
720 - Gutters / Downspouts 54 $8.90/l.f.30$481 26 Gym Building
Rehab08000 -
100 - General 1 $3,900/LS15$3,900 10 Barn
226 - Restrooms 1 $3,320/LS20$3,320 2 Clubhouse Upper Level
230 - Kitchen 1 $5,190/Rm20$5,190 11 Clubhouse Lower Level
236 - Kitchen 1 $7,725/Rm20$7,725 12 Clubhouse Upper Level
240 - Clubhouse 1 $10,045/LS20$10,045 2 Lower Floor Decorating
242 - Clubhouse 1 $3,863/LS15$3,863 7 Upper Floor Decorating
246 - Restrooms 1 $3,500/LS20$3,500 13 Clubhouse Lower Level
248 - Restrooms 2 $3,795/Rm20$3,795 2 (50%) Clubhouse Upper Level
250 - General 1 $4,030/LS20$4,030 11 Office
Gate Equipment11000 -
780 - Pedestrian Gate 1 $6,650/LS30$6,650 20 Lower Lake Access
Recreation14000 -
290 - Exercise: Miscellaneous Equip. 1 $5,520/LS8$2,760 4 (50%) Gym Building
900 - Miscellaneous 1 $5,500/LS5$1,100 3 (20%) Barn Horse Tack
Tennis Court17000 -
100 - Reseal 5,000 $.80/SqFt7$4,000 7 Tennis Court
500 - Resurface 5,000 $2.00/SqFt21$10,000 21 Tennis Court
550 - Fixtures 1 $532/Itm5$532 0 Tennis Court Net
© Browning Reserve Group 2016 831106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Current
Replacement Cost
Useful
Life
Remaining
Life Quantity
Cost/
U of MComponent LocationTreatment
Crystal Falls Association
Component Tabular Listing
First Draft
Prepared for the 2017 Fiscal Year
Included Components
Basketball / Sport Court17500 -
200 - Seal & Striping 3,510 $.60/SqFt7$2,106 7 Basketball Court
400 - Overlay 3,510 $2.00/SqFt20$7,020 20 Basketball Court
900 - Basketball Standard 1 $500/LS5$500 0 Basketball Court
904 - Miscellaneous 1 $14,000/LS20$14,000 0 [nr:1] Court Surfaces (2016 Only)
Landscaping18000 -
340 - Irrigation: Pumps 1 $6,300/LS5$3,150 1 (50%) Pump House
Lakes / Ponds18500 -
330 - Aeration Heads / Diffusers 1 $4,190/LS10$4,190 7 Lower Lake
334 - Aeration Heads / Diffusers 1 $1,290/Itm10$1,290 3 Third Aerator
620 - Pump / Motor 1 $880/Itm5$880 3 Lower Lake Drain
911 - Miscellaneous 1 $25,168/LS35$25,168 31 Lower Lake Weir Gate Valve
914 - Miscellaneous 1 $30,000/LS2$30,000 1 Lower & Upper Lake Maintenance
990 - Miscellaneous 1 $6,570/LS5$6,570 0 Floating Dock
Fencing19000 -
110 - Chain Link: 6' 80 $15.00/l.f.35$600 10 (50%) Basketball Court Backstops
112 - Chain Link: 6' 1,730 $17.00/l.f.35$29,410 20 Upper Lake Perimeter
120 - Chain Link: 8' 1,259 $19.00/l.f.5$3,588 4 (15%) Clubhouse & Lake Perimeter
130 - Chain Link: 10' 300 $24.00/l.f.30$7,200 15 Tennis Courts
324 - Wood: 4' 78 $23.00/l.f.18$1,794 4 Barn East Perimeter
340 - Wood: 6' 80 $36.00/l.f.18$2,880 10 Barn East Perimeter
540 - Metal 2,000 $17.00/l.f.6$3,400 5 (10%) Corral Fencing
542 - Metal 835 $40.00/l.f.30$33,400 5 Barn Perimeter
543 - Metal 1 $1,754/LS1$1,754 0 [nr:1] Barn Perimeter (2016 Only)
Retaining Wall19500 -
120 - Wood: 1' 40 $40.00/l.f.25$1,600 7 Lower Lake
Lighting20000 -
100 - Exterior: Misc. Fixtures 1 $1,105/LS15$1,105 9 Barn Security Lighting
Signage21000 -
792 - Monument 1 $1,400/Itm20$1,400 15 Community Entrance
Office Equipment22000 -
100 - Computers, Misc. 1 $2,500/LS5$2,500 3 Office Equipment
Mechanical Equipment23000 -
200 - Furnace 1 $880/Itm20$880 10 Clubhouse Lower Level
© Browning Reserve Group 2016 841106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Current
Replacement Cost
Useful
Life
Remaining
Life Quantity
Cost/
U of MComponent LocationTreatment
Crystal Falls Association
Component Tabular Listing
First Draft
Prepared for the 2017 Fiscal Year
Included Components
Mechanical Equipment23000 -
202 - Furnace 1 $880/Itm20$880 5 Clubhouse Upper Level
996 - Swamp Cooler 3 $2,590/Itm12$7,770 7 Clubhouse
Furnishings24000 -
100 - Office Desk, Chair 1 $3,400/LS12$1,700 4 (50%) Clubhouse
102 - Tables 3 $495/Itm20$1,485 5 Clubhouse Lower Level
110 - Chairs 123 $50.00/Itm12$6,150 5 Clubhouse
130 - Tables 13 $145/Itm12$1,885 3 Clubhouse
Safety / Access24600 -
520 - Card Readers 1 $3,500/LS10$3,500 6 Lower Lake Access Control
700 - Security System 1 $3,865/LS6$3,865 3 Alarms & Cameras
701 - Security System 1 $1,040/LS1$1,040 0 [nr:1] Alarms & Cameras (2016 Only)
720 - Security System 1 $8,755/LS6$4,378 5 (50%) Park
Flooring25000 -
200 - Miscellaneous 217 $40.00/SqYd15$8,680 7 Clubhouse Upper Level
210 - Carpeting 10 $35.00/SqYd10$350 1 Clubhouse Office Lower Level
600 - Vinyl 52 $40.00/SqYd12$2,080 1 Clubhouse Lower Level
604 - Vinyl 19 $40.00/SqYd7$380 2 (50%) Clubhouse Upper Level Restrooms
Outdoor Equipment26000 -
100 - Tot Lot: Play Equipment 1 $5,000/Itm18$5,000 7 Upper Lake
102 - Tot Lot: Play Equipment 1 $5,000/Itm15$5,000 7 Lower Lake
200 - Pedestal Grill BBQ 3 $390/Itm20$1,170 3 Lower & Upper Lakes
202 - Pedestal Grill BBQ 2 $390/Itm20$780 5 Lower & Upper Lakes
210 - Barbecue 1 $400/LS5$400 2 Lower Lake Near Clubhouse
300 - Picnic Table: Wood 5 $715/Itm7$1,430 5 (40%) Lower & Upper Lakes
310 - Wood Benches 11 $500/Itm12$5,500 6 Lower Lake
480 - Drinking Fountain 1 $775/Itm15$775 9 Clubhouse
Appliances27000 -
200 - Refrigerator 1 $1,100/Itm12$1,100 4 Clubhouse Lower Level
