RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol Nippani) June 2012 GOVERNMENT OF KARNATAKA PUBLIC WORKS DEPARTMENT Karnataka State Highways Improvement Project - II RP946 v3 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol – Nippani)

June 2012

GOVERNMENT OF KARNATAKA PUBLIC WORKS DEPARTMENT

Karnataka State Highways Improvement Project - II

KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT - II

RP946 v3

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

i

Contents

ABBREVIATIONS ..................................................................................................................................... iv

EXECUTIVE SUMMARY .......................................................................................................................... 1

I INTRODUCTION ...................................................................................................................................... 3

Objectives of RIP .................................................................................................................................... 4

Main activities of RIP ............................................................................................................................. 4

Minimization of Impacts and Corridor of Impact ............................................................................... 5

II. LAND ACQUISITION AND RESETTLEMENT IMPACTS ................................................................ 6

Land Acquisition Status ............................................................................................................................ 6

Guidance Value ......................................................................................................................................... 6

Negotiation Committee ............................................................................................................................. 6

Method of Price Negotiation ..................................................................................................................... 7

Records to be submitted by the Land Owners .......................................................................................... 7

Failure of KHA and Appellate Committee ............................................................................................... 8

Conclusion of negotiation ........................................................................ Error! Bookmark not defined.

Valuation of Assets on land under LA ....................................................... Error! Bookmark not defined.

Valuation of Crops .................................................................................................................................. 8

Valuation of other structures/assets .......................................................................................................... 8

Site Requirement for Residential and Commercial impacts ............................................................... 8

Loss of Community Assets ....................................................................................................................... 8

III. BASELINE CENSUS SURVEYS AND CONSULTATIONS ............................................................ 10

Characteristics of displaced households ................................................................................................. 10

Major and Minor Impacts ....................................................................................................................... 11

Vulnerable groups ................................................................................................................................... 12

Consultations........................................................................................................................................... 13

IV. IMPLEMENTATION MECHANISMS ............................................................................................... 16

Page 3: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

ii

Institutional Arrangements ...................................................................................................................... 16

Extending R & R Assistance to PAPs. .................................................................................................... 16

Implementation support by NGOs .......................................................................................................... 18

IR Activities ............................................................................................................................................ 19

Monitoring and Evaluation support for RAP .......................................................................................... 19

Grievance Redressal mechanism ............................................................................................................ 20

Resettlement Colonies and Vendor Markets ........................................................................................... 20

Protection of RoW .................................................................................................................................. 21

Impacts on Municipal Towns ............................................................................................................... 21

Data Base Management .......................................................................................................................... 21

Co –ordination between R&R and Civil works ...................................................................................... 22

Monitoring and R&R Activities ................................................................. Error! Bookmark not defined.

Additional Impacts .................................................................................................................................. 24

Budget ..................................................................................................................................................... 24

Disclosure ............................................................................................................................................... 24

Annexure 1: Guidance Value as on May 2011 ........................................................................................... 26

Annexure 2: Details of PAFs in link 19A ................................................................................................... 28

Annexure 3: Details of PAFs in link 19B ................................................................................................... 32

Annexure 4 : Details of PAFs in Link 19C ................................................................................................. 36

Annexure 5: Details of PAFS in Link 19D ................................................................................................. 38

Annexure 6: Details of Community Structure ............................................................................................ 43

List of Tables

Table 1- 1: Package Details .......................................................................................................................... 3

Table 1- 2: Summary Tables on Impacts ...................................................................................................... 4

Table 2- 2: Summary Table on Community Assets ...................................................................................... 9

Table 3- 1: Baseline Socio Economic information - for Major impacts (232) ........................................... 10

Table 3- 2: Distribution of PAFs by Major and Minor Impacts for WAP 2 ............................................... 11

Page 4: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

iii

Table 3- 3: Consultation Summary ............................................................................................................. 13

Table 4- 1: R& R Assistance ...................................................................................................................... 16

Table 4- 2: Time line for Key LA and R & R Activities ............................................................................ 22

Table 4- 3: Time line for LA and R & R Activities ....................................... Error! Bookmark not defined.

Table 4- 4: Monitoring Indicators for Physical Progress ............................................................................ 24

Table 4- 5: Budget ...................................................................................................................................... 24

Table 4- 6: Guidance Value for Link 19A .................................................................................................. 26

Table 4- 7: Guidance Value for Link 19B .................................................................................................. 26

Table 4- 8: Guidance Value for Link 19C .................................................................................................. 26

Table 4- 9: Guidance Value for Link 19D .................................................................................................. 27

Table 4- 10: PAFs Structure details of link 19A ......................................................................................... 28

Table 4- 11: PAF Structure details of link 19B .......................................................................................... 32

Table 4- 12: PAF Structure details of link 19C .......................................................................................... 36

Table 4- 13: PAF Structure details of link 19D .......................................................................................... 38

Table 4- 14: Community Asset Details of link 19A (Mudhol - Mahalingapura ) ....................................... 43

Table 4- 15: Community Asset Details of link 19B (Mahalingapura - Kabbur) ......................................... 44

Table 4- 16: Community Asset Details of link 19C (Kabbur - Chikodi) .................................................... 46

Table 4- 17: Community Asset Details of link 19D (Chikodi - Nippani (NH4)) ....................................... 48

List of Figures

Figure 1- 1: Distribution of PAFs for Package WAP2 ............................................................................... 12

Figure 1- 2: Distribution of PAFS by Major Impact for Package WAP 2 .................................................. 12

Page 5: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

iv

ABBREVIATIONS

AC Assistant Commissioner

ADSW Assistant Director Social Welfare

CAO Chief Administrative Officer

CPO Chief Project Officer

CPR Common Property Resources

COI Corridor of Impact

DC Deputy Commissioner

DPR Detail Project Report

EWS Economically Weaker Section

EPC Engineering Procurement Contract

GOI Government of India

GOK Government of Karnataka

GRC Grievance Redressal Cell

ID Identity Card

IPDP Indigenous People Development Plan

IR Income Restoration

KHA Karnataka Highways Act

KSHIP Karnataka State Highways Improvement Project

LAA Land Acquisition Act

LAO Land Acquisition Officer

LAP Land Acquisition Plan

NGO Non-Governmental Organization

PAF Project Affected Family

PAG Project Affected Group

PAP Project Affected Person

PIU Project Implementation Unit

PGB Project Governing Body

PWD Public Works Department

PU Pre University

PGB Project Governing Body

RTC Record of Rights

R & R Resettlement and Rehabilitation

RAP Resettlement Action Plan

ROW Right of Way

SIA Social Impact Assessment

SDO Social Development Officer

SDRC Social Development Resettlement Cell

SWI Social Welfare Inspector

SC Scheduled Caste

SR Schedule of Rates

ST Scheduled Tribes

SHG Self Help Group

Page 6: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

v

SIA Social Impact Assessment

ToR Terms of Reference

UR Upgradation

ZP Zilla Panchayat

Page 7: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

1

EXECUTIVE SUMMARY

The Karnataka State Highways Improvement Project (KSHIP) – II covers a length of 826.7 kms.

The roads have been categorised into two types of contracts EPC and Annuity. It consists of 269.4 kms of

EPC roads consisting of 5 packages and 557.3 kms of roads under annuity contract consisting of 4

packages. Contract package WAP 2, is an Annuity package which covers 108 kms consisting of 4 links.

The details are given in Table 1.1This Resettlement Implementation Plan covers the implementation

requirements for Package WAP 2.

In this package about 77 acres 17 ¾ guntas land has to be acquired, of this about 76 acre 06 ¾

guntas is dry land and 02 guntas plantation and 1 acre 09 guntas is kharab land. As a result of land

acquisition and related impacts 681 PAFs will lose part of their land; and another 298 PAFs lose their

house hold/commercial/ assets /livelihood . In addition, 156 community assets will also be affected. Out

of these impacts, 232 PAFs are in the major impact category losing their houses/shop and livelihood and

753 PAFs in the minor category who loses only part of their land or assets and the remaining land and

assets is sufficient to continue their shelter and livelihoods.

A baseline survey was conducted amongst the affected people which indicated that a large

majority of them are Hindus(77.72 percent), followed by Jains at 6.35 percent and Muslims at 3.81

percent. Distribution of PAPs by occupation indicates that 77.35 percent are in agriculture; agricultural

labourers account for 5.58 percent; commerce and trade supports 11.16 percent. In this package 69.17

percent of population has income less than Rs.26,000. 61.9 percent of the population falls within the age

group of 18-60, which happens to be the working age group. In this package illiterate population

accounts for 24.07 percent; those with primary education account for 11.19 percent and those with

secondary education account for 18.12 percent.

Public consultations were held at 4 important locations in this package in November 2008 and

November 2007 and 256 persons participated in these consultations. The consultations focused on mainly

in explaining the entitlements under the R&R Policy and measures taken to minimize the impacts and

receive the suggestions from participants. The consultations have helped in not only in disseminating the

policy provisions to deal with land acquisition related impacts, but also assisted in gathering suggestions

for mitigation of adverse impacts, improvements in designs and facilitating inputs for resettlements plan

preparation and implementation. During Consultations, a number of issues have been raised. One of the

main issues is the shifting of water pipelines in this package. This issue is under the process of being

resolved by the PIU; in another instance people have asked for over-bridges in all sensitive areas,

however such requests would have been considered if technically feasible; another issue of temples being

affected has been addressed by relocation if it is not possible to retain the temple; other cases where

people said that the affected house/land is under litigation and wanted to know how the project would

deal with it, such cases will be dealt on a case to case basis during implementation; other issues raised

were people wanted to know about the entitlements. Besides this, safety concerns have been addressed by

building footpaths in built up area, providing footpath barricades, school/village signages, rumble strips

and road humps.

The key potential issue is the shifting of the pipelines, which is being resolved by the PIU.

Besides there are realignments proposed to minimize impact, such as in Belagalli village. There are 6

Page 8: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

2

cross section options adopted in this package to minimize impacts, the COI width varies from 11 m to 26

m.

The GOK has adopted the Resettlement and Rehabilitation (R&R) Policy for KSHIP- II

consistent with NRRP, 2007 and World Bank Policy on Involuntary Resettlement to address adverse

impacts arising out of this project. Land Acquisition will be done through the Karnataka Highways Act

1964. Land acquisition under this Act will help the PAPs to receive the market price/replacement cost of

land as compensation is negotiated through negotiations. Negotiation Committee has been constituted to

negotiate the price of land with the landlord. The minimum negotiated price will be twice the current

guidance value for Bagalkot and Belgaum districts.

Some of the entitlements include payment of compensation through negotiation according to the

Karnataka Highways Act, 1964; additional compensation for those becoming marginal farmers; grant for

replacement of cattle shed; alternative house or developed plot +construction cost for those losing house;

additional 25% compensation for partially affected structures towards reconstruction; support for

purchase of income generating assets; rental allowance for affected tenants; and support for non-title

holders to provide alternative houses or developed plot; construction cost; support for providing alternate

shop or income generating asset to those who are losing commercial structures; employees losing

livelihood will be given a onetime payment; vulnerable groups including physically challenged and those

above 60 years will be assisted to get Government pension, if they are eligible or given a lump sum

amount as assistance; and all community assets will be replaced and reconstructed.

This RIP will be implemented by Karnataka PWD-PIU Social Development Resettlement Cell

with support from the NGO - BIRDS (Bijapur Integrated Rural Development Society). The SDRC is

responsible for monitoring the implementation of all resettlement and rehabilitation activities, including

land acquisition. The Special Deputy Commissioner, Land Acquisition, will be responsible for land

acquisition activities while the Chief Administrative Officer will be responsible for all Resettlement and

Rehabilitation works. A Grievance Redressal Cell with 3 members is constituted with Deputy

Commissioner of the District as the Chairman. An independent agency viz., Samaj Vikas has been hired

for Monitoring and Evaluation support. The SDRC, PIU will facilitate land acquisition and compensation,

relocation and resettlement, distribution of assistance for the PAPs. WAP 2 will be implemented by

KHSIP Division, Belgaum. The SDO and SWIs appointed for the Belgaum division will take care of

R&R activities of this package.

The civil works for this package is likely to commence in December 2012. The R&R and land

acquisition is targeted to be completed by August 2012. Implementation activities include land

acquisition process, relocation and rehabilitation and monitoring. The budget estimated for land

acquisition and R&R activities for this package is Rs.13.41 Crores which forms a part of the overall

budget approved by the GoK. All cash allowances to be paid to the PAPs is adjusted for inflation for

2012-13 and those who receive the assistance beyond April 2013 will further be adjusted by 10% as

needed.

This RIP will be disclosed through public consultations, Government of Karnataka/PWD

Website. In addition, copies will be kept in: (i) State Government Library at Bangalore; (ii) - District

library of Belgaum and Bagalkot districts; and (iii) in the Panchayat offices along the project roads.

Page 9: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

3

I INTRODUCTION

1. The Karnataka State Highways Improvement Project (KSHIP) – II Phase-I covers a length of 826.7

kms. In this connection a detailed Resettlement Action plan has been prepared in consultation with

the affected persons, PIU and other stakeholders. This document includes, among other things, legal

frame work and Resettlement Policy Provisions, Land acquisition and compensation payment, Social

impact assessment and base line Socio-Economic characteristic and the implementation arrangement.

The Government approved the Resettlement Action plan vide its order dated 28th July 2010. This has

been published in the PWD web sites in the month of August 2010. This Resettlement

Implementation Plan outlines the steps for resettlement and rehabilitation of PAFs/PAPs losing their

land and structures and relocation of community assets for WAP 2.

2. Contract package WAP 2 covers 108 kms consisting of 4 links. The details about the package are

given in Table 1.1. In the Annexure, the lists of those losing structures are provided, which are

enumerated in 2007-08 and verified by NGO in 2011. Details of those losing land are given in the

Notifications issued under Section 15 of the KHA. The list of vulnerable people will be subsequently

prepared and assistance extended as needed. Any additional people moved into the ROW after the

cut-off date and are not served notices subsequently will be identified through additional verification

by 31st July 2012. The question of extending assistance to them will be examined on case to case

basis. In case of those who are mobile type of shop will not be provided any assistance since, they

keep on changing on regular basis and they can easily find another alternative place to continue their

petty business provided after verification.

