74 m²CLASSROOM14 m²
WASH
112 m²STUDENT INFORMAL
16 m²STAFF ROOM
133 m²PREPARATION AREA
8 m²ANTE ROOM
16 m²COOL ROOM
B
COMPACTUS
DISPLAY
MB MB
FCFC
MB BSC BSC MB
BSC
SS B
372 m²LABORATORY
FR/ST FR/ST
CANOPY ABOVE
EXT. COURTYARD / STUDENT BREAKOUT
MAIN ENTRY
BS
BS
BSC
SS B
SKSKSKSK
HW
T
SKSKSS B SS B
SKSK
HWB
SAFETYSTATION
PC2 CONTAINMENT
CANOPY OVER
MB
MB
BSC
BSC
B
SK
SK
TR
FC
AUTOCLAVE ZONE
MB
DG
250
L
TR
TR TR
B
B
B
B
WA
STE
24 m²BIN ENC.
RL 18.250
1:20 WALKWAY
SERVICE YARD
GLFFH
R
B
19 m²DIRT / WASH
B
B
BSC
B
HWB
EQ
UIP
ME
NT
SAFETYSTATION
MB
DISPLAY
30 m²BAGS
SK SK SK SKDEMO DEMO DEMO DEMO
B
NEW PAVED AREA
NEW PAVED AREA
SOFT LANDSCAPING
RL 18.250
SAFTEYSTATION
SAFETYSTATION
SAFETYSTATION
B B
BENCH
B311AB304 PUMPS AND TANKS
HWB
RL 17.750
RL 18.200
RL 18.200
RL 18.200
RL 18.200 RL 18.250
RL 18.200
RL 18.200RL 18.200
FLUSH THRESHOLD
EX
HA
US
T S
TAC
KS
AB
OV
E
B
B152
UNDERGROUND WATER TANKS
3 m²EXT. WC
14 m²EXT MALE
14 m²EXT. FEMALE
EXT. SAFETYSTATION
22 m²
DANGEROUSGOODS
17 m²MEETING ROOM
13 m²UNISEX AMENITIES
5 m²UAT
2 m²STORE
2 m²CYL. ST
RL 18.250
RL 18.200
EX
ISTI
NG
PA
VIN
G
RL 18.200
NEW RAISED PAVED WALKWAY
NE
W C
LAD
DIN
G
NEW CLADDING
NE
W C
LAD
DIN
G
NEW CLADDING
EXISTING PAVING
ACOUSTIC TREATMENT TO VOID
EXISTING FOYER
NE
W E
NTR
Y/E
XIT
UP
NEW PAVED AREARL 17.750
SOUTH WING
- REMOVE EXTERNAL ACCESS TO NORTH WALL & FILL IN OPENING TO MATCH EXISTING EXTERNAL WALLS.- NEW WALL CONSTRUCTION TO PERIMETER OF STORE TO ACHIEVE 4HR FIRE RATING. PROPOSED CONSTRUCT (TBC). - NEW CEILING AND ACCESS PANELS TO ACHIEVE 3HR FIRE RATING. PROPOSED CONSTRUCT (TBC)- NEW MECHANICAL FIRE RATED EXHAUST AS REQUIRED.
FUTURE WORKS (OPTIONAL):- REMOVE EXISTING FLOOR FINISH.- CUT EXISTING CONCRETE SLAB TO ALLOW FOR DRY SUMP.- NEW TOPPING TO EXISTING SLAB FALLING TOWARDS DRY SUMP - COMPLETE WITH FORMED UP BUND TO PERIMETER OF ROOM.- NEW WALL CONSTRUCTION TO REDUCE AREA TO DANGEROUS GOODS STORE TO SEPARATE SAFETY STATION FOR COMPLIANCE.
