COMPANY PROFILE
2015
2/33www.hps.co.krwww.hps.co.kr
Ⅰ. General Information
Ⅱ. Our Business
Ⅲ. Pictures of Field Works
1. General Status2. History3. Plant Overhaul Performance4. Organization5. Location of Sites and Head Office6. Business Area7. License and Qualifications
1. Domestic2. Overseas3. Subsidiaries 4. Industrial Facility5. New & Renewable Energy6. Training
1. Domestic
2. Overseas
CONTENTS
3/33www.hps.co.krwww.hps.co.kr
Ⅰ. General Information
1. General Status
Company
CEO
Address
Business Field
HANKUK PLANT SERVICE CO., LTD.
Mr. Joong-Kun Park
Michelan Cherville D-5th, Jeongja-ilro 100, Bundang-gu, Seongnam-si, Gyeonggi-do, Republic of Korea
-Maintenance Businesses in Combined Cycle and Thermal Power Plants
at home and abroad ( Routine, O/H, Commissioning, Advice for O&M)
-Maintenance Businesses in Domestic Nuclear Power Plants
-Design and Construction Businesses in New & Renewable Energy
-Engineering in power plant facilities
4/33www.hps.co.krwww.hps.co.kr
1999
2003
2004
2006
2008
2009
2010
2012
2013
2013
2014
2015
2015
Founded HPS Co., Ltd. by Spinning off from KPS
Commenced Maintenance Service at Shinincheon C.C.P.P (Owned by KOSPO)
Local Partnership MOU with ALSTOM Korea Ltd.
Maintenance Contract for Busan C.C.P.P (Owned by KOSPO)
Maintenance Contract for Hadong T.P.P (Owned by KOSPO)
Technical Support MOU with Hitachi IBARAKI Science Laboratory in Japan
Maintenance Contract for Youngwol C.C.P.P (Owned by KOSPO)
Founded NG Power – HPS Limited in Nigeria
Maintenance Contract for Ulsan C.C.P.P (Owned by EWP)
Maintenance Contract for Yangju / Pocheon C.C.P.P (Owned by Private Company)
Commissioning & Maintenance for Vietnam Mong Doung1 T.P.P
Participates in take-over and O&M of FIPL 4 power plants in Rivers state, Nigeria
Qualified Maintenance Company for MHPS Power Generation facility
Ⅰ. General Information
2. History
5/33www.hps.co.krwww.hps.co.kr
Ⅰ. General Information
3. Plant Overhaul PerformanceAs of June 30.
2015
*M.I : Major Inspection, *H.G.P.I : Hot Gas Path Inspection, *C.I : Combustion Inspection
Work Scale
Gas TBNGrade A (M.I)*
Grade B (H.G.P.I) *
Grade C (C.I)*
Grade A
Grade B
Numbers of Completed Performance
8
12
9
29
2
3
5
Steam TBN
Total
Combined
Cycle
Power
Plant
BoilerGrade A
Grade B
Grade A
Grade BTBN / GEN
Thermal
Power
Plant
3
2
5
2
6
8
47
Sub-Total
Sub-Total
Sub-Total
Sub-Total
6/33www.hps.co.krwww.hps.co.kr
Ⅰ. General Information
4. Organization
CEOCEO
AdministrationDiv.
Q. A / Safety Planning & Coordination
Power Plant Business Unit Overseas & Plant
Business Div.
BusinessDevelopment
Training Institute
BusinessManagement
Auditor
Overseas Business
Plant Business
Administration(Gen. Affair / Accounting)
※ 1Unit, 2 Divisions, Q.A/Q.C, P&C, Training Institute, 12 Local Offices, R&D Center
Local site Offices(12 Offices)
7/33www.hps.co.krwww.hps.co.kr
C.C.P.PC.C.P.P
Shinincheon Office
Busan Office
Youngwol Office
Nuclear P.PNuclear P.P
Wolsong Office
Yonggwang Office
Ulchin Office
H.QH.Q
Shinincheon Office
Younggwang Office
HadongOffice
BusanOffice
Wolsong Office
Ulchin Office
YoungwolOfficeH.Q
Ⅰ. General Information
5-1. Location of Domestic sites and Headquarters
Combined Cycle Power Plant (GE / MHI)
Kyungin Office
Ulsan Office
Ulsan Office
Yangju Office
Yangju Office
Pocheon Office
Pocheon Office
Central District Office
Thermal P.PThermal P.PHadong Office
Thermal Power Plant(Coal / Oil etc.)