Table 1- 1: Package Details

Link Description Length Districts Taluks Cutoff date

19A Mudhol – Mahalingapura 19.17 Bagalakot Mudhol 30.10.2008

19B Mahalingapura – Kabbur 42.34

Bagalkot,

Belgaum

Mudhol, Raibagh,

Chikkodi

04.11.2008

19C Kabbur - Chikodi 18.41 Belgaum Chikkodi 14.11.2008

19D Chikodi - (NH-4 cross)

Nippani 28.01

Belgaum Chikkodi 06.12.2007

3. WAP 2 falls within the Northern Karnataka Plateau. Northern Karnataka Plateau comprises of the

districts of Belgaum and Bagalkot. It is largely composed of Deccan Trap. It represents &

monotonous treeless extensive plateau landscape with a general elevation of 300 to 600 meters from

the mean sea level. However the river plains of the Krishna, the Bhima, the Ghataprabha and the

Malaprabha with the intervening watersheds, the step like landscapes, lateritic scarpments, residual

hills and ridges break the monotony of this extensive plateau. The general slope is towards east and

Page 10: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

4

this region is largely covered with rich black cotton soils (Expansive Soil). In this region, major crops

grown are Tobacco, Sugar cane, Jawar, Sunflower, Toor, Groundnut, Soya bean and maize

4. The entire package is regarded as a single milestone. All the R&R and land acquisition has to be

completed at the time of handing over of package to the contractor.

5. In this package 77 acres 17 ¼ guntas land has to be acquired, of this 76 acre 6 ¾ guntas is dry land

and 02 guntas is plantation land and 1 acre 09 guntas is kharab land; there are 298 PAFs whose house

hold/commercial structures/ assets/ livelihood is getting affected and 681 PAFs losing land;. There are

165 community assets getting affected. The PAPs listed in this RIP is as recorded during the cut-off

date and further verified by the NGOs.

6. There are no major issues related to land acquisition and resettlement identified in this package.

Objectives of RIP

7. The objective of this RIP is to provide a package specific guideline for implementation for R&R

activities. The implementation plan identifies the persons affected, the type of entitlements to be

provided for specific losses, what are the steps that will be adopted in getting compensation, details of

members of the Negotiation Committee and the GRC members in the package, time table and steps to

be taken by the PIU for protecting right ROW. Overall it provides how the RAP will be implemented

in this particular package.

Main activities of RIP

8. The main activities to be carried out in finalizing the RIP includes, Joint verification, distribution of

ID cards, identification of sites for relocation, identification of income generating options,

identification of vulnerable people who are not getting any assistance from Government, identification

of resettlement centers and vendor markets, negotiations for land acquisition, payment of

compensation, relocation and shifting of community assets. The members of the GRC and Negotiation

committees have to be identified and informed, as mentioned in the RIP. The RIP after finalization

will be disclosed

Table 1- 2: Summary Tables on Impacts

Link

Description LA Pvt Land

Transfer

Major Impact Minor

Impact

Community

Assets

19A Mudhol –

Mahalingapura

6.14 1/2 0.01 41 149 39

19B Mahalingapura –

Kabbur

42.39 1/4 0.23 1/2 75 367 65

19C Kabbur - Chikodi 4.22 - 29 48 26

19D Chikodi - (NH-4 cross)

Nippani

22.12 0.25 1/2 87 189 35

Page 11: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

5

Minimization of Impacts and Corridor of Impact

9. There are 6 cross section options adopted in this package to minimize impacts. The COI width varies

from 11 m to 26m. Besides this, safety concerns have been addressed by building footpaths in built

up area, providing footpath barricades, school/village signages, rumble strips and road humps.

The different cross sections used are:

1. UR1A Rural Cross section with paved shoulders varying from 18-26 m

2. UR2 Rural Cross section through village width varying from 11m to 22m.

3. UR3 Urban Cross Section in built up area with covered drain with a maximum width of 22m

4. UR4 Urban Dual lane Cross section in built up area with covered drain with a maximum width of

24 m.

5. UR6 Rural Cross section in hilly terrain

6. UR7 Rural cross section cutting

Page 12: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

6

II. LAND ACQUISITION AND RESETTLEMENT IMPACTS

10. This chapter provides an overview of the extent of land acquisition and the process of land price

negotiations and details of documents to be submitted. It also provides the impacts of the project on

community assets.

11. In this package 77 acres 17 ¼ guntas land has to be acquired, of this 76 acre 6 ¾ guntas is dry land, 2

guntas is plantation and 15 acres 1 acre 9 guntas is kharab land.. The details of the PAFs losing land is

given in Notification issued under section 15 of the KHA 1964 in connection with land acquisition.

There are 199 PAFs who are losing 5 guntas and more of agricultural land.

Land Acquisition Status

12. The Notifications under Section 15 under the KHA for WAP 2 is as follows:

1. 19 A: No. PWD :139: EAP : 2011, Bangalore, dated 19 .10.2011;

2. 19 B: No. PWD :140: EAP : 2011, Bangalore, dated 19 .10.2011;

3. 19 C : No. PWD :141: EAP : 2011, Bangalore, dated 19 .10.2011;

4. 19 D: No. PWD :142: EAP : 2011, Bangalore, dated 19 .10.2011

Guidance Value

13. The Guidance Value of land for different categories of land, for the villages along the project road is

given in Annexure 1 are as of July 2011. This guidance value will be referred to by the Negotiation

Committee.

14. The rates will be revised annually by 10% on the 1st of April every year, in case Government has

not revised it. The guidance value varies from a minimum of Rs. 40,000 per acre in Kothalli village

in Chikkodi Taluk to Rs 3,03,000 per acre in Nippani village in Nippani Taluk..

Negotiation Committee

15. The Replacement Cost of land for consent award will be determined by the Negotiation Committee.

In this package the Negotiation Committee has been constituted vide GO No. PWD 215 EAP 2007

dated 24-10-2009. This Committee consists the following members:

1. Assistant Commissioner of the concerned Sub Division : Chairman

2. Assistant Commissioner of KSHIP : Member Secretary

3. Executive Engineer KSHIP Division, : Member

4. Zilla Panchayat Member of the concerned jurisdiction : Member.

16. The details about the committee members will be updated by 30th June 2012.

Page 13: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

7

Method of Price Negotiation

1. The concerned Land Acquisition officer who is the member secretary of the Negotiation

Committee will call for a meeting;

2. Dates for price negotiation will be given village wise. Negotiation will be conducted village wise

calling all the land losers together for negotiation. This is to ensure transparency.

3. The PIU will provide information on the guidance value of the land to land losers before

Negotiations.

4. The minimum negotiated price will be twice the current guidance value for Bagalkot and

Belgaum districts.

5. The Negotiation Committee will negotiate the price with the landlord;

6. Based on the decision of the Negotiation Committee the Special Land Acquisition Officer will

initiate action to collect documents after obtaining the approval of competent authority in the

PIU.

7. Compensation will be given within 30 days of receiving all the necessary documents by the

Special LA officer. In case of delay , 9% interest will be given to the beneficiary upto a period of

one year and after which, it will be increased to15% . (This is as per the provisions of the LA

Act).

8. On approval of the award by the Special DC or PD, the Special Land Acquisition Officer will

make the payments accordingly.

9. Possession of Land will be taken vide Section 19, which will be only after the payment of

compensation.

Records to be submitted by the Land Owners

17. As soon as Notification u/s 19 is issued, the NGO shall collect the following documents in respect of

lands to be acquired, before inviting for negotiations.

1. Original copy of RTC for current year;

2. Original or attested copy of mutation in respect of land and Khatha Certificate in respect of site /

building;

3. Encumbrance Certificate for 13 years;

4. No Tenancy Certificate and Certificate regarding 79A, 79B and 66;

5. Bank Account details;

6. Land holding / small / marginal farmers Certificate whenever necessary; and

7. G. Tree.

After negotiations, the NGO shall collect the remaining documents such as –

Page 14: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

8

1. Attested copy of Sale Deed/Partition Deed/Saguvali Chit/Regrant Order etc., to prove title of

land;

2. Indemnity Bond;

3. Agreement and Affidavit

and submit them to the Assistant Commissioner for processing for compensation. Any fees incurred by

the NGO in obtaining the documents shall be reimbursed by the Executive Engineer of the Division

Failure of KHA and Appellate Committee

18. Even after the minimum negotiation price as per the RAP is offered and the land owner does not

agree for it, then the negotiation will be treated as failed and award will be passed as per the general

LA Act. The price offered and the price demanded by the land owner in such cases will be recorded

in the proceedings. The provisions of the LA amendment bill will be followed when they come into

force.

Valuation of assets on land under LA

19. The valuation of structures and other assets will be carried out by Government approved Valuators

appointed by the Executive Engineer in consultation with PIU. Valuation will be done on the basis

of current PWD Schedule of Rates, without depreciation. Based on the valuation, another 30% will

be given as top up to those who come forward for consent award. Trees will be valued by the

Agriculture/Horticulture/Forest Department.

Valuation of Crops

20. Crop loss will be compensated based on the valuation done by the Agriculture/Horticulture

Department.

Valuation of other structures/assets

21. The valuation of structures and other assets will be carried out as mentioned above. However, this

will be verified and approved by the concerned Executive Engineer.

Site Requirement for Residential and Commercial impacts

22. Actual requirement of sites in each package, has been indicated in the Joint Verification report of

NGO. In this package 13 sites are required for non - titleholders. Verification for titleholders is

under progress. As for as possible, Government land will be identified for formation of sites and

allotted to the eligible PAFs/PAPs. Where Government land is not available then the PIU, KSHIP

shall examine alternatives such as - cash in lieu of sites or purchase of private land - on case to case

basis, based on local factors.

Loss of Community Assets

23. In the contract package WAP 2, 165 community Assets getting affected.

Page 15: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

9

Table 2- 1: Summary Table on Community Assets

Sl.

No. Type of Community Asset No

1. Temple/Shrines 30

2. Aralikatte 2

3. Bus Shelters 23

4. Hand Pumps 29

5. MWS/Water supply tanks 18

6. Borewells 17

7. Others 46

Total 165

24. All community assets on Government land will be shifted by PIU. All assets on private land will be

shifted with assistance of NGO.

25. For Temple/shrine, Aralikatte, new site has to be identified by NGO in coordination with

SDO/SWIs at the Divisional level. This site should be a Gramathana land or land given as donation.

For land that is donated the concerned Engineer has to take a site consent letter from the donor of

the site in prescribed format which will be prepared by NGO. The format will have Donor name and

address, Site details(Survey nos, place, boundary) with measurement, the signatures of atleast 3

persons from the village is necessary on the letter for evidence. The donor has to also sign on the

consent letter. The letter will be submitted to the Executive Engineer of the division. The EE will

then have to construct the new community structure/Temple/Shrine/ Aralikatte etc. After the

construction of the new structure the SDO/SWIs and NGO will jointly convince the concerned

village people to demolish the existing structure, and shift the activities to the new place.

26. Bus shelters, Hand pump, MWS tanks, Bore wells and other community assets will be relocated and

reconstructed. The KSHIP divisional staff will be taking necessary action with assistance of

SDO/SWIs. The chainage wise community assets details are given in Annexure 6.

Page 16: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

10

III. BASELINE CENSUS SURVEYS AND CONSULTATIONS

Characteristics of displaced households

27. This chapter outlines the characteristics of displaced households. As a part of the project, a census

survey of Project Affected Families / Persons (PAFs and PAPs) was carried out in the month of

Dec.2007-Nov.2008. The findings of the census survey provided the magnitude of social impacts

on the PAFs and PAPs. In this chapter, baseline socio-economic analysis has been done separately

for the major impacted families.

28. Among religious groups, Hindus dominate with 77.72 percent followed by Jains at 6.35 percent and

Muslims at 3.81 percent. Distribution of PAPs by occupation indicates that 77.35 percent are in

agriculture; agricultural labourers account for 5.58 percent; commerce and trade supports 11.16

percent. In this package 69.17 percent of population has income less than Rs.26,000. 61.9 percent

of the population falls within the age group of 18-60, which happens to be the working age group.

In this package illiterate population accounts for 24.07; those with primary education account for

11.19 percent; those with secondary education account for 18.12 percent. Average land holding size

is 5.36 acres. A look at the ownership of household assets indicate 57.92 percent own televisions;

30.13 percent own 2/4 wheelers; 15.90 percent own cooking gas; while only 8.48 percent own

refrigerators. Some of the baseline parameters identified for those with major impacts are given in

the table below. The details of the PAPs losing structures are given in Annexure 2,3.4.and 5.

Table 3- 1: Baseline Socio Economic information - for Major impacts (232)

1. Losing total house 13

2. Average area 30.16 sq.m

3. % of houses electrified 2.15%

4. % of houses having water supply 0.11%

5. Average earning Rs. 39,811/-

6. % of earners 26.78%

7. % of PAPs earning less than Rs.26,000* 14.58%

8. Average land holding (A-G) 5.36 Acres

9. % of Farmers having less than 2.20 acres of holding 28.30%

10. % of PAPs in agriculture 2.03%

11. % of PAPs working as agriculture labour 1.24%

12. % of PAPs in the service sector 0.34%

13. % of PAPs in Commerce and Trade 25.31%

14. Loss of commercial structures 219

15. Type of commercial structure 1 Pucca 3.20%

2. Semi pucca 12.79%

3. Kutcha 84.02%

16. Average area of commercial structure 6.73 sqm

17. Type of shops affected (majority)

1. Pan/cigarette – 34.25%

2. Tea shop/hotel - 11.42%

3. Barber- 11.42%

18. Average monthly turnover of shops

1. Rs.13,000

19. Ownership of Household assets 1. Television - 51.29%

2. Refrigerator – 5.17%

Page 17: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

11

3. Telephone – 16.38%

4. Cooking Gas – 20.26%

5. 2/4 wheeler - 11.64%

Note : * Rs.26,000 has been taken as the cut off for BPL

Major and Minor Impacts

29. The list of major and minor impacts for this package is given below.

Table 3- 2: Distribution of PAFs by Major and Minor Impacts for WAP 2

Sl.