204 - Refrigerator 1 $800/Itm12$800 4 Clubhouse Lower Level
208 - Refrigerator 1 $880/Itm12$880 4 Clubhouse Upper Level
276 - Oven: Wall 1 $1,600/Itm12$1,600 2 Clubhouse Lower Level
280 - Cook Top Stove 1 $500/Itm12$500 3 Clubhouse Upper Level
284 - Cook Top Stove 1 $550/Itm12$550 5 Clubhouse Lower Level
300 - Dishwasher 1 $850/Itm10$850 2 Clubhouse Lower Level
© Browning Reserve Group 2016 851106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Current
Replacement Cost
Useful
Life
Remaining
Life Quantity
Cost/
U of MComponent LocationTreatment
Crystal Falls Association
Component Tabular Listing
First Draft
Prepared for the 2017 Fiscal Year
Included Components
Miscellaneous30000 -
442 - Miscellaneous 1 $695/Itm24$695 6 Horse- Harley
446 - Miscellaneous 1 $1,280/Itm24$1,280 8 Horse- Cowgirl
700 - Tools 1 $3,600/LS2$720 1 (20%) Barn Maintenance Shop
810 - Tractor 1 $18,200/Itm15$18,200 5 1983 Case 480 LL
812 - Tractor 1 $20,862/Itm15$20,862 12 Kubota Tractor
830 - Vehicle 1 $6,620/Itm10$6,620 1 2002 Ford Ranger
Undesignated32000 -
100 - Miscellaneous 1 $1,100/LS1$1,100 1 Reserve Items
© Browning Reserve Group 2016 861106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Current
Replacement Cost
Useful
Life
Remaining
Life Quantity
Cost/
U of MComponent LocationTreatment
Crystal Falls Association
Component Tabular Listing
First Draft
Prepared for the 2017 Fiscal Year
Excluded Components
Painting: Exterior03000 -
130 - Surface Restoration 2,148 $1.20/SqFt5$2,578 1 Fitness Building
134 - Surface Restoration 4,240 $1.10/SqFt5$4,680 1 Clubhouse
150 - Stain 364 $1.66/SqFt5$603 1 Clubhouse Upper Level Deck
152 - Stain 172 $1.66/SqFt5$285 1 Clubhouse Lower Deck
406 - Railings 835 $9.00/l.f.5$7,515 0 Barn Perimeter Fencing
Painting: Interior03500 -
100 - Building 1,987 $1.10/SqFt8$2,193 3 Gym Building
102 - Building 1 $760/LS2$760 1 Barn
Fencing19000 -
990 - Post & Cable 1 $1,131/LS5$1,131 2 Park Perimeter
994 - Post & Cable 26 $126/Itm5$1,091 2 (33%) [nr:3] Park Perimeter Posts
Retaining Wall19500 -
124 - Wood: 4' 69 $226/l.f.25$15,613 3 Lower Lake Bulkhead
Mechanical Equipment23000 -
600 - Water Heater 1 $993/Itm15$993 2 Barn 40 US Gallon
602 - Water Heater 1 $773/Itm12$773 2 Clubhouse
Audio / Visual24500 -
300 - PA System 1 $629/LS10$629 2 Clubhouse
Miscellaneous30000 -
880 - Boat 2 $883/Itm5$1,766 1 Lower LakeLower LakeLower Lake
© Browning Reserve Group 2016 871106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section VII-a
Expenditures by Year - Next 4 YearsFirst Draft
Prepared for the 2017 Fiscal Year
Reserve Component
Life
Useful Replacement Cost
Current Forecast
Inflated Cost @ 2.50%
2016Concrete02000 -
220 - Walkways 1,250 Sq. Ft. Clubhouse (3%)
6005
300 - Driveways 6,835 Sq. Ft. Barn Entrance Drive (3%)
5,00015
5,600Total 02000 - Concrete: 5,600
Structural Repairs04000 -
961 - Awnings 2 Barn Shade Shelters (2016 Only)[nr:1]
1,7541
Tennis Court17000 -
550 - Fixtures Tennis Court Net
5325
Basketball / Sport Court17500 -
900 - Basketball Standard Basketball Court
5005
904 - Miscellaneous Court Surfaces (2016 Only)[nr:1]
14,00020
14,500Total 17500 - Basketball / Sport Court: 14,500
Lakes / Ponds18500 -
990 - Miscellaneous Floating Dock
6,5705
Fencing19000 -
543 - Metal Barn Perimeter (2016 Only)[nr:1]
1,7541
Safety / Access24600 -
701 - Security System Alarms & Cameras (2016 Only)[nr:1]
1,0401
31,750Total 2016:
2017Paving01000 -
100 - Asphalt: Sealing 12,195 Sq. Ft. Clubhouse Parking
2,4395 2,500
110 - Asphalt: Sealing 2,596 Sq. Ft. Gym Building Parking
5195 532
120 - Asphalt: Sealing 5,031 Sq. Ft. Basketball Ct & Tennis Parking
1,0065 1,031
200 - Asphalt: Ongoing Repairs 12,195 Sq. Ft. Clubhouse Parking (2%)
7935 812
210 - Asphalt: Ongoing Repairs 2,596 Sq. Ft. Gym Building Parking (2%)
1695 173
220 - Asphalt: Ongoing Repairs 5,031 Sq. Ft. Basketball Ct & Tennis Parking (2%)
3275 335
820 - Striping All Parking Areas
1,0055 1,030
© Browning Reserve Group 2016 881106
Version 5/10/2016 5:02:09 PM
5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component
Life
Useful Replacement Cost
Current Forecast
Inflated Cost @ 2.50%
Crystal Falls Association
Expenditures by Year- Next 4 Years
First Draft
Prepared for the 2017 Fiscal Year
2017Paving01000 -
6,413Total 01000 - Paving: 6,258
Painting: Exterior03000 -
454 - Wood Fencing 82 Lin. Ft. Corral Perimeter
4925 504
Landscaping18000 -
340 - Irrigation: Pumps Pump House (50%)
3,1505 3,229
Lakes / Ponds18500 -
914 - Miscellaneous Lower & Upper Lake Maintenance
30,0002 30,750
Flooring25000 -
210 - Carpeting 10 Sq. Yds. Clubhouse Office Lower Level
35010 359
600 - Vinyl 52 Sq. Yds. Clubhouse Lower Level
2,08012 2,132
2,491Total 25000 - Flooring: 2,430
Miscellaneous30000 -
700 - Tools Barn Maintenance Shop (20%)
7202 738
830 - Vehicle 2002 Ford Ranger
6,62010 6,786
7,524Total 30000 - Miscellaneous: 7,340
Undesignated32000 -
100 - Miscellaneous Reserve Items
1,1001 1,128
52,03950,770Total 2017:
2018Painting: Exterior03000 -
