28
naiara Valcarlos Portfolio + CV

resume_naira valcarlos

Embed Size (px)

Citation preview

Page 1: resume_naira valcarlos

naiara ValcarlosPortfolio + CV

Page 2: resume_naira valcarlos

My background in architecture, focused in the smaller scale and immediate surroundings has been enriched with landscape architectural lenses that widen its scope.

Research as a tool for understanding design problems as well as informing design has been inherited from Wageningen University, and the awareness with larger scale issues have widened my design frame and vocabulary. Initiated in a path that faces climate change issues, energy landscapes, shrinking areas, or cultural landscapes, such as the dike landscapes, the intention is to give creative solutions to existing problems. And the ultimate goal, to turn every single landscape into a memorable experience.

My most recent work has focused on processes and dynamics that conform the dike landscape, their material manifestation and representation, and the relationship with the aesthetic experience they provide, setting a new language for landscape design.

Name_ Naiara ValcarlosLive_ Netherlands-SpainTelephone_ (NL)+31 (0) 616 301 454 (SP) +34 688 684 700 e-Mail_ [email protected]_ [email protected] (in construction)

Page 3: resume_naira valcarlos

_. education

MSc Landscape Architecture and Planning, Major: Landscape Architecture; 2010-2014MSc Thesis: Phenomenological approach to ecological restoration, supervised in collaboration with Pieter Veen from Vista Landschaparchitecten en Stedenbouw, 2012-2014

Bachelor degree in Architecture of construction, June 2008

Architectural Studies Year Abroad, Erasmus Program in Bruxelles, Belgium, 2004-2005(In conjunction with Architecture School of San Sebastian), Landscape Atelier.

_. professional experiencelandscape architecture intern. Amsterdam. (NL)_Co-development design competition for nature area including idea generation and sketchingVijkerburg, _Assisted in digital document selection & preparation for book publication `Strootman: Strategies for the sublime´_Assisted in regional vision and specific local scale design: mapping and visualization of landscape program proposals* Research in vision generation of a region embedded in participatory planning process, case study of Assen AA

landscape architecture intern. Wageningen. (NL)_Assisted in interior office design Daesung Corporate Headquarters in Korea_Assisted in project work at various phases including schematic design, design development, material and furniture selection, 3d visualisations

architect. Tolsoa (SP)_Development of design proposal, schematic design, material selection, construction details, document arrangement for irrigation pond_According to client requirements, arrangement of involved professionals

architect assistant. San Sebastian (SP)_Produced permitting documents, monetary plans and LEED documentation for new projects _Arrangement of existing plans to new regulation, revising and adapting their documentation _Meeting clients for project development and arranging presentation_Types of projects include single housing, sports facilities, housing blocks, hotel, commercial buildings, as well as new construction plans or refurbishment of existing buildings

internship as architect, in conjunction with Estudio A architects, Tolosa (SP)_Architectural data gathering within`Recovery of Historical Housing´, initiative of the municipality of Aia, urbanism department_Co-designed detailed plans of house typologies, including sections and required construction details_Participative approach to document restoration process by interviews to house owners_Presented complete project outcome with team to municipality

internship as architect, Tolosa (SP)_Assisted in project work at various phases including schematic design, design development, construction documentation, and material selection_Assisted in design-build construction work including demolition, framing, roofing, concrete, welding, siding, and finishing

Toledo architects, San Sebastian (SP)_Architectural data gathering for`Restoration Plan of Historical Housing´ Basque Government

CCoCouGovernment- Co-designed detailed plans of house typologies, including sections and completed original urbanism plan- Participative approach to document restoration process by interviews to house owners- Presented complete project outcome with team to municipality, with graphic presentations

_. research & publication_Murmur of limits: evoking the sensuous encounter between ecological phenomena and humans. MSc thesis. Wageningen University. 2014http://edepot.wur.nl/310609_Phenomenological analysis: Aesthetic embodiment of the southern coast of Schouwen-Duiveland. Wageningen University. 2014_Instilling human scale to the limit: evoking metaphors. Toposa Online Magazine. 2015http://www.toposonline.nl/2015/murmur-of-limits-evoking-the-sensuous-encounter-between-ecological-phenomena-and-humans-2/

_. awards & honors- ARCHIPRIX 2015; annual best landscape architecture plan by students in the Netherlands.Candidate by Wageningen University.

