Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
www.meogroup.com
2020
RESOLUTION
key particulars▪ Built 2013▪ Indonesian flagged▪ 60 pax accommodation
▪ SPS compliant, FiFi 1▪ Mezzanine Deck▪ Moonpool 2m x 2m
▪ 20T A-frame ▪ 20T man-riding crane ▪ Air Dive Platform on Main Deck
70m Dp2 5000BHp roV support Vessel
year Built
place Built
Design
Flag
lengtH oVerall
lengtH Bp
BreaDtH moulDeD
DeptH moulDeD
DraFt (max)
FreeBoarD (sll)
class
notation
grt/ nrt
DeaDweigHt
Fuel oil
FresH water
Bilge
Ballast water
Fuel oil pump
FresH water pump
Drill water pump
Brine pump
Bilge/Ballast/Fire/gs
ancHors & cHain
capstan
ancHor winDlass c/w
Bow
proVision crane
knuckle crane
a Frame
mezzanine Deck
moon pool
BertHs
total pax
liFe raFts
rescue Boat c/w DaVit
Fi-Fi notation
Fi-Fi monitors
Fi-Fi pump
main Deck area
mezzanine Deck area
total clear Deck area
Deck carrying loaD
Deck strengtH
maximum speeD
economic speeD
main engines
auxiliary engines
emergency generator
sHaFt generator
roV generator
air compressor
Bow tHruster
steering gear system
DP2 System, Navis NavDP 4022, 2 Veripos DGPS,
Kongsberg HiPAP 501, Bandak LTW, Radius 1000, Cyscan,
2 Anemometers, 1 MRU, 2 x VRS, 3 Gyro Compass, Navis
Independent Joystick
Capable to support ROV, Deck Mounted SAT & Air Dive System
2013
Loh & Loh Construction, Indonesia
70 m DP2 5000 BHP
Indonesia
70.00 m
63.60 m
16.00 m
6.50 m
5.40 m
1112 mm
BV
I x HULL x MACH, Supply, Fire-fighting 1, Special
Service Standby Rescue Vessel LHNS WS,
Unrestricted Navigation, Dynapos AM/AT R
2549.00 T / 765.00 T
2600.00 T
584.583 m³
456.98 m³
10.866 m³
793.855 m³
80 m³/hr @ 60 m head, Desmi NSL80-265
80 m³/hr @ 60 m head, Itur ILNC50-2001
80 m³/ hr @ 60 m head, Itur ILNC50-2001
2 x 70 m³/hr @ 60 m head, Magnum 4x3x13
2 x 80 m³/hr @ 60 m head, Itur ILNC50-2001
2 x AC 14 High-Holding Power Stockless,
1710kg, 2 x 357.5m x 36mm
2 x 5T Electro Hydraulic Vertical Capstan
2 x Electro Hydraulic 10 T @ 9 m/min
SWL 3 T @ 13 m radius (max SWL/Radius)
SWL 20 T @ 6 m radius (max SWL)
SWL 9 T @ 11 m radius (max Radius)
Man-Riding Capability
20 T @ 35 deg
16 m (L) x 12 m (B), Strength 5.5 T/m²
2 m Length x 2 m Breadth
4 x 1, 6 x 2, 11 x 4 Berths
60
6 x 30 men, SOLAS compliant
1 x 6 men, Inboard Engine, 50 L
Diesel, SOLAS Compliant
I x Hull x Mach, Supply Vsl FiFi ship 1,
Special Svc, Standby Rescue, LHNS-WS,
Unrest’d Nav
2 x 1200 m³/hr Capacity, 120 m
Throw Length
2 x 1650 m³/hr
489.00 m²
186.00 m²
675.00 m²
600.00 T
7.5 T/m²
13 Knots @ 14.00 T/24hrs
11 Knots @ 11.00 T/24hrs
2 x Niigata 6L28HX, 2500 BHP, 1838
kW, 750 RPM, Total 5000 BHP
3 x Baudouin 8M26.2, 441 kW @ 1500 RPM
Weishai CCF J90Y-WV, 99 kW
2 x Leroy Somer LSAM 50.2, 900 kW
@ 1500 RPM
2 x Cat C18, 500 kW
