RESETTLEMENT PLAN

THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT

for the

RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT

in

NEPAL

Nepal Electricity Authority

May 2004

This report was prepared by the Borrower and is not an ADB document.

Page 2: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

NEPAL ELECTRICITY AUTHORITY (AN UNDERTAKING OF HIS MAJESTY’S GOVERNMENT OF NEPAL)

TRANSMISSION AND SYSTEM OPERATIONS TRANSMISSION LINE/SUBSTATION CONSTRUCTION DEPARTMENT

THANKOT-CHAPAGAON-BHAKTAPUR 132 Kv TRANSMISSION LINE PROJECT

RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT

(ADB LOAN NO. 1732-NEP: (SF) & OPEC LOAN NO. 825 P)

INDEPENDENT ASSESSMENT OF

ACQUISITION, COMPENSATION, REHABILITATION PLAN (ACRP)

FINAL REPORT

Prepared by: Dr. Toran Sharma

Mr. Hari P. Bhattarai (Independent Consultants)

May 2004

Page 3: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Foreword The independent consultants as per the request of ADB to NEA prepare this Resettlement Plan (RP). This RP is based on the data already collected by NEA and its consultants at different times and the Environmental Impact Assessment (EIA) and ACRP with short Resettlement Plan Reports of the Transmission Line Project, approved by the concerned ministries of HMG and reviewed by ADB. The independent consultants have reviewed all the available reports in the context of ADB Guideline for Resettlement. In the process of independent assessment, the consultants made revisit of the T/L alignment and relocate house structures. Similarly, plant/vegetation and crop inventories have been prepared to assess the losses. Extensive discussion were held with the NEA officials for the development of the resettlement policy framework for the project, taking consideration of the HMG’s rules, regulations and practices and ADB policy on resettlement. The report presented is in the ADB report format and addresses the issues as per the ADB requirement. The consultants extend their gratitude to Mr. M.P. Khakurel (Project Manager), Mr. S.K. Mishra (Engineer) and Mr. P.D. Ulak (Assistant Administrative Officer) of Thankot–Chapagaon–Bhaktapur T/L project, NEA for providing all needed information and help to expedite independent assessment. Report is organized in XII Chapters and Six Annexes with an executive summary. The content of each chapter is briefly presented below: Chapter I describes the salient features of the project. Chapter II discusses on the efforts made to minimize the resettlement from the project activities. Chapter III presents the ADB and HMG policies for resettlement and describes the legal provisions of HMG including the practices of resettlement in the past and ongoing T/L projects implemented in Nepal. Resettlement policies for the proposed Thankot-Chapagaon-Bhaktapur 132 kV T/L project are briefly described. Chapter IV details the project-affected areas of the T/L project. Chapter V lists the project affected families/persons of the T/L project. Chapter VI presents the findings of the socio-economic study of the project affected communities and the project relocates. Chapter VII discusses on the socio-economic impacts of the project and mitigation measures to minimize the impacts. Chapter VIII describes the mechanism of stakeholders’ consultations and dialogues adopted for the RP preparation. Chapter X presents the institutional organization to accomplish the RP. Chapter XI presents the implementation schedule of RP. Chapter XII discusses monitoring and evaluation of RP. Chapter XIII presents the compensation/benefits to AFs/APs and RP cost estimates.

Page 4: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ACRONYMS

% Percentage ADB Asian Development Bank AFs Affected Families APs Affected Persons CBOs Community Base Organization CDO Chief District Officer CFC Compensation Fixation Committee DC Disturbance Compensation DDCs District Development Committees EIA Environmental Impact Assessment GI Galvanized Iron ha Hector HMG/N His Majesty’s Government of Nepal ITR Income Tax Return kg Kilogram km Kilometer kV Kilo Volt LAO Land Acquisition Officer m Meter M2 Meter Square MoPE Ministry of Population and Environment MT Metric Tonne NEA Nepal Electricity Authority NEPAP Nepal Environmental Policy and Action Plan NGOs Non-governmental Organizations Nos. Numbers NRs Nepali Rupees PM Project Manager PMO Project Management Office ROW Right of Way RP Resettlement Plan SLC School Leaving Certificate Sq. ft. Square Feet T/L Transmission Line TA Transportation Allowance VDCs Village Development Committee WECs Water and Energy Commission Secretariat

Page 5: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

TABLE OF CONTENTS FOREWORD

ACRONYMS

TABLE OF CONTENTS

EXECUTIVE SUMMARY

CHAPTER I: THE PROJECT 1 1.1 Rationale 1 1.2 Status of Resettlement Design 1 1.3 Project Description 2

CHAPTER II: EFFORTS TO MINIMIZE RESETTLEMENT 4

2.1 Efforts in the Phase of Alignment Survey 4 2.2 Efforts Planned During Implementation 4

CHAPTER III: POLICY AND LEGAL FRAMEWORK 5

3.1 ADB Policy on Environment 5 3.2 HMG Laws and Policy 5 3.3 Resettlement Policy Framework for Thankot-Chapagaon-Bhaktapur 132kV T/L Project 9

3.3.1 Resettlement Policies 10 3.3.2 Compensation Policy for the Project 10

CHAPTER IV: THE PROJECT AFFECTED AREAS 15 CHAPTER V: AFFECTED FAMILIES/PERSONS (AFS/APS) 18 CHAPTER VI: SOCIOECONOMIC STUDY 20

6.1 Methodology 20 6.2 Results of Socio-economic Survey 20

6.2.1 Project Affected Families 20 6.2.2 Project Affected Relocatee Families 23

CHAPTER VII: SOCIOECONOMIC IMPACTS AND MITIGATING MEASURES 26 CHAPTER VIII: COMMUNITY CONSULTATION AND DIALOGUES 27

8.1 Project Stakeholders 27 8.2 Mechanisms for Stakeholders’ Participation 27

8.2.1 Dialogues/Consultation 27 8.2.2 Information Campaign 27 8.2.3 Local Government Endorsement 27

8.3 Role of NGOs and CBOs 28 CHAPTER IX: RESOLUTION OF CONFLICTS, APPEALS AND GRIEVANCE PROCEDURES 29

9.1 Setting Up a Complaint Desk 29 9.2 Procedure 29

CHAPTER X: INSTITUTIONAL ORGANIZATION 30

10.1 Organizational Linkages and Responsibilities 30 10.1.1 Project Management Office (PMO) 30 10.1.2 Account Section, PMO 30 10.1.3 Relocatees 30

10.2 Institutional Capability Building and Strengthening 30

Page 6: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

CHAPTER XI: IMPLEMENTATION SCHEDULE 31 11.1 Relocation Schedule 31 11.2 Relation of Relocation Activities to Project Schedule 31 11.3 Procedures for RP Implementation 31 11.4 Involvement of APs, Local Government and NGOs 32

11.4.1 APs 32 11.4.2 NGOs 32 11.4.3 Local Governments 32

CHAPTER XII: MONITORING AND EVALUATION 33

12.1 Internal Monitoring 33 12.2 External Monitoring 33 12.3 Post-Relocation Evaluation 33

CHAPTER XIII: COMPENSATION/BENEFITS TO AFS/APS AND COST ESTIMATES 34

13.1 Compensation/Benefits to AFs/APs 34 13.2 Cost Estimates 35

13.2.1 Relocatee 35 13.2.2 Payments for Land Acquisition and Land Use Restriction 36 13.2.3 Payments for Crops and Trees 36 13.2.4 External Monitoring 37 13.2.5 Summary 37

REFERENCES 38 ANNEXES ANNEX IV – 1: Vegetation Inventory Report ANNEX V – 1: Land Parcel and Land Ownership ANNEX V – 2: Photographs of Affected Structures ANNEX VI – 1: Socio-economic Data Tables (Project Affiliated Families) ANNEX VI – 2: Socio-economic Data Tables (Relocatees) ANNEX X – 1: Implementation Schedule

Page 7: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

RESETTLEMENT PLAN Thankot-Chapagaon-Bhaktapur 132 kV Transmission Line Project

EXECUTIVE SUMMARY

1. This resettlement plan (RP) has been prepared for the households affected by the Thankot-Chapagaon-Bhaktapur 132 kV Transmission Line Project, the construction sites of which are located in the districts of Kathmandu, Bhaktapur and Lalitpur. 2. The project aims to increase the power transfer capacities of transmission lines of the Kathmandu Valley in order to accommodate the planned additional power and load growth in the Valley. Additionally, it also helps enhance the reliability of power supply in the Valley. 3. The main project components, which will displace people and properties, are the construction of 132 kV overhead Transmission Line (T/L) with a total length of 28.4 km and two new sub-stations in Kathmandu and Lalitpur districts. 4. About 2,424 households residing within the T/L Right-of-Way (ROW) and substation areas will be affected which includes 1,651 landowners, 764 tenants, 6 landowners with residential structure and 3 tenants with residential structures. 5. Of the affected only 9 households require relocation. 6. House/structure owners will also be paid for the replacement cost of their houses/structures along with the associated land plots. 7. Relocatee-households will be granted an additional relocation package consisting of disturbance compensation and transportation allowance to help them resettle in new places. 8. Landowners without tenants will be paid for the land occupied permanently by the tower pads under T/L ROW and substation area at the market based prices. Loss of trees will also be paid at the market-based prices. 9. Landowners with tenant will be paid for land occupied permanently by the tower pads under T/L ROW and substation area at 50% of the market prices and remaining 50% will be paid to the tenants. Besides, tenants will also be paid for the damaged crops and plants at market-based price. 10. Landowners without tenants will be paid for the land restricted for use under T/L ROW at the 10% of market based prices. The loss of crops and trees will also be paid. 11. Landowners with tenant will be paid for land restricted for use under T/L ROW at 50% of the 10% market prices and remaining 50% of the 10% will be paid to the tenants. Besides, Tenants will also be paid for the crops and plants. 12. A third party monitoring team will be contracted by the project management office to undertake the external monitoring of RP implementation. 13. The project will provide the relocation budget estimated at NRs 136.39 million and will implement this RP with the assistance of His Majesty’s Government of Nepal.

Page 8: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Chapter I THE PROJECT

1.1 Rationale The Nepal Electricity Authority has undertaken the Thankot-Chapagaon-Bhaktapur 132 kV T/L Project to complete the planned 132 kV T/L ring in Kathmandu Valley which helps enhance the reliability of power supply, decreases voltage drops and energy losses and supports rural electrification of 19 Village Development Committees (VDCs) of Lalitpur district. Besides, the T/L increases the power transfer capacities of transmission system in the valley to be able to cope with the projected increase in power demand and to accommodate planned generation capacity additions. The project will require construction of about 28.4 km long 132 kV transmission line and two substations. Out of this, about 28.4 km of the length shall be new double circuit line with new ROW, whereas about 2 km of the length shall be the replacement of existing transmission line with double circuit configuration by four-circuit towers. As this 2 km long stretch utilizes the existing ROW, this Resettlement Action Plan is therefore prepared for the new construction works only. Nevertheless, since the replacing four circuit towers shall require little more land (total about 288 square meters) for foundation construction around the existing foundation, the compensation policy and modality to be followed for the new line shall be applied for this case also. The construction of T/L and substations will affect families/communities with regard to land and other properties lying within the right-of-way (ROW) of T/L and areas occupied by the substations. The Resettlement Plan (RP) has been prepared to effect the payment of compensation for the affected families/persons/communities in accordance with the ADB policy and guidelines on Resettlement /Relocation and with the following objectives:

(i) To clear houses, structures, crops, plants and trees in the areas occupied by substations and permanent structures of T/L on ROW,

(ii) To clear houses, plants and trees on newe T/L ROW limit, (iii) To restrict land use along the T/L ROW only for crops, (iv) To smoothly and effectively relocate/compensate the affected families/communities, (v) To delineate the responsibilities of various concerned agencies and the affected

families/communities in the implementation of the RP. 1.2 Status of Resettlement Design This RP is the third edition. The first edition of the RP (as mitigation measures of Socio-economic environmental impact in the EIA report) was prepared by NEA in August 2002, which was submitted to and approved by the Ministry of Population and Environment (MOPE) of His Majesty’s Government of Nepal on the same year, as per the prevailing environmental laws and regulations of HMG/N. The second edition of RP was prepared by NEA on May 2003 on the request of Asian Development Bank (ADB) to comply with its policy. ADB reviewed and commented this edition, which necessitated the preparation of this latest edition. This revised RP has been prepared to accommodate the comments of ADB dated 07.02.2003. Payment of compensation and resettlement of affected families/communities within the substation sites shall be completed before construction works commence. And, as locating the precise area of ROW follows only after the finalization of the check survey and tower spotting by the contractors, the payment for T/L shall commence immediately after these activities. The data presented herein is based on cross-verification and updating of field research and household surveys and interviews conducted by the NEA project office through Soil, Rock and Concrete Laboratory of NEA.

Page 9: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

2

1.3 Project Description The scope of works under Thankot-Chapagaon-Bhaktapur 132 kV T/L Project is as under:

(i) Construction of a 132 kV T/L of about 28.4 km long. (ii) Upgrading of about 2 km long existing transmission line with double circuit tower

configuration to four-circuit tower configuration. (iii) Construction of two new substations at Thankot and Harisiddhi. (iv) Expansion/upgrading of existing Bhaktapur and Balaju substations. As the construction

works shall be confined inside the existing substation premises, no resettlement/rehabilitation shall be involved in this case.

This Resettlement Plan is prepared for new transmission line and substation works. Salient features of the new Transmission Line component is presented in the box below: Source of Power National Grid Nominal Line Voltage 132 kV Circuit Partly double and single circuit strung and, partly four circuits. Length of Line 28.4 km Tower Type Galvanized steel latticed Ruling Span 350 m Conductor ACSR “BEAR” Shieldwire OPGW Line Route: Runs around the southern part of Kathmandu Valley starting from a tapping point on the Kulekhani II – Siuchatar 132 kV transmission line at Matatirtha (Thankot), passes through the Harisiddhi substation under the project) and terminates at the Bhaktapur substation.

Kathmandu District: Matatirtha VDC: ward no. 1, 4, 5 and 7; Satungal VDC: ward no. 1, 2, 4 and 7; Machchhegaon VDC: ward nos. 1,6, 7 and 8; Kirtipur Municipality: ward no. 11, 12, 14, 15, 16 and 19. Lalitpur District: Khokhana VDC: ward no. 3, 4, 5, 6, 8 and 9; Bungmati VCD: ward no. 2, 3, 4 and 9; Chhampi VDC: ward no. 2, 5 and 6; Chapagaon VDC: ward no. 1,3 and 9; Thecho VDC: ward no. 1, 2, 3 and 8; Dhapakhel VDC: ward 6, 7, 8 and 9; Harisiddhi VDC: ward 6, 7, 8 and 9; Thaiba VDC: ward 2, 4 and 8; Lamatar VDC: ward 4, 5, 7 and 8. Bhaktapur District: Sirutar VDC: ward 9; Dhadhikote VDC: ward 1, 2, 3, 6 and 7; Gundu VDC: ward 6 and 8; Katunje VDC ward 5 and 6.

Right of Way (ROW) 18 m (9 m each on both sides of tower from its centerline). [Total land (private, forest, government, community, etc.) under T/L ROW is 47.55 ha. Portion of which is permanently acquired for tower structures while the rest is restricted for land use other than agriculture]

Total No. of Tower Pads 97 including 38 Angle Point towers (Total land required on permanent basis for tower erections is approximately 0.60 ha at the average rate of 64 m2 for one tower pad)

Page 10: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

3

Salient Features of New Substation Components are as under: Substations Key Features

Three 132 kV line bays One bus coupler bay Switching station control building

132 kV Matatirtha switching station with double bus bar scheme

Total land required – 2.33 has. Two 132 kV line bays One bus coupler One 132 kV transformer bay 1 x 22.5 MVA, 132/11 kV power transformer 7 nos of 11 kV switchgears Substation control building

132/11 kV Harishiddhi substation double bus bar scheme (currently one bus bar only with the provision for second one in future)

Total land required = 1.48 has. The project will be funded jointly by the Asian Development Bank, OPEC fund (to be administered by the ADB), HMG/N and NEA. ADB requires the preparation of this resettlement plan in conformity with its policy on involuntary resettlement. An Environmental Impact Assessment (EIA) approval has already been obtained for the project from the Ministry of Population and Environment of His Majesty’s Government of Nepal.

Page 11: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

4

Chapter II EFFORTS TO MINIMISE RESETTLEMENT

2.1 Efforts in the Phase of Alignment Survey Alignment survey in the pre-feasibility, feasibility and detail design stages have avoided displacement of people as far as practicable by exploring alternative realignment of the T/L. Settlement areas and the residential/community structures were avoided wherever possible to minimize the relocation and displacement The efforts made have minimized relocation of people and community facilities also. During feasibility stage a total number of 12 households' structures were identified for relocation. Realignment of the T/L in the detail design stage avoided 3 household structures from relocation. The substation sites have been selected in areas away from settlement with no residential or community structures so as to avoid relocation. Despite the efforts, some structures and productive land could not be avoided. This RP is prepared to execute resettlement as a development initiative, which provides displaced or affected households/person/communities with opportunities to participate in the planning and to restore and improve their livelihood. 2.2 Efforts Planned During Implementation The project office is aware of the gravity of the impacts to the affected people and has put due emphasis to avoid environmental impacts as far as possible during construction phase. Tender Document has provisions to minimize the loss of standing crops/trees while stringing the conductors.

Page 12: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

5

Chapter III POLICY AND LEGAL FRAMEWORK

3.1 ADB Policy on Resettlement The ADB policy on resettlement rests on the following principles:

• Involuntary resettlement should be minimized by exploring all viable project options. • Affected families/persons should be fully informed and consulted. • A resettlement plan should be prepared for those to be displaced. • Affected families/persons should receive compensation at replacement rates for all losses and

damaged assets. The absence of legal titles to lands should not be a bar to for compensation. • Affected families have to be fully compensated and resettled before their houses are demolished

and their land is acquired by the project. • Involuntary resettlement should be conceived and executed as a development project.

The resettlement plan implementation has to be monitored by the project implementer and the ADB. 3.2 HMG Laws and Policy Nepal has a long history of voluntary resettlement. But there is not a clear and comprehensive policy on the resettlement of project displaced families. Till now, different development projects have been implementing involuntary resettlement, compensation and rehabilitation activities on the basis of specific circumstances without the framework of a coherent policy. Existing legal provisions of the country on land acquisition, compensation and rehabilitation also are not sufficient enough to address the needs of the project-displaced people. Table below provides a brief account of the existing policies and legal framework, which focus on description and also limitations and constraints of these with respect to forming a national policy.

Key Policy/La/Regulations of Nepal

Policy/Law/Regulation Responsible Authority

Applications

The constitution of the Kingdom of Nepal (1990) Article 17 His Majesty’s

Government Establishes the right of individual’s property as a fundamental right. But private property could be acquired for public interest by compensating the losses of property, following the procedures on delivering compensation for any property, as prescribed by Laws (The applicable Act is Land Acquisition Act, 1977)

Hydropower Development Policy (1992 and 2001) Policy Document Ministry of Water

Resources Focuses on conservation of the environment while developing hydropower, transmission and distribution projects. It further mentions that it is the project developer’s obligation to relocate and resettle the families being displaced by the project, as per the standards set by the Government.

Nepal Environmental Policy and Action Plan (NEPAP) 1993 Policy Document His Majesty’s

Government NEPAP emphasized the need for mitigating adverse environmental impacts to address urban and industrial development, air and water pollution and infrastructure development.

Land Acquisition Act 1977 as amended in 1992 Section 3 & 4 His Majesty’s

Government Right of HMG/N to acquire or cause to acquire any land – subject to compensation under this law – for public interest and for institutions/organization.

Section 5 & 6 Land Acquisition Officer

After obtaining permission for land acquisition, the LAO shall be responsible to identify, survey, notification to the concerned parties and other works related to acquisition.

Page 13: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

6

Policy/Law/Regulation Responsible Authority

Applications

Section 7 Land Acquisition Officer/Chief District Officer (CDO)

The LAO shall determine the amount of compensation for the damaged property (house, wall, trees, etc.) while conducting initial survey works. In case the concerned person is not satisfied with the amount of compensation determined, he may file the complaint to the CDO within 15 days and CDO’s decision shall be final.

Section 8 Land Acquisition Officer

Within 15 days of the preliminary activities the LAO has confirmed the required land and submit the other details of the required property to the CDO. The details shall also include complete account of the losses and associated compensation amount as per clause 7.

Section 9 Chief District Officer/land revenue officer

Empowers CDO for public notification, with details of the affected property after receiving the report of preliminary activities from the LAO. The notification with required details is to be published in the notice boards of Project Site Office, District Development Office, Concerned Village Development Office or Municipality Office, Land Administration Office, Land Revenue Office, or any place close to the land and property acquisition sites. And, if the CDO feels that any concerned party might not be informed by the public notice, then he may inform him/her personally with other details. Land Revenue office is mandated to stop registration of the notified and property till further notice by the CDO.

Section 10 Chief District Officer Describes the facts to be included in the public notice of clause 9 such as: the documents required and the time to apply for the compensation; the time period within which the standing crops, structures, etc. could be managed by the concerned party, etc.

Section 11 Home Ministry, His Majesty’s Government

Any grievance to disable land and property acquisition could be reported to Home Ministry within 7 days of public notification by CDO. Home Ministry is required to decide on the grievances within 15 days of the receipt of grievances. On deciding the grievances, home ministry is authorized in as much capacity as the district court to consult the local authority or, ask for necessary documents or, consult witnesses.

Section 12 CDO After the expiry of the grievance period or after the decision on grievances whichever is earlier, CDO can hold the land for acquisition for the purpose of project implementation and give to the project office or the concerned organization. Notwithstanding the above, if the land acquired has a built-house structure and is being occupied by the owner, then, at least 50% of the compensation amount shall be paid before acquisition, provided the compensation is decided; if not, the owner shall be given reasonable amount as advance payment required for relocation.

Section 13 Compensation Fixation Committee

A compensation fixation committee comprising of Chief District Officer, Land Administrator or Land Revenue Officer, Project Manager and Representative of District Development Committee decides upon the compensation amount of land and property. The compensation decided will be based on cash compensation. Furthermore, separate compensation rates could be fixed for the cases of – whole and a part – of the land being owned by a person is acquired.

Section 14 HMG/Compensation Fixation Committee

On request from the concerned party, land to land compensation could be given provided HMG has such land on its ownership.

Section 16 Compensation Fixation Committee

Following considerations shall be made while deciding compensation of the land and property to be acquired for HMG or institutions with full HMG ownership • Guidelines of HMG

Page 14: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

7

Policy/Law/Regulation Responsible Authority

Applications

• Losses incurred by concerned party because of the relocation of his settlement or place of business.

• For land and property acquisition for the institution other than HMG undertakings.

• Market price of the land at the time of notification. • Losses incurred by the concerned party because of the

relocation of his settlement or place of business. • Price of land with residential structures and standing

agricultural products Section 18 CDO Provision for information to the concerned parties regarding the

list of the persons being compensated. Section 19 CDO States that after the compensation fixation committee decides

on the compensation, this shall be notified to HMG/N by the CDO.

Section 20 CDO Legal tenants of the land are entitled for 25% of compensation amount of the acquired land. If the tenant has built house also with the consent of the landowner, then he shall be entitled for full compensation of such house.

Section 21 CDO Unpaid government taxes, if any, could be deducted from the compensation amount.

Section 22 & 23 CDO Transfer of ownership of land and property to the name of HMG or institution for which the land and property has been acquired. The CDO shall notify the local land revenue office for such transfer within 15 days of acquisition.

Section 29 CDO If the concerned party requests that the land be acquired along with the existing houses, wall, standing crops, trees, etc. complete, then the acquisition process shall consider this also.

Section 30 HMG/N The government may decide not to acquire any land for any reason, which was initially put in the process of acquisition. This is subject to the concerned party’s information. Nevertheless, the losses incurred during the preliminary activities of land acquisition shall be compensated as described in clause 7.

Section 33 HMG The land acquired for the specified purpose shall be used for that purpose only.

Section 34 & 35 HMG If the acquired land is not used for the specified purpose, it has to be returned to the land and property owners only in condition that the owner pays back the compensation amount paid. If the owner is not willing to take back the land and property or, he could not be traced, it could be sold to third party.

Section 37 CDO The concerned party should take the compensation amount within specified time. If not, the affected person shall be notified by CDO giving 3 months time. Failing to meet the given time, the concerned party shall not be paid the compensation amount. And, such amount shall be deposited in the Government’s reserve fund.

Section 39 CDO Any obstruction in the execution of the provisions of the clause 6 of the Act shall be fined and penalized.

Section 40 Appeal Court Preliminary hearing of grievances/cases related to the Act shall be done by the CDO. Appeal to such hearing could be made to the Appellate Court within 35 days. The decision of the CDO could be filed to the Appellate Court within 35 days.

Land Reform Act 1964 (2021) as amended 1997 (2053/9/24) Section 25 HMG Sets the ownership rights to the actual tiller on the land. Section 26 HMG Sets 50% ownership right to the tenant. Tenants have

prerogative right on the structures and access in the land property.

Land Revenue Act 1977 (2034) Section 8 HMG Registration, change of ownership, termination of ownership

right and maintenance of land records are done by local Land

Page 15: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

8

Policy/Law/Regulation Responsible Authority

Applications

Revenue (Malpot) Office Section 16 HMG If the concerned owner did not pay land revenue for long period

of time the government can collect revenue through auction of the concerned parcel.

Water Resources Act 1992 (2049) Section 16 HMG States that if private land has to be used in order to utilize water

resources, the licensed person can request the government to acquire the land through standard procedures (Land Acquisition Act, 1977). The transmission Line Project is considered as water resource development project.

Electricity Act 1992 (2049) Section 33 HMG States that if private land ahs to be used in order to utilize for

water resource development including electricity generation, transmission and distribution, the licensed person can request the government; and the government could require the land through standard procedures (Land Acquisition Act, 1977) as it does for organized institutions. States further that HMG can restrict land use in and around the electricity infrastructure such as generation, transmission and distribution being developed by HMG or a licensed person. However, HMG or licensed person will have to compensate the concerned parties for the losses incurred due to restriction of the land use through the standard procedures (Land Acquisition Act, 1977).

Electricity Rule 1993 (2050) Rule 66 HMG Empowers the government to prohibit use of land places of

generation, transmission or distribution infrastructures or, other structures, for other specific purposes in and around them through publication of public notice in HMG gazette from time to time. It further states that no building construction or tree plantation is allowed within the specified limit in and around the electricity transmission and distribution lines.

Rule 87 HMG or licensed person/institution

States that the land and property owners of acquired or restricted property shall be paid, full compensation amount as determined by the compensation fixation committee as per clause 88.

Rule 88 HMG A compensation fixation committee under the chairmanship of HMG-appointed person, concerned person or the representative of the project, an expert appointed by HMG in the field of electricity, fixed-property owner or his/her representative, representative of the Land Revenue Office, representative of the concerned Village Development Committee/Municipality shall decide the compensation of the affected land and property. Compensation shall be based on the actual loss of the land and property.

Note: LAO = Land Acquisition Officer: An officer deputed by HMG/N for the preliminary activities related to the land acquisition. CDO = Chief District Officer: An Officer responsible for district administration and security. The Concerned Party: Any person or organization being affected because of the acquisition of the land being owned by him/her or it, and who shall be entitled for the compensation for such land. Despite limitations, Land Acquisition Act 2034 (1977) and Electricity Regulations, 1993 are the main legislation to guide land acquisition/restriction in Nepal. Water and Energy Commission Secretariat (WECS) is currently taking initiative for the Amendment of Land Acquisition Act 2034 with technical assistance of ADB. It is likely to take some time.

Page 16: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

9

Thus, based on the limitations in the existing legal framework, a project-specific policy for Thankot-Chapagaon-Bhaktapure 132 kV T/L Project is developed based on the best past practices of NEA transmission line projects below and in conformity with ADB policy on resettlement.

Key Project Specific Policy in T/L Projects in Nepal

Project Policy Transmission Line Projects prior to 1993

Compensation in cash to the legal APs (owners and tenants) only for house structures under ROW and land occupied by Tower structures as per Land Acquisition Act 1977. No compensation to other land restricted for land use under ROW. No resettlement provisions. No provisions for rehabilitation and livelihood assistance to APs. No provisions for compensation to the trees and standing crops. No provision of compensation and rehabilitation/livelihood assistance to APs other than legal titleholders.

Kathmandu Valley High Voltage Reinforcement Project (1993-1997), financed under World Bank’s loan assistance.

Inclusion of representatives of the APs and village development committees in the Compensation Fixation Committee. 100% cash compensation to legal APs for the land occupied by the permanent structures. The land is registered to NEA. 10% cash compensation to the legal APs for the land use restriction on ROW. The land ownership remains to APs. 100% cash compensation to the legal APs for the house structure under ROW and 90% cash compensation to the land occupied by house structure. The land is restricted for structure and tree plantation. The land ownership remains to APs. 100% cash compensation to planted trees, fruit trees and crops. Cash compensation for land is based on the market price of the land. Cash compensation for house structure is based on the district evaluation norms. Depreciation was accounted. Cash compensation for trees and crops based on the District Forest Officer’s evaluation. The structure owner was entitled for salvaged materials. Additional 10% of the structure cost was compensated in cash to APs for the transportation of salvaged material.

Khimti-Bhaktapur-Balaju 132 kV Transmission Line Project (1995-1999), financed under the Finnish grant and Nordic Development Fund loan.

All provisions similar to Kathmandu Valley Reinforcement Project (1993-1997) with following instructions: 100% cash compensation for utility facilities such as water supply, power supply, telephone, toilets, bio-gas plant and cowsheds to legal APs of house structure on ROW.

Lalpur-Gaddahcauki 132 kV Transmission Line Project (1997-1999), under NEA & HMGN finance.

All provisions similar to Khimti-Bhaktapur-Balaju 132 kV Transmission Line Project (1995-1999) with following additions. Rental costs in cash to legal APs of the house structures on ROW for a period of 6 months.

Chilime-Trishuli-Devighat 66 kV Transmission Line Project (1997-1999) under NEA & HMGN finance.

All provisions similar to Khimti-Bhaktapur-Balaju 1323 kV Transmission Line Project (1995-1999).

Lower Marsyangdi-Middle Marsyangdi 132 kV T/L Project (Proposed for construction under NEA& KfW financing.

All provisions similar to Khimti-Bhaktapur-Balaju 1323 kV Transmission Line Project (1995-1999).

3.3 Resettlement Policy Framework for Thankot- Chapagaon – Bhaktapur 132 kV T/L Project To execute the Resettlement and Rehabilitation of the APs of Thankot- Chapagaon - Bhaktapur 132 kV T/L Project following policies together with the Entitlement Matrix will be complied.

Page 17: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

10

3.3.1 Resettlement Policies The resettlement activities to be pursued by of the project will be guided by the following basic policies:

• Land acquisition and involuntary resettlement shall be avoided where feasible or minimized to the extent possible through the incorporation of social considerations into project design options.

• Where population displacement is unavoidable, individuals, households and community losing assets, livelihood and other resources shall be informed and consulted.

• APs shall be compensated at replacement rates for all losses and damaged assets. The absence of legal titles to lands, property, and facilities shall not be a bar to compensation.

• APs shall be fully compensated and resettled before their houses are demolished and their land and facilities are acquired.

• A resettlement plan shall be prepared and consulted with APs in advance of the implementation of the project.

• The resettlement plan implementation shall be monitored. • The resettlement shall be executed as part of the development project. • After RP implementation, the economic and social conditions of the APs should be improved or at

least maintained. 3.3.2 Compensation Policy for the Project The following compensation policies are part of the overall policy on resettlement/relocation. The Land Acquisition Act 1977, Electricity Act 1992 and Electricity Regulation (1993) will be the key legal procedures that shall be followed for the compensation determination and payments. 3.3.2.1 Compensation and Benefits

1. The permanent loss of land (agricultural, residential, commercial and forestry)

(i) APs whose land (agricultural, residential, commercial and forestry) will be acquired permanently for T/L structure or substation, the land shall be paid at replacement rate based on the valuation of lands by the Compensation Fixation Committee. Such land parcel registration shall be transferred to NEA.

(ii) If the remaining land parcel after permanent acquisition is too small (i.e. less than 64 square meter) and the APs does not own adjoining plot and is willing to dispose the land, the entire plot shall be acquired at the replacement cost.

2. Restriction on land use.

APs whose land (agricultural, residential, commercial and forestry) will be restricted for development of structures and forestry, the land shall be paid at 10% of replacement rate based on the valuation of lands by the Compensation Fixation Committee. Such land parcel registration will remain with APs.

3. The loss of crop and other natural resources

Crops/plants and trees/natural resources that will be damaged during project construction shall be compensated to APs based on the current fair market value determined by District Forest Office, District Agriculture Office or other government agencies.

4. The loss of houses and other structures including utility facilities

Houses and other structures including utility facilities (electricity, telephone, water supply, toilets, bio-gas plants etc.) shall be compensated based on their replacement cost which is the cost of

Page 18: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

11

materials and labor in the locality or as evaluated by the district norms at the time of relocation. No depreciation shall be applied. Additionally, the associated land plots of the houses as estimated in this study shall be provided. The house owners/structure owners shall be responsible for dismantling the affected house/structure and shall own salvageable materials.

5. The loss of community facilities and resources

(i) The project affected community facilities (such as schools, temples, health posts, water

points, irrigation canals, footbridges, graves and ghats (a ghat ;s a Hindu cremation place which is a small and open platform-like structure at river bank) shall be compensated at replacement cost or restored to their previous condition or replaced in areas identified in consultation with affected communities and the relevant authorities.

(ii) The loss of resources such as community forests and religious forests shall be compensated in consultation with Community Forestry User groups and Religious Organizations.

6. The loss of government property

(i) Government infrastructure and facilities including utilities affected by the project shall be

repaired or replaced or compensated at replacement costs in consultation with the relevant departmental authorities.

(ii) Government forest areas shall be acquired in consultation with the Department of Forestry and any loss of trees therein shall be compensated as per the government rules.

7. Grant of disturbance compensation (DC)

Disturbance compensation in the amount not exceeding of NRs. 21000 will be given to each displaced family or amount equivalent to the daily minimum wage in the project-affected area multiplied by 150 days whichever is lower. This grant shall be used to defray the affected households daily expenses while adjusting to their new environment.

8. Transportation allowance (TA) to displaced households

For APs of acquired house structure, an additional Transport allowance of NRs. 15000 as a grant shall be paid to cover the transportation of the salvaged materials.

9. Compensation for business losses

Compensation for business losses in amount up to NRs 30000 will be paid or based on daily income which ever is lower, as reflected on income tax return (ITR) multiplied by the number of days of business stoppage due to the project, but in no case shall it be more than 90 days.

3.3.2.2 Valuation Process

Valuation of land and other property shall follow the HMG Acts and Regulations and the ADS resettlement policy.

1. Valuation of land

Valuation of the land on ROW and Substation will be made by the Compensation Fixation Committee as per section 13 of the Land Acquisition Act 1977. The composition of the Compensation Fixation Committee members will be as per Rule 88 of Electricity Rules. The land evaluation cost shall be based on the replacement cost. Consideration to residential, urban, and rural agricultural land shall be taken while evaluating the land replacement cost of the affected areas.

Page 19: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

12

2. Valuation of house and other structures and utilities

Decisions on the valuation of house and other structures and utilities by Compensation Fixation Committee shall be based on the valuation norms of the District Development Committee or valuation made by District Office of Housing. Depreciation shall not be included in the valuation.

3. Valuation of trees and biomass

Decisions on the valuation of trees and biomass by Compensation Fixation Committee shall be based on the valuation norms of the District Forest Office or Valuation made by the officers of District Forest Office.

4. Valuation of damaged crops and agriculture produce

Decision on the valuation of damaged crops and agriculture produce by the Compensation Fixation Committee shall be based on the valuation norms of the District Agriculture Office or Valuation made by the officers of District Agricultural Office. Valuation shall be made to the actual damage of the crops and agriculture produce.

3.3.2.3 Participation of Affected and Displaced Families

The affected and displaced families shall be informed and consulted during the pre-relocation activities on compensation package and procedures for payment and settlement of conflicts/disagreements. They will also be regularly informed and consulted during RP implementation. Requests for meeting/consultations with Compensation Fixation Committee to resolve related issues/concerns could be coursed through the Project Management Office (PMO).

3.3.2.4 Entitlement/Eligibility of Affected Households/Persons

The following APs, communities and Government agencies as defined are eligible for payment of compensation as provided in the RP:

(i) Landowner - A person who owns land/s within the project-affected areas with legal

ownership documents. In some exceptional cases, a person who owns land/s within the project-affected areas regardless of proof of such ownership will also be entitled. However, special decisions by the concerned Governmental agency shall be made taking into account the local government/community's recommendation also.

(ii) Land tenant - A person who works on a project-affected land owned by another person

with a legal proof from Land Revenue Office. (iii) Structure owner - A person who owns a project-affected building/structure including a

dwelling unit but resides in an area not affected by the project. (iv) Business owner - A person who owns or conduct a business within the project-affected

area, the operation of which will be disrupted by the construction of the project. (v) Community - A community who owns project affected building structures or resources

and utilize buildings or resources of the affected areas. (vi) Government Agency - A government agency that owns project affected building

structures or resources and utilizes buildings and resources of the affected areas.

Page 20: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

13

(vii) Relocatees - APs who are actually residing in the affected areas at the time of the conduct of socioeconomic survey and have to move their residences as a result of project construction. The different types of relocatees are:

a. House and Lot owner - a person/family who owns and actually occupies an

affected house and lot.

b. House owner tenant - a person/family who owns and actually occupies a project-affected house with or without the consent of the lot owner.

c. Informal Settler - a person/family who owns and actually occupies a project- affected house located on a government land or on a private land but without the consent of the owner.

d. House occupant - a person or family who occupies an affected house either as an occupant free of charge or on rent.

The matrix in the table below shows the basic compensation each AF/AP, communities and Government agencies will receive. 3.3.2.5 Cut-Off Date/Non-Eligibility for Compensation The validation of APs based on the parcellary and house-to-house surveys of the T/L ROW was completed on April 2003. Accordingly, Ministry of Water Resources published a public notification pursuant to the Electricity Act 1992 section 33.3 and Electricity Regulation, Rule 66. 1 in the Nepal Gazette on 26th of May 2003 as cut off date for the Project compensation and benefits to APs. Households or persons who will introduce new houses/structures at the project affected areas after the cut-off date will be considered non-eligible households/persons and therefore will neither be compensated for their properties nor will be granted relocation benefits. Land required for substation/switching station areas are already acquired as per prevailing rules and in consensus with the people concerned in compliance to this proposed RP. Payment of compensation amount to the concerned landowners of the planned Matatirtha switching station is already over on February 2004. As a rule, the compensation amount of all the concerned landowners of the planned Harisiddhi substation is deposited to the relevant Government office (District Administration Office) and the payment of that is being made from that office.

Page 21: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

14

Entitlement Matrix for the project APs

Types of APs

Types of Compensation/Rehabilitation

Permanent loss of land at replacement cost

Restriction on land use 10% of replacement cost

Loss of crops and Natural resources

Loss of House and other structures at replacement cost

Loss of community facilities and resources

Loss of government property

Grant for disturbance compensation to displaced households

Grant of Transportation allowance to displaced households

Loss of Business

Landowner X X X Land tenant X X X Structure owner

X

Business owner

X

Community X Government Agency

X

Relocatees House and Lot owner

X X X X X X

House owner tenant

X X X X X X

Informal Settler

X X X

House occupant

X X

Note: Compensation to land (permanent or land use restriction) with tenant shall be halved between the owner and tenant as per Land Reform Act provisions. The loss of crops and natural resources on such land however shall be paid to the tenant only.

Page 22: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

15

Chapter IV THE PROJECT-AFFECTED AREAS

The Transmission Line and the Sub-station components affect the land and property under different land ownership categories. The Districts and Village Development Committees affected by the T/L and sub-stations are as follows:

T/L components

District Village Development Committee

Ward Nos.

Kathmandu Matatirtha 1, 4, 5, 7 Satungal 1, 2, 4, 7 Machchhegaon 1, 6, 7, 8 Bahirigaon* 9 Balkumari* 3, 4, 6, 8, 9 Chovar* 5, 9 Lalitpur Khokana 3, 4, 5, 6, 8, 9 Bungmati 2, 3, 4, 9 Chhampi 2, 5, 6 Thecho 1, 2, 3, 8 Chapagaon 1, 3, 9 Dhapakhel 6, 7, 8, 9 Thaiba 9 Harisidhi 6, 7, 8, 9 Sanagaon 4, 5, 6, 7 Luvu 2, 4, 8 Lamatar 4, 5, 7, 8 Bhaktapur Sirutar 9 Dadhikot 1, 2, 3, 6, 7 Gundu 6, 8 Katunje 5, 6 Sub-stations Matatirtha Kathmandu Matatirtha 4 Harisiddhi Lalitpur Harisiddhi 4 * These are the VDCs as per original record in the Land Revenue Office. These have now been transformed into the units of Kirtipur Municipality and accordingly they are no reorganized and recognized as ward numbers 11, 12, 14, 15, 16 and 19 of this Municipality. Most of the affected areas are agricultural lands planted to rice, wheat, corn, and diverse types of seasonal vegetables with various plants/trees. Below are the impact figures on affected land area. A. Total Land Area Affected

Land Affected (ha) Component Total Length of T/L (km)

T/L ROW (meter) Permanent

acquisition (a) Land use

restriction (b)

Total Land Affected (a+b)

(ha) T/L New 26.4 0.57 46.95 Replacement by 4-circuit line

2

18

0.029*1 0*2

47.55

Matatirtha Sub-station

2.33 0 2.33

Harisiddhi Substation

1.48 0 1.48

Total Land Affected

28.4 4.41 46.95 51.36

Note = *1 – additional land for 8 tower pads, *2 – land already acquired at 10% of the replacement cost on 1996

Page 23: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

16

B. Total land to be acquired permanently for tower pads and sub stations

Component Total Number of Tower Pads

Average land area per tower pad (m2)

Total land permanently occupied

by tower pads and substations (ha)

T/L a. New line b. Four circuit towers

89 8

64 36*

0.60 0.57

0.029* Matatirtha Sub-station 2.33 Harisiddhi Substation 1.48 Total 97 4.41 * Additional land required for replacing 8 towers. C. Affected number of private houses and agricultural land area of the house plots for land use restriction

Component Total Number of house

structures

Agriculture land around

the house plots (m2)

Total area occupied by houses (m2)

Total agriculture land area of the house plots for

land use restriction (ha)

T/L 9 1699.59 395.65 0.21 Matatirtha Sub-station Harisiddhi Substation Total 9 1699.59 395.65 0.21 D. Affected number of community structures in other lands

Component Total Number of structures* Total land area occupied by structures (m2)

T/L 2 185.48 Matatirtha Sub-station Harisiddhi Substation Total 2 185.48 * Water tank and the crematory shed. E. Affected agricultural land, forestland and other lands

Component Affected Agricultural

land (ha)

Affected forest land (ha)

Affected other lands (HMG and

others) (ha)

Total land affected (ha)

T/L 42.56 1.08 3.91 47.55 Matatirtha Sub-station 2.33 2.33 Harisiddhi Substation 1.48 1.48 Total 46.37 1.08 3.91 51.36

Page 24: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

17

F. Total land types affected due to restricted land use Component Restricted

Agricultural land (ha)

Restricted forest land (ha)

Restricted other lands (ha)

Total land restricted (ha)

T/L 41.96 1.08 3.91 46.95 Matatirtha Sub-station Harisiddhi Substation Total 41.96 1.08 3.91 46.95 G. Total plants and trees affected by T/L component A total of sixteen plant species are affected by the T/L component that requires felling. Of the affected plant species none are in the protection category. The details of the plants affected by T/L component are presented in Annex IV – 1. Highlights of the affected plant numbers according to size and volume are presented below.

Agricultural land Forest and other land Plant size No Wood

volume (m3) Biomass

(kg) No Wood

volume (m3) Biomass

(kg) Polo size 57 88 Tree 420 127.1 4 19.927 Sapling 61 7 Bamboo 51

65,511

13,106

Total 589 127.1 65,511 99 19.921 13,106 Note: Substation land are devoid of any trees H. Total crop affected The restricted agricultural land crops under T/L ROW may be affected during stringing of the conductors. Normal construction period will be dry season (November to Mid June). Considering the construction season, only planted wheat and maize crop may be affected. The land under permanent acquisition category (substations, tower pads and houses under ROW) will be acquired after harvesting of the crop. Under the above scenario, the effect on the crops under the T/L ROW restricted land is presented as below.

Wheat (MT) Maize (MT) Mustard (MT) Potato (MT) 81 52 2 79

Note: Crop and production are based on district averages.

Page 25: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

18

Chapter V AFFECTED FAMILIES/PERSONS (AFs/APs)

The project-affected households/persons are those residing within the T/L right-of-way and land area of the sub-stations, who will be displaced by the dismantling and construction of transmission towers and sub-stations including those who own properties and/or conduct their economic activities within the project-affected areas. The total estimated number of affected Families (AFs) (i.e. landowners, tenants, structure owners, and business owners) for the T/L component is 2377 excluding land owned by Guthi (a community trust) and government (refer Annex V - 1). The above figures are based on the verification of survey conducted by the NEA. With an average household size of 6.5, the estimated population of APs is 15451. Out of the AFs, 1610 are landowners, 764 are tenants, and 9 are structure owners. Of the structure owners, 6 are landowners with structure and three are tenants with structures. The number of landowner and tenants, however, will be further validated during final check survey to be conducted by the contractors. From the 9 structure owners, only 8 are using their structures for residential purposes. None of the structure owners are using the structures for business purpose. Besides, there are two structures built on the government land. One structure is a water tank for community water supply and other is a shed by the side of the river for cremation purpose. These are community structures. Annex V - 2 presents the photographs of private and community structures. Matatirtha switching station component affects 27 families (i.e. landowners, and tenants). With an average household size of 6.5, the estimated population of APs is 176. Of the total AFs, 24 are landowners and 3 are tenants. The land for the planned sub-station site does not involve any structures and is exclusively used for agriculture purpose. In the planned Harisiddhi sub-station site, a total of 20 families (i.e. landowners, and tenants) are affected. With an average household size of 6.5, the estimated population of APs is 130. Of the total AFs, 17 are landowners and 3 are tenants. The site does not involve any structures and is exclusively used for agriculture purpose. In total, the project affects 2424 AFs with an estimated population of 15,756 APs. Below are the basic impact figures on lands, houses and structures etc. A. Land parcels affected

Components Total land parcels

Government owned parcels

Guthi owned parcels

Privately owned parcels

Privately owned parcels

with tenants

Guthi owned parcels

with tenants

T/L components 2,080 58 4 1,135 715 168 Matatirtha switching station

23 20 3

Harisiddhi substation

17 14 3

Total land parcels affected

2,120 58 4 1,169 721 168

Page 26: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

19

B. Residential Structures affected

Components Pakki* one story private residential structure

Pakki two story private residential structure

Kacchi** one story private residential structure

Kacchi two story private residential structure

Total residential structure affected

T/L components

2 3 3 1 9

Matatirtha switching station

Harisiddhi substation

Total 2 3 3 1 9 * made with brick and cement; ** made with raw brick and mud. Note: Residential structures are built in land owned by APs only. Guthi (public trust) land and government owned land has no residential structures of landowners or tenants. C. Community structure affected Components Pakki underground

water tank Pakki one story

crematorium shed Total community structure affected

T/L components 1 1 2 Matatirtha switching station

Harisiddhi substation Total 1 1 2 Note: The structures are built in government land. D. Affected Families (AFs) 1. Land and residential structure affected Families Components AFs Land

owner AFs land

owner with structure

AFs tenant AFs with structture

AFs Tenant in Guthi

land

Total AFs

T/L components

1,610 6 602 3 156 2,377

Matatirtha switching station

24 3 27

Harisiddhi substation

17 3 20

Total 1,651 6 608 3 156 2,424 At places, a parcel of land is owned by more than one private landowner and at other places one land owner owns more than one land parcels. Similarly, one land parcel has more than one tenant. Hence number of parcels does not directly tally with the number of owners. Guthi land is land owned by public trust. Mostly tenants till such lands. For details of land ownership and parcels refer Annex V-1.