- De Folkert Hellinga MSc Award van het Netwerk Land en Water 2014, 1st Prize,Wageningen University, NL

- WUF-KLV Thesis Awards 2013-2014, candidate by Landscape Architecture and Planning Chairgroup, Wageningen University, NL

_. skills Windows - MacAutocad. V-Ray. 3D Max. Sketchup Pro.Adobe package: Photoshop. Illustrator. Indesign. Acrobat Pro. MS Office: Word Excel, Powerpoint

Spanish and Basque mother tongueEnglish proficientFrench intermediateDutch beginner

Sketching. Physical modelling. Collage. Pottery.

_. workshops, lectures, courses & conference_Art and Architecture as Tools to Rethink Participative Planning Approach in the Social Milieu, organized by M-etxea, Lur Paisajistak, Recetas Urbanas y Straddle3, assisted by Hiria Kolektiboa, Todo por la Praxis, and Hackitectura, Pasaia (SP), July 2010 ._‘Architecture and Art’ workshop ISAI. Brussels (BE). 2005

_‘The City and its Current Mutations’ Summer Lectures by Carlos Ferrater, University of the Basque Country. San Sebastian (SP). August 2005.

Archiprix 2015, Delft University. (NL). February 2015Murmur of limits: Interweaving the rhythms of nature. Municipality of Zierikzee. Coming September-October 2015 (NL)

Network Ecologies: exploring relations between environmental art, science and activism, Hull University, Scarborugh (UK). `Aesthetic concepts, metaphors and phenomenology enhancing ecology expressive of cultural values´. June (4-6) , 2015.

Wagenigen University Netherlands

Architecture School of San SebastianSpain

Faculté d’Architecture La Cambre Horta Belgium

Strootman LandschaparchitectenFebruary - June 2011

Oikos Landsape ArchitectsJune 2011-August 2011

Freelance2009-2010

Ansa ArchitectsFebruary 2008-August 2008

Municipality of AiaJanuary - October 2007

Estudio A architectsOctober 2006 - October 2007

Toledo architects,June - September 2006

Toledo architects, June - September- Architectural data gathering

Academic

Professional Magazine

design

research

Software

Languages

Physical

workshops

lectures

exhibitions

conference

Curriculum

Vitae

Page 4: resume_naira valcarlos

1

2

3

4

1

2 3

4

66 m

88 m

Thieu

e 31

e 30

e 29

e 28

e 27

e 26

e 25 e 24

e 23

e 22

e 21

e 20

e 19 e 18

e 17

e 17 e 31

Locks

Seneff e

Ronquieres

Island-peninsula

Territory

_. An area of prosperous industrial activity is decaying and asks for a new reinterpretation for its revitalization.

_. The sensuous analysis, detecting concepts that conform our sensuous experience, understands this landscape as a sum of sensuous constrasts worth of being heighlighted.

_. The analysis goes narrowing down from majure lines, main function of the landscape, until coming up with concepts under which the landsape is recognized, and an architectural project suggested.

Type_ Landscape Atelier, in collaboration with Université Livre de Bruxelles Location, Date_ La Louviére, Belgium, 2008Team_ Christophe Lengrand, Alina Popescu, Naiara Valcarlos

Scope of the project_Reinterpreting elements of the landscape and their aesthetic expression for its revitalization

A canal landscape. Ancienne and new canal.

Island - Peninsula territory. Dynamic and Static

Water-Land.

CanaI Bruxelles-Charleroi_ Part of a north-south axis of water transport in Belgium, whereby the north of France and important waterways in the south of Belgium are connected.Canal centre_ Links the waterways of the Meuse and Scheldt rivers. It connects the artificial lake Grand Large near Nimy, with the Brussels-Charleroi Canal near Seneffe.

Both canals draw an island-peninsula territory. Together with the hydraulic engineering elements, they make visible its infrastructural purpose.

