Retail Markets Co-Ordination Design ServiceReMCoDS

Retail Markets Co-Ordination Working Group

Wednesday, 14th August, 2013

NIAUR Offices

Belfast

Page 2: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

ReMCoWG Agenda

Agenda Item Presenter Time

Introduction A O Connor ReMCoDS 13:00 – 13:05

ReMCoSG Meeting Feedback

Seán mac an Bhaird CER 13:05 – 13:15

ESBN/NIE Update Paul Mallon, ESBN/Nigel Wray, NIE

13:15 – 13:35

Market Design Update A O Connor ReMCoDS 13:35 – 13:50

ReMCoWG To-Do List Review

A O Connor ReMCoDS 13:50 – 13:55

AOB & Closing A O Connor ReMCoDS 13:55 – 14:00

Page 3: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

Approval of Minutes

Minutes from ReMCoWG meeting

12th June 2013

Page 4: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

Update from ReMCoSG Meeting 26/06/13

Topic Detail Review of matters arising from ReMCoWG

MCR1066 V2: Update of SIC – EAI Codes

Approved by ReMCoSG

Update on Tibco Hub

The Network Operators gave a presentation covering the Tibco Hub/EMMA workplan via a slidepack ‘Retail Market Messaging Update’.

Data Archiving progressing well & being monitored on a daily basis. Work is commencing on the End to End Market Reconciliation

solution. Interim Contingency solution expected to be in place by 30th June Performance Improvement items - Tibco were hired to carry out an

Independent Audit and are expected to arrive on site in July. This may take longer to complete than originally expected.

Capita are carrying out Design Analysis of known issues and Network Operators are expecting a scope of work by 5th July and the start of some build work.

Work is on-going to develop a Proof of Concept for the BC Upgrade to plan and prepare for next year.

Supplier Resources required currently for Data Archiving and towards the end of November for the technical delivery of the EMMA Software upgrade

S mac an Bhaird asked if there was any further information on resource requirements for Suppliers as this had also been discussed at the ReMCoSG on 6th June. F Hannon said she would follow-up with Suppliers to see if further information is needed. P Mallon advised that they do need to give more detail on the cutover in December. The Proof of Concept for the BC Upgrade will help give more detail on supplier resource requirements around April/May 2014 as there will be more supplier involvement needed at that time. The requirement for further information on resources is an open action at the ReMCoWG but the meeting also agreed it was important to raise a similar action at the ReMCoSG.

Page 5: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

Update from ReMCoSG Meeting 26/06/13

Review of ReMCoSG Actions

It was agreed at the Extraordinary ReMCoSG that the Network Operators should proceed with sourcing availability and cost of a Quality & Standards Manager. P Mallon advised that this is work in progress. The Regulators need to agree the need for this position and determine cost recovery arrangements.

BC Archiving is complete for the Central Hub and a schedule is in place for weekly archival. Backlog archival is in progress for BW. Data Archiving is progressing well and is being monitored on a daily basis Feedback from some smaller suppliers has highlighted that they feel there is no need for them to archive with low volumes. The Network Operators do not agree with this and it needs to be pursued. The target for completion is the end of June however it will overrun by a few weeks. S mac an Bhaird advised that the agreed action was that the Network Operators were to provide a status update and there would be a Joint Regulatory follow-up once that was received.

Page 6: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Market MessagingUpdate

Paul Mallon/Nigel Wray

14/08/2013

6

Page 7: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Agenda

• Recent Events

• Current Status

• Plan Progress Update

7

Page 8: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Recent events

• Central Hub Events– 2nd August

• Central Hub outage

• TIBCO EMS queue failure @ 17:30

• Services restored and central hub messages cleared by 21:30.– Some follow-on work on Monday 6th in ESBN.

• Incident under investigation with TIBCO

– 12th August• Loss of Supplier’s EMMA – Services stopped• Central Hub message processing delays• Supplier’s EMMA restored and message backlog cleared• Known issue for Central Hub – December release.

8

Page 9: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Current Status• Data Archiving (BC and BW)

– Central Hub - Completed– EMMAs - majority completed but there are two instances still

outstanding.

• Proven results from data archiving– monitoring stats, error reports reduced

• Feedback welcome

9

Page 10: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

10

Year 2013 2014Ref Work Item Description March April May June July Aug Sept Oct Nov Dec Jan Feb March April May June July Aug Sept Oct

1 PI Software Release Central Hub 24th March 2 Data Archiving

Centra l Hub Database BC ArchivingEMMA Database BC Archiving (Suppl iers )Centra l Hub Bus inessWorks (BW) & Fi le ArchivingEMMA Database Bus inessWorks (BW) & Fi le Archiving (Suppl iers )

3 Message Reconciliation End to End4 Contingency Solution Central Hub - Interim5 Performance Improvement (Hub & EMMA)

TIBCO Technica l Independent Audit (ToR)Des ign & Analys is including loss of EMMAsBui ld & Unit TestSystem TestingRegress ion TestingPerformance TestingRelease Cut-over

