is closest to Atlantic City Electric’s facilities Call Before You Dig The bottom of the meter glass can be no more Protect yourself and any workers or than 72 inches above final grade or elevated contractors on your property by calling platform and no less than 36 inches 811 before you dig to find out where underground utility lines are located. This service is At least 3 feet of unobstructed space in front of free and required by law at least three business days the meter must be provided before any digging project can begin. Meter sockets can be installed only on the finished outside wall surface. Atlantic City Electric will determine the final location of the Resources customers meter socket and attachment point For more information about applying for new or upgraded electric service, visit our website at www.atlanticcityelectric.com. Keep in Mind Here are some helpful links: New or changed wiring and equipment must be New Service Application: www.atlanticcityelectric.com/newservice installed in accordance with the latest edition of General terms and conditions: the National Electrical Code and Atlantic City www.atlanticcityelectric.com/terms Electric requirements. This work may require an Electric Service Handbook: electrical inspection and certification. www.atlanticcityelectric.com/electricservicehandbook Approved Meter Sockets: For your safety and the safety of Atlantic City www.atlanticcityelectric.com/approvedmetersockets Electric crews, only authorized Atlantic City Electric employees and contractors are permitted to make and energize the connection between Contact Us the customer’s service entrance and the service Our engineering offices are open from 7:30 a.m. to 4 p.m. connection location. Monday through Friday. You can find the nearest local district at: It is important that you notify your Atlantic City webapps.atlanticcityelectric.com/ace/contractors/ Electric representative if there will be any office_search_form.cfm changes with the schedule of your project. Bridgeton 856-863-7926 Fax 856-863-7979 Please be aware that any customer responsibili- [email protected] ties not met could delay your project. Cape May 609-463-3823 Fax 609-463-3832 [email protected] For your safety, do not remove existing meters. Contact us to schedule a meter removal. Glassboro 856-863-7906 Fax 856-863-7979 [email protected] If you are planning to install solar or other Pleasantville 609-645-4667 Fax 609-645-4788 renewable energy equipment that will be [email protected] interconnected to Atlantic City Electric’s system, West Creek 609-294-6727 Fax 609-294-6757 contact us at (866) 634-5571 or [email protected] [email protected]. Winslow 856-753-2808 Fax 856-753-2828 [email protected] Key Activity Responsible Cust ACE 1. Discuss electrical needs with a X licensed electrician 2. Complete all sections and submit application for electrical service form. X Incomplete information may delay your application 3. Submit Plot Plan or Site Plan to include X the following: • Building layout and location on property • Property lines and street location • Desired meter location (location will require approval ) • Obstructions such as driveways, parking areas, water/sewer Lines or other utilities 4. Review application and associated plans. Develop new service design and cost X estimate and forward to the customer 5. Sign and submit new service agreement and necessary documents such as X Right of Way easements 6. Submit all applicable fees X 7. Prepare site for new service construction X • Clear all obstructions and conduct necessary tree trimming for installing facilities to the premise • Ensure water lines, sewer lines, septic beds and gas lines are clearly marked (underground service) • If customer owned underground, run customer cables from approved meter socket location to the approved ACE connection point or pole, and have it inspected 8. Install the meter box on outside of structure at ACE approved location. All meter sockets heights and locations must conform to both Atlantic City Electric X requirements as well as local building codes. Consult your local building department and Atlantic City Electric for further details 9. Obtain private property easement for X electrical facilities 10. Obtain electrical inspection of customer’s X facilities from the local jurisdiction 11. Obtain permits as necessary X (Street opening, Highway, DOT, etc.…) 12. Construct and energize service X APPLYING FOR NEW OR UPGRADED RESIDENTIAL SERVICE

Resources - Atlantic City Electric | Atlantic City Electric... · than 72 inches above final grade or elevated contractors on your property by calling platform and no less than 36

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Resources - Atlantic City Electric | Atlantic City Electric... · than 72 inches above final grade or elevated contractors on your property by calling platform and no less than 36

is closest to Atlantic City Electric’s facilities Call Before You Dig� The bottom of the meter glass can be no more Protect yourself and any workers or

than 72 inches above final grade or elevated contractors on your property by callingplatform and no less than 36 inches 811 before you dig to find out where

� underground utility lines are located. This service isAt least 3 feet of unobstructed space in front offree and required by law at least three business daysthe meter must be providedbefore any digging project can begin.

