Richard Andrews (214)662-1973 [email protected] SUMMARY Richard is an effective, results-oriented Construction Foreman, who works quickly and efficiently in order to complete projects safely, on time, and within budget. He is adept at planning for the unexpected, such as absenteeism or inclement weather, and possesses a commendable work ethic. His leadership skills have been recognized throughout his career, as has his ability to organize and motivate a crew with varying skill levels. Richard’s ability to drive superior workmanship has been noticed by Management, and acknowledged through advancement and promotion opportunities, and he is ready for his next challenge. ACCOMPLISHMENTS Managed a $20,000,000 project while supervising a team of 18-20 workers, resulting in the highly profitable completion of Edithe Clarke to Cottonwood Led the construction of 200+ miles of new power lines and that included anchor bolt foundations and direct embeds while dealing with many soil types, often with multiple crews working at different locations simultaneously Trained and mentored 15+ workers on one job whose scope included construction from the ground up of 16 tower foundations, 64 legs poured in five days Zero accidents or legal infractions on professional driving record of 20,000+ miles CERTIFICATIONS, TRAINING and ADDITIONAL QUALIFICATIONS 10 & 30 hour OSHA certified Forklift certified Air brake certification Tanker endorsement CDL Class “A” CPR training Standard first aid training Blood-borne pathogens training Safe job-site set-up Construction machinery operation Concrete estimation Cost control EXPERIENCE System 3; Carmichael, CA General Foreman: 2/2015 – 6/2015 (lay-off due to lack of projects) Hired to build transmission line foundation division

Resume with System 3

Embed Size (px)

Citation preview

Page 1: Resume with System 3

Richard Andrews(214)662-1973

[email protected]

SUMMARYRichard is an effective, results-oriented Construction Foreman, who works quickly and efficiently in order to complete projects safely, on time, and within budget. He is adept at planning for the unexpected, such as absenteeism or inclement weather, and possesses a commendable work ethic. His leadership skills have been recognized throughout his career, as has his ability to organize and motivate a crew with varying skill levels. Richard’s ability to drive superior workmanship has been noticed by Management, and acknowledged through advancement and promotion opportunities, and he is ready for his next challenge.

ACCOMPLISHMENTS▪ Managed a $20,000,000 project while supervising a team of 18-20 workers,

resulting in the highly profitable completion of Edithe Clarke to Cottonwood▪ Led the construction of 200+ miles of new power lines and that included anchor

bolt foundations and direct embeds while dealing with many soil types, often with multiple crews working at different locations simultaneously

▪ Trained and mentored 15+ workers on one job whose scope included construction from the ground up of 16 tower foundations, 64 legs poured in five days

▪ Zero accidents or legal infractions on professional driving record of 20,000+ miles

CERTIFICATIONS, TRAINING and ADDITIONAL QUALIFICATIONS10 & 30 hour OSHA certified Forklift certifiedAir brake certification Tanker endorsementCDL Class “A” CPR trainingStandard first aid training Blood-borne pathogens trainingSafe job-site set-up Construction machinery operationConcrete estimation Cost control

EXPERIENCESystem 3; Carmichael, CA General Foreman: 2/2015 – 6/2015 (lay-off due to lack of projects)Hired to build transmission line foundation divisionPoured multiple foundations, assisted in a substation build and set poles using a 70 ton mantis, in addition to drilling holes with a Watson 1100 & 3110Hired multiple personnel for the company including a substation Superintendent, Foreman, a drill rig operator, and five handsTenure successfully completed with zero injuries and zero damaged equipment

Workforce Leave of AbsenceStay-at-home-Dad: 4/2014 – 1/2015Took time away from working to help with family obligations

Techline Construction; Austin, TX Operator/Lineman: 03/2013 - 3/2014

Page 2: Resume with System 3

Built and participated in the erection of distribution power linesIncreased knowledge from just transmission power lines to distribution power linesHad a hand in every phase from locating, staking, digging, setting, wire pulling, hanging transformers, cutouts, and arresters to hot tapping

Canfer Construction - Grand Prairie, TX Foreman: 07/2012 - 12/2012Acted as the liaison between the batch plant, concrete testers, inspectors, safety coordinators and the general contractorsDelegated projects and tasks to employees based on their competencies and specialtiesCompetently executed project plans by providing proper tools and equipment to all construction personnelPerformed construction site pre-inspections and coordinated post-construction auditsAccurately reported status updates on project progression to the project management teamMonitored the safety of all construction activities, making on-site personnel safety the top priority

Seaboard Foundations; Benbrook, TXForeman: 09/2011 - 07/2012Coordinated job-site plans and specifications with precision learned from on-the-job experienceEducated multiple crews on new box template technique with full comprehension achieved by 10th mile of a 100 mile projectDrove and operated construction equipment, including cranes, drill rigs, sky tracks, backhoes, dozers, concrete pumps, and tractor trailersAppointed “first person” to new work sites in order to familiarize myself with the location and expectations, determine best work plan and then staff and train the crews accordingly in order to complete each job safely, on time and within budgetEducated general contractors and subcontractors on quality standards throughout the construction process

Sun Electric; Andrews, TX Operator: 02/2011 - 09/2011Continually maintained clean, safe work areas and equipment without incidentTransported materials, tools, and machines to installation sitesMentored junior team members and provided guidance on proper work and safety techniques Coordinated mobilization and demobilization of sites across multiple states Poured and grouted concrete

Chapmen Construction; McKinney, TXLaborer: 09/2009 - 01/2011Assisted skilled workers with construction projects in all phases of power line building Cleaned all construction areas and achieved perfect grade in safety inspectionOperated construction equipment required to prepare sites for concrete pouringPoured and grouted concreteLoaded trucks and hauled equipment from site to siteWorked as an apprentice to senior team members and received on the job training

EDUCATION

Page 3: Resume with System 3

Western Texas College; Snyder, TX, AA (Horticulture); 2007GPA – 4.0; Dean’s list;

Aimes Academy; Dallas, TX AA (Culinary Arts); 1996