Hydraulic system. Boat lift and locks

Ronq

uier

es in

clin

ed p

lan

Thie

u Bo

at li

ft

Houdeng-Goegnies

Houdeng-Aimeries

Strépy-Bracquegnies

1898 Bruxelles

Mons

new canal du Centre

new

cana

l Cha

rler

oi -

Brus

sels

ancienne canal charleroi brussel

canal du ce

ntreBoatlifts

New canal Charleroi-Brussel

Old canal Charleroi-Brussel

l= 10,4 km

height dif= 88 m

l= 14,8 km

3-4

3-4

New canal centre

Old canal centre

l= 7,5 km

height dif= 66 m

l= 6,79 km

1-2

1-2

La Louviére

Thieu

188

5 - 1

888

1917

-191

9

1917

-191

9

1917

-191

9

1

2

3

4

canal

locks

historical boat lift

modern boat lift

Page 5: resume_naira valcarlos

1

2 3

4

Density4 %

12 %

18 %

43 %

85%

dynamic_urban

static_idyllic

25%

Arquennes

Ronquieres

Feluy

Seneffe

11 %

63 %

Analysis. Concepts.

Analysis. Functions.

Peninsular belt. Cherry trees

Peninsular walking structure. Pedestrian

Contrast analysis

canal du centre

canal charleroi

Inland

Peninsula

canal du centre

canal charleroi

Duferco

Houdeng GoegniesLa Louviére

Strepy Bracquegnies Houdeng Aimeries

Highway/Pedestrian

End paved/Green

Steep belt line/Horizontal canal

Dense Industry/Vacuun fields

Historicallifts

Silence

SoundAir containing specificity of landscape function

DensityLight/High

Lines providing reliefMorphology

Encounter past and present

Time

Movement through landscape

Dynamism

Industry

Agriculture

Urban

Page 6: resume_naira valcarlos

0 0,5 1 km

Landscape and environemntal art center

_. The steep cherry peninsular promenade and the canal linked and giving entrance inland by means of a public slope.

_. The building contains three main areas: workshop and art residence rooms, the inner museum containing indoor art pieces and an auditorium, and public space articulating both, from inside the building, and from outside.

_. The outdoors landscape recovers local species: forest and agricultural production plantation for biodiversity, educational and leisure purposes. Empty land is provided for site related environmental art projects.

An empty land, with no specific function in an urban and industrial setting surrounded by a canal turning the land into a peninsula.

Water infratructure shaping an area that asks for its revitalization by engaging community and bringing new insights.

A landsape and environmental art museum is proposed. Grasslands accommodate the outside laboratory, creating an active landsape. The building, with its public space welcomes the visitors.

A contrast peninsular landscape. Dense Industry - Empty land. Steep vegetation belt - Smooth slope inland grasslands. Dynamic peripheral - Static inland Idillyc - Neglected

Cherry trees peninsular belt

Type_ BA Diploma Location, Date_ La Louviére, Belgium, 2008Scope of the project_Revitalization of idylique but neglected area

Page 7: resume_naira valcarlos

0 5 10 m

1.

12

3

4.

5.

1. Workshop rooms 2. Art residence studios3. Public space4. Cafe and restaurant5. Museum entry6. Museum offices7. Museum8. Auditorium

Landspe and Environmental Art Museum

Outdoors Museum

9. Botanical forest 10. Culture fields11. Environmental artopen museum

4.

6.

7.

8.

9.

10.

11.

Page 8: resume_naira valcarlos

0

1

2

Building view . Back-side elevation.

Section . Landscape atelier rooms.

Details . Art residence rooms.

Details . Cafe-Restaurant roof and floor.

Page 9: resume_naira valcarlos

Public space. Wooden platform. Overcomes the height difference. Access to the public areas: cafe-restaurant. Furniture facing canal and inland botanical forest, cultural fields and environmental art pieces

Public space. Roof terrace. Connection between canal and inland.

1. Slope connecting roof terrace2. Panorama towards canal3. Up Roof terrace4. Private spaces in roof terrace5. Open square of roof terrace. Vegetated6. Access to open air museum7. Cafeteria

Roof Terrace

Roof access - panorama

Entrance land art museum

Roof terrace

1

2

3

4.