� Meter sockets can be installed only on thefinished outside wall surface. Atlantic CityElectric will determine the final location of the Resourcescustomers meter socket and attachment point For more information about applying for new or

upgraded electric service, visit our website atwww.atlanticcityelectric.com.

Keep in Mind Here are some helpful links:

� New or changed wiring and equipment must be New Service Application:www.atlanticcityelectric.com/newserviceinstalled in accordance with the latest edition ofGeneral terms and conditions:the National Electrical Code and Atlantic City www.atlanticcityelectric.com/terms

Electric requirements. This work may require an Electric Service Handbook:electrical inspection and certification. www.atlanticcityelectric.com/electricservicehandbook

Approved Meter Sockets:� For your safety and the safety of Atlantic City www.atlanticcityelectric.com/approvedmetersockets

Electric crews, only authorized Atlantic CityElectric employees and contractors are permittedto make and energize the connection between Contact Usthe customer’s service entrance and the service Our engineering offices are open from 7:30 a.m. to 4 p.m.connection location. Monday through Friday.

You can find the nearest local district at:� It is important that you notify your Atlantic City

webapps.atlanticcityelectric.com/ace/contractors/Electric representative if there will be any office_search_form.cfmchanges with the schedule of your project.

Bridgeton 856-863-7926 Fax 856-863-7979Please be aware that any customer responsibili- [email protected] not met could delay your project. Cape May 609-463-3823 Fax 609-463-3832

[email protected]� For your safety, do not remove existing meters.

Contact us to schedule a meter removal. Glassboro 856-863-7906 Fax [email protected]

� If you are planning to install solar or other Pleasantville 609-645-4667 Fax 609-645-4788renewable energy equipment that will be [email protected]

interconnected to Atlantic City Electric’s system, West Creek 609-294-6727 Fax 609-294-6757

contact us at (866) 634-5571 or [email protected]

[email protected]. Winslow 856-753-2808 Fax [email protected]

Key Activity Responsible

Cust ACE

1. Discuss electrical needs with a Xlicensed electrician

2. Complete all sections and submitapplication for electrical service form. XIncomplete information may delayyour application

3. Submit Plot Plan or Site Plan to include Xthe following:• Building layout and location on

property• Property lines and street location• Desired meter location (location will

require approval )• Obstructions such as driveways,

parking areas, water/sewer Lines orother utilities

4. Review application and associated plans.Develop new service design and cost Xestimate and forward to the customer

5. Sign and submit new service agreementand necessary documents such as XRight of Way easements

6. Submit all applicable fees X

7. Prepare site for new service construction X• Clear all obstructions and conduct

necessary tree trimming for installingfacilities to the premise

• Ensure water lines, sewer lines, septicbeds and gas lines are clearly marked(underground service)

• If customer owned underground, runcustomer cables from approved metersocket location to the approved ACEconnection point or pole, and haveit inspected

8. Install the meter box on outside ofstructure at ACE approved location.All meter sockets heights and locationsmust conform to both Atlantic City Electric Xrequirements as well as local building codes.Consult your local building departmentand Atlantic City Electric for further details

9. Obtain private property easement for Xelectrical facilities

10. Obtain electrical inspection of customer’s Xfacilities from the local jurisdiction

11. Obtain permits as necessary X(Street opening, Highway, DOT, etc.…)

12. Construct and energize service X

APPLYING FORNEW OR UPGRADEDRESIDENTIALSERVICE

Page 2: Resources - Atlantic City Electric | Atlantic City Electric... · than 72 inches above final grade or elevated contractors on your property by calling platform and no less than 36

GETTING STARTED � Requested service and metering requirements and Fees Construction Checklistlocation, overhead or underground ACE owned