132 - Surface Restoration 4,466 Sq. Ft. Barn
4,0195 4,223
Rehab08000 -
226 - Restrooms Clubhouse Upper Level
3,32020 3,488
240 - Clubhouse Lower Floor Decorating
10,04520 10,554
248 - Restrooms 2 Clubhouse Upper Level (50%)
3,79520 3,987
18,029Total 08000 - Rehab: 17,160
Flooring25000 -
604 - Vinyl 19 Sq. Yds. Clubhouse Upper Level Restrooms (50%)
3807 399
Outdoor Equipment26000 -
210 - Barbecue Lower Lake Near Clubhouse
4005 420
Appliances27000 -
276 - Oven: Wall Clubhouse Lower Level
1,60012 1,681
300 - Dishwasher Clubhouse Lower Level
85010 893
© Browning Reserve Group 2016 891106
Version 5/10/2016 5:02:09 PM
5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Reserve Component
Life
Useful Replacement Cost
Current Forecast
Inflated Cost @ 2.50%
Crystal Falls Association
Expenditures by Year- Next 4 Years
First Draft
Prepared for the 2017 Fiscal Year
2018Appliances27000 -
2,574Total 27000 - Appliances: 2,450
Undesignated32000 -
100 - Miscellaneous Reserve Items
1,1001 1,156
26,80125,509Total 2018:
2019Recreation14000 -
900 - Miscellaneous Barn Horse Tack (20%)
1,1005 1,185
Lakes / Ponds18500 -
334 - Aeration Heads / Diffusers Third Aerator
1,29010 1,389
620 - Pump / Motor Lower Lake Drain
8805 948
914 - Miscellaneous Lower & Upper Lake Maintenance
30,0002 32,307
34,644Total 18500 - Lakes / Ponds: 32,170
Office Equipment22000 -
100 - Computers, Misc. Office Equipment
2,5005 2,692
Furnishings24000 -
130 - Tables 13 Clubhouse
1,88512 2,030
Safety / Access24600 -
700 - Security System Alarms & Cameras
3,8656 4,162
Outdoor Equipment26000 -
200 - Pedestal Grill BBQ 3 Lower & Upper Lakes
1,17020 1,260
Appliances27000 -
280 - Cook Top Stove Clubhouse Upper Level
50012 538
Miscellaneous30000 -
700 - Tools Barn Maintenance Shop (20%)
7202 775
Undesignated32000 -
100 - Miscellaneous Reserve Items
1,1001 1,185
48,47145,010Total 2019:
© Browning Reserve Group 2016 901106
Version 5/10/2016 5:02:09 PM
5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Section X
Notes to the Auditor
First Draft
Prepared for the 2017 Fiscal Year
This report is intended to assist the auditor while preparing the audit, review or compilation of Crystal Falls Association’s (the "Association") financial documents.
Browning Reserve Group ("BRG") prepared a reserve study for the Association during the 2016 fiscal year. This was done to help determine the Association's reserve contribution for the next fiscal year (2017) and future fiscal years. In addition, BRG prepared the proper statutory disclosures for distribution to the Association members.
This Reserve Study is an Update w/ Site Visit Review. An Update With Site-Visit Reviewis a reserve study update in which the following tasks are performed:
development of a reserve component inventory (verification only, not quantification);
condition assessment based upon on-site visual observation;
life and valuation estimates;
fund status;
and a funding plan. Please note, in order to complete these study tasks, one or more
visits were conducted by BRG to Crystal Falls Association.
For BRG reserve studies, the year in which the study is being conducted, is the first year of the study. For example, this study is being prepared during 2016 and is the Association’s first year in the study. This enables BRG to use a starting point which ties to the last audited financial statement, December 31, 2015. You will notice in Section III, Reserve Fund Balance Forecast, a Beginning Reserve Balance of $12,781 is being used which ties to the last completed audit or review of the Association’s financial statements. BRG then re-builds the first year of the study, in this case 2016, and estimates an ending reserve fund balance. Again, see Section III and the 2016 ending reserve balance estimate of $37,478.
“Re-building” the first year of the study as mentioned above simply means using the 2016 adopted budget for the 2016 reserve contribution. Finally, the 2016 reserve expenses both actual and projected are estimated.
We find by using the above method a more accurate reserve study is possible because the beginning reserve fund balance ties directly to the Association’s audited financial statement or, in the absence of an audit or review, the year end balance sheet. There is no need to rely on others for determining mid year reserve balances or estimating current year ending reserve balances. This approach forces all involved, to look at the current year’s reserve fund activities so a more accurate ending reserve fund balance can be estimated.
© Browning Reserve Group 2016 911106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Notes to the Auditor
First Draft
Prepared for the 2017 Fiscal Year
With respect to the reserve component Percent Funded values on the next page(s), here are the calculations:
FFB = Year Cost X Year Effective Age / Useful Life
% Funded = Year Estimated Ending Reserve Balance / Year FFB
Please see Section V - Reserve Fund Balance Forecast.