DANGEROUS GOODS STORE
- REMOVE EXISTING FLOOR FINISH.- CUT EXTENT OF EXISTING SLAB FOR NEW SERVICE & WASTE LAYOUT.- NEW FLOOR TILES GRADED TOWARDS FLOOR WASTES.- REPLACE EXISTING OPENING GLAZING WITH FROSTED GLASS TO ALL OPENINGS.- DEMOLISH EXISTING ENTRY DOOR. FILL IN TO MATCH EXISTING WALLS.- DEMOLISH EXISTING EAST WALL FOR NEW ENTRY TO AMENITIES.- NEW FULL HEIGHT WALL CONSTRUCTION (RW48) TO ENCLOSE UAT COMPLETE WITH FULL HEIGHT TILING.- NEW PARTITIONING TO ENCLOSE AMBULANT CUBICLES.- FULL HEIGHT WALL TILING TO EXISTING WALLS THROUGHOUT.- NEW FIXTURES AND FITTINGS- NEW CEILING AND ACCESS PANELS AS REQUIRED. 2700MM HEIGHT.- NEW MECHANICAL EXHAUST/FRESH AIR AS REQUIRED.- NEW POWER & LIGHTING FIT OUT AS REQUIRED- NEW STATUTORY AND WAY FINDING SIGNAGE
UNISEX AMBULANT & UAT AMENITIES
- REMOVE EXISTING FLOOR FINISH - TBC.- NEW CARPET FINISH AS REQUIRED.- PAINT FINISH TO EXISTING WALLS & CEILING.- INSTALL ACOUSTIC PANELS TO WALL SURFACE AS REQUIRED.- REPLACE EXISTING OPENING GLAZING WITH FROSTED GLASS.- NEW AV FIT OUT AS PER CURTIN STANDARDS.- UPGRADE/ NEW TO MECHANICAL SERVICE AS REQUIRED.- UPGRADE/ NEW POWER, LIGHTING AS REQUIRED.- NEW WAY FINDING SIGNAGE.
MEETING ROOM
- REDUCED AREA AS A RESULT OF REMOVING THE CENTRAL WET STATION
TEACHING LAB
- ALL OTHER AREAS PROPOSED FOR THE NEW LABORATORY TO REMAIN AS PER THE SCHEMATIC DESIGN ISSUED ON 5TH MAY 2017
GENERAL
NORTH WING
- AV FITOUT BRIEF UPDATED TO CURTIN MEETING ROOM STANDARDS -REDUCE SCOPE
CLASSROOM
REVISED EXTENT OF WORKS
NORTH
© COPYRIGHTUNLESS OTHERWISE AGREED, THIS DRAWING AND THE INTELLECTUAL PROPERTY CONTAINED HEREIN REMAINS THE PROPERTY OF DONALDSON + WARN ARCHITECTS.
Dwg No:Job No:
Scale:
Donaldson + Warn346 William Street, PerthWestern Australia 6000
T 08 9328 4475 F 08 9227 [email protected]@ A1
01/06/17
Asindicated
-FBUILDING B311PC2 LABORATORY
FLOOR PLAN GROUND LEVELA2111703
CURTIN UNIVERSITY
LEGENDB BENCHBS BAG STOREBSC BIO SAFETY CABINETDG DANGEROUS GOODSFR FRIDGEFRZ FREEZERGLF GLASS FULL HEIGHTGLW GLASS WINDOWGW GLASS WASHERHWT HAND WASH TROUGHHWB HAND WASH BASININC INCUBATORMB MOBILE BENCHSB STAINING BENCHSK SINKTR TROLLEY
1 : 1001 : 200 @ A3
201 203
206207 208
V201
C202
C203
210
211 212 213 214 215
C204A
216218
217
219
L201
C204
222223224225226227228229230
202
P202
E201
D20
1
F201
P203
P201
V202
P204
P205
P206
P207
23 m²COMMS ROOM
MECH PLANT
BOX GUTTER
2°2°
2°
GU
TTER
ME
SH
RO
OF
EXH
AU
ST
EXISTING ROOF
EXISTING ROOF
EXISTING PLANT DECK
EXISTING GLASS HOUSE
EXISTING PARAPET
SOUTH WING
- DEMOLISH WALL BETWEEN PROPOSED COMMS ROOM & ROOM 206.- MAKE GOOD/REPLACE FLOOR FINISH TO ROOM 206.- MAKE GOD TO EXISTING WALLS & CEILING TO ROOM 206.- CONSTRUCT NEW FULL HEIGHT WALL BETWEEN PROPOSED COMMS & EXISTING ROOM 206 ROOMS - RW 48 ACOUSTIC RATING.- ALLOW FOR NEW RACKS AS PER CURTIN STANDARDS. 2No. COMMS & AV RACKS AND 1No. SPARE RACK.- ALLOW FOR EXTENT OF SERVICE TO CONNECT PROPOSED GROUND FLOOR WORKS I.E. FLOOR/WALL PENETRATIONS, CABLE TRAYS, ACOUSTIC/FIRE SEPARATION ETC.- NEW MECHANICAL WORKS TO SERVICE NEW COMMS ROOM AS REQUIRED.
COMMS ROOM & ROOM 206
- REDUCED ROOF & CANOPY AREA AS A RESULT OF REMOVING THE CENTRAL WET STATION.