Kyungin Office
Central District Office
8/33www.hps.co.krwww.hps.co.kr
: Performed Project
: On-going Project
Ⅰ. General Information
5-2. Location of Overseas sites(record)
Jordan Samra Phase III GT(Simple) Commissioning2010 ~ 2011 / 288MW
Qatar Ras-Laffan IWPPCommissioning2009 ~ 2011 / 2,730MW
Vietnam Mong-Doung TPPCommissioning(Coal-fired)2013 ~ 2015 / 1,000MW
Jordan Al-Qatrana CCPPCommissioning2010 ~ 2011 / 377MW
Israel Rotem CCPPCommissioning2012 ~ 2013 / 427MW
Jordan Al-Qatrrana Overhaul Maintenance2014 / 377MW
Nigeria TSA / Rivers state(Omoku / Trans-Amadi)2009 ~ Current / 250MW
HPS Head-Quarters
9/33www.hps.co.krwww.hps.co.kr
Plant Commissioning Support and Maintenance
Energy Facility Engineering & Construction
New & Renewable Energy SystemConstruction
Routine Maintenance of Power Plant System
Scheduled Outage Maintenance
Plant Modification & Rehabilitation
Ⅰ. General Information
6. Business Area
10/33www.hps.co.krwww.hps.co.kr
◆ Quality management system ISO-9001
◆ Environment management system ISO-14001
◆ Safety-health management system KOSHA18001
◆ KOMIPO ◆ KOSEP ◆ KOSPO
◆ KOWEP ◆ KEWP ◆ KHNP
Ⅰ. General Information
7. Qualifications
11/33www.hps.co.krwww.hps.co.kr
▪ TBN / GEN / BLR
▪ Capacity : 2,000MW (500MW x 4units)
※ Service scope : Main & Aux. system
maintenance
Hadong Thermal P.P
Ⅱ. Our Business
1. Domestic◆ Thermal Power Plants
12/33www.hps.co.krwww.hps.co.kr
▪ 2 units of G/T(HRSG) + 1 unit of S/T
▪ Capacity : 450MW [150 MW(GE) х 3 units]
※Service scope : Main & Aux. system
maintenance
Busan C.C P.P
▪ 2 units of G/T(HRSG) + 1 unit of S/T
▪ Capacity : 450MW [150 MW(GE) х 3 units]
※Service scope : Main & Aux. system
maintenance
Shinincheon C.C P.P
Ⅱ. Our Business
1. Domestic◆ Combined Cycle Power Plants
13/33www.hps.co.krwww.hps.co.kr
▪ 1 unit of G/T, HRSG, S/T
▪ Capacity : 183MW(MHI) х 1 Unit
※Service scope : Main & aux. system
maintenance
Youngwol C.C.P.P
Ulsan C.C P.P
▪ 2 units of G/T(HRSG) + 1 unit of S/T
▪ Capacity : 450MW[150 MW(WH) х 3 units]
※Service scope : Main & Aux. system
maintenance
Ⅱ. Our Business
1. Domestic◆ Combined Cycle Power Plants
14/33www.hps.co.krwww.hps.co.kr
Yangju C.C P.P
Pocheon C.C P.P
▪ 2 units of G/T(HRSG) + 1 unit of S/T
▪ Capacity : 555MW
※Service scope : Main & Aux. system
maintenance
▪ 4 units of G/T(HRSG) + 2 units of S/T
▪ Capacity : 1,560MW
※Service scope : Main & Aux. system
maintenance
Ⅱ. Our Business
1. Domestic◆ Combined Cycle Power Plants
15/33www.hps.co.krwww.hps.co.kr
▪ Capacity : 1,000MW (each)
▪ Commissioning & Maintenance Service.