No. Extent of Loss Owner Tenant Squatter Encroacher Total

Major Impact

1 Losing Total House 3 0 7 3 13

2 Losing Total Com. Struc. 2 0 213 4 219

3 Losing Total House and Com. Struc. 0 0 0 0 0

4 Tenants Losing Total Livelihood 0 0 0 0 0

Total Major Impact 5 0 220 7 232

Minor Impact

1 Losing only Part of House 1 0 5 36 42

2 Losing Part of Com. Struc. 1 0 11 12 24

3 Losing Part of House and Com.

Struc. 0 0 0 1

1

4 Partial Plot 0 0 0 0 0

5 Total Boundary Wall 0 0 0 0 0

6 Partial Boundary Wall 0 0 0 0 0

7 Total Cattle shed 4 0 0 1 5

8 Farmers 681 0 0 0 681

9 Others 0 0 0 0 0

Total Minor Impact 687 0 16 50 753

Total (Major & Minor Impacts) 692 0 236 57 985

Page 18: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

12

Figure 1- 1: Distribution of PAFs for Package WAP2

Figure 1- 2: Distribution of PAFS by Major Impact for Package WAP 2

Vulnerable groups

30. Based on the Census survey, there are 1115 PAPs who come within the purview of vulnerable

group. The categories include 185 widows; 828 persons above the age of 60 and 102 persons with

disabilities. However this is only an enlistment of all persons coming under the vulnerable category.

Only after verification by the NGO it will be confirmed whether these people are vulnerable. If so it

Page 19: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

13

will be verified further whether they are already receiving pension / assistance from the

Government. If the person is already receiving pension / assistance, then this offer will not be

extended. Only after such verification will the person be entitled to assistance under this category. li

Consultations

31. Four consultations were carried out in this package. The outcome of the consultation are

summarized below

Table 3- 3: Consultation Summary

Section Details Issued Raised Response of project Authority

19A Date: 21.11.2008

Place: Ranna

Belagali

No. of

Participants: 53

People wanted to know the road formation

width in village limit and outside.

People wanted to know whether equal widening

is possible within village limits

People asked to construct over bridge in

school, hospital and religious sensitive places.

It was also informed that about 23000 meters of

panchayat water supply pipeline will get

affected. The people wanted to know who will

take responsibility to shift the pipeline

People losing their commercial structure

wanted to know what assistance will be given

by the project

A likely affected Tenant wanted know what is

the provisions making in the project for tenants

BPL squatter losing their house asked for

alternative site and construction cost of the

house from the project.

People wanted to know what provisions are

there for community assets getting affected.

There were two temples which the people did

not want the project to affect. The

Mahalingeshwara temple and Mallikarjuna

temple Mahadwara in belagali village

It was informed that outside the village limit

11 mt. from the existing center line and within

village limit 8 mt. from the existing center

line, and also informed that the proposed road

design have prepared on the basis of field

condition.

It was explained that if existing road was

straight it will take both side equally from the

center, in the curve situation as per availability

of width will considered.

It was informed that all type of public utilities

including water supply pipeline will be

shifting by project authority before execution

of civil work

It was informed that the project will provide

10x15” commercial site for each BPL

commercial squatter PAF accordingly project

policy. If more than 20 BPL commercial

squatter PAF’s are going to affect within 2 km

project authority will construct commercial

complex and allotted the rooms for them.

It was informed that if any legal tenant is

going to be affected in this project those who

will be getting three month rental allowance

which is determined by project policy .

It was explained that all the residential BPL

squatters will be getting EWS houses and

shifting and subsistence allowance from the

project

As for as possible we try to retain the temple

and other community assets as it is, in case it

is not able to save that assets panchayat people

would identify the alternative land/site outside

of COI in your village limit, after that project

authority will construct better Temple and all

the community assets .

19 B Date: 21.11.2008

Place:

He wanted to know the PWD road boundary

and new road formation width in village limit

and outside

It was informed that according to Karnataka

State highway Gazette PWD boundary is in

village limit is total 30 mt. and outside the

Page 20: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

14

Section Details Issued Raised Response of project Authority

Kankanawadi

No. of

Participants: 58

He was asked if owner structure is getting

affected how to fix the compensation rate.

He is losing his commercial shop. He asked

after getting the assistance from the project,

whether he can shift to remaining PWD land or

out ROW

He asked if any private trees will getting

affected weather project will compensate or

not.

She is losing her residential house and she

asked alternative site and house as

compensation.

He is a Tenant PAP, he wanted know what the

provisions in the project are for tenants.

What to do when the Temple, Community

assets are affected in the village? And he asked

to people to give cooperation to project

implement officials.

village limit total 45 mt. The new road

formation width is outside the village limit 11

mt. from the existing center line (Total

22mtr)and within village limit 8 mt. from the

existing center line(Total 16 mt.), and also

informed that the proposed road design have

prepared on the basis of field condition

It was explained that if any owner structure

will getting affected in this project authority

will make valuation as per current PWD SR

rate for structure, and site cost valued by

project price fixation committee negotiation on

basis of local sub-registrar guidance value

It was informed that if he receives assistance

then he should shift out of ROW.

It was informed that any type private trees will

affecting by project compensation would be

given accordingly agriculture department

valuation.

It was informed that project authority will give

EWS house for BPL residential squatters

It was informed that if any legal tenant is

going to be affected in this project those who

will be getting three month rental allowance

which is determined by project policy .

As for as possible we try to retain the temple

and other community assets as it is, in case it

is not able to save the assets panchayat people

would identify the alternative land/site

outside of COI within village limit, after that

project authority will construct the affected

Temple and any other affected community

assets.

19 C Date: 21.11.2008

Place:

Nagaramunnoli

No. of

Participants: 32

He asked if panchayat water supply pipeline will

getting affected, who will take responsible to shift

the pipeline

He is losing his commercial shop. He asked what

type compensation will be paid by project.

He is losing his commercial shop. He asked more

compensation because no site will not available for

20.000 Rs in their village

He asked if any private trees will getting affected

weather project will compensate or not?

It was informed that all type of public utilities

including water supply pipeline will be

shifting by project authority before execution

of civil work.

The project will provide alternate IGA or a

shop

It was informed that this matter will bring to

notice to higher authority after that they will

take decision

It was informed that any type private trees will

affecting by project compensation would be

given accordingly agriculture department

valuation

It was informed that if any legal tenant is

Page 21: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

15

Section Details Issued Raised Response of project Authority

He is a Tenant PAP, he wanted know what the

provisions in the project for tenants.

What to do when the Temple, Community assets are

affected in the village? He demanded upto 50.000 Rs

for commercial site purchase for commercial

squatters .And he asked to people to give

cooperation to project implement officials

going to be affected in this project those who

will be getting three month rental allowance

which is determined by project policy

As for as possible we try to retain the temple

and other community assets as it is, in case it

is not able to save that assets panchayat people

would identify the alternative land/site outside

of COI in your village limit, after that project

authority will construct better Temple and all

the community assets . More assistance for

commercial squatters matter will be reported

to higher authority for consideration.

19D Date: 19.12.2007

Place: Pattankudi

No. of

Participants: 113

People asked for proper compensation and also

wanted to know the mode of compensation.

People wanted to know the road cross sections

and how compensation would be paid.

A Handicapped person losing her shop wanted

to know what additional assistance would be

provided to her.

In Nippani Town the people requested the COI

to be reduced to 9 mts on either side of the

centre line.

An affected person had just taken a loan to

build his house, which is likely to get affected.

He wanted to know how he would be

compensated.

Another point raised was a person losing his

agriculture land; his land is under dispute and

the matter is pending in court; he wanted to

know how the project would compensate him.

Another affected person losing open land

wanted to know whether the project would give

another site as compensation.

The project will pay compensation for

agricultural land according to KHA. Structure compensation will be according to the current

PWD SR. Assistance for squatters will be

according to the Project Policy.

Handicapped persons will be provided

assistance according to Project Policy and

RAP.

The cross section at Nippani will be looked

into.

If a person’s house has been affected by the

project he will get compensation according to

the project policy .

For cases pending with the court , the matter

will be looked onto on case to case basis

during implementation and will be taken up

with the DCs office.

It was explained the project did not have an

option of land for land. But compensation will

be paid for any land acquired by the project.

Page 22: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

16

IV. IMPLEMENTATION MECHANISMS

Institutional Arrangements

32. This chapter outlines the implementation mechanism specifically for this package, including the

tasks of the NGO and the GRC. It also outlines the assistance to be paid to affected persons and

provides the tasks to be completed before the start of civil works.

33. The SDRC, PIU will facilitate land acquisition and compensation, relocation and resettlement,

distribution of assistance for the PAPs. The SDRC is responsible for monitoring the implementation

of all resettlement and rehabilitation activities, including land acquisition. WAP 2 will be

implemented by KSHIP Division, Belgaum. The SDO and SWI appointed for the Belgaum division

will take care of R&R activities of this package. The SDRC will be supported by the NGO for

implementation of RAP.

Extending R & R Assistance to PAPs.

34. R& R assistance will be disbursed according to the R&R Policy. The NGO will verify the PAPs and

ensure that they get the assistance in accordance with their entitlements. The entitlements given

here are accurate as far as possible, however, because only preliminary notification for land losers

has been given at this stage, the exact details about entitlements need to be updated at the time of

paying R&R assistance. The cash allowances are updated for 2012-13 and will be further adjusted

as needed for 2013-14 and beyond. The exact number of disbursements made for each year will be

computed after all assistance is given. The annually revised amounts are mentioned in the

Implementation Manual.

35. Table 4- 1: R& R Assistance Entitlement

Category

Category of loss Entitlement

1a 681 PAF losing

land Negotiation as per Karnataka State Highway Act, 1964;

Amount equivalent to current stamp duty and registration charges

on compensation amount;

**Additional 25% compensation in case remaining land is severed;

Crop/tree damage compensation as assessed by concerned

Departments;

*In case land owners becomes landless or marginal families, the

following additional entitlements will be offered: (a) subsistence

allowance of Rs.36,300 for land less and marginal; and, (b)

assistance for creating Income generation asset valued upto

Rs.90,750 for those becoming marginal farmers and landless only;

Additional amount of Rs.24,2001 will be restricted to those who

loose narrow stretch of land as additional compensation in lieu of

all other benefits. Additional amount of Rs 24,200 to those who

1 Narrow stretch of land is defined as persons losing upto 5 guntas of land.

*These entitlements will be applicable only when the farmers submit the landholding/ marginal farmer document,

and if found applicable.

** This will be verified after Section. 19.

Page 23: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

17

Entitlement

Category

Category of loss Entitlement

lose more than a narrow stretch and are not eligible for any other

additional benefits.

*For those becoming landless and all marginal farmers training

assistance will be provided for income generating vocational

training and skill upgradation options as per affected persons choice

;

Employment opportunity for affected persons as per his skills and

availability of suitable work in road construction work.

Ib 3owners losing total

residential structure

Compensation at current PWD scheduled rates without

depreciation and 30% solatium

Alternative houses in resettlement colony or developed plot2 and

construction cost of Rs. 60,000 linked to construction progress.

Shifting assistance of Rs. 12,100

Subsistence allowance of Rs. 36,300

1b 1owner1 losing

partial residential

structures

Compensation at current PWD scheduled rates without

depreciation and 30% solatium

Additional 25% compensation for partially affected structures

towards reconstruction

Ic 2 owners losing

commercial

structure

Compensation at current PWD scheduled rates without

depreciation and 30% solatium

Alternative shop or assistance for income generation asset valuated

upto Rs. 90,750

Shifting assistance of Rs. 12,100

Subsistence allowance of Rs. 36,300

1c 1owner PAFs

losing partial

commercial

Compensation at current PWD scheduled rates without

depreciation and 30% solatium

Additional 25% compensation for partially affected structures

towards reconstruction

1a 4 owners losing

cattle shed

A grant of Rs. 15,000 for replacement of Cattle shed;

IIIa 7 Squatter s losing

residential

structure

House in resettlement colony or developed plot and construction

cost of Rs. 60,000 linked to construction progress.

Subsistence allowance of Rs.15,000;

Shifting Allowance of Rs.5000.

IIIb 213 Squatter losing

commercial

structures

Alternative shop of 100 sq.ft or assistance for income generation

asset value upto Rs. 36,300;

Subsistence allowance of Rs.18,150

Shifting Allowance of Rs. 6,050

1encroacher losing

cattle shed A grant of Rs. 15,000 for replacement of Cattle shed;

16 Squatter losing

partial assets This needs to be further verified

IIIc 57 encroachers Replacement cost of affected structure calculated at current PWD

scheduled rates without depreciation

2 Developed plot will be restricted to those who do not have any homestead land.

Page 24: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

18

Implementation support by NGOs

36. The work of the NGO will include consultations and counseling of PAPs, encouraging PAPs for

productive utilization of compensation and rehabilitation grants, facilitating PAP access to income

generating assets, increasing the social acceptability, ensuring effectiveness of training programs

organized for PAPs electing participation in self employment schemes etc.

37. The NGO will work as a link between the PIU - SDR Cell and the affected community. For this

section the NGO is: BIRDS (Bijapur Integrated Rural Development Society). The division office of

this NGO is located in Dharwad. They will educate the PAPs on the need to implement the Project,

on aspects relating to LA and R&R measures and ensure proper utilization of various compensations

extended to the PAPs under the R&R entitlement package. The tasks of the NGO will be to facilitate

the resettlement process. The responsibilities of the NGOs include

1. Identification, verification and updating of PAP Census, includes verification of properties of

PAPs and estimation of their type and level of losses;

2. Educate PAPs on their rights, entitlements, and obligations under the RAP; Assist the PAPs to

identify suitable alternate land for resettlement purposes;

3. Preparation and Distribution of Entitlement cum Identity Card. All eligible project affected

families will be issued Identity Cards, giving details of the type of losses and type of entitlements.