Page 27: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

20

Chapter VI SOCIOECONOMIC STUDY

6.1 Methodology The team of sociologist and engineers covered the T/L stretch on foot to observe and investigate the actual site condition. A carefully designed questionnaire was used to conduct household survey of the statistically designed sampled households. The sample households were selected using a stratified random sampling method. Stratification targeted to include tower pad, right of way and affected houses. A checklist for key informant interview was used to collect other necessary primary data and to triangulate the information collected through household survey. The local people were extensively consulted during the fieldwork. This information was supplemented with other published materials and reports. Besides, a separate socio-economic study of the project relocatees (AFs who are to be displaced) was carried out. A detailed household survey on relocatees was carried out using structured questionnaires. Besides, using a separate checklist, some key informants were interviewed to triangulate the data collected through household survey. The survey team also collect impressions and other primary information by actual observation of the situation. 6.2 Results of Socio-economic Survey 6.2.1. Project Affected Families Of the total 2424 affected families a detailed survey of 200 sampled households was conducted in May 2000 by NEA consultants with the assistance of locally hired enumerators and project personnel. The data presented below are the results of the analysis of socioeconomic data obtained from the sampled households. The socioeconomic data tables are provided in Annex VI - 2. Population by Age and Sex As shown in Annex VI - 2, Table 1 the total population of the sampled household is 1263 which constitutes 663 & 600 male and female population respectively. The male/female ratio in the composition of family members in the surveyed households, males slightly outnumber females with the percentage of the family member estimated as 52.5% for male and 47.5% for female. Likewise the table also shows the sex distribution within the 15 years age difference. This shows that about 33% of the household members fall under the 0-15 years age group and about 13% are over the age of 60 years and above. This implies that, the economically active population in the project impact area accounts for more than 54% (see Annex VI- 1, Table 1). 6.2.1.2 Household Size, Type and Gender of Head The overall family size of the surveyed households in the project area has been estimated as 6.5. About 34% of all sampled houses have 2-5 family members. Similarly, another 30% and 24 % households are with 6-7 and 8-9 members respectively while the remaining 10 % have 10 and above family members. In 4 affected houses, only one person represents the family. (see Annex VI- 1, Table 2). Regarding the family type, Annex VI - 1 Table 3 shows that the single type of family is prevailing than other one, showing that the difficulties and constraints in the family's income and expenditure are slowly forcing Nepalese society to prefer "nuclear" families. The survey indicates that female population is less than the male population. Among 151 surveyed households only 14 households were found female headed, that accounts to 9.3% (see Annex VI-1, Table 4).

Page 28: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

21

6.2.1.3 Caste and Ethnic Composition As far as the caste and ethnic composition of the sampled households is concerned, it clearly indicates a heterogeneous character. As the Annex VI. 1 Table 5 shows, Newar are the numerically dominant caste group comprising 46% of the total surveyed households, followed by the Chhetries with 32% and Brahmin 18%. Other groups are represented by the small figure below 2% only. The caste/ethnicity distribution is not uniform throughout the transmission line corridor. For example, Lalitpur district has the dominant inhabitation of Newari people comprising 56. % of the surveyed households of that district and with only 29.7% of the people from Chhetri community. Whereas, the biggest ethnic group of the Bhaktapur district is represented by the Chhetries with 40.4% and it is followed by the Newars with 31% (see Annex VI- 1, Table 5). 6.2.1.4 Educational Attainment The project area is comparatively advanced in terms of literacy. The overall literacy rate is estimated 73 % which is higher when compared to the national average of 53.74% in 2001. However, this figure is lower than the district averages of 77%, 77.7% and 70.3% for Kathmandu, Lalitpur and Bhaktapur respectively. On the other hands, females are less literate (63%) than males (81.4%). Majority (44%) of those who reported as literate acquired elementary and high school education only. The remaining 29 % have acquired education of SLC and above (see Annex VI- 1, Table 6). 6.2.1.5 Major Occupation Subsistence farming is the main occupation of the large majority of the population (45.1%) in the project area. The second largest group according to the occupation is found to be student with 28.4%. The interesting fact is that although the project impact area lies in the vicinity of the busiest trade center, the occupation by service and business of the affected person constitutes only about 9% and 3% respectively. Similarly, incapable and 'other' constitute 7% and 6% of the total sample population respectively (see Annex VI- 1, Table 7). 6.2.1.6 Gross Annual Household Income Although the income figures are not the exact representation of the situation, due to the non- availability of proper/confirming data, nevertheless, they are expected to be important as they not only show the economic condition of the sampled households but also reflect the general economic situation of all households in the impact area. The income of the households constitutes mainly two sources: income from agriculture and off- farm income from sources like service, wage labor, pension and business. The data on total income from various sources shows that although agriculture is the main occupation of the population, in total the income coming from other sources (83.3% of total) exceeds than from agriculture (16.70%). This can be contributed to the fact that the income from the agriculture is usually utilized inside the household, without any possibility to come out to the market (see Annex VI- 1, Table 8). 6.2.1.7 Settlement Patterns The availability of public facilities such as road and health facilities and productive and cultivated land in the project impact area have greatly attributed to the location of the resettlement areas. However, some major settlements are located in the places of historically famous religious sites. These settlements are usually dense and have appropriate market areas. Settlement elevations vary from 1300 m to 1450 m. Some major settlements along the transmission line alignment are Bosigaun, Taukhel, Gamcha, khadkagaun, Chasikot, wakhat, Dhapakhel, Thulagar, Sahambu, Shikartar, Makantol and Bungal. All settlements, irrespective of

Page 29: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

22

caste/ethnicity and economic status appear similar in terms of housing arrangements and other features. In main villages, dominated by the Newar Architecture, the houses are built closely together and line the cobbled streets and alleys. The standard house has several storeys, framed doors and windows, and often a verandah overlooking the street below. Roofs are almost always of tile, slate or aluminum sheet. Usually, elaborately carved wooden doors and windows are the mark of Newar aristocracy. Most of the villages in the impact area are composed of one ethnic group, living in separate clusters based on their caste/ethnic status. There were no monuments, structures or archeological sites of major significance in the affected area. 6.2.1.8 Land Holding and Size of Affected Portion Majority of households own between 0.32 and 0.38 ha of agricultural land, among it the average of the affected land for one household is estimated to be about 0.002 ha or 0.5 % of the average land holding size (see Annex VI- 1, Table 9). Likewise, of the total 200 sample households 38, 19 and 38 households will lose more than 75%. 50 % & 25% of their land respectively due to the project activities. However, the majority (52%) will loose less than 25% of their total lands (see Annex VI- 1, Table 10). 6.2.1.9 Land Ownership In average 91 % of the affected land is the own property of the affected households, about 5% has been occupied or given to the tenant, 3 % is shared equally by owner and tenant, and no land has been rented out (see Annex VI- 1, Table 11). 6.2.1.10 Land Use and Type Agriculture is the predominant form of land use in the impact area. Other includes grazing, residential/village and public lands. The land use along the T/L route is dominantly agricultural land. The forestland in the impact area is limited and primarily located on the sides of small rivers. There are two types of agricultural lands in the project area: Khet and Pakho Bari. Khet refers to fields that have been terraced, leveled and bound for the cultivation of mainly rice. Khet is highly preferred by the local people because it usually yields three crops per annum. Pakho Bari (un- irrigated land) is rain-fed and usually terraced land. Bari is often situated above Khet and used as residential site. 6.2.1.11 Food Sufficiency The status of food sufficiency shows that 94 out of 200 households have a food deficit. The remaining households have food surplus. Among the deficit households a large majority (56%) were reported to be in the deficit for 4 to 6 months period. However about 10% of the sampled households were reported to be food deficit throughout whole year. To the questions of the source of income during the food deficit period, almost half of the sampled households replied that the only way of defeating food deficit is through daily wage labour. (see Annex VI- 1, Table 12). 6.2.1.12 Awareness and Perception of Project Nearly 80(%) of the interviewed households are aware of the plan to construct the transmission line. About 20% said that they are not aware of it. Around 75% of the households said that they are in favor of the project while about 10% mentioned that they are not in favc;>r. The rest were either undecided (10%) or simply did not indicate their position (5%). Almost all (96%) of the households are willing to be compensated for their affected properties. Very few (1 %) are willing to contribute their properties for the project, whereas the remaining 3% are undecided.

Page 30: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

23

6.2.2 Project Affected Relocatee Families Of the total 2424 project affected families, only 9 families need relocation as their residential house structures lie under the Transmission Line ROW. The data presented below are the results of the socioeconomic surveys of relocatees. The socioeconomic data tables on relocate households are provided in Annex VI- 2. 6.2.2.1 Population by Age Land Sex The relocatee households have a total population of 49 with 23 & 26 male and female populations respectively. The young dependent age group of 15 years old and below comprises 18% while the working age group of 16-59 years old accounts for 65%. About 17% make up the old dependent age group of 60 years old and above. The age dependency ratio is comparatively high 35% while the sex ratio (the number of males per 100 females) is 88 with 23 males versus 26 females (see Annex VI- 2, Table 1). 6.2.2.2 Household Size and Gender of Head More than half (55%) of the households have 6-7 members. Twenty-two percent (22. %) are with 3-4 members while the remaining 23% have 5 members. The average household size is 5.4. Only one of the 9 households is female-headed while the rest are male-headed (see Annex VI- 2, Table 3). 6.2.2.3 Caste and Ethnic Composition The caste and ethnic composition of the relocatee is heterogeneous, and is dominated by Newar group. About 72 % of the population belong to the different caste groups of Newar and remaining 28% population belongs to the Chhetris of the hill origin. 6.2.2.4 Educational Attainment of Relocatee About 68% of the population in relocatee households is literate. Females are less literate (34.47%) than males (65.53%). Majority of those who reported as literate acquired elementary and high school education only. Only around 23% of the populations have acquired secondary level education while another 2 % has passed SLC exam. The total number of people having educational level of Intermediate, Bachelor, and Masters' Degree are 5 (10%), 3(6%), &1 (2%) respectively (see Annex VI- 2, Table 4). 6.2.2.5 Major Occupation of Relocatees The affected household populations have diverse occupations. The production workers or agriculture farmers have the highest numbers at 56%, followed by the petty business with 10%. The service holders and wage laborer follow with 8% and 2% respectively. Nearly one fourth (24%) of the population is reported as dependent, which constitutes students (22%) and incapables (2%) (See Annex VI- 2, Table 5. 6.2.2.6 Gross Annual Household Income Average annual income per family engaged in agriculture and non-agriculture enterprises for project affected area is calculated as NRs 71,044. As shown in Annex VI - 2, Table 6, about one third of relocatee households earn below NRs 50,000 per year. The largest group of the households (44.44%) earns from NRs 50,001 to NRs100,000 while the remaining two households make NRs 100,001 and above annually. 6.2.2.7 Houses and Mode of Occupancy Eight out of the 9 relocatee households own the house they occupy. Only one household resides currently in a rented house.

Page 31: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

24

6.2.2.8 Type of Housing Units Majorities (55%) of the houses of the relocatee families are pakki (made with brick/stone and cement with RCC roofing) and the remaining 45% houses are kachhi (made with raw brick and mud with thatch roof/CGI roofing). Similarly, of the total 5 pakki houses, there are 3 two-storied building whereas there is only one house of kachhi category with two-storied building and the remaining houses are of one story (see Annex VI- 2, Table 7). 6.2.2.9 House Floor Area The affected houses having large-sized floor areas of 801sq.ft and over, medium-sized floor areas of 300-800 sq. ft. and those with smaller floor areas of 299 sq. ft. and below make up 33.33% each. 6.2.2.10 Housing Materials Two-thirds (66.66%) of the houses have strong roofing materials made of RCC slab and galvanized iron (G.I.) sheets while the remaining one third have thatch/tile roof made of indigenous and makeshift/salvage materials. For walling, majorities (55%) of the houses have strong materials such as concrete and wood and the remaining houses have light indigenous materials (see Annex VI- 2, Table 7). 6.2.2.11 Land Ownership All the total 9 relocatee families own more or less some areas of land they occupy/cultivate. Besides, 5 households have rented-in and 1 household has rented-out land as well. Majority (55%) of households own 5 ana to 1 ropani of land whereas the remaining households (45%) own 1 to 2 ropani of land. It is found that the affected land mostly belongs to the affected population. The Annex VI- 2, Table 3 & 8 also show that in average 57 % of the affected land is the own property of the affected households, 31 % has been taken for leased by the affected households and very small amount (3 ana) land has been rented out. 6.2.2.12 Proof of Land Ownership Almost all the relocatee households have documents to prove ownership of their affected land. Most of them have jaga dhanipurja (Land Registration Certificate). However, some merely have mal pot tireko rasit (Tax Payment Receipt) as proof of their land ownership. 6.2.2.13 Type of Land There are two types of agricultural lands in the project area: Khet and Pakho Bari. Khet refers to fields that have been terraced, leveled and bound for the cultivation of mainly rice. Khet is highly preferred by the local people because it usually yields three crops per annum. Pakho Bari (un- irrigated land) is rain-fed and usually terraced land. Bari is often situated above Khet and used for residence purpose. Majority of the affected lands falls under the agricultural land comprising of both Khet and Pakho Bari. Residential lands, commercial land, public land and those classified as mixed agricultural and industrial land comprise a small portion of the total affected lands. 6.2.2.14 Total Area of Affected Lands and Size of Affected Portion Total area of affected land of relocate families is about 4 ropani, 4 ana, 3 paisa and 2 dam (0.21 halo Around 55% of the affected lands have area less than 5 ana each. Another 33 % of the affected lands have areas in between 10 ana to 1 ropani each and the remaining 12% affected lands have area more than 1 ropani each.

Page 32: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

25

6.2.2.15 Awareness and Perception of Project All the interviewed households are aware of the plan to construct the transmission line and they also said that they are in favor of the project. However, they strongly demanded that the project authority should compensate their affected properties. 6.2.2.16 Affected Structure and Public Places Some 11 structures will be affected by the project. Out of this figures, nine (9) are residential houses while the remaining two structures comprise of ghat (crematory) and public water tank/reservoir (see Annex VI. 2, Table 7).

Page 33: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

26

Chapter VII SOCIOECONOMIC IMPACTS AND MITIGATING MEASURES

The project’s main adverse impact is the displacement of some families residing within the T/L ROW and in the substation areas. Except for the substation areas, minimal impact is foreseen for owners of agricultural lands on ROW that will be affected by the project since they could still continue cultivating their lands after project construction. A summary of socioeconomic impacts on APs and mitigating measures is shown in the table below:

Impact Mitigation Measures Loss of land due to permanent acquisition

• Landowners and tenants of the permanently acquired lands of ROW and substation will be compensated in cash at the replacement cost. The Compensation Fixation Committee in consultation with local government and APs shall decide the replacement costs of the land.

Land use restriction • Landowners and tenants whose land will be restricted for the construction of structures and trees shall be compensated in cash at 10% of the replacement costs of the land. The Compensation Fixation Committee in consultation with local government and APs shall decide the replacement costs of the land.

• The landowners and tenants of the restricted land use will be allowed to crop the land and the land ownership will remain with the respective landowners/tenants.

Damage to crops/plants/trees during construction

Any loss of crops/plants/trees shall be paid to landowners and tenants of the permanently acquired area based on the evaluation norms of District Forest Office and District Agricultural Office. Any loss of crops/plants/trees shall be paid to landowners and tenants of the land use restricted areas and any other areas during construction of T/L based on the evaluation norms of District Forest Office and District Agricultural Office.

Dismantling of the House and other structures and Utilities

House and other structures and utilities shall be compensated at replacement costs based on the evaluation norms of the District Development Committee. Depreciation shall not be accounted.

Transportation Allowance All the APs whose house structure is occupied permanently will be given a transportation allowance of NRs, 15,000 to transport the salvaged materials to the new place.

Disturbance to APs who are relocated

Grant of disturbance compensation to APs to tide them over while reconstruction their houses and /or adjusting to their new environment up to NRs. 21,000. The amount shall be not more than 150 days multiplied by the daily minimum wage in the project-affected area.

Disruption of Business Grants for the loss of business in amount up to NRs 30,000 will be paid or based on daily income whichever is lower as reflected on income tax return (ITR) multiplied by the number of days of business stoppage due to the project, but in no case shall it be more than 90 days.

Page 34: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

27

Chapter VIII COMMUNITY CONSULTATION AND DIALOGUES

8.1 Project Stakeholders The stakeholders other than NEA/Department of Electricity Development/Ministry of Water Resource! Ministry of Population and Environment are listed and categorized below: Stakeholders Descriptions Affected Persons /Families/ Communities / Government Agencies

Landowners, tenants, house and lot owners, house owners, informal, settlers, house occupants, and structure/business owners, community and government agencies whose properties will be affected and/or will be displaced by the project's construction.

District Government Office and Offices of Local Governments

All district government offices and local government offices that have jurisdiction on the area occupied by the project.

8.2 Mechanisms for Stakeholders' Participation It is NEA's responsibility to inform all relevant stakeholders of the important aspects of the project so that they can be informed about the decisions on how the construction of Transmission Line and Substation will affect them and how they can best benefit from it. 8.2.1 Dialogues/Consultation Consultation with the affected APs and communities was started during the socio-economic surveys of the households in the affected areas. Such consultation, however, shall continue in the coming periods of RP implementation. APs, communities and local governments shall be consulted for evaluation of the land and properties for compensation and shall be the part of the Compensation Fixation Committee. Public hearing on the project were conducted on 6th, 10th, and 14th of February 2001 at places: panga, Katunje, and Harishiddhi. APs, local government officials, NGOs and CBOs participated these hearings. 8.2.2 Information Campaign Project brochures were prepared and distributed to affected APs, local governments and interested local NGOs and CBOs. The brochures give information on the project alignment, potential impacts and its gravity and steps taken by the project to minimize the impacts. NEA project office shall organize and will be responsible for the presentation and dissemination of information sought by APs on related issues. A field team from the project management office is regularly providing information at the site level to the APs, local government and NGOs as and when required. 8.2.3 Local Government Endorsement As per the Environmental Protection Rule, local government endorsement on the project is mandatory pre-requisite for project development. Interaction, discussions, and consultation with regard the project were conducted in the various occasions with the heads and members of local government. Of the 21 project affected local governments (1 municipality and 20 Village Development Committees) of the three districts of Kathmandu, Bhaktapur and Lalitpur, all the 21 local governments have given endorsement for the project development. The copies of the local government endorsement are attached in the EIA report prepared by the project.

Page 35: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

28

8.3 Role of NGOs and CBOs As in any national development project, APs seek the assistance of non-government and/or community-based organizations (NGOs/CBOs) for a nonpartisan or impartial assessment of the project. These groups are encouraged to participate in public hearings and community dialogues and voice out their concerns about the project.

Page 36: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

29

Chapter IX RESOLUTION OF CONFLICTS, APPEALS AND GRIEVANCE PROCEDURES

Issues, which may arise concerning the land rights and dissatisfactions on the land and property acquisition, value fixation etc. shall be addressed by the Chief District Officer and Ministry of Home as per the legal provisions of the Land Acquisition Act 1977 (section 7 and 11). Issues, which may arise concerning payment of lands, crops and improvements and relocation, will be settled by the Project Management Office (PMO). They will be assisted by NEA's legal wing to handle all the legal matters/concerns. Issues related to the insufficiency of the compensation costs shall be refereed to Compensation Fixation Committee as a last resort to settle the issue. 9.1 Setting Up a Complaint Desk The Project Management Office (PMO) shall set up a Complaint Desk at its office to be manned by administrative officer assisted by a field supervisor. All complaints/concerns shall be received at this desk and resolved immediately if minor ones and involves procedural/policies and guidelines only. Likewise, the Project Management Office (PMO) shall refer to the concerned office/group all other issues, which cannot be resolved. The APs shall be informed about the status of his concern as soon as possible. 9.2 Procedure The following procedure will be observed in the settlement of conflicts/concerns • PMO receives the issue/concern from APs and determines if there is a conflict. • AP/PMO representative discuss/resolve issue/concern. If this is settled, the process ends. • If not, PMO elevates the concern to the NEA's legal adviser for evaluation/review and resolution. • If the concern is resolved, the process ends. If not, the PMO through Legal Adviser forwards concern

to Compensation Fixation Committee, which evaluates and provides solution. If resolved at this stage, the process ends.

• If the concern remains unresolved, and If AP is still not satisfied, this is elevated to the Court of Appeals and finally to the Supreme Court by AP

Page 37: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

30

Chapter X INSTITUTIONAL ORGANIZATION

The NEA is responsible for overall implementation of the RP based on the requirement of ADB and shall provide the necessary resources such as the budget and the manpower. To ensure smooth implementation of the RP, the different NEA departments as well as the relocatees are tasked with the following responsibilities. 10.1 Organizational Linkages and Responsibilities 10.1.1 Project Management Office (PMO)

• Conducts consultations/dialogues and project presentation with the APs and concerned VDCs, municipalities, DOCs and District Offices respectively.

• Secures project endorsements • Identifies affected households/persons and prepares initial valuation of houses/structures as a

start point to Compensation Fixation Committee • Surveys and valuates lands, crops/improvements and recommends payment of the same to the

NEA Board. • Prepares and secures approval of the RP. • Secure necessary budget for RP • Identifies affected landowners and tenants and negotiates for the acceptance of payment of

affected lands, crops, trees and plants as well as prepares DVs for the payment of the same. • Facilitates the resolution of right of-way and resettlement issues. • Implement RP and provide updates to NEA

10.1.2 Account Section, PMO Processes and disburses payments for relocation in consultation with PMO 10.1.3 Relocatees • Relocate/transfer their houses and structures outside the project boundaries within thirty (30) days

after receipt of payment due them. • Cooperate with the PMO/NEA offices and other government agencies in the implementation of the

RP. • Help maintain peace and order during and after relocation. • Comply with all the provisions set forth in the Waiver of RighVQuit Claim and Voluntary Undertaking

in connection with the payment of their houses/structures. PMO is currently carrying out and have accomplished a number of tasks listed above. 10.2 Institutional Capability Building and Strengthening Some of the staff currently working under PMO have been involved in the resettlement planning, parcellary investigation and socio-economic surveys of the APs in other NEA transmission line projects. They have skills in dealing and maintaining public relationship with the APs and in the conflict resolution. Some of the currently PMO staffs will be deputed for RP implementation. The new staff of PMO shall be given training through workshops and seminars from the experienced staffs of NEA involved in other T/L RP projects with an objective to strengthen institutional capacity building of the personals prior to the start of RP implementation.

Page 38: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

31

Chapter XI IMPLEMENTATION SCHEDULE

11.1 Relocation Schedule As shown in Annex X - 1, the implementation of RP is targeted for completion at the end of 2005. Furthermore, community related works and resolution of issues shall continuously be undertaken until completion of RP implementation. Implementation of RP begins upon its approval both by the ADB and NEA Board. Major activities during RP implementation include final determination of costs by Compensation Fixation Committee for permanent land acquisition, land use restriction, house and other structures etc as per RP policy of the project; documentation, processing and payment of relocation compensation; and supervision and monitoring of RP. A third party monitoring team shall be engaged to oversee the implementation of the RP to ensure that its provisions are properly followed. 11.2 Relation of Relocation Activities to Project Schedule To ensure that the project will be completed on time, NEA Management assigned a Project Manager (PM) to oversee the project implementation. The PM is tasked to coordinate and monitor all the activities with the concerned NEA departments during the early stage of the project to ensure that decisions/approval of the related matters would be finished prior to actual project construction/implementation. Some relocation activities during the planning stage such as information campaigns with the APs and local governments and arrangements to facilitate final determination of compensation costs from Compensation Fixation Committee are necessary. Besides, co-ordination to obtain approvals and permission from other concerned HMG offices is equally important. Relocation is not necessary in case of substations. As described above, RP activities for T/L is in process. 11.3 Procedures for RP implementation

• Project has secured cadastral maps, VDC and DOC maps, etc. necessary for the first hand identification of land required for the projects & land ownership.

• Project has prepared a master list of the land plots and ownership/tenant status from the field book from the District survey office.

• The concerned District Administration office acquires necessary land and properties in line with the Land Acquisition Act and other related Acts/Rules/Regulations.

• Project notifies the people of the project area with plots and owners/tenants to be affected. • Project requests to land survey office to identify the land plots affected by the project and survey

and delineates the affected land to finalize the land parcels affected by the project. • Project gathers/consolidates/examines the needed documentary requirements such as land titles,

proofs of ownership, tax declarations, etc. to facilitate the payment of project claims. • Project requests District Forest Office, District Office of Housing and District Agriculture Offices to

evaluate the compensation amount of respective properties. • Public notification of the affected property by COO with details of land parcels, owners/tenants,

structures, and other property in the project affected areas. • Project assists CFC on investigation, negotiation with APs, and evaluation of the properties for

the determinations of the compensation as per RP policy. • Projects starts paying compensation amounts immediately after all Government decisions. • Project co-ordinates and conducts regular consultation with APs, local communities, NGOs, VDC

and DOC throughout process in matters related to information dissemination, identification and evaluation of the property, negotiations with APs to resolve any issues of RP.

• Project monitors the RP and prepare regular updates of RP implementation

Page 39: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

32

11.4 Involvement of APs, Local Government and NGOs Active participation of APs, NGOs and local governments (VDC/DDC) will be encouraged to ensure the smooth and successful implementation of the through the following means: 11.4.1 APs

(i) Allowing entry for the preliminary survey of the affected areas by the project (ii) Collating of documents to support their relocation and right-of-way claims so that

assistance and grievances are submitted on time for processing. (iii) Participation in the count of improvements (crops/plants/trees) and cooperation in the

valuation of the same including those of their affected lands. (iv) Participation in the CFC meetings for evaluation of the compensation (v) Examination/review of the computations of relocation compensations and affixing their

signatures on the assistance and grants to facilitate payment of their claims. (vi) Allowing entry of the construction crew to the affected lands upon receipt of payment and

timely dismantling of their houses/structures. 11.4.2 NGOs Participation in the community dialogues/meetings to resolve issues that may arise during relocation implementation. 11.4.3 Local Governments Local Governments shall be involved in the RP process in two ways: firstly, as per the role/assignment stated in the prevailing Acts/Laws/ Rules & Regulations and secondly, on the request of the project. Major points are:

(i) Assistance to relocatees in looking for suitable places to transfer to facilitate their early relocation.

(ii) Participation in the CFC meetings for the evaluation of compensation (iii) Participation in the dialogues/meetings with the APs for the resolution of some conflicts

associated with the processing/payment of their claims. (iv) Assistance to project in the prevention of illegal encroachers or new settlers in the

affected areas to take advantage of relocation compensation and benefits being granted by the project.

Page 40: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

33

Chapter XII MONITORING AND EVALUATION

Monitoring and evaluation are important activities of the RP because these will keep track of NEA's commitments to programs and projects and will ensure the attainment of the program's goals and objectives. While RP evaluation will be done internally by NEA through PMO. Monitoring of the RP implementation will be done both internally and externally. Internal monitoring will be undertaken by NEA through the PMO and the Department of Electricity Development/Ministry of Water Resources while external monitoring will be contracted out to a third party. Performance indicators that reflect the program's objectives will be the basis of monitoring and evaluation. The parameters/indicators for monitoring and evaluation will be as per the HMG approved EIA report. 12.1 Internal Monitoring Project will be monitoring its own concern particularly the status of their activities as well as expenditures. The expenses will be audited by the NEA Audit Department. The implementation schedule on relocation and rehabilitation will be used in monitoring the activities. Monthly status reports are prepared by the PMO on payment of RP compensation, assistance and grants. The conduct of continuing information campaigns/dialogues and issues and concerns of stakeholders are also included in the PMO report. The project management will ensure that the monitoring by PMO is conducted as per the requirement. It will regularly review the reports and provide comments and suggestions for improvements. The reports shall also be send for review and comments to Department of Electricity Development, Ministry of Water Resources and Ministry of Population and Environment for their review and suggestions. 12.2 External Monitoring The Project Manager will contract out external monitoring of the RP implementation to a third party. A term of reference will be prepared by the PMO and reviewed and agreed upon by the funding agency and the third party. NEA will provide cost from the project budget. 12.3 Post-relocation evaluation After completion of resettlement and development activities, a process and impact evaluation will be undertaken as per prevailing Laws. The evaluation will specially assess whether living standards of the relocatees have been restored or enhanced. It will also review the RP program's efficiency, impact and sustainability. The evaluation results shall serve as NEA's tool/reference to improve the formulation of future relocation programs.

Page 41: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

34

Chapter XIII COMPENSATION/BENEFITS TO AFs/APs AND COST ESTIMATES

13.1 Compensation/Benefits to AFs/APs Based on compensation policy for the project, the identified AFs/APs of the project area will receive the following compensation/benefits:

Component AFs and APs category Compensation and Benefits T/L component Land owner (also including

Guthi “community trust land”) 1. 100% payment on Market based rates of the

permanent land occupancy for tower pads. 2. 10% payment on the market based rates for

the land use restriction 3. 100% payment of plants, crops and trees

Land owner with Tenant/tiller (also including Guthi “community trust land”)

1. 50% payment on market based rates of the permanent land occupancy for tower

2. 50% out of 10% payment on market based rates for the land restricted for land use

Tenant/tiller 1. 50% payment on market based rates of the permanent land occupancy for tower

2. 50% out of 10% payment on market based rates for the land restricted for land use

3. 100% payment of plants, crops and trees House and lot (land) owner 1. Replacement cost of house

structure/associated land plot and utilities 2. Disturbance compensation 3. Transportation allowance 4. 100% payment for land

House owner tenant 1. Replacement cost of house structure and utilities

2. Disturbance compensation 3. Transportation allowance

Community structure 1. Replacement of structures and facilities Land owner (also including

Guthi “community trust land”) 1. 100% payment on market based rates of the

permanent land occupancy for tower 2. 100% payment of plants, crops and trees

Land owner with Tenant/tiller (also including Guthi “community trust land”)

1. 50% payment on market based rates of the permanent land occupancy for sub-station

Tenant/tiller 1. 50% payment on market based rates of the

permanent land occupancy for sub-station

Page 42: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

35

13.2 Cost Estimates 13.2.1 Relocatee a. Replacement Cost of Houses/Structures The total estimated cost for payment of 9 residential structures and 2 community structures affected by the project is NRs 8,267,865.60. Cost breakdown of the affected houses as per their category is presented below:

Type of house Cost per sq. ft. (NRs)

Number of house

Total sq. ft. Total cost (NRs)

1 Residential structures 1.1 House of RCC

construction 900 4 3,784.73 3,406,257.00

1.2 House with CGI roofing 500 2 601.75 300,875.00 1.3 Houses/Huts of stone

masonry in mud mortar and thatch roof

343 3 1,019.83 349,801.69

Sub-total 1 4,056,933.69 2 Community structures 2.1 RCC water tank 900 1 1,733.33 1,559,997.00 2.2 Crematorium shed 900 1 262.15 235,935.00 Sub-total 2 1,795,932.00 3 Land (occupied by structure and remaining farm of the plot) Cost/ha (NRs) Total land (ha) Total cost

(NRs) 3.1 Total land private and

public 11,500,000 0.21 2,415,000.00

Sub-total 3 2,415,000.00 Grand Total 8,267,865.60 Note: Cost per sq. ft. is based on the district evaluation rates of Kathmandu, Lalitpur and Bhaktapur for built structures. b. Disturbance compensation (DC) The amount of DC to be granted to each AF is NRs 21,000.00. However, actual DC shall be computed based on the average minimum wage in the affected areas multiplied by 150 days. The total estimated for the project is NRs 189,000.00 as under:

Total eligible relocatees DC/relocates (NRs) Total DC (NRs) 9 21,000.00 189,000.00

c. Transportation allowances (TA) to displaced households The amount of TA to be granted to each displaced house owner, to transport the salvaged materials to new location amounts to NRs 135,000.00 as under:

Total eligible relocatees TA/relocates (NRs) Total FA 9 15,000.00 135,000.00

Page 43: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

36

13.2.2 Payments for Land Acquisition and Land Use Restriction a. Payments for permanent land acquisition T/L ROW The amount for permanent land acquisition under T/L ROW is for the tower pad occupancy area. A total of NRs 9,000,000.00 is estimated for the permanent land acquisition as under:

Number of tower

Area per Tower pad (sq. m.)

Estimated cost per sq. m. (NRs)

Total land (sq. m.)

Total cost (NRs)

97 64 1,500.00 6,000.00 9,000,000.00 Note: Land cost is based on the average district land costs. b. Payments for permanent land acquisition sub-stations The amount for permanent land acquisition for sub-station at Mataritha and Harisiddhi is NRs 54,075,781.00 as detailed below:

Name of sub-station Area occupied (ha) Rate per ha (NRs) Total Cost (NRs)

Matatirtha 2.33 14,581,880.00 33,975,781.00 Harishiddi 1.48 13,581,081.00 20,100,000.00 Total 54,075,781.00 Note: Land cost is based on the actual payments made as per the evaluation of CFC. c. Payments for land use restriction under T/L ROW The agriculture land area under T/L ROW restricted for land use is compensated at 10% of the current market value of the land prices. Price estimated for the land use restriction is NRs 48,254,000.00 as under:

Agricultural land restricted for ROW

(ha)

Average land cost per hectare (NRs)

10% of the cost per hectare ( NRs)

Total Cost (NRs)

41.96 11,500,000.00 1,150,000.00 48,254,000.00 Note: Land cost is based on the average district land costs. 13.2.3 Payments for Crops and Trees a. Payment for crops Costs for loss of crops is estimated at NRs 2.898.000.00 as under:

Crop type Estimated production (MT) Unit cost/MT (NRs) Total Cost (NRs) Wheat 81 13,000 1,053,000.00 Maize 52 14,000 728,000.00 Mustard 2 45,000 90,000.00 Potato 79 13,000 1,027,000.00 Total 2,898,000.00 Note: Unit costs are based on the averages of district market rates (Kathmandu, Lalitpur and Bhaktapur)

Page 44: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

37

b. Payment for trees Cost for loss of trees is estimated at NRs 818,505.00 as under: Types of trees Number Unit Total Unit Cost per unit

(NRs) Total Cost

(NRs) Polo size 57 Number 57 250 14,250.00 Tree 420 m3 147.027 5,380 791,005.26 Sapling 61 Number 61 50 3,050.00 Bambpp 51 Number 51 200 10,200.00 Total 818,505.26 Note: Based on the local market rates of Kathmandu, Lalitpur and Bhaktapur districts 13.2.4 External Monitoring The amount of NRs 350,000.00 shall be provided by project to fund the external monitoring of the RP implementation. 13.2.5 Summary Particulars Cost (NRs) 1 Relocatee Rehabilitation a Replacement Cot of Houses/Structures 8,267,865.60 b Disturbance Compensation 189,000.00 c Travel Allowance for Displaced Households 135,000.00 2 Payments for land acquisition and land use restriction a Payments for permanent land acquisition T/L ROW 9,000,000.00 b Payments for permanent land acquisition sub-stations 54,075,781.00 c Payments for land use restriction under T/L ROW 48,254,000.00 3 Payments for crops and trees a Payments for crops 2,898,000.00 b Payments for trees 818,505.00 4 External Monitoring 350,000.00 Sub-Total 123,988,151.00 5 Miscellaneous 10% of Subtotal 12,398,815.16 Grand Total 136,386,966.76

Page 45: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

38

REFERENCES [1] Handbook on Resettlement: A Guide to Good Practice, ADB, Manila, 1998. [2] Environmental Impact Assessment (EIA) (Final Report), Soil, Rock and Concrete Laboratory (SRCL),

NEA, Kathmandu, August 2002. [3] EIA of Hetauda-Bardaghat 220 kV Transmission Line Project, SRCL, NEA, Kathmandu, July 1999. [4] ACRP with Short Resettlement Planfor Thankot-Chapagaon-Bhaktapur 132 kV Tarnsmission Line

Project, SRCL, NEA, Kathmandu, May 2003. [5] EIA of Khimti-Bhaktapur-Balaju 132 kV Transmission Line Project, SRCL, NEA, Kathmandu, April

1997. [6] EIA of Jhirpu-Sunkoshi 132 kVTransmission Line Project of Bhotekoshi Hydroelectric Project, SRCL, NEA, Kathmandu, 1998. [7] Land Acquisition Act, 1977 (anlended on 1992), HMG/N. [8J Electricity Act, 1992, HMG/N. [9] Electricity Rule, 1993, HMG/N. [10] Rate Analysis of crops in Kathmandu district, 2004, District Agricultural Development Office, Kathmandu. [11] Rate Analysis of crops in Lalitpur district, 2004, District Agricultural Development Office, Lalitpur. [12] Rate Analysis of crops in Bhaktapur district, 2004~ District Agricultural Development Office,

Bhaktpaur. [13] Rate Analysis of houses in Kathmandu, Lalitpur and Bhaktapur districts, District Housing and Urban Development Offices of Kathmandu, Lalitpur and Bhaktapur districts. [14] Norms/or Forestry and Wildlife, Ministry of Forest and Soil Conservation, HMG/N, 2004.

Page 46: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ANNEXES

Page 47: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ANNEXES IV-1

Page 48: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ANNEX IV - 1

VEGETATION INVENTORY REPORT

List of the species identified Nepali Name Scientific Name Khari Celtis australis Bakaino Melia azedarach Bains Salix spp. Utis Alnus nepalensis Hadebayar Ziziphus incurva Laharepipal Populas spp. Salla Pinus wallichiana Kangio Gravellea robusta Mayal Pyrus pashia Paiyun Prunus cerasoides Lapsi Choerospondias axillaris Siris Albizia spp. Kaulo Machilus spp. Bohori Cordia dichotoma Kutmiro Litsea monopetala Bamboo Dendrocalamus spp. No. of trees under T/L ROW S.N. Status No. Remark 1. Tree 67 > 30 cm dbh 2. Pole 502 10-29.9 cm dbh 3. Sapling 68 4 -9.9 cm dbh 4. Bamboo 51 688

Total Volume and Biomass except Bamboo: Total Volume: 147.021 Cubic meter (Calculation based on linear regression model) Total Biomass: 78517.17 Kg. (Calculation based on Linear regression model) No. of Trees on Private Land: 538 ( Trees+ Poles+ Saplings) No of Trees under Guthi (Devithan, Bakhate, Khokana): 99

Page 49: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured Species No.From To Species Category dbh(cm) Height(m) BiomassAP-0 AP-1 0 0 0 0 0 0 0 No vegetation are foundAP-1 AP-2 0 0 0 0 0 0 0 No vegetation are foundAP-2 AP-3 Khari P 28 11 1 0.311 221.68 Pvt. Land

Khari T 57 22 1 2.15 641.56 Pvt. LandKhari P 11 7 1 0.05 55.2 Pvt. LandKhari T 32 20 1 0.7 262 Pvt. LandKhari P 19 18 1 0.223 125 Pvt. LandKhari T 34 21 1 0.79 296.2 Pvt. LandBains P 21 12 1 0.194 145 Pvt. LandBains P 15 13 1 0.1 87.8 Pvt. LandBains T 31 12 1 0.411 252 Pvt. LandBains T 43 13 1 0.87 422.4 Pvt. LandBains T 35 12 1 0.52 306 Pvt. LandBains T 42 18 1 1.07 412 Pvt. LandBains T 48 18 1 1.37 495.66 Pvt. LandBains T 48 16 1 1.24 495.66 Pvt. Land

AP-3 AP-4 Bakaino P 21 8 1 0.05 226.9 Pvt. LandBains T 41 17 1 0.89 402 Pvt. LandBains T 37 16 1 0.81 326 Pvt. LandBains T 40 14 1 0.79 392 Pvt. Land

P(Pole) 6T(Tree) 12S(Sapling)

Note: Tree: > 30 cm dbh ( Diameter at breast height)Pole: 10-29.9 cm dbhSapling: 4-9.9 cm dbh

5565.06

RemarksAP

Forest Inventory Data

Volume

Total 18 12.539

Page 2 of 10 Annex IV-1

Page 50: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured Species No. Volume BiomassFrom To Species Category dbh(cm) Height(m) (Cu.m.) (Kg.)AP-4 AP-5 No vegetation are foundAP-5 AP-6 Bains P 25 16 5 1.72 190 Pvt. Land

Khari T 54 15 1 1.5 610 Pvt. LandKhari T 32 14 1 0.53 199.65 Pvt. LandBamboo 4 Pvt. LandUttis S 9 1 17 Pvt. LandUttis S 8 2 25.8 Pvt. LandUttis P 16 8 2 0.106 128.4 Pvt. LandUttis T 37 18 2 1.82 898.6 Pvt. LandUttis P 25 19 1 0.477 180.4 Pvt. LandUttis P 26 18 1 0.465 197.7 Pvt. LandUttis T 34 19 1 0.81 368.9 Pvt. LandBains P 18 7 2 0.1 115.4 Pvt. LandKangio P 23 18 1 0.323 350 Pvt. LandBains P 22 8 1 0.05 145 Pvt. LandHaribel P 20 10 2 0.167 104.6 Pvt. LandBains T 48 16 2 2.48 495.66 Pvt. LandBains T 54 18 1 1.7 610 Pvt. LandHaribel P 18 16 2 0.404 90.4 Pvt. LandKhari P 25 15 5 1.54 955 Pvt. LandBains T 32 17 1 0.59 199.65 Pvt. LandBains T 36 13 1 0.58 316 Pvt. LandHaribel P 16 11 2 0.22 77 Pvt. LandKhari P 18 10 1 0.137 115.4 Pvt. LandKhari P 12 6 1 0.05 63 Pvt. LandHaribel P 12 10 1 0.065 26 Pvt. LandUttis P 24 16 1 0.357 164.1 Pvt. LandUttis P 23 12 1 0.251 148.7 Pvt. LandBains P 16 10 1 0.11 96.7 Pvt. LandUttis P 16 10 1 0.106 64.2 Pvt. Land

AP-6 AP-7 Bamboo 2 Pvt. LandAP-7 AP-8 NIL No trees are found

T 10P 31S 3Bamboo 6

Forest Inventory Data

AP Remarks

Total 50 16.658 6953.26

Page 3 of 10 Annex IV-1

Page 51: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured Species No. Volume BiomassFrom To Species Category dbh(cm) Height(m) (Cu.m.) (Kg)AP-8 AP-9 Lahare Pipal T 37 25 1 1.01 1794 Devi Than

Lahare Pipal T 34 26 1 0.96 1445 Devi ThanLahare Pipal T 37 26 1 1.07 1794 Devi ThanLahare Pipal P 22 27 1 0.427 487 Devi ThanLahare Pipal T 35 27 1 0.96 1561.5 Devi ThanLahare Pipal P 21 20 1 0.293 371 Devi ThanPine P 13 6 3 0.15 109.5 Devi ThanPine P 18 9 2 0.206 122.4 Devi ThanPine P 11 12 2 0.126 56 Devi ThanPine P 24 18 5 2.06 482.5 Devi ThanPine P 20 15 5 1.125 361.5 Devi ThanPine S 8 11 3 0.15 50.4 Devi ThanPine P 13 13 5 0.315 182.5 Devi ThanPine P 16 15 23 3.519 1166.1 Devi ThanPine P 13 9 8 0.504 292 Devi ThanPine P 12 7 3 0.12 96.3 Devi ThanPine P 13 11 1 0.063 36.5 Devi ThanPine P 17 14 4 0.748 223.2 Devi ThanPine P 26 16 1 0.413 109.6 Devi ThanPine P 23 16 3 0.93 270.6 Devi ThanPine P 10 8 5 0.25 120 Devi ThanPine P 24 8 1 0.2 96.5 Devi ThanPine P 24 10 1 0.208 96.5 Devi ThanUttis P 29 26 1 0.825 254.8 Devi ThanUttis P 13 20 1 0.141 39.7 Devi ThanUttis P 11 12 1 0.063 27 Devi ThanUttis P 17 18 1 0.251 73.8 Devi ThanUttis P 21 18 3 0.375 361.2 Devi ThanUttis P 20 20 2 0.68 215.2 Devi ThanUttis P 27 21 1 0.535 215.8 Devi ThanUttis S 9 11 1 0.05 17 Devi ThanUttis P 18 9 1 0.11 84.3 Devi ThanKangio P 12 12 1 0.78 80 Devi ThanKangio S 6 13 1 15.2 Devi ThanKangio P 22 16 1 0.31 337 Devi ThanKangio S 6 8 2 30.4 Devi ThanKangio S 8 8 1 30.2 Devi Than

P 88 99 19.927 13106.2T 4S 7

Total

Forest Inventory Data

AP Remarks

Page 4 of 10 Annex IV-1

Page 52: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured Species No. Volume BiomassFrom To Species Categorydbh(cm) Height(m) (Cu.m.) (Kg.)AP-8 AP-9 Uttis T 35 12 2 1.12 789.4 Pvt. Land

Uttis P 26 12 1 0.317 197.7 Pvt. LandUttis T 31 20 1 0.717 297.5 Pvt. LandUttis P 14 22 2 0.346 94.2 Pvt. LandBakaino T 30 16 1 0.52 550 Pvt. LandBakaino P 16 16 1 0.163 104.2 Pvt. LandBakaino P 10 8 3 0.15 85.5 Pvt. LandMayal P 28 12 1 0.361 235.5 Pvt. LandMayal P 12 8 1 0.06 37.7 Pvt. LandMayal P 16 10 1 0.11 71.2 Pvt. LandMayal P 12 10 4 0.26 150.8 Pvt. LandMayal P 12 8 10 0.6 377 Pvt. LandMayal P 15 9 5 0.4 309 Pvt. LandMayal P 16 12 2 0.22 142.4 Pvt. LandMayal P 10 8 2 0.1 50.4 Pvt. LandKhari P 11 10 2 0.12 55.2 Pvt. LandKhari P 15 10 1 0.086 87.8 Pvt. LandKhari T 32 19 1 0.65 199.65 Pvt. LandKhari T 32 22 1 0.76 262 Pvt. LandPainyun P 24 15 1 0.308 186.88 Pvt. LandPainyun P 18 15 1 0.181 115.4 Pvt. LandPainyun P 15 10 1 0.086 87.8 Pvt. LandLapsi P 26 20 1 0.48 207 Pvt. LandLapsi P 24 20 1 0.413 186.88 Pvt. Land

AP-9 AP-10 NIL No trees are foundAP-10 AP-11 Bamboo 4 Pvt. Land

Hadebayar T 36 18 1 0.8 115 Pvt. LandBakaino P 16 10 2 0.22 208.4 Pvt. LandBakaino P 20 9 1 0.16 197.1 Pvt. LandBakaino P 24 9 1 0.23 334.9 Pvt. LandUttis T 36 20 1 0.95 421.5 Pvt. LandUttis P 24 14 1 0.315 164.1 Pvt. LandUttis T 42 20 1 1.28 604.1 Pvt. LandUttis P 26 18 1 0.465 197.7 Pvt. LandPainyun P 12 8 2 0.1 63 Pvt. Land

AP-11 AP-12 Uttis P 12 15 15 1.35 495 Pvt. LandUttis P 15 16 12 1.758 663.6 Pvt. LandUttis P 10 11 1 0.05 21.7 Pvt. LandUttis P 14 14 1 0.113 47.1 Pvt. LandUttis P 13 17 1 0.107 39.7 Pvt. Land

T 9 92 16.426 8454.01P 79S 0Bamboo 4Total

Forest Inventory Data

AP Remarks

Page 5 of 10 Annex IV-1

Page 53: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured SpeciesFrom To Species Category dbh(cm) Height(m)AP-12 AP-13 Uttis T 32 18 1 0.69 320.3 Pvt.Land

Uttis P 28 19 1 0.535 234.8 Pvt.LandUttis P 12 8 6 0.3 198 Pvt.LandUttis P 20 10 1 0.162 107.6 Pvt.LandUttis P 18 7 1 0.08 84.3 Pvt.LandUttis P 19 8 1 0.1 95.5 Pvt.LandUttis P 16 10 2 0.106 128.4 Pvt.LandSiris T 38 15 1 0.73 1141.44 Pvt.LandSiris P 18 12 1 0.158 216.8 Pvt.LandSiris P 24 12 1 0.262 455 Pvt.LandSiris P 13 8 3 0.195 282.9 Pvt.LandSiris P 16 10 1 0.108 159.7 Pvt.LandSiris T 32 18 1 0.64 855 Pvt.LandPaiyun P 14 8 1 0.086 79.2 Pvt.LandBamboo 1 Pvt.Land

AP-13 AP-14 Uttis P 10 8 25 1.25 542.5 Pvt.LandUttis P 18 17 19 3.933 1601.7 Pvt.LandUttis P 13 11 4 0.292 158.8 Pvt.LandUttis P 22 14 10 2.67 1341 Pvt.LandUttis P 20 14 6 1.338 645.6 Pvt.LandUttis P 19 18 6 1.386 573 Pvt.LandUttis P 15 16 6 0.768 331.8 Pvt.LandUttis S 9 10 2 34 Pvt.LandUttis P 20 17 5 1.265 538 Pvt.LandUttis P 27 17 2 0.832 431.6 Pvt.LandUttis P 26 18 6 2.79 1186.2 Pvt.LandUttis P 16 19 5 0.925 321 Pvt.LandUttis T 32 26 7 6.86 4244.9 Pvt.LandUttis P 28 25 1 0.702 234.8 Pvt.LandUttis P 16 15 7 1.022 449.4 Pvt.LandUttis P 12 14 2 0.168 66 Pvt.LandUttis P 20 9 2 0.324 215.2 Pvt.LandUttis P 24 25 8 4.184 1312.8 Pvt.LandUttis P 22 20 1 0.374 134.1 Pvt.LandUttis P 14 15 10 1.13 471 Pvt.LandUttis S 8 12 11 141.9 Pvt.LandPaiyun P 10 6 2 48 Pvt.LandPaiyun T 50 25 1 1.87 516 Pvt.LandPaiyun T 32 20 1 0.7 262 Pvt.LandPaiyun P 22 8 2 0.35 167 Pvt.LandKhari P 27 17 1 0.399 212 Pvt.LandBakaino P 9 8 4 85.6 Pvt.LandBamboo 17 Pvt.Land

AP-14 AP-15 Uttis P 16 7 1 0.08 64.2 Pvt.LandUttis P 29 21 1 0.646 254.8 Pvt.LandUttis T 34 22 1 0.93 368.9 Pvt.LandUttis P 18 18 1 0.231 84.3 Pvt.LandBamboo 3 Pvt.Land