MAIN ROOF
- ALL OTHER AREAS PROPOSED FOR THE NEW LABORATORY TO REMAIN AS PER THE SCHEMATIC DESIGN ISSUED ON 5TH MAY 2017
GENERAL
NORTH WING
REVISED EXTENT OF WORKS
- ALLOW FOR EXTENT OF WORKS TO SERVICE DANGEROUS GOODS STORE BELOW I.E FLOOR/WALL PENETRATIONS, DUCTS ETC SERVICE CONSULTANTS TO CONFIRM EXTENT IF REQUIRED.
ROOM 215
BIN ENCLOSURE- ALLOW FOR MESH ROOFING TO PART OF THE BIN ENCLOSURE AS SHOWN.EXTENT OF MESH AREA TO BE CONFIRMED.
NORTH
© COPYRIGHTUNLESS OTHERWISE AGREED, THIS DRAWING AND THE INTELLECTUAL PROPERTY CONTAINED HEREIN REMAINS THE PROPERTY OF DONALDSON + WARN ARCHITECTS.
Dwg No:Job No:
Scale:
Donaldson + Warn346 William Street, PerthWestern Australia 6000
T 08 9328 4475 F 08 9227 [email protected]@ A1
31/05/2017
Asindicated
-FBUILDING B311PC2 LABORATORY
LEVEL 01 FLOOR PLANA2121703
CURTIN UNIVERSITY 1 : 1001 : 200 @ A3
B152
B304
B302
B301
B303
B311AB304 PUMPSAND TANKS
NORTH
© COPYRIGHTUNLESS OTHERWISE AGREED, THIS DRAWING AND THEINTELLECCTUUAL PROOPERTY COCONTAINED HEREIN REMAINSS THE PROPERTY OF DONALDSON + WARN ARCHITECTS.
Dwg No:Job No:
Scale:
Donaldson + Warn346 William Street, PerthWestern Australia 6000
T 08 9328 4475 F 08 9227 6558admin@donaldsonandwarn.com.auwww.dodonaaldsodsonaanddwaarn.cocom.auau@ A1
05/05/2017
1 : 200-B-B
BUILDING B311PC2 LABORATORY
MASTERPLANA121
CURTIN UNIVERSITY
CURTIN B311 FLEXILAB - LANDSCAPE
EXTENT OF HARD AND SOFT LANDSCAPING
EXTENT OF HARD LANDSCAPING
Technical Room Data Sheets
B311 PC2 LABORATORY - EQUIPMENT LIST FOR COMMENT
1/02/2017B311 LABORATORY
CURTIN UNIVERSITY0.2
draft
Issue DateVersion number
Room NameRef RDSStudent Informal Area Student Informal Area102Bag Room Bagstore104Handwash Handwash105Staff Area Staff Area106Collaborative Classroom Teaching Laboratory: Collaborative
Classroom107
PC2 Laboratory Teaching Laboratory: Wet PC2108Prep Store Room Technical: Prep Store109Preparation Area Preparation: Wet PC2 Work Zones110Cold Room Constant Temp: Cold111Warm Room Constant Temp: Warm112Flammable Store Technical: Flammable Store113Bin Enclosure Waste Storage114Gas Store Gas Storage115
Room ListRDS List
Teaching Laboratory: Collaborative ClassroomTeaching Laboratory: Wet PC2Preparation: Wet PC2 Work ZonesTechnical: Prep StoreTechnical: Flammable StoreConstant Temp: ColdConstant Temp: WarmHandwashStudent Informal AreaStaff AreaBagstoreWaste StorageGas Storage
001002003004005006007008009010011012013
0.10.10.10.10.10.10.10.20.10.1
Room NameRef RDSRDS Ref RDS Rev
To date, Extensive Stakeholder Consulations were convened by ARINA for;
Design Working User Group (DWUG) - 6 meetings,
Kitchen Cabinet Meetings (KCG) - 6meetings,
From these meetings technical requirements such as equipment, unit timetabling, and class size ratios were developed. These meetings have been minuted and functional planning diagrams, equipment lists, and draft timetable models were circulated for discussion andincorporation into the brief.
These documents have formed the basis for the Technical Rooms Data Sheets as listed on the page and detailing in the following.
Each Data sheet represents a list of similar styled rooms. The RDSs also show indicative planning diagrams and a list of preliminary equipment and fixtures, sorted by its installation code (Group 1; Supply and Install by the Contractor, Group 2; Supply by the Client and Install bythe Contractor, Group 3; Supply and Install by the Client.