Commissioning Technical Service for Shin-wolsung nuclear P.PUnit #1, 2
Ⅱ. Our Business
1. Domestic◆ Nuclear Power Plants
16/33www.hps.co.krwww.hps.co.kr
▪ 2 units of GT(HRSG) + 1 unit of ST
▪ Capacity : 46.1MW
(17.3MW x 2units + 11.5MW )
※Service scope : Supervising & Maintenance
Samcheolli Kwang myungEnergy Complex
▪ 1 unit of GT(HRSG) + 1 unit of ST
▪ Capacity : 50.1MW( 29.5MW + 20.6MW )
※Service scope : Supervising & Maintenance
Busan Jung-Kwan Energy, Inc
Ⅱ. Our Business
1. Domestic◆ District Heating & Power Supply Facility
17/33www.hps.co.krwww.hps.co.kr
- Service : Commissioning & Maintenance
- Capacity : 2,730MW
• GT (MHI) : 225MW x 8 Units
• ST (MHI) : 260MW x 4 Units
Qatar Ras-Laffan C.C.P.P
Ⅱ. Our Business
2. Overseas◆ Qatar
- Service : Commissioning & Maintenance
- Capacity : 377MW
• GT (SIEMENS): 127 MW x 2 Units
• ST (SKODA): 123 MW x 1 Unit
Jordan Al-Qatrana C.C.P.P
◆ Jordan1
18/33www.hps.co.krwww.hps.co.kr
-Service : Commissioning & Operation
- Capacity : 288MW
• GT (Alstom): 144 MW x 2 Units
Jordan Samra P-III Commissioning (Simple cycle G/T P.P)
Ⅱ. Our Business
2. Overseas◆ Jordan2
19/33www.hps.co.krwww.hps.co.kr
Israel Rotem C.C.P.P
Ⅱ. Our Business
2. Overseas◆ Israel
- Service : Commissioning & Maintenance
- Capacity : 427MW
• GT (MHI) : 227MW x 1unit
• ST (MHI) : 200MW x 1unit
20/33www.hps.co.krwww.hps.co.kr
- Service : Omoku, Trans Amadi P.P
Supervising, O&M
- Capacity : 250MW
• Omoku GT(GE): 25 MW x 6 Units
• T/A GT(GE): 25 MW x 4 Units
Technical service for Nigeria G/T
Ⅱ. Our Business
2. Overseas◆ Nigeria(Since 2009 )
21/33www.hps.co.krwww.hps.co.kr
- Service : Commissioning & Maintenance
- Capacity : 1,000MW
ㆍCFBC Boiler(Foster Wheeler): 916 ton/hr x 4 Units
ㆍST(Doosan) : 500MW×2Units
Vietnam Mong Doung1 T.P.P
Ⅱ. Our Business
2. Overseas◆ Vietnam(Since 2013 )
22/33www.hps.co.krwww.hps.co.kr
- Service : Overhaul maintenance
- Capacity : 377MW
• GT (SIEMENS): 127 MW x 2 Units
• HRSG(DKME): 209 T/H(HP)+ 29 T/H(LP)
• ST (SKODA): 123 MW x 1 Unit
- Overhaul Grade : B(HGPI)
- Period : 4 months
Jordan Al-Qatrana C.C.P.P
Ⅱ. Our Business
2. Overseas◆ Overhaul Maintenance
23/33www.hps.co.krwww.hps.co.kr
Ⅱ. Our Business
3. Subsidiaries of HPS
- SPC name : KoPES(Korea Power Engineering Service Co., Ltd.)
- Partner companies : 3 companies (HPS is the largest share holder (36%))
- Purpose : Participation of private power plant operation service
- Establishment year : 2013
Domestic
◆ Status of subsidiaries
- SPV name : NG Power-HPS Ltd
- Partner company : NG Power Ltd.