T 13 203 41.571 21397.04P 148S 21Bamboo 21Total

Forest Inventory Data

AP RemarksNo. Volume Biomass

Page 6 of 10 Annex IV-1

Page 54: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured SpeciesFrom To Species Category dbh(cm) Height(m)AP-15 AP-18 NIL No trees are foundAP-18 AP-19 Uttis P 12 18 11 1.177 396 Pvt. Land

Uttis S 6 18 13 85.8 Pvt. LandUttis P 19 21 1 0.312 95.5 Pvt. LandUttis P 23 21 1 0.374 148.7 Pvt. LandBamboo 3 Pvt. Land

AP-19 AP-20 Uttis P 16 14 5 0.73 321 Pvt. LandUttis P 21 15 3 0.669 361.2 Pvt. LandUttis P 15 13 1 0.098 55.3 Pvt. LandUttis P 12 10 4 0.244 132 Pvt. LandUttis P 25 18 3 1.197 721.6 Pvt. LandUttis P 19 13 2 0.266 191 Pvt. LandUttis T 38 22 3 3.45 1434.6 Pvt. LandBakaino T 34 11 1 0.45 737 Pvt. LandLapsi T 31 11 1 0.35 252 Pvt. LandLapsi T 37 22 1 1.04 312 Pvt. LandKhari P 19 15 4 0.181 500 Pvt. LandKhari P 27 15 1 0.315 212 Pvt. LandHadebayar P 16 12 3 0.384 115.5 Pvt. LandHadebayar P 24 14 1 0.272 68 Pvt. LandHadebayar P 18 8 1 0.13 45.2 Pvt. LandMayal P 16 6 1 0.05 71.2 Pvt. LandKutmiro P 15 18 5 0.7 430 Pvt. LandBamboo 4 Pvt. Land

AP-20 AP-21 Paiyun P 18 16 1 0.202 115.4 RoadPaiyun P 16 15 1 0.146 96.7 Road

AP-21 AP-22 Uttis P 14 13 1 0.082 47.1 Pvt. LandUttis P 16 20 3 0.612 192.6 Pvt. LandUttis P 12 15 5 0.42 165 Pvt. Land

T 6 84 13.851 7302.4P 58S 13B 7TOTAL

Forest Inventory Data

AP RemarksNo. BiomassVolume

Page 7 of 10 Annex IV-1

Page 55: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured Species No. Volume BiomassFrom To Species Category dbh(cm) Height(m) (Cu.m.) (Kg.)AP-22 AP-23 NIL No trees are foundAP-23 AP-24 Kaulo T 38 22 1 1.05 322 Pvt. Land

Khari P 11 12 1 0.065 55.2 Pvt. LandKhari T 44 20 1 1.27 433 Pvt. LandKhari P 14 7 1 0.05 79.2 Pvt. LandLapsi P 16 10 1 0.11 96.7 Pvt. LandBohori P 13 6 2 0.1 60.6 Pvt. LandBohori P 18 7 3 0.195 117 Pvt. LandBohori P 20 10 1 0.167 62.4 Pvt. LandUttis S 9 1 17 Pvt. LandUttis S 7 1 9.5 Pvt. LandUttis P 17 16 1 0.165 73.8 Pvt. LandUttis T 36 20 1 0.95 421.5 Pvt. LandUttis S 9 4 68 Pvt. LandUttis T 31 20 1 0.674 297.5 Pvt. LandUttis P 14 16 1 0.128 47.1 Pvt. LandUttis P 24 15 2 0.63 328.2 Pvt. LandUttis P 20 11 1 0.133 107.6 Pvt. LandUttis T 32 25 1 0.9 320.3 Pvt. LandUttis P 24 13 1 0.229 164.1 Pvt. LandUttis P 14 10 1 0.82 47.1 Pvt. LandUttis P 18 20 1 0.255 84.3 Pvt. LandUttis P 22 13 9 1.764 1206.9 Pvt. LandUttis P 16 18 13 2.405 834.6 Pvt. LandUttis S 6 10 66 Pvt. LandPainyu P 14 11 2 0.172 158.4 Pvt. LandPainyu T 36 18 1 0.8 302 Pvt. LandPainyu P 29 18 1 0.504 288 Pvt. LandBakaino P 16 11 1 0.11 104.2 Pvt. LandBakaino P 14 11 2 0.172 143.2 Pvt. LandHadebayar P 20 11 1 0.167 52.3 Pvt. LandHadebayar S 6 1 10.1 Pvt. LandHadebayar S 8 1 14.9 Pvt. LandHadebayar P 12 8 1 0.06 25.9 Pvt. LandHadebayar P 20 12 1 0.194 52.3 Pvt. LandMayal P 16 10 0.11 71.2 Pvt. LandBamboo 4 Pvt. Land

AP-24 AP-25 NIL No trees are foundT 6P 51S 15Bamboo 4Total

Forest Inventory Data

AP Remarks

76 6542.114.349

Page 8 of 10 Annex IV-1

Page 56: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured Species No. Volume BiomassFrom To Species Categorydbh(cm) Height(m) (Cu.m.) (Kg.)A-25 AP-26 Uttis P 20 18 4 1.128 430.4 Pvt Land

Uttis P 26 17 1 0.416 197.7 Pvt LandUttis P 16 15 3 0.438 192.6 Pvt LandPaiyun S 6 3 67.2 Pvt LandPaiyun P 16 14 2 0.292 193.4 Pvt LandPaiyun P 14 7 1 0.065 79.2 Pvt LandBakaino P 18 9 1 0.137 145.6 Pvt Land

AP-26 AP-27 Bakaino P 22 8 2 0.38 519.4 Pvt LandBakaino P 19 8 1 0.137 170 Pvt LandBakaino P 24 6 1 0.075 334.9 Pvt LandBakaino T 31 15 1 0.466 605 Pvt LandPaiyun P 16 6 1 0.065 580.2 Pvt LandPaiyun T 31 8 1 0.353 252 Pvt LandMayal P 18 8 1 0.137 92.3 Pvt LandMayal P 16 6 1 0.065 71.2 Pvt LandKhari T 31 8 1 0.353 252 Pvt LandBamboo 4 Pvt Land

AP-27 AP-28 Uttis S 8 2 25.8 Pvt LandUttis P 18 20 1 0.255 84.3 Pvt LandUttis T 32 22 1 0.83 320.3 Pvt LandUttis P 28 20 1 0.591 234.8 Pvt LandUttis P 16 18 4 0.924 256.8 Pvt LandUttis P 26 20 1 0.513 197.7 Pvt LandUttis P 22 18 1 0.338 134.1 Pvt LandUttis S 6 2 13.2 Pvt LandBains P 16 6 2 0.13 193.4 Pvt LandBamboo 1 Pvt Land

T 4P 29S 7Bamboo 5Total

Forest Inventory Data

AP Remarks

45 8.088 5643.5

Page 9 of 10 Annex IV-1

Page 57: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Description of Measured Species No. Volume BiomassFrom To Species Category dbh(cm) Height(m) (Cu.m.) (Kg.)AP-28 AP-29 Paiyun P 16 5 1 0.065 96.7 Pvt. Land

Paiyun P 11 5 1 0.06 55.2 Pvt. LandPaiyun P 21 7 1 0.167 145 Pvt. LandPaiyun P 25 8 1 0.234 197 Pvt. LandPaiyun P 22 8 1 0.199 155 Pvt. LandPaiyun T 30 12 1 0.411 242 Pvt. LandLapsi T 40 18 1 0.98 393 Pvt. LandBakaino P 20 11 1 0.167 197.1 Pvt. LandBakaino P 19 9 2 0.167 340 Pvt. LandBakaino P 26 10 1 0.271 423 Pvt. LandBakaino T 32 10 1 0.4 647 Pvt. LandBakaino P 16 8 2 0.22 208.4 Pvt. LandBakaino P 26 10 1 0.271 423 Pvt. LandBamboo 3 Pvt. Land

AP-29 AP-30 Bakaino S 8 2 31.4 Pvt. LandBamboo 1 Pvt. Land

T 3P 12S 2Bamboo 4

Forest Inventory Data

AP Remarks

Total 21 3.612 3553.8

Page 10 of 10 Annex IV-1

Page 58: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ANNEXES V-1

Page 59: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Measurement System of Units of Land in Kathmandu Valley 4 DAAM (D) = 1 PAISA (P) 4 PAISA (P) = 1 ANA (A) 16 ANA (A) = 1 ROPANI (R) NOTE : 1 Ropani of Land is Equivalent to 5476 sq. ft. or 509 sq. m.

Page 60: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

VDC: Matatirtha

1 4 (GA) 129 Not Identified 1 Dhan Kumari Rijal 1 2 1 3 0 0 0 3 0 0 0

2 4 (GA) 281 Juju Kaji 1 - 0 1 3 11 1 0 1 15 2 0

3 5 (KA) 77 Not Identified 1 Ganesh Bahadur Shrestha 1 2 0 13 0 2 0 6 2 0

4 5 (KA) 78 Not Identified 1 Babukaji Shrestha 1 2 0 13 0 2 0 4 2 0

5 5 (KA) 85 Not Identified 1 Krishna Bahadur Shrestha 1 2 1 4 0 0 0 10 1 0

6 5 (KA) 102 Not Identified 1 Rajendra Kumar Shah 1 2 1 7 2 0 0 6 0 1

7 5 (KA) 165 Not Identified 1 - 0 1 0 14 0 0 0 10 1 0

8 5 (KA) 455 Not Identified 1 - 0 1 0 0 0 0 1 3 1 0

9 5 (KA) 121 Bishnu Raj 1 - 0 1 0 4 2 0 0 0 1 0

10 5 (KA) 164 Chitra Karki 1 - 0 1 1 0 4 0 0 0 0 2 0

11 5 (KA) 17 guthi 1 Juthe Khatri 1 2 1 10 0 0 0 0 0 1

12 5 (KA) 18 guthi 1 Puskar Bahadur Khatri 1 2 2 15 2 0 0 10 1 0

13 5 (KA) 37 guthi 1 Deva Maya Shresthani 1 2 1 4 11 2 0 1 10 2 0

14 5 (KA) 38 guthi 1 Bekha Lal Maharjan 1 2 3 15 2 0 0 9 3 0

15 5 (KA) 39 guthi 1 Tui Lal Maharjan 1 2 2 8 0 0 0 8 3 0

16 5 (KA) 112 Ram Ji Prasad Upadhyay 1 - 0 1 4 2 1 0 0 7 1 0

17 5 (KA) 122 Subash Kumar Sharma Nepal 1 - 0 1 0 2 0 0 0 1 3 0

18 7 (KHA) 18 Chatur Man 1 - 0 1 0 8 0 0 0 0 1 0

19 7 (KHA) 7 Guthi 1 Shekhar Khadka 1 2 0 8 0 0 0 6 1 0

20 7 (KHA) 15 Hari Bahadur Khanche 1 - 0 1 3 4 0 0 0 0 3 0

21 7 (KHA) 3 Harka Lal Kasai - 0 1 0 5 2 0 0 2 2 0

22 7 (KHA) 4 Harka Lal Kasai - 0 0 0 5 2 0 0 4 2 0

23 7 (KHA) 6 Hira Bhaie Kasahini, Bhim Bd., Ram Bd. 3 - 0 3 1 0 9 0 0 0 6 2 0

24 7 (KHA) 64 HMG/ Land 0 - 0 0 1 3 8 2 0 1 2 2 0

25 7 (KHA) 5 Krishna Bahadur Sherestha 1 - 0 1 0 6 3 0 0 1 1 1

Total 25 11 36 1 4 30 186 21 4 7 120 39 3

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1

Number of Tenant

Total Number AffectedNmae of Tenant

Thankot - Chapagaun - Bhaktapur 132 kV Transmission Line Project

District - Kathmandu

Page 1 of 15 Annex V- 1

Page 61: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

VDC: Satungal 15 1 3 3

26 1 (KA) 25 Bhadra Bahadur Bista 1 Lalcha Maharjan 1 2 0 6 0 0 0 3 1 0

27 1 (KA) 23 Chaita Lal Maharjan 1 - 0 1 3 1 0 0 2 10 0 0

28 1 (KA) 283 Divya Prasad Padhyay Purna Bahadur Putawar 2 0 5 3 2 0 4 3 0

29 1 (KA) 284 Divya Prasad Padhyay Purna Bahadur Putawar 0 1 10 1 0 0 2 0 0

30 1 (KA) 22 Lalcha Maharjan 1 Astaman Maharjan 1 2 1 0 0 0 2 7 2 0

31 1 (KA) 26 Ratna Lal Maharjan 1 Nanda Bahadur Maharjan 1 2 1 10 0 0 0 9 1 0

32 2 (KA) 197 Aasha Lal 1 - 0 1 0 3 1 2 0 3 1 2

33 2 (KA) 59 Bhaktaman Maharjan 1 - 0 1 9 9 1 0 0 6 3 0

34 2 (KA) 149 Bimla Singh K.C. 1 - 0 1 1 0 3 0 0 0 0 0 2

35 2 (KA) 97 Chaita Lal Maharjan 1 Bhaicha Maharjan 1 2 0 11 2 0 1 1 1 0

36 2 (KA) 26 Chandabir Jyapu 1 Man Kumari Maharjan 1 2 1 0 7 3 0 0 1 0 0

37 2 (KA) 198 Chiri Babu 1 - 0 1 0 3 1 2 0 3 1 2

38 2 (KA) 60 Dhan Bahadur Maharjan 1 - 0 1 1 7 3 0 0 4 2 0

39 2 (KA) 81 Dhan Lal Maharjan 1 - 0 1 2 6 1 0 0 10 1 0

40 2 (KA) 83 Dhan Putabar 1 - 0 1 6 7 0 0 1 1 2 0

41 2 (KA) 188 Gyan Bahadur Mahrjan 1 - 0 1 1 0 3 2 0 10 1 0

42 2 (KA) 27 HMG/ N Land 0 - 0 0 1 2 11 3 0 1 1 0 0

43 2 (KA) 110 HMG/ N Land 0 - 0 0 1 1 9 3 0 0 1 0 0

44 2 (KA) 165 Jaya Puran Singh 1 - 0 1 0 4 1 2 0 1 0 0

45 2 (KA) 166 Jiban Kumar Shrestha 1 - 0 1 0 6 2 2 0 0 1 0

46 2 (KA) 98 Jit Bahadur Maharjan 1 - 0 1 1 10 3 0 0 6 3 0

47 2 (KA) 25 Laxmeshwor Guthi 1 Bhai Lal Maharjan 1 2 1 4 1 0 1 14 1 0

48 2 (KA) 57 Laxmeshwor Guthi 1 Kishan Lal Maharjan 1 2 0 14 2 0 0 9 2 0

49 2 (KA) 58 Laxmeshwor Guthi 1 - 0 1

50 2 (KA) 61 Laxmeshwor Guthi 1 Astaman Maharjan 1 2 2 6 3 0 0 6 2 0

51 2 (KA) 62 Laxmeshwor Guthi 1 Bhare Singh Maharjan 1 2 1 9 3 0 0 1 2 0

52 2 (KA) 187 Mandas Maharjan 1 - 0 1 1 1 0 3 2 0 0 2 3

53 2 (KA) 183 Sanu Bahadur Shahi 1 - 0 1 0 13 3 0 0 14 0 1

54 2 (KA) 184 Saraman Samet (four) 4 - 0 4 1 12 0 0 0 1 1 2

55 2 (KA) 96 Tulasi Maharjan Shambhu Maharjan 2 2 10 3 0 1 6 2 0

1 1

1 1 1

Page 2 of 15 Annex V- 1

Page 62: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

56 2 (Ka) 99 Tulasi Maharjan Shambhu Maharjan 0 1 11 3 0 0 13 1 0

57 4 (KA) 48 HMG/Land 0 - 0 0 1 6 0 0 0 0 10 0 0

58 4 (KA) 74 Not Identified 1 Hari Lal Maharjan 1 2 0 1 2 0 0 0 3 2

59 4 (KA) 57 Aber Bahadur Khatri 1 Lok Bahadur Khatri 1 2 2 0 0 0 0 0 2 2

60 4 (KA) 75 Ashamaya Maharjan Ghancha Maharjan 1 2 0 6 0 0 0 6 2 0

61 4 (KA) 67 Asthamaya Maharjan Asthamaya Maharjan 1 1 0 12 0 0 0 6 10 0

62 4 (KA) 66 Beri Maya Maharjan 1 Bhakta Man Maharjan 1 2 1 1 0 0 0 0 8 2 0

63 4 (KA) 76 Bhuicha Maharjan 1 - 0 1 1 10 0 0 0 11 3 0

64 4 (KA) 81 Budhabir Maharjan 1 - 0 1 3 0 0 0 0 8 2 0

65 4 (KA) 51 Ghan singh Maharjan 1 Ghanchar Maharjan 1 2 3 0 0 0 1 2 0 0

66 4 (KA) 62 Guthi 1 Laxmi Devi shrestha 1 2 1 4 0 0 0 1 9 1 0

67 4 (KA) 72 Hari Lal Maharjan 1 - 0 1 0 4 0 0 0 0 2 1

68 4 (KA) 54 Jitbir Maharjan - 0 1 5 9 0 0 1 1 3 0

69 4 (KA) 56 Jitbir Maharjan - 0 0 8 0 0 0 1 15 0 0

70 4 (KA) 52 Krishna Rijal 1 - 0 1 3 12 0 0 1 5 2 0

71 4 (KA) 53 Kulananda Rijal 1 Chiranjivi Rijal 1 2 1 0 0 0 0 1 2 0

72 4 (KA) 68 Lalcha Maharjan 1 Bhicha Maharjan 1 2 2 0 0 0 0 8 0 0

73 4 (KA) 73 Mansing Maharjan 1 - 0 1 1 0 3 0 0 0 1 0 0

Total 44 20 64 3 8 77 264 54 14 14 238 70 17

VDC: Machhegaun 30 0 2 1

74 1 (GA) 6 Not Identified 1 Rishi Prasad Upadhyay 1 2 2 8 3 0 0 11 3 0

75 1 (GA) 9 Not Identified 1 Ram Krishna Shrestha 2 1 1 3 0 0 10 2 0

76 1 (GA) 7 Not Identified 1 Ram Krishna Shrestha 1 2 6 1 0 0 7 2 0

77 1 (GA) 10 Not Identified 1 Dhan Bahadur Shrestha 1 2 4 3 0 0 0 5 0 0

78 1 (GA) 62 HMG/ Land 0 0 0 1 0 12 1 0 0 4 0 0

79 1 (GA) 63 Not Identified 1 Chhetra Bahadur Baniya 1 2 0 8 1 0 0 4 1 0

80 1 (GA) 159 Not Identified 1 - 0 1 0 8 0 0 0 5 3 0

81 1 (GA) 37 Baburam Upadhayay 1 Ishwori Prasad Adhikari 1 2 2 8 2 0 0 1 1 2

82 1 (GA) 64 Cheta Nath Khanal 1 Chirraj Upadhaya Khanal 1 2 0 8 1 0 1 0 1 0

83 1 (GA) 89 Dataram Regmi 1 Raji Lal Manandhar 1 2 0 13 0 0 0 9 3 0

84 1 (GA) 66 Dhan Singh Jyapu 1 Dharma Singh Maharjan 1 2 2 7 1 0 0 12 1 0

1

1

1

1 1 1

1

Page 3 of 15 Annex V- 1

Page 63: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

85 1 (GA) 132 Kokil Man Maharjan 1 - 0 1 0 4 0 0 0 4 1 0

86 1 (GA) 8 Krishna Lal Deshar 1 - 0 1 1 10 0 0 0 13 1 0

87 1 (GA) 38 Krishna Singh Manadhar 1 - 0 1 0 4 3 0 0 4 0 0

88 1 (GA) 158 Kul Devi, Shiva Kumari Sherchan 2 - 0 2 2 1 14 0 0 0 8 2 0

89 1 (GA) 121 HMG/Land 0 - 0 0 1 0 0 1 0 0 5 1 0

90 1 (GA) 65 Mukti Nath Upadhayay - 1 1 10 1 0 0 13 0 0

91 1 (GA) 92 Mukti Nath Upadhayay - 0 1 0 2 0 0 7 3 0

92 1 (GA) 67 Ram Lal Shrestha 1 - 0 1 0 0 2 0

93 1 (GA) 91 Swam Nath Upadhyay 1 - 0 1 5 8 3 0 1 5 0 0

94 6 (KA) 7 Not Identified 1 Tari Babucha 1 2 1 1 10 2 0 0 13 2 0

95 6 (KA) 41 Not Identified 1 Ramcha Maharjan 1 2 0 4 0 0 0 0 1 3

96 6 (KA) 45 Not Identified 1 Bhim Bahadur Mali 1 2 1 2 1 0 0 4 0 0

97 6 (KA) 48 Not Identified 1 Dil Bahadur Maharjan 1 2 1 0 10 1 0 0 8 2 0

98 6 (KA) 49 Not Identified 1 Ram Shrestha 1 2 0 7 0 0 0 0 1 0

99 6 (KA) 551 Not Identified 1 - 0 1 1 0 0 1 0

100 6 (KA) 254 Ambar Bahadur Khadka 1 - 0 1 0 3 0 0 0 3 0 0

101 6 (KA) 46 Bhim Bahadur Mali 1 - 0 1 1 6 1 0 1 3 1 0

102 6 (KA) 246 Ganesh Bahadur Poudel 1 - 0 1 0 8 0 0 0 6 2 0

103 6 (KA) 37 Govinda Hari Sigadel 1 Tulsi Bahadur Shrestha 1 2 3 8 0 0 0 14 0 0

104 6 (KA) 38 Jaganatha Guthi 1 Shiva Lal Maharjan 1 2 0 8 0 0 0 4 2 0

105 6 (KA) 39 Jaganatha Guthi 1 Ram Maharjan 1 2 1 9 1 0 1 1 3 0

106 6 (KA) 40 Jaganatha Guthi 1 - 0 1 0 2 3 0

107 6 (KA) 247 Khadga Bahadur Thapa 1 - 0 1 0 8 0 0 0 0 2 3

108 6 (KA) 644 Krishna Bahadur Bista 1 - 0 1

109 6 (KA) 642 Krishna Bista 1 - 0 1 0 5 1 0 0 2 1 0

110 6 (KA) 50 Krishna Govinda Shrestha 1 - 0 1 1 9 0 0 0 1 1 0

111 6 (KA) 252 Makhu Maya Thapa 1 - 0 1 1 0 4 3 0 0 4 0 0

112 6 (KA) 251 Mithu Malla 1 - 0 1 1 0 4 0 0 0 1 0 0

113 6 (KA) 249 Pita Bahadur Singkhada 1 - 0 1 0 7 0 0 0 1 3 0

114 6 (KA) 253 Sabitri Adhikari 1 - 0 1 1 0 4 0 0 0 4 0 0

115 6 (KA) 43 Shayam Prasad Krishna Maya Ranjitkar 1 2 1 1 6 0 0 0 9 3 0

0

1

1

Page 4 of 15 Annex V- 1

Page 64: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

116 6 (KA) 44 Shayam Prasad Buddhi Lal Ranjitkar 1 1 1 6 0 0 0 14 0 0

117 6 (KA) 643 Shiva Bista 1 - 0 1 1 2 2 2 0 0 12 2 0

118 6 (KA) 250 Sumitra Gyanwali 1 - 0 1 1 0 4 0 0 0 1 1 0

119 6 (GHA) 77 Not Identified 1 - 0 1 1 13 0 0 0 0 2 0

120 6 (GHA ) 51 Not Identified 1 Kanchha Putuwar 1 2 1 8 0 0 0 5 3 0

121 6 (GHA ) 45 Baburam Upadhya 1 - 0 1 2 8 0 0 1 3 3 0

122 6 (GHA) 84 Beti Maya Maharjan 1 - 0 1 1 0 15 2 0 0 9 0 0

123 6 (GA) 49 Bhimukeswor Guthi 1 Khasa Bahadur Putuwar 1 2 6 6 0 0 0 8 2 0

124 6 (GHA ) 50 Chir Raj Upadhyay 1 - 0 1 0 10 1 0 0 8 2 0

125 6 (GHA) 93 Devendra Kumar Shrestha 1 - 0 1 0 6 0 0 0 0 1 0

126 6 (GHA ) 29 Guthi 1 Pamacha Putuwar 1 2 1 8 0 0 0 3 1 0

127 6 (GHA) 85 Hira Kaji Maharjan 1 - 0 1 0 15 2 0 0 0 0 2

128 6 (GHA ) 52 Jagdish Putuwar 1 - 0 1 1 8 0 0 0 1 1 0

129 6 (GHA ) 55 Kanchha Putuwar 1 - 0 1 0 8 0 0 0 0 2 2

130 6 (GHA ) 81 Khecha 1 - 0 1 1 14 0 0

131 6 (KHA) 95 Mang Lal 1 Chandra Bahadur Maharjan 1 2 1 8 1 0 1 1 2 0

132 6 (KHA) 97 Nar Bahadur Bista Kale Bista 1 2 0 4 1 0 0 15 2 0

133 6 (KHA) 98 Nar Bahadur Bista Ramchandra Bista 1 1 1 1 1 0 0 0 0 1 1

134 6 (GHA ) 28 Padmaraj Padhya 1 - 0 1 1 3 0 0 0 5 2 0

135 6 (GHA ) 46 Ram Bahadur Putuwar 1 - 0 1 2 9 0 0 1 4 3 0

136 6 (GHA ) 54 Tirtha Raj Padhya Bhakta Bahadur Basnet 2 0 6 0 0 0 5 3 0

137 6 (GHA ) 27 Tirtha Raj Padhya Bhakta Bahadur Basnet 0 3 2 0 0 1 2 0 0

138 7 (KA ) 190 Haka Naran Maharjan 1 Man Das Maharjan 1 2 2 5 0 0 0 1 1 2

139 7 (KA ) 195 Harka Narayan Maharjan 1 Kul Bahadur 1 2 0 13 5 0 0 0 2 0

140 7 (KA ) 196 Prem Nath Upadhyay 1 Gita Raj Upadhyay 1 2 4 9 0 0 0 4 0 0

141 7 (KA ) 191 Youg Parsad upadhaya Durga Parsad Padhya 1 2 1 4 2 0 0 3 1 0

142 7 (KA ) 192 Youg Parsad upadhaya Yog Nath Upadhyay 1 1 1 3 5 2 0 1 3 0 0

143 7 (KA ) 194 Youg Parsad upadhaya Durga Parsad Shrestha 1 1 2 12 0 0 0 9 0 0

144 8 (KA) 99 Not Identified 1 Nhechha Bahadur Maharjan 1 2 1 0 0 0 0 10 2 0

145 8 (KA) 104 Dambar Kumari Rana Astaman Maharjan 2 2 0 0 0 0 0 3 0

146 8 (KA) 98 Dambar Kumari Rana Astaman Maharjan 0 0 8 0 0 0 6 3 0

1

1

1

1

1

1

Page 5 of 15 Annex V- 1

Page 65: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

147 8 (KA) 96 Dambar Kumari Rana Hakucha Maharjan 1 1 0 13 0 0 0 4 1 0

148 8 (KA) 92 Dambar Kumari Rana Krishna Bahadur Maharjan 1 1 2 5 0 0 1 3 2 0

149 8 (KA) 93 Dambar Kumari Rana Man Singh Maharjan 1 1 1 8 0 0 0 4 0 0

150 8 (KA) 185 Dev Lal Maharjan 1 - 0 1 2 1 5 0 0 0 6 2 0

151 8 (KA) 186 Jhalendra Bikram Rana - 0 1 1 5 0 0 1 5 0 0

152 8 (KA) 189 Jhalendra Bikram Rana - 0 0 1 0 1 2 0 0 0 0 1

153 8 (KA) 158 Jhalendra Bikram Rana - 0 0 0 1 0 0 0 3 2 0

154 8 (KA) 157 Krishna Bahadur Maharjan 1 - 0 1 0 14 2 0 0 5 0 0

155 8 (KA) 89 Nani Maya 1 Nani Maya Maharjan 1 2 2 2 15 0 0 1 0 2 0

156 8 (KA) 97 Sabendra Bikram Rana Gurumcha Maharjan 1 2 0 8 0 0 0 0 1 0

157 8 (KA) 91 Sabendra Bikram Rana Bathi Maharjanni 1 1 1 1 12 0 0 0 2 0 0

158 8 (GHA) 107 Not Identified 1 - 0 1 0 11 0 0 0 8 0 0

159 8 (GHA) 75 Not Identified 1 - 0 1 0 14 0 0 0 0 2 2

160 8 (GHA) 76 Not Identified 1 - 0 1 0 14 0 0 0 10 3 0

161 8 (GHA) 107 Not Identified 1 Hira Kaji Shrestha 1 2 0 11 0 0 0 8 0 0

162 8 (GHA) 46 Maila Kasai Gyan Bahadur Kasai 1 2 0 6 0 0 0 5 2 0

163 8 (GHA) 44 Maila Kasai Narayan Kasai 1 1 0 7 1 0 0 3 0 0

164 8 (GHA) 13 Ram Sundar Shrestha 1 Bhim Bahadur Shrestha 1 2 1 8 0 0 0 15 0 0

165 8 (GHA) 47 Yam Das Shrestha 1 Ganesh Bahadur Shrestha 2 3 0 0 0 0 13 3 0

166 8 (CHA) 15 Not Identified 1 Ganesh Bahadur Shrestha 1 2 9 0 0 0 14 2 0

167 8 (CHA) 52 Not Identified 1 - 0 1 0 9 2 0 0 7 1 0

168 8 (CHA) 51 Not Identified 1 - 0 1 2 5 0 0 1 3 0 0

169 8 (CHA) 53 Not Identified 1 - 0 1 0 9 2 0 0 7 1 0

170 8 (CHA) 75 Not Identified 1 - 0 1 0 14 0 0 0 8 2 0

171 8 (CHA) 16 Not Identified 1 Krishna Bahadur Shrestha 1 2 2 4 0 0 0 0 1 0

172 8 (CHA) 70 Astha Bahadur 1 - 0 1 1 8 0 0 0 13 1 0

173 8 (CHA) 24 Babu Lal Upadhyay 1 Hari Prasad Upadhyay 1 2 4 1 0 0 1 4 2 0

174 8 (CHA) 79 Not Identified 1 - 0 1 0 11 3 1 0 0 2 1

175 8 (CHA) 81 Not Identified 1 - 0 1 0 11 2 2 0 5 2 0

176 8 (CHA) 23 Bishnu Mati guthi 1 Dharma Singh 1 2 1 0 0 0 0 11 0 0

177 8 (CHA) 77 Bishnu Maya 1 - 0 1 1 0 4 0 0 0 0 2 2

1

1

1

1

1

1

Page 6 of 15 Annex V- 1

Page 66: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

178 8 (CHA) 78 Hira Kaji Manandhar 1 - 0 1 0 2 0 3 0 0 1 0

179 8 (CHA) 17 Lalit Bahadur Khatri 1 - 0 1 3 10 0 0 0 2 0 0

180 8 (CHA) 76 Mangal Maya 1 - 0 1 1 0 4 0 0 0 2 0 0

Total 92 47 139 2 23 97 733 65 6 14 509 137 21

VDC: Bahirigaun 48 0 2 1

181 9 (GA) 29 Baburam Upadhyay 1 Ishwori Prasad Adhikari 1 2 3 14 0 0 1 4 0 0

182 9 (GA) 23 Sudama Prasad Acharya 1 - 0 1 2 5 0 0 0 13 1 0

183 9 (GA) 261 Surya Devi 1 - 0 1 1 0 14 2 0 0 10 2 0

184 9 (KHA) 66 Not Identified 1 - 0 1 0 1 1 0

185 9 (KHA) 63 Not Identified 1 Tek Bahadur Thapa 1 2 1 13 0 0 1 9 0 0

186 9 (KHA) 64 Not Identified 1 Krishna Prasad Acharya 1 2 1 3 0 0 0 11 3 0

187 9 (KHA) 65 Not Identified 1 Bishnu Prasad Upadhyay 1 2 1 3 0 0 0 0 0 2

188 9 (KHA) 83 Not Identified 1 Khil Nath Upadhyay 1 2 1 13 2 0 0 0 1 0

189 9 (KHA) 84 Not Identified 1 Durga Prasad Dahal 2 1 2 0 0 0 13 2 0

190 9 (KHA) 85 Not Identified 1 Durga Prasad Dahal 1 1 7 0 0 0 9 1 0

191 9 (KHA) 30 Balram Upadhyay 1 Kali Lal Manandhar 1 2 1 13 1 0

192 9 (KHA) 136 Devi Prasasd Baskota 1 - 0 1 0 4 0 0 0 2 2 0

193 9 (KHA) 36 Dilli Prasad Upadhyay 1 - 0 1 5 14 3 0 1 4 2 0

194 9 (KHA) 31 Mangal Das Maharjan - 0 1 2 0 2 0 1 5 3 0

195 9 (KHA) 37 Mangal Das Maharjan - 0 0 1 7 0 0 0 9 1 0

196 9 (KHA) 32 Min Bahadur Maharjan 1 - 0 1 1 6 2 0 0 9 0 0

197 9 (KHA) 159 Radhe Krishna Thapa 1 - 0 1 1 0 8 2 0 0 6 1 0

198 9 (KHA) 137 Tikar Uprety 1 - 0 1 3 14 0 0 0 11 1 0

Total 17 7 24 0 2 24 140 14 0 4 116 21 2

VDC: Balkumari 11 9 1 2

199 3 (KA) 91 Not Identified 1 Nil Bahadur Basnet 1 2 1 15 0 0 1 0 0 0

200 3 (KA) 108 Not Identified 1 Thimicha Maharjan 2 1 12 0 0 1 2 0 0

201 3 (KA) 109 Not Identified 1 Thimicha Maharjan 1 0 8 0 0 0 4 3 0

202 3 (KA) 112 Not Identified 1 Thimicha Maharjan 1 1 11 0 0 0 0 3 0

203 3 (KA) 117 Not Identified 1 Prem Maharjan 1 2 0 11 0 0 0 5 2 0

204 3 (KA) 129 Not Identified 1 Khadaga Kumari Thapa Magar 1 2 1 1 2 0 0 0 8 0 0

1

1

1

Page 7 of 15 Annex V- 1

Page 67: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

205 3 (KA) 130 Not Identified 1 - 0 1 0 0 2 0

206 3 (KA) 9 Babu Lal Maharjan 1 Dhan Das Maharjan 1 2 0 1 0 0 0 0 1 2

207 3 (KA) 204 Bani Maharjan 1 - 0 1 1 2 6 0 0 0 9 2 0

208 3 (KA) 138 Not Identified 1 Nati Maharjan 1 2 2 13 0 0 0 2 1 0

209 3 (KA) 14 Bhim Bahadur Krishna Bahadur Adhikari 1 2 1 15 2 0 0 14 2 0

210 3 (KA) 19 Bhim Bahadur Bhairab Bahadur Adhikari 1 1 1 1 2 0 0 13 0 0

211 3 (KA) 20 Bhim Bahadur Krishna Bahadur Adhikari (14) 0 0 1 7 2 0 0 3 0 0

212 3 (KA) 90 Bhoj Raj Basnet 1 - 0 1 4 3 0 0 1 1 0 0

213 3 (KA) 12 Bir Bahadur Maharjan 1 - 0 1 0 9 0 0 0 7 2 0

214 3 (KA) 38 Bishnu Lal Shrestha 1 Chandra Devi Shresthani 1 2 1 0 13 2 0 0 0 2 0

215 3 (KA) 170 Chanaku Maharjan 1 - 0 1 1 0 8 0 0

216 3 (KA) 89 Chhatra Bahadur Basnet 1 - 0 1 2 11 2 0 0 8 0 0

217 3 (KA) 106 Dhan Krishna Maharjan Beri Maharjan 1 2 1 0 9 2 0 0 4 3 0

218 3 (KA) 107 Dhan Krishna Maharjan Dashcha Maharjan 1 1 0 9 2 0 0 8 2 0

219 3 (KA) 113 Dhan Krishna Maharjan Dhan Nani 1 1 1 0 12 2 0 0 0 3 0

220 3 (KA) 114 Dhan Krishna Maharjan Bhaicha Maharjan 1 1 0 11 0 0 0 1 3 0

221 3 (KA) 201 Ganesh Bahadur Basnet - 0 1 2 10 2 1 0 1 1 0

222 3 (KA) 42 Ganesh Bahadur Basnet Nil Bahadur Basnet 1 1 1 2 2 2 0 0 5 1 0

223 3 (KA) 178 Ganesh Bahadur Basnet - 0 0 2 0 0 0 0 13 0 0

224 3 (KA) 125 Jaganath Maharjan 1 Shri Kumari Maharjan 1 2 1 1 0 0 0 0 11 1 0

225 3 (KA) 115 Kislal Maharjan 1 Krishna Lal Maharjan 1 2 0 13 2 0 0 7 0 0

226 3 (KA) 148 Lal Maharjan 1 - 0 1 0 7 0 0 0 3 2 0

227 3 (KA) 177 Laxmi Maharjan 1 - 0 1 1 1 8 0 0 0 0 2 0

228 3 (KA) 205 Manik Lal Maharjan 1 - 0 1 2 5 0 0 1 0 1 0

229 3 (KA) 169 Nan Maya Maharjan 1 - 0 1 1 1 3 2 0 0 2 2 0

230 3 (KA) 147 Nati Maharjan Lal Maharjan 0 1 0 7 0 0 0 4 0 0

231 3 (KA) 211 Nati Maharjan - 0 0 0 13 0 0 0 7 1 0

232 3 (KA) 88 Prem Bahadur Basent 1 - 0 1 0 12 0 0 0 3 3 0

233 3 (KA) 120 Punbir Maharjan Krishna Bir Maharjan 1 2 1 0 0 0 0 2 2 0

234 3 (KA) 121 Punbir Maharjan Bhim Chaku Maharjan 1 1 1 0 0 0 0 6 3 0

235 3 (KA) 123 Punbir Maharjan, Purna Maya Maharjan 2 - 0 2 1 1 0 0 0 0 4 3 0

1

1

1

1

1

Page 8 of 15 Annex V- 1

Page 68: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

236 3 (KA) 122 Punbir Maharjan, Shree Kumari Maharjan 2 - 0 2 1 1 0 0 0 0 5 3 0

237 3 (KA) 149 Ram Maharjan 1 - 0 1 0 7 0 0 0 3 2 0

238 3 (KA) 210 Simpa Lal Maharjan 1 - 0 1 0 6 0 0 0 3 1 0

239 3 (KA) 110 Surja Maya Maharjan Govind Das Maharjan 2 0 12 0 0 0 0 2 0

240 3 (KA) 111 Surja Maya Maharjan Govind Das Maharjan 0 2 9 0 0 0 2 3 0

241 4 169 Not Identified 1 Bekha Lal Maharjan 1 2 1 5 2 0 0 4 0 0

242 4 170 Not Identified 1 Narsing Maharjan 1 2 2 15 2 0 1 11 0 0

243 4 171 Not Identified 1 Tulsi Lal Maharjan 1 2 2 6 0 0 0 1 3 0

244 4 175 Not Identified 1 Bekha Lal Maharjan 0 1 1 1 2 0 0 14 1 0

245 4 214 Not Identified 1 Chir Babu Maharjan 1 2 1 11 2 0 0 2 3 0

246 4 215 Not Identified 1 Puna Maya 1 2 1 1 14 2 0 0 9 3 0

247 4 216 Not Identified 1 Puna Maya Maharjanni 1 2 1 1 11 1 0 0 10 2 0

248 4 217 Not Identified 1 Chir Babu Maharjan 1 2 1 1 11 0 0 11 2 0

249 4 218 Not Identified 1 Bhai Maharjan 1 2 4 8 1 0 1 3 2 0

250 4 225 HMG/ Land 0 - 0 0 1 2 2 3 0 0 2 1 0

251 4 296 Not Identified 1 - 0 1 0 3 0 0 0 4 0 0

252 4 268 Not Identified 1 - 0 1

253 4 297 Astha Maya 1 - 0 1 1 1 6 1 2 0 0 1 1

254 4 537 Babu Raja Maharjan - 0 1 0 2 3 0 0 2 3 0

255 4 538 Babu Raja Maharjan - 0 0 0 0 0 0 0 0 2 0

256 4 224 Hari Govinda Maharjan 1 Swoyacha Maharjan 1 2 1 10 0 0 0 0 3 0

257 4 438 Laxmi Kumari Shrestha 1 - 0 1 1 0 3 1 0 0 2 3 0

258 4 435 Laxmi Maharjan - 0 1 0 6 1 0 0 0 3 0

259 4 436 Laxmi Maharjan - 0 0 0 6 1 0 0 4 0 0

260 4 174 Mangal Das Maharjan 1 Mangal Das 1 2 1 4 2 0 0 0 0 2

261 4 536 Manju Singh Mahrajan 1 - 0 1 1 0 5 0 0 0 1 1 0

262 4 533 Mohi Manta Lal 1 - 0 1 1 15 0 0 1 7 1 0

263 4 437 Prabha Sigdel (Parajuli) 1 - 0 1 1 0 4 1 0 0 4 1 0

264 4 221 Pun singh Jyapu, Mandas Maharjan - 0 2

265 4 220 Pun singh Jyapu, Mindas Maharjan Dhan Das Maharjan 1 1 1 2 0 0 0 0 1 0

1

1

2

1

1

1

1

Page 9 of 15 Annex V- 1

Page 69: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

266 6 (KA) 57 HMG/ Land 0 - 0 0 1 0 9 0 0 0 2 2 0

267 6 (KA) 283 Babu Kaji Maharjan 1 - 0 1 0 9 2 0 0 3 1 0

268 6 (KA) 64 Bhaicha Maharjan 1 - 1 2 1 13 2 0 0 0 1 2

269 6 (KA) 49 Bhojraj Basnet 1 - 0 1 4 1 0 0 0 14 0 0

270 6 (KA) 61 Dhan Das Maharjan 1 - 0 1 0 14 0 0 0 5 2 0

271 6 (KA) 51 Hari Das Maharjan 1 Shil Maya Maharjan 1 2 1 1 4 0 0 0 4 1 0

272 6 (KA) 60 Hira Maya Maharjan 1 Bulal Maharjan 1 2 1 0 6 1 0 0 3 1 0

273 6 (KA) 284 Jit Bahadur Khadka 1 - 1 2 0 9 2 0 0 2 3 0

274 6 (KA) 44 Krishna Bahadur Napit 1 Krishna Bahadur 1 2 2 6 0 0 1 0 2 0

275 6 (KA) 53 Lal Singh Karki 1 Maina Karkini 1 2 1 2 4 0 0 0 1 0 0

276 6 (KA) 54 Lal Singh Karki 1 Lachhuman Karki 1 2 1 15 0 0 0 15 0 0

277 6 (KA) 56 Padam Bahadur Adhikari 1 Shyam Bdr. Adhikari 0 1 0 0 0 3 0 2 1 0

278 6 (KA) 59 Prem Bahadur Raymajhi 1 Nahakul Raymajhi 1 2 3 5 2 0 1 7 0 0

279 6 (KA) 63 Purna Bahadur Maharjan 1 Purna Bhai Maharjan 1 2 2 5 0 0 0 3 2 0

280 6 (KA) 43 Purna Man Shrestha 1 - 1 2 1 8 2 0 0 5 1 0

281 6 (KA) 272 Raju Maharjan 1 - 0 1 1 0 0 0 0 7 0 0

282 6 (KA) 282 Ram Maharjan 1 - 0 1 0 15 1 0 0 9 1 0

283 6 (KA) 281 Sambhu Man Amtaya 1 - 0 1 0 15 0 0 0 5 0 0

284 8 261 Not Identified 1 Chandra Bahadur Basnet 1 2 2 7 0 0 0 4 3 0

285 9 (KA) 79 Babu Lal Jyapu 1 - 0 1 3 0 0 0 0 13 2 0

286 9 (KA) 78 Chiri Mai Maharjan 1 Bekha Lal Maharjan 1 2 1 1 3 2 0 0 7 0 0

287 9 (KA) 77 Lal Bahadur Maharjan 1 Maila Maharjan 1 2 0 10 0 0 0 1 0 0

288 9 (KA) 75 Nar Bahadur Maharjan 1 Kaji Lal Maharjan 1 2 2 1 1 0 1 9 1 0

Total 78 44 122 2 24 81 592 75 6 10 390 124 7

VDC: Chovar 36 5 1 3

289 5 (KA) 20 Not Identified 1 Jog Lal Maharjan 1 2 1 9 2 0 0 13 1 0

290 5 (KA) 23 Not Identified 1 Hari Shankar Maharjan 2 2 4 0 0 0 1 1 0

291 5 (KA) 24 Not Identified 1 Hari Shankar Maharjan 1 1 4 0 0 0 5 2 0

292 5 (KA) 25 Not Identified 1 Hari Shankar Maharjan 1 0 11 1 0 0 8 1 0

293 5 (KA) 26 Not Identified 1 Hari Krishna Maharjan 1 0 13 0 0 0 8 0 0

294 5 (KA) 56 Not Identified 1 Nar Bahadur Maharjan 1 2 0 3 0 0 0 3 0 0

1

Page 10 of 15 Annex V- 1

Page 70: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

295 5 (KA) 88 Not Identified 1 Mangal Das Maharjan 1 2 2 5 2 0 0 4 3 0

296 5 (KA) 89 Not Identified 1 Chhayakcha Maharjan 1 2 3 2 0 0 0 2 3 0

297 5 (KA) 92 Not Identified 1 Bishnu Maya Maharjan 1 2 1 0 0 2 0 0 0 0 2

298 5 (KA) 102 Not Identified 1 Man Bahadur Khadka 2 1 5 0 0 0 0 3 0

299 5 (KA) 105 Not Identified 1 Man Bahadur Khadka 1 1 4 0 0 0 3 2 0

300 5 (KA) 106 Not Identified 1 Singh Bahadur Khadka 1 2 0 1 0 0 0 2 0 0

301 5 (KA) 107 Not Identified 1 Kanchha Khadka 1 2 0 14 0 0 0 2 2 0

302 5 (KA) 161 Not Identified 1 Tulsi Maya Maharjan 1 2 1 1 12 0 0 1 0 3 0

303 5 (KA) 214 Balram 1 - 0 1 0 15 2 0 0 7 0 0

304 5 (KA) 33 Bekha singh Maharjan 1 Bekha Lal Maharjan 1 2 2 11 0 0 0 1 2 0

305 5 (KA) 70 Chhalak Bahadur Mahat 1 Balram Mahat 1 2 0 11 0 0 0 0 2 0

306 5 (KA) 58 Dhan Das Jyapu 1 Gyan Bahadur Maharjan 1 2 2 1 0 0 0 1 3 0

307 5 (KA) 112 Gyan Bahadur Maharjan - 0 1 0 4 2 0 0 4 2 0

308 5 (KA) 114 Gyan Bahadur Maharjan - 0 0 0 6 1 0 0 5 0 2

309 5 (KA) 52 Hakucha Maharjan - 0 1 2 0 0 0 0 4 0 0

310 5 (KA) 63 Hakucha Maharjan - 0 0 0 10 0 0 0 1 0 0

311 5 (KA) 57 Jagat Bahadur Jyapu 1 Bekha Lal Maharjan (33) 0 1 0 13 2 0 0 0 2 0

312 5 (KA) 113 Krishan Bahadur Maharjan 1 Chiri Babu Maharjan 1 2 0 5 2 0 0 1 3 0

313 5 (KA) 53 Krishna Bahadur Mahat Gyan Kumari Mahat 1 2 1 0 3 2 0 0 1 2 0

314 5 (KA) 215 Krishna Bahadur Mahat - 0 0 0 9 1 2 0 6 2 0

315 5 (KA) 166 Krishna Bhagat Maharjan 1 - 0 1 1 12 0 0 1 0 3 0

316 5 (KA) 111 Mahanta Maharjan 1 - 0 1 1 0 2 0 0 1 2 0

317 5 (KA) 168 Nanda Bahadur Khatri 1 - 0 1 2 6 3 0 0 7 3 0

318 5 (KA) 226 Nanda Maharjan 1 - 0 1 1 0 13 3 0 0 3 0 0

319 5 (KA) 223 Nati Bhai Maharjan 1 - 0 1 0 7 2 0 0 5 3 0

320 5 (KA) 64 Prem Bahadur Mahat Dirgha Kumari Mahat 2 2 1 2 0 0 14 3 0

321 5 (KA) 69 Prem Bahadur Mahat Dirgha Kumari Mahat 0 0 13 0 0 0 3 1 0

322 5 (KA) 84 Prem Bahadur Mahat Dirgha Kumari Mahat 0 1 4 0 0 0 0 0 2

323 5 (KA) 222 Ram Kumar Maharjan 1 - 0 1 0 7 2 0 0 1 1 0

324 5 (KA) 221 Samu Maiya Mahat 1 - 0 1 1 1 7 1 0 0 5 1 0

325 5 (KA) 55 Shiva Narayan Maharjan 1 Nanda Lal Maharjan 1 2 0 5 0 0 0 4 2 2

1

1

1

1 1

1

1

1

Page 11 of 15 Annex V- 1

Page 71: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

326 5 (KA) 220 Sita Silwal 1 - 0 1 1 0 0 2 0 0 0 1 0

327 5 (KA) 216 Tilak Bahadur 1 - 0 1 0 9 1 2 0 8 3 0

328 5 (KA) 65 Tilak Bahadur Mahat Gyan Kumari Mahat 1 2 1 0 12 0 0 0 4 2 0

329 5 (KA) 66 Tilak Bahadur Mahat - 0 0 0 14 0 0 0 3 1 0

330 5 (KA) 54 Tilak Bahadur Mahat - 0 0 0 2 2 0 0 2 2 0

331 5 (KA) 165 Tulsi Maya Maharjan 1 - 0 1 1 1 12 0 0 1 0 3 0

332 5 (KA) 108 Udba Bahadur Khadka 1 Man Bahadur Khadka 1 2 2 12 0 0 1 0 2 0

333 5 (KHA) 415 Ben Bahadur Maharjan - 0 1 0 8 2 0 0 2 3 0

334 5 (KHA) 418 Ben Bahadur Maharjan - 0 0 0 3 0 0 0 0 0 1

335 5 (KHA) 416 Daya Ram Maharjan - 0 1 0 9 0 0 0 5 2 0

336 5 (KHA) 417 Daya Ram Maharjan - 0 0 0 3 0 0 0 2 0 3

337 5 (KHA) 428 Gyan Bahadur 1 - 0 1 0 7 2 0 0 3 2 0

338 5 (KHA) 156 Jagat Man Maharjan 1 Mahila Maharjan 1 2 1 11 2 0 0 8 1 0

339 5 (KHA) 158 Jagat Man Maharjan, Krishnu Maya Maharjan 2 - 0 2 1 0 10 0 0 0 3 3 0

