RETAIL COMPETITION AND OPEN ACCESS (RCOA) Debora Anastacia T. Layugan Energy Regulatory Commission Continuing Regulatory Education for the Stakeholders for Visayas Journalists 8 September 2016

RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

RETAIL COMPETITION AND OPEN ACCESS (RCOA)

Debora Anastacia T. Layugan Energy Regulatory Commission

Continuing Regulatory Education for the Stakeholders for Visayas Journalists

8 September 2016

Page 2: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

Generation Transmission Distribution Supply Captive &

Contestable Customers

The industry today

NPC / IPPs NGCP Distribution Utilities

Retail Electricity Suppliers

Page 3: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

3

The Road to Restructuring

NPC-IPP Transfer

NPC Privatization

WESM

Cross-subsidy removal

Unbundling

Retail Competition

and Open Access

Page 4: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

What is RCOA?

 Non-­‐  

discriminatory    use  of    

transmission    and  distribution  facilities  

Scheme  which  paves  the  way  for    the   creation   of   a   Competitive  Retail   Electricity   Market  (CREM)  

CREM-­‐   Electricity   market   wherein   contestable  customers  exercise  ability   to  choose  suppliers  of  electricity   by   virtue   of   open   access   in   the  distribution  system      

4

Page 5: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

RCOA Set-up

Sellers  (Suppliers)  •  RES  •  Local  RES  •  SOLR  (regulated)  

Commercial  Operations    (26  June  2013)  •  Open  in  2  grids    Luzon  and    Visayas  

Rules  and  Regulations  governing  RCOA  •  ERC  Rules  •  DOE  Circulars  

Buyers  (Contestable  Customers)  •  1MW  and  above  •  750kW-­‐999kW  •  500  below    •  Household  level  

Page 6: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

7 Pillars of ERC

Revised  Rules  for  

Contestability  (12  May  2016)  

Code  of  Conduct  (June  7,  2006)  

Supplier  of  Last  Resort  (SoLR)  

(June  21,  2006)  

2016  RES  Rules  

(8  March  2016)  

DSOAR  (Jan.  18,  2006)  

Business  Separation  Guidelines  (BSG)  

(Sept.22,  2006)  Competition  Rules  

(June  23,  2006)  

Page 7: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

Billing Arrangements

7

RES

Contestable Customer

DU

NGCP

GenCo

Single Billing

Bilateral Contract

Transmission Supply Contract

(TSA)

Distribution Wheeling Services Agreement

(DWSA)

Retail Supply Contract (RSC)

Page 8: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

Expected Outcome

Competitive rates

Entrance of new industry players

Flexible contract terms

Strong competition among players

Better Supplier service

Innovation of additional service

8

Page 9: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

Recent RCOA Rules

RES Licensing Revised Rules

for Contestability

Restrictions on CREM

Operations

Page 10: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

Licensing Rules

- Subject to the r e s t r i c t i o n s o n market share limits a n d c o n d u c t o f business activities

An affiliate of a DU allowed to become RES

Exemption allowed depending on actual operations - U n u s e d c a s h

resources of PhP10M - Min. Quick Ratio of 1.5x - Program to Comply performing below Quick Ratio - Website reflecting average prices and value-added service - G e n e r a l Information Sheet

A d d i t i o n a l Requirements

Lifted suspension of evaluation of RES license

Page 11: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

RCOA Timeline

26 June 2016

- Threshold Reduction Date- 750kW - Voluntary

26 Dec. 2016

- Mandatory Contestability- 1MW and above

26 June 2017

-Mandatory Contestability-750kW-999kW

26 June 2018

-Retail Aggregation -Lowering of threshold to 500kW subject to the review of ERC

Page 12: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

Restrictions

Prohibition of DU as supplier unless SOLR

• 3-year winding down period • Existing Retail Supply Contracts (RSC) remain valid within winding down period • No new RSC after effectivity of Resolution • No renewal of RSC after effectivity of Resolution.

Discontinuance of Local RES

30% limit on the total average monthly peak demand of all contestable customers of RES supply

• 2-year compliance period

50% limit on the total energy transactions of affiliate contestable customer

18 months for ERC to review applicability of restrictions

Page 13: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

framework

Retail Supply Contract (RSC) • Minimum term: 1 billing cycle • Maximum term: 2 years

Prospective GenCo • Secure provisional license from ERC • Contract with contestable customer allowed • Compliant with mandatory contestability • Exercised once for limited period of time • DU to continue to supply power to contestable customer

while power plant is under construction. • TOU Rate or Peak/Off-Peak Rate approved by ERC

Page 14: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

RES (As of September 2016)

Aboitiz Energy Solutions, Inc.

AdventEnergy, Inc.

DirectPower Services, Inc.

Ecozone Power Management, Inc.

Ferro Energy, Inc.

Global Energy Supply Corporation

GNPower Ltd. Co.

Kratos RES Inc.

Masinloc Power Partners Co., Ltd. Premier Energy Resources Corp.

PRISM Energy Inc.

San Miguel Electric Corp.

Team (Phils.) Energy Corp.

Trans-Asia Oil & Energy Dev. Corp.

SN Aboitiz Power-RES, Inc.

First Gen Energy Solutions

Manta Energy, Inc.

Millennium Power RES Inc.

FDC Retail Electricity Sales Corp. SMC Consolidated Power Corporation

Corenergy, Inc.

AC Energy Holdings, Inc.

Page 15: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single

Statistics (as of June 2016)

Number of Contestable Customers With Retail Supply Contracts (RSC) 390 Without RSC 725

Total System Peak Demand 11,463 Total Demand of 1MW and above 37.76%

Retail Electricity Supplier (RES) - 22 (as of September) Local RES - 24 Supplier of Last Resort (SOLR) - 42

75%

25%

Number of Qualified Contestable Customers

1MW and above (1st Phase)

750kW-999kW (2nd Phase)

1,115

367

93%

7%

Demand of Qualified Contestable Customers

1MW and above (1st Phase) 750kW-999kW (2nd Phase)

315MW

4,328 MW

Page 16: RETAIL COMPETITION AND OPEN ACCESS (RCOA) - RCOA 101- DTL.pdf · Competition% (Sept.22,2006) Rules (June23,2006) Billing Arrangements 7 RES Contestable Customer DU NGCP GenCo Single