4. Ensure that PAPs receive their full entitlements; Where options are available, the NGO will

provide advice to PAPs on benefits of each option; Ensure proper utilization by the PAPs of

various compensations available under the R&R package; Assist the PAPs in getting benefits

from various government development programs;

5. Rehabilitation of Affected Families and restoration of Income and Livelihood. The NGO will

help the communities derive maximum benefits out of the project without losing their livelihoods

and the least impact on socio-cultural aspects of their lives.

6. Assist PAPs on grievance redressal through the established system; and

7. Will relocate PAPs. Assist PIU in making arrangements for the smooth relocation of the PAPs;

No Physical relocation from agriculture land, residential units, commercial establishments or

other immovable properties will begin before alternate arrangements are made.

8. Any other responsibility that may be assigned by the PIU for the welfare of the affected

communities.

38. In order to carry out the above tasks, NGO staff will be stationed in the site office at Nippani.

Besides contacting the PAPs on an individual basis to regularly update the baseline information,

group meetings and village-level meetings will be conducted by the support agency on a regular

basis. The frequencies of such meetings will depend on the requirements of the PAPs but should

occur at least once a month. The support agency will have to encourage participation of individual

APs in such meeting by discussing their problems regarding LA, R&R and other aspects relating to

their socio-economic lives. Such participation will make it easier to find a solution acceptable to all

involved.

Page 25: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

19

IR Activities

39. There are two types of IR activities, i.e. short term and long term. Process of identifying income

generating options for those losing commercial structures is under progress.

40. Short Term IR activities: Short-term IR activities mean restoring APs’ income during periods

immediately before and after relocation. For this, the NGO shall ensure that: compensation and

R&R assistance as provided in the entitlement matrix such as subsistence allowance and shifting

allowance are provided to the PAPs. Other works of the NGO include facilitating employment to the

PAPs in the project construction activities, depending on their skill and other allied activities.

41. Long Term IR Activities: This includes provision of shops for those losing their total livelihood to

re-establish their commercial activities. It also includes providing of a shop plot in a commercial

block or purchase of income generating assets upto Rs.36,300 in case of commercial squatters.

42. The steps to be followed for income restoration include:

Step 1: Identification of Target Groups – NGOs need to identify the affected persons;

Step 2: Identification of IR Activities - Prepare a list of possible and feasible income restoration

options. While identifying IR options, the following factors shall also be considered: (i) Education

level of APs; (ii) Skill possession;(iii)Likely economic activities in the post displacement period;

(iii) Extent of land left; (iii) Suitability of economic activity to supplement the income; (iv)Market

potential and marketing facilities. Based on socio-economic characteristics and options preferred by

APs, the NGO may have to re-assign trades to PAPs. Options include (i) petty trade (iii) skill

related schemes and loans for pumps, bore wells, bullock carts etc to increase productivity. The

NGO will assist PAPs in identifying appropriate alternative economic rehabilitation schemes

through counseling and consultation.

Step 3: Training: Option for training for skill enhancement for those losing their livelihood has been

provided in the Entitlement Matrix for owners losing commercial structure and employees losing

their livelihood.

Step 4: Identification of Trainers / Training Institutes: Based on trades selected, NGO shall have to

identify master trainer and/or training institute for different trades / activities who can provide on the

job training.

Step 5: Training Arrangement: NGO shall make different groups of PAPs as per trades selected and

make all the arrangements such as fixing the venue etc.

Step 6: Monitoring of APs: After training the NGO shall monitor the PAPs in order to take mid-term

correction measures, if required.

Monitoring and Evaluation support for RAP

43. An external monitoring and evaluation agency, Samaj Vikas, has been appointed to concurrently

monitor and evaluate R&R activities on periodical basis with NGOs. The role of such an agency will

facilitate process of R&R and thus provide support in the proper implementation of rehabilitation

programmes. And the M&E Consultant will ensure and certify that the stretch is free from all

encumbrances related R&R measures, at every stage prior to issue of bids, prior to signing

concession agreement, prior to appointed date and prior to hand over of the second Milestone

stretches to the developer. The end evaluation will be carried out through independent consultants

not associated with the implementation as to how the R&R objectives are realized and the changes

Page 26: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

20

in the living conditions of the PAPs which will be compared with the baseline data on key impact

indicators related to income, occupation, assets, housing conditions, land ownership pattern, etc.

Grievance Redressal mechanism

44. The project will establish a Grievance Redressal process with district-level committees. The

following persons constitute the District Level Grievance Redressal Cell :

1. Deputy Commissioner of the District – Chairman

2. Academician ( to be selected by the DC) – Member

3. Representative from PAPs (to be selected by the DC) – Member

4. Divisional EE – Convener

The members of the GRC to be selected by the DC and representatives from the PAPs are under

progress and will be completed by 30th June 2012.

45. The main functions of the GRC will be:

a. to provide support to PAPs on problems arising out of eligibility for RAP-provided

entitlements and assistance provided;

b. to record the grievances of the PAPs, and categorize, prioritize and solve them within one

month;

c. to inform PIU of serious cases within one week; and

d. to report to the aggrieved parties about the developments regarding their grievance and

decisions of the PIU, within one month.

46. The Grievance Committees will meet regularly during implementation of the RAP, at least once a

month. The committees will suggest corrective measures at the field level itself and fix

responsibilities for implementation of its decisions. However the NGOs will form the first level of

intervention in resolving PAP related grievances and attempt to motivate the PAP to facilitate

implementation of the R&R program. Details regarding registering complaints, response times,

communication modes, and mechanisms for appeal or approaching civil courts if other provisions

fail are:

1. At the first level intervention the NGO will attempt to resolve the grievance;

2. Next the CAO will attempt to address land related grievance and the ADSW will address the non-

land related grievances;

3. The third step will be to approach the Grievance Redressal Committee;

4. Next the PAP can approach the Regional Commissioner who is the Appellate Authority.

5. If all the above fails, the PAPs can approach the court.

It is the responsibility of the SDRC/NGO to inform the affected person’s decisions of the GRC to

make it effective.

Resettlement Colonies and Vendor Markets

47. In this package there is no requirement for resettlement colony, as more than 20 families are not

losing their residential structure in this stretch.

Page 27: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

21

Protection of RoW

48. Section 5 of the KHA mentions the Highway Authority will exercise power and discharge duties in

accordance with provisions of the KHA for restriction of ribbon development along the highways

and for prevention and removal of encroachments. The Highway Authority under Section 7 has

power to fix boundary of building and control lines of highways. Section 21 mentions prevention of

unauthorized occupation of highway. Thus the onus of protecting the COI/RoW lies with the Project

Authority. Once the COI/Row has been identified and frozen, the COI/RoW has to be clearly

marked with boundary stones.

49. Any new encroachment into the area will be monitored by the concerned KSHIP Division from the

time the cut-off date is established and the baseline surveys are completed. The Divisional Engineers

shall visit the project roads periodically, at least once in three months, in order to ensure that no new

encroachments take place and submit quarterly reports in this regard. Any additional encroachments

noticed through periodical visits will be issued notices and their shifting will be done immediately.

To avoid future encroachments, it is proposed to construct drains at the edge of ROW and ROW

stones will also be laid.

50. The NGOs shall take photographs of the affected structures at the time of joint verification and also

after their shifting / demolition of the affected portion and prepare documentation of structures.

51. Those Non-titleholders already identified by the project will be issued Identity Cards by the PIU. All

new encroachers / squatters not present during the time of survey, will have to be verified by the

NGO/PIU. All squatter and encroachers have to be shifted from out of the COI and RoW. Those who

remain in the Row will not be eligible to entitlements.

Impacts on Municipal Towns

52. Verification for non - titleholders has already been completed on this package. All the persons

identified at the time of survey and verified by the NGOs at the time of joint verification but

subsequently shifted by the Municipalities will be extended assistance as per the RAP.

53. KSHIP shall address all the Municipalities in the Project Roads informing them of the Rehabilitation

and Resettlement Policy of the Government under KSHIP-II and the details of persons identified as

Project Affected Persons in their jurisdiction. If the Municipality wants to shift any of them for their

development works, they may do so after providing them assistance as per the R&R Policy of the

Government or inform the details of such persons to KSHIP for extending assistance under the project

54. In this package the project road passes through the Municipality areas of Mudhol and Chikkodi .

These Municipalities will be addressed informing them of the Rehabilitation and Resettlement policy

of Government under KSHIP-II project and the details of the persons identified as ‘Project Affected

Persons’ in their respective jurisdiction. In case the Municipalities desire to shift any of the Project

Affected Person on account of development work, they may do so after providing assistance to them

Page 28: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

22

as per the R&R Policy of Government or to inform the details of such displaced persons to KSHIP for

extending assistance to them under the project.

Data Base Management

55. The database generated will be used for tracking progress of this package by PIU. The data in the HQ

will be updated based on the information sent by the division office. PIU will be responsible for

tracking payments, generation of ID cards etc through the Data Base Management Consultants. The

socio-economic data for all PAPs are recorded in the Data Base and will be used for monitoring and

impact evaluation and other purposes.

Compensation and R&R assistance payment:

56. All the compensation and R&R assistance will be directly credited to the individual Bank A/cs. The

deduction of income tax is not applicable for receipt of compensation. The NGO will assist in

opening of the Bank A/cs and the details of payments will be recorded in the individual identification

cards and Pass Books. In case where the house/shop plots are allotted, the titles to those will be

provided in the joint name of wife and husband.

Co –ordination between R&R and Civil works

57. The resettlement programme will be co-coordinated with the timing of civil works. The Civil works

for this package is expected to start in December 2012. R&R and land acquisition is estimated to be

completed by August 2012. Under the Annuity Packages all land has to be handed over at one stage.

This will be after issue of Notification under Section 19 of KHA. The timeline for key activities is

given below.

58. The implementation of RIP will be performed in coordination with the procurement process and civil

works. The key mile stone in the process includes: issue of bids, singing of concession agreement,

appointed date and handing over of second mile stone stretches within 3 month of appointed date. The

various land acquisition and resettlement implementation actions to be completed prior to those mile

stones are listed below with respective target dates. The completion of these actions will be certified

through certification and confirmation by the M&E consultants.

Table 4- 2: Time line for Key LA and R & R Activities

Tasks Target Date Prior to Event

I Land Acquisition

Land Acquisition Plans

Section 15 Notification (first

notification)

November, 2011 Issue of bids

Section 27 (negotiation ) August, 2012 Signing of concession

agreement

Section 28(award declaration)

Notification

September, 2012 Appointed Date

Section 19 Possession of land December, 2012 Appointed Date

Section 39 (compensation offer and November 2012 Appointed Date

Page 29: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

23

payment )

Transfer/ No objection received for

Government land

December 2012 Appointed Date

II R&R Implementation activities

PIU Approval and Disclosure of

RIP

Mid June 2012 Issue of bids

Completion of additional joint

verification for identification of

additional PAPs

June 2012 Signing concession

agreement

Issue of ID cards May 2012 Issue of bids

Constitution of GRCs June 2012 Signing concession

agreement

Completion of structure valuation June, 2012 Signing of concession

agreement

Relocation of Community assets

completed

November, 2012 Appointed Date

Identification of alternative sites

and options

October , 2012 Signing Concession

agreement

Disbursement of assistance October, 2012 Appointed Date

Completion of allotment of

developed Sites and first

installment of construction grant

November, 2012 Appointed Date

III Resettlement

Relocation of PAPs March , 2013 Handing over second mile

stone stretches

Handing over of CPRs to

community

November,2012/March, 2013 Appointed Date/Second

miler stone stretches

Certification by M&E consultants

for site readiness

As needed

Prior to each event

Joint inspection of site: Prior to appointed date, representatives of KSHIP and developer will be

undertaken a joint site visit to ascertain the encumbrance free site on the ground and record any

encumbrance noticed and accordingly a time frame for mitigating those encumbrances within the agreed

time frame and accordingly measures will be taken to mitigation encumbrances.

Monitoring and R&R activities:

59. The R&R Monitoring indictors for physical progress are given in the table below.

Page 30: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

24

Table 4- 3: Monitoring Indicators for Physical Progress

Sl. No Monitoring Indicators for

Physical Progress

Implementa

tion Target

Nos

Revised

Implementati

on Target

Progress

This

Month

Cumulati

ve

Progress

% against

Revised

Implementati

on Target

1 Land Acquired- private

76 Acres 07

¾ guntas

2 Land transferred –

Government 1.10

3 PAFs paid compensation for

land 681

4 Construction cost for

residential owners 1

5 Construction cost for

residential squatters 1

6 Construction shop/ or IGA for

Owners 1

7 Alternative plot or IGA for

Commercial squatter 213

8 Subsistence allowance for

squatters 220

9 Shifting allowance for

squatters 220

10 Community Assets 165

Additional Impacts

60. Any additional impacts identified during the implementation will be considered in

accordance with RAP and the project entitlement matrix given therein. Any observation on

additional impacts will be forwarded by the Division to the PIU. The NGO will follow up

the matter in the field. A note will be prepared for the concurrence of the CPO.

Budget

61. The budget for land acquisition and R&R activities for this package is Rs.13.41 crores which forms a

part of the overall budget approved by the GoK. The details of the budget have been given in the

RAP. Any additional budget need, will be obtained through additional approvals.

Table 4- 4: Budget

Sl. No Category Total (INR)

1. Land Acquisition 75290000

2. Alternative site cost 12400000

3. Structure cost 3356101

4. R&R assistance 43070000

WEP 2 total 1,34,11,6101

.