5.

6

7

entrancebuilding

Page 10: resume_naira valcarlos

_. The municipality of Nijmegen in collaboration with Wageningen University aims to develop a future scenario and design solutions for its adaptation to climate change

_. The railroad climatope, with open land allowing strong winds and drawing a gap withing the urban framework becomes an interesting spot.

_. The objective implies to adapt and improve the urban quality.

Railroad climatope_ Strong wind Warm Tº during the day Quick cooling in the evening

Urban Functions _ Cycling and pedestrian. Empty, exposed green areas

Urban Dis-Fuctions _Poor connectivity between neighborhoods

Type_ MSc Design Atelier, Wageningen Location, Date_ Nijmegen, Netherlands 2010Client_ Municipality of NijmegenScope of the project_Adapting the city to climate change

UHI. City or metropolitan area significantly warmer than its surrounding due to human activities. Surfaces store short wave readiation, water runoff. Most noticeable in summer and winter.

Effects. Warmer Tº, Heavy rain showers, Strong winds

Design tools Trees for shadow evapotranspiration Trees /Buildings for wind blocking effect Water retention areas

Climate change

S_E main wind direction

0 50 100m

increasing wind speed and cooling effect

smoothedslope

artifically raised

Greening rails.

Combating Warm Tº / Strong Winds.Strategy of slopes and trees.

Planting treesstrategically

buff er zone

buff er zone

buff er zone

Page 11: resume_naira valcarlos

View

2

4

5

4

1

winter

Study of shadow pattern. Winter and Summer. Morning, noon, afternoon

summer

Vegetated walls. Cooling effect. Connecting down area and square

UHI. Changing building configuration for adaption. Existing situation Proposal

Alley.Building blocking wind in winter. Trees cooling in spring-summer.View of connection .Opened space.

Vegetated roofsCooling effectWater retention

Water retention. Vegetations stretches. Room for ponds

Page 12: resume_naira valcarlos

phas

e 2

phas

e 1

Concrete perforation with plants.

Little islands in movement

SandyHill

r= 3mm

h=3 m

d= 3,5m d=10cm

Casserie Aans_ Former industrial site. A new garden is developed within the existing walls. The entry has to be designed and the assignment asked for a fence to be delicate, meaningful, suggestive and welcoming.

`Le petit paradise´. `Small paradise . Romantic. Delicate

Atmospheres. Green rooms. Rock garden.

Type_ Internship Strootman landscape architects, garden design Location, Date_ La Casserie, France, 2011Scope of the project_Design the entrance fence

LA CASSERIE

Gallery:Transformation of facades. Reuse of Metallic carpentry for flowery pergola .

Behind wall: Grassed or flowery Hills

Entry closed at night

Garden of rocky ground.Parts of the existing paving stones integratedto the project, combined with plants.

Existing situations. Ground plan.

Proposal. Ground plan.

Page 13: resume_naira valcarlos

Ancient washingpond

Allotment gardens

Project area

Farm_ Familiar house with productive allotment gardens and supply of fresh water directly from the mountains.

Garden_ Fallen in misuse, the clients wanted to enlarge the existing water pond. Turn the green garden into water garden. Larger surface for pleisure, and division with allotment gardens.

Countryside farm.

Allotmen gardens.

Type_ Pond design, freelance garden Location, Date_ Mekola, Spain, 2008-09Scope of the project_Enlarge existing water retention and irrigation pond

IRRIGATIONPOND

200 m

20 m

10m

1. Existing water retention2. Water running element3. Filtering water to pond4. Water pool with different heights5. Water channel for irrigations 6. Stone walls7. Irrigation water for allotment gardens

Existing water drainage2. New water pipes connecting to existing system, discharging to the river

Ground plan.

1 2

4

3

6

7

5

Proposal. Ground plan and sections.

Page 14: resume_naira valcarlos

Catalyzing the border

1

2

3

FormerMining activity

Abandoned mining train rails

Bord

er N

ethe

rland

s

echoes catalizer zone: abandoned train line

ActiveMining activity

250 500 m

Goal: work in traverse.

development of echoed´ elements

in time

Detect Catalyzing element

establishing different activities along catalizer element: dynamics

Establish echoes

Unifying landscape through and along the catalizer-border zone

Train lines. Structure to cover with wood.