Browning Reserve Group
© Browning Reserve Group 2016 921106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Schedule of Supplementary Information for Auditor Component Method
First Draft
Prepared for the 2017 Fiscal Year
Current Repl. Cost
UsefulLife
RemainingLife
2017 Line ItemContribution
based onCash Flow Method
2017 Fully Funded BalanceReserve Component
2016 Fully Funded Balance
01000 - Paving
100 - Asphalt: Sealing 12,195 Sq. Ft. Clubhouse Parking
2,439 5 1 5042,5001,951
110 - Asphalt: Sealing 2,596 Sq. Ft. Gym Building Parking
519 5 1 107532415
120 - Asphalt: Sealing 5,031 Sq. Ft. Basketball Ct & Tennis Parking
1,006 5 1 2081,031805
200 - Asphalt: Ongoing Repairs 12,195 Sq. Ft. Clubhouse Parking (2%)
793 5 1 164812634
210 - Asphalt: Ongoing Repairs 2,596 Sq. Ft. Gym Building Parking (2%)
169 5 1 35173135
220 - Asphalt: Ongoing Repairs 5,031 Sq. Ft. Basketball Ct & Tennis Parking (2%)
327 5 1 68335262
300 - Asphalt: Overlay w/ Interlayer 12,195 Sq. Ft. Clubhouse Parking
21,341 25 17 1,3087,8756,829
310 - Asphalt: Overlay w/ Interlayer 2,596 Sq. Ft. Gym Building Parking
4,585 25 17 2811,6921,467
320 - Asphalt: Overlay w/ Interlayer Road to Upper Lake
14,000 25 22 9712,2961,680
340 - Asphalt: Overlay w/ Interlayer 5,031 Sq. Ft. Basketball Ct & Tennis Parking
8,885 25 17 5453,2792,843
820 - Striping All Parking Areas
1,005 5 1 2081,030804
02000 - Concrete
220 - Walkways 1,250 Sq. Ft. Clubhouse (3%)
600 5 0 121123600
300 - Driveways 6,835 Sq. Ft. Barn Entrance Drive (3%)
5,000 15 0 3363425,000
03000 - Painting: Exterior
132 - Surface Restoration 4,466 Sq. Ft. Barn
4,019 5 2 8513,2962,412
136 - Surface Restoration Clubhouse Railings
3,501 5 4 7791,435700
454 - Wood Fencing 82 Lin. Ft. Corral Perimeter
492 5 1 102504394
03500 - Painting: Interior
104 - Building 5,079 Sq. Ft. Clubhouse
7,111 10 4 7915,1024,266
04000 - Structural Repairs
200 - Wood: Siding & Trim 2,148 Sq. Ft. Fitness Building
17,184 40 35 02,6422,148
210 - Wood: Siding & Trim 4,240 Sq. Ft. Clubhouse
38,160 40 15 1,39225,42423,850
232 - Wood: Siding & Trim 4,466 Sq. Ft. Barn (5%)
1,786 10 12 186153137
550 - Bridge Maintenance Upper Lake Spillway
1,270 5 4 282521254
826 - Floating Dock Lower Lake
16,280 20 12 1,1037,5096,512
960 - Awnings Barn Shade Shelters
5,465 15 8 4472,9882,550
961 - Awnings 2 Barn Shade Shelters (2016 Only)[nr:1]
1,754 1 0 001,754
996 - Miscellaneous 3,920 20 13 2721,6071,372
© Browning Reserve Group 2016 931106
Version 5/10/2016 5:02:09 PM
05/10/2016 December 31
Current Repl. Cost
UsefulLife
RemainingLife
2017 Line ItemContribution
based onCash Flow Method
2017 Fully Funded BalanceReserve Component
2016 Fully Funded Balance
Crystal Falls Association
Schedule of Supplementary Information for AuditorComponent Method
First Draft
Prepared for the 2017 Fiscal Year
04000 - Structural Repairs
Barn PVC Pipe
04500 - Decking/Balconies
100 - Wood 364 Sq. Ft. Clubhouse Upper Level
18,200 20 6 1,06313,99112,740
320 - Railing: Wood 181 Lin. Ft. Clubhouse
5,792 25 15 3382,6122,317
05000 - Roofing
400 - Pitched: Dimensional Composition 36 Squares- Clubhouse
12,600 25 21 8532,5832,016
410 - Pitched: Dimensional Composition Gym Bldg Pump House
750 25 5 34646600
412 - Pitched: Dimensional Composition 99 Squares- Barn
32,175 25 21 2,1776,5965,148
500 - Pitched: Dimensional Composition 11 Squares- Gym Building
5,500 25 23 391677440
700 - Gutters / Downspouts 220 Lin. Ft. Clubhouse
1,760 30 26 112301235
712 - Gutters / Downspouts 282 Lin. Ft. Barn
2,651 25 21 179543424
720 - Gutters / Downspouts 54 Lin. Ft. Gym Building
481 30 26 318264
08000 - Rehab
100 - General Barn
3,900 15 10 3351,5991,300
226 - Restrooms Clubhouse Upper Level
3,320 20 2 1763,2332,988
230 - Kitchen Clubhouse Lower Level
5,190 20 11 3432,6602,336
236 - Kitchen Clubhouse Upper Level
7,725 20 12 5233,5633,090
240 - Clubhouse Lower Floor Decorating
10,045 20 2 5329,7819,041
242 - Clubhouse Upper Floor Decorating
3,863 15 7 3082,3762,060
246 - Restrooms Clubhouse Lower Level
3,500 20 13 2431,4351,225
248 - Restrooms 2 Clubhouse Upper Level (50%)
3,795 20 2 2013,6953,416
250 - General Office
4,030 20 11 2662,0651,814
11000 - Gate Equipment
780 - Pedestrian Gate Lower Lake Access
6,650 30 20 3662,4992,217
14000 - Recreation
290 - Exercise: Miscellaneous Equip. Gym Building (50%)
2,760 8 4 3841,7681,380
900 - Miscellaneous Barn Horse Tack (20%)
1,100 5 3 239677440
17000 - Tennis Court
100 - Reseal 5,000 Sq. Ft. Tennis Court
4,000 7 7 599586500
500 - Resurface 5,000 Sq. Ft. Tennis Court
10,000 21 21 769488455
550 - Fixtures Tennis Court Net
532 5 0 107109532
17500 - Basketball / Sport Court
200 - Seal & Striping 3,510 Sq. Ft. Basketball Court
2,106 7 7 315308263
400 - Overlay 3,510 Sq. Ft. Basketball Court
7,020 20 20 552360334
900 - Basketball Standard Basketball Court
500 5 0 101103500
© Browning Reserve Group 2016 941106
Version 5/10/2016 5:02:09 PM
05/10/2016 December 31
Current Repl. Cost
UsefulLife
RemainingLife
2017 Line ItemContribution
based onCash Flow Method
2017 Fully Funded BalanceReserve Component
2016 Fully Funded Balance
Crystal Falls Association
Schedule of Supplementary Information for AuditorComponent Method
First Draft
Prepared for the 2017 Fiscal Year
17500 - Basketball / Sport Court
904 - Miscellaneous Court Surfaces (2016 Only)[nr:1]
14,000 20 0 0014,000
18000 - Landscaping
340 - Irrigation: Pumps Pump House (50%)
3,150 5 1 6503,2292,520
18500 - Lakes / Ponds
330 - Aeration Heads / Diffusers Lower Lake
4,190 10 7 5021,7181,257
334 - Aeration Heads / Diffusers Third Aerator
1,290 10 3 1401,058903
620 - Pump / Motor Lower Lake Drain
880 5 3 191541352
911 - Miscellaneous Lower Lake Weir Gate Valve
25,168 35 31 03,6852,876
914 - Miscellaneous Lower & Upper Lake Maintenance
30,000 2 1 15,48730,75015,000
990 - Miscellaneous Floating Dock
6,570 5 0 1,3241,3476,570
19000 - Fencing