Methodology
1/02/2017: Page 1 of 33Prepared by ARINA Hayball B311 LaboratoryB311 Pc2 Laboratory - Equipment List
Blank
Prepared by ARINA HayballTeaching Laboratory: Collaborative Classroom 1/02/2017: Page 2 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: 22±ºC
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
PC2 Lab AC
HYDRAULIC
DimmingNormal
LIGHTING
Power and data reticulation from floor and wall. On perimeter glazed walls, minimise brackets and other attachments for required AV/ITservices.
Cold water to staining sinksRO water in perimeter sinksH+C water in perimeter sinks and handwashSubject to activity undertaken in this room, travel to Safety shower can be via PC2 laboratory.
to code
TELEPHONE AND DATA
High AV and IT fitout to Collaborative Classroom to include display monitors and computer monitors to student table.
Nominal 1800W comms cabinet to Curtin CITS requirements.
None
RELATIONSHIPS AND GENERAL DESCRIPTION
Adjacent to PC2 lab and handwash.Within PC2 zone
LAB SERVICES None
Curtin University
At minimum, capacity of 36 seats in groups between 6-9P
WINDOWS User openable: Yes
Internal Glazing: BlindsDesirable
Convertible PC2 and PC1 Small Teaching Room adjacent to the PC2 Laboratory.
AV and IT rich teaching room.
ARCHITECTURAL
Ceiling
Wall (allor low)
Acoustic control Architect selection Cleanable
Architect selectionScrubbable surface
<no values defined>Height
Floor
<no values defined>Skirt
TEACHING LABORATORY: COLLABORATIVECLASSROOM
B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY AUDIO VISUALInstructor Master ControlsInteractive Whiteboard
LED ScreensStandard AV speakers
Data, WiFi sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching: Gp
StoolsStudent Tables
Loose
Student benches (fixed)Wall unit to hold staff AV control devices
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:
Wall(high)
YesRequire:Within the restrictions of Laboratory finishes detail to provide a good acoustic environment to encourage the AV module separation
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
Architect selectionScrubbable surface
LEGEND: Empty square indicates not applicable or none
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Arch SelectionLaboratory GradeNon Slip
Non Staining to chemicals and diesResilient and scrubbableResistant to intermittent flooding
Wet Cleanable
REF # 001 REF # 001
Avoid abuttment of furniture to north wall to maintain consistency ofnorth facade for showcase. Provide student group ratio of 8P
(See also room list on next page for detailed equipment list.)
107 Collaborative Classroom
1000w clear min1200w clear min
to code Hold OpenProximity
Acoustic sealsAuto Glass SlidingGlazed Swing
to codeEgressGeneral access
Door location Door type Clear width Hardware Locking
Nth Glazing to have appropriate sun shading control but external to the laboratory. Glazing to the Nth Wall to betransparent and non cluttered for showcase of laboratory to public space.
Primary doors to be autosliding glass with card reader activation.
450x600h pinboardA4 paper document holderCertifying Notices (if applicable)CorrosiveEnclosed footwearEnclosed Footwear (Yes/No sliding panel)Flammable Gas
Flammable LiquidLab coats (Yes/No sliding panel)No drinkNo FoodNon flammable/Non Toxic GasRoom Name/NumberSafety Glasses (Yes/No sliding panel)
to CodeToxinType of room
Auto Glass SlidingGlazed Swing
to codeEgressGeneral access
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballTeaching Laboratory: Collaborative Classroom 1/02/2017: Page 3 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
TEACHING LABORATORY: COLLABORATIVE CLASSROOM CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Teaching Laboratory: Collaborative Classroom 1 room(s) of this type total UFA: 75.5 sq mREF # 001 REF # 001
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
107Collaborative Classroom
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
COLLABORATIVE CLASSROOM 107GROUP 1 COLLABORATIVE CLASSROOM
Joinery Custom 240$Moveable Student benches with power nomes plus power for AV
31/1/20174:20:30 pm
Bench ?578 GPO10off ?
Joinery Custom 240$Cantilevered Side wall bench with store under (25% drawers, 25% cupboard 50% trolley space)
31/1/20174:20:09 pm
Bench ?623 GPO10off ?
Blank
Prepared by ARINA HayballTeaching Laboratory: Wet PC2 1/02/2017: Page 4 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: 22±ºC
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
Lab AC
HYDRAULIC
Refer to equipment schedule for Fume Cupboard qty.
Refer to equipment schedule for biohazard hood qty.
Fume Cupd discharge to acceptable clearances from activities on roof.
MotionDimmingLab Grade
LIGHTING
Cold water to staining sinksRO water in perimeter sinksH+C water in perimeter sinks and handwashProvide staining sinks in qty matching plans.
to code
TELEPHONE AND DATA
Data and AV to Instructor Stations and Master Control.