Catalizing

the border

_. The international student competition asked for reflecting upon the borders and their potentials.

_. A design strategy that understand the border as a zone intends to unify it, and create a transboundary connection.

_. The infrastructure fallen in lack of use due to shrinkage process in the area is reinterpreted as design material and diverse activities to be developed in time suggested.

Eygelshoven, located in the south of the Netherlands, surrounded by Natura 2000 and with abandoned infrastructure, a border zone with Germany.

Strong mining activity in both sides of the border:the dutch site stopped its activity, meanwhile the german border still keeps it partially active.

With the border placed in Natura 2000 protected area the border is illegible, remains difficult to access, and lacks any attractive purpose.

A shrinking area. Population decrease. Oversized urban structure.

Former mining activity. Vacant land and infrastructure

Border. Zone, area. Illegible and undefined area.

Type_ IFLA student competition Location, Date_ Eygelshoven, Netherlands, 2011Scope of the project_ Conceptual design for border areas

Recovering the train lines

Urban Settlementaround mining areas

Border and water

active mining activity

former mining activity

former mining activity

former mining activity

natura 2000

water structure

border

min

ing

train

rails

Page 15: resume_naira valcarlos

New cycling routes _

5

16

development of echoed elements establishing dynamics unifying landscape

through train line

Dynamics in the landsape

The entrance to the city is redesigned. Allotment gardens relocated. Train lines integrated withthe vacant land and planted for immersion with the train parcour.

Cleared partially the dense vegetation, the field welcomes leisure activities that revitalize the backside of the city, now opened by means of the old train lines:contemplation, gathering for concerts, gamesthe vegetation grows spontaneously, and partly maintained

Willows for biomass production due to the vicinity of water. Solar panels are implemented.

The area can become an educational park and laboratory.

Slow dynamics. Energy park.

Mid dynamics. Platform for public events.

High dynamics. Anchor point in the train lines.

OPEN FIELD FO

R ACTI

VITIE

S: FE

STIV

ALS

AND

MAR

KETS

ENERGY PARK: W

ILLOW

, SOL

AR P

ANEL

S, W

ATER

RET

ETNT

ION

Character of space

Walking path and cycling route

Nature 2000 protected area

Empty green_connecting urban/train

Proximity to train lines No specific function

Urba allotments Entrance to backyards

HiGH

Middle

SlOW

Transboundarytraffic/pedestrian

Establishing dynamics: Functions to develop in the urban areas that connect with the old train lines

ALLOTM

ENT

GARD

ENS,

ENT

RANC

E TO

NAT

URE

AND

CITY

, PUB

LIC

SPAC

E

vacant lots

Page 16: resume_naira valcarlos

murmur of Limits

_. Aesthetic concepts: Limit and Rhythm

_. Aesthetic strategy: Focus on the processes and dynamics existent in site. Enhance the aesthetic experience to its maximum supported by aesthetic metaphors.

_. Aesthetic metaphors: Voices of the water, voices of the wind Murmur of culture and nature Embodying the horizon

Plan Tureluur_ construction of inner dike nature reserve areas along the Oosterschelde, preservation of sandbars and marshes against erosion, and eventually the conservation of inner dike brackish marsh.Cultural understanding of nature_Ecological understanding of nature

Experiences that nature affords us and their essence as relevant as ecological knowledge for the development of new nature in XXIst century.

Type_ MSc Thesis Location, Date_ Schouwen, Nethrelands, 2014Scope of the project_Ecology expressive of human experience for nature development

* The dike is an aesthetic limit.

* ‘key spatial configuration in aesthetic expressiveness of the landscape’(Casey, 2011)

* facilitator of different perceivable phenomena,

manifested in rhythms

Its materiality involves: * interweaving diverse rhythms in which nature manifests:

infinitesimal, ephemeral, tidal, seasonal, geological * the materiality of the dike provides specific

rhythm to the embodiment of the dike,

framing our aesthetic experience * facilitates the

murmur of limits:

interaction of the rhythms of nature

in close relationship with the landscape

Limit and rhythm: aesthetic concepts

Page 17: resume_naira valcarlos

aestheticmetaphors as design material

A dike landscape. Equally shaped by both the forces of nature and human intention, tangible meeting point between culture and nature .