110 - Chain Link: 6' 80 Lin. Ft. Basketball Court Backstops (50%)
600 35 10 22457429
112 - Chain Link: 6' 1,730 Lin. Ft. Upper Lake Perimeter
29,410 35 20 1,38713,78112,604
120 - Chain Link: 8' 1,259 Lin. Ft. Clubhouse & Lake Perimeter (15%)
3,588 5 4 7981,471718
130 - Chain Link: 10' 300 Lin. Ft. Tennis Courts
7,200 30 15 3503,9363,600
324 - Wood: 4' 78 Lin. Ft. Barn East Perimeter
1,794 18 4 1111,5321,395
340 - Wood: 6' 80 Lin. Ft. Barn East Perimeter
2,880 18 10 2061,4761,280
540 - Metal 2,000 Lin. Ft. Corral Fencing (10%)
3,400 6 5 6461,162567
542 - Metal 835 Lin. Ft. Barn Perimeter
33,400 30 5 1,26929,67027,833
543 - Metal Barn Perimeter (2016 Only)[nr:1]
1,754 1 0 001,754
19500 - Retaining Wall
120 - Wood: 1' 40 Lin. Ft. Lower Lake
1,600 25 7 771,2461,152
20000 - Lighting
100 - Exterior: Misc. Fixtures Barn Security Lighting
1,105 15 9 93529442
21000 - Signage
792 - Monument Community Entrance
1,400 20 15 102431350
22000 - Office Equipment
100 - Computers, Misc. Office Equipment
2,500 5 3 5421,5381,000
23000 - Mechanical Equipment
200 - Furnace Clubhouse Lower Level
880 20 10 57496440
202 - Furnace Clubhouse Upper Level
880 20 5 50722660
996 - Swamp Cooler 3 Clubhouse
7,770 12 7 7753,9823,238
24000 - Furnishings
100 - Office Desk, Chair Clubhouse (50%)
1,700 12 4 1581,3071,133
102 - Tables 3 Clubhouse Lower Level
1,485 20 5 851,2181,114
110 - Chairs 6,150 12 5 5844,2033,588
© Browning Reserve Group 2016 951106
Version 5/10/2016 5:02:09 PM
05/10/2016 December 31
Current Repl. Cost
UsefulLife
RemainingLife
2017 Line ItemContribution
based onCash Flow Method
2017 Fully Funded BalanceReserve Component
2016 Fully Funded Balance
Crystal Falls Association
Schedule of Supplementary Information for AuditorComponent Method
First Draft
Prepared for the 2017 Fiscal Year
24000 - Furnishings
123 Clubhouse
130 - Tables 13 Clubhouse
1,885 12 3 1701,6101,414
24600 - Safety / Access
520 - Card Readers Lower Lake Access Control
3,500 10 6 4091,7941,400
700 - Security System Alarms & Cameras
3,865 6 3 6992,6411,933
701 - Security System Alarms & Cameras (2016 Only)[nr:1]
1,040 1 0 001,040
720 - Security System Park (50%)
4,378 6 5 8311,496730
25000 - Flooring
200 - Miscellaneous 217 Sq. Yds. Clubhouse Upper Level
8,680 15 7 6935,3384,629
210 - Carpeting 10 Sq. Yds. Clubhouse Office Lower Level
350 10 1 36359315
600 - Vinyl 52 Sq. Yds. Clubhouse Lower Level
2,080 12 1 1792,1321,907
604 - Vinyl 19 Sq. Yds. Clubhouse Upper Level Restrooms (50%)
380 7 2 57334271
26000 - Outdoor Equipment
100 - Tot Lot: Play Equipment Upper Lake
5,000 18 7 3333,4173,056
102 - Tot Lot: Play Equipment Lower Lake
5,000 15 7 3993,0752,667
200 - Pedestal Grill BBQ 3 Lower & Upper Lakes
1,170 20 3 631,079995
202 - Pedestal Grill BBQ 2 Lower & Upper Lakes
780 20 5 44640585
210 - Barbecue Lower Lake Near Clubhouse
400 5 2 85328240
300 - Picnic Table: Wood 5 Lower & Upper Lakes (40%)
1,430 7 5 233628409
310 - Wood Benches 11 Lower Lake
5,500 12 6 5353,2892,750
480 - Drinking Fountain Clubhouse
775 15 9 65371310
27000 - Appliances
200 - Refrigerator Clubhouse Lower Level
1,100 12 4 102846733
204 - Refrigerator Clubhouse Lower Level
800 12 4 74615533
208 - Refrigerator Clubhouse Upper Level
880 12 4 82677587
276 - Oven: Wall Clubhouse Lower Level
1,600 12 2 1411,5031,333
280 - Cook Top Stove Clubhouse Upper Level
500 12 3 45427375
284 - Cook Top Stove Clubhouse Lower Level
550 12 5 52376321
300 - Dishwasher Clubhouse Lower Level
850 10 2 90784680
30000 - Miscellaneous
442 - Miscellaneous Horse- Harley
695 24 6 34564521
446 - Miscellaneous Horse- Cowgirl
1,280 24 8 65929853
700 - Tools Barn Maintenance Shop (20%)
720 2 1 372738360
810 - Tractor 1983 Case 480 LL
18,200 15 5 1,38313,68012,133
© Browning Reserve Group 2016 961106
Version 5/10/2016 5:02:09 PM
05/10/2016 December 31
Current Repl. Cost
UsefulLife
RemainingLife
2017 Line ItemContribution
based onCash Flow Method
2017 Fully Funded BalanceReserve Component
2016 Fully Funded Balance
Crystal Falls Association
Schedule of Supplementary Information for AuditorComponent Method
First Draft
Prepared for the 2017 Fiscal Year
30000 - Miscellaneous
812 - Tractor Kubota Tractor
20,862 15 12 1,8845,7024,172
830 - Vehicle 2002 Ford Ranger
6,620 10 1 6836,7865,958
32000 - Undesignated
100 - Miscellaneous Reserve Items
1,100 1 1 5681,128550
Totals 313,304 58,605618,270
[B]
13.03%Percent Funded
[EndBal]
[B]
288,182
[A]
13.01%
[EndBal]
[A]
© Browning Reserve Group 2016 971106
Version 5/10/2016 5:02:09 PM
05/10/2016 December 31
Crystal Falls Association
Section XI
Glossary
First Draft
Prepared for the 2017 Fiscal Year
of Reserve Study Terms
Terms & Definitions CAI
CASH FLOW METHOD: A method of developing a Reserve Funding Plan where
contributions to the Reserve fund are designed to offset the variable annual expenditures from the Reserve fund. Different Reserve Funding Plans are tested against the anticipated schedule of Reserve expenses until the desired Funding Goal is achieved.
COMPONENT INVENTORY: The task of selecting and quantifying Reserve Components.
This task can be accomplished through on-site visual observations, review of association design and organizational documents, a review of established association precedents, and discussion with appropriate representative(s) of the association or cooperative.
COMPONENT METHOD: A method of developing a Reserve Funding Plan where the total
contribution is based on the sum of contributions for individual components. See “Cash Flow Method.
COMPONENT: The individual line items in the Reserve Study, developed or updated in the
Physical Analysis. These elements form the building blocks for the Reserve Study. Components typically are: 1) Association responsibility, 2) with limited Useful Life expectancies, 3) predictable Remaining Useful Life expectancies, 4) above a minimum threshold cost, and 5) as required by local codes.