Disclosure

62. The RIP will be disclosed on the KSHIP website and the document will be available in PIU HQ and

the respective PIU division office at Belgaum, and Taluk offices of Mudhol and Chikkodi . General

Page 31: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

25

Consultations will also be done for the package and documented and recorded. As part of disclosure

of RIP, public consultations will be held at important, locations to explain the contents of the RIP and

make them understand the process of implementation of RAP and also information about whether the

document and the list of PAPs will be available for their information. The details of grievance redress

process will also be explained. In addition, the periodical progress reports and other studies carried

out in relation to R&R will also be disclosed in the website.

Page 32: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

26

Annexure 1: Guidance Value as on July 2011

Table 4- 5: Guidance Value for Link 19A

Sl.

No. District Taluk

Village

Name

Dry Land Wet Land

Minimu

m

Maximu

m

Minimu

m

Maximu

m

1 Bagalkot Mudhol Mudhol 131500 149000 213000 244500

2 Bagalkot Mudhol Malali 74000 83000 146000 171500

3 Bagalkot Mudhol Mughalkhod 70500 83000 137000 170500

4 Bagalkot Mudhol Belagali 67000 76000 139500 175000

5 Bagalkot Mudhol Mahalingapur 126000 149000 205500 256500

Table 4- 6: Guidance Value for Link 19B

Sl.

No. District Taluk

Village

Name

Dry Land Wet Land

Minimum Maximum Minimum Maximum

1 Bagalkot Mudhol Bisanala 63500 70500 134500 170500

2 Bagalkot Mudhol Saidapura 115500 135000 190500 231000

3 Bagalkot Mudhol P.D Budni 129500 149000 223500 256500

4 Bagalkot Mudhol Kesarakoppa 65500 70000 137000 168000

5 Belgaum Raibagh Kappalaguddi 77000 87000 192000 225000

6 Belgaum Gokak Hallura 60500 72600 176000

7 Belgaum Gokak Mudalagi 72600 96200 193600

8 Belgaum Raibagh Kankanawadi 89000 98000 192000 225000

9 Belgaum Raibagh Jodahatti 57000 63000 94000 108000

10 Belgaum Raibagh Bendavada 64000 71000 87000 108000

11 Belgaum Raibagh Nippanala 77000 87000 174000 197000

12 Belgaum Chikkodi Kabbura 41000 59000 114000

13 Belgaum Raibagh Mantura 60000 69000 108000 123000

Table 4- 7: Guidance Value for Link 19C

Sl.

No. District Taluk

Village

Name

Dry Land Wet Land

Minimum Maximum Minimum Maximum

1 Belgaum Chikkodi Kabbura 41000 59000 114000

2 Belgaum Chikkodi Umrani 43000 60000 118000

3 Belgaum Chikkodi Itanala 53000 90000 151000

4 Belgaum Chikkodi Belakoda Away from Village

5 Belgaum Chikkodi Chikkodi 87000 130000 217000

Page 33: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

27

Table 4-8: Guidance Value for Link 19D

Sl.