All company owned underground services (not in � Clear all obstructions at the service connectionunderground (available for residential customersWhether you are building a new home or upgrading existing developments), and overhead services in location. For underground service: The cable pathonly) or customer owned underground. For detailsyour current electric service, we want you to know excess of 250 feet will require a payment made on your property must be clear of all obstructionson current offerings and requirements, visitthat we are here to help. This brochure is designed before the service can be scheduled. A letter for a width of ten (10) feet and be within six (6)www.atlanticcityelectric.comto help guide you through the application process detailing these charges will be sent to you after a inches +/- of final grade. Paving, final grading, and

and keep your project on track. � Scaled site plans and building square footage designer has looked at the property. landscaping should not be completed until Atlantic(existing and additions) City Electric has installed our facilities. As anThe process for applying for new or upgraded An initiation of service charge of $65 will appear on

alternative the customer may install conduit andelectric service can be broken down into four phases: � Complete the application for electric service the first bill. For upgraded electric service, there is�

pull string under any obstructions. Atlantic CityApplication Phase normally no charge if the location of the serviceElectric must approve the size and location of the

� Design Phase Additional Checklist for New Service connection and the type of service remain the same.conduit before installation

�If you are requesting a different type of service in aConstruction Phase � Kilowatt size of major appliances (e.g., electric different location, an Atlantic City Electric � Ensure property lines, easements, rights-of-way,

� Completion Phase heat, air conditioning, stove, water heater, etc.) representative will provide the associated fees when water lines, sewer lines, sprinkler systems, septic� Horsepower ratings of motors the design process is completed. systems and septic reserve areas and any other

Application Phase obstructions are staked and markedPlease refer to Atlantic City Electric’s “General Terms

In order for your project to get under way, we Additional Checklist for Upgraded or & Conditions for Furnishing Electric Service in New � Provide a safe and substantial support for serviceneed some critical information from you. The Relocated Service Jersey” for specifics related to residential services, drop wiresrequirements for new service are generally the

� Identify existing and any additional load including the latest Board of Public Utilitiessame as for upgraded or relocated service, but � Ensure all meter box’s and associated equipment

requirements approved service connection fees. Both can be foundsome minor differences do apply. To ensure that is installed and inspected

on our website at www.atlanticcityelectric.com.our schedule meets your needs, please apply at the Now that you have gathered all your information,

� If customer owned underground service isstart of your project. it is time to submit your application. To obtain After you receive your cost estimate from Atlantic

requested, install customer cables from approvedan application form, or apply online, go to City Electric, use this checklist to complete the

Use our checklists below to make sure you have meter socket location to approved ACE serviceatlanticcityelectric.com/newservice or call your Design Phase.

everything in order before you submit your pole or facility. All customer owned and installednearest local District office.

application. equipment must be inspected by the buildingDesign Checklistinspection agency having jurisdiction in your area

New or Upgraded Residential Electric Service Design Phase � Sign and return the customer contract

Application Checklist �Completion PhasePay all required construction feesNext, an Atlantic City Electric representative will

� Exact location of the premises (house number, review your application and assign your job a work �Your work is complete and it is time to turn onEnsure the permitting agency notifies Atlantic

street, ZIP code and utility pole number, if request number. We will contact you if there are any your service. Once all the requirements are met andCity Electric of the electrical inspection (Cut Inpossible) questions or additional required information. your site is ready for service, an Atlantic City Elec-Card )

tric crew will install your meter, connect or install� Name, telephone number and address of the Once your application is approved, the Atlantic City your service cables, and energize your service.

person to be billed for service Electric representative will inform you that the Construction Phase�

design phase is under way. An Atlantic City ElectricName and telephone number of additional Use the following checklist during the Construction Meter Requirementsdesigner will develop your site-specific design plancontacts such as the builder or electrician Phase.and contact you by phone, email or letter with an Here are some guidelines regarding your metering

� Date electric service is required estimated construction fee and an approved meter equipment:

�socket location. If you agree to the charges, aSize and type of electrical load and any special � Metering equipment must be located on theseparate invoice will be sent to you. Payment in fullload requirements exterior wall of the structure being serviced thatwill be required for the work to begin.

atlanticcityelectric.com