340 5 (KHA) 135 Kaji Man Maharjan - 0 1 0 3 1 0 0 3 1 0

341 5 (KHA) 136 Kaji Man Maharjan - 0 0 0 9 2 0 0 8 1 0

342 5 (KHA) 137 Kaji Man Maharjan - 0 0 0 9 0 0 0 1 2 0

343 5 (KHA) 146 Kaji Man Maharjan - 0 0 0 11 0 0 0 8 2 0

344 5 (KHA) 148 Kaji Man Maharjan Haracha Maharjan 1 1 0 11 1 0 0 5 0 0

345 5 (KHA) 142 Krishna Datta Maharjan - 0 1 0 10 0 0 0 1 0 0

346 5 (KHA) 143 Krishna Datta Maharjan - 0 0 0 11 1 0 0 8 2 0

347 5 (KHA) 153 Kumacha Maharjan 1 - 0 1 0 13 1 0 0 4 0 0

348 5 (KHA) 414 Nati Bhai Maharjan 1 - 0 1 0 8 2 0 0 0 0 2

349 5 (KHA) 427 Nhunche Bahadur 1 - 0 1 0 7 2 0 0 6 1 0

350 5 (KHA) 147 Seti Bahadur Jyapu 1 - 0 1 0 11 0 0 0 0 3 0

351 5 (KHA) 155 Sri Lal Jyapu 1 Manbir Maharjan 1 2 1 8 0 0 0 6 1 0

352 5 (KHA) 154 Tulsi Maharjan - 0 1 0 14 0 0 0 4 3 0

353 5 (KHA) 159 Tulsi Maharjan - 0 0 0 11 0 0 0 1 0 0

354 5 (GA) 17 Not Identified 1 Khadga Bahadur 1 2 0 14 0 0 0 9 0 0

355 5 (GA) 47 Not Identified 1 Si Lal Maharjan 1 2 2 9 2 0 0 13 2 0

356 5 (GA) 106 Not Identified 1 Nil Dhan Guman 1 2 0 14 2 0 0 11 3 0

1

1

1

1

1

1

Page 12 of 15 Annex V- 1

Page 72: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

357 5 (GA) 107 Not Identified 1 Chetaman Tuladhar 1 2 1 2 2 0 0 4 2 0

358 5 (GA) 108 Not Identified 1 Napcha 1 2 1 6 0 0 0 3 3 0

359 5 (GA) 115 Not Identified 1 Si Lal Maharjan 1 2 0 4 2 0 0 2 2 0

360 5 (GA) 254 Bekha Lal Maharjan 1 - 0 1 0 9 0 3 0 0 2 0

361 5 (GA) 39 Chakra Dhan Shakya Ram Shakya 2

362 5 (GA) 103 Chakra Dhan Shakya Ram Shakya 0 0 3 0 0 0 0 3 0

363 5 (GA) 42 Chiri Mai Maharjan 1 Tari Babu Jyapu 1 2 1 0 8 0 0 0 1 0 0

364 5 (GA) 45 Dev Narayan Jyapu Mohan Man Maharjan 1 2 0 7 2 0 0 7 2 0

365 5 (GA) 18 Harsa Narayan Jyapu Nkhara Jyapu 1 1 0 4 0 0 0 0 0 1

366 5 (GA) 19 Harsa Narayan Jyapu - 0 0 0 4 0 0 0 1 0 0

367 5 (GA) 46 Jitbir Jyapu 1 Sher Bahadur Maharjan 1 2 0 3 0 0 0 3 0 0

368 5 (GA) 15 Jugi Naha Jyapu 1 Gopi Chandra Maharjan 1 2 3 12 2 0 1 5 1 0

369 5 (GA) 36 Kish Lal Maharjan - 0 1 1 8 2 0 0 3 0 0

370 5 (GA) 37 Kish Lal Maharjan Jit Lal Maharjan 1 1 1 8 2 0 0 2 1 0

371 5 (GA) 8 Kul Bahadur Maharjan Krishna Bahadur Maharjan 2 3 3 2 0 0 13 3 0

372 5 (GA) 40 Kul Bahadur Maharjan Krishna Bahadur Maharjan 0 1 11 2 0 0 1 1 0

373 5 (GA) 41 Laicha Maharjan - 0 1 2 6 2 0 0 2 1 0

374 5 (GA) 44 Laicha Maharjan - 0 0 3 5 0 0 0 6 0 0

375 5 (GA) 253 Nahuchhe Lal 1 - 0 1 1 0 0 0 0 3 3 0

376 5 (GA) 16 Nahuchhe Man Maharjan Babu Lal Maharjan 1 2 1 2 2 0 0 7 1 0

377 5 (GA) 32 Nahuchhe Man Maharjan Nhuchhe Lal Maharjan 1 1 4 7 0 0 0 11 0 0

378 5 (GA) 38 Ramcha Shakya 1 Chet Bahadur Maharjan 1 2 1 9 0 0 0 1 3 0

379 5 (GA) 50 Ratna Devi Maharjan 1 Mahesh Man Maharjan 1 2 1 2 0 0 0 0 0 3 0

380 5 (GHA) 106 Not Identified 1 Nildhan 1 2 0 4 0 0 0 1 3 0

381 5 (GHA) 107 Not Identified 1 Punabir Maharjan 1 2 2 1 0 0 1 1 2 0

382 5 (GHA) 151 Not Identified 1 - 0 1 1 2 1 0

383 5 (GHA) 152 Not Identified 1 - 0 1 0 1 1 0

384 5 (GHA) 154 Not Identified 1 - 0 1 0 8 3 0

385 5 (GHA) 105 Chakra Dhan Shakya Moti Shakya 1 2 0 12 0 0 0 5 2 0

386 5 (GHA) 108 Chakra Dhan Shakya Ram Shakya (39,103) 0 0 0 11 0 0 0 10 0 2

387 5 (GHA) 109 Gopi Lal Tuladhar Kanchha Tuladhar 2 1 13 0 0 0 6 1 0

1

1

1

1

1

1

1

1

1

1

1

Page 13 of 15 Annex V- 1

Page 73: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

388 5 (GHA) 110 Gopi Lal Tuladhar Kanchha Tuladhar 0 1 12 0 0 0 15 0 0

389 5 (GHA) 111 Gopi Lal Tuladhar Chetman Tuladhar 1 1 1 5 0 0 0 7 3 0

390 5 (GHA) 157 Indra Bahadur 1 - 0 1 0 12 0 0 0 1 2 0

391 9 (KHA) 125 Not Identified 1 Mukti Maya Maharjan 1 2 1 0 8 0 0 0 4 0 0

392 9 (KHA) 161 Not Identified 1 Ram Chandra Thapa 1 2 2 8 0 0 0 13 0 0

393 9 (KHA) 121 Bil Bahadur Maharjan Tarmecha Maharjan 1 2 1 3 12 0 0 0 4 3 0

394 9 (KHA) 122 Bil Bahadur Maharjan Tulal Maharjan 1 1 1 8 0 0 0 15 0 2

395 9 (KHA) 123 Bil Bahadur Maharjan Siddhi Lal Maharjan 1 1 1 0 0 0 0 10 3 0

396 9 (KHA) 130 Gopi Lal Maharjan 1 - 0 1 0 11 0 0 0 5 0 0

397 9 (KHA) 183 Hem Man Singh 1 - 0 1 0 12 3 0 0 7 0 0

398 9 (KHA) 124 Jgan Nath Maharjan 1 Shir Kumari Maharjan 1 2 1 1 8 0 0 0 5 2 0

399 9 (KHA) 184 Krishna Hari 1 - 0 1 0 12 3 0 0 10 3 0

400 9 (KHA) 149 Math Kumari Jyapuni 1 Babu Kaji Maharjan 1 2 1 5 8 0 0 1 4 0 0

401 9 (KHA) 131 Moti Lal Maharjan 1 - 0 1 0 8 0 0 0 0 0 1

402 9 (KHA) 129 Sher Bahadur Maharjan 1 - 0 1 1 0 0 0 0 5 0 0

403 9 (GA) 43 Not Identified 1 Babu Lal Maharjan 1 2 3 0 0 0 0 9 3 0

404 9 (GA) 64 Not Identified 1 Ganga Raimajhi 1 2 1 1 8 0 0 0 7 2 0

405 9 (GA) 65 Not Identified 1 Padma Bahadur Bista 1 2 1 4 0 0 0 4 0 0

406 9 (GA) 66 Not Identified 1 Bishnu Maya Thapa 1 2 1 1 2 0 0 0 7 1 0

407 9 (GA) 67 Not Identified 1 Hari Bahadur Thapa 1 2 3 4 0 0 1 1 1 0

408 9 (GA) 72 Komal Sowakoti 1 Kaleshi Basnet 1 2 2 3 2 0 0 0 2 0 0

409 9 (GA) 44 Lal Bahadur Maharjan 1 - 0 1 3 0 0 0 0 14 2 0

410 9 (GA) 74 SanMan Shing Basnet 1 Chhetra Kumari Basnet 1 2 1 1 0 4 0 0 6 2 0

411 9 (GA) 73 Tikaman Singh Basnet 1 - 0 1 3 0 0 0 0 5 1 0

412 9 (GHA) 202 Not Identified 1 Murali Basnet 1 2 0 9 2 0 0 11 2 0

413 9 (GHA) 59 Parti 0 - 0 0 1 0 0 0 0 0 1 1 0

414 9 (GHA) 234 Not Identified 1 - 0 1 0 8 1 0

415 9 (GHA) 65 Babu Krishna Budhathoki 1 Takal Bahadur Budhathoki 1 2 1 8 0 0 0 12 3 0

416 9 (GHA) 191 Babu Lal Maharjan 1 - 0 1 1 12 0 0 0 9 1 0

417 9 (GHA) 63 Bakhat Man Singh Basnet 1 - 0 1 1 2 0 0 0 9 2 0

418 9 (GHA) 203 Basudev Maharjan 1 - 0 1 0 11 2 0 0 9 0 0

1

1

1

Page 14 of 15 Annex V- 1

Page 74: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

S. No.

Ward No.

Plot No.

Number of OwnerName of Owner GVT

Land

Total Number Affected (Women)

Official Land Area Affected Land AreaNumber of

TenantTotal Number

AffectedNmae of Tenant

419 9 (GHA) 195 Bhaicha Maharjan 1 Lan Maya Maharjan 1 2 1 1 9 0 0 0 6 1 0

420 9 (GHA) 179 Bhaicha Singh Maharjan 1 Siddhi Bhakta Maharjan 1 2 1 3 2 0 0 2 3 0

421 9 (GHA) 188 Bir Bahadur Maharjan 1 Bika Bahadur Maharjan 1 2 0 15 1 0 0 9 2 0

422 9 (GHA) 197 Dundu Man Singh Basnet 1 Mohan Man Singh Basnet 1 2 0 15 0 0 0 3 2 0

423 9 (GHA) 297 Ganga Ram Basnet 1 - 0 1 1 9 2 0 0 15 1 0

424 9 (GHA) 206 Gujuman Maharjan 1 Mohan Maya Maharjan 1 2 1 1 13 3 0 1 4 0 0

425 9 (GHA) 207 Gunjaman Maharjan 1 Bartaman Maharjan 1 2 1 11 3 0 0 0 3 0

426 9 (GHA) 218 Hakucha 1 Ganesh Maya 1 2 1 1 12 0 0 0 1 0 0

427 9 (GHA) 192 Haricha 1 Thaila Maharjan 1 2 1 1 4 2 0 0 9 0 0

428 9 (GHA) 62 Iman Singh Basnet Bakhat Man Singh Basnet 2 1 4 0 0 0 6 2 0

429 9 (GHA) 64 Iman Singh Basnet Bakhat Man Singh Basnet 0 1 2 0 0 0 7 2 0

430 9 (GHA) 61 Mohanman Singh Basnet 1 - 0 1 2 1 0 0 0 13 3 0

431 9 (GHA) 291 Nawa Raj Basnet 1 - 0 1 0 0 0 0 0 11 1 0

432 9 (GHA) 196 Purn Man 1 Hari Bhagat Maharjan 0 1 0 15 0 0 1 14 0 0

433 9 (GHA) 213 Purna Man Maharjan 1 Hari Govinda Maharjan 1 2 2 0 3 0 0 1 3 0

434 9 (GHA) 74 Ram Chandra 1 Ram Chandra Basnet 1 2 2 12 0 0 1 6 2 0

435 9 (GHA) 198 Ram Govinda Maharjan 1 - 0 1 1 0 11 0 0 0 1 1 0

436 9 (GHA) 193 Ram Maharjan 1 - 0 1 2 6 2 0 0 9 1 0

437 9 (GHA) 296 Ram Sharan Basnet 1 - 0 1 1 9 2 0 0 12 1 0

438 9 (GHA) 194 Shiva Das Maharjan 1 Lal Singh Maharjan 1 2 0 13 0 0 0 0 2 0

439 9 (NGA) 178 Gangga Ram Basnet 1 - 0 1 0 6 2 0 0 0 0 1

440 9 (NGA) 94 Kalidas Maharjan 1 - 0 1 1 14 0 0 0 3 2 0

441 9 (NGA) 99 Kashi Lal Maharjan 1 - 0 1 4 9 2 0 1 0 0 0

442 9 (NGA) 179 Kumar Basnet 1 - 0 1 0 6 2 0 0 3 3 0

443 9 (NGA) 95 Nar Bdr. Budhathoki 1 - 0 1 3 3 0 0 1 1 0 0

Total 127 73 200 1 28 125 1085 119 7 14 717 221 21

62 5 2 1

Total 383 202 585 9 89 434 3000 348 37 63 2090 612 71

1 1

Page 15 of 15 Annex V- 1

Page 75: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

VDC : Khokana

1 3 (GHA) 5 Bhir Bdr. Maharjan 1 - 0 1 0 7 2 0 0 5 2 0

2 3 (GHA) 6 Bhuwan Singh Khatri 1 - 0 1 2 2 0 0 0 11 0 0

3 3 (GHA) 11 Dil Bdr. Thapa 1 Pashupati Bhakta Khatri 1 2 1 9 0 0 0 3 1 0

4 3 (GHA) 10 Hari Bhakta Khatri 1 - 0 1 2 8 0 0 0 14 1 0

5 3 (GHA) 4 Jit Singh Jyapu 1 Sher Bdr. Khatri 1 2 0 4 1 0 0 3 3 0

6 3 (GHA) 12 Rudra Bhakta Khatri - 0 1 0 14 2 0 0 8 3 0

7 3 (GHA) 13 Rudra Bhakta Khatri - 0 0 0 15 2 0 0 1 0 0

8 3 (GHA) 3 Surya Man Maharjan 1 - 0 1 0 8 2 0 0 1 0 2

9 4 (GHA) 185 Ashamaru Jyapu 1 - 0 1 1 5 3 0 0 0 2 0

10 4 (GHA) 140 Badi Wali Bibini 1 Shree Krishna Jyapu 1 2 1 2 14 2 0 1 0 2 0

11 4 (GHA) 79 Bekha Lal Jyapu - 0 1 1 4 0 0 0 8 1 0

12 4 (GHA) 179 Bekha Lal Jyapu - 0 0 0 0 2 0 0 0 2 0

13 4 (GHA) 101 Bekha Lal Nhona Maharjan 1 - 0 1 1 3 0 0 0 10 0 0

14 4 (GHA) 144 Bhakha Lal Jyapu 1 - 0 1 1 4 0 0 0 5 2 0

15 4 (GHA) 135 Bhim Mukteshwor Guthi 1 Nyacha Jyapu 1 2 0 9 2 0 0 13 0 0

16 4 (GHA) 174 Bhim Mukteshwor Guthi 1 Bekha Lal Jyapu 1 2 0 1 0 0 0 0 2 1

17 4 (GHA) 175 Bhim Mukteshwor Guthi 1 Jit Lal Jyapu 1 2 1 1 2 0 0 9 3 0

18 4 (GHA) 176 Bhim Mukteshwor Guthi 1 Krishan Gopal Jyapu 1 2 0 0 2 0 0 0 2 0

19 4 (GHA) 81 Bhim Mukteswor Guthi 1 Nanda Lal Maharjan 1 2 3 15 2 0 0 0 1 0

20 4 (GHA) 137 Bhimbeshowri Guthi 1 Bulal Jyapu 1 2 1 10 0 0 0 7 2 0

21 4 (GHA) 138 Bhimbeshowri Guthi 1 Tej Narayan Jyapu 1 2 2 6 0 0 1 2 1 0

22 4 (GHA) 184 Buddhi Bir Jyapu - 0 1 1 14 2 0 0 13 2 0

23 4 (GHA) 188 Buddhi Bir Jyapu - 0 0 0 15 2 0 0 8 2 0

24 4 (GHA) 177 Dash Lal Maharjan 1 - 0 1 0 1 0 0 0 1 0 0

25 4 (GHA) 96 Dashrath Jyapu 1 - 0 1 1 13 2 0 1 1 1 0

Thankot - Chapagaon - Bhaktapur 132 kV Transmission Line Project

District - Lalitpur

S. No.

Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1

1

1

Page 1 of 43 Annex V- 1

Page 76: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

26 4 (GHA) 181 Dev Lal Maharjan 1 - 0 1 0 9 2 0 0 0 1 0

27 4 (GHA) 178 Govindra Maharjan 1 - 0 1 0 2 1 0 0 2 0 0

28 4 (GHA) 99 Gyan Bahadur Jyapu 1 - 0 1 1 13 3 0 0 14 0 0

29 4 (GHA) 143 Gyan Bir Maharjan 1 - 0 1 1 9 0 0 1 1 1 0

30 4 (GHA) 62 Harka Bdr. Jyapu - 0 1 0 10 0 0 0 10 2 0

31 4 (GHA) 83 Harka Bdr. Jyapu - 0 0 0 3 0 0 0 1 2 0

32 4 (GHA) 142 Hira Lal Jyapu 1 - 0 1 2 12 2 0 0 11 3 0

33 4 (GHA) 120 Jagat Bahadur Kasai 1 - 0 1 3 12 0 0

34 4 (GHA) 126 Jagat Man Maharjan - 0 1 1 5 0 0 0 3 2 0

35 4 (GHA) 128 Jagat Man Maharjan - 0 0 0 12 1 0 0 0 3 0

36 4 (GHA) 97 Jit Lal Jyapu 1 Dash Lal Jyapu 1 2 3 8 2 0 0 10 1 0

37 4 (GHA) 139 Jugi Das Jyapu 1 Bhaicha Kasain 1 2 2 10 0 0 0 7 1 0

38 4 (GHA) 187 Kaji Man Jyapu 1 - 0 1 2 0 3 0 0 5 3 0

39 4 (GHA) 91 Khokana Rudrayani Guthi 1 Bekh Lal Jyapu 1 2 3 4 0 0 0 0 0 3

40 4 (GHA) 80 Kish Lal Jyapu 1 - 0 1 1 11 0 0 0 15 3 0

41 4 (GHA) 84 Maila Maharjan 1 - 0 1 1 12 1 0 0 14 1 0

42 4 (GHA) 75 Nanda Jyapu 1 - 0 1 2 5 0 0 0 6 3 0

43 4 (GHA) 180 Nar Bdr. Jyapu 1 - 0 1 3 10 0 0 1 7 2 0

44 4 (GHA) 100 Pandaha Jyapu 1 Tagacha Jyapu 1 2 0 8 2 0 0 1 2 0

45 4 (GHA) 141 Pun Lal Jyapu 1 Harka Bdr. Jyapu 1 2 2 13 0 0 0 9 0 0

46 4 (GHA) 82 Pun Lal Maharjan 1 - 0 1 0 2 0 0 0 2 0 0

47 4 (GHA) 85 Rudrayani Guthi 1 Bekha Lal Jyapu 1 2 0 5 1 0 0 5 3 0

48 4 (GHA) 186 Santa Man Jyapu 1 - 0 1 0 9 0 0 0 5 3 0

49 4 (GHA) 127 Tirtha Lal Jyapu 1 - 0 1 1 11 2 0 0 3 0 0

50 4 (GHA) 102 Tuyesingh Dangol 1 - 0 1 0 13 2 0 0 1 0 0

51 4 (JA) 30 Bhai Maharjan 1 Shree Krishna Jyapu 1 2 0 10 0 0 0 5 3 0

52 4 (JA) 11 Bulal Jyapu 1 - 0 1 1 5 2 0 0 9 0 0

53 4 (JA) 28 Chan Maya Jyapuni 1 - 0 1 1 1 13 2 0 0 5 0 0

54 4 (JA) 3 Hira Man Jyapu 1 - 0 1 1 9 1 0 0 1 0 0

55 4 (JA) 13 HMG 0 - 0 0 1 0 9 3 0 0 4 1 0

1

1

Page 2 of 43 Annex V- 1

Page 77: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

56 4 (JA) 100 Jit Lal Maharjan 1 - 0 1 0 11 1 0 0 7 3 0

57 4 (JA) 12 Kanchi Jyapuni 1 - 0 1 1 1 8 2 0 0 8 2 0

58 4 (JA) 88 Kanchi Sthapit 1 - 0 1 1 0 12 2 2 0 6 2 0

59 4 (JA) 31 Kish Lal Jyapu 1 Bekh Lal Jyapu 1 2 0 4 2 0 0 4 2 0

60 4 (JA) 10 Pyakhansin Jyapu 1 - 0 1 2 10 2 0 0 4 3 0

61 4 (KA) 80 Asha Man Maharjan 1 - 0 1 0 12 2 0 0 11 1 0

62 4 (KA) 72 Babu Lal Maharjan 1 - 0 1 1 3 0 0 0 6 2 0

63 4 (KA) 93 Dev Lal Maharjan 1 - 0 1 0 9 0 0 0 7 3 0

64 4 (KA) 74 Dhan Bahadur Dhungel 1 - 0 1 0 9 0 0 0 6 3 0

65 4 (KA) 116 Dhan Bahadur Maharjan 1 Asta Maya Maharjan 1 2 1 0 9 0 0 0 9 3 0

66 4 (KA) 87 Gyanmati Maharjan 1 - 0 1 1 1 14 0 0 0 10 0 0

67 4 (KA) 90 Kaji Man Maharjan 1 - 0 1 1 12 0 0 0 6 3 0

68 4 (KA) 89 Kischa Maharjan 1 - 0 1 1 12 2 0 0 11 1 0

69 4 (KA) 88 Krishna Bahadur Maharjan - 0 1 0 15 0 0 0 5 2 0

70 4 (KA) 81 Krishna Bahadur Maharjan Nakali Maharjan 1 1 1 0 7 0 0 0 6 2 0

71 4 (KA) 94 Lamman Maharjan 1 - 0 1 0 0 3 0 0 0 0 3

72 4 (KA) 79 Mahanta Lal Maharjan 1 - 0 1 1 0 0 0 0 1 0 0

73 4 (KA) 142 Mohan Maya Bajracharaya 1 - 0 1 1 0 12 2 0 0 0 3 0

74 4 (KA) 117 Nayacha Maharjan 1 - 0 1 0 7 0 0 0 2 0 0

75 4 (KA) 75 Not Identified 1 Maharjan 1 2 1 1 1 0 0 5 3 0

76 4 (KA) 92 Not Identified 1 Lal Maharjan 1 2 0 4 0 0 0 4 0 0

77 4 (KA) 73 Pashupati Bhakta Khatri 1 - 0 1 0 14 2 0 0 4 0 0

78 4 (KA) 95 Pulal Maharjan 1 - 0 1 0 7 2 0 2 3 0 0

79 4 (KA) 91 Shrestha 1 Taj Narayan Maharjan 1 2 0 3 3 0 0 4 2 0

80 5 (KA) 175 Asha Lal Maharjan 1 Pushpa Lal Maharjan 1 2 0 15 0 0 0 0 1 1

81 5 (KA) 55 Bakha Lal Maharjan - 0 1 0 15 3 0 0 0 0 1

82 5 (KA) 171 Bekha Lal Maharjan - 0 0 2 7 1 0 0 4 3 0

83 5 (KA) 51 Bhaicha Maharjan 1 Bekha Lal Maharjan 2 0 13 1 0 0 5 3 0

84 5 (KA) 59 Busali, Bekha Naran, Nanda Maya, Gyan Lal 4 Bekha Lal Maharjan 4 1 2 5 3 0 0 14 0 0

1

1

1

Page 3 of 43 Annex V- 1

Page 78: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

85 5 (KA) 39 Guthi 1 Pekasi Maharjan 1 2 0 9 1 0 0 2 1 0

86 5 (KA) 160 Guthi 1 Bakhat Lal Maharjan 1 2 1 3 1 0 0 2 0 0

87 5 (KA) 162 Guthi 1 Dhan Bahadur Maharjan 1 2 1 1 0 0 0 15 1 0

88 5 (KA) 78 Guthi 1 Asha Maya Maharjan 1 2 1 0 8 1 0 0 0 0 1

89 5 (KA) 40 Hom Nath Upadyaya 1 Hira Bhai Maharjan 1 2 0 9 0 0 0 8 1 0

90 5 (KA) 45 Kal Mochan Guthi 1 Krishan Bdr. Maharjan 1 2 1 11 2 0 0 8 2 0

91 5 (KA) 50 Kal Mochan Guthi 1 Chir Maya Maharjan 1 2 1 2 11 0 0 1 8 3 0

92 5 (KA) 54 Kal Mochan Guthi 1 Buddhi Raj Maharjan 1 2 0 7 3 0 0 0 1 0

93 5 (KA) 76 Kal Mochan Guthi 1 Moti Lal Maharjan 1 2 0 10 1 0 0 6 0 0

94 5 (KA) 77 Kal Mochan Guthi 1 Babu Lal Maharjan 1 2 0 9 1 0 0 1 2 2

95 5 (KA) 181 Kashi Man Dangol 1 Bakhat Lal Maharjan 1 2 1 0 1 0 0 8 1 0

96 5 (KA) 42 Laxmi Das 1 Laxmi Bahadur Maharjan 1 2 0 8 3 0 0 4 1 0

97 5 (KA) 182 Mangal Das 1 Dhan Bahadur Maharjan (162) 0 1 2 11 0 0 1 1 2 0

98 5 (KA) 188 Nhuchhen Lal Maharjan 1 Silal Maharjan 1 2 2 4 1 0 0 12 0 0

99 5 (KA) 172 Pashupati Guthi 1 Aapasi Maharjan 1 2 2 12 2 0 0 9 1 0

100 5 (KA) 173 Pashupati Guthi 1 Gun Maya Maharjan 1 2 1 0 11 0 0 0 9 3 0

101 5 (KA) 183 Pashupati Guthi 1 Moon Das Maharjan 1 2 1 1 2 0 0 3 0 0

102 5 (KA) 41 Punasin Maharjan 1 Pun Maya Maharjan 1 2 1 0 8 3 0 0 1 3 0

103 5 (KA) 61 Saincha Maharjan 1 Gyan Bahadur Maharjan 1 2 2 5 1 0 0 15 1 0

104 5 (KA) 60 Sankha Lal Dangol 1 - 0 1 2 1 3 0 1 8 3 0

105 5 (KA) 317 Shankar Dev Patha 1 Bakhat Lal Maharjan (181) 0 1 0 6 2 0 0 2 2 0

106 5 (KA) 43 Siwalaya Guthi 1 Asha Lal Bamakho Maharjan 1 2 0 8 0 0 0 7 0 0

107 5 (KA) 52 Tulsi Prashad Upadyaya 1 Hira Lal Maharjan 1 2 1 3 0 0 0 0 2 0

108 6 (KHA) 1 Badri Nath Upadyaya 1 Jit Govinda Maharjan 1 2 1 3 2 0 0 9 0 0

109 6 (KHA) 67 Bhuthucha Maharjan 1 Bhuthu Takaya Jyapu 1 2 0 9 2 0 0 3 1 0

110 6 (KHA) 13 Dhana Raj Pandit Krishna Bahadur Maharjan 1 2 0 12 3 0 0 11 3 0

111 6 (KHA) 16 Dhana Raj Pandit Nhuche Lal Maharjan 1 1 0 11 1 0 0 0 2 0

112 6 (KHA) 17 Dhana Raj Pandit Hira Man Maharjan 1 1 0 11 0 0 0 9 0 0

113 6 (KHA) 14 Krishna Bahadur Maharjan 1 - 0 1 0 14 3 0 0 7 1 0

1

Page 4 of 43 Annex V- 1

Page 79: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

114 6 (KHA) 18 Murari Basnet 1 Krishna Bahadur Mahrjan (13) 0 1 3 7 2 0 1 2 0 0

115 6 (KHA) 66 Sesh Narayan Maharjan 1 Chiree Kaji Maharjan 1 2 1 4 0 0 0 10 2 0

116 6 (KHA) 33 Shree Kailash Badrinath Sadabarta Guthi 1 Taree Kaji Jyapu 1 2 1 12 0 0 0 4 0 0

117 6 (KHA) 35 Shree Kailash Badrinath Sadabarta Guthi 1 Dash Lal Jyapu 1 2 1 0 0 0 0 0 2 0

118 6 (KHA) 37 Shree Kailash Badrinath Sadabarta Guthi 1 Nhuchhen Lal Jyapu 1 2 1 0 0 0 0 3 2 0

119 6 (KHA) 38 Shree Kailash Badrinath Sadabarta Guthi 1 Gyan Bahadur Maharjan 1 2 0 13 2 0 0 4 1 0

120 6 (KHA) 39 Shree Kailash Badrinath Sadabarta Guthi 1 Ramcha Jyapu 1 2 1 14 0 0 0 9 3 0

121 6 (KHA) 40 Shree Kailash Badrinath Sadabarta Guthi 1 Kish Lal Jyapu 1 2 2 8 0 0 0 11 3 0

122 6 (KHA) 41 Shree Kailash Badrinath Sadabarta Guthi 1 Gyan Bahadur Maharjan (38) 0 1 1 14 0 0 0 7 0 0

123 6 (KHA) 34 Shyam Krishna Jyapu 1 - 0 1 2 3 0 0 1 3 1 0

124 6 (KHA) 61 Siwalaya Kalyan Guthi 1 Mohan Maya Maharjan 1 2 1 1 11 3 0 0 11 3 0

125 6 (KHA) 15 Subarna Raj Satyal Pyakhansi Maharjan 1 2 1 4 3 0 0 5 2 0

126 6 (KHA) 47 Subarna Raj Satyal Govinda Jyapu 1 1 0 14 2 0 0 3 0 0

127 6 (KHA) 210 Tek Bahadur 1 Krishna Bahadur Dangol 1 2 2 5 0 0 0 0 3 0

128 8 (KA) 75 Asta Maya, Jagat Nath Maharjan, 2 - 0 2 1 1 0 0 0 0 8 0 0

129 8 (KA) 9 Bahicha Jyapu 1 - 0 1 3 11 3 0 0 15 0 0

130 8 (KA) 74 Bhakta Bahadur Maharjan 1 - 0 1 1 12 0 0 0 2 1 0

131 8 (KA) 10 Bhim Bahadur Jyapu 1 - 0 1 0 12 2 0 0 1 1 0

132 8 (KA) 68 Bulal Jyapu 1 - 0 1 4 10 2 0 0 7 0 0

133 8 (KA) 69 Dev Lal Jyapu 1 - 0 1 1 10 1 0 0 10 1 0

134 8 (KA) 61 Gyan Beti Jyapuni 1 - 0 1 1 0 10 2 0 0 0 2 0

135 8 (KA) 29 Hira Man Jyapu 1 - 0 1 0 4 0 0 0 0 0 2

136 8 (KA) 8 HMG 0 - 0 0 1 0 5 3 0 0 3 2 2

137 8 (KA) 33 Indra Jatra Guthi 1 Maila Jyapu 1 2 2 5 3 0 0 13 1 0

138 8 (KA) 31 Laxmi Bahadur Jyapu 1 - 0 1 0 4 2 0 0 4 1 0

139 8 (KA) 60 Lok Man Jyapu - 0 1 2 1 1 0 0 15 3 0

140 8 (KA) 55 Lok Man Jyapu - 0 0 1 4 2 0 0 12 0 0

141 8 (KA) 66 Mukti Bahadur 1 - 0 1 1 9 3 0 0 10 3 0

1

1

Page 5 of 43 Annex V- 1

Page 80: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

142 8 (KA) 30 Nara Raj Jyapu 1 - 0 1 0 4 0 0 0 2 2 0

143 8 (KA) 76 Not Identified 1 - 0 1 0 11 3 0 0 10 2 0

144 8 (KA) 32 Siddhi Bahadur Jyapu 1 - 0 1 1 1 2 0 0 10 0 0

145 8 (KA) 67 Sita Ram Maharjan 1 - 0 1 1 9 2 0 0 9 1 0

146 8 (KA) 65 Tej Lal Jyapu 1 - 0 1 1 13 1 0 0 9 0 0

147 8 (KHA) 9 Chiree Mai Jyapuni 1 Gopal Kasain 1 2 1 0 11 3 0 0 1 0 0

148 8 (KHA) 11 HMG 0 - 0 0 1 0 5 2 0 0 4 3 0

149 8 (KHA) 12 HMG 0 - 0 0 1 3 15 1 0 1 0 2 0

150 8 (KHA) 14 Jit Lal Jyapu 1 - 0 1 5 3 2 0 1 1 3 0

151 8 (KHA) 13 Kanchi Kasain 1 - 0 1 1 1 0 1 0 0 8 2 0

152 8 (KHA) 10 Krishna Lal Jyapu 1 - 0 1 1 13 1 0 0 9 3 0

153 8 (KHA) 15 Nitya Bahadur Shrestha 1 Jit Bahadur Jyapu 1 2 2 15 2 0 0 15 0 0

154 9 (KA) 64 Bahi Maharjan 1 - 0 1 1 4 0 0 0 0 2 0

155 9 (KA) 143 Bakhat Lal Maharjan 1 Jit Bahadur Maharjan 1 2 0 3 3 0 0 3 1 0

156 9 (KA) 120 Bhim Raj Shakya Chankha Tuladhar 2 0 11 2 0 0 7 0 0

157 9 (KA) 122 Bhim Raj Shakya Chankha Tuladhar 0 0 12 0 0 0 8 2 0

158 9 (KA) 66 Bhimeswori guthi 1 Jit Lal Sainju 1 2 2 4 2 0 0 3 3 0

159 9 (KA) 47 Dash Man Jyapu 1 - 0 1 0 13 2 0 0 4 0 0

160 9 (KA) 65 Dev Lal Dangol 1 - 0 1 3 6 0 0 0 14 0 0

161 9 (KA) 48 Dhan Bahadur Jyapu 1 Lok Man Maharjan 1 2 0 5 3 0 0 4 0 0

162 9 (KA) 119 Dil Bahadur Bada 1 - 0 1 0 1 0 0 0 1 0 0

163 9 (KA) 166 Ganga Ram Karki 1 - 0 1 0 3 3 2 0 3 2 2

164 9 (KA) 125 Hari Lal Dangol 1 - 0 1 1 6 0 0 0 2 3 0

165 9 (KA) 56 Jiou Thaku Dangolni 1 - 0 1 1 0 14 2 0 0 1 3 2

166 9 (KA) 124 Jit Bahadur Maharjan - 0 1 0 12 2 0 0 5 2 0

167 9 (KA) 154 Jit Bahadur Maharjan - 0 0 0 7 3 0 0 5 1 2

168 9 (KA) 144 Moda Sansher JBR 1 Jit Bahadur Maharjan 2 0 2 0 0 0 1 3 2

169 9 (KA) 123 Modanath JBR 1 Jit Bahadur Maharjan 1 1 10 0 0 0 15 1 0

170 9 (KA) 73 Nanda Lal Jyapu 1 Nanda Lal Jyapu 1 2 2 10 2 0 0 8 1 0

1 1

1

1

Page 6 of 43 Annex V- 1

Page 81: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

171 9 (KA) 117 Om Kumari Nhuchhendhan Pradhan 1 Padma Raj Bada 1 2 1 1 7 0 0 0 3 3 0

172 9 (KA) 74 Punsi Jyapu 1 - 0 1 1 12 0 0 0 8 0 0

173 9 (KA) 51 Rudrayani Guthi 1 Jinu Thukun Dangolni 1 2 1 1 3 0 0 0 12 2 0

174 9 (KA) 145 Sankar Dev Pantha 1 Jit Bahadur Maharjan (144,123) 0 1 0 1 3 0 0 1 2 0

175 9 (KA) 49 Shiddi Lal Dangol - 0 1 0 11 0 0 0 0 1 0

176 9 (KA) 57 Shiddi Lal Dangol - 0 0 1 2 2 0 0 12 0 0

177 9 (KA) 50 Sugarib Dangol - 0 1 0 11 0 0 0 6 2 0

178 9 (KA) 52 Sugarib Dangol - 0 0 0 8 2 0 0 2 3 0

179 9 (KA) 167 Surya Wada 1 - 0 1 0 3 3 2 0 0 0 3

180 3 (NGA) 27 Badecha Kusle 1 Bhuwan Singh Khatri 1 2 1 2 0 0 0 9 2 0

181 3 (NGA) 22 Bhuwan Singh Khatri 1 - 1 1 4 0 0 0 5 2 0

182 3 (NGA) 5 Chandra Bhakta Khatri - 0 1 0 14 0 0 0 1 0 2

183 3 (NGA) 6 Chandra Bhakta Khatri - 0 0 0 11 2 0 0 1 1 0

184 3 (NGA) 26 Dev Naran Jyapu 1 - 0 1 1 6 0 0 0 15 1 0

185 3 (NGA) 23 Dil Bahadur Thapa 1 - 0 1 1 8 0 0 0 10 0 0

186 3 (NGA) 16 HMG 0 - 0 0 1 0 3 0 0 0 1 0 0

187 3 (NGA) 19 Moti Lal Maharjan 1 - 0 1 1 4 0 0 0 0 0 3

188 3 (NGA) 112 Not Identified 1 - 0 1 1 2 0 0 0 1 0 0

189 3 (NGA) 113 Not Identified 1 - 0 1 1 2 0 0 0 10 0 0

190 3 (NGA) 18 Pancha Lal Maharjan 1 Ram Bahadur Bogati Chettri 1 2 1 2 0 0 0 10 2 0

191 3 (NGA) 24 Pashupati Bhakta Khatri 1 - 0 1 0 5 1 0 0 2 0 0

192 3 (NGA) 13 Pyakhansin Maharjan Nhuchhen Lal Maharjan 2 0 4 1 0 0 1 2 0

193 3 (NGA) 14 Pyakhansin Maharjan Nhuchhen Lal Maharjan 0 2 9 0 0 1 3 3 0

194 3 (NGA) 12 Rudra Bhakta Khattri 1 - 0 1 1 1 2 0 0 1 2 0

195 3 (KHA) 79 Bhuwan Singh Khatri 1 - 0 1 1 2 0 0 0 1 1 2

196 3 (KHA) 65 Bishlal Jyapu 1 - 0 1 1 6 0 0 0 4 2 0

197 3 (KHA) 56 Dil Bahadur Thapa 1 - 0 1 2 9 1 0 0 8 2 0

198 3 (KHA) 88 Indra Gopal Maharjan 1 - 0 1 0 10 2 0 9 3 0

199 3 (KHA) 57 Krishna Bahadur Thapa Chettri 1 Kul Bahadur 1 2 2 3 0 0 1 0 1 0

1

1

1

1 1

Page 7 of 43 Annex V- 1

Page 82: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

200 3 (KHA) 78 Lal Bahadur Jyapu 1 Tej Bahadur Jyapu 1 2 1 2 1 1 6 1 0

201 3 (KHA) 55 Nanda Lal Jyapu 1 - 0 1 1 12 0 0 0 3 1 0

202 3 (KHA) 77 Nanda Singh Jyapu 1 - 0 1 1 4 0 0 0 11 1 0

203 3 (KHA) 71 Nil Bahadur Thapa 1 - 0 1 0 8 1 0 0 0 3 0

204 3 (KHA) 81 Pandu Jyapu 1 Rudra Bhakta Khatri 1 2 0 10 0 0 0 1 3 0

205 3 (KHA) 67 Rudra Bhawani 1 - 0 1 1 1 9 0 0 1 3 3 0

206 3 (KHA) 89 Shubhe Bahadur Maharjan 1 - 0 1 0 10 2 0 0 2 1 0

Total 188 78 266 5 22 166 1551 236 6 18 1095 288 36

91 1 1 0

VDC :Bungamati

207 2 (KHA) 3 Anirup Maharjan 1 Pun shinh Jayapu 1 2 0 8 1 0 0 0 2 0

208 2 (KHA) 111 Babu Kaji Jyapu 1 - 0 1 0 7 0 0 0 1 1 0

209 2 (KHA) 139 Bhairab Guthi 1 Hira Devi Badaini 1 2 1 2 3 0 0 0 0 0 1

210 2 (KHA) 99 Bhakta Raj Paneju 1 - 0 1 0 8 0 0 0 5 3 0

211 2 (KHA) 40 Chankha Tuladhar 1 Bhima Raja Shakya 1 2 1 2 3 0 0 1 2 0

212 2 (KHA) 134 Daita Griwa Guthi 1 Bhakta Raj Paneju 1 2 3 11 0 0 0 12 0 0

213 2 (KHA) 8 Dil Bahadur Bada 1 - 0 1 0 13 0 0 0 2 0 0

214 2 (KHA) 132 Gurubada Shikarmi 1 Tara Parsad Giri 1 2 1 12 0 0 0 0 1 0

215 2 (KHA) 108 Gyan Bahadur Jyapu 1 Astha Maya Jyapuni 1 2 1 1 1 3 0 0 0 0 2

216 2 (KHA) 9 Hira Lal Tualadhar 1 - 0 1 0 7 0 0 0 0 0 3

217 2 (KHA) 135 Kai Griwa Guthi 1 Ishowori Raj Paneju 1 2 3 11 1 0 0 12 3 0

218 2 (KHA) 184 Kancha Maharjan 1 - 0 1 1 4 0 0 0 10 0 0

219 2 (KHA) 100 Karya Binayak Guthi 1 Lal Maya Maharjan 1 2 1 0 3 0 0 0 1 1 0

220 2 (KHA) 122 Lal Maya Maharjani 1 - 0 1 1 2 2 1 0 0 0 2 2

221 2 (KHA) 98 Maiya Devi Tuladhar Bhuthu Tuladhar 1 2 2 0 9 1 0 0 0 0 2

222 2 (KHA) 117 Maiya Devi Tuladhar Bhuyu Tuladhar 1 1 1 1 9 3 0 0 4 1 0

223 2 (KHA) 116 Mal Ral Wada 1 - 0 1 1 2 0 0 0 12 3 0

224 2 (KHA) 4 Malla Raj Bramhacharya 1 Padma Raj Bada 1 2 2 1 3 0 0 7 1 0

225 2 (KHA) 188 Maya Devi Wodeni - 0 1 1 10 1 0 0 1 1 0

226 2 (KHA) 189 Maya Devi Wodeni - 0 0 1 10 1 0 0 3 0 0

1

1 1

Page 8 of 43 Annex V- 1

Page 83: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

227 2 (KHA) 133 Nil Raj Tuladhar 1 - 0 1 3 13 1 0 0 11 3 0

228 2 (KHA) 180 Not Identified 1 - 0 1 1 6 2 0 0 1 1 0

229 2 (KHA) 181 Not Identified 1 - 0 1 1 6 2 0 0 9 2 0

230 2 (KHA) 185 Not Identified 1 - 0 1 1 4 0 0 0 9 3 0

231 2 (KHA) 42 Om Kumari Nhuchhen Pradhan 1 Padma Raj Bajracharya 1 2 1 1 13 2 0 0 0 1 0

232 2 (KHA) 118 Paras Muni Lawat 1 - 0 1 1 5 2 0 0 15 3 0

233 2 (KHA) 102 Purna Devi Tuladhar 1 Ishowri Raj Paneju 1 2 1 1 10 0 0 0 0 1 0

234 2 (KHA) 114 Rudrayani Guthi 1 Bakhat Lal Dangol 1 2 7 0 1 0 0 4 2 0

235 2 (KHA) 138 Santa Jangh Rana 1 Madan Bhakta Paneju 1 2 3 3 2 0 1 7 2 0

236 2 (KHA) 115 Shree Bishnu Bhagawan 1 Padam Raj Bramhacharya 1 2 1 3 1 0 0 13 2 0

237 2 (KHA) 112 Surya Lal Maharjan 1 - 0 1 0 7 2 0 0 1 3 0

238 3 (GHA) 95 Chandra Lal Maharjan 1 - 0 1 0 2 3 0 0 2 2 0

239 3 (GHA) 89 Dharma Raj Shrestha 1 Prem Maharjan 1 2 0 0 6 2 0 2 1 0

240 3 (GHA) 96 Dharma Raj with 5 Person Barhma Maharjan 6 0 2 0 0 0 2 0 0

241 3 (GHA) 97 Dharma Raj with 5 Person Barhma Maharjan 0 0 11 1 0 0 2 0 0

242 3 (GHA) 87 Mal Ral Bada 1 Budhi Raj Bada 1 2 0 3 2 0 0 0 1 0

243 3 (GHA) 94 Parti 0 - 0 0 1 8 4 1 0 8 4 1 0

244 3 (GHA) 150 Parti Bhir 0 - 0 0 1 0 9 2 0 0 5 3 0

245 3 (GHA) 88 Satucha Bada 1 Dashrath Tuladhar 2 0 5 0 0 0 4 1 0

246 3 (GHA) 84 Shree Karya binayak Guthi 1 Dashrath Tuladhar 1 1 1 3 0 1 1 3 0

247 3 (GHA) 85 Shree Karya binayak Guthi 1 Jit Bahadur Tuladhar 1 2 1 11 0 0 0 10 2 0

248 3 (GHA) 86 Shree Karya binayak Guthi 1 Krishna Bahadur Tuladahr 1 2 0 11 0 0 0 1 2 0