No. District Taluk

Village

Name

Dry Land Wet Land

Minimum Maximum Minimum Maximum

1 Belgaum Chikkodi Chikkodi 87000 130000 217000

2 Belgaum Nippani Pattankudi 92000 140000 235000

3 Belgaum Chikkodi Chinchani 89000 133000 222000

4 Belgaum Chikkodi Kothalli 40000 60000 118000

5 Belgaum Nippani Kutali 69000 101000 212000

6 Belgaum Chikkodi Navalihala 46000 90000 154000

7 Belgaum Nippani Nippani 152000 227000 303000

8 Belgaum Nippani Kodani 67000 92000 193000

9 Belgaum Chikkodi Peerawadi 33000 55000 121000

Page 34: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

28

Annexure 2: Details of PAFs in link 19A

Table 4- 93: PAFs Structure details of link 19A

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

1 2.660 RHS Soragav Parashurama S/o

Sadashiva Squatter Residential

2 10.615 RHS Mugalakhoda Somappa S/o

Ningappa Squatter Commercial

3 10.645 RHS Mugalakhoda Raju S/o Hasansab Squatter Residential/Commer

cial

4 13.240 LHS Belagali Thimmanna S/o

Tukarama Encroacher Commercial

5 13.280 LHS Belagali Vijay Kumar S/o

Tukarama Encroacher Residential

6 13.325 LHS Belagali Sadashiva S/o

Siddappa Nagarala Encroacher Residential

7 13.510 LHS Belagali Eshwarappa S/o

Bheemappa Encroacher Residential

8 14.477 LHS Ranna

Belagali

Yamanavva W/o

Maruthi Squatter Residential

9 14.505 RHS Ranna

Belagali

Paramanna S/o

Hanumantha Squatter Commercial

10 14.510 LHS Ranna

Belagali

Srimantha S/o

Nagappa Squatter Commercial

11 14.510 RHS Ranna

Belagali

Kallavva W/o

Lachumappa Squatter Commercial

12 14.530 LHS Ranna

Belagali

Dasthagirsab S/o

Allasab Squatter Commercial

13 14.543 RHS Ranna

Belagali

Dattathreya S/o

Baburao Squatter Commercial

14 14.644 RHS Ranna

Belagali

Mahalingappa S/o

Siddaramappa

Malkod

Encroacher Residential

15 14.720 RHS Ranna

Belagali

Siddappa S/o

Ramappa Konnura Encroacher Residential

16 14.725 LHS Ranna

Belagali Prakasha S/o Revappa Encroacher Commercial

17 14.727 LHS Ranna

Belagali

Channaparappa S/o

Rudrappa Mandi Squatter Commercial

18 14.729 LHS Ranna

Belagali

Santhosha S/o

Jakkappa Squatter Commercial

19 14.730 RHS Ranna

Belagali

Mahadeva S/o

Shivappa Squatter Commercial

20 14.731 LHS Ranna

Belagali

Mahalingeshwara

Temple Trust Encroacher Commercial

21 14.734 LHS Ranna

Belagali

Mahalingeshwara

Temple Trust Encroacher Commercial

Page 35: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

29

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

22 14.738 LHS Ranna

Belagali

Mahalingeshwara

Temple Trust Encroacher Commercial

23 14.745 RHS Ranna

Belagali

Mahalingappa S/o

Channappa Pujari Encroacher Residential

24 14.747 RHS Ranna

Belagali

Shivaiah S/o Basaiah

Matigudda Squatter Commercial

25 14.749 RHS Ranna

Belagali Mallappa Guravva Squatter Commercial

26 14.770 LHS Ranna

Belagali

Shivaputrappa S/o

Virupakshappa

Konnur

Squatter Commercial

27 14.795 LHS Ranna

Belagali

Dundaiah S/o

Gangaiah Squatter Commercial

28 14.800 RHS Ranna

Belagali

Mahadeva S/o

Balappa Jagadala Squatter Commercial

29 14.830 LHS Ranna

Belagali

Hanumantha S/o

Basappa Lokapura Squatter Commercial

30 14.834 RHS Ranna

Belagali

Sadashiva S/o

Mallappa Squatter Commercial

31 14.836 RHS Ranna

Belagali

Basappa S/o

Fakirappa Squatter Commercial

32 14.845 LHS Ranna

Belagali

Bheemappa S/o

Mallappa Squatter Commercial

33 17.093 LHS Mahalingapura Subhadra W/o

Mahalingappa Squatter Commercial

34 18.015 LHS Mahalingapura Mallappa Squatter Commercial

35 18.105 RHS Mahalingapura Shivananda S/o

Channa Basappa Squatter Commercial

36 18.108 RHS Mahalingapura Rachaiah S/o

Mallaiah Shiromata Squatter Commercial

37 18.125 LHS Mahalingapura Dasthagir S/o

Mohammad Squatter Commercial

38 18.160 RHS Mahalingapura Mahalingappa S/o

Gurulingappa Squatter Commercial

39 18.232 LHS Mahalingapura Noorandappa S/o

Veerabhadrappa Squatter Commercial

40 18.237 LHS Mahalingapura Smt Shankramma

Umesha S/o Matagi Squatter Commercial

41 18.392 RHS Mahalingapura Husainbee W/o

Janglisab Squatter Residential

42 18.423 RHS Mahalingapura Manjunatha S/o

Balakrishnappa Squatter Commercial

43 18.426 RHS Mahalingapura Mahadeva S/o

Girimallappa Squatter Commercial

44 18.493 LHS Mahalingapura Prakash S/o

Yamanappa Encroacher Commercial

Page 36: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

30

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

45 18.497 LHS Mahalingapura Prakash S/o

Yamanappa Encroacher Commercial

46 18.500 LHS Mahalingapura Prakash S/o

Yamanappa Encroacher Commercial

47 18.535 LHS Mahalingapura Jamal S/o Gajabarsab

Tambuli Squatter Commercial

48 18.655 RHS Mahalingapura Eshwara S/o Rajanna

Kalal Squatter Commercial

49 18.710 RHS Mahalingapura Naganatha S/o

Shiddarama Squatter Commercial

50 18.893 LHS Mahalingapura Yamanappa

Geethjavva Uttara Squatter Residential

51 18.915 LHS Mahalingapura Sumithra W/o Prahlad Squatter Commercial

52 18.915 LHS Mahalingapura Kamala W/o

Kasheppa Uttura Squatter Residential

53 18.927 LHS Mahalingapura Sadashiva S/o

Bhimappa Mangadi Squatter Commercial

54 18.931 LHS Mahalingapura Gowramma W/o

Shambara Manga Encroacher Residential

55 18.940 LHS Mahalingapura Mahalingappa S/o

Santhappa Manga Encroacher Residential

56 18.947 RHS Mahalingapura Lalsab S/o Yakamsab Encroacher Residential/Commer

cial

57 18.955 LHS Mahalingapura Roopa Nimbevva

Alasappagola Squatter Residential

58 18.956 RHS Mahalingapura Bashasab S/o

Ajarathsab Squatter Commercial

59 18.965 LHS Mahalingapura Lalithavva W/o

Chikkappa Squatter Commercial

60 19.013 LHS Mahalingapura Devendra S/o

Parashurama Lathore Encroacher Residential

61 19.020 LHS Mahalingapura Lakshmana S/o

Ningappa Encroacher Residential

62 19.020 RHS Mahalingapura Bhimappa S/o

Yallappa Squatter Commercial

63 19.025 LHS Mahalingapura Yusuf Khan S/o

Rasulsab Jamadhar Encroacher

Residential/Commer

cial

64 19.040 LHS Mahalingapura Marembee W/o

Rajasab Encroacher Residential

65 19.040 RHS Mahalingapura Mahalingappa S/o

Bhimappa Encroacher Residential

66 19.052 LHS Mahalingapura Abdul Terdal Encroacher Residential

67 19.055 LHS Mahalingapura Sayavva W/o

Bhimappa Kanatti Encroacher Residential

68 19.062 LHS Mahalingapura Hanumanthappa S/o

Bhimappa Valikara Encroacher Residential

Page 37: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

31

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

69 19.062 RHS Mahalingapura Ramanna S/o

Lakshmana Encroacher Residential

70 19.066 RHS Mahalingapura Lakshmana S/o

Gangappa Encroacher Residential

71 19.075 LHS Mahalingapura Suresh S/o Sadashiva

Shinde Encroacher Commercial

72 19.080 LHS Mahalingapura Kulkarni Encroacher Commercial

73 19.097 LHS Mahalingapura Gajanana S/o Lathore Squatter Commercial

Page 38: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

32

Annexure 3: Details of PAFs in link 19B

Table 4- 40 PAF Structure details of link 19B

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

1 0.020 LHS Mahalingapura

Eshwarappa S/o

Mahalingappa

Asthagi

Encroacher Commercial

2 0.030 LHS Mahalingapura M C Betageri Encroacher Commercial

3 0.034 LHS Mahalingapura M C Betageri Encroacher Commercial

4 0.037 LHS Mahalingapura Godachavva

Murugappa Betageri Encroacher Commercial

5 0.038 RHS Mahalingapura Sadashiva S/o

Veerabhadrappa Encroacher Commercial

6 0.039 LHS Mahalingapura M C Betageri Encroacher Commercial

7 0.041 LHS Mahalingapura S N Nagamurthy Encroacher Commercial

8 0.060 RHS Mahalingapura Nasaruddin Encroacher Commercial

9 0.072 LHS Mahalingapura Malakajappa Kuri Owner Commercial

10 4.865 LHS Saidapura Gopala S/o

Channappa Squatter Commercial

11 5.415 RHS Saidapura Hanumantha S/o

Gulappa Squatter Commercial

12 7.368 RHS Saidapura Govinda S/o

Krishnappa Squatter Commercial

13 7.500 LHS Saidapura Honnavva W/o

Baramappa Squatter Commercial

14 7.503 LHS Saidapura Manjunatha S/o

Neelakantappa Squatter Commercial

15 8.007 RHS Saidapura

Rukkamma W/o

Ganapathi

Devaramani

Squatter Commercial

16 8.530 LHS Saidapura Shivalinga S/o

Devappa Squatter Commercial

17 11.570 LHS Hallur Eshwarappa S/o

Siddappa Squatter Commercial

18 12.782 RHS Hallur Basappa S/o

Pundalika Squatter Commercial

19 12.782 LHS Hallur Eshwara S/o

Lakshmana Squatter Commercial

20 12.785 RHS Hallur Shankar S/o

Lakshmana Squatter Commercial

21 12.820 RHS Hallur Bhimappa S/o

Giryappa Squatter Commercial

22 12.825 RHS Hallur Hanumantha S/o

Basappa Squatter Commercial

23 12.826 RHS Hallur Yakub S/o Khajasab Squatter Commercial

Page 39: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

33

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

24 12.828 LHS Hallur

Basavva S/o

Hanumantha

Lokkkannavar

Squatter Commercial

25 12.833 RHS Hallur Sathyappa S/o

Mahadevappa B Patil Squatter Commercial

26 12.848 RHS Hallur Hanumantha S/o

Channabasappa Squatter Commercial

27 14.895 RHS Gandhinagara Lakshmi W/o Erappa Squatter Residential

28 17.410 RHS Gurlapura

Cross Abubkar S/o Gaussab Squatter Commercial

29 17.418 RHS Gurlapura

Cross

Shekhar S/o

Mahadevappa Squatter Commercial

30 17.421 RHS Gurlapura

Cross Ramesh S/o Kallappa Squatter Commercial

31 17.430 RHS Gurlapura

Cross

Shrishaila S/o

Hanumantha Squatter Commercial

32 17.433 RHS Gurlapura

Cross

Prakasha S/o

Basappa Squatter Commercial

33 17.436 RHS Gurlapura

Cross

Gokula Borewell

Services Squatter Commercial

34 17.438 RHS Gurlapura

Cross

Shiddalinga S/o

Basappa Squatter Commercial

35 17.446 RHS Gurlapura

Cross

Mudukappa S/o

Hanumantha Squatter Commercial

36 17.448 RHS Gurlapura

Cross Erappa Squatter Commercial

37 17.450 RHS Gurlapura Hanumantha S/o

Ramappa Squatter Commercial

38 17.454 RHS Gurlapura

Cross

Shivabasava S/o

Basappa Squatter Commercial

39 17.464 RHS Gurlapura

Cross

Shivappa S/o

Mallappa Squatter Commercial

40 17.467 RHS Gurlapura

Cross

Murigendra S/o

Gurupadappa Squatter Commercial

41 17.469 RHS Gurlapura

Cross

Revappa S/o

Mallappa Squatter Commercial

42 17.476 RHS Gurlapura

Cross

Lingappa S/o

Channabasappa Squatter Commercial

44 17.480 RHS Gurlapura

Cross

Shivappa S/o

Mallappa Squatter Commercial

45 17.490 RHS Gurlapura

Cross

Balappa S/o

Basavaneppa Squatter Commercial

46 17.496 RHS Gurlapura

Cross

Basavaraja S/o

Mallappa Squatter Commercial

47 17.498 RHS Gurlapura

Cross Holleppa Shetty Squatter Commercial

Page 40: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

34

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

48 17.500 RHS Gurlapura

Cross

Gurappa S/o

Karagulappa Squatter Commercial

49 17.506 RHS Gurlapura

Cross

Tangevva W/o

Karugolappa Squatter Commercial

50 17.512 RHS Gurlapura

Cross

Revappa S/o

Channappa Squatter Commercial

51 17.521 RHS Gurlapura

Cross

Basappa S/o

Rangappa Squatter Commercial

52 17.552 RHS Gurlapura Mahadeva S/o

Kallappa Squatter Commercial

53 17.892 LHS Gurlapura Shrishaila S/o

Basappa Nerli Owner Residential

54 17.905 LHS Gurlapura Boravva W/o

Shankarappa Owner Residential

55 20.125 RHS Maladoor

Yallappa

Shivabasappa

Mukkad

Squatter Commercial

56 23.570 RHS Kankanavadi Vittala S/o Yallappa Squatter Commercial

57 23.590 RHS Kankanavadi Denamma W/o

Fakrusab Squatter Commercial

58 23.655 RHS Kankanavadi Maruthi S/o Yallappa

Maradi Encroacher Commercial

59 23.660 RHS Kankanavadi Halappa S/o

Yankappa Squatter Commercial

60 23.665 RHS Kankanavadi Halappa S/o Amarani Squatter Commercial

61 23.665 LHS Kankanavadi Paraiah S/o Balaiah

Hiremata Squatter Commercial

62 23.680 LHS Kankanavadi Sadashiva S/o

Shankar Squatter Commercial

63 23.683 LHS Kankanavadi Pundalika S/o

Siddappa Squatter Commercial

64 23.686 LHS Kankanavadi Malappa S/o

Mutthappa Squatter Commercial

65 23.690 LHS Kankanavadi Balappa S/o Yallappa Squatter Commercial

66 23.724 RHS Kankanavadi Tammanna Squatter Commercial

67 23.727 RHS Kankanavadi Husain S/o Hanadaf Squatter Commercial

68 25.252 LHS Kankanavadi Bhimappa S/o

Mallappa Squatter Commercial

69 25.283 LHS Kankanavadi Chandramma W/o

Balappa Squatter Residential

70 26.650 LHS Kankanavadi Lakkappa S/o

Lakshmana Squatter Commercial

71 26.655 LHS Kankanavadi Balappa Squatter Residential/Commer

cial

72 28.940 LHS Nippanala Bhimappa S/o

Mallappa Squatter

Residential/Commer

cial

Page 41: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

35

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

73 29.380 LHS Nippanala

Kallappa S/o

Lakshmana Encroacher Cattle Shed

74 29.4 LHS Nippanala Basappa S/o

Lakshmana Encroacher Cattle Shed

75 29.730 RHS Nippanala Ramagoda S/o

Basappa Squatter Commercial

76 29.735 RHS Nippanala Kedari S/o Kadappa

Bastuvadi Squatter Commercial

77 29.749 LHS Nippanala Maruthi S/o Kallappa Squatter Commercial

78 29.755 LHS Nippanala Dastagirisab S/o

Shahbuddin Squatter Commercial

79 29.758 LHS Nippanala Krishnappa S/o

Bhimappa Kantikar Encroacher Commercial

80 30.550 RHS Nippanala Muthyappa S/o

Bheerappa Borgod Owner Residential

81 31.270 RHS Mantur Rangappa S/o

Ramappa Squatter Commercial

82 32.862 LHS Mantur Siddappa S/o

Narasappa Squatter Commercial

83 34.060 LHS Bendevadi

Cross

Mahadeva S/o

Kallappa Squatter Commercial

84 37.415 LHS Jodatti Pundalika S/o

Basappa Owner Residential

85 40.710 RHS Kabbur Lakshmana S/o

Krishnappa Bidare Owner Cattle Shed

86 40.920 RHS Kabbur Basayya S/o C

Basayya Owner Cattle Shed

87 42.362 RHS Kabbur Subhash Squatter Commercial

88 42.416 RHS Kabbur

Gundappa S/o Kati

Basappa

Kattappanavar

Squatter Commercial

Page 42: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

36

Annexure 4 : Details of PAFs in Link 19C

Table 4- 51: PAF Structure details of link 19C

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

1 0.010 LHS Kabbur Gaffar S/o

Mohiddinsab Squatter Commercial

2 0.011 RHS Kabbur Jannath W/o Ameer

Jamadar Squatter Commercial

3 0.013 LHS Kabbur Kallappa S/o

Shivaraya Squatter Commercial

4 0.015 LHS Kabbur Kallappa S/o Maruthi Squatter Commercial

5 0.015 RHS Kabbur Gaus S/o Malliksab Squatter Commercial

6 0.018 LHS Kabbur Anil S/o Siddarama Squatter Commercial

7 0.025 LHS Kabbur Sadashiva S/o Gopal Squatter Commercial

8 0.032 RHS Kabbur Kallamesh S/o

Yallappa Squatter Commercial

