3
WWW.MEOGROUP.COM 2020 RESOLUTION KEY PARTICULARS Built 2013 Indonesian flagged 60 pax accommodation SPS compliant, FiFi 1 Mezzanine Deck Moonpool 2m x 2m 20T A-frame 20T man-riding crane Air Dive Platform on Main Deck 70M DP2 5000BHP ROV SUPPORT VESSEL

RESOLUTION · Survey & Positioning Services for Air Diving Campaign Phase 1. Surface air diving inspection works Vessel particulars are believed to be correct but are not guaranteed

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RESOLUTION · Survey & Positioning Services for Air Diving Campaign Phase 1. Surface air diving inspection works Vessel particulars are believed to be correct but are not guaranteed

www.meogroup.com

2020

RESOLUTION

key particulars▪ Built 2013▪ Indonesian flagged▪ 60 pax accommodation

▪ SPS compliant, FiFi 1▪ Mezzanine Deck▪ Moonpool 2m x 2m

▪ 20T A-frame ▪ 20T man-riding crane ▪ Air Dive Platform on Main Deck

70m Dp2 5000BHp roV support Vessel

Page 2: RESOLUTION · Survey & Positioning Services for Air Diving Campaign Phase 1. Surface air diving inspection works Vessel particulars are believed to be correct but are not guaranteed

year Built

place Built

Design

Flag

lengtH oVerall

lengtH Bp

BreaDtH moulDeD

DeptH moulDeD

DraFt (max)

FreeBoarD (sll)

class

notation

grt/ nrt

DeaDweigHt

Fuel oil

FresH water

Bilge

Ballast water

Fuel oil pump

FresH water pump

Drill water pump

Brine pump

Bilge/Ballast/Fire/gs

ancHors & cHain

capstan

ancHor winDlass c/w

Bow

proVision crane

knuckle crane

a Frame

mezzanine Deck

moon pool

BertHs

total pax

liFe raFts

rescue Boat c/w DaVit

Fi-Fi notation

Fi-Fi monitors

Fi-Fi pump

main Deck area

mezzanine Deck area

total clear Deck area

Deck carrying loaD

Deck strengtH

maximum speeD

economic speeD

main engines

auxiliary engines

emergency generator

sHaFt generator

roV generator

air compressor

Bow tHruster

steering gear system

DP2 System, Navis NavDP 4022, 2 Veripos DGPS,

Kongsberg HiPAP 501, Bandak LTW, Radius 1000, Cyscan,

2 Anemometers, 1 MRU, 2 x VRS, 3 Gyro Compass, Navis

Independent Joystick

Capable to support ROV, Deck Mounted SAT & Air Dive System

2013

Loh & Loh Construction, Indonesia

70 m DP2 5000 BHP

Indonesia

70.00 m

63.60 m

16.00 m

6.50 m

5.40 m

1112 mm

BV

I x HULL x MACH, Supply, Fire-fighting 1, Special

Service Standby Rescue Vessel LHNS WS,

Unrestricted Navigation, Dynapos AM/AT R

2549.00 T / 765.00 T

2600.00 T

584.583 m³

456.98 m³

10.866 m³

793.855 m³

80 m³/hr @ 60 m head, Desmi NSL80-265

80 m³/hr @ 60 m head, Itur ILNC50-2001

80 m³/ hr @ 60 m head, Itur ILNC50-2001

2 x 70 m³/hr @ 60 m head, Magnum 4x3x13

2 x 80 m³/hr @ 60 m head, Itur ILNC50-2001

2 x AC 14 High-Holding Power Stockless,

1710kg, 2 x 357.5m x 36mm

2 x 5T Electro Hydraulic Vertical Capstan

2 x Electro Hydraulic 10 T @ 9 m/min

SWL 3 T @ 13 m radius (max SWL/Radius)

SWL 20 T @ 6 m radius (max SWL)

SWL 9 T @ 11 m radius (max Radius)