249 4 (KA) 30 Asta Bahadur 1 - 0 1 0 9 3 0 0 4 3 0

250 4 (KA) 26 Asta Man Wada - 0 1 2 6 1 0 0 1 1 0

251 4 (KA) 32 Asta Man Wada - 0 0 1 2 1 0 0 10 2 0

252 4 (KA) 35 Basanta Raj Wada 1 - 0 1 1 8 1 0 1 3 2 0

253 4 (KA) 12 Bhairab Guthi 1 Asta Man Wada 1 2 5 10 2 0 0 0 2 0

254 4 (KA) 19 Bhairab Guthi 1 Bishnu Maya Kasain 1 2 2 9 0 0 1 8 0 0

255 4 (KA) 22 Bhairab Guthi 1 Jit Lal Kasasin 1 2 0 13 2 0 0 3 0 0

256 4 (KA) 31 Bharat Man Shakya 1 Hakucha Lawar 1 2 2 1 2 0 0 9 2 0

5 1

1

1

Page 9 of 43 Annex V- 1

Page 84: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

257 4 (KA) 18 Bungamati Bhairab Guthi 1 Nhuchhen Lal Kasai 1 2 3 2 3 0 0 2 2 0

258 4 (KA) 233 Damodar Thapa 1 - 0 1 0 0 1 3 0 12 2 0

259 4 (KA) 27 Dhan Maya Jyapuni - 0 1 0 4 0 0 0 2 2 0

260 4 (KA) 28 Dhan Maya Jyapuni - 0 0 0 5 1 0 0 1 0 2

261 4 (KA) 232 Harihar Thapa 1 - 0 1 0 8 2 0

262 4 (KA) 49 Herman Mali 1 - 0 1 1 13 0 0 0 2 1 0

263 4 (KA) 36 Nau Raj Wada 1 Bhote Sarki 1 2 1 4 2 0 0 1 2 0

264 4 (KA) 230 Not Identified 1 - 0 1 1 3 0 0 0 1 1 0

265 4 (KA) 231 Not Identified 1 - 0 1 1 3 0 0 0 2 1 0

266 4 (KA) 234 Ramjee Thapa 1 - 0 1 0 8 1 3 0 14 1 0

267 4 (KA) 21 Bungamati Bhairab Guthi 1 Tucho Wada 1 2 0 11 1 0 0 9 2 0

268 4 (KHA) 99 Basanta Raj Wada 1 - 0 1 1 12 1 0 0 15 1 0

269 4 (KHA) 71 Chet Man Tuladhar 1 - 0 1 1 3 2 0 0 2 3 0

270 4 (KHA) 70 Dhan Lal Jyapu 1 - 0 1 1 14 2 0 1 4 3 0

271 4 (KHA) 102 Dharma Raj Jyapu 1 - 0 1 1 15 1 0 0 6 3 0

272 4 (KHA) 69 Hera Kumari Wada 1 Puntha Raj Wada 1 2 1 3 1 2 0 0 10 0 0

273 4 (KHA) 60 Hera Man Maharjan 1 - 0 1 3 9 1 0 0 13 3 0

274 4 (KHA) 67 Hera Man Panju 1 - 0 1 1 13 2 0 0 11 2 0

275 4 (KHA) 101 Kaji Man Jyapu 1 - 0 1 2 10 1 0 0 12 1 0

276 4 (KHA) 66 Kaji Man Tuladhar 1 - 0 1 1 5 2 0 0 6 3 0

277 4 (KHA) 36 Narayan Puri 1 Nandu Lal Mali 1 2 4 2 2 0 0 7 3 0

278 4 (KHA) 35 Nhuchhen Lal Kasain 1 - 0 1 3 3 2 0 1 1 0 0

279 4 (KHA) 68 Not Identified 1 Mangal Das Jyapu 1 2 3 5 2 0 1 5 1 0

280 4 (KHA) 234 Raj Bhai Shakya 1 - 0 1 2 3 3 3 0 1 3 0

281 4 (KHA) 65 Shyam Lal Jyapu 1 - 0 1 2 5 2 0 0 0 1 2

282 4 (KHA) 64 Silal Jyapu 1 - 0 1 1 15 2 0 1 0 1 0

283 4 (KHA) 97 Sukucha Wada 1 - 0 1 2 3 0 0 0 12 1 0

284 9 (CHA) 150 Bhairab Guthi 1 Pancha Lal Patwar 2 0 10 0 0 0 8 3 1

285 9 (CHA) 151 Bhairab Guthi 1 Pancha Lal Putuwar 1 0 10 0 0 0 0 2 1

286 9 (CHA) 136 Dharani Raj Tuladhar 1 Shiga Bahadur Shrestha 1 2 3 2 0 0 0 5 2 0

1 1

1

Page 10 of 43 Annex V- 1

Page 85: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

287 9 (CHA) 135 Durga Prasad Shrestha 1 Bulung Romba 1 2 1 4 0 0 0 0 0 1

288 9 (CHA) 121 Haya Briva Guthi 1 Kaila Chandra Bahadur 1 2 4 2 2 0 0 1 1 2

289 9 (CHA) 152 Haya Briva Raj Guthi 1 Kaila Chandra Bahadur Tamang 1 2 5 12 1 0 2 1 3 0

290 9 (CHA) 228 Janak Raj Tuladhar Magarni Shyanbo 2 0 13 2 0 0 9 3 0

291 9 (CHA) 229 Janak Raj Tuladhar Magarni Shyanbo 0 2 10 0 0 1 8 0 0

292 9 (CHA) 230 Janak Raj Tuladhar Nhuchhen Mali 1 1 6 12 0 0 0 0 3 3

293 9 (CHA) 110 Machhendranath Guthi 1 Kaji Krishna Patwar 1 2 0 9 1 0 0 1 1 0

294 9 (CHA) 127 Machhendranath Guthi 1 Ganesh Man Dakarmi 1 2 1 12 1 0 0 13 1 0

295 9 (CHA) 137 Machhendranath Guthi 1 Hira Lal Putuwar 1 2 0 10 1 0 0 10 1 0

296 9 (CHA) 139 Machhendranath Guthi 1 Buddhi Lal Putuwar 1 2 1 8 2 0 0 12 0 2

297 9 (CHA) 154 Nhuchhen Lal Mali 1 - 0 1 4 13 0 0 0 1 1 0

298 9 (CHA) 109 Purna Lal Patwar 1 - 0 1 1 4 0 0 0 9 3 0

299 9 (CHA) 148 Sanu Lal Tuladhar Nhuchhe Raj Tuladhar 2 0 13 0 0 0 6 2 0

300 9 (CHA) 149 Sanu Lal Tuladhar Nhuchhe Raj Tuladhar 0 0 6 2 0 0 2 1 0

301 9 (CHA) 129 Shree Mahendra Nath Guthi 1 Shree Krishna Putuwar 1 2 0 9 1 0 0 4 2 0

302 9 (CHA) 130 Shree Mahendra Nath Guthi 1 Purna Lal Putuwar 1 2 0 10 1 0 0 5 0 0

303 9 (CHA) 131 Shree Mahendra Nath Guthi 1 Beti Maya Putuwar 1 2 1 2 2 2 2 0 5 0 0

304 9 (CHA) 132 Shree Mahendra Nath Guthi 1 Purna Lal Putuwar 1 2 0 4 0 0 0 1 1 0

305 9 (CHA) 133 Shree Mahendra Nath Guthi 1 Dhana Lal Putuwar 1 2 1 2 0 0 0 6 3 0

306 9 (CHA) 134 Shree Mahendra Nath Guthi 1 Bekha Lal Putuwar 2 0 15 0 0 0 5 1 0

307 9 (CHA) 138 Shree Mahendra Nath Guthi 1 Bekha Lal Putuwar 1 1 11 0 0 0 8 1 0

308 9 (CHA) 227 Shree Mahendra Nath Guthi 1 Kancha Putuwar 1 2 1 7 2 0 0 2 3 0

309 9 (JHA) 44 Bhairab Guthi 1 Shyam Lal Tuladhar 1 2 5 9 0 0 0 0 2 0

310 9 (JHA) 45 Bhairab Guthi 1 Gyan Raj Wada 1 2 5 13 0 0 2 11 0 0

311 9 (JHA) 47 Bhairab Guthi 1 Hera Man Shakya 1 2 3 8 0 0 0 0 1 1

312 9 (NGA) 23 Bhairab Guthi 1 Bhairab Bahadur Bista 1 2 1 0 1 0 0 6 1 0

313 9 (NGA) 26 Ganesh Das Desar 1 Kishna Bahadur Ghimire 1 2 2 4 3 0

314 9 (NGA) 14 Haya Briva Guthi 1 Hem Kumari Khatrini 1 2 1 1 14 0 0 0 11 3 0

315 9 (NGA) 15 Haya Briva Guthi 1 Hitmat Bahadur Kha Chhen 1 2 3 1 1 0 0 7 3 0

11 1

1 1

1

Page 11 of 43 Annex V- 1

Page 86: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

316 9 (NGA) 16 Haya Briva Guthi 1 Champa Khatrini 1 2 1 0 8 1 0 0 7 2 0

317 9 (NGA) 29 Lok Bahadur Bista 1 Bal Bahadur Bista 1 2 3 12 0 0 1 3 0 0

318 9 (NGA) 22 Lok Man Dangol Kale Bista 1 2 1 0 1 0 0 5 2 0

319 9 (NGA) 24 Lok Man Dangol Indra Bahadur Bista 1 1 1 2 1 0 1 1 0 0

320 9 (NGA) 30 Mangal Das Maharjan 1 Bhim Bahadur Ghimere 1 2 2 9 3 0 0 12 3 0

321 9 (NGA) 21 Ram Narayan Bista 1 Indra Bahadur Bista 1 2 1 1 0 0 0 0 1 0

322 9 (NGA) 28 Tahree Babu Wada 1 Mangal Das Maharjan 1 2 2 9 3 0 0 9 0 0

323 9 (CHHA) 50 Bhairab Guthi 1 Ram Hari Khatri 1 2 2 4 3 0 0 8 0 0

324 9 (CHHA) 51 Bhairab Guthi 1 Bhakta Kumari Khatrini 1 2 1 1 6 3 0 0 13 3 0

325 9 (CHHA) 52 Bhairab Guthi 1 Ganesh Bahadur Khatri 1 2 1 8 0 0 0 2 3 0

326 9 (CHHA) 53 Bhairab Guthi 1 Mangal Das Maharjan 1 2 4 12 0 0 1 8 3 0

327 9 (CHHA) 95 Bhairab Guthi 1 Lekh Kumari Thapini 1 2 1 7 1 0 0 1 12 2 0

328 9 (CHHA) 96 Bhairab Guthi 1 Indra Bahadur Khatri 1 2 3 2 1 0 1 8 2 0

329 9 (CHHA) 100 Bhairab Guthi 1 Ram Narayan Bista 1 2 5 4 3 0 0 12 2 0

330 9 (CHHA) 101 Bhairab Guthi 1 Krishna Bahadur Bista 1 2 0 5 0 0 0 9 1 0

331 9 (CHHA) 102 Bhairab Guthi 1 Bhairab Bahadur Bista 1 2 1 4 0 0 1 4 0 0

332 9 (CHHA) 103 Bhairab Guthi 1 Indra Bahadur Bista 1 2 0 9 1 0 0 1 0 0

333 9 (CHHA) 104 Bhairab Guthi 1 Krishna Bahadur Bista (101) 0 1 0 9 0 0 0 7 2 0

334 9 (CHHA) 105 Bhairab Guthi 1 Bhakta Kumari Khatri 1 2 1 0 12 0 0 0 3 2 0

335 9 (CHHA) 106 Bhairab Guthi 1 Indra Bahadur Bista Khatri 1 2 1 6 0 0 0 5 0 0

336 9 (CHHA) 107 Bhairab Guthi 1 Mangal Das Maharjan 1 2 1 4 0 0 0 14 3 0

337 9 (CHHA) 108 Bhairab Guthi 1 Kancho Khadka 1 2 2 14 3 0 0 2 3 0

338 9 (CHHA) 143 Bhairab Guthi 1 Lekh Kumari Thapini 1 2 1 4 8 0 0 0 2 3 0

339 9 (GHA) 28 Khadga Bahadur Panju 1 - 0 1 1 5 3 0 0 9 3 0

340 9 (GHA) 16 Kul Devi Guvaju Jacha Kasain 2 4 8 1 0 0 10 0 0

341 9 (GHA) 29 Kul Devi Guvaju Jacha Kasain 0 3 0 3 0 0 3 2 0

342 9 (GHA) 17 Machhendranath Guthi 1 Purna Lal Tuladhar 1 2 3 5 0 0 1 0 3 0

343 9 (JA) 7 Bhairab Guthi 1 Moj Man Tuladhar 1 2 5 0 0 0 0 15 2 0

344 9 (JA) 1 Machhendranath Guthi 1 Kul Bahadur Bada 2 0 12 2 0 0 10 1 0

345 9 (JA) 2 Machhendranath Guthi 1 Kul Bahadur Bada 1 0 7 3 3 0 7 2 0

1

1 1 1

1

Page 12 of 43 Annex V- 1

Page 87: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

346 9 (JA) 3 Machhendranath Guthi 1 Surje Man Bada 2 0 10 1 0 0 0 1 2

347 9 (JA) 6 Machhendranath Guthi 1 Surje Man Bada 1 1 13 3 0 0 10 1 0

348 9 (JA) 8 Mangal muni Guvaju 1 Dil Maya Kasaini 1 2 1 1 0 0 0 0 11 2 0

349 3 (KA) 54 Chaita Bada 1 - 0 1 1 2 0 0 0 2 0 0

350 3 (KA) 49 Chandra Muni Bada 1 - 0 1 1 9 0 0 1 2 0 0

351 3 (KA) 47 Ganesh Raj Shrestha 1 - 0 1 1 3 0 0 0 13 0 0

352 3 (KA) 62 Gyan Jyoti Shakya 1 Buddhi Tuladhar 1 2 5 0 0 0 0 10 3 0

353 3 (KA) 48 Not Identified 1 Ishow Raj Paneju 1 2 3 15 2 0 0 12 2 0

354 3 (KA) 52 Not Identified 1 Bal Kumari Badani 2 0 14 0 0 0 11 0 0

355 3 (KA) 53 Not Identified 1 Bal Kumari Badani 1 2 0 0 0 0 1 0 0

356 3 (KA) 59 Not Identified 1 Shanka Bir Jyapu 1 2 2 10 2 0 0 4 0 0

357 3 (KA) 60 Not Identified 1 Parbati Shresthani 1 2 1 2 10 2 0 0 5 2 0

358 3 (KA) 61 Not Identified 1 Durga Prashad Shrestha 1 2 2 5 0 0 0 4 0 0

359 3 (KA) 63 Not Identified 1 Ganesh Raj Shrestha 1 2 3 12 0 0 0 14 0 0

360 3 (KA) 67 Not Identified 1 Man Raj Shrestha 1 2 1 4 0 0 0 15 1 0

361 3 (KA) 77 Purna Raj Shakya 1 - 0 1 2 14 2 0 0 9 1 0

362 3 (KA) 76 Sapta Raj Bajracharya 1 - 0 1 3 2 2 0 0 10 3 0

363 3 (KA) 50 Tika Tuladhar 1 - 0 1 1 0 2 0 0 1 2 0

Total 149 94 243 2 24 243 1059 173 16 29 863 233 27

86 10 3 3

VDC :Chhampi

364 5(Ka) 255 Bekhacha Desar Krishna Bahadur Thapa 2 0 8 0 0 0 5 0 0

365 5(Ka) 274 Bekhacha Desar Krishna Bahadur Thapa 0 0 1 2 0 0 1 2 0

366 5(Ka) 200 Bhaicha Desar 1 Ganesh Bahadur Khadka 1 2 0 14 1 0 0 7 3 0

367 5(Ka) 202 Chini Upadyayani Krishna Bahadur Thapa (255,274) 0 1 0 11 0 0 0 1 0 0

368 5(Ka) 205 Chini Upadyayani Sano Kancha Thapa 1 1 0 11 0 0 0 7 0 0

369 5(Ka) 276 Dekhacha Desar 1 Krishna Bahadur Thapa (255,274) 0 1 1 0 0 0 0 7 0 0

370 5(Ka) 437 Gopal Khatri 1 - 0 1 2 5 0 0 0 3 2 0

371 5(Ka) 439 Govinda K.C. 1 - 0 1 2 0 0 0 0 11 0 0

1

1 1

1 1

1 1

Page 13 of 43 Annex V- 1

Page 88: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

372 5(Ka) 291 Harka Bahadur Desar 1 - 0 1 5 12 0 0 0 15 0 0

373 5(Ka) 154 HMG 0 - 0 0 1 5 5 0 0 0 11 0 0

374 5(Ka) 209 HMG 0 - 0 0 1 0 2 0 0 0 0 3 0

375 5(Ka) 275 Jit Bahadur Desar - 0 1 0 7 0 0 0 4 0 0

376 5(Ka) 277 Jit Bahadur Desar - 0 0 0 10 0 0 0 6 1 0

377 5(Ka) 258 Jit Bahadur Khatri Narayan Thapa 1 2 0 5 0 0 0 2 2 0

378 5(Ka) 273 Jit Bahadur Khatri Narayan Thapa Chettri 1 1 1 5 2 0 0 2 3 0

379 5(Ka) 61 Krishna Bahadur Desar 1 - 0 1 3 7 0 0 1 1 2 0

380 5(Ka) 201 Kumar Desar 1 Ganesh Bahadur Khadka 1 2 0 12 2 0 0 6 0 0

381 5(Ka) 64 Not Identified 1 Badri Nath Upadyaya 1 2 1 5 2 0 0 2 1 0

382 5(Ka) 206 Not Identified 1 Samsher Bahadur Thapa 1 2 0 13 0 0 0 11 1 0

383 5(Ka) 207 Not Identified 1 Harka Bahadur 1 2 0 9 0 0 0 1 1 0

384 5(Ka) 208 Not Identified 1 Samsher Bahadur Thapa 1 2 0 8 0 0 0 5 1 0

385 5(Ka) 251 Not Identified 1 - 0 1 2 3 0 0 0 5 0 0

386 5(Ka) 256 Not Identified 1 Tirtha Desar 1 2 1 13 0 0 0 10 3 0

387 5(Ka) 257 Not Identified 1 Man Krishna Jyapu 1 2 1 13 2 0 0 13 1 0

388 5(Ka) 262 Not Identified 1 - 0 1 1 9 0 0 0 0 2 0

389 5(Ka) 263 Not Identified 1 - 0 1 1 0 0 0 0 5 0 0

390 5(Ka) 285 Not Identified 1 - 0 1 1 5 2 0

391 5(Ka) 293 Not Identified 1 - 0 1 1 9 0 0

392 5(Ka) 470 Ram Bhagat Khatri 1 - 0 1 0 4 0 0 0 0 2 0

393 5(Ka) 425 Rama Devi Bhandari 1 - 0 1 1 6 0 0 0

394 5(Ka) 62 Santa Lal Desar Indra Bahadur Bista 1 2 2 5 0 0 0 10 1 0

395 5(Ka) 63 Santa Lal Desar Krishna Bahadur Bista 1 1 2 6 0 0 1 2 3 0

396 5(Ka) 286 Shayam Lal Shrestha 1 Ganesh Bahadur Khadka 1 2 1 2 0 0 0 13 0 0

397 5(Ka) 249 Shree Mahendra Shrestha Janaki Sarkini 1 2 1 2 10 2 0 0 1 1 0

398 5(Ka) 265 Shree Mahendra Shrestha Krishna Bahadur Khatri 1 2 9 1 0 0 6 2 0

399 5(Ka) 266 Shree Mahendra Shrestha Krishna Bahadur Khatri 0 0 12 0 0 0 1 3 0

400 5(Ka) 283 Shree Mahendra Shrestha Chaure Sarki 1 1 3 12 0 0 1 10 0 0

401 5(Ka) 471 Thule Kanchi Mijar Nepali 1 - 0 1 1 0 11 2 0 0 7 3 0

1

1

1

1 1

Page 14 of 43 Annex V- 1

Page 89: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

402 5(Ka) 287 Tuyucha Jyapu 1 Ganesh Bahadur Khadka 1 2 1 15 0 0 0 9 0 0

403 5 (KHA, 2) 12 HMG/Land 0 - 0 0 1

404 5 (KHA, 2) 330 Badri Thapa Chettri 1 - 0 1 1 8 2 0 0 1 2 0

405 5 (KHA, 2) 331 Tul Kumari 1 Purna Kumari Damini 1 2 0 5 3 0 0 2 3 0

406 5 (KHA, 2) 332 HMG/Land 0 - 0 0 1 13 15 0 0 1 2 2 0

407 5 (KHA, 2) 333 Krishna Bahadur Thapa 1 - 0 1 0 11 3 0 0 3 0 0

408 5 (KHA, 2) 334 Ram Bahadur Thapa 1 - 0 1 0 11 3 0 0 4 2 0

409 5 (KHA, 2) 335 Sano Kancha Thapa 1 - 0 1 0 11 3 0 0 5 3 0

410 5 (KHA, 2) 340 Not Identified 1 - 0 1 2 8 2 0 0 4 0 0

411 5 (KHA, 2) 342 Chir Bhai Desar 1 Ram Bahadur Dharti 1 2 1 4 0 0 0 13 1 0

412 5 (KHA, 2) 402 Krishna Maiya Thapini 1 Surath Bahadur Thapa 1 2 2 9 2 0 0 0 0 1