9 0.035 RHS Kabbur Shekhar S/o Manohar Squatter Commercial

10 0.090 LHS Kabbur Yasin S/o Usman

Jamam Squatter Commercial

11 0.098 LHS Kabbur Balasab S/o

Sidramasab Squatter Commercial

12 0.585 LHS Kabbur Srikantha S/o Vittala Squatter Commercial

13 1.160 LHS Kabbur Halappa S/o

Buddappa Encroacher Residential

14 1.650 LHS Kabbur Basappa S/o Siddappa Encroacher Residential

15 2.998 RHS Kabbur Vittala S/o Siddappa Encroacher Cattle Shed

16 3.742 LHS Bilagi Cross Siddarama S/o

Bhimappa Encroacher Residential

17 4.470 LHS Nagaramunoli Ningappa S/o

Ramappa Squatter Commercial

18 5.575 LHS Nagaramunoli Sudheesh S/o

Pundalika Squatter Commercial

19 5.625 LHS Nagaramunoli Ananda S/o Santhappa

Myagale Squatter Commercial

20 5.638 RHS Nagaramunoli Chitrasena S/o Babu Squatter Commercial

21 5.708 LHS Nagaramunoli Siddu S/o Ramappa Squatter Commercial

22 5.710 LHS Nagaramunoli Dastagir S/o Alisab Squatter Commercial

23 5.775 LHS Nagaramunoli Fakruddin S/o

Mirasab Jamadar Squatter Commercial

24 5.777 LHS Nagaramunoli Smt Kastrivva Shekar

Pujar Encroacher Residential

25 5.800 LHS Nagaramunoli Jayakumar S/o

Siddappa Squatter Commercial

26 5.810 LHS Nagaramunoli Mahesh S/o Shivappa Squatter Commercial

27 5.830 LHS Nagaramunoli Virupaksha S/o

Mallappa Encroacher Residential

Page 43: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

37

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

28 5.860 LHS Nagaramunoli Baramappa S/o

Basappa Kore Squatter Commercial

29 5.864 LHS Nagaramunoli Subhash S/o Somappa Squatter Commercial

30 5.870 LHS Nagaramunoli Lakshmana S/o

Bhimappa Squatter Commercial

31 5.873 LHS Nagaramunoli Mallikarjuna S/o

Shivappa Squatter Commercial

32 5.880 LHS Nagaramunoli Shankara S/o

Ramappa Squatter Commercial

33 5.885 LHS Nagaramunoli Appasab S/o Kalisab Squatter Commercial

34 5.900 LHS Nagaramunoli Siddaruda S/o

Ramappa Squatter Commercial

35 12.405 LHS Umrani Smt Gangavva

Siddappa Dadugola Squatter Residential

36 12.413 RHS Umrani Appanna S/o

Narasappa Encroacher Residential

37 17.676 RHS Chikkodi Kempanna S/o

Bhimappa Squatter Commercial

38 17.716 RHS Chikkodi Basavaraj S/o

Gangadhara Encroacher

Boundary

Wall

39 18.060 RHS Chikkodi Tabaraka S/o Hyderali Encroacher Residential

Page 44: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

38

Annexure 5: Details of PAFS in Link 19D

Table 4- 12: PAF Structure details of link 19D

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

1 3.435 RHS Chikkodi Jothibha Malave Owner Commercial

2 6.000 LHS Chinchani Suresh S/o Rama

Nadoni Encroacher Residential

3 6.010 LHS Chinchani Annasab S/o Ramu

Nadoni Encroacher Residential

4 6.055 LHS Chinchani Sanjaya Dadu S/o

Bheema Nadoni Squatter Commercial

5 8.000 LHS Kuppanawadi Vijay S/o Annasab

Gulle Encroacher Residential

6 10.870 LHS Kothali Sanjeeva S/o Prakash

Mugdum Squatter Commercial

7 10.940 RHS Kutali

Balagowda S/o

Ramangowda

Demannanavar

Squatter Commercial

8 10.940 LHS Kothali Raju S/o Prakash

Mugdum Squatter Commercial

9 10.980 LHS Kothali Tategowda S/o

Annagowda Patil Tenant Commercial

10 10.990 LHS Kutali Sadashiva S/o Annappa

Chougala Squatter Commercial

11 11.000 LHS Kutali Mallappa S/o

Bheemappa Navi Squatter Commercial

12 11.010 LHS Kutali Gajanana S/o Shivappa

Chougala Squatter Commercial

13 11.020 LHS Kutali Appasaheb S/o

Mahadeva Mane Squatter Commercial

14 11.025 LHS Kutali

Suresh S/o

Veerupakshappa

Chougala

Squatter Commercial

15 11.080 LHS Kutali Bheemappa S/o

Devappa Kamagowda Squatter Commercial

16 11.280 LHS Kutali Shankar S/o Ramu

Mugdum Squatter Commercial

17 17.800 RHS Pattankudi Riaz S/o Iqbal Jari Squatter Commercial

18 17.820 RHS Pattankudi Vinayaka Y Shinde Squatter Commercial

19 17.840 LHS Pattankudi Sanjay S/o Keshav

Prabhalakar Squatter Commercial

20 17.850 LHS Pattankudi Elahi S/o Hasan Kamate Squatter Commercial

21 17.865 LHS Pattankudi Mahaveera S/o

Hucchannanavar Encroacher Residential

22 17.870 LHS Pattankudi Bhoopal S/o Rama

Hucchannanavar Encroacher Residential

Page 45: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

39

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

23 17.875 LHS Pattankudi Shanthabai W/o

Ramagonda Patil Encroacher Residential

24 17.880 LHS Pattankudi Gowrabai W/o Late

Appa Bankapura Encroacher Residential

25 17.885 LHS Pattankudi Tathoba Koth Encroacher Residential

26 17.895 LHS Pattankudi Srinivasa S/o

Panduranga Sasini Encroacher Residential

27 17.910 RHS Pattankudi Rajendra Sripala

Dumme Encroacher Residential

28 17.920 RHS Pattankudi Ashok S/o Vasantha

Bagal Encroacher Residential

29 17.926 RHS Pattankudi Shankar Ramjee Bagal Encroacher Residential

30 17.931 RHS Pattankudi Sriranga S/o Appa

Shelara Squatter Commercial

31 17.945 RHS Pattankudi Suresh S/o Ganapathi

Bagal Encroacher Commercial

32 17.945 RHS Pattankudi Raveendra S/o

Dadasaheb Punekar Encroacher Residential

33 17.960 RHS Pattankudi Bagavatha S/o Dondiba

Punekar Encroacher Residential

34 22.188 RHS Nippani Anil Sankapala Squatter Commercial

35 22.300 RHS Nippani Anasuya W/o Rajaram

Rapri Squatter Residential

36 22.520 LHS Nippani Umesh S/o Maruthi

Hegde Squatter Commercial

37 22.525 RHS Nippani Maruthi S/o Ningapp

Hegde Squatter Commercial

38 22.575 LHS Nippani Mahadeva S/o Annappa

Patil Squatter Commercial

39 22.620 RHS Nippani Balu S/o Datta Honne Squatter Commercial

40 22.625 RHS Nippani

Veepan S/o

Rameshwarlal

Vaishnava

Squatter Commercial

41 22.628 RHS Nippani Sushma Kamble C/o

Manorama Kamble Squatter Commercial

42 22.631 RHS Nippani Shekar S/o Gangaram

Teradali Squatter Commercial

43 22.632 LHS Nippani Raju S/o Siddappa

Kamate Squatter Commercial

44 22.634 RHS Nippani Vijay S/o Gundu

Tipukade Squatter Commercial

45 22.635 LHS Nippani Kallappa S/o Babu

Kamate Squatter Commercial

46 22.640 RHS Nippani Prabhakar S/o Pundalik

Kadam Squatter Commercial

47 22.646 RHS Nippani Hanumantha S/o

Lakshman Jalapura Squatter Commercial

Page 46: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

40

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

48 22.650 RHS Nippani Maruthi S/o Bheema

Rao Hakkule Squatter Commercial

49 22.653 RHS Nippani Sikandar S/o Babasab

Mujavar Squatter Commercial

50 22.656 RHS Nippani Ramachandra S/o

Annappa Tippukude Squatter Commercial

51 22.659 RHS Nippani

Mumtaz W/o Late

Mohammad Haneef

Mujavar

Squatter Commercial

52 22.661 RHS Nippani Vikas Kamble S/o

Shyama Rao Kamble Squatter Commercial

53 22.664 RHS Nippani Amol Kamble S/o

Prakash Kamble Squatter Commercial

54 23.110 RHS Nippani Vijay S/o Dattathreya

Tippe Squatter Commercial

55 23.113 RHS Nippani Sudhakar S/o

Lakshmana Jathrate Squatter Commercial

56 23.165 RHS Nippani Sagar S/o Narayana

Indalakar Squatter Commercial

57 23.168 RHS Nippani Rao Saheb S/o

Ramachandra Malhabad Squatter Commercial

58 23.172 RHS Nippani Samiulla S/o Iqbal

Mujavar Squatter Commercial

59 23.175 RHS Nippani Havasa bai W/o Ashok

Lakhe Squatter Commercial

60 23.178 RHS Nippani Marufa Babasab Bhavan Squatter Commercial

61 23.180 RHS Nippani Muksuda S/o Kareem

Muniyar Squatter Commercial

62 23.183 RHS Nippani Vittala Hadhikara Squatter Commercial

63 23.185 RHS Nippani Basavaraj S/o Veerappa

Ammanagi Squatter Commercial

64 23.198 RHS Nippani Raju S/o Panduranga

Suthara Squatter Commercial

65 23.201 RHS Nippani Ghanu Gosamvi Squatter Commercial

66 23.206 RHS Nippani Mamtaz W/o Daraveshi Squatter Commercial

67 23.210 RHS Nippani Bharathesh S/o Kallappa

Pangare Squatter Commercial

68 23.212 RHS Nippani Shivaji S/o Rama

Suryavamshi Squatter Commercial

69 23.215 RHS Nippani Dilip S/o Bamane Squatter Commercial

70 23.220 LHS Nippani Harish S/o Jasud 2

Commercial,

(O) Open

Land

71 23.222 RHS Nippani Mahadeva S/o Daadu

Kumbara Squatter Commercial

72 23.224 RHS Nippani Anil S/o Narayana

Kumbara Squatter Commercial

Page 47: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

41

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

73 23.227 RHS Nippani Chandrakantha S/o

Krishna Surangi Squatter Commercial

74 23.230 RHS Nippani Aslam S/o Mohiddin

Bhagavan Squatter Commercial

75 23.234 RHS Nippani Dilip S/o Ramu

Desamane Squatter Commercial

76 23.237 RHS Nippani Kurlinga S/o Shivarudra

Udase Squatter Commercial

77 23.240 RHS Nippani Bala Saheb S/o Bairu

Ravuth Squatter Commercial

78 23.244 RHS Nippani Jubeera S/o Aslam

Bhagavan Squatter Commercial

79 23.250 RHS Nippani Juneed S/o Aslam

Bhagavan Squatter Commercial

80 23.325 LHS Nippani Faruk S/o Ismail Mulla Squatter Commercial

81 23.340 LHS Nippani Mahesh S/o Shivaji

Suthara Squatter Commercial

82 23.345 LHS Nippani Pradeep S/o Jadav Squatter Commercial

83 23.350 LHS Nippani Dasthagir S/o Moulasab Squatter Commercial

84 23.353 LHS Nippani Prabhakar S/o

Panduranga Patade Squatter Commercial

85 23.359 LHS Nippani Ashoka Neevut Ravut Squatter Commercial

86 23.362 LHS Nippani Manohar S/o Ravut N Squatter Commercial

87 23.365 RHS Nippani Anil S/o Maruthi

Manjrekar Squatter Commercial

88 23.365 LHS Nippani

Vimala W/o

Chandrakantha

Karavekara

Squatter Commercial

89 23.390 LHS Nippani Umesha S/o Shivaputra

Chougale Squatter Commercial

90 23.400 LHS Nippani Ananda S/o Bairu

Sangapala Squatter Commercial

91 23.440 LHS Nippani Sabuddin S/o Abubakar

Mujavar Squatter Commercial

92 23.445 RHS Nippani Sachin S/o Raghunatha

Patil Squatter Commercial

93 23.450 LHS Nippani Chandu S/o Sakarama

Patil Encroacher Commercial

94 23.480 LHS Nippani Arun S/o Vittal Rao

Savanth Encroacher Commercial

95 23.485 RHS Nippani Preveen Batle Encroacher Commercial

96 23.500 LHS Nippani Arun S/o Vittalrao

Savanth Encroacher Commercial

97 23.520 RHS Nippani Mohan S/o

Ramachandra Kade Squatter Commercial

98 24.025 RHS Nippani Alla Baksh S/o Hazarath

Hazukhan Squatter Commercial

Page 48: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

42

Sl.

No. Chainage Side Village Name

Occu.

Status Loss Type

99 24.028 RHS Nippani Ashoka S/o Keraba

Shindhe Squatter Commercial

100 24.032 RHS Nippani

Srikanth S/o

Parashurama

Mathivaddara

Squatter Commercial

101 24.036 RHS Nippani Vinoda S/o Ekanatha

Suthara Squatter Commercial

102 24.038 RHS Nippani Vijay S/o Dondiba

Savantha Squatter Commercial

103 24.040 RHS Nippani Chandrakantha S/o

Panduranga Maane Squatter Commercial

104 24.042 RHS Nippani Vinayaka S/o Ganapathi

Rao Squatter Commercial

Page 49: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

43

Annexure 6: Details of Community Structure

Table 4- 6: Community Asset Details of link 19A (Mudhol - Mahalingapura )

Area in Sq.m

Sl.

No.

Chain

age Side District Taluk Village Typeof Asset Owner Type

Total

Struc

ture

Affec

ted

Strct

ure

% of

Str.

Getti

ng

Affec

ted

1 0.210 LHS Bagalkot Mudhol Mudhol Hand Pump Panchayat 13.50 2.25 16.67

2 0.240 LHS Bagalkot Mudhol Mudhol Arch Community 48.00 24.00 50.00

3 1.870 LHS Bagalkot Mudhol Mudhol Bore Well Panchayat 13.50 2.25 16.67

4 2.622 RHS Bagalkot Mudhol Soragav Temple Community 45.00 15.00 33.33

5 2.635 RHS Bagalkot Mudhol Soragav Hand Pump Panchayat 16.50 2.25 13.64

6 2.645 LHS Bagalkot Mudhol Soragav Bus Stand Panchayat 49.00 28.00 57.14

7 2.960 LHS Bagalkot Mudhol Soragav Bore Well Panchayat 12.75 2.25 17.65

8 2.980 RHS Bagalkot Mudhol Soragav Well & Pump

House

Panchayat 34.00 14.00 41.18

9 4.025 LHS Bagalkot Mudhol Soragav Temple Community 33.00 6.00 18.18

10 6.450 RHS Bagalkot Mudhol Soragav Bore Well Panchayat 13.50 2.25 16.67

11 7.100 LHS Bagalkot Mudhol Malali Temple Community 10.00 1.00 10.00

12 8.092 RHS Bagalkot Mudhol Mugalkhod Hand Pump Panchayat 12.00 2.25 18.75

13 8.280 LHS Bagalkot Mudhol Mugalkhod Ashrama Community 48.00 4.00 8.33

14 8.315 LHS Bagalkot Mudhol Mugalkhod Shrine Community 7.50 1.00 13.33

15 9.182 LHS Bagalkot Mudhol Mugalkhod Hand Pump Panchayat 13.50 2.25 16.67

16 11.920 RHS Bagalkot Mudhol Belagali Bore Well Panchayat 7.50 2.25 30.00

17 13.320 LHS Bagalkot Mudhol Ranna

Belagali Temple

Community 63.00 35.00 55.56

18 13.725 RHS Bagalkot Mudhol Belagali Hand Pump Panchayat 15.00 2.25 15.00

19 14.345 RHS Bagalkot Mudhol Ranna

Belagali Hand Pump

Panchayat 10.50 2.25 21.43

20 14.425 RHS Bagalkot Mudhol Ranna

Belagali Temple

Community 20.00 12.00 60.00

21 14.550 LHS Bagalkot Mudhol Ranna

Belagali Circle

Community 10.00 4.00 40.00

22 14.550 RHS Bagalkot Mudhol Ranna

Belagali

Mini Water

Supply Tank

Panchayat 9.00 2.25 25.00

23 14.562 RHS Bagalkot Mudhol Ranna

Belagali Water Tap

Panchayat 7.50 2.25 30.00

24 14.670 RHS Bagalkot Mudhol Ranna

Belagali Water Tap

Panchayat 7.50 2.25 30.00

25 14.720 LHS Bagalkot Mudhol Ranna

Belagali High School

Panchayat 45.00 4.50 10.00

26 14.740 LHS Bagalkot Mudhol Ranna

Belagali Temple

Community 96.00 32.00 33.33

27 14.740 RHS Bagalkot Mudhol Ranna Water Tap Panchayat 12.00 2.25 18.75

Page 50: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

44

Belagali

28 14.800 RHS Bagalkot Mudhol Ranna

Belagali

Mini Water

Supply Tank

Panchayat 7.80 2.25 28.85

29 14.955 RHS Bagalkot Mudhol Ranna

Belagali Temple

Community 12.00 2.25 18.75

30 15.410 LHS Bagalkot Mudhol Ranna

Belagali Temple

Community 9.00 1.00 11.11

31 17.485 LHS Bagalkot Mudhol Mahalingapu

ra Laboratory

Private 18.00 4.00 22.22

32 18.463 LHS Bagalkot Mudhol Mahalingapu

ra

Mini Water

Supply Tank

Panchayat 10.50 2.25 21.43

33 18.465 LHS Bagalkot Mudhol Mahalingapu

ra Temple

Community 14.00 4.00 28.57

34 18.475 LHS Bagalkot Mudhol Mahalingapu

ra Circle

Community 4.00 4.00 100.0

0

35 18.882 RHS Bagalkot Mudhol Mahalingapu

ra Toilet

Panchayat 164.0

0

16.00 9.76

36 18.885 LHS Bagalkot Mudhol Mahalingapu

ra Anganavadi

Panchayat 27.75 2.25 8.11

37 18.968 LHS Bagalkot Mudhol Mahalingapu

ra Circle

Community 104.2

5

30.75 29.50

38 18.995 LHS Bagalkot Mudhol Mahalingapu

ra

Mini Water

Supply Tank

Panchayat 9.75 2.25 23.08

39 19.119 LHS Bagalkot Mudhol Mahalingapu

ra Toilet

Panchayat 28.00 8.00 28.57

Table 4- 7 Community Asset Details of link 19B (Mahalingapura - Kabbur)

Area in Sq.m

Sl.

No.

Chain

age Side District Taluk Village Typeof Asset

Owner

Type

Total

Structur

e

Affecte

d

Strctur

e

% of

Str.