CONDITION ASSESSMENT: The task of evaluating the current condition of the
component based on observed or reported characteristics.
CURRENT REPLACEMENT COST: See “Replacement Cost."
DEFICIT: An actual (or projected) Reserve Balance less than the Fully Funded Balance.
The opposite would be a Surplus.
EFFECTIVE AGE: The difference between Useful Life and Remaining Useful Life. Not
always equivalent to chronological age, since some components age irregularly. Used primarily in computations.
FINANCIAL ANALYSIS: The portion of a Reserve Study where current status of the
Reserves (measured as cash or Percent Funded) and a recommended Reserve contribution rate (Reserve Funding Plan) are derived, and the projected Reserve income and expense over time is presented. The Financial Analysis is one of the two parts of a Reserve Study.
© Browning Reserve Group 2016 981106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Glossaryof Reserve Study Terms
First Draft
Prepared for the 2017 Fiscal Year
FULLY FUNDED BALANCE (FFB): Total Accrued Depreciation. An indicator against which
Actual (or projected) Reserve balance can be compared. The Reserve balance that is in direct proportion to the fraction of life “used up” of the current Repair or Replacement cost. This number is calculated for each component, then summed together for an association total. Two formulae can be utilized, depending on the provider’s sensitivity to interest and inflation effects. Note: Both yield identical results when interest and inflation are equivalent.
FFB = Current Cost X Effective Age / Useful Life
or
FFB = (Current Cost X Effective Age / Useful Life) + [(Current Cost X Effective Age / Useful Life) / (1 + Interest Rate) ^ Remaining Life] -[(Current Cost X Effective Age / Useful Life) / (1 + Inflation Rate) ^ Remaining Life]
FULLY FUNDED: 100% Funded. When the actual (or projected) Reserve balance is equal
to the Fully Funded Balance.
FUND STATUS: The status of the reserve fund as compared to an established benchmark
such as percent funding.
FUNDING GOALS: Independent of methodology utilized, the following represent the basic
categories of Funding Plan goals:
Baseline Funding: Establishing a Reserve funding goal of keeping the Reserve cash balance above zero.
Full Funding: Setting a Reserve funding goal of attaining and maintaining Reserves at or near 100% funded.
Statutory Funding: Establishing a Reserve funding goal of setting aside the specific minimum amount of Reserves required by local statues.
Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than “Fully Funding."
FUNDING PLAN: An association’s plan to provide income to a Reserve fund to offset
anticipated expenditures from that fund.
FUNDING PRINCIPLES:
Sufficient Funds When Required
Stable Contribution Rate over the Years
Evenly Distributed Contributions over the Years
Fiscally Responsible
LIFE AND VALUATION ESTIMATES: The task of estimating Useful Life, Remaining
Useful Life, and Repair or Replacement Costs for the Reserve components.
PERCENT FUNDED: The ratio, at a particular point of time (typically the beginning of the
Fiscal Year), of the actual (or projected) Reserve Balance to the Fully Funded Balance, expressed as a percentage.
PHYSICAL ANALYSIS: The portion of the Reserve Study where the Component Inventory,
Condition Assessment, and Life and Valuation Estimate tasks are performed. This represents one of the two parts of the Reserve Study.
© Browning Reserve Group 2016 991106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Glossaryof Reserve Study Terms
First Draft
Prepared for the 2017 Fiscal Year
REMAINING USEFUL LIFE (RUL): Also referred to as “Remaining Life” (RL). The
estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the initial year have “zero” Remaining Useful Life.
REPLACEMENT COST: The cost of replacing, repairing, or restoring a Reserve Component
to its original functional condition. The Current Replacement Cost would be the cost to replace, repair, or restore the component during that particular year.
RESERVE BALANCE: Actual or projected funds as of a particular point in time that the
association has identified for use to defray the future repair or replacement of those major components which the association is obligated to maintain. Also known as Reserves, Reserve Accounts and Cash Reserves. Based upon information provided and not audited.
RESERVE PROVIDER: An individual that prepares Reserve Studies.
RESERVE STUDY: A budget planning tool which identifies the current status of the
Reserve fund and a stable and equitable Funding Plan to offset the anticipated future major common area expenditures. The Reserve Study consists of two parts: the Physical Analysis and the Financial Analysis.
RESPONSIBLE CHARGE: A reserve specialist in responsible charge of a reserve study
shall render regular and effective supervision to those individuals performing services which directly and materially affect the quality and competence rendered by the reserve specialist. A reserve specialist shall maintain such records as are reasonably necessary to establish that the reserve specialist exercised regular and effective supervision of a reserve study of which he was in responsible charge. A reserve specialist engaged in any of the following acts or practices shall be deemed not to have rendered the regular and effective supervision required herein:
1. The regular and continuous absence from principal office premises from which professional services are rendered; except for performance of field work or presence in a field office maintained exclusively for a specific project;
2. The failure to personally inspect or review the work of subordinates where necessary and appropriate;
3. The rendering of a limited, cursory or perfunctory review of plans or projects in lieu of an appropriate detailed review;
4. The failure to personally be available on a reasonable basis or with adequate advance notice for consultation and inspection where circumstances require personal availability.
SPECIAL ASSESSMENT: An assessment levied on the members of an association in
addition to regular assessments. Special Assessments are often regulated by governing documents or local statutes.
SURPLUS: An actual (or projected) Reserve Balance greater than the Fully Funded
Balance. See “Deficit.”
USEFUL LIFE (UL): Total Useful Life or Depreciable Life. The estimated time, in years,
that a reserve component can be expected to serve its intended function if properly constructed in its present application or installation.
The above terms and definitions are from the Community Associations Institute (CAI) national standards.
© Browning Reserve Group 2016 1001106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
Glossaryof Reserve Study Terms
First Draft
Prepared for the 2017 Fiscal Year
Terms & Definitions BRG
Browning Reserve Group reserve studies use several terms that are unique to our reports. Our specialized systems have been developed to offer flexibility in many areas of our reporting. Please see below for definitions of abbreviations and symbols used in many of our reserve studies.
NR-1 (LIMITED RECURRENCE, 1 TIME): This signifies a major reserve component
recurs for only a fixed number of cycles. Most often used to display a cost in a specific year only, NR-1 signifies the component only occurs one time. An NR-2 means the component will display for two cycles and so on. This makes it easy to enter one-time costs that pop up from time to time, or to display a cost that may be unique at one replacement date only.
SE-2 (SPREAD EVENLY OVER 2 YEARS): This signifies the major component, when
replaced is spread evenly over 2 or more years. For example if a component will be replaced in year 8 of the study, and there is a SE-2, then the component will be replaced over 2 years, year 8 and year 9. Although the component is split over 2 or more years, each subsequent year will increase by the study’s inflation factor. An SE-3 signifies the component is split over three years and so on.