New nature development. Plan Tureluur.1200 Ha.

tidal rhythm

Primary Dike line

Inlaag/Karrevelden dike

seasonal rhythmbrackish ecosystem

seepage

foams and waves

voices of the water, voices of the wind

Aesthetic metaphors.

[1] Voices of the water, voices of the wind[2] Murmur of rhythms, culture and nature[3] Embodiment of the horizon

horizon, the limit of our site experience

seasonal rhythm

Page 18: resume_naira valcarlos

193

The limit, the dike, is given a new outline, a new widened relief.

The dike is heightened following the existing slope, and provided with a second walking path, immersed in the dike. This gives the possibility to either walk exposed to the winds, the sound of the sea, the foams, the movement of the grass, with open horizon, on the side of the dike, or to walk on top, immersed in the dike, surrounded by it, revealing the dike anew, as an element that rather than exposing us, now, it protects us, that becomes closely tactile, making the voices of the water and the winds to reveal only in their aurial expression, becoming echo, remote, and, indeed, not embodied as a visual or tactile phenomena: the transposition of the visual landscape to the aurial and new tactile space.

What we see, is, the sky and the grass.

But the dike becomes a sequence (300 meters long): it is narrow, focused on the sky and the new tactiliy, and we walk through it, in sort of canyon, enclosed space, until it widens, opens, the line breaths, in order to open towards a space that reveals to us as a panorama. The limit comes to embrace the space, to indeed determine it, in an ellipse, continuing to protect us, but also allowing us simultaneously the perception of the seasonal rhythm, with the big water elements on one side, and the tidal rhythm on the other. Both as a visual phenomena again.

We come to sit on the stairs, in order to look at the sea, exposed again to the wind, to the sea, to its foams and waves, and discovering the dike break that lies down. We go down the stairs, and we lead towards the path, wooden path that guides us until the end of the dike break. The rocks located on both sides of the broken dike enhance the waves and the foams, so the voices of the water get enhanced, and we get to the end of the path, in order to be in the midst of the sea.

In overall we impose over the given material, we provide a new relief that enhances the experience of the voices of the water and the winds and we give them a new expression, allowing different intensities.

Voices of the water, voices of the wind

before

after

_. The limit, the dike, is given a new outline, a new widened relief: heightened following the existing slope, provided with a second walking path, immersed in the dike.

_. This gives the possibility to either walk exposed to the winds, the sound of the sea, the foams, the movement of the grass, with open horizon, on the side of the dike; or to walk on top, immersed in the dike, revealing the dike as an element that now protects us.

_. Closely tactile, voices of the water and the winds revealing only in their aurial expression in this new relief, they become echoed and remote.

The dike in this stretch is highest, as response to the strong north-east winds. The dike relief dates back to 1856, with continuous reconstruction due to dike failures. A compilation of historical dates.

The deep water, in combination with strong winds, expresses very vividly, making the stretch a extremely harsh and exposed area.

The sea arm getting immersed in the sea is the remnant of a fortmer dike that disappeared under the waves; generates new dynamics, allowing the gathering of sediments.

A dike landscape. Material manifestation of the encounter between forces of nature and human intention .

Cultural landscape. Dynamic transformation with land retreating.

Voices of the water, voices of the wind

Page 19: resume_naira valcarlos

creating opennesswidening dike

s1 s1´

Dike profile. Transformation introducing force line.

Exposed-Enclosed. Vivid sound-Echo.

Tidal rhythm-Seasonal rhythm. Tactile

Open Sea

s2

s3

s1

water

inland

dike profile

opening space_expanding tactly

current profile

creating enclosenessdiggint out space

reinforcementheightening the dike

dike canyontactile

Page 20: resume_naira valcarlos

s1

s3’ s3

s2’ s2

Sequence of sections. Dike canyon widens creating space.

Expanded dike. Nature conquers it slowly. Wind, sand, water, birds.