Getti

ng

Affec

ted

1 0.030 RHS Bagalkot Mudhol Mahalingapura Malige Panchayat 38.10 10.80 28.35

2 0.455 RHS Bagalkot Mudhol Mahalingapura Temple Community 5.50 1.00 18.18

3 1.13 LHS Bagalkot Mudhol Mahalingapura Pond Panchayat 45.00 10.00 22.22

4 3.548 LHS Bagalkot Mudhol Mahalingapura Temple Community 35.00 14.00 40.00

5 3.575 RHS Bagalkot Mudhol Mahalingapura Bore Well Panchayat 26.25 2.25 8.57

6 3.890 RHS Bagalkot Mudhol Mahalingapura Hand Pump Panchayat 10.50 2.25 21.43

7 4.530 LHS Bagalkot Mudhol Saidapura Temple Community 14.00 4.00 28.57

8 4.806 RHS Bagalkot Mudhol Basavanagara Bore Well Panchayat 13.50 0.75 5.56

9 4.815 LHS Bagalkot Mudhol Saidapura Temple Community 33.00 24.00 72.73

10 4.882 LHS Bagalkot Mudhol Saidapura Hand Pump Panchayat 6.00 2.25 37.50

11 5.480 RHS Bagalkot Mudhol Busanala Hand Pump Panchayat 15.00 1.50 10.00

12 6.716 LHS Bagalkot Mudhol Saidapura Hand Pump &

Water Tap

Panchayat 13.50 1.50 11.11

13 7.000 LHS Bagalkot Mudhol Saidapura Bore Well Panchayat 12.00 2.25 18.75

14 7.015 LHS Bagalkot Mudhol Saidapura Pump House Panchayat 12.00 2.25 18.75

Page 51: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

45

15 7.355 RHS Bagalkot Mudhol Saidapura Mini Water

Supply Tank

Panchayat 46.00 6.00 13.04

16 7.360 RHS Bagalkot Mudhol Saidapura Arch Community 66.00 9.00 13.64

17 7.385 RHS Bagalkot Mudhol Saidapura Temple Community 60.00 15.00 25.00

18 7.475 RHS Bagalkot Mudhol Saidapura Water Tap Panchayat 11.25 0.75 6.67

19 7.495 RHS Bagalkot Mudhol Saidapura Bore Well &

Pump House

Panchayat 10.50 1.50 14.29

20 7.990 RHS Bagalkot Mudhol Saidapura Mini Water

Supply Tank

Panchayat 10.50 2.25 21.43

21 8.508 LHS Bagalkot Mudhol Mahalingapura Hand Pump Panchayat 8.25 3.38 40.91

22 9.400 RHS Belgaum Raybag Kappalagudi Hand Pump Panchayat 20.25 1.50 7.41

23 9.680 RHS Belgaum Raybag Kappalagudi Primaty

School

Panchayat 154.00 112.00 72.73

24 9.700 RHS Belgaum Raybag Kappalagudi Hand Pump Panchayat 18.00 2.25 12.50

25 10.570 LHS Belgaum Raybag Kappalagudi Aralikatte Community 22.00 16.00 72.73

26 11.115 RHS Belgaum Raybag Kappalagudi Hand Pump Panchayat 12.00 2.25 18.75

27 12.775 RHS Belgaum Gokak Hallur Hand Pump Panchayat 15.00 0.75 5.00

28 12.810 RHS Belgaum Gokak Hallur Temple Community 24.00 12.00 50.00

29 13.330 LHS Belgaum Gokak Hallur Temple Community 20.00 16.00 80.00

30 14.803 RHS Belgaum Gokak Gandhinagara Bus Stand Panchayat 56.00 28.00 50.00

31 14.812 RHS Belgaum Gokak Gandhinagara Milk Dairy Government 24.00 9.00 37.50

32 14.83 RHS Belgaum Gokak Gandhinagara Aralikatte Community 24.00 9.00 37.50

33 17.467 RHS Belgaum Gokak Gurlapura

Cross Bus Stand

Panchayat 60.00 40.00 66.67

34 17.487 LHS Belgaum Gokak Gurlapura

Cross Bore Well

Panchayat 9.00 2.25 25.00

35 17.488 LHS Belgaum Gokak Gurlapura

Cross

Mini Water

Supply Tank

Panchayat 15.00 2.25 15.00

36 20.072 LHS Belgaum Gokak Maldoor Temple Community 32.00 2.00 6.25

37 21.86 LHS Belgaum Raybag Kankanavadi Temple Community 27.00 9.00 33.33

38 22.010 RHS Belgaum Raybag Kankanavadi Bore Well &

Hand Pump

Panchayat 15.00 1.50 10.00

39 23.090 RHS Belgaum Raybag Kankanavadi Bore Well &

Hand Pump

Panchayat 13.50 2.25 16.67

40 23.186 RHS Belgaum Raybag Kankanavadi Hand Pump Panchayat 15.00 0.75 5.00

41 23.280 RHS Belgaum Raybag Kankanavadi Bore Well Panchayat 13.50 1.50 11.11

42 24.085 LHS Belgaum Raybag Kankanavadi Hand Pump Panchayat 14.25 1.50 10.53

43 24.1 LHS Belgaum Raybag Kankanavadi Toilet Pvt. Trust 44.00 4.00 9.09

44 26.595 LHS Belgaum Raybag Kankanavadi Hand Pump Panchayat 16.50 1.50 9.09

45 27.802 LHS Belgaum Raybag Hippanal Hand Pump Panchayat 15.00 2.25 15.00

46 28.152 RHS Belgaum Raybag Nippanal Temple Community 32.00 16.00 50.00

47 28.410 RHS Belgaum Raybag Nippanal Hand Pump Panchayat 15.00 2.25 15.00

48 29.432 RHS Belgaum Raybag Nippanal Bore Well Panchayat 9.00 2.25 25.00

49 29.448 LHS Belgaum Raybag Nippanal Mini Water

Supply Tank

Panchayat 10.50 2.25 21.43

50 29.74 LHS Belgaum Raybag Nippanal Circle Community 16.00 1.00 6.25

51 29.8 LHS Belgaum Raybag Nippanal Hand Pump Panchayat 30.00 2.25 7.50

52 29.805

LHS Belgaum Raybag Nippanal Stage

(Rangamandir

a)

Community

140.00 64.00 45.71

53 31.435 RHS Belgaum Raybag Mantoor Hand Pump Panchayat 13.50 2.25 16.67

Page 52: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

46

54 31.813 RHS Belgaum Raybag Mantoor Temple Community 28.00 16.00 57.14

55 32.855 LHS Belgaum Raybag Mantoor Hand Pump Panchayat 16.50 2.25 13.64

56 32.858 LHS Belgaum Raybag MantoorMTR/

RBG/HP/L/

Mini Water

Supply Tank Panchayat

18.00 2.25 12.50

57 32.868 LHS Belgaum Raybag Mantoor Bus Stand Panchayat 63.00 28.00 44.44

58 34.038 LHS Belgaum Raybag Bendevad

Cross Hand Pump

Panchayat 15.00 1.50 10.00

59 34.053 LHS Belgaum Raybag Bendevad

Cross

Bus Stand Panchayat

51.00 15.00 29.41

60 37.614 LHS Belgaum Raybag Jodatti Cross Bus Stand Panchayat 54.00 27.00 50.00

61 38.862 LHS Belgaum Raybag Jodatti Bus Stand Panchayat 52.50 24.50 46.67

62 39.160 LHS Belgaum Chikko

di

Jodatti Cross Hand Pump

Panchayat 10.50 2.25 21.43

63 39.96 RHS Belgaum Chikko

di

Ganesh Nagar Hand Pump Panchayat

15.00 2.25 15.00

64 40.660 RHS Belgaum Chikko

di

Kabbur Pump House

Panchayat 30.00 6.00 20.00

65 40.660 LHS Belgaum Chikko

di

Kabbur Compound

Wall

Community 48.00 3.00 6.25

Table 4-15: Community Asset Details of link 19C (Kabbur - Chikodi)

Area in Sq.m

Sl.

N

o.

Chain

age Side District Taluk Village Typeof Asset

Owner

Type

Total

Struct

ure

Affected

Strcture

% of

Str.

Getting

Affecte

d

1 4.420 LHS Belgaum Chikkodi Nagarmunoli Mini Water

Supply Tank Panchayat

10.50 2.25 21.43

2 5.423 LHS Belgaum Chikkodi Nagarmunoli Toilet Panchayat 34.50 1.50 4.35

3 5.660 LHS Belgaum Chikkodi Nagarmunoli Water Tap Panchayat 8.00 1.00 12.50

4 5.810 LHS Belgaum Chikkodi Nagarmunoli Bus Stand Panchayat 49.00 21.00 42.86

5 6.160 LHS Belgaum Chikkodi Nagarmunoli Bore Well Panchayat 13.50 2.25 16.67

6 6.823 LHS Belgaum Chikkodi Nagarmunoli Mini Water

Supply Tank

Panchayat 13.50 1.50 11.11

7 8.850 LHS Belgaum Chikkodi Itnal Cross Bus Stand Panchayat 56.00 21.00 37.50

8 10.290 LHS Belgaum Chikkodi Bengoda

Cross Bus Stand

Panchayat 73.50 10.50 14.29

9 12.238 LHS Belgaum Chikkodi Umrani Hand Pump Panchayat 15.00 2.25 15.00

10 12.340 LHS Belgaum Chikkodi Umrani Compound

Wall

Panchayat 585.00 22.50 3.85

11 12.888 LHS Belgaum Chikkodi Umrani Temple Communit

y

42.50 27.50 64.71

12 12.942 LHS Belgaum Chikkodi Umrani Hand Pump Panchayat 13.50 2.25 16.67

13 12.950 LHS Belgaum Chikkodi Umrani

Temple Communit

y

60.00 32.00 53.33

14 13.700 LHS Belgaum Chikkodi Umrani Bore Well &

Pump House Panchayat

12.00 2.25 18.75

15 13.900 LHS Belgaum Chikkodi Umrani Mini Water

Supply Tank Panchayat

16.50 1.50 9.09

Page 53: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

47

16 15.660 LHS Belgaum Chikkodi Umrani

Temple Communit

y

40.00 30.00 75.00

17 17.785 LHS Belgaum Chikkodi Chikkodi Water Tank Panchayat 32.00 16.00 50.00

18 17.789 LHS Belgaum Chikkodi Chikkodi Compound

Wall

Governme

nt

1200.0

0

50.00 4.17

19 17.840 LHS Belgaum Chikkodi Chikkodi Bore Hole Panchayat 10.50 2.25 21.43

20 18.000 LHS Belgaum Chikkodi Chikkodi Mini Water

Supply Tank Panchayat

15.00 2.25 15.00

21 0.003 RHS Belgaum Chikkodi Kabbur Bus Stand Panchayat 34.00 2.00 5.88

22 3.871 RHS Belgaum Chikkodi Belagali

Cross Bus Stand

Panchayat 31.50 28.00 88.89

23 15.065 RHS Belgaum Chikkodi Umrani Bus Stand Panchayat 15.00 2.25 15.00

24 15.920 RHS Belgaum Chikkodi Chikkodi Compound

Wall

Governme

nt

30.75 5.25 17.07

25 17.680 RHS Belgaum Chikkodi Chikkodi Compound

Wall

Panchayat 634.50 23.50 3.70

26 18.073 RHS Belgaum Chikkodi Chikkodi

Temple Communit

y

162.00 54.00 33.33

Page 54: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

48

Table 4- 86: Community Asset Details of link 19D (Chikodi - Nippani (NH4))

Area in Sq.m

Sl.

No.

Chaina

ge Side District Taluk Village

Typeof

Asset Owner Type

Total

Land

Affec

ted

Land

% of

Land

Getti

ng

Affec

ted

Total

Struc

ture

Affec

ted

Strct

ure

% of

Str.

Getti

ng

Affec

ted

1 0.085 LHS Belgaum Chikkodi Chikkodi Compound

Wall

Government 160.0

0

8.00 5.00

2 0.140 LHS Belgaum Chikkodi Chikkodi Public Toilet Panchayat 22.50 5.00 22.22

3 0.930 LHS Belgaum Chikkodi Chikkodi Compound

Wall

Government 492.2

5

27.50 5.59

4 1.130 LHS Belgaum Chikkodi Chikkodi Bus Stand Panchayat 62.45 20.70 33.15

5 3.080 LHS Belgaum Chikkodi Chikkodi Government

Land

Government 3300.

00

3300.

00

100.0

0

6 3.480 LHS Belgaum Chikkodi Chinchani Bus Stand Panchayat 35.10 33.60 95.73

7 3.480 LHS Belgaum Chikkodi Chinchani Government

Land Government

3190 3190 100.00

8 5.040 LHS Belgaum Chikkodi Chinchani Hand Pump Panchayat 13.95 2.25 16.13

9 6.040 LHS Belgaum Chikkodi Chinchani Mini Water

Supply Tank Panchayat 22.80 4.00 17.54

10 6.660 LHS Belgaum Chikkodi Chinchani Hand Pump Panchayat 12.30 2.25 18.29

11 12.300 LHS Belgaum Chikkodi Dulaganawadi Bus Stand

Panchayat 107.1

0 38.25 35.71

12 16.500 LHS Belgaum Chikkodi Pattankudi Temple Community 43.74 3.06 7.00

13 17.845 LHS Belgaum Chikkodi Pattankudi Bus Stand Panchayat 40.20 12.00 29.85

14 17.860 LHS Belgaum Chikkodi Pattankudi Flag Pole Community 3.75 0.25 6.67

15 22.295 LHS Belgaum Chikkodi Nippani Primaty

School Government

310.0

0

15.50 5.00

16 23.360 LHS Belgaum Chikkodi Nippani Mini Water

Supply Tank Panchayat

11.60 4.00 34.48

17 23.390 LHS Belgaum Chikkodi Nippani Temple Community 18.00 10.50 58.33

18 23.460 LHS Belgaum Chikkodi Nippani Basement Pvt. Trust 63.00 0.00 0.00

19 0.020 RHS Belgaum Chikkodi Chikkodi Bus Stand Panchayat 70.92 21.60 30.46

20 0.075 RHS Belgaum Chikkodi Chikkodi Sign Board Private 9.60 1.00 10.42

21 0.860 RHS Belgaum Chikkodi Chikkodi Compound

Wall Government

408.0

0

20.00 4.90

22 0.900 RHS Belgaum Chikkodi Chikkodi Compound

Wall Government

170.0

0

10.00 5.88

23 3.440 RHS Belgaum Chikkodi Chikkodi Bore Well Private 4.00 0.25 6.25

24 4.820 RHS Belgaum Chikkodi Chinchani Temple Community 12.45 2.25 18.07

25 5.380 RHS Belgaum Chikkodi Chinchani Temple Community 18.00 4.00 22.22

26 9.690 RHS Belgaum Chikkodi Kothali Shrine Community 5.00 1.00 20.00

27 10.420 RHS Belgaum Chikkodi Kothali Mini Water

Supply Tank Panchayat 15.00 6.25 41.67

28 10.430 RHS Belgaum Chikkodi Kothali Mini Water

Supply Tank

Panchayat 13.00 4.00 30.77

29 10.980 RHS Belgaum Chikkodi Kutali Bus Stand Panchayat 52.79 27.60 52.29

30 13.980 RHS Belgaum Chikkodi Dulaganawadi Bus Stand Panchayat 91.30 44.00 48.19

31 15.540 RHS Belgaum Chikkodi Pattankudi Bus Stand Panchayat 58.10 28.00 48.19

32 17.810 RHS Belgaum Chikkodi Pattankudi Bus Stand Panchayat 36.00 24.00 66.67

33 21.380 RHS Belgaum Chikkodi Nippani Pump House Panchayat 36.00 20.25 56.25

Page 55: RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol …documents.worldbank.org/curated/en/... · RESETTLEMENT IMPLEMENTATION PLAN WAP 2 (Mudhol ... guntas is dry land and 02 guntas plantation

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-2

(Mudhol - Nippani)

49

34 22.638 RHS Belgaum Chikkodi Nippani Bus Stand Panchayat 46.40 23.20 50.00

35 23.170 RHS Belgaum Chikkodi Nippani Mini Water

Supply Tank Panchayat

16.00 6.25 39.06