Man-Riding Capability

20 T @ 35 deg

16 m (L) x 12 m (B), Strength 5.5 T/m²

2 m Length x 2 m Breadth

4 x 1, 6 x 2, 11 x 4 Berths

60

6 x 30 men, SOLAS compliant

1 x 6 men, Inboard Engine, 50 L

Diesel, SOLAS Compliant

I x Hull x Mach, Supply Vsl FiFi ship 1,

Special Svc, Standby Rescue, LHNS-WS,

Unrest’d Nav

2 x 1200 m³/hr Capacity, 120 m

Throw Length

2 x 1650 m³/hr

489.00 m²

186.00 m²

675.00 m²

600.00 T

7.5 T/m²

13 Knots @ 14.00 T/24hrs

11 Knots @ 11.00 T/24hrs

2 x Niigata 6L28HX, 2500 BHP, 1838

kW, 750 RPM, Total 5000 BHP

3 x Baudouin 8M26.2, 441 kW @ 1500 RPM

Weishai CCF J90Y-WV, 99 kW

2 x Leroy Somer LSAM 50.2, 900 kW

@ 1500 RPM

2 x Cat C18, 500 kW

2 x Sperre HL/77, Presurre 30 Bar, Cap-25m³/

hr, 6.2kw, 1475RPM Ø U3 Stud Link Chain

2 x NCG NCT165, 10 T Thrust

2 x Niigata Z-pellers ZP-41CP

PRINCIPAL PARTICULARS

TANK CAPACITIES

CARGO DISCHARGE CAPACITIES

DECK EQUIPMENT

ACCOMMODATION

LIFE-SAVING EQUIPMENT

DIVING AND ROV SYSTEMS

EXTERNAL FIRE-FIGHTING EQUIPMENT

DECK PARTICULARS

PERFORMANCE

PROPULSION SYSTEM

DP SYSTEM

www.meogroup.comwww.meogroup.com

20202020

VESSELSPECIFICATIONS

VESSELWORK HISTORY

END USER WORK LOCATION END DATE SCOPE OF WORK

Formosa TaiwanTaiwan Present Offshore Windfarm Commissioning vessel

PTTEP Myanmar Myanmar 2019 ROV IRM project

PT Timas Indonesia Indonesia 2019 ROV pipeline inspection and IRM project

ENI Indonesia Indonesia 2018 ROV IRM project

James Fisher Indonesia 2018FSO disconnection and reconnection, cutting of anchor chains with ROVs

PTT Thailand Thailand 2018 ROV IRM project

Chevron Thailand Thailand 2018 ROV inspection and survey

Medco Energy Indonesia Indonesia, Natuna Sea 2017 IRM Campaign

ExxonMobil IndonesiaIndonesia, Lamongan /

Surabaya2017 FSO UWILD

Technip Indonesia Indonesia, Balikpapin 2017 Delivery of Min Bell Umbilical

Mubadala Petroluem Indonesia, Balikpapin 2016 IRM Campaign

Pearl Oil Indonesia, Balikpapin 2016 Ruby platform inspection

Kangean Energy Indonesia, North Bali 2016 Navigation Buoy replacement

Premier Oil Indonesia, Natuna Sea 2016 Plug & Abandonment Program Phase 1

ConocoPhillips / Premier Oil Indonesia

Indonesia, Natuna Sea 2016 IRM Campaign

Kangean Energy Indonesia, North Bali 2016 Freespan Rectification

ConocoPhillips / Premier Oil Indonesia

Indonesia, Natuna Sea 2016 Wellhead leak investigation

Nippon Steel / PTTEP Thailand 2016 Pipeline as laid and as built surveys

ConocoPhillips / Premier Oil Indonesia, Natuna Sea 2016 WNTS leak monitoring

Kangean Energy Indonesia, North Bali 2015 Freespan Rectification

ConocoPhillips / Premier Oil Indonesia, Natuna Sea 2015 IRM Campaign

Chevron Thailand Thailand 2015Survey & Positioning Services for Chevron Air Diving Campaign Phase #2. Surface air diving for TAWD Riser reinstatement.

PTTEP Thailand Thailand 2015Platform inspection, chain measurement and anode sled

modification and monitoring

Chevron Thailand Thailand 2015Survey & Positioning Services for Air Diving Campaign Phase

1. Surface air diving inspection works

Vessel particulars are believed to be correct but are not guaranteed. Owners reserve the rights to amend the specifications without notification. Particulars are entirely without warranty as to correctiveness. Interested parties must inspect vessel’s certificates, drawings or conduct a physical inspection of vessel.

Page 3: RESOLUTION · Survey & Positioning Services for Air Diving Campaign Phase 1. Surface air diving inspection works Vessel particulars are believed to be correct but are not guaranteed

Tel: +65 6545 6211 / 6829 6100 | Email: [email protected]

SPECIALISED VESSEL SERVICES www.meogroup.com

2020