Rhythms of nature. The dike expands allowing the mixity of rhythms and a halt on the dike: different intensities of voices

The open space face to the sea catches the sand, and new ecologies can grow through time.It works as a platform for performances.

Page 21: resume_naira valcarlos

Construction Drawing . Sea arm.

dikereinforcement

dikereinforcement

walking line. width 3.00 m.

concrete stairs on top of reinforced concrete

change existing replenishment with clay

concrete body reinforced with stone .

rubble

sand replenishment.

wooden structure. widht 1.5m.

rubblereinforced concrete

with stones

depth 0.45 m

walkingpath

big stones: reinforcement and enhancement voices of the water rubble

depth 0.35 m

asfaltsmall stone basalt

* technical detail adapted from official documents for dike reinforcement: http://www.zeeweringenwiki.nl/mediawiki/images/7/73/Werkbestek_-_alle_tekeningen_(incl._NvI_3).pdf

1

1´1

basaltlarge stone

concrete dike body reinforced with stone

rubble. small stonesrubble. large stones

dike

reinforcement

N.A.P. + 1.45

N.A.P. + 0.00

Page 22: resume_naira valcarlos

sea/inlandtidal rhythm/ sea-

sonal rhythm

Inner land

Open seaN 59Secondary road

Primary dike line and walking line

Inlaag dike accessibleInlaag

Karrevelden

sluice

Farm unit

Gravel path

Wooden path

Wooden path on karrevelden

Wooden path karrevelden access

Access to dike by stairs

Grass path

N

1.250 2.5Kilometers

Scale

Farm unit

N

1.250 2.5Kilometers

Scale

Site structure . 1. Dike system and road. 2. Water and farm units.

_. Minimal interventions in historical karrevelden whose major changes manifest in seasonal rhythm become partially perceivable.

_. Saline and flowery grasslands, and small-scale pioneering vegetation become accessible by wooden paths that draw a laberynth pattern.

_. The dike becomes a new limit of our sight experience, announcing the tidal landscape.

The remnants of the ancient battle against water and humans in Schouwen.

Inlaag dike_ Secondary dike line protecting the land in case the first primary dike failed. Inlagen_ The characteristic areas between two dikes, usually dug out for salt or clay winning purposekarrevelden_ Low-lying areas directly behind the dikes.

The LIFE-Nature project Brackish Marsh Nature contributes to the conservation of 178 hectares ofnature. It concerns the conservation of former creeks and brackish marsh nature.

`karrevelden´`inlagen´Old Low lying areas. Brackish nature

Tidal - Seasonal Rhythm. The dike as transposition element

Water-Land. Cultural-nature.

Rhythms of culture

and nature

Page 23: resume_naira valcarlos

Seasonal rhythm. Water fluctuation and brackish nature.

Seasonal rhythm_Tidal rhythm. Approaching tidal landscape.We cross the dike, perpendicularly, opening the wide panorama and revealing the tidal rhythm.

winter level -1.90 meters

summer level -2.30 meters

Tactile nature. Low lying landscape. Sensing reddish brackish grasslands with strawberry clover and scattered small-scale pioneering vegetation. The root vole, terns, waders and geese the most important animal species.