413 5 (KHA, 2) 407 Naran Thapa Chettri 1 - 0 1 2 6 0 0 0 1 1 0

414 5 (KHA, 2) 408 Dil Bahadur Thapa 1 - 0 1 1 11 3 0 0 3 0 0

415 5 (KHA, 2) 409 Indra Kumari Thap 1 Dil Bahadur Thapa 1 2 0 8 2 0 0 2 0 0

416 5 (KHA, 2) 410 HMG/Land 0 - 0 0 1 0 14 0 0 0 9 1 0

417 5 (KHA, 2) 415 Ema Kumari Jyapuni 1 Ema Kumari Jyapuni 1 2 2 14 0 0 0 13 0 0

418 5 (KHA, 2) 417 Harsha Lal Deshar 1 - 0 1 1 14 3 0 0 3 3 0

419 5 (KHA, 2) 418 Ram Maya Kasaini 1 Surje Maya 1 2 1 12 2 0 0 3 0 0

420 5 (KHA, 2) 419 HMG/Land 0 - 0 0 1 1 8 3 0 1 0 0 0

421 5 (KHA, 2) 420 Bhim Bahadur Josi 1 Tulshi Naran Jyapu 1 2 1 2 0 0 0 4 0 0

422 5 (KHA, 2) 421 Nhucheen Lal Jyapu 1 - 0 1 0 6 2 0 0 2 0 0

423 5 (KHA, 2) 422 Tulshi Naran Jyapu 1 - 0 1 1 14 0 0 0 1 0 0

424 5 (KHA, 2) 457 Not Identified 1 - 0 1 0 0 1 0

425 5 (KHA, 2) 458 Not Identified 2 - 0 2 0 5 0 0

426 5 (KHA, 2) 502 Sanker Kumar Thapa 1 - 0 1 1 0 3 0 0 13 3 0

427 5 (KHA, 2) 503 Sano Babu Thapa 1 - 0 1 1 13 1 0 0 5 0 0

428 5 (KHA, 2) 556 Sanker Kumar Thapa 1 - 0 1 1 4 0 0 0 12 2 0

429 6 (KHA) 40 Bajra Barahi Guthi 1 Tusi Jyapu 1 2 3 5 0 0 0 8 3 0

430 6 (KHA) 50 Bal Bahadur Deshar 1 Jit Bahadur Deshar 1 2 0 8 0 0 0 0 3 1

431 6 (KHA) 39 Bal Dev Upadyaya 1 Narayan Thapa 1 2 0 14 0 0 0 6 0 0

Page 15 of 43 Annex V- 1

Page 90: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

432 6 (KHA) 300 Bekah Lal 1 - 0 1 0 11 2 0 0 9 2 0

433 6 (KHA) 308 Bhai Maharjan 1 - 0 1 2 6 2 0 0 10 2 0

434 6 (KHA) 164 Bhim Nath Joshi 1 Hari Bahadur Thapa 1 2 0 11 0 0 0 0 2 0

435 6 (KHA) 38 Dambar Bahadur Thapa 1 - 0 1 1 5 0 0 0 8 0 0

436 6 (KHA) 170 Haricha Jyapu 1 - 0 1 0 7 0 0 0 5 2 0

437 6 (KHA) 47 Jit Bahadur Desar 1 Bal Bahadur Desar 1 2 3 3 0 0 0 7 0 0

438 6 (KHA) 34 Krishna Kumari Thapa 1 - 0 1 1 2 0 0 0 2 2 0

439 6 (KHA) 173 Kul Bir Maharjan Gyan Maya Jyapuni 2 2 6 0 0 1 8 0 0

440 6 (KHA) 174 Kul Bir Maharjan Gyan Maya Jyapuni 0 0 10 0 0 0 0 0 1

441 6 (KHA) 185 Kul Bir Maharjan Purna Bahadur Jyapu 1 1 0 10 0 0 0 8 2 0

442 6 (KHA) 301 Laxman Maharjan 1 - 0 1 2 6 2 0 0 4 0 0

443 6 (KHA) 169 Moti Lal Bada 1 Asha Maya Jyapu 1 2 3 10 0 0 1 7 0 0

444 6 (KHA) 46 Narayan Thapa 1 - 0 1 0 9 0 0 0 3 2 0

445 6 (KHA) 171 Pannacha Jyapu 1 - 0 1 0 7 0 0 0 0 0 1

446 6 (KHA) 165 Rajendra Bahadur Thapa 1 Silal Jyapu 1 2 2 0 0 0 7 1 0

447 6 (KHA) 172 Shiva Narayan Jyapu 1 Dev Das Jyapu 1 2 1 1 0 0 0 3 3 0

448 6 (KHA) 309 Sukuram Maharjan 1 - 0 1 1 0 1 0 0 14 3 0

Total 70 36 106 6 4 98 613 60 0 9 433 96 4

VDC :Thecho 37 9 1 0

449 1 49 Dal Bahadur Jogi 1 - 0 1 2 4 0 0 0 2 3 0

450 1 988 Daya Ram Shrestha 1 - 0 1 1 1 2 0 0 15 1 0

451 1 987 Dhan Shyam Shrestha - 0 1 0 4 2 0 0 3 1 0

452 1 990 Dhan Shyam Shrestha - 0 0 0 13 1 0 0 1 1 0

453 1 31 Ganesh Bahadur Khatri 1 - 0 1 0 11 2 0 0 5 3 0

454 1 940 Gopi Krishna Kunwor 1 - 0 1 0 11 0 0 0 3 0 0

455 1 828 HMG 0 - 0 0 1 1 0 3 0 0 8 2 0

456 1 38 Jyapu Lal Kusle 1 - 0 1 1 3 2 0 0 2 1 0

457 1 32 Nakali Dangolni 1 - 0 1 1 0 7 3 0 0 1 0 1

458 1 30 Nhuchhen Lal Dangol 1 - 0 1 1 15 0 0 1 0 1 0

459 1 941 Pralhad Kunwor 1 - 0 1 0 11 0 0 0 0 1 1

11

1

Page 16 of 43 Annex V- 1

Page 91: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

460 1 39 Pun Lal Mali 1 - 0 1 1 12 2 0 0 11 3 0

461 1 986 Shiva Ram Shrestha - 0 1 0 0 4 2 0 3 2 0

462 1 989 Shiva Ram Shrestha - 0 0 0 13 1 0 0 6 2 0

463 1 950 Shyam Lal Mali 1 - 0 1 0 13 0 0 0 2 1 0

464 2 (KA) 257 Bahadur Deshar 1 Dhan Lal Maharjan 1 2 2 0 0 0 0 10 2 0

465 2 (KA) 193 Bulal Desar - 0 1 0 8 0 0 0 0 2 1

466 2 (KA) 189 Bulal Desar - 0 0 1 8 2 0 1 4 3 0

467 2 (KA) 261 Chandra Bahadu Shrestha 1 Gopi Lal 1 2 1 4 0 0 0 7 2 0

468 2 (KA) 264 HMG/ Land 0 - 0 0 1 1 9 0 0 0 3 1 0

469 2 (KA) 196 HMG/ Land 0 - 0 0 1 0 5 0 0 0 4 0 0

470 2 (KA) 188 HMG/ Land 0 - 0 0 1 0 11 0 0 0 3 0 0

471 2 (KA) 192 HMG/ Land 0 - 0 0 1 5 4 2 0 0 1 1 0

472 2 (KA) Kulo HMG/ Land 0 - 0 0 1 0 1 3 0 0 1 3 0

473 2 (KA) Kulo HMG/ Land 0 - 0 0 1 0 1 1 0 0 1 1 0

474 2 (KA) 233 Ichha Bahadur Jyapu 1 Chakra Bahadur Dangol 1 2 5 3 0 0 1 8 1 0

475 2 (KA) 279 Ichha Bahadur Maharjan 1 - 0 1 1 4 0 0 0 9 2 0

476 2 (KA) 197 Jagat Maya Kayasthani 1 - 0 1 1 2 0 0 0 0 0 2 0

477 2 (KA) 198 Krishna Mehar Maharjan 1 - 0 1 1 0 0 0 0 4 0 0

478 2 (KA) 230 Lal Bahadur Shrestha 1 - 0 1 0 10 0 0 0 6 0 0

479 2 (KA) 191 Purna Desar - 0 1 1 8 0 0 0 1 3 0

480 2 (KA) 195 Purna Desar - 0 0 0 7 2 0 0 7 0 0

481 2 (KA) 229 Ram Bhakta Shrestha 1 - 0 1 0 11 1 0 0 6 3 0

482 2 (KA) 263 Saman Maya Maharjan 1 Krishna Lal Maharjan 1 2 1 1 14 2 0 0 8 0 0

483 2 (KA) 331 Santi Devi Rajbhandari 1 - 0 1 1 0 5 0 0 0 8 1 0

484 2 (KA) 190 Tari Babu Desar 1 - 0 1 1 6 0 0 0 7 1 0

485 8 (GA) 98 Bhaicha Jyapu 1 - 0 1 0 14 0 0 0 0 1 2

486 8 (GA) 103 Gopi Lal 1 - 0 1 2 9 0 0 1 5 0 0

487 8 (GA) 97 Hira Lal Maharjan 1 - 0 1 1 1 0 0 0 10 3 0

488 8 (GA) 109 HMG/Land 0 - 0 0 1 7 1 0 0 3 10 3 0

489 8 (GA) 82 Jit Govinda Maharjan 1 - 0 1 1 11 0 0 0 2 1 0

1

1

1

Page 17 of 43 Annex V- 1

Page 92: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

490 8 (GA) 102 Kashi Lal Maharjan 1 - 0 1 0 4 0 0 0 3 3 0

491 8 (GA) 101 Shankhabir Jyapu 1 - 0 1 1 15 0 0 0 1 2 0

492 8 (GA) 96 Shiva Das Maharjan 1 - 0 1 2 3 0 0 0 0 1 0

493 8 (GHA) 1 Babu Lal Mali 1 - 0 1 1 3 2 0 0 8 1 0

494 8 (GHA) 20 Dil Bahadur Ranamagar 1 - 0 1 0 10 2 0 0 2 1 0

495 8 (GHA) 71 Govinda Jyapu 1 Singh Bir Jyapu 1 2 1 4 1 0 0 1 2 0

496 8 (GHA) 23 Harka Lal Jyapu 1 - 0 1 0 11 2 0 0 3 3 0

497 8 (GHA) 21 Hira Lal Jyapu 1 - 0 1 3 7 3 0 0 14 0 0

498 8 (GHA) 67 HMG/Land 0 - 0 0 1 2 7 2 0 0 15 2 0

499 8 (GHA) 104 HMG/Land 0 - 0 0 1 0 13 2 0 0 14 0 0

500 8 (GHA) 172 Jamuna Mali 1 - 0 1 1 1 1 2 0 0 3 3 0

501 8 (GHA) 182 Jman Singh Maharjan 1 - 0 1 1 1 2 0 0 3 3 0

502 8 (GHA) 105 Kishmer Jyapu Kishan Mayer Jyapu 1 2 1 7 2 0 1 5 0 0

503 8 (GHA) 118 Kishmer Jyapu - 0 0 1 1 0 0 0 5 2 0

504 8 (GHA) 174 Krishna Govinda Maharjan 1 - 0 1 0 2 3 0 0 4 2 0

505 8 (GHA) 78 Man Kishan Jyapu 1 - 0 1 0 2 0 0 0 7 3 0

506 8 (GHA) 173 Nahuchhe Raj Maharjan 1 - 0 1 0 2 3 0 0 4 1 0

507 8 (GHA) 72 Nakali Jyapuni 1 Kishan Maya Jyapuni 1 2 2 0 14 3 0 0 1 3 0

508 8 (GHA) 2 Nani Maya Mali - 0 1 1 3 3 0 0 1 1 0

509 8 (GHA) 3 Nani Maya Mali - 0 0 0 10 2 0 0 5 1 0

510 8 (GHA) 183 Ratna Kaji Maharjan 1 - 0 1 1 1 2 0 0 8 2 0

511 8 (KA) 144 Gyan Bahadur Khatri Chhetri 1 - 0 1 0 2 0 0 0 0 0 2

512 8 (KA) 199 Hira Maya Maharjan - 0 1 2 9 2 0 0 4 2 0

513 8 (KA) 201 Hira Maya Maharjan - 0 0 0 13 2 0 0 0 0 1

514 8 (KA) 184 HMG/Land 0 - 0 0 1 0 4 0 0 1 9 2 0

515 8 (KA) 185 HMG/Land 0 - 0 0 1 1 13 0 0 0 7 1 0

516 8 (KA) 220 HMG/Land 0 - 0 0 1 2 15 0 0 1 12 1 0

517 8 (KA) 143 Jagat Bahadur Poudel Chettri 1 - 0 1 0 4 2 0 0 1 3 0

518 8 (KA) 251 Jit Maya 1 - 0 1 1 0 8 1 0 0 8 1 0

519 8 (KA) 198 Kish Lal Kusle - 0 1 2 12 0 0 0 15 3 0

1

1 1

1 1

1

Page 18 of 43 Annex V- 1

Page 93: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

520 8 (KA) 250 Krishna Kumari - 0 0 1 0 6 2 0 0 6 2 0

521 8 (KA) 219 Man Krishna Maharjan 1 - 0 1 7 2 2 0 1 6 1 0

522 8 (KA) 211 Muthi Damini - 0 1 0 2 2 0 0 0 1 0

523 8 (KA) 212 Muthi Damini - 0 0 0 10 0 0 0 0 1 2

524 8 (KA) 218 Muthi Damini - 0 0 0 2 2 0 0 0 3 0

525 8 (KA) 270 Nanda Maharjan 1 - 0 1 1 1 4 2 0 0 0 1 0

526 8 (KA) 249 Nanda Maya 1 - 0 1 1 0 8 0 0 0 8 0 0

527 8 (KA) 142 Ram Hari Kha Chhen 1 - 0 1 0 1 3 0 0 1 3 0

528 8 (KA) 236 Shiv Das Jyapu 1 - 0 1 0 15 0 0 0 5 2 0

529 8 (KA) 141 Tej Bahadur Khatri Chhetri - 0 1 0 4 2 0 0 1 3 0

530 8 (KA) 145 Tej Bahadur Khatri Chhetri - 0 0 0 6 1 0 0 0 0 3

531 8 (KA) 223 Uma Nath Upadyaya - 0 1 3 8 0 0 0 12 3 0

532 8 (KA) 140 Uma Nath Upadyaya - 0 0 1 1 1 0 0 3 1 0

Total 59 7 66 13 14 75 543 95 2 11 392 128 13

VDC :Chapagaun 37 8 3 1

533 1 (KA) 42 Asta Maya Maharjan 1 - 0 1 1 1 13 0 0 0 6 2 0

534 1 (KA) 95 Bakhat Bahadur Karanjit Santa Lal Desar 2 0 2 3 0 0 0 2 3

535 1 (KA) 96 Bakhat Bahadur Karanjit Santa Lal Desar 0 0 7 0 0 0 5 0 0

536 1 (KA) 97 Bakhat Bahadur Karanjit Ramcha Desar 1 1 0 2 1 0 0 0 2 1

537 1 (KA) 2 Dhan Lal Jyapu 1 - 0 1 1 0 2 0 0 8 1 0

538 1 (KA) 45 Dhan Nari Maharjan 1 - 0 1 1 9 2 0 0 0 2 2

539 1 (KA) 148 Ganga Devi Rajbhandari Asta Lal Jyapu 1 2 1 10 0 0 0 3 3 0

540 1 (KA) 149 Ganga Devi Rajbhandari Mohan Lal Shrestha 1 1 2 3 0 0 0 15 2 0

541 1 (KA) 26 Gopal Jyapu 1 - 0 1 1 1 0 0 0 1 1 0

542 1 (KA) 151 HMG 0 - 0 0 1 1 4 0 0 0 5 1 0

543 1 (KA) 281 HMG/Land 0 - 0 0 1 45 12 0 0 0 12 1 0

544 1 (KA) 145 Indra Bahadur Lakhe Gajendra Bahadur Shrestha 2 1 13 0 0 0 4 1 0

545 1 (KA) 147 Indra Bahadur Lakhe Gajendra Bahadur Shrestha 0 0 1 2 0 0 0 3 0

546 1 (KA) 46 Janak Lal Patwar 1 - 0 1 3 13 2 0 0 3 0 0

547 1 (KA) 22 Jit Lal Maharjan 1 - 0 1 1 1 0 0 0 6 0 0

1

1 1

1

1

11

1 1

1 1

Page 19 of 43 Annex V- 1

Page 94: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

548 1 (KA) 44 Kirti Lal Maharjan 1 - 0 1 0 11 0 0 0 6 2 0

549 1 (KA) 3 Kish Lal Jyapu 1 - 0 1 1 2 0 0 0 12 1 0

550 1 (KA) 7 Krishnacha Jyapu - 0 1 0 10 2 0 0 3 3 0

551 1 (KA) 23 Krishnacha Jyapu - 0 0 0 13 2 0 0 5 0 0

552 1 (KA) 38 Mahanta Lal Jyapu 1 - 0 1 3 0 0 0 1 3 1 0

553 1 (KA) 28 Narsingh Desar 1 - 0 1 3 3 2 0 0 11 0 0

554 1 (KA) 152 Nhuchhen Lal Jyapu - 0 1 3 7 0 0 0 11 0 0

555 1 (KA) 156 Nhuchhen Lal Jyapu - 0 0 0 8 0 0 0 3 0 0

556 1 (KA) 318 Not Identified 1 - 0 1 0 4 1 0 0 3 3 0

557 1 (KA) 319 Not Identified 1 - 0 1 0 4 1 0 0 0 2 0

558 1 (KA) 21 Pirtha Man Jyapu - 0 1 1 0 3 0 0 4 3 0

559 1 (KA) 4 Pirtha Man Jyapu - 0 0 1 6 0 0 0 10 3 0

560 1 (KA) 27 Ratna Bahadur Jyapu 1 - 0 1 5 3 2 0 1 10 3 0

561 1 (KA) 85 Shyam Lal Shrestah 1 Lok Man Desar 1 2 1 12 0 0 0 7 0 0

562 1 (KA) 43 Shyan Lal Puri 1 - 0 1 2 6 0 0 0 6 2 0

563 1 (KA) 146 Surya Bahadur Shrestha 1 - 0 1 2 3 0 0 1 2 2 0

564 1 (KA) 5 Tikacha Jyapu - 0 1 0 9 0 0 0 3 2 0

565 1 (KA) 24 Tikacha Jyapu - 0 0 1 3 0 0 0 10 0 0

566 1 (KA) 39 Tulsi Karanjit 1 - 0 1 1 0 5 0 0 0 3 2

567 1 (KA) 157 Tulsi Shrestha 1 - 0 1 3 0 0 0 0 8 3 0

568 1 (KA) 86 Vyanari Maharjan 1 - 0 1 1 2 5 2 0 0 14 3 0

569 1 (KHA) 429 Charndra Meher Kayastha 1 - 0 1 0 10 2 0 0 7 1 0

570 1 (KHA) 442 Dhurba Man Shrestha 1 - 0 1 0 7 0 0 0 2 3 0

571 1 (KHA) 8 Guthi 1 Ganesh Bahadur Chakhun 1 2 0 10 2 0 0 0 2 0

572 1 (KHA) 5 HMG 0 - 0 0 1 2 10 2 0 2 10 2 0

573 1 (KHA) 6 HMG 0 - 0 0 1 1 12 2 0 1 12 2 0

574 1 (KHA) 23 Mangal Das Napi Shau 1 - 0 1 1 0 2 0 0 4 3 0

575 1 (KHA) 10 Not Identified 1 Kashi Lal Maharjan 1 2 0 4 0 0 0 0 3 0

576 1 (KHA) 443 Purna Bahadur Shahi 1 - 0 1 0 7 0 0 0 6 0 0

577 1 (KHA) 431 Ram Shrestha 1 - 0 1 0 10 2 0 0 1 2 0

1

1

1

1

Page 20 of 43 Annex V- 1

Page 95: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

578 1 (KHA) 430 Siddhi Ram Shrestha 1 - 0 1 0 10 2 0 0 4 3 0

579 1 (KHA) 428 Sudharsan Meher Kayastha 1 - 0 1 0 10 3 0 0 6 1 0

580 1 (KHA) 24 Tilak Bahadur Patuwar 1 - 0 1 0 7 2 0 0 2 1 0

581 3 (KA) 14 Hasta Bahadur Jogi 1 - 0 1 2 15 0 0 0 11 2 0

582 3 (KA) 736 Ichha Bahadur Maharjan 1 - 0 1 1 0 0 0 0 2 0 0

583 3 (KA) 23 Jagat Laxmi Shrestha 1 Sinlal Jyapu 1 2 1 1 0 2 0 0 12 2 0

584 3 (KA) 612 Karna Bahadur Deshar 1 - 0 1 0 14 0 0 0 12 1 0

585 3 (KA) 3 Kish Lal Jyapu 1 Kish Lal Jyapu 1 2 6 0 3 0 0 11 2 0

586 3 (KA) 611 Krishana Deshar 1 - 0 1 0 14 0 0 0 4 2 0

587 3 (KA) 52 Kumar Desar 1 Jit Govinda Jyapu 1 2 3 8 2 0 0 0 3 0

588 3 (KA) 31 Matshendra Guthi 1 Kancha Santa Lal Desar 1 2 0 4 2 0 0 8 2 0

589 3 (KA) 32 Matshendra Guthi 1 Lalcha Desar 1 2 1 4 0 0 0 10 1 0

590 3 (KA) 604 Nanda Bahadur 1 - 0 1 1 8 0 0 0 8 1 0

591 3 (KA) 512 Not Identified 1 - 0 1 0 11 1 0 0 0 3 0

592 3 (KA) 513 Not Identified 1 - 0 1 0 11 1 0 0 4 0 0

593 3 (KA) 514 Not Identified 1 - 0 1 0 9 2 2 0 2 2 0

594 3 (KA) 515 Not Identified 1 - 0 1 0 9 2 2 0 1 0 0

595 3 (KA) 516 Not Identified 1 - 0 1 0 4 3 0 0 0 2 0

596 3 (KA) 622 Not Identified 1 - 0 1 0 7 3 0 0 4 3 0

597 3 (KA) 623 Not Identified 1 - 0 1 1 1 2 0 0 8 3 0

598 3 (KA) 624 Not Identified 1 - 0 1 0 9 2 0 0 8 2 0

599 3 (KA) 625 Not Identified 1 - 0 1 1 1 2 0 0 8 2 0

600 3 (KA) 15 Pond, HMG 0 0 0 1 0 12 1 0 0 12 1 0

601 3 (KA) 40 Purna Bahadur Jyapu 1 - 0 1 3 3 1 0 0 5 0 0

602 3 (KA) 38 Ram Bahadur 1 Nanda Gopal Jyapu 1 2 3 10 1 0 1 6 0 0

603 3 (KA) 603 Ram Gopal Maharjan 1 - 0 1 2 1 0 0 0 12 2 0

604 3 (KA) 41 Ratna Mal Jyapu 1 Ram Gopal Jyapu 1 2 3 4 2 0 0 13 2 0

605 3 (KA) 610 Sanjay Kumar Desar 1 - 0 1 0 12 0 0 0 1 0 0

606 3 (KA) 594 Sanu Kaji Maharjan 1 - 0 1 1 0 0 0 0 4 3 0

607 9 (GHA) 160 Nanda Bahadur 1 - 0 1 0 14 0 2 0 6 0 0

Page 21 of 43 Annex V- 1

Page 96: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

608 9 (GHA) 159 Ram Gopal 1 - 0 1 0 13 3 0 0 0 0 2

Total Area 63 15 78 5 4 120 495 86 6 7 425 121 10

VDC : Dhapakhel 35 7 3 2

609 6 (KHA) 132 Harsha Bahadur Karki 1 - 0 1 3 13 2 0 0 10 1 0

610 6 (KHA) 118 Harsha Bahadur Mali 1 - 0 1 2 14 2 0 1 0 2 0

611 6 (KHA) 133 Hasta Bahadur Karki 1 - 0 1 1 3 0 0 0 11 1 0

612 6 (KHA) 129 Hira Lal Mali 1 - 0 1 0 9 1 0 0 6 2 0

613 6 (KHA) 117 Krishna Bahadur Mali 1 - 0 1 2 1 2 0 0 13 2 0

614 6 (KHA) 130 Krishnacha Mali 1 - 0 1 0 5 1 0 0 5 1 0

615 6 (KHA) 137 Nandacha Maharjan 1 Ratna Bahadur Mali 1 2 0 7 1 0 0 2 1 0

616 6 (KHA) 246 Not Identified 1 Denda Kumari Giri 1 2 0 8 0 0 0 0 2 1

617 7 (KA) 341 Bhai Lal 1 - 0 1 0 2 3 0 0 2 2 0

618 7 (KA) 265 Bhakta Man Mali 1 - 0 1 0 6 1 0 0 6 0 0

619 7 (KA) 291 Bhyakuli Girini 1 - 0 1 1 3 10 2 0 0 1 0 0

620 7 (KA) 254 Divya Prashad Upadyaya 1 Santa Man Mali 1 2 0 5 2 0 0 8 2 0

621 7 (KA) 340 Gyan Bhakta - 0 1 0 2 3 0 0 0 2 0

622 7 (KA) 344 Gyan Bhakta - 0 0 0 0 3 0

623 7 (KA) 274 Kancho Giri 1 - 0 1 1 5 0 0 0 8 2 0

624 7 (KA) 263 Karna Bahadur Giri 1 - 0 1 0 2 1 0 0 1 2 0

625 7 (KA) 330 Krishna Bahadur 1 - 0 1 0 14 3 0 0 2 1 0

626 7 (KA) 257 Kul Bahadur Giri - 0 1 0 1 0 0 0 1 0 0

627 7 (KA) 264 Kul Bahadur Giri - 0 0 0 5 0 0 0 1 2 0

628 7 (KA) 266 Min Bahadur Giri 1 - 0 1 0 5 2 0 0 0 0 1

629 7 (KA) 258 Musi Mahantani - 0 1 0 0 2 0 0 0 2 0

630 7 (KA) 262 Musi Mahantani - 0 0 0 2 1 0 0 2 1 0

631 7 (KA) 275 Myakuli Giri 1 - 0 1 1 1 1 0 0 0 7 0 0

632 7 (KA) 261 Sanu Mali 1 - 0 1 1 0 12 1 0 0 1 3 0

633 7 (KA) 270 Shree Nau Jogini Guthi Dhamansin Mali 1 2 0 8 2 0 0 8 2 0

634 7 (KA) 271 Shree Nau Jogini Guthi Surje Man Mali 1 1 0 2 3 0 0 0 1 0

635 7 (KA) 259 Tej Bahadur Giri 1 - 0 1 0 7 1 0 0 5 3 0

1

1

1 1

1

Page 22 of 43 Annex V- 1

Page 97: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

636 7 (KA) 290 Thulo Ram Bahadur Giri 1 - 0 1 3 14 0 0 1 3 0 0

637 7 (KHA) 5 Chitra Bahadur Khadka 1 Jit Lal Mali 1 2 2 0 2 0 1 10 3 0

638 7 (KHA) 24 Harkha Bahadur Mali - 0 1 1 1 1 0 0 10 3 0

639 7 (KHA) 27 Harkha Bahadur Mali - 0 0 2 0 0 0 0 1 2 0

640 7 (KHA) 56 Harkha Bahadur Mali - 0 0 0 8 2 0 0 2 0 0

641 7 (KHA) 54 Harkha Lal Mali 1 Ratna Lal Shrestha 1 2 0 14 0 0 0 0 2 0

642 7 (KHA) 23 Harsa Bahadur Mali 1 - 0 1 0 2 3 0 0 2 2 0

643 7 (KHA) 1 Jit Lal Mali 1 - 0 1 3 5 0 0 0 6 1 0

644 7 (KHA) 6 Jit Man Thapa 1 - 0 1 1 1 2 0 0 3 3 0

645 7 (KHA) 8 Kale Bhai Thapa 1 - 0 1 1 0 2 0 0 2 1 0

646 7 (KHA) 7 Karna Thapa 1 Tikacha Mali 1 2 1 11 0 0 0 14 2 0

647 7 (KHA) 22 Krishan Bahadur Giri 1 Chandra Bahadur Mali 1 2 0 7 3 0 0 3 2 0

648 7 (KHA) 17 Kul Bhadur Giri 1 - 0 1 0 3 3 0 0 3 0 0

649 7 (KHA) 19 Min Bahadur Giri 1 - 0 1 0 2 3 0 0 2 2 2

650 7 (KHA) 15 Musi Mahantani 1 - 0 1 1 0 3 3 0 0 0 1 1

651 7 (KHA) 58 Nanada Kumari Mohantini 1 - 0 1 1 1 7 1 0 0 7 0 0

652 7 (KHA) 191 Not Identified 1 - 0 1 0 11 2 1 0 2 0 0

653 7 (KHA) 196 Not Identified 1 - 0 1 1 15 1 0 1 4 0 0

654 7 (KHA) 197 Not Identified 1 - 0 1 1 15 1 0 0 1 3 0

655 7 (KHA) 21 Pusker Giri - 0 1 0 7 3 0 0 6 3 0

656 7 (KHA) 63 Pusker Giri - 0 0 0 12 0 0 0 1 1 2

657 7 (KHA) 14 Ram Bahadur Giri 1 Prem Bahadur Giri 1 2 0 12 2 0 0 2 0 0

658 7 (KHA) 61 Rana Bhahdur Mali 1 - 0 1 5 1 0 0 2 3 0 0

659 7 (KHA) 20 Sanu Lok Bahadur Giri 1 - 0 1 0 6 3 0 0 4 1 0

660 7 (KHA) 18 Sher Bahadur Griri 1 - 0 1 0 3 1 0 0 3 1 0

661 7 (KHA) 16 Tej Bahadur Giri 1 - 0 1 0 0 3 0 0 0 1 3

662 7 (KHA) 11 Tuyesin Mali 1 - 0 1 0 13 3 0 0 15 0 0

663 8 (KHA) 511 Asta Bahadur Mali - 0 1 0 7 0 0 0 1 2 0

664 8 (KHA) 513 Asta Bahadur Mali - 0 0 1 6 0 0 0 9 3 0

665 8 (KHA) 488 Buddhi Bahadur Maharjan 1 - 0 1 4 4 0 0 0 8 2 0

1

1

1

Page 23 of 43 Annex V- 1

Page 98: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

666 8 (KHA) 489 Buddhi Raj Maharjan 1 - 0 1 4 4 0 0 0 12 1 0

667 8 (KHA) 401 Canal 0 - 0 0 1 4 10 3 0 0 3 3 0

668 8 (KHA) 406 Canal 0 - 0 0 1 0 7 2 0 0 0 3 2

669 8 (KHA) 448 Dashmaya Maharjan 1 - 0 1 0 8 2 0 0 6 0 0

670 8 (KHA) 143 Dev Lal Jyapu 1 - 0 1 0 3 0 0 0 0 0 2

671 8 (KHA) 554 Gopal 1 - 0 1 0 4 0 0 0 1 2 0

672 8 (KHA) 565 Gopal Mali 1 - 0 1 0 6 0 0 0 0 2 3

673 8 (KHA) 76 Hera Lal Maharjan 1 Krishna Bdr. Magar 1 2 0 4 0 0 0 2 2 0

674 8 (KHA) 139 Hera Lal Mali 1 Puncha Mali 1 2 1 8 0 0 0 7 3 0

675 8 (KHA) 70 Hira Lal Jyapu 1 - 0 1 1 4 0 0 0 0 0 1

676 8 (KHA) 294 HMG/Land 0 - 0 0 1 2 12 0 0 2 12 0 0

677 8 (KHA) 380 HMG/Land 0 - 0 0 1 0 11 0 0 0 8 1 0

678 8 (KHA) 381 HMG/Land 0 - 0 0 1 2 15 0 0 1 3 2 0

679 8 (KHA) 441 Jagat Bahadur - 0 1 0 9 0 0 0 5 1 0

680 8 (KHA) 447 Jagat Bahadur - 0 0 0 2 0 0 0 2 0 0

681 8 (KHA) 37 Jit Raj Jyapu 1 Min Bahadur Mali 1 2 1 3 0 0 0 6 1 0

682 8 (KHA) 510 Kaji Bahadur Mali - 0 1 0 7 0 0 0 5 0 0

683 8 (KHA) 512 Kaji Bahadur Mali - 0 0 1 6 0 0 0 4 2 0

684 8 (KHA) 288 Kamal Bahadur Giri - 0 1 0 4 0 0 0 3 0 0

685 8 (KHA) 291 Kamal Bahadur Giri - 0 0 0 2 2 0 0 2 2 0

686 8 (KHA) 292 Kamal Bahadur Giri - 0 0 0 14 1 0 0 2 1 0

687 8 (KHA) 452 Kande Giri 1 - 0 1 1 2 0 0 1 2 0 0

688 8 (KHA) 78 Komal Bahadur Giri 1 Sambhu Giri 1 2 1 5 0 0 0 3 1 0

689 8 (KHA) 77 Laxmi Das Maharjan 1 Laxmi Das Maharjan 1 2 1 7 0 0 0 2 0 0

690 8 (KHA) 86 Min Bahadur Giri 1 - 0 1 1 9 0 0 0 6 0 0

691 8 (KHA) 297 Nar Lal Mali - 0 1 1 1 0 0 0 1 0 0

692 8 (KHA) 45 Nar Lal Mali - 0 0 2 6 0 0 0 6 1 0

693 8 (KHA) 80 Narsingh Mali - 0 1 1 10 0 0 0 4 1 0

694 8 (KHA) 82 Narsingh Mali - 0 0 0 1 1 0 0 1 1 0

695 8 (KHA) 506 Padam Bahadur Giri 1 - 0 1 0 5 2 0 0 0 1 2

1

1

1

1

1

Page 24 of 43 Annex V- 1

Page 99: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

696 8 (KHA) 451 Phung & Ram Krishana 2 - 0 2 0 7 0 0

697 8 (KHA) 450 Raj Kumar Giri 1 - 0 1 1 0 0 0 0 5 0 0

698 8 (KHA) 85 Ram Bahadur Giri 1 - 0 1 0 10 2 0 0 2 3 0

699 8 (KHA) 453 Ram Krishna Giri 1 - 0 1 1 0 2 0 0 13 2 0

700 8 (KHA) 137 Ratna Man Tamrakar 1 - 0 1 1 3 0 0 0 7 0 0

701 8 (KHA) 145 Rudra Bahadur Giri 1 - 0 1 0 14 0 0 0 0 2 0

702 8 (KHA) 440 Sano Kaji 1 - 0 1 0 12 0 0 0 4 1 0

703 8 (KHA) 505 Shambhu Giri 1 - 0 1 0 5 0 0 0 3 1 0

704 8 (KHA) 382 Shankha Lal Maharjan 1 - 0 1 3 5 0 0 0 15 2 0

705 8 (KHA) 378 Shiva Raj Maharjan 1 - 0 1 1 11 0 0 0 8 1 0

706 8 (KHA) 384 Shiva Rash Maharjan 1 - 0 1 2 5 0 0 0 8 2 0

707 8 (KHA) 446 Surya Bahadur 1 - 0 1 0 8 0 0 0 5 3 0

708 8 (KHA) 566 Tayu Mali 1 - 0 1 0 6 0 0 0 1 0 0

709 8 (KHA) 551 Thule Devi Pandey 1 - 0 1 1 0 2 2 0 0 3 3 0

710 8 (KHA) 284 Tirtha Mali 1 Bish Lal Jyapu 1 2 0 13 0 0 0 8 2 0

711 8 (KHA) 296 Tulsingh Das Maharjan 1 - 0 1 3 5 0 0 0 11 1 0

712 8 (KHA) 38 Tuyisin Mali 1 - 0 1 1 5 0 0 0 9 1 0

713 9 (KHA) 190 Bhuvan Bahadur 1 Nanada Lal Maharjan 1 2 0 2 0 0 0 2 0 0

714 9 (KHA) 217 Hira Lal Maharjan 1 - 0 1 0 14 1 0 0 15 3 0

715 9 (KHA) 219 Kisna Bahadur Jyapu 1 - 0 1 0 3 2 1 0 3 2 0

716 9 (KHA) 188 Laxmi Devi Maharjan 1 - 0 1 1 0 5 2 0 0 7 0 0

717 9 (KHA) 256 Not Identified 1 - 0 1 5 0 0 0 0 12 2 0

718 9 (KHA) 257 Not Identified 1 - 0 1 0 15 0 0 0 3 3 0

719 9 (KHA) 292 Pawan Maya Karki 1 - 0 1 1 1 4 2 0 0 12 1 0

720 9 (KHA) 220 Ramcha Jyapu 1 - 0 1 0 3 0 0 0 5 0 0

721 9 (KHA) 290 Sanjiv Karki - 0 1 0 5 2 0 0 2 1 0

722 9 (KHA) 291 Sanjiv Karki - 0 0 1 4 0 0 0 10 3 0

723 9 (KHA) 223 Sankha Lal Maharjan 1 - 0 1 3 4 0 0 0 8 0 0

724 9 (KHA) 191 Shyam Bahadur Thapa 1 - 0 1 4 8 0 0 2 5 3 0

725 9 (GA) 100 Asha Lal Mali 1 - 0 1 2 2 0 0 0 9 0 0

1

Page 25 of 43 Annex V- 1

Page 100: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

726 9 (GA) 123 Babu Lal Mali 1 - 0 1 0 3 0 0 0 1 1 0

727 9 (GA) 202 Bekha Ram Maharjan 1 - 0 1 1 9 1 0 0 1 0 0

728 9 (GA) 127 Bhai Lal Maharjan 1 Yahu Jyapuni 2 1 6 2 0 1 0 1 0

729 9 (GA) 141 Bhai Lal Maharjan 1 Yahu Jyapuni 1 0 11 0 0 0 1 1 0

730 9 (GA) 135 Das Lal Jyapu 1 - 0 1 1 9 2 0 0 0 3 0

731 9 (GA) 97 Dig Bijaya Maharjan - 0 1 0 12 1 0 0 2 1 0

732 9 (GA) 99 Dig Bijaya Maharjan - 0 0 0 7 2 0 0 5 2 0

733 9 (GA) 70 Dil Bahadur Bohra Chettri 1 - 0 1 0 9 3 0 0 1 0 0

734 9 (GA) 190 Ganesh Bahadur Khatri 1 - 0 1 0 1 2 0 0 0 0 1

735 9 (GA) 122 Gyan Lal Mali 1 - 0 1 0 5 0 0 0 4 2 0

736 9 (GA) 133 HMG 0 - 0 0 1 1 1 2 0 0 4 2 0

737 9 (GA) 113 Jethi Thapani 1 - 0 1 1 0 12 3 0 0 0 1 0

738 9 (GA) 134 Kajicha Jyapu 1 - 0 1 3 7 2 0 2 0 1 0

739 9 (GA) 120 Kisna Das Maharjan 1 - 0 1 0 6 1 0 0 0 0 1

740 9 (GA) 105 Krishna Bahadur Karki 1 - 0 1 1 4 2 0 0 2 3 0

741 9 (GA) 102 Lato Jyapu 1 - 0 1 0 8 3 0 0 8 3 0

742 9 (GA) 188 Laxmi Bahadur Khatri 1 - 0 1 0 6 2 2 0 1 1 0

743 9 (GA) 96 Mahanta Lal Jyapu - 0 1 0 0 3 0 0 0 3 0

744 9 (GA) 98 Mahanta Lal Jyapu - 0 0 0 2 2 0 0 2 0 0

745 9 (GA) 103 Mahanta Lal Jyapu - 0 0 0 8 2 0 0 5 2 0

746 9 (GA) 104 Mahanta Lal Jyapu - 0 0 0 12 2 0 0 1 3 0

747 9 (GA) 121 Moti Bahadur Karki 1 - 0 1 1 1 1 0 0 6 3 0

748 9 (GA) 125 Nanicha Mali 1 - 0 1 1 0 5 2 0 0 1 1 0

749 9 (GA) 228 Prakash K.C. 1 - 0 1 0 2 1 0

750 9 (GA) 69 Ramcha Jyapu 1 Bashudev Maharjan 1 2 1 13 2 0 0 3 0 0

751 9 (GA) 227 Ramsaran K.C. 1 - 0 1 0 0

752 9 (GA) 126 Shiva Das Jyapu 1 - 0 1 0 13 3 0 0 12 0 0

753 9 (GA) 211 Shyam Lama 1 - 0 1 0 8 0 0 0 7 2 0

754 9 (GA) 213 Sri Ram Neupane 1 - 0 1 0 2 0 0 0 5 0 0

Total 122 19 141 6 11 103 881 153 4 15 611 191 22

1

1

1

Page 26 of 43 Annex V- 1

Page 101: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

VDC :Thaiba 56 4 0 2

755 9 124 Bhadra Bdr Mahat Chhetri 1 - 0 1 0 10 2 0 0 2 3 0

756 9 5 Dharma Dhoj Pradhan - 0 1 0 10 1 0 0 3 0 0

757 9 117 Dharma Dhoj Pradhan - 0 0 3 2 0 0 0 7 3 0

758 9 114 Ganga Dhoj 1 Shyam Bdr Thapa Chettri 1 2 1 0 9 0 0 0 9 1 0

759 9 127 Guthi 1 Kumale Mahat Chhetri 1 2 1 3 0 0 0 1 3 0

760 9 129 Harisiddi Bhawani Guthi 1 Tika Bahadur Mahat Chettri 1 2 0 15 0 0 0 9 1 0

761 9 115 Keshar Bdr Mahat Chhetri 1 - 0 1 1 7 0 0 1 0 2 0

762 9 128 Tika Bahadur Mahat Chhetri 1 - 0 1 0 3 1 0 0 2 2 0

Total 7 3 10 0 1 5 59 4 0 1 33 15 0

VDC: Harishiddi 3 4 3 0

763 9 180 Asha Kaji Shakya Dotipa Maharjan 1 2 1 1 9 1 0 0 11 2 0

764 9 181 Asha Kaji Shakya Ganesh Bahadur Maharjan 1 1 1 9 0 0 0 11 2 0

765 9 470 Balram Maharjan 1 - 0 1 0 7 0 1 0 5 2 0

766 9 148 Buddhi Bahadur Maharjan 1 - 0 1 0 14 2 0 0 9 1 0

767 9 400 Chandra Bahadur Maharjan 1 - 0 1 1 9 0 0 0 6 1 0

768 9 149 Chatra Raj Wada 1 Laxmi Devi Maharjan 1 2 1 1 6 2 0 0 9 3 0

769 9 241 Dharma Maharjan 1 - 0 1 0 6 0 0 0 6 1 0

770 9 179 Ganesh Bahadur Maharjan 1 - 0 1 0 8 0 0 0 1 2 0

771 9 159 Govinda Maharjan 1 Mersingh Maharjan 1 2 1 0 0 0 0 1 2 0

772 9 140 Hakha Raj Maharjan - 0 1 0 1 2 0 0 1 0 0

773 9 142 Hakha Raj Maharjan - 0 0 1 5 1 0 0 9 0 0

774 9 132 Harisiddi Bhawani Guthi 1 Harkha Raj Maharjan 1 2 5 6 2 0 0 8 2 0

775 9 242 Harisiddi Bhawani Guthi 1 Tar Bahadur Maharjan 1 2 1 13 0 0 0 4 0 0

776 9 156 HMG/ Land 0 - 0 0 1 0 1 2 0 0 1 2 0

777 9 147 Jit Raj Maharjan 1 - 0 1 2 5 0 0 1 0 0 0

778 9 157 Jog Lal Maharjan - 0 1 1 15 0 0 1 1 0 0

779 9 182 Jog Lal Maharjan - 0 0 1 2 2 0 0 11 2 0

780 9 112 Krishna Govinda Maharjan 1 - 0 1 0 15 0 0 0 1 0 0

781 9 234 Lachhim Das Maharjan 1 - 0 1 8 4 0 0 2 4 2 0

1

1

1

1

Page 27 of 43 Annex V- 1

Page 102: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

782 9 155 Machhindra Nath Guthi 1 Buddhi Bahadur Maharjan 1 2 1 15 0 0 0 14 2 0

783 9 186 Mahakal Bhajan Guthi 1 Burma Maharjan 1 2 1 7 0 0 0 0 1 0

784 9 252 Mahila Saheb 1 Asha Maru Maharjan 1 2 0 4 0 0 0 2 1 0

785 9 116 Manohar Bikram Shah 1 Babu Kaji Maharjan 0 1 2 5 0 0 0 0 2 0

786 9 183 Mohini Prashad Upadyaya 1 Jog Lal Maharjan 1 2 2 3 0 0 0 1 3 0

787 9 113 Nanda Lal Maharjan 1 - 0 1 1 7 0 0 0 3 0 0

788 9 240 Pashupati Sadabarta Guthi 1 Buddhi Lal Maharjan 1 2 2 10 0 0 0 12 2 0

789 9 399 Ram Maharjan 1 - 0 1 0 10 0 0 0 3 2 0

790 6 (KHA) 111 Chir Kaji Maharjan 1 - 0 1 1 3 0 0 0 0 2 1

791 6 (KHA) 149 Dambar Bahadur Baniya 1 Kanchi Nani Bajini 1 2 1 0 11 1 0 0 2 3 0

792 6 (KHA) 158 Dash Bahadur Manji 1 - 0 1 0 14 2 0 0 10 3 0

793 6 (KHA) 153 Dharma Maharjan 1 Arjun Maharjan 1 2 2 2 0 0 0 12 3 0

794 6 (KHA) 156 Gyan Bahadur 1 Dash Bahadur Manji 1 2 0 1 2 0 0 1 1 2

795 6 (KHA) 157 Gyan Bahadur Manji 1 - 0 1 0 9 3 0 0 9 2 0

796 6 (KHA) 155 Harsa Bahadur Tyohi 1 - 0 1 0 13 1 0 0 2 2 0

797 6 (KHA) 105 Manga Lal Maharjan 1 Krishna Lal Maharjan 1 2 4 8 2 0 0 6 3 0

798 6 (KHA) 107 Not Identified 1 - 0 1 4 8 1 0 0 10 0 0

799 6 (KHA) 152 Padma Dhoj Thapa Chettri - 0 1 2 1 3 0 1 1 3 0

800 6 (KHA) 154 Padma Dhoj Thapa Chettri - 0 0 1 12 3 0 0 4 2 0

801 6 (KHA) 150 Thuli Maiya 1 - 0 1 1 1 15 0 0 0 0 0 1

802 7 (KHA) 275 Asta Govinda 1 - 0 1 0 11 0 0 0 6 1 0

803 7 (KHA) 278 Asta Maharjan 1 - 0 1 0 9 3 0 0 0 1 2

804 7 (KHA) 82 Bachhu Khadka 1 - 0 1 0 14 2 0 0 0 1 0

805 7 (KHA) 92 Bhagan Chhabi Maharjan 1 - 0 1 2 8 1 0 1 10 2 0

806 7 (KHA) 90 Bhakta Bahadur Maharjan 1 - 0 1 1 11 0 0 0 10 0 0

807 7 (KHA) 83 Dal Kumari Khadkeni 1 Khadga Bahadur Khadka 1 2 1 0 14 3 0 0 0 1 0

808 7 (KHA) 273 Hari Saran Maharjan 1 - 0 1 0 11 0 0 0 3 3 0

809 7 (KHA) 276 Hari Saran Maharjan 1 - 0 1 0 9 3 0 0 2 3 0

810 7 (KHA) 61 Hesh Man Maharjan 1 - 0 1 0 8 0 0 0 5 3 0

811 7 (KHA) 80 Jaya Narayan Bhasi Maharjan 1 - 0 1 2 6 2 0 0 5 2 0

1

Page 28 of 43 Annex V- 1

Page 103: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

812 7 (KHA) 89 Krishna Das 1 - 0 1 2 4 0 0 1 3 1 0

813 7 (KHA) 91 Mahila Dhabi Maharjan 1 - 0 1 1 0 1 0 0 1 1 0

814 7 (KHA) 74 Mishri Khadakeni 1 - 0 1 1 2 10 3 0 1 11 2 0

815 7 (KHA) 274 Rajendra Maharjan - 0 1 0 11 0 0 0 5 0 0

816 7 (KHA) 277 Rajendra Maharjan - 0 0 0 9 3 0 0 1 2 0

817 7 (KHA) 62 Road 0 - 0 0 1 0 8 0 0 0 5 3 0

818 7 (KHA) 79 Shiva Ram Maharjan 1 - 0 1 2 6 2 0 1 3 0 0

819 7 (KHA) 59 Siddhi Lal Maharjan 1 - 0 1 2 8 0 0 0 1 1 0

820 7 (KHA) 76 Silal Saicho 1 - 0 1 1 3 1 0 0 7 2 0

821 8 (KA) 208 Asta Man Damali 1 - 0 1 4 1 0 0 1 8 3 0

822 8 (KA) 169 Basant Bahadur Khadka 1 Nari Kyanti 1 2 1 0 4 2 0 0 4 2 0

823 8 (KA) 374 Bhuwaneshor Ghimere 1 - 0 1 0 6 2 0 0 4 1 2

824 8 (KA) 165 Bil Bahadur Bhiwaha - 0 1 0 8 2 0 0 5 0 0

825 8 (KA) 168 Bil Bahadur Bhiwaha - 0 0 1 0 0 0 0 0 1 3

826 8 (KA) 212 Bir Krishna Bhasin 1 - 0 1 0 15 0 0 0 1 0 0

827 8 (KA) 70 Canal, HMG 0 - 0 0 1 1 0 0 0 0 7 2 0

828 8 (KA) 401 Dabhu Maharjan 1 - 0 1 0 9 2 0 1 2 1 0

829 8 (KA) 182 Dev Guthi 1 Chandra Bahadur 1 2 3 12 0 0 0 7 1 0

830 8 (KA) 181 Dev Kumar Buyena 1 - 0 1 1 13 0 0 0 15 0 0

831 8 (KA) 180 Dharma Maharjan 1 Karma Bahata 1 2 2 0 0 0 1 2 0 0

832 8 (KA) 379 Ganesh Bahadur Maharjan 1 - 0 1 0 13 2 0 0 6 2 0

833 8 (KA) 372 Ganga Bahadur 1 - 0 1 0 4 0 0 0 3 3 0

834 8 (KA) 59 Govinda Shrestha - 0 1 3 1 0 0 1 6 2 0

835 8 (KA) 60 Govinda Shrestha - 0 0 5 1 0 0 0 8 2 0

836 8 (KA) 381 Hari Govinda 1 - 0 1 0 13 2 0 0 7 2 0

837 8 (KA) 61 Harisiddhi Bhawani Guthi 1 Asta Kaji 1 2 2 9 1 0 0 12 2 0

838 8 (KA) 91 Harisiddi Bhawani Guthi 1 Bekh Bahadur Sudaya 1 2 3 12 0 0 1 7 1 0

839 8 (KA) 177 Hira Kumar Bhaya 1 - 0 1 1 9 2 0 0 0 2 0

840 8 (KA) 174 Hira Kumar Maharjan 1 - 0 1 0 5 2 0 0 1 0 0

841 8 (KA) 380 Jaya Govinda 1 - 0 1 0 13 2 0 0 8 0 0

1

1

1

Page 29 of 43 Annex V- 1

Page 104: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

842 8 (KA) 383 Jyapu Napit 1 - 0 1 0 5 3 2 0 3 0 0

843 8 (KA) 179 Kish Lal Mathaya 1 - 0 1 5 1 0 0 1 6 1 0

844 8 (KA) 327 Krishna Gopal 1 - 0 1 0 5 2 0 0 2 2 2

845 8 (KA) 173 Krishna Maharjan 1 - 0 1 1 2 0 0 0 2 0 0

846 8 (KA) 373 Lok Bahadur 1 - 0 1 0 4 0 0 0 4 1 2

847 8 (KA) 164 Muhamuda Bibi 1 Hari Lal Phasaha 1 2 1 0 4 2 0 0 3 0 0

848 8 (KA) 171 Nanda Maharjan 1 - 0 1 1 1 0 0 0 0 3 0 0

849 8 (KA) 320 Not Identified 1 - 0 1 1 11 0 0 0 11 2 0

850 8 (KA) 328 Raju Maharjan 1 - 0 1 1 15 2 0 0 10 2 0

851 8 (KA) 170 Ram Maharjan 1 - 0 1 1 3 0 0 0 5 1 0

852 9 (KA) 371 Ram Maharjan 1 - 0 1 0 4 0 0 0 0 1 0

853 8 (KA) 443 Shyam Maharjan 1 - 0 1 0 8 0 0 0 4 2 0

854 8 (KA) 210 Tuyesin Balasu 1 - 0 1 1 1 0 0 0 6 3 0

Total 82 22 104 3 9 100 664 84 3 15 441 132 15

VDC : Sanagaun 42 12 3 3

855 4 277 Chandra Bahadur Krishna Bahadur Thapa 2 0 9 0 0 0 1 3 0

856 4 295 Chandra Bahadur Krishna Bahadur Thapa 0 0 9 0 0 0 0 3 0

857 4 263 Jagat Bahadur Nemkul 1 - 0 1 0 13 0 0

858 4 275 Jogi Thapa 1 - 0 1 2 8 3 0 1 10 0 0

859 4 298 Kaji Bahadur Maharjan 1 - 0 1 0 13 0 0 0 0 3 0

860 4 301 Kishan Lal 1 Ganesh Maharjan 1 2 1 2 0 0 0 7 3 0

861 4 296 Naran Jyapu Lasan Jyapu 1 2 0 7 0 0 0 6 2 0

862 4 297 Naran Jyapu - 0 0 0 7 2 0 0 5 3 0

863 4 276 Not Identified 1 - 0 1 1 10 2 0 0 15 0 0

864 4 274 Purna Kumari Jyapuni 1 Asha Maru Jyapuni 1 2 2 0 12 2 0 0 9 2 0

865 4 300 Purna Kumari Shake Ashamaru Jyapu 1 2 0 13 0 0 0 8 3 0

866 4 273 Purna Kumari shakya - 0 0 1 11 2 0 0 6 1 0

867 4 302 Ram Maharjan - 0 1 0 1 2 0 0 1 0 2

868 4 303 Ram Maharjan - 0 0 2 4 2 0 0 0 2 0

869 5 119 Aasha Ratna Dhapa 1 Bahaucha Maharjan 1 2 1 11 0 0 0 0 3 0

1 1

1

1 1

1

Page 30 of 43 Annex V- 1

Page 105: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

870 5 87 Bekha Lal Maharjan 1 - 0 1 0 8 0 0 0 0 0 1

871 5 239 Bhaicha Maharjan 1 Govinda Maharjan 1 2 1 8 0 0 0 3 3 0

872 5 105 Bil Bahadur Maharjan 1 - 0 1 0 1 0 0 0 0 3 2

873 5 61 Bishnu Lal 1 Bekh Lal Jyapu 1 2 1 6 2 0 0 9 1 0

874 5 243 Buddhi Govinda Maharjan 1 - 0 1 0 7 0 0 0 2 3 0

875 5 74 Buddhi Lal Nemkul 1 Ganesh Maharjan 1 2 0 12 1 0 0 4 0 0

876 5 107 Chakra Samsher Hakucha Maharjan 1 2 0 3 2 0 0 3 1 0

877 5 108 Chakra Samsher Bil Bahadur Maharjan 1 1 0 15 0 0 0 1 3 0

878 5 223 Chandra Jyoti 1 Tuishi Maharjan 1 2 1 4 0 0 0 0 1 0

879 5 296 Chanshim Maharjan 1 Shankha Mul Guthi 1 2 0 6 2 0 0 1 3 2

880 5 295 Dash Bahadur Maharjan 1 - 0 1 0 7 0 0 0 0 1 2

881 5 237 Dekhacha Maharjan Kish Lal Maharjan 2 0 3 2 0 0 3 1 0

882 5 238 Dekhacha Maharjan Kish Lal Maharjan 0 0 3 3 0 0 3 3 0

883 5 242 Dhakwa Banda 1 Thulo Chanman Maharjan 1 2 0 7 0 0 0 1 1 0

884 5 126 Dhan Bansa Singh Gubhaju Hira Kaji Maharjan 1 2 1 10 0 0 0 11 1 0

885 5 234 Dhan Bansa Singh Gubhaju Tulsi Maharjan 1 1 0 13 0 0 0 1 0 0

886 5 298 Durga Kumari 1 Bekhmana Maharjan 1 2 1 0 2 0 0 0 1 0 0

887 5 469 Govinda Raj Rajbhandari 1 Hakucha Maharjan 1 2 0 6 3 0 0 6 0 0

888 5 121 Guthi 1 Tuishi Maharjan 1 2 0 2 0 0 0 2 0 0

889 5 122 Guthi 1 Kaji Maya Maharjan 1 2 1 0 8 0 0 0 4 3 0

890 5 123 Guthi 1 Das Bahadur Maharjan 1 2 0 9 0 0 0 3 2 0

891 5 124 Guthi 1 Nhuchhen Maharjan 1 2 0 12 0 0 0 5 0 0

892 5 299 Guthi 1 Ram Govinda Maharjan 1 2 0 2 0 0 0 1 3 0

893 5 300 Guthi 1 Mangal Das Maharjan 1 2 2 1 2 0 1 5 2 0

894 5 301 Guthi 1 Rameshwor Maharjan 1 2 2 3 2 0 2 4 0 0

895 5 302 Guthi 1 Tikacha Maharjan 1 2 3 2 0 0 0 9 2 0

896 5 342 Guthi 1 Govinda Man Maharjan 1 2 0 4 0 0 0 2 2 0

897 5 103 Hakucha Maharjan - 0 1 0 8 0 0 0 8 1 0

898 5 104 Hakucha Maharjan - 0 0 0 10 0 0 0 1 3 0

899 5 476 Jit Govinda Maharjan 1 - 0 1 0 6 2 0 0 5 1 0

1

1 1

1

1

Page 31 of 43 Annex V- 1

Page 106: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

900 5 127 Kaji Man Maharjan 1 - 0 1 1 10 0 0 0 11 3 0

901 5 120 Kaji Saheb 1 Kumacha Maharjan 1 2 0 2 0 0 0 0 3 0

902 5 475 Kashi Lal Maharjan 1 - 0 1 0 6 2 0 0 3 2 0

903 5 95 Kunti, Mathura 2 Gyan Bahadur Maharjan 1 3 1 0 1 1 0 0 0 3 2

904 5 96 Mathura Shrestha Kumacha Maharjan (120) 0 1 0 1 1 0 0 0 1 0

905 5 99 Mathura Shrestha Hira Lal Maharjan 1 1 0 4 1 0 0 0 2 0

906 5 100 Mathura Shrestha Kaji Lal Maharjan 1 1 0 4 2 2 0 3 3 0

907 5 101 Mathura Shrestha Hira Lal Maharjan (99) 0 0 0 4 0 0 0 4 0 0

908 5 102 Mathura Shrestha Kumacha Maharjan (120) 0 0 0 7 0 0 0 4 1 0

909 5 106 Mera Singh Maharjan 1 - 0 1 0 2 0 0 0 2 0 0

910 5 291 Nakul Shrestha 1 Thulo Gopal Maharjan 1 2 1 7 0 0 0 4 2 0

911 5 92 Nanda Lal Subba Ganesh Bahadur Shrestha 1 2 0 4 2 0 0 0 1 2

912 5 93 Nanda Lal Subba Bil Bahadur Maharjan 1 1 0 10 0 0 0 6 2 0

913 5 94 Nanda Lal Subba Mer Singh Maharjan 1 1 0 1 1 0 0 1 0 0

914 5 75 Not Identified 1 Narayan Maharjan 1 2 0 8 0 0 0 0 0 1

915 5 240 Pancha and Tahree Kaji Maharjan 2 Asha Man Maharjan 1 3 1 6 0 0 0 14 1 0

916 5 444 Punraj Shakya 1 Chalsiyen Maharjan 1 2 0 8 0 0 0 4 2 0

917 5 235 Purna Man Maharjan Govinda Maharjan 1 2 0 12 2 0 0 3 3 0

918 5 236 Purna Man Maharjan Kish Lal Maharjan 1 1 0 5 0 0 0 3 2 0

919 5 241 Ratna Lal Shrestha 1 Gopal Maharjan 1 2 0 7 3 0 0 3 1 0

920 5 244 Sukur Govinda Maharjan 1 - 0 1 3 1 2 0 1 2 0 0

921 5 128 Tulsi Maharjan 1 - 0 1 0 5 0 0 0 0 0 2

922 6 391 Guthi 1 Chalyasi Maharjan 1 2 1 0 14 0 0 0 6 1 0

923 6 393 Guthi 1 Harsha Bahadur Maharjan 1 2 1 1 0 0 0 6 1 0

924 6 387 Jiv Jyoti Wada 1 Jagat Maharjan 1 2 1 7 2 0 0 0 0 3

925 6 392 Kancha Sahu Shrestha 1 Shree Krishana Maharjan 1 2 1 8 3 0 0 15 0 0

926 6 384 Lal Bahadur Maharjan 1 - 0 1 2 7 0 0 0 1 0 0

927 6 388 Purna Raj Shakya 1 Chalyasi Maharjan (391) 0 1 1 11 2 0 0 14 3 0

928 7 (KA, 2) 658 Bir Man Maharjan 1 - 0 1 0 14 2 0 0 7 2 0

1

1

1

Page 32 of 43 Annex V- 1

Page 107: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

929 7 (KA, 2) 715 Dati Lal Tamot 1 Narsingh Sakya 1 2 2 11 0 0 0 1 1 0

930 7 (KA, 2) 686 Guthi 1 Govind Man Maharjan 1 2 1 15 0 0 0 1 2 0

931 7 (KA, 2) 705 Guthi 1 Rameshwor Maharjan 2 0 10 2 0 0 11 0 0

932 7 (KA, 2) 706 Guthi 1 Rameshwor Maharjan 1 0 2 1 0 0 2 0 0

933 7 (KA, 2) 707 Guthi 1 Tikacha Maharjan 2 0 2 0 0 0 1 2 0

934 7 (KA, 2) 708 Guthi 1 Tikacha Maharjan 1 0 10 0 0 0 4 0 0

935 7 (KA, 2) 657 HMG 0 - 0 0 1 0 8 0 0 0 1 3 0

936 7 (KA, 2) 704 Juju Man Maharjan 1 - 0 1 3 0 2 0 0 10 0 0

937 7 (KA, 2) 659 Kai Lal 1 Shankar Jyoti Shakya 1 2 0 14 0 0 0 6 2 0

938 7 (KA, 2) 655 Kul Narsingh Shakya 1 Hakucha Maharjan 1 2 1 7 2 0 0 8 0 0

939 7 (KA, 2) 716 Kumacha Maharjan 1 - 0 1 0 8 0 0 0 3 3 0

940 7 (KA, 2) 918 Narashing 1 Harsha Bahadur Maharjan 1 2 1 4 0 0 1 0 1 0

941 7 (KA, 2) 703 Narsingh Shakya 1 - 0 1 2 8 0 0 1 5 2 0

942 7 (KA, 2) 714 Sanker Jyoti Sakya 1 - 0 1 0 15 0 0 0 0 2 2

Total Area 74 53 127 1 7 41 609 69 2 7 335 129 21

VDC :Luvu 30 0 2 1

943 2 (KA) 262 Ajita Rajbahak 1 - 0 1 1 1 7 1 1 0 10 2 0

944 2 (KA) 194 Baba Jyan Shrestha Joshi 1 Buddi Bahadur Shrestha 1 2 2 1 2 0 0 14 0 0

945 2 (KA) 73 Babu Lal Maharjan 1 - 0 1 0 3 0 0 0 3 0 0

946 2 (KA) 210 Bekha Lal Maharjan 1 - 0 1 0 15 0 0 0 5 1 0

947 2 (KA) 141 Dambar Jung Asha Lal Maharjan 1 2 2 1 1 0 0 7 0 0

948 2 (KA) 144 Dambar Jung Laxmi Bahadur Maharjan 1 0 2 0 0 0 6 1 0

949 2 (KA) 180 Dambar Jung Laxmi Bahadur Maharjan 0 0 10 0 0 0 3 1 0

950 2 (KA) 183 Dambar Jung Laxmi Bahadur Maharjan 0 1 7 1 0 0 1 2 0

951 2 (KA) 125 Dambar Singh 1 Buddhi Lal Shrestha 1 2 1 5 0 0 0 3 3 0

952 2 (KA) 147 Durga Kumari Rana Nanda Bahadur Maharjan 1 2 5 5 1 0 0 10 1 0

953 2 (KA) 179 Durga Kumari Rana Ratna Bahadur Maharjan 1 1 0 15 0 0 0 1 2 0

954 2 (KA) 225 Gopal Shrestha 1 - 0 1 1 3 0 0 0 3 0 0

955 2 (KA) 77 Guthi 1 Khekha Lal Maharjan 1 2 0 13 1 0 0 1 2 0

956 2 (KA) 80 Guthi 1 Kishbahadur Maharjan 1 2 1 5 0 0 0 3 0 0

1

1

11

1 1

Page 33 of 43 Annex V- 1

Page 108: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

957 2 (KA) 102 Guthi 1 Balram Shrestha 1 2 1 13 2 0 0 7 0 0

958 2 (KA) 105 Guthi 1 Babu Lal Kasain 1 2 0 12 0 0 0 7 1 0

959 2 (KA) 106 Guthi 1 Balram Shrestha (102) 0 1 0 10 1 0 0 2 1 0

960 2 (KA) 107 Guthi 1 Bekha Lal Maharjan 1 2 6 12 0 0 1 4 0 0

961 2 (KA) 119 Guthi 1 Gyan Maya Shrestha 1 2 1 3 13 0 0 0 13 2 0

962 2 (KA) 120 Guthi 1 Kanchi Shrestha 1 2 1 1 8 0 0 0 4 1 0

963 2 (KA) 121 Guthi 1 Babu Lal Sain 1 2 1 1 1 0 0 7 3 0

964 2 (KA) 123 Guthi 1 Krishan Bahadur Maharjan 1 2 0 7 0 0 0 5 2 0

965 2 (KA) 75 Guthi Santhan 1 Asha Lal Maharjan 1 2 0 9 0 0 0 6 0 0

966 2 (KA) 76 Guthi Santhan 1 Siddhi Lal Maharjan 1 2 0 10 0 0 0 4 1 0

967 2 (KA) 124 Hakha Bahadur Shrestha 1 - 0 1 1 5 1 0 0 0 0 1

968 2 (KA) 181 Kaji Lal Shrestha 1 - 0 1 0 9 0 0 0 14 2 0

969 2 (KA) 143 Kancha Khusal - 0 1 0 2 1 0 0 0 0 2

970 2 (KA) 145 Kancha Khusal Ram Khusal 1 1 0 3 2 0 0 2 0 0

971 2 (KA) 220 Kanchi Shrestha 1 - 0 1 1 0 10 0 0 0 2 3 0

972 2 (KA) 259 Kashi Barkhasan Guthi 1 - 0 1 0 4 2 3 0 2 2 0

973 2 (KA) 260 Kashi Barkhasan Guthi 1 - 0 1 0 1 1 1 0 1 0 1

974 2 (KA) 146 Krishna Kumar 1 - 0 1 0 3 0 0 0 3 0 0

975 2 (KA) 139 Lochan Samsher Thapa Siddhi Bahadur Sherestha 1 2 3 8 0 0 0 14 0 0

976 2 (KA) 140 Lochan Samsher Thapa Krishna Maya Thuwai 1 1 1 2 11 1 0 0 13 0 0

977 2 (KA) 78 Lok Maharjan 1 - 0 1 1 13 1 0 0 4 2 1

978 2 (KA) 307 Madan Gopal Shrestha 1 - 0 1 0 4 0 3 0 2 2 0

979 2 (KA) 203 Mangal Das Shrestha 1 Maili Shrestha 1 2 1 1 15 2 0 0 5 0 0

980 2 (KA) 219 Not Identified 1 - 0 1 0 10 0 0 0 3 1 0

981 2 (KA) 291 Not Identified 1 - 0 1 0 4 0 0 0 0 2 0

982 2 (KA) 298 Puspa Raja Thapa 1 - 0 1 0 8 0 0 0 7 0 0

983 2 (KA) 276 Ram Hari Shrestha - 0 1 0 7 0 0 0 2 0 0

984 2 (KA) 297 Ram Hari Shrestha - 0 0 0 8 0 0 0 3 2 0

985 2 (KA) 285 Roshani Kapali 1 - 0 1 1 0 8 0 0 0 0 3 2

986 2 (KA) 226 Sankar Maharjan 1 - 0 1 1 3 0 0 0 5 2 0

1

1

1

Page 34 of 43 Annex V- 1

Page 109: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

987 2 (KA) 286 Sankar Maharjan - 0 1 0 8 0 0 0 6 0 0

988 2 (KA) 290 Sankar Maharjan - 0 0 0 2 2 0 0 1 2 0

989 2 (KA) 308 Sanu Bhai 1 - 0 1 0 12 2 1 0 6 1 0

990 2 (KA) 312 Sanu Man Karki 1 - 0 1 0 4 0 1 0 1 3 0

991 2 (KA) 310 Shanu Man Shrestha 1 - 0 1 0 8 0 0 0 4 2 0

992 2 (KA) 299 Sharan Gopal Shrestha 1 - 0 1 2 8 0 0 1 0 0 0

993 2 (KA) 309 Shuman Gopal Shresth - 0 1 1 0 0 0 0 11 1 0

994 2 (KA) 311 Shuman Gopal Shresth - 0 0 0 8 2 0 0 5 0 0

995 2 (KA) 222 Sitaram Shrestha 1 - 0 1 2 6 0 0 0 13 0 0

996 2 (KA) 186 Thuli Magarni 1 Prith Man Shrestha 1 2 1 2 12 2 0 1 11 2 0

997 2 (KA) 72 Tisko Bhawani Guthi 1 Bhairab Bahadur Thapa 1 2 0 3 0 0 0 2 0 0

998 8 (KA, 1) 325 Aasaa man Jyapu 1 Sukra bir Jyapu 1 2 3 10 0 0

999 8 (KA, 1) 289 Asta man Jyapu 1 - 0 1 0 5 2 0 0 5 2 0

1000 8 (KA, 1) 745 Babu Jasbir 1 Bakhat Man Jyapu 1 2 5 4 2 0 0 12 0 0

1001 8 (KA, 1) 693 Babu Narayan 1 Bekha Lal Jyapu 1 2 1 4 2 0 0 0 3 0

1002 8 (KA, 1) 747 Bekha Bahadur 1 Dhan Bahadur Jyapu 1 2 2 15 1 0 0 14 3 0

1003 8 (KA, 1) 217 Bekha Lal 1 Prem Lal Maharjan 1 2 0 5 2 0 0 5 2 0

1004 8 (KA, 1) 692 Beni Bahadur Thapa 1 - 0 1 0 3 3 0 0 0 3 2

1005 8 (KA, 1) 290 Bhimeswor Guthi 1 Asha Lal Maharjan 1 2 0 8 0 0 0 2 0 0

1006 8 (KA, 1) 291 Bhimeswor Guthi 1 Nanda Man Maharjan 1 2 8 1 0 0 0 5 0 0

1007 8 (KA, 1) 292 Bhimeswor Guthi 1 Man Krishan Maharjan 1 2 8 2 0 0 0 6 3 0

1008 8 (KA, 1) 1363 Bhuvan Bahadur Basnet 1 - 0 1 0 2 2 0 0 1 0 0

1009 8 (KA, 1) 1517 Bidur Basnet 1 - 0 1 0 11 0 0 0 7 3 0

1010 8 (KA, 1) 296 Bishankhu Narayan Guthi 1 Jit Lal Maharjan 1 2 0 6 0 0 0 2 2 0

1011 8 (KA, 1) 272 Bishnu Bahadur Karki - 0 1 0 3 0 0 0 3 2 0

1012 8 (KA, 1) 766 Bishnu Bahadur Karki - 0 0 0 5 3 0 0 2 3 0

1013 8 (KA, 1) 769 Bishnu Bahadur Karki - 0 0 0 6 2 0 0 3 1 0

1014 8 (KA, 1) 684 Bishnu Maya Nauni 1 Krishna Bhadur Thapa 1 2 1 0 8 1 0 0 6 0 0

1015 8 (KA, 1) 284 Chakra Man Jyapu Gopal Maharjan 1 2 0 2 2 0 0 2 1 0

1016 8 (KA, 1) 285 Chakra Man Jyapu Jit Lal Maharjan (296) 0 0 0 3 0 0 0 0 3 0

1

1

1

1

Page 35 of 43 Annex V- 1

Page 110: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1017 8 (KA, 1) 219 Chalan Singh Maharjan 1 - 0 1 0 7 1 0 0 1 3 0

1018 8 (KA, 1) 765 Chihre Kaji Jyapu 1 - 0 1 0 8 1 0 0 2 3 0

1019 8 (KA, 1) 200 Das Bahadur Maharjan - 0 1 0 9 0 0 0 0 1 0

1020 8 (KA, 1) 1518 Das Bahadur Maharjan - 0 0 1 1 1 2 0 2 2 0

1021 8 (KA, 1) 687 Ganesh Bahadur Shrestha - 0 1 1 8 1 0 0 12 1 0

1022 8 (KA, 1) 689 Ganesh Bahadur Shrestha - 0 0 0 14 0 0 0 10 2 0

1023 8 (KA, 1) 266 Ganesh Maharjan - 0 1 0 8 0 0 0 8 0 0

1024 8 (KA, 1) 267 Ganesh Maharjan - 0 0 0 8 0 0 0 8 0 0

1025 8 (KA, 1) 265 Ganesh Man Jyapu - 0 1 0 6 3 0 0 2 1 0

1026 8 (KA, 1) 273 Ganesh Man Jyapu - 0 0 0 2 2 0 0 2 2 0

1027 8 (KA, 1) 323 Govind Man Tara Maiya Jyapuni 2 2 1 2 0

1028 8 (KA, 1) 324 Govind Man Tara Maiya Jyapuni 0 0 12 0 0 0 6 1 0

1029 8 (KA, 1) 688 Govinda Shrestha 1 Bhuyecha Jyapu 1 2 3 1 1 0 0 13 1 0

1030 8 (KA, 1) 678 Gyan Bahadur Thapa 1 Lal Bahadur Thapa 1 2 0 2 0 0 0 1 2 0

1031 8 (KA, 1) 1509 Gyan Manjari Keshari 1 - 0 1 1 1 6 2 2

1032 8 (KA, 1) 215 Hakucha Maharjan - 0 1 0 14 0 0 0 0 3 0

1033 8 (KA, 1) 220 Hakucha Maharjan - 0 0 0 1 3 0 0 1 3 0

1034 8 (KA, 1) 279 Hari Bahadur Karki - 0 1 0 1 3 0 0 1 0 0

1035 8 (KA, 1) 280 Hari Bahadur Karki - 0 0 0 2 0 0 0 1 0 0

1036 8 (KA, 1) 826 Hari Bahadur Karki - 0 0 0 13 2 0 0 11 3 0

1037 8 (KA, 1) 294 Hari Baje 1 Ratna Man Maharjan 1 2 3 3 0 0 0 2 1 0

1038 8 (KA, 1) 210 Harka Bahadur Maharjan - 0 1 0 3 3 0 0 3 0 0

1039 8 (KA, 1) 184 Harka Bahadur Maharjan - 0 0 1 5 0 0 0 1 3 0

1040 8 (KA, 1) 767 Hem Bahadur Karki 1 - 0 1 0 9 0 0 0 6 2 0

1041 8 (KA, 1) 203 HMG/Land 0 - 0 0 1 0 2 3 0 0 1 3 0

1042 8 (KA, 1) 297 Iba Natha Baje 1 Gopal Lal Maharjan 1 2 0 6 2 0 0 2 2 0

1043 8 (KA, 1) 755 Indra Man Jyapu 1 - 0 1 0 10 1 0 0 6 1 0

1044 8 (KA, 1) 268 Jagat Man Maharjan 1 - 0 1 0 11 0 0 0 11 0 0

1045 8 (KA, 1) 205 Jit Lal Maharjan 1 - 0 1 0 0 3 0 0 0 3 0

1046 8 (KA, 1) 206 Juki Das Maharjan - 0 1 0 1 0 0 0 1 0 0

1

1

1

1

1 1 1

1

1

1

1

Page 36 of 43 Annex V- 1

Page 111: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1047 8 (KA, 1) 209 Juki Das Maharjan - 0 0 0 7 1 0 0 7 1 0

1048 8 (KA, 1) 680 Kamal Bahadur Thapa - 0 1 0 1 2 0 0 1 2 0

1049 8 (KA, 1) 681 Kamal Bahadur Thapa - 0 0 0 3 2 0 0 0 1 0

1050 8 (KA, 1) 691 Kancha Nanu 1 - 0 1 0 4 3 0 0 7 2 0

1051 8 (KA, 1) 679 Kancha Thapa 1 - 0 1 0 1 3 0 0 1 2 0

1052 8 (KA, 1) 749 Kanchi Thapani 1 - 0 1 1 2 1 2 0 1 8 3 0

1053 8 (KA, 1) 277 Kish Lal Jyapu - 0 1 0 11 0 0 0 4 2 0

1054 8 (KA, 1) 278 Kish Lal Jyapu - 0 0 0 3 0 0 0 3 0 0

1055 8 (KA, 1) 1506 Komal Bahadur Thapa 1 - 0 1 1 2 0 0 0 10 2 0

1056 8 (KA, 1) 1508 Komal Kumar Thapa 1 - 0 1 1 6 2 2 0 8 2 0

1057 8 (KA, 1) 768 Krishnacha Jyapu 1 - 0 1 1 1 2 0 0 8 3 0

1058 8 (KA, 1) 218 Lal Singh Maharjan 1 - 0 1 0 4 2 0 0 3 1 0

1059 8 (KA, 1) 208 Lalcha Maharjan 1 - 0 1 0 6 1 0 0 2 1 0

1060 8 (KA, 1) 1519 Man Kumari, Babu Kaji 2 - 0 2 1 1 1 1 2 0 10 3 0

1061 8 (KA, 1) 212 Man May, Bahadur Maharjan 2 Harka Bahadur Maharjan 1 3 1 0 5 0 0 0 0 1 0