NSE-2 (SPREAD NON-EVENLY OVER 2 YEARS): Similar to above, but the spread is not
equal in each year. The spread is entered at a different amount for each year in the spread. The total of the spread will always equal 100% of the total replacement cost, excluding inflation.
% (PERCENT TO INCLUDE): This signifies that the component is being replaced at less
than 100 percent of its replacement cost or quantity. Perhaps a component is replaced partially at each replacement year. Another example would be to do a small portion of the work at each replacement year. Oftentimes wood fencing is replaced over several cycles, and the study will display a percentage of the fence at each replacement cycle.
DELAYED START (REMAINING LIFE GREATER THAN USEFUL): In many instances a
component's replacement cycle may not begin immediately, so the replacement cycle start is delayed. Delay is accomplished by setting the remaining life greater than the useful life.
ZERO REMAINING LIFE: Zero remaining life signifies that the component is replaced in
the year which the study is prepared. All replacements are reflected in their replacement year, and the year in which the study is prepared is no different than any other year.
© Browning Reserve Group 2016 1011106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
RESERVE STUDY
Member Distribution Materials
First Draft
Published - May 10, 2016
Prepared for the 2017 Fiscal Year
Update w/ Site Visit Review
Clarity from Complexity
Section Report Page
California: Member Summary 1
Assessment and Reserve Funding Disclosure Summary
3[Civil Code §5570]
Section III: 30 Year Reserve Funding Plan 5Cash Flow Method {c}
1106
Version 5/10/2016 5:02:09 PM
5/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
www.BrowningRG.com
Browning Reserve Group
© Browning Reserve Group 2016
May 10, 2016
Crystal Falls Association
California Member Summary First Draft
Prepared for the 2017 Fiscal Year
This is a summary of the Reserve Study that has been performed for Crystal Falls Association, (the "Association"). This study was conducted in compliance with California Civil Code Sections 5300, 5550 and 5560 and is being provided to you, as a member of the Association, as required under these statutes. A full copy is available (through the Association) for review by members of the Association.
The intention of the Reserve Study is to forecast the Association's ability to repair or replace major components as they wear out in future years. This is done utilizing the "Cash Flow Method." This is a method of developing a reserve funding plan where the contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund.
Browning Reserve Group prepared this Update w/ Site Visit Review for the January 1, 2017 - December 31, 2017 fiscal year.
Crystal Falls Association is a Planned Development with a total of 851 Lotss.
The Reserve Study is not an engineering report, and no destructive testing was performed. The costs outlined in the study are for budgetary and planning purposes only, and actual bid costs would depend upon the defined scope of work at the time repairs are made. Also, any latent defects are excluded from this report.
Funding Assessment
Based on the 30 year cash flow projection, the Association's reserves appear adequately funded as the reserve fund ending balances remain positive throughout the replacement of all major components during the next 30 years.
California statute imposes no reserve funding level requirements nor does it address funding level adequacy, and although one or more of the reserve fund percentages expressed in this report may be less than one hundred percent, those percentages do not necessarily indicate that the Association's reserves are inadequately funded.
© Browning Reserve Group 2016 11106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
RemainingLife
UsefulLife
Current Replacement
CostReserve Component
2017Fully
Funded Balance
2017Line Item
Contributionbased on
Cash Flow Method
2016Fully
Funded Balance
Crystal Falls Association
California Member Summary
First Draft
Prepared for the 2017 Fiscal Year
21,556 4,39701000 - Paving 55,069 5-25 1-22 17,826
465 45702000 - Concrete 5,600 5-15 0-0 5,600
5,236 1,73103000 - Painting: Exterior 8,012 5-5 1-4 3,505
5,102 79103500 - Painting: Interior 7,111 10-10 4-4 4,266
40,843 3,68204000 - Structural Repairs 85,819 1-40 0-35 38,578
16,603 1,40104500 - Decking/Balconies 23,992 20-25 6-15 15,057
11,427 3,77805000 - Roofing 55,916 25-30 5-26 8,927
30,408 2,92708000 - Rehab 45,368 15-20 2-13 27,268
2,499 36611000 - Gate Equipment 6,650 30-30 20-20 2,217
2,445 62214000 - Recreation 3,860 5-8 3-4 1,820
1,183 1,47517000 - Tennis Court 14,532 5-21 0-21 1,487
771 96817500 - Basketball / Sport Court
23,626 5-20 0-20 15,098
3,229 65018000 - Landscaping 3,150 5-5 1-1 2,520
39,099 17,64318500 - Lakes / Ponds 68,098 2-35 0-31 26,958
53,485 4,78919000 - Fencing 84,026 1-35 0-20 50,180
1,246 7719500 - Retaining Wall 1,600 25-25 7-7 1,152
529 9320000 - Lighting 1,105 15-15 9-9 442
431 10221000 - Signage 1,400 20-20 15-15 350
1,538 54222000 - Office Equipment 2,500 5-5 3-3 1,000
5,200 88223000 - Mechanical Equipment
9,530 12-20 5-10 4,338
8,337 99724000 - Furnishings 11,220 12-20 3-5 7,248
5,930 1,93924600 - Safety / Access 12,783 1-10 0-6 5,102
8,163 96525000 - Flooring 11,490 7-15 1-7 7,122
12,826 1,75726000 - Outdoor Equipment 20,055 5-20 2-9 11,010
5,228 58627000 - Appliances 6,280 10-12 2-5 4,562
28,399 4,42130000 - Miscellaneous 48,377 2-24 1-12 23,998
1,128 56832000 - Undesignated 1,100 1-1 1-1 550
Totals $313,304
13.0%Percent Funded
$58,605$618,270
$40,838Estimated Ending Balance $5.74/Lot/month @ 851
$288,182
13.0%
$37,478
© Browning Reserve Group 2016 21106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO
Crystal Falls Association
California Assessment and Reserve Funding Disclosure For the Fiscal Year Ending 2017
First Draft
May 10, 2016
(1) The regular assessment per ownership interest is ____________ per month for the fiscal year beginning January 1, 2017.
Note: If assessments vary by the size or type of ownership interest, the assessment applicable to this ownership interest may be found on page ___ of the attached summary.
(2) Additional regular or special assessments that have already been scheduled to be imposed or charged, regardless of the purpose, if they have been approved by the board and/or members:
Date
assessment will be due:
Amount per ownership interest per month or year (if assessments
are variable, see note immediately below):Purpose of the assessment:
N/A $0.00 N/A
Total: $0.00
Note: If assessments vary by the size or type of ownership interest, the assessment applicable to this ownership interest may be found on page ___ of the attached report.
(3) Based upon the most recent reserve study and other information available to the board of directors, will currently projected reserve account balances be sufficient at the end of each year to meet the association's obligation for repair and/or replacement of major components during the next 30 years?
