RESOURCE MANAGER:
A SUCCESFUL SCHEDULING
PROGRAM
8/11/2019 Resourcemanager Two
2/21
PRESENTED BY:
Deng, [email protected]
Horvath, [email protected]
Mursidi, [email protected] Setiawan, [email protected]
Zahuranec, [email protected]
8/11/2019 Resourcemanager Two
3/21
OVERVIEW OF THE PROGRAM
USER SOLUTIONS MOST POPULAR
EXCELL PROGRAM.
GOALTo Provide a Flexible andAdaptable Approach to ManageMaterials, Work-centers, and Labor forMost Manufacturers.
8/11/2019 Resourcemanager Two
4/21
OVERVIEW (contd.)
INCLUDES:
B.O.M.
M.R.P.
Finite CapacityPlanning &Scheduling.
Inventory.
Purchasing andReceiving.
Costing and More.
DOES NOTINCLUDE:
AccountingApplications.
8/11/2019 Resourcemanager Two
5/21
Program Provides a Step By Step Way
to Organize a Companys Schedules
8/11/2019 Resourcemanager Two
6/21
FORECAST INPUT TABLE
From One Screen You Can Drive Your Complete Schedule.
All your orders, when due or when to start, can be scheduled
and/or rescheduled based on changing conditions at any time. In addition to quantities, you can enter a custom Job Number, Work
Order Number, or Sales Order Number, etc.
Import the demand schedule from outside systems & prioritize jobs.
8/11/2019 Resourcemanager Two
7/21
FORECAST INPUT TABLE (contd.)
The Forecast Sheet is Also Ideal to RapidlyPerform a Series of What Ifs on Various
Plans, Concurrently with Reports to Analyze
Impact and Feasibility of Schedules.
8/11/2019 Resourcemanager Two
8/21
BILL OF RESOURCES
You can make direct edits to the BOR, even Readingin complete BOR structures from other systems. Youcan enter data, or copy-and-paste from othersystems, directly into the BOR table
8/11/2019 Resourcemanager Two
9/21
BOR: ERROR CHECK SYSTEM
Error check will check all enteredcomponents against theProducts/Operations table. If thenumbers dont exist, RM willautomatically prompt you to add the
new products operations to theappropriate list. For copied BORs that miss key data,
the error checking will even establishthe logical linkages for all levels and
routings in a simple click and chooseformat.
8/11/2019 Resourcemanager Two
10/21
MPS CAPABILITIES
RM Helps the User By Creating Two MPS Tables,One for End Products and One for Subcomponents. End Products Table Provides the User a Way to Enter
Values for Num. Required, Num. of steps, cost per unit, etc.
8/11/2019 Resourcemanager Two
11/21
GANTT CHART CAPABILITIES
Gantt Charts Developed in RM Allows the User toInstantly Check the Due Dates of All Jobs in theSchedule, Scroll Down to Find Bottlenecks, AdjustCapacity and Schedule to Meet Critical Dates.
8/11/2019 Resourcemanager Two
12/21
GANTT CHARTS (contd.)
By Simply Clicking Expand and Selecting aJob, RM Allows the User to Quickly ViewGantt Chart Expansions/Breakdowns forSingle End Product Jobs.
8/11/2019 Resourcemanager Two
13/21
PRODUCTION REPORTS
This Report ContainsComplete Information
About the Job, IncludingPlanned vs. Actual andVariances in Time and
Costs
8/11/2019 Resourcemanager Two
14/21
USER FRIENDLY SCHEDULING
OPTIONS
The User Can Tell RM toCalculate the Finish DatesBased on the User ProvidedStart Dates or CalculateNecessary Start Dates Basedon User Provided Finish Dates
(i.e. due dates) by SelectingForward or Reversed Order.
Virtually any combination ofSchedules Can Co-exist in TheSystem (i.e estimated Jobs
entered as Forward, FirmOrders Entered as Reverse).
8/11/2019 Resourcemanager Two
15/21
ITEM REPORT
The Item ReportSummarizes AllRequirements per PartNo. Ideal for Work-Center Loading, it ListsEach Job, When to
Start, When toComplete, and HowMuch is Required
8/11/2019 Resourcemanager Two
16/21
SUMMARY REPORT
The Summary Report, an Instant, Top LevelMRP Report for All Products, Will Tell the
User What They Need to Buy or Make, HowMuch, and When. View Over Any TimeHorizon, By Day, Week, or Month.
8/11/2019 Resourcemanager Two
17/21
SUMMARY REPORT GRAPH
GENERATIONS
RM Can Provide the User With Two Types of UsefulGraphs. The Schedule Quantity for a ParticularProduct per Month and a Production Summary for AllProducts for a Particular Month.
8/11/2019 Resourcemanager Two
18/21
RESOURCE CALENDAR
RM Helps the User to Identify Capacity ConstraintsBy Using a Resource Calendar. Cells in theResource Calendar Which Are Full (no more
processing can be added for that resource on thatday) Will be Formatted With the Total in Red.
8/11/2019 Resourcemanager Two
19/21
RESOURCE CALENDAR (contd.)
RM Allows the User toGenerate a Mini Report for
Any Cell in the ResourceCalendar By SimplyDouble Clicking on the
Desired Cell. This Function Accesses aSimple, Quick, Form forReviewing and Editing the
Available Capacity and/or
Secondary Constraint Onthat Day as Well as theAbility to Scroll Forward orBackward One Day at aTime.
8/11/2019 Resourcemanager Two
20/21
DOWNSIDE OF RM
DOES NOT HELP USER TO FIND BEST(OPTIMAL) ROUTINGS, OR FIND THEBEST PRIORITY SCHEDULINGSELECTION RULE (ALL MUST BE
ENTERED BY USER), etc. VIA HUERISTICSOR OTHER TYPE OF OPERATIONSRESEARCH FUNCTIONS THAT ARENECCESSARRY TO OPTIMIZE
PRODUCTION AND OR SCHEDULING. Total Cost = $600.00+
8/11/2019 Resourcemanager Two
21/21
REFRENCE AND QUESTIONS
All information from this presentationand more can be found at UserSolution, Inc.s website located at
http\\:www.usersolutions.com Questions or additional comments?