1062 8 (KA, 1) 204 Manya Lal Maharjan 1 Satlal Maharjan 1 2 0 0 2 0 0 0 2 0

1063 8 (KA, 1) 694 Mukunda Prsada Acharya 1 - 0 1 8 13 0 0 0 8 1 0

1064 8 (KA, 1) 1350 Narayan Bahadur Karki 1 - 0 1 0 10 1 0 0 1 0 0

1065 8 (KA, 1) 211 Narayan Das Maharjan - 0 1 1 0 2 0 0 11 1 0

1066 8 (KA, 1) 213 Narayan Das Maharjan - 0 0 0 13 1 0 0 8 2 0

1067 8 (KA, 1) 216 Not Identified 1 Gopal Maharjan 1 2 0 6 1 0 0 6 0 0

1068 8 (KA, 1) 1290 Not Identified 1 - 0 1 0 3 0 1 0 0 0 1

1069 8 (KA, 1) 221 Prem Lal Maharjan 1 - 0 1 0 6 3 0 0 6 2 0

1070 8 (KA, 1) 183 Purna Dhoj Karki 1 Surya Bahadur Karki 1 2 1 15 0 0 0 9 0 0

1071 8 (KA, 1) 1516 Puspa Raj K.C. 1 - 0 1 0 4 0 0 0 2 0 0

1072 8 (KA, 1) 222 Sher Bahadur Maharjan - 0 1 0 10 2 0 0 0 1 0

1073 8 (KA, 1) 223 Sher Bahadur Maharjan - 0 0 1 0 0 0 0 1 2 0

1074 8 (KA, 1) 228 Shiddi Lal Maharjan 1 - 0 1 0 4 3 0 0 1 1 0

1075 8 (KA, 1) 756 Shir Kaji Jyapu 1 - 0 1 0 8 2 0 0 0 0 3

1076 8 (KA, 1) 274 Shyam Mahrajan - 0 1 0 2 0 0 0 2 0 0

1

1

1

1

1

1

Page 37 of 43 Annex V- 1

Page 112: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1077 8 (KA, 1) 275 Shyam Mahrajan - 0 0 0 5 1 0 0 3 0 0

1078 8 (KA, 1) 827 Sidhi Bahadur Maharjan 1 - 0 1 2 8 2 0 0 0 1 0

1079 8 (KA, 1) 207 Sirman Jyapu 1 - 0 1 0 1 1 0 0 1 1 0

1080 8 (KA, 1) 201 Sirman Maharjan 1 - 0 1 0 3 3 0 0 0 2 0

1081 8 (KA, 1) 825 Surya Lal Shrestha 1 Bhim Bahadur Karki 1 2 0 14 1 0 0 2 1 0

1082 8 (KA, 1) 293 Tika Prashad Babu Lal Maharjan 1 2 3 3 0 0 0 2 0 0

1083 8 (KA, 1) 295 Tika Prashad Nhuchhen Lal Maharjan 1 1 4 1 0 0 0 2 2 0

1084 8 (KA, 1) 344 Tulshi Lal Maharjan 1 - 0 1 3 1 0 0 0 13 0 0

1085 8 (KA, 2) 342 Jaya Bahadur Bista - 0 1 3 10 0 0 0 0 2 0

1086 8 (KA, 2) 343 Jaya Bahadur Bista - 0 0 4 11 2 0 0 15 1 0

1087 8 (KHA) 132 Bir Bahadur Thapa 1 - 0 1 0 14 0 0 0 2 3 0

1088 8 (KHA) 73 Buddhi Bahadur Shrestha 1 - 0 1 0 2 0 0 0 2 0 0

1089 8 (KHA) 87 Chandra Bahadur Thapa 1 Ratna Lal Shrestha 1 2 0 13 0 0 0 9 2 0

1090 8 (KHA) 274 Deli Lami 1 - 0 1 1 1 0 0 0 0 8 0 0

1091 8 (KHA) 92 Dhan Bahadur Thapa - 0 1 0 15 0 0 0 14 0 0

1092 8 (KHA) 119 Dhan Bahadur Thapa - 0 0 0 12 2 0 0 7 0 0

1093 8 (KHA) 78 Hari Bahadur Khatri 1 - 0 1 0 5 1 0 0 0 0 3

1094 8 (KHA) 72 Harsa Bahadur Shrestha 1 - 0 1 4 0 0 0 0 8 2 0

1095 8 (KHA) 80 Hira Lal Shrestha 1 - 0 1 0 4 2 0 0 3 3 0

1096 8 (KHA) 270 Jiban Krishna Tuladhar 1 0 1 1 0 0 0 0 8 1 0

1097 8 (KHA) 89 Jaga Nanda Guthi 1 Jit Bahadur Maharjan 1 2 4 14 2 0 1 11 3 0

1098 8 (KHA) 86 Joga Bahadur Maharjan 1 - 0 1 1 5 0 0 0 3 2 0

1099 8 (KHA) 75 Kaji Lal Maharjan 1 - 0 1 0 3 0 0 0 3 3 0

1100 8 (KHA) 93 Kamal Bahadur Thapa - 0 1 0 8 3 0 0 1 1 0

1101 8 (KHA) 117 Kamal Bahadur Thapa - 0 0 1 4 0 0 0 11 3 0

1102 8 (KHA) 116 Keshar Bahadur Thapa 1 - 0 1 0 8 0 0 0 0 3 0

1103 8 (KHA) 77 Krishna Bahadur Khatri 1 - 0 1 0 6 0 0 0 3 0 0

1104 8 (KHA) 84 Krishna Bahadur Khatri 1 - 0 1 2 1 0 0 0 1 2 0

1105 8 (KHA) 74 Pirthi Man Shrestha 1 - 0 1 0 1 0 0 0 1 0 0

1106 8 (KHA) 79 Ram Shrestha 1 - 0 1 0 4 2 1 0 3 3 0

1

1

1

1

1

Page 38 of 43 Annex V- 1

Page 113: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1107 8 (KHA) 76 Shankar Shrestha 1 - 0 1 0 3 0 0 0 3 0 0

1108 8 (KHA) 273 Sumitra Bista 1 - 0 1 1 0 5 0 0 0 5 0 0

1109 8 (KHA) 94 Tika Kumari Thapeni 1 - 0 1 1 1 8 0 0 0 4 1 0

1110 8 (KHA) 118 Tilak Bahadur Khatri 1 - 0 1 0 8 0 0 0 14 2 0

1111 8 (KHA) 81 Tirtha Man Shrestha 1 - 0 1 0 6 2 0 0 3 0 0

Total Area 139 48 187 1 18 132 1027 148 20 5 752 214 16

VDC : Lamatar 0 0 55 6 2 0

1112 4, 1 79 Bhairab Bahadur Thapa 1 - 0 1 3 4 2 0 1 4 1 0

1113 4, 1 506 Bishnu Hari Upadyaya 1 - 0 1 2 7 0 0 0 2 0 0

1114 4, 1 24 Buddhi Bahadur Shrestha - 0 1 0 14 0 0 0 6 3 0

1115 4, 1 25 Buddhi Bahadur Shrestha - 0 0 0 7 2 0 0 7 1 0

1116 4, 1 14 Chandra Bahadur Shrestha Gyan Bhai Shrestha 2 1 1 2 0 0 10 2 0

1117 4, 1 18 Chandra Bahadur Shrestha Gyan Bhai Shrestha 0 1 10 0 0 0 3 2 0

1118 4, 1 13 Damodar Prashad Upadyaya 1 - 0 1 5 6 0 0 0 1 3 0

1119 4, 1 26 Krishna Bahadur Shrestha - 0 1 0 8 1 0 0 0 3 0

1120 4, 1 27 Krishna Bahadur Shrestha - 0 0 0 3 3 0 0 4 0 0

1121 4, 1 28 Krishna Devi Shrestha 1 Ram Shrestha 1 2 1 1 4 1 0 0 2 3 0

1122 4, 1 22 Lal Bahadur Shrestha - 0 1 1 15 0 0 0 8 1 0

1123 4, 1 23 Lal Bahadur Shrestha - 0 0 0 3 1 0 0 3 1 0

1124 4, 1 5 Nanda Guruju 1 Prithivi Man Shrestha 1 2 0 15 2 0 0 0 1 0

1125 4, 1 504 Nanda Kumari Thapini 1 Bhim Bahadur Puri 1 2 1 1 2 0 0 0 3 3 0

1126 4, 1 808 Pancha maya, Sanu Kanchha 1 - 0 1 1 0 15 0 0 0 6 2 0

1127 4, 1 12 Ram Bahadur Shrestha 1 Jagat Bahadur Tandukar 1 2 2 0 0 0 0 3 2 0

1128 4, 1 15 Sanu Kanchha Shrestha 1 - 0 1 0 10 0 0 0 4 2 0

1129 4, 1 78 Tej Mohan Upadhyay 1 Kaji Man Jyapu 1 2 0 4 1 0 0 3 1 0

1130 4, 1 77 Tulsi Man Sherestha 1 - 0 1 0 4 2 0 0 0 2 0

1131 5(KA) 297 Badri Prashad Chaulagain 1 - 0 1 1 0 0 0 0 5 2 0

1132 5 (KA) 67 Bal Krishan Upadyaya Risal 1 - 0 1 0 6 0 0 0 5 0 0

1133 5(KA) 269 Bharat Raj Ghimere 1 - 0 1 1 2 1 1 0 0 2 0

1134 5(KA) 237 Churna Bahadur Khatri 1 - 0 1 0 6 3 0 0 5 3 0

1

1 1

1

1

Page 39 of 43 Annex V- 1

Page 114: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1135 5 (KA) 56 Damaru Nath Upadyaya 1 - 0 1 2 2 0 0 0 1 2 0

1136 5 (KA) 13 Damodar Prashad Upadyaya 1 - 0 1 5 6 0 0 0 1 3 0

1137 5 (KA) 42 Damodar Upadyaya Ghimere 1 - 0 1 0 14 2 0 0 11 0 0

1138 5 (KA) 74 Devi Bahadur Khatri 1 - 0 1 1 0 2 0 0 14 0 0

1139 5(KA) 217 Durga Prashad Ghimere - 0 1 0 8 0 0 0 2 0 0

1140 5(KA) 223 Durga Prashad Ghimere - 0 0 1 8 0 0 0 0 0 2

1141 5 (KA) 40 Gagan Nath Upadyaya Ghimere - 0 1 3 5 2 0 0 12 2 0

1142 5 (KA) 57 Gagan Nath Upadyaya Ghimere - 0 0 2 1 1 0 0 9 3 0

1143 5 (KA) 43 Ghana Nath Upadyaya Ghimere Hari Bahadur Bhujel 1 1 1 9 0 0 0 10 2 0

1144 5(KA) 238 Khadga Bahadur Khatri 1 - 0 1 0 6 3 0 0 7 1 0

1145 5 (KA) 29 Krishna Hari Ghimere 1 - 0 1 1 14 2 0 0 4 0 0

1146 5(KA) 264 Madhav Raj Ghimere - 0 1 1 1 3 3 0 3 1 0

1147 5(KA) 268 Madhav Raj Ghimere - 0 0 1 1 2 3 0 4 0 0

1148 5(KA) 180 Not Identified 1 - 0 1 2 4 2 0 0 15 0 0

1149 5(KA) 197 Not Identified 1 - 0 1 0 10 0 0 0 9 3 0

1150 5(KA) 201 Not Identified 1 - 0 1 0 6 3 0 0 3 1 0

1151 5 (KA) 236 Not Identified 1 - 0 1 0 6 3 0 0 0 2 2

1152 5 (KA) 23 Parti 0 - 0 0 1 0 9 3 0 0 3 3 0

1153 5 (KA) 66 Radha Devi Upadyayani 1 - 0 1 1 1 2 1 0 0 1 0 0

1154 5(KA) 218 Ram Prashad Ghimere 1 - 0 1 0 8 0 0 0 7 1 0

1155 5(KA) 298 Ruku Chaulagain 1 - 0 1 1 1 0 0 0 0 0 1 0

1156 5(KA) 202 Shiva Prashad 1 - 0 1 2 5 1 0 0 5 2 0

1157 5(KA) 219 Shree Dhar Ghimere 1 - 0 1 0 11 0 0 0 1 2 0

1158 5(KA) 265 Shyam Raj Ghimere - 0 1 0 15 1 0 0 4 0 0

1159 5(KA) 284 Shyam Raj Ghimere - 0 0 1 2 1 2 0 10 0 0

1160 5(KA) 286 Shyam Raj Ghimere - 0 0 0 5 0 0 0 0 2 0

1161 5 (KA) 75 Tej Kumari Risalni Upadyayani 1 Bhakta Bahadur Shrestha 1 2 1 1 0 0 0 0 8 0 0

1162 5 (KA) 24 Tika Prashad Ghimere 1 - 0 1 1 1 0 0 0 8 2 0

1163 5 (KA) 73 Toya Nath Upadyaya Risal 1 - 0 1 1 11 2 0 0 10 2 0

1164 7 (KA, 1) 67 Akal Bahadur Khadka Chettri - 0 1 1 12 0 0 1 0 1 0

1

1

1

1

1

Page 40 of 43 Annex V- 1

Page 115: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1165 7 (KA, 1) 77 Akal Bahadur Khadka Chettri - 0 0 0 15 0 0 0 4 0 0

1166 7 (KA, 1) 479 Babu Krishan Silwal 1 - 0 1 0 11 0 0 0 7 0 0

1167 7 (KA, 1) 76 Bekh Lal Maharjan 1 - 0 1 0 12 0 0 0 4 0 0

1168 7 (KA, 1) 498 Bhairab Bahadur Khadka 1 - 0 1 0 5 2 3 0 2 2 0

1169 7 (KA, 1) 72 Bhumi Nanada Shrestha 1 Krishna Lal Shrestha 1 2 0 3 2 0 0 1 1 2

1170 7 (KA, 1) 478 Chandra Bahadur Silwal 1 - 0 1 0 6 2 0 0 3 1 0

1171 7 (KA, 1) 105 Deep Bahadur Khatri Chettri 1 - 0 1 4 3 0 0 0 15 0 0

1172 7 (KA, 1) 366 Juju Kaji 1 - 0 1 2 12 0 0 1 3 3 0

1173 7 (KA, 1) 74 Nanda Lal Shrestha 1 - 0 1 0 5 2 0 0 4 0 2

1174 7 (KA, 1) 85 Pun Maya Jyapuni 1 - 0 1 0 7 2 0 0 1 1 0

1175 7 (KA, 1) 73 Ratna Lal Shrestha 1 Krishna Lal Shrestha (72) 0 1 0 3 2 0 0 1 3 0

1176 7 (KA, 1) 361 Ratna Lal Shrestha 1 - 0 1 1 14 0 0 0 7 3 0

1177 7 (KA, 1) 88 Rip Dhoj Ranamagar 1 - 0 1 2 1 0 0 0 3 2 0

1178 7 (KA, 1) 89 Ripu Dhoj Ranamagar 1 - 0 1 0 10 0 0 0 3 1 0

1179 7 (KA, 1) 90 Rishi Upadyaya Bir Bahadur Ranamagar 1 2 0 10 0 0 0 4 0 0

1180 7 (KA, 1) 91 Rishi Upadyaya Jit Bahadur Ranamagar 1 1 0 10 0 0 0 4 3 0

1181 7 (KA, 1) 92 Rishi Upadyaya Ganesh Bahadur Ranamagar 1 1 0 10 0 0 0 4 3 0

1182 7 (KA, 1) 93 Rishi Upadyaya Padma Dhoj Ranamagar 1 1 0 10 0 0 0 3 3 0

1183 7 (KA, 1) 360 Rup Nath Shrestha 1 - 0 1 1 14 0 0 0 6 3 0

1184 7 (KA, 1) 353 Sarswati Khatri 1 - 0 1 1 3 9 1 0 0 14 0 0

1185 7 (KA, 1) 497 Shiva Bahadur Khadka 1 - 0 1 0 5 2 3 0 0 1 0

1186 7 (KA, 1) 352 Shushila Budhathoki 1 - 0 1 1 1 8 0 0 0 8 0 0

1187 7 (KA, 1) 83 Tuyecha Jyapuni 1 Bishnu Bahadur Ranamagar 1 2 1 1 2 0 0 0 2 2 0

1188 8 (GA, 2) 321 Bishu Hari Poudel Sharma 1 - 0 1 3 15 0 0 1 5 1 0

1189 8 (GA, 2) 323 Bishu Lal Awale 1 Thulo Ratna Bahadur Awale 1 2 0 6 0 0 0 3 0 0

1190 8 (GA, 2) 328 Bishwo Nath Gautam Upadyaya 1 - 0 1 3 1 2 0 0 1 0 0

1191 8 (GA, 2) 331 Buddhi Man Awale 1 - 0 1 1 9 2 0 0 8 0 0

1192 8 (GA, 2) 326 Gopal Prashad Poudel 1 - 0 1 2 2 1 0

1193 8 (GA, 2) 299 Krishna Prashad Ghimere 1 - 0 1 3 0 3 0 0 3 1 0

1194 8 (GA, 2) 588 Mailee Maya Awale 1 - 0 1 1 0 14 2 0 0 7 1 2

1

1

Page 41 of 43 Annex V- 1

Page 116: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1195 8 (GA, 2) 589 Prem Bahadur Awale - 0 1 0 1 2 0 0 1 3 2

1196 8 (GA, 2) 590 Prem Bahadur Awale - 0 0 0 13 0 0 0 1 0 0

1197 8 (GA, 2) 591 Purna Bahadur Awale - 0 0 0 3 0 0 0 2 1 0

1198 8 (GA, 2) 322 Thulo Ratna Bahadur Awale 1 - 0 1 0 6 0 0 0 2 0 0

1199 8 (Ka) 31 Indra Bahadur Thapa - 0 1 0 15 0 0 0 15 2 0

1200 8 (Ka) 35 Indra Bahadur Thapa - 0 0 0 11 3 0 0 1 0 0

1201 8 (Ka) 37 Kanchi Thapani 1 Bhakta Bahadur Thapa 1 2 1 3 8 2 0 1 7 3 0

1202 8 (Ka) 39 Keshab Upadyaya 1 Kanak Bahadur Khadka 1 2 0 9 0 0 0 8 1 0

1203 8 (Ka) 32 Keshar Prashad Upadyaya 1 Harihar Poudel 1 2 0 8 0 0 0 4 1 0

1204 8 (Ka) 30 Mithhu Ram Thapa 1 - 0 1 0 13 0 0 0 1 0 0

1205 8 (Ka) 36 Mithhu Ram Thapa Chettri 1 - 0 1 3 11 0 0 0 14 0 0

1206 8 (Ka) 38 Rishi Upadyaya 1 Kanak Bahadur Khadka (39) 0 1 0 9 0 0 0 3 1 0

1207 8 (KHA) 218 Bhoj Raj Poudel - 0 1 0 10 0 0 0 5 1 0

1208 8 (KHA) 222 Bhoj Raj Poudel Jojraj Upadyaya Poudel 1 1 0 1 1 0 0 0 3 0

1209 8 (KHA) 204 Bhoj Raj Upadyaya Poudel 1 - 0 1 0 2 0 0 0 0 0 1

1210 8 (KHA) 151 Bhola Natha Poudel 1 - 0 1 0 8 0 0 0 0 1 0

1211 8 (KHA) 260 Bishnu Hari Upadyaya 1 - 0 1 3 15 0 0 1 2 0 0

1212 8 (KHA) 227 Bishnu Prashad Upadyaya - 0 1 3 15 0 0 1 3 2 0

1213 8 (KHA) 233 Bishnu Prashad Upadyaya - 0 0 5 3 0 0 1 1 3 0

1214 8 (KHA) 244 Bishnu Prashad Upadyaya Kailo Damai 1 1 1 8 2 0 0 5 2 0

1215 8 (KHA) 251 Damayanti Poudel - 0 1 0 13 0 0 0 1 0 0

1216 8 (KHA) 252 Damayanti Poudel - 0 0 1 14 2 0 0 11 2 0

1217 8 (KHA) 259 Dilli Nath Poudel 1 Manorath Upadyaya 1 2 1 2 2 0 0 11 1 0

1218 8 (KHA) 256 Dilli Nath Upadyaya Poudel 1 - 0 1 1 6 0 0 0 2 3 0

1219 8 (KHA) 257 Ganesh Bahadur Shrestha 1 - 0 1 1 3 0 0 0 13 0 0

1220 8 (KHA) 216 Gopi Krishna Upadyaya - 0 1 0 9 2 0 0 0 3 0

1221 8 (KHA) 217 Gopi Krishna Upadyaya - 0 0 0 7 0 0 0 7 2 0

1222 8 (KHA) 219 Gyan Prashad Poudel 1 - 0 1 0 9 2 0 0 6 2 0

1223 8 (KHA) 154 Hari Krishan Pokhrel Lal Bahadur Kuikel Khatri 1 2 0 10 0 0 0 4 1 0

1224 8 (KHA) 155 Hari Krishan Pokhrel Durga Bahadur Kuikel Khatri 1 1 0 11 0 0 0 8 2 0

1

1

1

1

1 1

1

1

Page 42 of 43 Annex V- 1

Page 117: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS.

No.Ward No.

Plot No. Name of Owner

Numberof

OwnerNmae of Tenant Number of

TenantTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area Affected Land Area

1225 8 (KHA) 269 HMG (Well) 0 - 0 0 1 0 0 1 0 1 1 1 0

1226 8 (KHA) 369 Maiya Khadka 1 - 0 1 1 3 12 3 0 0 7 2 0

1227 8 (KHA) 214 Narayan Prashad Poudel - 0 1 0 11 0 0 0 6 2 0

1228 8 (KHA) 220 Narayan Prashad Poudel - 0 0 0 12 1 0 0 9 1 0

1229 8 (KHA) 245 Narayan Prashad Poudel - 0 0 1 13 0 0 0 0 1 0

1230 8 (KHA) 246 Narayan Prashad Poudel Jyan Prashad Poudel 1 1 0 8 0 0 0 7 2 0

1231 8 (KHA) 279 Not Identified 1 - 0 1 3 12 3 0 0 1 1 0

1232 8 (KHA) 226 Parti 0 - 0 0 1 0 9 2 0 0 2 3 0

1233 8 (KHA) 253 Pashupati Prashad Poudel 1 - 0 1 1 15 0 0 0 12 0 0

1234 8 (KHA) 258 Punde Prashad Gautam 1 - 0 1 1 6 2 0 0 2 0 0

1235 8 (KHA) 200 Ratna Kumari Upadyaya Shiva Prashad Poudel 2 0 2 0 0 0 1 0 0

1236 8 (KHA) 213 Ratna Kumari Upadyaya Shiva Prashad Poudel 0 0 10 2 0 0 10 1 0

1237 8 (KHA) 203 Sita Poudel 1 - 0 1 2 2 0 0 0 8 2 0

1238 8 (KHA) 208 Sita Ram Poudel - 0 1 0 9 0 0 0 9 0 0

1239 8 (KHA) 209 Sita Ram Poudel - 0 0 0 9 2 0 0 3 3 0

1240 8 (KHA) 215 Sita Ram Poudel - 0 0 1 9 0 0 0 0 3 0

1241 8 (KHA) 232 Tulsi Prashad Upadyaya Dahal 1 - 0 1 0 11 0 0 0 3 2 0

1242 8 (KHA) 201 Not Identified 1 - 0 1 0 8 0 0 0 5 3 0

Total 99 25 124 3 14 107 969 113 15 11 602 179 13

51 7 2 1

Total 1052 400 1452 45 128 1190 8470 1221 74 128 5982 1726 177

529 8 2 1

1

1

1

1 1

Page 43 of 43 Annex V- 1

Page 118: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

1 9 553 Basudev Neupane 1 - 0 1 0 8 0 0 0 0 0 1 0

2 9 395 Hota Raj Neupane 1 - 0 1 0 9 0 0 1 1 13 3 0

3 9 525 Not Identified 1 - 1 3 9 0 0 1 2 3 0

4 9 552 Uttam Neupane 1 - 0 1 0 8 0 0 0 0 0 1 0

Total 4 0 4 0 0 28 9 0 1 2 15 8 0

5 1-1 358 Babu Khadka Prashad 1 Krishna Prashad Neupane 1 2 3 11 2 0 0 6 2 0

6 1-1 277 Bishnu Kumari, Bishnu Hari, Narayan Hari Ghimere 3 - 0 3 1 1 8 0 0 0 1 3 0

7 1-1 278 Buddhi Krishana Neupane 1 - 0 1 2 10 2 0 0 2 1 0

8 1-1 638 Durga Prasasd 1 - 0 1 0 9 0 0 0 3 1 0

9 1-1 724 Ganga Prashad Ghimire 1 - 0 1 0 13 2 0 0 0 2 0

10 1-1 776 Gopal Krishna 1 - 0 1 0 6 0 0 0 5 3 0

11 1-1 669 Janardan Ghimire - 0 1 0 10 1 2 0 1 0 0

12 1-1 672 Janardan Ghimire - 0 0 0 3 0 0 0 3 0 0

13 1-1 811 Janardan Neupane 1 - 0 1 0 1 2 0 0 1 2 0

14 1-1 280 Kul Prashad Ghimere Durga Prashad Chaulagain 1 2 4 4 0 0 0 0 3 1

15 1-1 281 Kul Prashad Ghimere - 0 0 4 0 2 0 0 9 1 0

16 1-1 667 Mani Ram Ghimere 1 - 0 1 0 11 3 0 0 1 1 0

17 1-1 777 Mira Neupane 1 - 0 1 1 0 6 2 0 0 6 2 0

18 1-1 778 Mohan Krishna 1 - 0 1 0 6 2 0 0 1 2 0

19 1-1 583 Not Identified 1 - 0 1 1 9 0 0 1 1 2 0

20 1-1 569 Not Identified 1 Name is not clear 0 1 1 13 0 0 0 13 0 0

21 1-1 666 Parasuram Ghimere - 0 0 7 2 0 0 6 1 0

22 1-1 671 Parasuram Ghimere - 0 0 5 2 0 0 4 2 0

23 1-1 674 Parasuram Ghimere - 0 0 3 0 0 0 0 1 2

24 1-1 725 Parbati Ghimire - 0 1 1 0 13 2 0 0 10 0 0

25 1-1 726 Parbati Ghimire - 0 0 1 0 0 0 0 12 0 0

26 1-1 611 Rameswor 1 1 0 14 2 0 0 9 2 0

27 1-1 673 Shiva Prashad 1 - 0 1 0 3 0 0 0 3 1 0

28 1-1 670 Shiva Prashad Ghimere 1 - 0 1 0 11 0 0 0 6 3 0

29 1-1 738 Sita Ghimire 1 - 0 1 1 0 4 0 0 0 1 1 0

Thankot - Chapagaun - Bhaktapur 132 kV Transmission Line Project

District - Bhaktapur

S. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

VDC: Sirutar

VDC: Dadhikot

1

1

1 1

1

Page 1 of 12 Annex V- 1

Page 119: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

30 1-1 779 Som Kumari 1 - 0 1 1 0 2 2 0 0 0 0 1

31 1-1 612 Subhas 1 - 0 1 0 14 2 0 0 1 0 0

32 1-1 327 Tek Bdr. Thapa Chettri Dilli Shing Karki 0 5 2 0 0 2 0 2

33 1-1 328 Tek Bdr. Thapa Chettri Dilli Shing Karki 1 12 2 0 0 0 3 0

34 1-1 279 Tika Prashad Neupane 1 - 0 1 2 2 0 0 1 4 1 0

35 2 (1) 2 Bajir Singh Karki Khil Bahadur Karki Chettri 1 2 1 5 2 0 0 6 1 0

36 2 (1) 3 Bajir Singh Karki Chetra Bahardur Karki Chettri 1 1 0 14 1 0 0 4 0 0

37 2 (1) 7 Bajir Singh Karki Khil Bahadur Karki Chettri (2) 0 0 0 4 1 0 0 2 0 0

38 2 (1) 8 Bajir Singh Karki Chetra Bahardur Karki Chettri (3) 1 1 0 4 1 0 0 2 1 0

39 2 (1) 20 Bajir Singh Karki Khil Bahadur Karki Chettri (2) 0 0 0 12 1 0 0 1 0 8

40 2 (1) 19 Bhim Bahadur Karki 1 - 0 1 0 4 2 0 0 1 2 0

41 2 (1) 22 Dal Bahadur Karki 1 - 0 1 0 9 3 0 0 4 2 0

42 2 (1) 23 Dambar Bahadur Karki Dambar Bahadur Karki 0 1 0 9 2 0 0 6 1 0

43 2 (1) 24 Dambar Bahadur Karki Bhim Bahadur Karki 1 1 0 9 1 0 0 2 0 0

44 2 (1) 465 Not Identified 1 - 0 1 1 5 1 0 0 8 0 0

45 2 (1) 4 Prem Prashad Neupane 1 - 0 1 2 3 2 0 0 13 2 0

46 2 (1) 9 Prem Prashad Neupane 1 - 0 1 1 6 1 0 0 13 2 0

47 2 (1) 6 Purna Kumari Neupane 1 Shiva Prashad Neupane 1 2 1 0 1 3 0 0 1 2 0

48 2 (1) 574 Uttam Neaupane 1 - 0 1 0 10 2 2 0 8 1 0

49 3Ka 1 606 Bal Chandra Neupane 1 - 0 1 2 0 0 0 0 7 1 0

50 3Ka 1 626 Bhim Bahadur Karki, chetri 1 - 0 1 0 8 1 0 0 0 2 0

51 3Ka 1 691 Bikram Raj Singh 1 Bhim Prashad Neupane 1 2 1 1 0 0 0 0 3 0

52 3Ka 1 604 Hari Prd Pathaka Asha Bahadur Manandhar 1 2 0 7 1 0 0 0 3 0

53 3Ka 1 605 Hari Prd Pathaka Khadak Prd Neupane 1 1 0 14 2 0 0 11 3 0

54 3Ka 1 690 Joga Maya Manandhar 1 Pun Kumar Manandhar 1 2 1 0 4 0 0 0 3 0 0

55 3Ka 1 621 Khadak Prd Neupane Bal Chandra Neupane 1 2 0 4 2 0 0 4 2 0

56 3Ka 1 622 Khadak Prd Neupane Prem Prashad Neupane 1 0 2 2 0 0 1 0 0

57 3Ka 1 623 Khadak Prd Neupane Prem Prashad Neupane 0 0 2 2 0 0 1 2 0

58 3Ka 1 620 Khadka Prashad Neupane Shiva Prashad Neupane 1 1 0 3 0 0 0 0 3 2

59 3Ka 1 571 Pancha Lal Manandhar 1 - 0 1 0 10 0 0 0 2 1 0

60 3(Ka 2) 715 Asha Lal Manandhar 1 Shiva Lal Manandhar 1 2 1 11 0 0 0 2 2 0

61 3(Ka 2) 606 Bal Chandra Neupane - 0 1 2 7 0 0 0 8 0 0

62 3(Ka 2) 630 Bal Chandra Neupane - 0 0 0 4 0 0 0 11 1 0

63 3(Ka 2) 687 Bhar Raj Pantha 1 Tika Bahadur Neupane 1 2 2 14 0 0 0 1 2 0

64 3(Ka 2) 626 Bhim Bahadur Karki - 0 0 8 1 0 0 0 2 0

65 3(Ka 2) 629 Bhim Bahadur Karki - 0 0 3 0 0 0 0 2 0

66 3(Ka 2) 691 Bikram Raj Singh Bhim Prashad Neupane 1 2 1 1 0 0 0 11 1 0

67 3(Ka 2) 693 Bikram Raj Singh Shiva Prashad Neupane 1 1 2 7 0 0 1 0 0 0

1 1 2

1

1

1

1 1

1

1 1

1

Page 2 of 12 Annex V- 1

Page 120: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

68 3(Ka 2) 677 Bishnu Narayan Manandhar 1 - 0 1 1 8 0 0 0 8 2 0

69 3(Ka 2) 952 Buddhi Bahadur 1 - 0 1 1 7 3 0 0 1 2 0

70 3(Ka 2) 953 Buddhi Bahadur & Chandra Maya 2 - 0 2 1 0 1 2 0 0 1 1 0

71 3(Ka 2) 607 Dal Bahadur Karki 1 - 0 1 0 8 0 0 0 1 0 0

72 3(Ka 2) 628 Dambar Bahadur 1 Sher Bahadur Karki 0 1 0 12 1 0 0 8 0 1

73 3(Ka 2) 594 Dilli Prashad Neupane 1 - 0 1 1 10 0 0 0 12 0 0

74 3(Ka 2) 627 Ganesh Bahadur 1 Sher Bahadur Karki 1 2 0 2 1 0 0 2 1 0

75 3(Ka 2) 379 Guru Prashad Neupane 1 Khadga Kumari Neupane 1 2 0 1 6 0 0 11 2 0

76 3(Ka 2) 709 Jwala Prashad Neupane 1 Dhana Nath Neupane 1 2 2 9 0 0 0 6 1 0

77 3(Ka 2) 688 Kaji Lal Shrestha 1 Tara Nath Neupane 1 2 0 14 0 0 0 10 1 0

78 3(Ka 2) 676 Khadananda Neupane 1 Khadananda Neupane 1 2 0 8 0 0 0 4 1 0

79 3(Ka 2) 618 Khanga Prashad Neupane 1 Purna Prashad Neupane 1 2 0 10 2 0 0 5 3 0

80 3(Ka 2) 712 Krishna Bahadur & Ram Bahadur Raya 2 Bishnu Prashad Neupane 1 3 1 11 0 0 0 0 0 2

81 3(Ka 2) 713 Krishna Bahadur Raya 1 Komal Prashad Neupane 1 2 1 9 0 0 0 9 1 0

82 3(Ka 2) 572 Mahamaya 1 Samir Bahadur Neupane 1 2 1 0 5 0 0

83 3(Ka 2) 599 Nararaj 1 Tuyusingh Manandhar 1 2 0 3 0 0 0 4 3 0

84 3(Ka 2) 600 Nararaj & Basudev 2 Ashadhakun Manandhar 1 3 0 8 2 0 1 8 1 0

85 3(Ka 2) 591 Nararaj Basudev 1 Jyoti Lal Manandhar 1 2 0 4 3 0 0 4 0 0

86 3(Ka 2) 831 Not Identified 1 - 0 1 0 12 0 0 0 5 3 0

87 3(Ka 2) 832 Not Identified 1 - 0 1 0 8 0 0 0 0 0 2

88 3(Ka 2) 689 Pun Kumar Manandhar 1 - 0 1 0 2 2 0 0 2 2 0

89 3(Ka 2) 714 Ratna Bahadur Manandhar 1 Gyan Bahadur 1 2 1 9 0 0 0 15 1 0

90 3(Ka 2) 608 Surya Kumar Ghimere Guru Prashad Neupane 1 2 0 12 0 0 0 5 1 0

91 3(Ka 2) 609 Surya Kumar Ghimere Chabi Lal Neupane 1 1 0 6 2 0 0 6 2 0

92 3(Ka 2) 694 Tara Maya 1 Buddhi Bahadur Neupane 1 2 1 2 3 3 0 0 4 1 0

93 3(Ka 2) 378 Tika Prashad Neupane 1 - 0 1 0 0 6 2 0 0 3 0

94 3(Ka 2) 593 Uma Devi 1 Krishana Prashad Neupane 1 2 1 0 4 0 0 1 10 2 0

95 3Kha 2 570 Asha Man Manandhar 1 Ganesh Bahadur Bogati 1 2 2 3 0 0 0 0 3 0

96 3Kha 2 775 Bishnu Prashad 1 - 0 1 1 9 2 0 0 0 9 0

97 3Kha 2 392 Buddhi Narayan Gobhaju 1 Hari Prashad Neupane 2 0 9 0 0 0 8 1 0

98 3Kha 2 565 Chandra Bahadur 1 Hari Prashad Neupane 1 1 2 0 0 0 14 0 0

99 3Kha 2 427 Danda Pani Neupane 1 Badri Prashad Neupane 1 2 1 6 0 0 0 3 0 0

100 3Kha 2 391 Dekuri Timilsina Hari Prashad Neupane (302, 565) 0 1 1 0 8 2 0 0 2 1 0

101 3Kha 2 380 Dekuri Timilsina Krishna Prashad Neupane (593) 0 0 0 15 2 0 0 9 0 0

102 3Kha 2 421 Dilli Prashad Neupane 1 - 0 1 0 9 2 0 0 0 1 0

103 3Kha 2 422 Ganedhar & Krishna Bahadur Manandhar 2 Tika Prashad Neupane 3 0 13 0 0 0 7 2 0

104 3Kha 2 569 Ganesh Bahadur 1 Tika Prashad Neupane 1 0 5 3 0 0 3 2 0

1

1

1

1

Page 3 of 12 Annex V- 1

Page 121: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

105 3Kha 2 425 Ganesh Maya Chokamini 1 Kul Bahadur Paka 1 2 1 0 5 2 0 0 1 3 0

106 3Kha 2 368 Ghyani Raj Theula, Ram Das, Tulsi Maya 3 Krishna Prashad Neupane (593, 380) 0 3 1 0 0 0 2 0 0 0 2

107 3Kha 2 774 Gun Prd 1 - 0 1 1 9 2 0 0 3 2 0

108 3Kha 2 372 Gyanti Rah Thedula Krishna Prashad Neupane (593, 380,368) 0 1 0 1 0 0 0 0 2 0

109 3Kha 2 355 Gyanti Rah Thedula Nanda Prashad Neupane 1 1 1 8 0 0 0 5 2 0

110 3Kha 2 235 Hari Prashad 1 Pun Kumar Manandhar 1 2 0 13 0 0 0 1 3 0

111 3Kha 2 377 Hari Prashad Neupane 1 - 0 1 6 5 0 0 0 15 1 0

112 3Kha 2 379 Harihar Thapa 1 Hari Prashad Neupane (302, 565,391) 0 1 0 9 0 0 0 0 1 2

113 3Kha 2 238 Harihar Thapa 1 Jit Lal Manandhar 1 2 0 9 0 0 0 0 3 0

114 3Kha 2 423 Hera Lal Jonche 1 Tulshi Bahadur Dhaubaji 1 2 2 10 0 0 0 5 1 0

115 3Kha 2 563 Indra Maya Rana Bahadur Bogati 2 0 11 0 0 0 2 3 0

116 3Kha 2 424 Indra Maya Rana Bahadur Bogati 0 0 3 0 0 0 0 3 0

117 3Kha 2 367 Jagat Bahadur Shrestha 1 Gopal Prashad Dotel 1 2 1 2 0 0 0 9 0 0

118 3Kha 2 370 Jit Bahadur 1 Pancha Lal Panchav 1 2 0 3 1 0 0 3 0 0

119 3Kha 2 237 Jit Lal Manandhar 1 - 0 1 2 5 0 0 1 2 1 0

120 3Kha 2 591 Joti Lal 1 - 0 1 0 0 0 0 0 2 1 0

121 3Kha 2 373 Kaji Lal Shrestha 1 Gopal Prashad Dotel (367) 0 1 1 1 8 0 0 0 8 2

122 3Kha 2 390 Kal Mochan Gopal Guthi 1 Rana Bahadur Bogati 1 2 1 5 0 0 0 4 0 0

123 3Kha 2 420 Krishna Bhakta Neupane 1 - 0 1 1 13 0 0 0 2 0 0

124 3Kha 2 654 Krishna Hari Thapa 1 - 0 1 3 3 0 0 0 3 1 0

125 3Kha 2 351 Lalit Devi Raut 1 Rudra Bahadur Raut 1 2 1 2 12 0 0 1 1 3 0

126 3Kha 2 369 Lop Shahu 1 Satya Lal Manandhar 1 2 0 6 0 0 0 6 0 0

127 3Kha 2 388 Madan Lal Pulachen 1 Kaji Bahadur Manandhar 1 2 0 14 0 0 0 6 1 0

128 3Kha 2 236 Maiju Maya 1 Ram Krishna Kishi 1 2 1 0 10 3 0 0 7 1 0

129 3Kha 2 378 Narasingh Bikram 1 Lallita Devi Rautni 2 1 10 2 0 0 9 1 0

130 3Kha 2 374 Prem Narhari 1 Lallita Devi Rautni 1 1 0 10 2 0 0 3 3

131 3Kha 2 778 Ramji Prashad 1 - 0 1 0 14 0 0 0 3 2 0

132 3Kha 2 426 Rudra Prashad Neupane Ramji Prashad Neupane 2 4 8 0 0 0 4 1 0

133 3Kha 2 240 Rudra Prashad Neupane Ramji Prashad Neupane 0 4 1 0 0 0 9 1 0

134 3Kha 2 779 Shanu Maya, Rabindra, Debendra 3 - 0 3 1 1 11 0 0 1 6 3 0

135 3Kha 2 371 Shiddi Kumar Manandhar 1 Bur Man Khatakho 1 2 0 1 3 0 0 0 0 1

136 3Kha 2 393 Tankeshwor Guthi 1 Hari Prashad Neupane (302, 565) 0 1 2 4 0 0 0 1 1 0

137 3Kha 2 564 Uma Devi Neupane Tulshi Bahadur Dhaubaji 2 0 10 0 0 0 8 0 0

138 3Kha 2 566 Uma Devi Neupane Tulshi Bahadur Dhaubaji 0 0 8 2 0 0 1 2 0

139 3Kha 1 809 Amrit Bahadur Thapa 1 - 0 1 0 2 2 0 0 0 3 0

140 3Kha 1 756 Batuli Bhandari Karki 1 - 0 1 1 0 4 0 0 0 6 0 0

1

1 1 1

1 1

1 1

1 1 1

Page 4 of 12 Annex V- 1

Page 122: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

141 3Kha 1 757 Beni Bahadur, Tej Bahadur 2 - 0 2 2 1 0 8 1 2 0 0

142 3 Kha 1 214 Bhaira Singh 1 Jamuna Khatrini 1 2 1 4 5 0 0 1 0 1 0

143 3 Kha 1 210 Dil Bahadur 1 Bhakta Bdr Thapa Chettri 2 0 13 0 0 0 11 1 0

144 3 Kha 1 212 Duwal 1 Bhakta Bdr Thapa Chettri 1 0 12 0 0 0 5 2 0

145 3 Kha 1 217 Ishowri Prashad Neupane 1 Krishna Bahadur Neupane 1 2 2 1 0 0 0 3 3 0

146 3Kha 1 808 Kabita Limbu 1 - 0 1 1 2 0 0 0 0 1 1 0

147 3Kha 1 198 Krishna Bahadur Thapa 1 - 0 1 0 6 0 0

148 3 Kha 1 213 Maya Devi, Dhana Devi Shrestha 2 Dal Bahadur Mishra Chettri 1 3 2 1 9 2 0 0 13 0 0

149 7Gha 1 351 Devi Parsad Ghimere 1 - 0 1 0 10 0 0 0 8 1 0

150 7Gha 1 334 Dhan Bahadur Amar Bdr. Khadka 1 2 5 0 0 0 2 8 3 0

151 7Gha 1 358 Dhan Bahadur Dil Bdr. Khadka 1 1 4 4 0 0 0 1 0 0

152 7Gha 1 463 Hira Lal pradhan 1 Chinu Maiya Ghimere 1 2 1 0 10 0 0 0 6 1 0

153 7Gha 1 478 Not Identified 1 - 0 1 1 9 0 0 0 12 2 0

154 7Gha 1 479 Not Identified 1 - 0 1 1 9 0 0 0 13 0 0

155 7Gha 1 329 Phaud Shing Karki 1 - 0 1 2 3 0 0 0 0 2 0

156 7Gha 1 350 Punya Lal Kok 1 Ram Prashad Ghimere 1 2 0 10 2 0 0 3 1 0

139 65 204 0 26 109 1012 151 18 12 646 212 31

174 10 3 2 55 12 3 3

157 8.1 381 Aas Lal 1 Tulsi Prashad Janawal 1 2 1 6 0 0 0 7 2 0

158 8.1 335 Akhanda Prashad Shrestha Tej Prashad 2 0 4 0 0 0 4 0 0

159 8.1 336 Akhanda Prashad Shrestha Tej Prashad 0 2 11 2 0 0 14 0 0

160 8.1 642 Bambi Bikateswor Guthi 1 Tulshi Prasad Khatibada 1 2 1 2 2 0 0 10 1 0

161 8.1 414 Chandra Bdr. Nagarkoti 1 - 0 1 1 14 0 0 0 6 0 0

162 8.1 334 Devendra Lal Malepati 1 Indra Bdr. Khatri Chettri 1 2 3 14 0 0 0 1 3 0

163 8.1 72 DhauMari 1 Hari Bhakta Koju 1 2 2 10 0 0 1 7 2 0

164 8.1 70 Dil Bdr. Thapa Chettri 1 Dhan Bdr. Thapa Chettri 2 0 12 2 0 0 5 0 0

165 8.1 71 Dilli Raj Upadhyaya 1 Dhan Bdr. Thapa Chettri 1 1 11 2 0 0 13 1 0

166 8.1 75 Govinda Das, Krishna Das Joshi 2 Lal Bahadur Mehphusi 1 3 0 13 0 0 0 13 0 0

167 8.1 59 Indra Bahadur Khatri 1 - 0 1 10 3 0 0 0 11 1 0

168 8.1 60 Indra Bdr. Khachen 1 - 0 1 1 5 0 0 0 4 3 0

169 8.1 357 Lalit Bdr. Palikhel 1 Krishna Bdr. Nagarkoti 1 2 0 16 0 0 0 2 2 0

170 8.1 403 Laxmi Prashad, Biku Lal, Radha Krishana, Tulsi Bhagat Bijukche 4 Dev Bdr. Nagarkoti 1 5 1 11 0 0 0 0 3 0

171 8.1 342 Mishri, Jagat Bdr., Shadu Ram 3 Krishna Bdr. Nagarkoti (357) 0 3 1 1 14 0 0 0 2 1 0

172 8.1 404 Not Identified 1 Dev Bdr. Nagarkoti (403) 1 0 0 3 0 0 0 1 0

173 8.1 405 Not Identified 1 Dev Bdr. Nagarkoti (403,404) 1 0 0 1 0 0 0 0 2

174 8.1 64 Padma Lal Padhya Purushotam Khatiwada 1 2 5 0 0 0 0 1 3 0

175 8.1 65 Padma Lal Padhya Man Bdr. Bakhucho 1 1 0 3 0 0 0 1 1 0

1

1

VDC: Gundu

1 1

1

0

1

Page 5 of 12 Annex V- 1

Page 123: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

176 8.1 66 Padma Lal Padhya Purushotam Khatiwada (64) 0 0 1 0 0 0 1 1 0

177 8.1 337 Purushotam Khatiwada 1 Purushotam Khatiwada (64,66) 1 2 7 0 0 0 5 2 0

178 8.1 385 Ratna Bdr. Makaju 1 Rana Bir Kami 1 2 0 1 2 0 0 1 2 0

179 8.1 358 Sant kaji Pradhan Durga Bdr. Nagarkoti 1 2 0 10 3 0 0 3 1 0

180 8.1 384 Sant kaji Pradhan Khadga Bdr. Nagarkoti 1 1 4 0 0 0 3 9 0 0

0

1

Page 6 of 12 Annex V- 1

Page 124: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

181 8.1 355 Santi Pradhanani Harsha Nagarkoti 1 2 1 11 0 0 1 0 1 0

182 8.1 383 Santi Pradhanani Harsa Bdr. Nagarkoti 1 1 0 7 2 0 0 1 3 0

183 8.1 386 Santi Pradhanani Dal Bdr. Nagarkoti 1 1 1 13 0 0 0 7 3 0

184 8.1 387 Santi Pradhanani Bala Bdr. Nagarkoti 1 1 1 1 0 0 0 0 1 0

185 8.1 738 Sanu Gaisingh 1 - 0 1 1 0 7 0 0 0 5 1 0

186 8.1 348 Shree Bambeshori Guthi 1 Purushotam Khatiwada (64) 0 1 9 14 0 0 1 8 0 0

187 8.1 379 Talcha Mari Tej Prashad 2 0 9 0 0 0 0 3 0

188 8.1 380 Talcha Mari Tej Prashad 0 1 6 0 0 0 13 1 0

189 8.1 61 Tej Prashad Khatiwada 1 - 0 1 2 1 0 0 0 7 3 0

190 8.1 377 Than Bdr. Koche 1 Man Bdr. Shnkha Deba 1 2 0 14 0 0 0 1 1 0

191 8.1 413 Tulsi Maya Kayastha 1 - 1 1 1 9 0 0 0 5 2 0

192 8.1 343 Tulsi Prashad Khatiwada 1 - 0 1 4 11 1 0 1 5 3 0

193 8 75 Govinda Das 1 Lal Bahadur 1 2 0 13 0 0 0 13 0 0

194 8 59 Indra Bahadur Khachen 1 - 0 1 10 3 0 0 1 11 1 0

195 6.1 928 Aik Bahadur Thapa chetri 1 - 0 1 4 2 0 0 0 3 2 0

196 6.1 24 Asha Kaji, Sanu Kaji, Hera Man, Krishna Man 4 Jam Prashad Katiwada Gainsi 1 5 0 1 3 0 0 1 3 0

197 6.1 940 Badri Thapa 1 - 0 1 0 7 2 0 0 5 1 0

198 6.1 180 Bal Bahadur Khatri - 0 1 1 8 0 0 0 3 1 0

199 6.1 57 Bal Bahadur Khatri - 0 0 2 15 0 0 0 8 0 0

200 6.1 990 Bishara Debi and Nirmala Padual 2 - 0 2 2 0 4 1 0 0 2 3 0

201 6.1 203 Budhi Bahadur Baniya - 0 1 1 2 0 0 0 11 1 0

202 6.1 195 Budhi Bahadur Baniya - 0 0 3 3 0 0 0 12 0 0

203 6.1 1067 Ganesha Kumar shrestha 1 - 0 1 0 2 2 0 0 2 2 0

204 6.1 941 Indra Bahadur Thapa 1 - 0 1 0 7 2 0 0 4 3 0

205 6.1 22 Indra Raj & Chaitanya Raj Sainju 2 Saila Gainsi 1 3 1 0 12 1 0 0 7 1 0