Page 24: resume_naira valcarlos

P

Legend

Parking lot

Mussel pole paths unit

New seawards extended dike line

Sluice

Entries to the dike

Harbour

Viewpoint in historical sublime

Existing dike line and walking line

Existing mud�ats

Karrevelden and inlagen

N 59

‘Heerenkeet’ Cafe

Farm unit

*

**

*

0 125 250 500

Scale

Meters

N

Open Sea

Nature development

Nature development NAP

NAPaverage high tide

average low tide

7.5

5.0

1.40 m

-1.00 m

Legend

NAP

New dike pro�le

Former dike pro�le

Nature to be developed

Average high/low tide: 1.40 - -1.00meters

10 200Meters

Scale

12

72 m

98 m

3.50

42

1/12

33.70

12.75

NAP 1.40 m2.10 m

1.60 m0.30 m

-1.00 m

7.5

5.0

98

NAPaverage high tide

average low tide

NAP

New dike pro�le

Former dike pro�le

Nature to be developed

Mussel growing poles

Average high/lowtide: 1.40 - -1.00 meters

Legend

4.5m

0.4 m

NAP

H. tide

L. tide

1.60 m

3.5 m

NAP

H. tide

L. tide

2.10 m

3.0 m

NAP

H. tide

L. tide

Platform 0.40 Platform 1.60 Platform 2.10

NAPNAP

average high tide

average low tide

7.5

5.0

1.40 m

-1.00 m

Legend

NAP

New dike pro�le

Former dike pro�le

Nature to be developed

Average high/low tide: 1.40 - -1.00meters

10 200Meters

Scale

12

72 m

98 m

3.50

42

1/12

33.70

12.75

NAP 1.40 m2.10 m

1.60 m0.30 m

-1.00 m

7.5

5.0

98

NAPaverage high tide

average low tide

NAP

New dike pro�le

Former dike pro�le

Nature to be developed

Mussel growing poles

Average high/lowtide: 1.40 - -1.00 meters

Legend

4.5m

0.4 m

NAP

H. tide

L. tide

1.60 m

3.5 m

NAP

H. tide

L. tide

2.10 m

3.0 m

NAP

H. tide

L. tide

Platform 0.40 Platform 1.60 Platform 2.10

NAPNAP

average high tide

average low tide

7.5

5.0

1.40 m

-1.00 m

Legend

NAP

New dike pro�le

Former dike pro�le

Nature to be developed

Average high/low tide: 1.40 - -1.00meters

10 200Meters

Scale

12

72 m

98 m

3.50

42

1/12

33.70

12.75

NAP 1.40 m2.10 m

1.60 m0.30 m

-1.00 m

7.5

5.0

98

NAPaverage high tide

average low tide

NAP

New dike pro�le

Former dike pro�le

Nature to be developed

Mussel growing poles

Average high/lowtide: 1.40 - -1.00 meters

Legend

4.5m

0.4 m

NAP

H. tide

L. tide

1.60 m

3.5 m

NAP

H. tide

L. tide

2.10 m

3.0 m

NAP

H. tide

L. tide

Platform 0.40 Platform 1.60 Platform 2.10

2,30 m

1,40 mtidal fluctuation

The dike, former inlaag dike and now primary dike, with softer water dynamics and the non existence of deep channels make this dike stretch a smooth walking line.

Exposure to tidal rhythm and a wide and far horizon. Mud flats, bordering the dike, exposed to the tidal fluctuation register this diurnal rhythmic dynamic.

Embodying the horizon _. The line is distracted and expanded.

_. Wooden paths are placed in the midst of mussel poles and linked to the dike slope at different heights.

_. It allows the embodiment of the horizon:Tidal rhythm and embodiment of the horizon tightly bound

_. Paths submerged under the waves, exposed with the tidal rhythm, delimiting our situation on the dike.

_. The mussel avenues enhance the flattened horizontaliy leading us towards its encounter.

Page 25: resume_naira valcarlos

150 m

4,5 m

3,5 m

3,0 m

0 25 50m

Legend

Delimitation of rocks

Walking

Former dike pro�le

Panoramas

Dike body

Mussel poles

Entry

Mussel pole under high tide

Viewpoints

Sea

Wooden platforms

Legend

Delimitation of rocks

Walking slopes

Mussel poles

Contemplation areas

Dike body

Staircase

Entry landmarkSea

Wooden platforms

Ground plan

High tide: +1.40 meters

Elevation

N

10 20 30 400 50Meters

Scale

Plan. Wooden paths and connections to the dike.

Embodying the horizon. Our position conditioned by the tide.

Page 26: resume_naira valcarlos

Flattened horizontality. Mussel poles enhancing its experience.

Active landscape Edible. Mussel harvesting.

high tide+ 1,40 meters

low tide-1.00 meters

Page 27: resume_naira valcarlos

Entry. Hidden landscape

Extraordinary and ephemeral event. Dike and mussel landscape disappearing under waves.

stormy conditionsabove +1.45 meters

Page 28: resume_naira valcarlos

naiara Valcarlosemail: [email protected]