Yes X No
This disclosure has been prepared by Browning Reserve Group and has been reviewed and approved by the association's board of directors based upon the best information available to the association at the time of its preparation. The accuracy of this information over the next 30 years will be dependent upon circumstances which are impossible to predict with specificity, and will require future action to adjust assessments over the period in accordance with the current projections and future developments.
(4) If the answer to (3) is no, what additional assessments or other contributions to reserves would be necessary to ensure that sufficient reserve funds will be available each year during the next 30 years that have not yet been approved by the board or the members
Approximate date assessment will be due: Amount per ownership interest per month or year:
N/A N/A
(5) All major components are included in the reserve study and are included in its calculations. See next page §5300(b)(4), for any major component exclusions.
(6) Based on the method of calculation in paragraph (4) of the subdivision (b) of section 5570, the estimated amount required in the reserve fund at the end of the current fiscal year is $288,182, based in whole or in part on the last reserve study or update prepared by Browning Reserve Group as of May, 2016. The projected reserve fund cash balance at the end of the current fiscal year is $37,478 resulting in reserves being 13.0% percent funded at this date. Civil code section 5570 does not require the board to fund reserves in accordance with this calculation.
An alternate and generally accepted method of calculation has been utilized to determine future reserve contribution amounts. The reserve contribution for the next fiscal year has been determined using the Cash Flow method of calculation (see section III, Reserve Fund Balance Forecast). This is a method of developing a reserve funding plan where the contributions to the reserve fund are designated to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved.
© Browning Reserve Group 2016 31106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017
Crystal Falls Association
California Assessment and Reserve Funding Disclosure For the Fiscal Year Ending 2017
First Draft
(7) Based on the method of calculation in paragraph (4) of subdivision (b) of section 5570 of the Civil Code, the estimated amount required in the reserve fund at the end of each of the next five budget years is presented in column (b) 'Fully Funded Balance' in the table immediately below; and the projected reserve fund cash balance in each of those years, taking into account only assessments already approved and other known revenues, is presented in column (c) 'Reserve Ending Balance'; leaving the reserve at percent funding as presented in column (d) 'Percent Funded' in each of the respective years.
FiscalYear(a)
Fully FundedBalance
(b)
PercentFunded
(d)
ReserveEnding Balance
(c)
2017 $313,304 $40,838 13.0%
2018 $321,730 $75,079 23.3%
2019 $357,586 $90,708 25.4%
2020 $373,689 $129,013 34.5%
2021 $412,330 $71,124 17.2%
If the reserve funding plan approved by the association is implemented, the projected fund cash balance in each of those years will be the amounts presented in column (c) 'Reserve Ending Balance' in the table immediately above, leaving the reserve at percent funding as presented in column (d) 'Percent Funded' in each of the respective years.
NOTE: The financial representations set forth in this summary are based on the best estimates of the preparer at that time. The estimates are subject to change. At the time this summary was prepared, 2.50% per year was the assumed long-term inflation rate, and 2.50% per year was the assumed long-term interest rate.
Additional Disclosures
§5565(d) The current deficiency in reserve funding as of December 31, 2017 is $320 per ownership
interest (average).
This is calculated as the current estimate of the amount of cash reserves necessary as of the end of the fiscal year for which the study is prepared, less, the amount of accumulated cash reserves actually (Projected to be) set aside to repair, replace, restore, or maintain the major components.
Deficiency = 2017 Fully Funded Balance - 2017 Reserve Ending BalanceOwnership Interest Quantity
§5300(b)(4) The current board of directors of the association has not deferred or determined to not
undertake repairs or replacements over the next 30 years.
M ajor Component: Justification for Deferral:
N/A N/A
§5300(b)(5) The board of directors as of the date of the study does not anticipate the levy of a
special assessment for the repair, replacement, or restoration of the major components.
© Browning Reserve Group 2016 41106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017
Crystal Falls Association
Section III
30 Year Reserve Funding Plan Cash Flow MethodFirst Draft
Prepared for the 2017 Fiscal Year
2016 2017 2018 2019 2020 2021 2022 2023 20252024
12,781 37,478 40,838 75,079 90,708 129,013 71,124 95,688 133,23874,105Beginning Balance
31,750 52,039 26,801 48,471 28,262 126,067 45,106 93,251 57,82815,017Inflated Expenditures @ 2.5%
60,000 58,605 60,305 62,054 63,854 65,706 67,611 69,572 73,66671,590Reserve Contribution
5.88 5.74 5.91 6.08 6.25 6.43 6.62 6.81 7.217.01Lots/month @ 851
-2.3% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9%2.9%Percentage Increase
1 -4,173 -4,173 -695 0 0 0 0 0 00Special Assessments / Other
620 967 1,431 2,047 2,713 2,471 2,059 2,096 3,5292,560Interest Pre Tax @ 2.50%
37,478 40,838 75,079 90,708 129,013 71,124 95,688 74,105 152,606133,238Ending Balance
Kubota tractor installment plan.1)
2026 2027 2028 2029 2030 2031 2032 2033 20352034
152,606 210,408 207,379 215,922 239,217 296,515 240,223 308,240 357,238271,476Beginning Balance
22,481 86,187 76,945 64,914 34,301 150,368 28,740 136,517 78,94017,281Inflated Expenditures @ 2.5%
75,802 78,000 80,262 82,590 84,985 87,450 89,986 92,596 98,04495,281Reserve Contribution
7.42 7.64 7.86 8.09 8.32 8.56 8.81 9.07 9.609.33Lots/month @ 851
2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9%2.9%Percentage Increase
0 0 0 0 0 0 0 0 00Special Assessments / Other
4,482 5,158 5,226 5,619 6,614 6,626 6,771 7,157 9,1707,762Interest Pre Tax @ 2.50%
210,408 207,379 215,922 239,217 296,515 240,223 308,240 271,476 385,512357,238Ending Balance
2036 2037 2038 2039 2040 2041 2042 2043 20452044
385,512 375,616 292,703 305,942 321,470 410,243 436,704 495,826 596,611499,799Beginning Balance
120,179 194,977 100,976 102,140 33,371 100,386 72,155 131,557 111,85043,536Inflated Expenditures @ 2.5%
100,887 103,813 106,824 109,922 113,110 116,390 119,765 123,238 130,490126,812Reserve Contribution
9.88 10.17 10.46 10.76 11.08 11.40 11.73 12.07 12.7812.42Lots/month @ 851
2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9% 2.9%2.9%Percentage Increase
0 0 0 0 0 0 0 0 00Special Assessments / Other
9,397 8,251 7,391 7,746 9,034 10,456 11,513 12,292 15,14813,536Interest Pre Tax @ 2.50%
375,616 292,703 305,942 321,470 410,243 436,704 495,826 499,799 630,400596,611Ending Balance
© Browning Reserve Group 2016 51106
Version 5/10/2016 5:02:09 PM
05/10/2016 v5.0;48c.12.2017 UDwSV.5.TO.MM.TO