6 TIBCO Business Connect (BC) UpgradeEMMA BC UpgradeDigi ta l Certifi cate Insta l lation

TIBCO HubSuppl iers - Phased

7 Market Schema ReleaseDes ign, Bui ld, Test and ReleaseIssue Schema XML v11.00.00Upgrade of Suppl iers test EMMA softwareInter Participant Testing (IPT) ROICut-overContingency cut-over

Progress Against Plan

Page 11: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

• Interim contingency now in place– De-risks market messages from a prolonged outage

of EMMA/s – Manually invoked at central hub level– Manual restore process for Suppliers messages

• Messages re-directed to dummy EMMA• Manual transfer of messages by Supplier• Manual message reconciliation by Supplier

– Supplier documentation to be issued shortly.

11

Progress Against Plan

Page 12: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Progress Against Plan• Permanent solution for December release

– De-risks market messaging processing for all– Design agreed and validated independently– Automatically invoked at central hub level– Supplier restore process uses the EMMA solution in full– Message reconciliation in 602

• Enhancements Package– Scope has been agreed and validated independently– Addresses database coding issues– Includes TIBCO technology refresh

12

Page 13: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

• High-level cut-over activities for Suppliers– Pre-cutover activities

• Full back-up of all EMMA environments

– Cut-over activities • Planned shutdown of production EMMA• Production EMMA application upgrade• Re-start of production EMMA and checks• Confirmation that production EMMA is processing messages

• Full details to be provided– Supplier involvement not anticipated much before 7th Dec go live

13

Progress Against Plan

Page 14: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

• TIBCO technical audit– Audit completed– Validation of plan through to December– Audit Report is being finalised– Briefing for CER/UR on completion

• Proof of Concept on TIBCO upgrade– On plan– May be extended to include other TIBCO components

14

Progress Against Plan

Page 15: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Capita Support Arrangements NIE/ESBN

• Normal business days and hours of work– NI based holidays– ROI and NI overlap– Emergency operational cover for central hub

infrastructure• As per existing NIE and ESBN commercial/service

arrangements

15

Page 16: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

ROI Bank / Public Holidays NI Bank / Public Holidays Christmas Day Christmas Day St Stephens Day St Stephens Day New Year’s Day New Year’s Day St Patrick’s Days St Patrick’s Day Good Friday Easter Monday Easter Monday Easter Tuesday May Day May Day Spring Holiday (last Monday in May) June Holiday (first Monday in June) July Holiday (12 & 13th July) August Holiday (first Monday in August) August Holiday (last Monday in August) October Holiday (last Monday in October)

Capita Support Arrangements NIE/ESBN

Page 17: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Capita Support Arrangements NIE/ESBN

• Support Arrangements cover– Central hub operation and maintenance– Maintenance and upgrade of TIBCO application– Supplier support for EMMA software solution– Support for a Supplier EMMA is limited to the core

EMMA application.– Additional Supplier requested support needs to be

discussed and agreed with Capita

17

Page 18: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Market Message Reconciliation Process

Reconciliation is performed each morning between SAP ISU (ESBN & NIE) and the TIBCO BusinessConnect (BC) database

1. Jobs run on ESBN & NIE SAP ISU each morning at 07.30am to produce CSV files containing total messages per message type per Supplier from 03:00am on the previous day to 02.59.59am on the current day.

2. Jobs run on the TIBCO database and reports are generated to highlight discrepancies between SAP isu and TIBCO

3. ESBN review to determine source of failures e.g. SAP pi or schema validation. Capita complete same for NIE

Page 19: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

4. Job runs each morning on TIBCO hub to create 602 reports for messages sent and received between 03:00 and 02:59.

5. Suppliers use the 602 message to reconcile against internal systems. Capita should be advised of any discrepancies.

Market Message Reconciliation Process

Page 20: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

Market Design Update – Workload Overview

CR Number Version Origin Request Description Action Requested

MCR 1114 v2.0 NI/ROIPost-Harmonisation Sundry Technical Changes to CoBL /Schema Recommendation for Approval

MCR 176 v3.0 ROI Email Address Validation Recommendation for Approval

MCR 1129 v2.0 NI/ROIPost-Harmonisation - Sundry Non-Technical Changes to CoBL Recommendation for Approval

DR 1134 v1.0 ROITo Update the RoI Retail Market Documentation Classification as RoI Specific

DR 1019 v1.0 ROICancellation of De-Energisation Service Orders for Change of Supplier with CoLE Classification as RoI Specific

CCR007 v1.0 ROI Unmetered Type - Additional Code Values Classification as RoI Specific