- Purpose : Obtaining and performing O&M of 4 power plants from Rivers state Gov.
- Establishment year : 2012
Overseas
24/33www.hps.co.krwww.hps.co.kr
▪ Area
- Construction of Industrial Plant ,
Housing (Condominium),
Building etc.
▪ Service Scope
- Mechanical, Electrical, I&C,
Fire Fighting System
- Installation, Fabrication,
Rebuilding etc.
Ⅱ. Our Business
4. Industrial Facility
25/33www.hps.co.krwww.hps.co.kr
▪ Specialties
- Geothermal, Heat Pump System
- Solar Energy System
- Cogeneration System
- Water Heat Collection and Storage
▪ Service Scope
- Installation, Equipment Supply
and Maintenance
Ⅱ. Our Business
5. New & Renewable Energy
26/33www.hps.co.krwww.hps.co.kr
CenterCenterManagerManager
Hadong Training center
ShinincheonTraining center
- Basic Course
- Pump & Valve Maintenance
- Turbine Maintenance
- Generator Maintenance
- Electrical Equipment
Training Institute was established in 2009
On-lineTraining Program
Partnership MOU with KOSPO Training Centers
Domestic Training Courses
Overseas Training Courses
- General Course for Gas Turbine
- Specialized Course of Each Field
Ⅱ. Our Business
6. Technical Training
27/33www.hps.co.krwww.hps.co.kr
- Country : Nigeria
- Field : Power Plant O&M
- Training record
☞ After completion of courses, trainees are
working at Omoku and Trans-Amadi Power Plant
in their fields(Mech., Elec. I&C, Oper.)
- Available Training courses
· Basic : GT General, Mech. , Elec., I&C, Operation
· Intermediate : Mech., Elec., I&C, Vibration, NDT etc.
Ⅱ. Our Business
6. Technical Trainings
Trainings for Foreign Power Plant Engineers
Year 2011 2012 2013 Total
Times 3 2 1 6
Trainees 12 24 10 46
www.hps.co.krwww.hps.co.kr 28/36
Ⅲ. Pictures of Field Works
1. Domestic | Overhaul
GEN. ROTOR O/H( grade A) – HADONG
STEAM TBN O/H( grade A) – HADONG
STM TBN(LP) O/H( grade A) – HADONG
www.hps.co.krwww.hps.co.kr 29/36
Ⅲ. Pictures of Field Works
1. Domestic | Overhaul
GT GEN. INSPECTION – SHININCEHON
STM TBN. Casing Bottom O/H( grade A) – HADONG#1 CVP INSPECTION - SHININCHEON
www.hps.co.krwww.hps.co.kr 30/36
Ⅲ. Pictures of Field Works
1. Domestic | Overhaul
ST. LP Rotor O/H( grade A) – HADONG
ST. HIP TBN. O/H(grade A) – HADONG
TBN. BRG. O/H (grade A) – HADONG
www.hps.co.krwww.hps.co.kr 31/36
Ⅲ. Pictures of Field Works
2. Overseas | Qatar Ras Laffan C.C.P.P
www.hps.co.krwww.hps.co.kr 32/36
Ⅲ. Pictures of Field Works
2. Overseas | Jordan Al-Qatrana / Samra C.C.P.P
www.hps.co.krwww.hps.co.kr 33/36
Ⅲ. Pictures of Field Works
2. Overseas | Nigeria Omoku / Trans Amadi P.P.
www.hps.co.krwww.hps.co.kr 34/36
Ⅲ. Pictures of field works
2. Overseas | Israel Rotem C.C.P.P
www.hps.co.krwww.hps.co.kr 35/36
Ⅲ. Pictures of field works
2. Overseas | Vietnam Mong Doung1 T.P.P
www.hps.co.krwww.hps.co.kr 36/36
Ⅲ. Pictures of Field Work
2. Overseas | Trainings for Foreigners (Since 2011)
Thank you for visiting us !