2 x Sperre HL/77, Presurre 30 Bar, Cap-25m³/
hr, 6.2kw, 1475RPM Ø U3 Stud Link Chain
2 x NCG NCT165, 10 T Thrust
2 x Niigata Z-pellers ZP-41CP
PRINCIPAL PARTICULARS
TANK CAPACITIES
CARGO DISCHARGE CAPACITIES
DECK EQUIPMENT
ACCOMMODATION
LIFE-SAVING EQUIPMENT
DIVING AND ROV SYSTEMS
EXTERNAL FIRE-FIGHTING EQUIPMENT
DECK PARTICULARS
PERFORMANCE
PROPULSION SYSTEM
DP SYSTEM
www.meogroup.comwww.meogroup.com
20202020
VESSELSPECIFICATIONS
VESSELWORK HISTORY
END USER WORK LOCATION END DATE SCOPE OF WORK
Formosa TaiwanTaiwan Present Offshore Windfarm Commissioning vessel
PTTEP Myanmar Myanmar 2019 ROV IRM project
PT Timas Indonesia Indonesia 2019 ROV pipeline inspection and IRM project
ENI Indonesia Indonesia 2018 ROV IRM project
James Fisher Indonesia 2018FSO disconnection and reconnection, cutting of anchor chains with ROVs
PTT Thailand Thailand 2018 ROV IRM project
Chevron Thailand Thailand 2018 ROV inspection and survey
Medco Energy Indonesia Indonesia, Natuna Sea 2017 IRM Campaign
ExxonMobil IndonesiaIndonesia, Lamongan /
Surabaya2017 FSO UWILD
Technip Indonesia Indonesia, Balikpapin 2017 Delivery of Min Bell Umbilical
Mubadala Petroluem Indonesia, Balikpapin 2016 IRM Campaign
Pearl Oil Indonesia, Balikpapin 2016 Ruby platform inspection
Kangean Energy Indonesia, North Bali 2016 Navigation Buoy replacement
Premier Oil Indonesia, Natuna Sea 2016 Plug & Abandonment Program Phase 1
ConocoPhillips / Premier Oil Indonesia
Indonesia, Natuna Sea 2016 IRM Campaign
Kangean Energy Indonesia, North Bali 2016 Freespan Rectification
ConocoPhillips / Premier Oil Indonesia
Indonesia, Natuna Sea 2016 Wellhead leak investigation
Nippon Steel / PTTEP Thailand 2016 Pipeline as laid and as built surveys
ConocoPhillips / Premier Oil Indonesia, Natuna Sea 2016 WNTS leak monitoring
Kangean Energy Indonesia, North Bali 2015 Freespan Rectification
ConocoPhillips / Premier Oil Indonesia, Natuna Sea 2015 IRM Campaign
Chevron Thailand Thailand 2015Survey & Positioning Services for Chevron Air Diving Campaign Phase #2. Surface air diving for TAWD Riser reinstatement.
PTTEP Thailand Thailand 2015Platform inspection, chain measurement and anode sled
modification and monitoring
Chevron Thailand Thailand 2015Survey & Positioning Services for Air Diving Campaign Phase
1. Surface air diving inspection works
Vessel particulars are believed to be correct but are not guaranteed. Owners reserve the rights to amend the specifications without notification. Particulars are entirely without warranty as to correctiveness. Interested parties must inspect vessel’s certificates, drawings or conduct a physical inspection of vessel.
Tel: +65 6545 6211 / 6829 6100 | Email: [email protected]
SPECIALISED VESSEL SERVICES www.meogroup.com
2020