Recommendation for Approval

Recommendation for Approval

Classification as Jurisdiction Specific

Co-ordinated Baseline Impacting change

Non Co-Ordinated Schema/Non CoBL Impacting change

Co-ordinated Schema/Baseline Impacting change

Page 21: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

MCR1114 V2.0 - Post-Harmonisation Sundry Technical Changes to CoBL /Schema

Provides a single gathering point for a no. of small technical changes to the CoBL and Schema that arose during the course of the Harmonisation Projects

Classified as Co-ordinated Schema Impacting at meeting of 12/06/13 and approved as DR

At today’s MeetingRecommendation for Approval of MCR1114 V2

Page 22: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

MCR 176 V3.0 – Email Address Validation

MCR Classified as Co-Ordinated Schema Impacting and approved as MCR at ReMCoWG on 27/06/12

The upgrade to the CMS (to SAP ERP6) included new functionality which validates the format of email addresses. Currently there is no validation on email address formats. MPs will need to adhere to the new email address format. If the validations fail, the inbound message will be rejected with associated rejection message and code EMA.

NIE requested MCR be updated to include implementation in NI MCR updated to include impacts

At Today’s Meeting: Approval of MCR V3.0 Requested

Page 23: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

MCR1129 V2.0 - Post-Harmonisation Sundry Non Technical changes to CoBL

Provides a single gathering point for a number of non-technical changes to the Co-Ordinated Baseline, identified during the course of the Harmonisation Projects

CoBL Code Updates and MM Guides Corrections/Updates to Supplier Id Codes (NI and RoI) Removal of Gen Unit Id and Gen MPID (RoI) C001 is not listed as a valid Outcome Reason Code in ROI and not listed as possible on 131

Message Company Authorised Officer not listed in the 016 MM in the CoBL or in the ROI Customer and

Data Agreements MM Guide Unit No is incorrectly listed as char 40 long - should be 10 long Code set for Security Question shows some values are valid for ROI - Need to set all codes to

ROI Usage "NO“ The CSSN segment on the 010, 017, 101 and 105 MM is correct but misplaced. It appears to

include several data items that are, in fact, part of the top level segment.

Classified as Co-ordinated Baseline Impacting at meeting of 12/06/13 and approved as DR

At today’s Meeting Recommendation for Approval of MCR 1129 V2.0

Page 24: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

MCR1129 V2.0 - Post-Harmonisation Sundry Non Technical changes to CoBL

Action 108

MPs to consider the impact of implementation of MCR1129 ahead of Market Release 2014

Proposal to update CoBL with non technical corrections Re-issue CoBL as V2.4Update all Message Guides and re-issue as V2.4Advantage that corrections and updates are up-to-dateTarget November 2013

Approval Requested

Page 25: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

DR1134 V1.0 - To Update the RoI Retail Market Documentation

Discussion Request

This request proposes to update the RoI Retail Market Documentation (Message Guides) with some corrections

At Today’s ReMCoWG Meeting:

Classification as RoI Specific Requested

Page 26: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

DR 1019 V1.0 – Cancellation of De-Energisation Service Orders for Change of Supplier with CoLE

Discussion Request Open Service Orders delay the progress of a CoS as need to be

complete or cancelled before CoS can proceed Could result in a new customer being de-energised

unnecessarily DR proposes that ESBN manually cancel SO for de-

energisations where CoS has a CoLE (explicit or implicit) where possible

Outgoing Supplier will not need to send 017W ESBN will issue 131MM to outgoing Supplier

At Today’s Meeting: Classification as RoI Specific requested

Page 27: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

CCR007 – Additional Code Values

New Code Change Request

Additional code values for existing

Unmetered Type “SONE”

At today’s Meeting Classification as RoI specific requested

Page 28: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

DR/MCR Status List

Classification Status TotalCo-Ordinated Approved - Not Implemented 6

In Progress 2Release 2014 2

Co-Ordinated Total 10NI Specific Not Initiated 2

NI Specific Total 2RoI Specific Approved - Not Implemented 3

In Progress 3On Hold 3

RoI Specific Total 9Grand Total 21

Page 29: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDSApril 18, 2023

DR/MCR Status List

Page 30: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

ReMCoWG Action Items

Open Items as at end of last meeting

AP No. TitleOrg. Assigned

to Date Due

104Information on detail/timelines for Supplier involvement of revised workplan ESBN 12/06/2013

105

Energia to forward list of 2007 SIC Codes to NIE for Implementation of MCR1066 Energia 14/08/2013

106

MPs to consider the impact of implementation of DR1129 ahead of Market Release 2014. All MPs 14/08/2013

Page 31: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

ReMCoWG Meeting

AOB

Page 32: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

Next StepsNext ReMCoWG meeting

16th October, 2013 (Dublin)

Dates for all meetings for 2013 can be viewed on the RMDS website Calendar at:

http://www.esbextra.ie/RMDS/

Page 33: Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 14 th August, 2013 NIAUR Offices Belfast

Retail Markets Co-Ordination Design ServiceReMCoDS

Thank You

ReMCoWG Meeting