206 6.1 1063 Iswori Man 1 - 0 1 0 7 0 0 0 6 1 0

207 6.1 15 Jit Bdr. Chaguthi Chandra Bdr. Chauguthi 1 2 1 2 0 0 0 11 0 0

208 6.1 16 Jit Bdr. Chaguthi Indra Bdr. Chaughuthi 1 1 1 4 2 0 0 4 1 0

209 6.1 1094 Kanchu Khatri 1 - 0 1 0 5 1 0 0 1 0 0

210 6.1 56 Khadka Bahadur Chettri 1 - 0 1 4 2 1 0 1 5 2 0

211 6.1 83 Krishna Sagha 1 Jit Bahadur Pancha 1 2 0 6 0 0 0 0 0 2

212 6.1 1068 Narendra Shrestha 1 - 0 1 0 2 2 0 0 2 2 0

213 6.1 1150 Not Identified 1 - 0 1 2 2 2 0 0 0 3 0

214 6.1 20 Not Identified 1 Bal Krishna Neupane 1 2 0 13 1 0 0 4 0 0

215 6.1 23 Not Identified 1 Indra Raj Chauguthi 1 2 0 8 1 0 0 3 3 0

216 6.1 179 Not Identified 1 Padam Bdr. Thapa Chetri 1 2 1 9 0 0 0 9 0 0

217 6.1 207 Not Identified 1 Krishna Bdr. Chettri 1 2 2 15 0 0 1 3 3 0

1 1

1 1

1

1

1

Page 7 of 12 Annex V- 1

Page 125: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

218 6.1 915 Not Identified 1 - 0 1 0 3 2 0 0 0 1 0

219 6.1 916 Not Identified 1 - 0 1 0 3 2 0 0 0 1 0

220 6.1 913 Not Identified 1 - 0 1 0 8 2 0 1 2 2 0

221 6.1 914 Not Identified 1 - 0 1 0 8 2 0 0 8 0 0

222 6.1 211 Padam Bdr. Thapa Chettri - 0 1 10 0 0 0 0 0 1

223 6.1 212 Padam Bdr. Thapa Chettri - 0 1 5 2 0 0 6 1 0

224 6.1 1039 Prushotam Bhattarai 1 - 0 1 0 4 0 0 0 4 0 0

225 6.1 205 Ram Bahadur Khatri 1 - 0 1 0 0 0 0 0 10 1 0

226 6.1 105 Ram Bahadur Khatri Chettri 1 - 0 1 2 15 0 0 0 11 3 0

227 6.1 1069 Ram Bdr. Karki 1 - 0 1 0 5 3 0 0 4 3 0

228 6.1 1126 Ram Bdr. Thapa Chettri 1 - 0 1 0 10 3 2 0 8 1 0

229 6.1 202 Samar Narayan Dhaubadel 1 Buddhi Bahadur Baniya 1 2 1 9 1 0

230 6.1 1149 Sharmila Thapa 1 - 0 1 1 0 11 2 0 0 1 2 0

231 6.1 113 shiv Kumari Deuja 1 Dan Bahadur Deuja 1 2 1 1 6 0 0 0 13 0 0

232 6.1 84 Taleju Guthi Tek Bahadur Thapa 1 2 2 9 2 0 0 3 3 0

233 6.1 85 Taleju Guthi Phate Bahadur Thapa 1 1 2 8 0 0 1 11 2 0

234 6.1 88 Tarne Das Dhubadel 1 Surya Bahadur 1 2 4 4 0 0 0 1 1 0

235 6.1 27 Yog man Amatya 1 Ganesh Gaishi 1 2 0 9 1 0 0 1 3 0

77 36 113 0 9 100 543 62 2 13 394 110 5

134 14 2 2 39 5 3 1

236 5 226 Babu Kaji 1 Laxman Koju 1 2 1 8 0 0 0 8 3 0

237 5 225 Bed Maya, Bal kumari, krishna kumari, Batu Krishna samet Five 5 Krishna Bdr. Achaju 1 6 3 0 15 0 0 0 5 0 0

238 5 546 Binendra Thapa 1 - 0 1 0 5 2 0 0 0 1 2

239 5 223 Bir Bdr., Tulsi Badeju Asta Lal Twana 1 3 1 7 1 0 0 7 3 0

240 5 224 Bir Bdr., Tulsi Badeju Nhuche Bahadur 1 1 1 0 2 0 0 1 1 0

241 5 216 Hira Man Shrestha Durga Bdr thapa 1 2 4 12 0 0 0 1 1 0

242 5 238 Hira Man Shrestha Babu Lal Panchav 1 1 0 6 3 0 0 5 3 0

243 5 496 Ishor Man 1 - 0 1 0 7 1 2 0 6 3 0

244 5 222 Kalmochan Guthi 1 Bhairav Bahadur Titaju 1 2 0 3 3 0 0 0 1 0

245 5 235 Kise Bahaju. Bir Man Koju 2 Mangal Lal Chauguthi 1 3 3 4 0 0 1 2 2 0

246 5 233 Krishna Bdr. Thapa 1 - 0 1 6 12 0 0 0 4 0 0

247 5 232 Laxman Koju 1 - 0 1 4 2 0 0 0 3 3 0

248 5 326 Naran Bhakta Sakhakarmi 1 - 0 1 0 8 2 0 0 0 0 2

249 5 324 Nawaf Singh, Ajaf Singh, Jagat Bahadur, Janak Singh Krishna Bdr. Chauguthi 1 5 0 7 0 0 0 2 0 0

250 5 325 Nawaf Singh, Ajaf Singh, Jagat Bahadur, Janak Singh Mangal Lal Chauguthi 1 1 0 6 2 0 0 3 2

1 1

1

VDC: Katunje

2

1

4

Page 8 of 12 Annex V- 1

Page 126: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

251 5 385 Not Identified 1 - 0 1 0 10 0 0 0 6 2 0

252 5 386 Not Identified 1 - 0 1 0 10 0 0 0 8 1 0

253 5 388 Not Identified 1 - 0 1 1 1 0 0 0 3 2 0

254 5 389 Not Identified 1 - 0 1 0 6 2 0 0 5 0 0

255 5 391 Not Identified 1 - 0 1 0 4 3 0 0 1 1 0

256 5 548 Ramesh Thapa 1 - 0 1 0 5 2 0 0 1 2 0

257 5 495 Santa Man 1 - 0 1 0 4 3 1 0 2 0 0

258 5 228 Sundar Koju 1 Laxman Koju 1 2 4 2 0 0 1 1 2 0

259 5 236 Upendra Lal Pradhananga 1 Shyam Bahadur Thapa 1 2 0 13 3 0 0 9 2 0

260 5 239 Upendra Raj Rajupadhyaya Ganesh Lal Sainju 1 2 0 4 0 0 0 4 1 3

261 5 240 Upendra Raj Rajupadhyaya Jagat Bahadur Panchav 1 0 4 0 0 0 3 1 0

262 5 214 Upendra Raj Rajupadhyaya Jagat Bahadur Panchav 0 1 2 0 0 0 13 1 0

263 5 215 Upendra Raj Rajupadhyaya Ganesh Lal Sainju (239) 0 0 0 15 0 0 0 0 2 0

264 6 (Ka) 379 Banas Bahadur Thapa - 0 0 10 1 0 0 1 1 0

265 6 (Ka) 383 Banas Bahadur Thapa - 0 0 15 3 0 1 0 1 0

266 6 (Ka) 38 Bed Ram Adhikari Jagat Bdr. Kiwanche 1 2 0 8 0 0 0 2 1 0

267 6 (Ka) 39 Bed Ram Adhikari Ram Kalee Dhartini 1 1 1 0 10 0 0 0 2 1 0

268 6 (Ka) 81 Bed Ram Adhikari Man Bdr. Kiwanche 1 1 1 8 0 0 0 2 1 0

269 6 (Ka) 446 Dhan Bahadur - 0 0 3 2 0 0 2 0 0

270 6 (Ka) 448 Dhan Bahadur - 0 0 2 2 0 0 2 2 0

271 6 (Ka) 451 Dhan Bahadur - 0 0 1 2 0 0 1 1 0

272 6 (Ka) 447 Dhan Bahadur & Krishna Bahadur - 0 0 0 10 0 0 0 10 0273 6 (Ka) 449 Dhan Bahadur & Krishna Bahadur - 0 0 0 0 2 0 0 0 2

274 6 (Ka) 15 Durga Bdr. Thapa Than Bdr. Achaju 1 2 1 0 1 0 0 3 0 0

275 6 (Ka) 29 Durga Bdr. Thapa - 0 0 1 9 0 0 0 10 2 0

276 6 (Ka) 36 Ganga Prashad Timilsina Pun Lal Achaju 2 0 2 0 0 0 1 1 0

277 6 (Ka) 137 Ganga Prashad Timilsina Pun Lal Achaju 0 0 9 0 0 0 3 0 0

278 6 (Ka) 339 Ganga Prashad Timilsina - 0 0 1 2 0 0 0 4 0 0

279 6 (Ka) 17 Hom Nath Adhikari Lok Bdr. Nepal 1 2 0 14 0 0 0 14 0 0

280 6 (Ka) 139 Hom Nath Adhikari Mailee Achaju 1 1 1 0 6 0 0 0 0 3 0

281 6 (Ka) 174 Hom Nath Adhikari Krishna Bdr. Kiwanche 1 1 1 1 0 0 0 7 3 0

282 6 (Ka) 178 Hom Nath Adhikari Asta Lal Kiwanche 1 1 0 10 1 0 0 15 2 0

283 6 (Ka) 340 Hom Nath Pachya 1 - 0 1 3 6 0 0 0 1 1 0

284 6 (Ka) 179 Homa Natha Adhikari 1 - 0 1 0 13 3 0 0 12 1 0

285 6 (Ka) 136 Hon Nath Adhirari 1 Krishna Bdr. Kiwanche 0 1 0 8 2 0 0 7 1 0

286 6 (Ka) 73 Jagat Ratna Hada 1 Purna Bdr. Sarki 1 2 3 11 2 0 0 4 0 0

287 6 (Ka) 28 Janak Kumar Upadhyaya 1 Shiva Lal Kiwanche 2 0 6 0 0 0 3 1 0

288 6 (Ka) 76 Janak Kumari Upadhyaya Shiva Lal Kiwanche 1 3 14 2 0 0 15 3 0

1 1

1 1

1

1 1

2 2

1

11

1

1

Page 9 of 12 Annex V- 1

Page 127: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

289 6 (Ka) 77 Janak Kumari Upadhyaya Krishna Bdr. Kiwanche (136) 0 0 0 7 0 0 0 3 1 0

290 6 (Ka) 79 Janak Kumari Upadhyaya Asta Lal Kiwanche (178) 0 0 1 0 0 0 0 0 0 3

291 6 (Ka) 422 Krishna Bdr. Kiwache 1 - 0 1 0 8 0 0 0 3 0 0

292 6 (Ka) 381 Krishna Bdr. Thapa - 0 1 0 3 2 0 0 0 1 1

293 6 (Ka) 382 Krishna Bdr. Thapa - 0 0 0 10 1 0 0 0 3 0

294 6 (Ka) 380 Kumar Prashad Thapa - 0 1 0 10 1 0 0 1 0 0

295 6 (Ka) 384 Kumar Prashad Thapa - 0 0 0 15 3 0 0 2 0 0

296 6 (Ka) 141 Padma Kumari Thapa Shiva Lal Kiwanche (28,76) 0 1 3 0 0 0 2 0

297 6 (Ka) 144 Padma Kumari Thapa Shiva Lal Kiwanche (28,76) 0 2 3 0 0 2 3 0

298 6 (Ka) 148 Padma Kumari Thapa Shiva Lal Kiwanche (28,76) 0 3 0 0 0 2 3 0

299 6 (Ka) 177 Padma Kumari Thapa Shiva Lal Kiwanche (28,76) 0 6 0 0 0 4 0 0

300 6 (Ka) 423 Ram Bdr. Kiwache - 0 0 6 0 0 0 2 3 0

301 6 (Ka) 425 Ram Bdr. Kiwache - 0 0 10 3 0 0 0 1 0

302 6 (Ka) 427 Ram Bdr. Kiwache - 0 0 3 2 0 0 2 0 0

303 6 (Ka) 429 Ram Bdr. Kiwache - 0 0 8 0 0 0 1 0 0

304 6 (Ka) 142 Rishi Keshab Man Bdr. Kiwanche 0 1 2 0 0 1 2 0

305 6 (Ka) 143 Rishi Keshab Man Bdr. Kiwanche 0 1 0 0 0 1 0 0

306 6 (Ka) 146 Rishi Keshab Man Bdr. Kiwanche 0 4 3 0 0 3 1 0

307 6 (Ka) 147 Rishi Keshab Man Bdr. Kiwanche 0 2 2 0 0 2 2 0

308 6 (Ka) 150 Rishi Keshab Man Bdr. Kiwanche 0 6 1 0 0 0 3 0

309 6 (Ka) 180 Rishi Keshab Man Bdr. Kiwanche 0 14 0 0 0 0 2 0

310 6 (Ka) 18 Shree Ram Adhikari 1 Krishna Bdr. Thapa Chettri 1 2 0 14 0 0 0 14 0 0

311 6 (Ka) 140 Tirtha Nath Adhikari 1 Ram Kalee Dhartini 1 2 1 1 9 3 0 0 3 1 0

312 6Kha 2 728 Asha Narayan Taga Narayan Bhakta Taga 2 2 14 0 0 0 12 0 0

313 6Kha 2 728 Asha Narayan Taga Narayan Bhakta Taga 0 2 14 0 0 0 12 0 0

314 6Kha 2 13 Bhakta Lal Chalishe 1 Deva raja Chalishe 1 2 Not clear 1 3 0 0

315 6Kha 2 1305 Bindabasini KC, Purusottam Khatri 2 - 0 2 1 0 11 2 0 0 4 0 0

316 6Kha 2 308 Bishankhar Manandhar 1 Kishang Khing 1 2 0 7 2 0 0 2 1 1

317 6Kha 2 1010 Dhan Bahadur 1 - 0 1 0 11 0 2 0 5 0 0

318 6Kha 2 6 Dhoja Bahadur Bijukachhe 1 - 0 1 Not clear 0 9 1 0

319 6Kha 2 15 Durga Dasa Shikrami 1 Shuku Narayan Dhon Bha 1 2 Not clear 0 4 3 0

320 6Kha 2 5 Gansha Lal Shrestha 1 Prem Kumari Thapini 1 2 1 Not clear 0 4 0 0

321 6Kha 2 8 Guthi 1 Ganga Pdr Timilashina 1 2 Not clear 0 13 3 0

322 6Kha 2 928 Hira Lal Duwal 1 - 0 1 0 13 1 0 0 3 3 0

323 6Kha 2 12 Karna Bahadur 1 Jagat Lal Acharya 1 2 Not clear 1 2 2 0

324 6Kha 2 1011 Kiran Kumar Kaphle 1 - 0 1 1 10 1 2 0 5 2 0

325 6Kha 2 307 Krishna Maya Bikulal 1 Kishang Khing (308) 0 1 0 7 1 0 0 2 2 0

1 1

1

1

1 0 1 1

1 1

1 1 2

1 1

Page 10 of 12 Annex V- 1

Page 128: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

326 6Kha 2 929 Laxmi Kumari Duwal 1 - 0 1 1 3 3 3 0 1 5 2 0

327 6Kha 2 7 Not Identified 1 Bhulang 1 2 0 0 1 3 0 0 1 3

328 6Kha 2 4 Parti 0 - 0 0 1 0 1 2 0

329 6Kha 2 14 Pashupatinatha Guthi 1 Babu Lal 1 2 Not clear 0 0 1 0

330 6Kha 2 1345 Ram Maya Lohala 1 - 0 1 1 1 12 1 2 1 5 0 0

331 6Kha 2 11 Sada Barta Guthi Bhakta Lal Kashapal Not clear 0 5 1 0

332 6Kha 2 3 Sada Barta Guthi Bhakta Lal Kashapal Not clear 0 6 3 0

333 6Kha 2 1304 Saraswoti Khadka 1 - 0 1 1 0 8 0 0 0 3 0 0

334 6Kha 2 784 Shanta Maya 1 - 0 1 1 0 14 2 0 0 9 1 0

335 6Kha 2 765 Thulo Bhai Khatri 1 - 0 1 1 3 2 0 0 6 2 0

336 6 Kha 28 Bed Nath Lakhe 1 Tueyesin Lakhe 1 2 0 12 2 0 0 3 0 0

337 6 Kha 97 Golphe Sarki 1 - 0 1 0 15 0 0 0 11 0 0

338 6 Kha 52 Krishna Giri 1 Biku Laxmi Sikami 1 2 1 0 13 1 0 0 0 3 0

339 6 (Kha 1) 1174 Achyutananda Upadyaya Chalese 1 - 0 1 1 2 2 0 0 2 2 0

340 6 (Kha 1) 341 Balram khatri chatri 1 Thulo Kanchha Sarki 1 2 0 9 3 0 0 7 3 0

341 6 (Kha 1) 294 Bera Maya 1 Nara Bdr. Karki 1 2 1 2 7 3 0 1 3 2 0

342 6 (Kha 1) 1196 Bijay Tamang 1 - 0 1 0 3 0 0 0 0 3 0

343 6 (Kha 1) 1138 Binita Dhungana (Bhandari) 1 - 0 1 1 0 8 2 0 0 1 0 0

344 6 (Kha 1) 125 Changu Narayan Gauri Ghat Guthi 1 Kedar Nath Chalese 1 2 3 13 3 0 0 8 0 0

345 6 (Kha 1) 451 Dilli Raj Upadhyaya Ganesh Prajapati 1 2 2 2 1 0 0 4 2 0

346 6 (Kha 1) 343 Dilli Raj Upadyaya Tuyesin Lakhe 1 1 0 7 3 0 0 4 1 0

347 6 (Kha 1) 1056 Dipendra Shilparak 1 - 0 1 0 4 10 0 0 0 2 0

348 6 (Kha 1) 1080 Ganesh Bdr. Gubhaju 1 - 0 1 0 12 0 0 0 1 0 0

349 6 (Kha 1) 1421 Gayatri Devi Poudel 1 - 0 1 1 0 10 3 0 0 6 2 0

350 6 (Kha 1) 131 Gopal Das Joshi 1 Nani Babu Khede 1 2 2 0 2 0 0 4 0 0

351 6 (Kha 1) 449 Govinda Prashad Chalese 1 Biku Bdr. Karmi 1 2 2 13 1 0 0 0 2 0

352 6 (Kha 1) 466 Hira Devi, Dev Maya, Indra Bdr., Devendra Sikarmi Devendra Karmi 1 5 1 3 0 0 0 6 0 0353 6 (Kha 1) 467 Hira Devi, Dev Maya, Indra Bdr., Devendra Sikarmi Indra Bdr. Karmi 1 1 0 8 0 0 0 3 0 0354 6 (Kha 1) 468 Hira Devi, Dev Maya, Indra Bdr., Devendra Sikarmi Devendra Karmi (466) 0 0 0 14 2 0 0 4 2 0355 6 (Kha 1) 448 Hira Devi, Dev Maya, Indra Bdr., Devendra Sikarmi Indra Bdr. Karmi (467) 0 0 0 8 0 0 0 2 2 0356 6 (Kha 1) 465 Hira Devi, Dev Maya, Indra Bdr., Devendra Sikarmi Indra Bdr. Karmi (467) 0 0 0 0 0 0 0 7 0 0

357 6 (Kha 1) 1057 Indra Bhadur Silpakar 1 - 0 1 0 5 3 0 0 0 3 0

358 6 (Kha 1) 452 Krishna Gopal Karmacharya 1 Ram Prajapati 1 2 0 6 0 0 0 1 1 0

359 6 (Kha 1) 747 Krishna Kumar, Keshari Maya 2 - 0 2 1 1 14 0 0 0 9 3 0

360 6 (Kha 1) 1414 Mohan Kumar Gurung 1 - 0 1 0 4 0 0 0 3 1 0

361 6 (Kha 1) 1419 Nanu Gadhi Mahato 1 - 0 1 1 0 3 0 0 0 2 2 0

362 6 (Kha 1) 292 Nhuche Bdr. Bhuju 1 Ganesh Prajapati 1 2 0 10 2 0 0 1 2 0

363 6 (Kha 1) 733 Not Identified 1 - 0 1 0 6 2 0 0 4 2 0

364 6 (Kha 1) 734 Not Identified 1 - 0 1 0 7 1 0 0 6 2 2

1 1 2

1

4 2

Page 11 of 12 Annex V- 1

Page 129: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P DS. No.

Ward

No.

Plot

No.

Name of Owner Number of Owner Nmae of Tenant Number of

Tenant

Affected Land AreaTotal Number

AffectedGVT Land

Total Number Affected (Women)

Official Land Area

365 6 (Kha 1) 1192 Prava Neupane Poudel - 0 1 0 2 0 0 0 1 2 0

366 6 (Kha 1) 1194 Prava Neupane Poudel - 0 0 4 1 1 0 1 0 3

367 6 (Kha 1) 1186 Prava, Jeevan, Kesari, Bhakti Laxmi, Sudarshan (common road) 5 - 0 5 3 0 1 0 3 0 1 0 3

368 6 (Kha 1) 327 Puna Prajapati 1 - 0 1 0 12 0 0 0 1 2 0

369 6 (Kha 1) 334 Purna Kumar Kul Bdr. Gosain 1 2 0 1 3 0 0 1 3 0

370 6 (Kha 1) 335 Purna Kumar Mohan Kumar Karmacharya 1 1 0 1 2 0 0 1 2 0

371 6 (Kha 1) 332 Purna Kumar Prajapati 1 - 0 1 0 12 1 0 0 1 1 0

372 6 (Kha 1) 1173 Rajendra Bdr. Gubhaju 1 - 0 1 0 12 0 0 0 3 1 0

373 6 (Kha 1) 137 Ram Lal Chalese 1 Chandika Jakibanja 1 2 1 3 0 0 0 14 3 0

374 6 (Kha 1) 453 Ram Prajapati 1 - 0 1 0 1 1 0 0 1 0 0

375 6 (Kha 1) 1139 Santi Shah 1 - 0 1 1 0 9 2 0 0 1 0 0

376 6 (Kha 1) 1039 Silan upreti 1 - 0 1 0 4 0 0 0 4 0 0

377 6 (Kha 1) 1197 Sundar Kumar Gubhaju 1 - 0 1 0 4 3 0 0 3 3 2

378 6 (Kha 1) 297 Uma Sarki 1 Hawa Sarki 1 2 1 1 3 3 0 0 12 2 0

119 55 174 1 28 68 907 167 18 8 527 195 27

127 5 3 2 44 1 1 3

339 156 495 1 63 305 2471 380 39 35 1582 525 63

142 5 0 3

1

1 1

Page 12 of 12 Annex V- 1

Page 130: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

VDC: Matatirtha, Ward No. 4 (GA)

R A P D R A P D

1 281 Balani Rijal 1 - 0 1 1 3 11 0 0 1 2 2 0

2 138 Bas Narayan Maharjan 1 Bhim Bahadur Khatri 1 2 2 1 0 0 2 1 0 0

3 155 Bhimeswori Panch Kumari Guthi 1 Bhagawati Rijal 1 2 1 1 0 0 0 1 0 0 0

4 129 Bishnu Devi Guthi 1 Dhan Kumari Rijalni 1 2 1 3 12 0 0 3 12 0 0

5 268 Chuna Kumari Gurung 1 - 0 1 1 1 1 0 0 1 1 0 0

6 135 Dhan Krishna, Nand Maya Maharjan 2 - 0 2 1 3 12 0 0 3 12 0 0

7 280 Durga Devi Rijal 1 - 0 1 1 1 3 3 0 0 3 2 0

8 274 Jadish Chandra Ghimire, Manik Shakya 2 - 0 2 0 3 0 0 0 3 0 0

9 118 Kanchha Shrestha 1 - 0 1 1 3 4 0 0 2 0 3 0

10 269 Keshar Bahadur Gurung 1 - 0 1 1 11 1 0 1 11 1 0

11 271 Keshar Prasad Parajuli 1 - 0 1 0 4 0 0 0 4 0 0

12 131 Khast Lal, Chandra Lal Shrestha 2 - 0 2 8 13 0 0 8 13 0 0

13 123 Krishna Bahadur Shrestha 1 - 0 1 5 14 0 0 0 15 0 0

14 120 Lal Kaji Shrestha 1 - 0 1 2 0 0 0 1 13 0 0

15 273 Maiya Manandhar 1 - 0 1 1 0 8 0 0 0 8 0 0

16 132 Mangal Das Shrestha - 0 1 0 7 0 0 0 7 0 0

17 134 Mangal Das Shrestha - 0 0 1 8 0 0 1 8 0 0

18 275 Muthi Gurung 1 - 0 1 1 2 0 0 0 2 0 0 0

19 154 Narhari Rijal 1 - 0 1 2 12 0 0 2 12 0 0

Total Number Affected (Women)

Thankot - Chapagaun - Bhaktapur 132 kV Transmission Line Project Matatirth Substation

District - Kathmandu

S. No.

Ward No.

Plot No.

Name of Owner Number of Owner Nmae of

Tenant

1

Total Number Affected

GVT Land

Number of Tenant

Official Land Area Affected Land Area

Page 1 of 2 Annex V- 1

Page 131: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

R A P D R A P D

Total Number Affected (Women)

S. No.

Ward No.

Plot No.

Name of Owner Number of Owner Nmae of

Tenant Total Number

AffectedGVT Land

Number of Tenant

Official Land Area Affected Land Area

20 270 Purn Bahadur sarki - 0 1 0 6 0 0 0 6 0 0

21 272 Purn Bahadur sarki - 0 0 0 6 0 0 0 6 0 0

22 137 Ram Krishna Rijal 1 - 0 1 1 3 0 0 0 3 0 0 0

23 121 Tara Prasad Sharma 1 - 0 1 6 1 0 0 6 1 0 0

Total 24 3 27 0 10 47 137 4 0 37 138 8 0

55 10 0 0 45 12 0 0

1

Page 2 of 2 Annex V- 1

Page 132: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

VDC: Harisiddhi, Ward No. 4 (GA)

R A P D R A P D

1 110 Badri Maharjan 1 - 0 1 2 10 2 0 2 10 2 0

2 105 Bhagat Lal, Purn Lal Maharjan 2 - 0 2 4 8 2 0 4 8 2 0

3 161 Bis Lal Maharjan 1 Bishnu Lal Parasi Maharjan 1 2 1 4 3 0 1 4 3 0

4 106 Chir Kumari Maharjan 1 Hira Man Maharjan 1 2 1 1 8 0 0 1 8 0 0

5 111 Chiri Kaji Maharjan 1 - 0 1 1 3 0 0 1 3 0 0

6 156 Dash Bahadur Maharjan - 0 1 0 1 2 0 0 1 2 0

7 158 Dash Bahadur Maharjan - 0 0 0 14 2 0 0 14 2 0

8 108 Dhan Bahadur Maharjan 1 - 0 1 1 0 0 0 1 0 0 0

9 152 Gopal Rejmi 1 - 0 1 2 1 3 0 2 1 3 0

10 109 Govind Maharjan 1 Govind Gwosi Maharjan 1 2 0 11 3 0 0 11 3 0

11 157 Gyan Bahadur Maharjan 1 - 0 1 0 9 3 0 0 9 3 0

12 159 Jit Govind Lohi 1 - 0 1 1 14 0 0 1 14 0 0

13 155 Krishan Maharjan 1 - 0 1 0 13 1 0 0 13 1 0

14 160 Krishan Maharjan 1 - 0 1 1 4 0 0 1 4 0 0

15 153 Laxmi Kumari Maharjan - 0 1 2 2 0 0 2 2 0 0

16 154 Laxmi Kumari Maharjan - 0 0 1 14 2 0 1 14 2 0

17 107 Nil Govind Maharjan, Karm Govind Maharjan 2 - 0 2 4 8 1 0 4 8 1 0

Total 17 3 20 0 2 21 124 24 0 21 124 24 0

29 2 0 0 29 2 0 0

1 1

1

GVT LandTotal Number

Affected (Women)

Official Land Area Affected Land Area

Thankot - Chapagaun - Bhaktapur 132 kV Transmission Line Project Harisiddhi Substation

District - Lalitpur

S. No.

Plot No. Name of Owner Number of

Owner Nmae of Tenant Number of Tenant

Total Number Affected

Page 1 of 1 Annex V- 1

Page 133: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ANNEXES V-2

Page 134: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ANNEXES VI-1

Page 135: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Page 1 of 5 Annex VI-1

Annex VI - 1 Socioeconomic Data Tables (Project Affected Families)

Table 1: Sex and Age Distribution Sample = 200 households

Male Population Female Population Total M/F Districts Nos. (%) Nos. (%) Nos. (%) Ratio

Kathmandu Average HH Size = 5.7 0 – 15 76 51.4 72 48.6 148 100.0 1.06

16 – 59 119 55.4 92 43.6 211 100.0 1.29 60 & above 55 59.1 38 40.9 93 100.0 1.45

Total: 250 55.3 202 44.7 452 100.0 1.24 Bhaktapur Average HH Size = 6.5

0 – 15 73 50.3 72 49.7 145 100.0 1.01 16 – 59 129 45.7 153 54.3 282 100.0 0.84

60 & above 33 64.7 18 35.3 51 100.0 1.83 Total: 235 49.2 243 50.8 478 100.0 0.97

Lalitpur Average HH Size = 7.2 0 – 15 62 50.8 60 49.2 122 100.0 1.03

16 – 59 103 54.5 86 45.5 189 100.0 1.20 60 & above 13 59.1 9 40.9 22 100.0 1.44

Total: 178 53.5 155 46.5 333 100.0 1.15 Total/Average: Average HH Size = 6.5

0 – 15 211 50.8 204 49.2 415 32.9 1.03 16 – 59 351 51.5 331 48.5 682 54.4 1.06

60 & above 101 60.8 65 39.2 166 13.1 1.55

Total: 511 52.5 600 47.5 1263 100.0 1.11

Field Survey, 2000 Table 2: Households Size by the No. of Persons in a House

Sample = 200 households Kathmandu Bhaktapur Lalitpur Total HH Size

HHs (%) HHs (%) HHs (%) HHs (%)

Only 1 Person 2 2.50 2 2.70 0 0.0 4 2.00 2 – 5 Persons 22 27.50 30 40.54 16 34.8 68 34.4 6 – 7 Persons 43 53.75 4 5.4 13 28.3 60 30.0 8 – 9 Persons 13 16.25 24 32.43 11 23.9 48 24.0 10 and Above 0 0.0 14 18.92 6 13.0 20 10.0

Total: 80 100 74 100.0 46 100.0 200 100.0

Source: Field Survey, 2000 Table 3: Household by Family Type

Sample = 200 households

Kathmandu Bhaktapur Lalitpur Total Type of Family

No. of HHs

No. of Pop.

% of Pop.

No. of HHs

No. of Pop.

% of Pop.

No. of HHs

No. of Pop.

% of Pop.

No. of HHs

No. ofPop.

% of Pop.

Joint Family 38 220 49 9 75 12.2 19 139 41.7 66 434 34.4 Single Family 42 232 51 65 403 87.8 27 194 58.3 134 826 65.6

Total: 80 452 100 74 478 100.0 46 333 100.0 200 1263 100

Source: Field Survey, 2000

Page 136: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Page 2 of 5 Annex VI-1

Table 4: Female Headed Households Sample = 200 Households

Male Headed Female Headed Total Districts HHs (%) HHs (%) HHs (%)

Kathmandu 78 97.5 2 2.5 80 100.0 Bhaktapur 41 89.1 7 6.3 46 100.0 Lalitpur 67 90.5 5 9.5 74 100.0 Total: 186 93.0 14 7.0 200 100.0

Source: Field Survey, 2000 Table 5: Population Distribution by the Ethnicity

Sample = 200 Households

Kathmandu Bhaktapur Lalitpur Total

Ethnicity HHs No.

No.of Pop.

% of Pop.

HHs No.

No.of Pop.

% of Pop.

HHs No.

No.of Pop.

% of Pop.

HHs No.

No.of Pop.

% of Pop.

Brahmin 12 74 16.4 20 119 24.9 4 38 11.4 36 231 18.3 Chhetri 22 118 26.1 27 193 40.4 11 99 29.7 60 410 32.5 Newar 43 245 54.2 24 148 31.0 28 188 56.5 95 581 46.0 Magar 3 15 3.3 0 0 0.0 0 0 0.0 3 15 1.2 Others 0 0 0.0 3 18 3.8 3 8 2.4 6 26 2.1 Total 80 452 100.0 74 478 100.0 103 333 100.0 200 1263 100

Source: Field Survey, 2000

Table 6: Population Distribution by the Educational Level Sample = 200 households

Male Population Female Population Total Education Nos. (%) Nos. (%) Nos. (%)

Kathmandu Illiterate (Above 10 yrs) 62 27.8 48 31.8 110 29.4

Literate without schooling 22 9.9 11 7.3 33 8.8 Primary Level 58 26.0 44 29.1 102 27.3

Lower Secondary 32 14.3 21 13.9 53 14.2 Secondary 14 6.3 15 9.9 29 7.8

Above 35 15.5 12 7.9 47 12.6 Total: 223 100 151 100 374 100

Bhaktapur Illiterate (Above 10 yrs) 26 12.6 82 35.7 108 24.8

Literate without schooling 20 9.7 27 11.7 47 10.8 Primary Level 50 24.3 68 29.6 118 27.1

Lower Secondary 14 6.8 12 5.2 26 6.0 Secondary 40 19.4 26 11.3 66 15.1

Above 56 27.2 15 6.5 71 16.3 Total: 206 100.0 230 100.0 436 100.0

Lalitpur Illiterate (Above 10 yrs) 19 11.9 62 44.9 81 24.3

Literate without schooling 10 6.3 4 2.9 14 4.2 Primary Level 49 30.8 25 18.1 74 22.2

Lower Secondary 12 7.5 9 6.5 21 6.3 Secondary 34 21.4 29 21.0 63 18.9

Above 35 22.0 9 6.5 44 13.2 Total: 159 100.0 138 100.0 297 89.2

Total/Average Illiterate (Above 10 yrs) 107 18.2 192 37.0 299 27.0

Page 137: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Page 3 of 5 Annex VI-1

Male Population Female Population Total Education Nos. (%) Nos. (%) Nos. (%)

Literate without schooling 52 8.8 42 8.1 94 8.5 Primary Level 157 26.7 137 26.4 294 26.6

Lower Secondary 58 9.9 42 8.1 100 9.0 Secondary 88 15.0 70 13.5 158 14.3

Above 126 21.4 36 6.9 162 14.6 Total: 588 100 519 100 1107 100

Field Survey, 2000

Table 7: Population Distribution by the Occupation Sample =200 households

Male Population Female Population Total Occupation Nos. (%) Nos. (%) Nos. (%)

Kathmandu Agriculture 100 40.0 88 43.6 188 41.6 Business 12 4.8 7 3.5 19 4.2 Service 45 18 6 3.0 51 11.3 Labour 0 0.00 0 0 0 0.0 Student 66 26.4 50 24.8 116 25.7 Incapable 6 2.4 10 5.0 16 3.5 Others 21 8.4 41 20.3 62 13.7 Sub-Total: 250 100 202 100 452 100 Bhaktapur Agriculture 89 37.9 142 58.4 231 48.2 Business 5 2.1 5 2.1 10 2.1 Service 40 17.0 1 0.4 41 8.6 Labour 4 1.7 0 0.0 4 0.8 Student 67 28.5 69 28.4 136 28.5 Incapable 28 11.9 18 7.4 46 9.6 Others 2 0.9 8 3.3 10 2.1 Sub-Total: 235 100.0 243 100.0 478 100.0 Lalitpur Agriculture 57 32.0 94 60.6 151 45.3 Business 12 6.7 1 0.6 13 3.9 Service 18 10.1. 3 1.9 21 6.3 Labour 3 1.7 1 0.6 4 1.2 Student 68 38.2 39 25.2 107 32.1 Incapable 15 8.4 14 9.0 29 8.7 Others 5 2.8 3 1.9 8 2.4 Sub-Total 178 100 155 100 333 100

TOTAL Agriculture 246 37.1 324 54.0 570 45.1 Business 29 4.4 13 2.2 42 3.3 Service 103 15.5 10 1.7 113 8.9 Labour 7 1.1 1 0.2 8 0.6 Student 201 30.3 158 26.3 359 28.4 Incapable 49 7.4 42 7.0 91 7.2 Others 28 4.2 52 8.7 80 6.3 Total: 663 100 600 100 1263 100

Source: Field Survey, 2000

Page 138: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Page 4 of 5 Annex VI-1

Table 8: Annual Average Incomes Sample = 200 Households

Amount Kathmandu Bhaktapur Lalitpur Average

Source of Income

(Rs.) (%) (Rs.) (%) (Rs.) (%) (Rs.) (%)

Agriculture 17,833.00 23.88 18,040.00 31.51 14,410.00 24.51 16,761.00 16.70 Other 56,854.84 76.12 39,217.00 68.49 44,392.00 75.49 46,821.28 83.30 Total 74,687.84 100.00 57,257.00 100.00 58,802.00 100.00 63,582.28 100.00

Source: Field Survey, 2000

Table 9: Landholding Pattern of Sampled Households Sample = 200 households

Districts Total Number of Surveyed HHS

Number of HHs Owing Land

Avg. Total LandHolding Size (Ha)

Avg. Affected Land

Size (Ha)/HHs

% of Affected

Land

%of the Average

Land

Kathmandu 8o 71 0.32 0.004 88.8 1.2

Lalitpur 46 44 0.32 0.007 95.7 2.0

Bhaktapur 74 69 0.38 0.005 93.2 1.5

Total/Average: 200 184 0.34 0.002 92.0 0.5

Source: Field Survey, 2000

Table 10: Distribution of Sampled Household by Extent of Project Affect Sample = 200 Households

Districts Number of Affected Households (Size) Percentage of Total Affected Households

Kathmandu (Total) 80 100.0 Loosing < 25% of total land 26 32.5 Loosing 25 - 50% of total land 18 22.5

Loosing 50 - 75% of total land 14 17.5

Loosing 75 – 100% of total land 22 27.5

Lalitpur (Total) 46 100.0

Loosing < 25% of total land 24 52.5

Loosing 25 - 50% of total land 8 17.4 Loosing 50 - 75% of total land 3 6.5

Loosing 75 – 100% of total land 11 23.9

Bhaktapur (Total) 74 100.0

Loosing < 25% of total land 55 74.3

Loosing 25 - 50% of total land 12 16.2

Loosing 50 - 75% of total land 2 2.7

Loosing 75 – 100% of total land 5 6.8

Total/Average: 200 100.0

Loosing < 25% of total land 105 52.5

Loosing 25 – 50% of total land 38 19.0

Loosing 50 – 75% of total land 19 9.5

Loosing 75 – 100% of total land 39 19.0

Source: Field Survey, 2000

Page 139: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Page 5 of 5 Annex VI-1

Table 11: Land Ownership Status of the Project Area Sample = 200 Households

Districts Fully Tenant (HH %)

Owner cum Tenant (HH/ %)

Rented_Out Only (HH/ %)

Owner Only (HH/ %)

Owner cum Rented_Out

(HH/ %)

Total (HH/ %)

Surveyed HHs 9 0 0 71 0 80 Kathmandu % 11.25 0.00 0.00 88.75 0.00 100

Surveyed HHs 1 1 0 44 0 46 Lalitpur % 2.17 2.17 0.00 96.65 0.00 100

Surveyed HHs 1 3 0 69 1 74 Bhaktapur % 1.35 4.05 0 87.84 1.35 100

Average 4.92 3.11 0.00 91.08 1.35 200 Source: Field Survey, 2000

Table 12: Status of Food Sufficiency from Agriculture Production

Sample = 200 Households

Kathmandu Bhaktapur Lalitpur Total/Average No. of Insu. Period HHs (%) HHs. (%) HHs (%) HHs. (%)

Upto 3 months 2 7.41 4 15.38 3 7.32 9 9.57 4 to 6 Months 18 66.67 15 57.69 20 48.78 53 56.38 7 to 9 Months 4 14.81 5 19.23 10 24.39 19 20.21 10 to 12 Months 3 11.11 2 7.69 8 19.51 13 13.83 Total: 27 100 26 100 41 100 94 100

Source: Field Survey, 2000

Page 140: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ANNEXES VI-2

Page 141: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Annex VI-2 Page 1 of 3

Annex VI - 2 Socioeconomic Data Tables (Relocatees)

Table1: Affected Households According to Age and Sex Group

S.No. Age group (years) Male population Female Population Total % 1 0-15 5 4 9 18 2 16-59 15 17 32 65 3 60 and above 3 5 8 17 Total 23 26 49 100

Source: Field survey. July 2002

Table 2: Population Distribution of Relocatee

Name of Hh Head Male population

Female population

Family size (Total population of Hhs)

Economically active population

Kathmandu District Dev Kumar Maharjan 3 2 5 5

Mahanta Lal Maharjan 3 3 6 3

Kanchharam Maharjan 3 3 6 5

Laxmi Maya Maharjan 1 4 5 5

Lalitpur District Sanjay Karki 2 2 4 2

Sanjeev Karki 1 2 3 2

Bhaktapur District Pradeep Kumar Deuja 3 4 7 6

Dhan Bahadur Achaju 3 3 6 4

Krishna Bahadur Achaju 5 2 7 3

Total 24 25 49 35 Note: Hh = Household Source: Field survey, July 2002

Table 3 List Of Relocatee Along the Transmission Line Alignment

Land Area (R-A-P-D)

S.No. Plot No. District VDC/M Ward No. Name of Owner

Official Land Affected Land Remarks

1 435, 536 Kathmandu Balkumari 4 Dev Kumar Maharjan 0-12-0-0 0-4-3-0 -

2 533 Kathmandu Balkumari 4 Manta Lal Maharajn 1-15-0-0 1-2-1-0 -

3 536 Kathmandu Balkumari 4 Kanchha Ram Maharjan 0-5-0-0 0-1-1-1 -

4 535 Kathmandu Balkumari 4 Laxmi Maya Manandhar 0-5-0-0 0-1-1-1 -

5 225 Kathmandu Balkumari 4 Water Tank 2-2-3-0 0-2-1-0 Public

Property

6 - Kathmandu Chovar 5 Shed (Ghat) - -

Public Property

(River bed)

7 292 Lalitpur Dhapakhel 9 (KHA)Sanjay Karki (Pawan Maya Karki) 1-4-2-0 0-12-1-0 -

8 290, 291 Lalitpur Dhapakhel 9 (KHA) Sanjeev Karki (lo/so) 1-10-2-0 0-12-4-0 -

9 225 Bhaktapur Katunje 5 Krishna Bahadur Achaju 0-7-2-0 0-2-2-0 -

10 225 Bhaktapur Katunje 5 Dhan Bahadur Achaju 0-7-2-0 0-2-2-0 -

11 113 Bhaktapur Gundu 6-1 Pradeep Kumar Deuja 1-6-0-0 0-13-0-0 -

Note: R-A-P-D = Ropani – Aana – Paisa - Dam Source: Field Survey, July 2002

Page 142: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Annex VI-2 Page 2 of 3

Table 4: Educational Distributions of Affected Households

Male population Female population Total S.No. Educational Level No. % No. % No. %

1 Under schooling age 1 5 1 4 2 4

2 Illiterate 3 14 14 50 17 35

3 Literate 1 5 2 7 3 6

4 Primary 3 14 2 7 5 10

5 Lower Secondary - - 1 4 1 2

6 Secondary 7 33 4 13 11 23

7 S.L.C. 1 5 - - 1 2

8 Intermediate/ +2 3 14 2 7 5 10

9 Bachelor 2 10 1 4 3 6

10 Masters' Degree - - 1 4 1 2

Total 21 100 28 100 49 100

Source: Field Survey. July 2002

Table 5: Occupational Distribution of Affected Households

Total S.N. Occupation Male Female No. %

1 Agriculture 7 20 27 56

2 Business 3 2 5 10

3 Service 3 1 4 8

4 Labor 1 1 2

5 Student (dependent) 8 3 11 22

6 Incapable 1 - 1 2

7 Others - - - -

Total 22 27 49 100 Source: Field Survey. July 2002

Table 6: Average Annual Income of Relocatee by Source

Annual Income (NRs) from S.N. Name of Household

Service Business Daily wages Agri/Livestock Total Kathmandu District

1 Dev Kumar Maharjan 31200 84000 - - 115200 2 Mahanta Lal Maharjan - 42000 - - 42000 3 Kanchharam Maharjan 123600 - - - 123600 4 Laxmi Maya Maharjan 57600 - - - 57600 Lalitpur District

6 Sanjay Karki - - 48000 3000 51000 7 Sanjeev Karki 48000 - - - 48000 Bhaktapur District

8 Pradeep Kumar Deuja - - 36000 4000 40000 9 Dhan Bahadur Achaju - 96000 - - 96000 10 Krishna Bahadur Achaju 48000 - 18000 - 66000

Annual average income: 61680 74000 34000 3500 71044 Source: Field Survey. July 2002

Page 143: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

Annex VI-2 Page 3 of 3

Table 7: Description of Affected Houses and Structures

Name of Household Head VDC/

Municipality Ward No.

House Type

No. of Stories Roof Type Total No.

of Rooms Area in sq.ft.

Year of Construction

(B.S./A.D)

Kathmandu District

Dev Kumar Maharjan Kirtipur 12 Pakki 1 Cemented 7 1589.87 2059/2001

Mahanta Lal Maharjan Kirtipur 11 Pakki 1 Cemented 4 497.24 2059/2001

Kanchharam Maharjan Kirtipur 11 Pakki 2 Cemented 8 865.33 2059/2001

Laxmi Maya Maharjan Kirtipur 11 Pakki 2 Cemented 8 832.29 2059/2001

Public Property

Ghat (Crematory area) Chovar 5 Pakki 1 Cemented 1 262.15 2058/2000

Water Tank Kirtipur 12 Pakki 1 Cemented 1 1733.33 2054/1996

Lalitpur District

Sanjay Karki Dhapakhel 9 Kachi 1 Tile 2 347.5 2052/1994

Sanjeev Karki Dhapakhel 9 Kachi 1 Thatch 2 437.33 2052/1994

Bhaktapur District

Pradeep Kumar Deuja Gundu 6 Kachi 1 Thatch 2 235 2046/1988

Dhan Bahadur Achaju Katunje 6 Kachi 2 C.G.I Roof 2 297.25 1990/1933

Krishna Bahadur Achaju Katunje 6 Pakki 2 C.G.I Roof 4 304.5 1990/1933

Source: Field survey, July 2002

Table 8: Land Ownership Status of Relocatee

Land ownership Name of Household Head

Own Leased in Leased out S.No.

Kathmandu District Low land (R-A-D-P)

Up land (R-A-D-P)

Low land (R-A-D-P)

Up land (R-A-D-P)

Low land (R-A-D-P)

Up land (R-A-D-P)

1 Dev Kumar Maharjan 3-0-0-0 - - - - -

2 Mahanta Lal Maharjan 1-15-0-0 - 3-0-0-0 - 0-3-0-0 -

3 Kanchharam Maharjan 2-0-0-0 - - - - -

4 Laxmi Maya Maharjan 2-0-0-0 - - - - -

Lalitpur District - - - - -

5 Sanjay Karki 2-0-0-0 2-0-0-0 1-0-0-0 - - -

6 Sanjeev Karki 2-0-0-0 2-0-0-0 - - - -

Bhaktapur District - - - - -

7 Pradeep Kumar Deuja - 1-6-0-0 6-0-0-0 - - -

8 Dhan Bahadur Achaju 1-0-0-0 0-8-0-0 1-0-0-0 - - -

9 Krishna Bahadur Achaju 2-0-0-0 4-0-0-0 2-0-0-0 1-0-0-0 - -

Total 15-15-0-0 9-14-0-0 13-0-0-0 1-0-0-0 0-3-0-0 - Source: Field survey, July 2002

Page 144: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

ANNEXES X-1

Page 145: RESETTLEMENT PLAN THANKOT-CHAPAGAON ... PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL

S.No. Activities Date1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

1 1. 132 kV Transmission Line2 1.1 Invitation for Bids3 1.2 Evaluation and Award of Contract4 1.3 Check survey by the Contractor5 1.4 Construction work 6 1.5 Independent Assesment of EIA and ACRP* 7 1.5.1 Draft Report Preparation8 1.5.2 Review and Discussions9 1.5.3 Finalization of the Report

11 1.6 Resettlement Plan12 1.6.1 Compensation for Houses/Structures etc.13 1.6.2 Compensaion of ROW

14 2. 132 kV switching- and 132/11 kV Sub-station15 2.1 Invitation for Bids17 2.2 Evaluation and Award of Contract18 2.3 Construction work 19 2.4 Resettlement Plan20 2.4.1 Land Acquisition21 2.4.2 Compensation for Houses/Structures etc.22 3. Monitoring

3.1 Internal Monitoring 3.2 External Monitoring

* This Assesment includes: Review of route alignment Review / update of data on affected people Review / update of data on affected land and associated details Review / update of data on affected crops,tres etc.

NOT REQUIRED

VALUATION OF LAND BY CFC AS PER RP COMPLETED, PAYMENT OF COMPENSATION AND REHABILITATION ONGOING

Nepal Electricity AuthorityThankot-Chapagaon-Bhaktapur 132 kV Transmission Line Project

Implemention Schedule (highlightng the implementation of Resettlement Plan (RP))2004 2005 2006

Page 1 of 1 Annex X-1