3 x AV Screens per 36P. (2 forward one back facing)
Cold WaterHot Water
RO (type 2)Safety Shower
Staining Sinks
RELATIONSHIPS AND GENERAL DESCRIPTION
DIRECT: Collaborative Classroom, Preparation, Handwash
LAB SERVICES NatG
Curtin University
up to 96 Students
WINDOWS User openable: Yes
Internal Glazing: BlindsDesirable
PC2 grade teaching laboratory, convertible into PC1.Cleanable space without nooks and crannies. The spaces will be detailed as a PC2 with penetrations sealed and any abutting surfaceseither easily removable or fully sealed. where sealing is not appropriate then separate the fixtures or items by distance that is practical toclean.All built-in joinery on coved plinth.Glazing to the Nth Wall to be transparent and non cluttered for showcase of laboratory to public space, avoid permanent equipmentfixings on Nth Wall.
ARCHITECTURAL
Ceiling
Wall (allor low)
Acoustic control Architect selection Cleanable
Architect selectionScrubbable surface
<no values defined>Height
Floor
<no values defined>Skirt
TEACHING LABORATORY: WET PC2 B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Provide natural gas outlet to each student position (1000 ctrs)
Type: dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY
AUDIO VISUAL
Typical hearing cluster 32 person group.
Directional AV SpeakersInstructor Desk
Instructor Master ControlsLED Screens
Data, WiFi sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching: Gp
First Aid
2L benchtop waste binGown Collection Bin
StoolsTrolleys with height to match the Student benches
Fixed
Loose
Perimeter benches (see equipment list)student bench 900mm H
Student benches (fixed)Wall unit to hold staff AV control devices
AV wall unit for headset and handheld mics ipad inc power and space for chargers, Controller shelf to include for Charging. Headset micto hang and not touch surfaces.All benches at a wall to have a small coved upturn at rear for cleaning and spill containment. Bench colour dark to allow for stainidentification.
Student benches in group clusters of 8. Demonstrator to ratio of 16.Instructor bench to ratio of 32. Benches 900AFL and without edge leg supports (cantilever). Fold-down section in the middle. Provideglass screens to staining sinks and infill panels for unused sinks.Perimeter bench heights to allow trolleys to fit under.
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:
Wall(high)
Glass behind benches to have an obscuring frit pattern behind thebench which transitions to none just above bench height..
YesRequire:ExternalShadingControls
Within the restrictions of Laboratory finishes detail to provide a good acoustic environment to encourage the AV module separationAV Directional speakers to group clusters of 32.
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
Architect selectionScrubbable surface
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Arch SelectionLaboratory GradeNon Slip
Non Staining to chemicals and diesResilient and scrubbableResistant to intermittent flooding
Wet Cleanable
REF # 002 REF # 002
(See also room list on next page for detailed equipment list.)
108 PC2 Laboratory
1000w clear min1200w clear min
to code Hold OpenProximity
to codeAcoustic sealsAuto Glass SlidingGlazed Swing
to codeEgressGeneral access
Staff accessDoor location Door type Clear width Hardware Locking
Nth Glazing to have appropriate sun shading control but external to the laboratory.
Primary doors to be autosliding glass with card reader activation.Provide 2 x exit doors to complying widths in consultation with Curtin Health and Safety
1000w clear min1200w clear min
to code Hold OpenProximity
to codeAcoustic sealsAuto Glass SlidingGlazed Swing
to codeEgressGeneral access
Staff access
450x600h pinboardA4 paper document holderCertifying Notices (if applicable)CorrosiveEnclosed footwear
Flammable LiquidLab coats (Yes/No sliding panel)No drinkNo FoodNon flammable/Non Toxic Gas
to CodeToxinType of room
1000w clear min1200w clear min
to code Hold OpenProximity
to codeAuto Glass SlidingGlazed Swing
to codeEgressGeneral access
Staff access
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballTeaching Laboratory: Wet PC2 1/02/2017: Page 5 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
TEACHING LABORATORY: WET PC2 CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Teaching Laboratory: Wet PC2 1 room(s) of this type total UFA: 336.8 sq mREF # 002 REF # 002
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
108PC2 Laboratory
Flammable Gas Safety Glasses (Yes/No sliding panel)Eq
uipm
ent I
D
POW
ERTY
PE
DATA
kW
PC2 LABORATORY 108GROUP 1 PC2 LABORATORY
Fume Cupboard 1800W Model 2 1.80m 0.75m 1.50m Y 30/01/20176:52:26 PM
Floor ?537 GPO ?
Biohazard Hoods ClydeAPAC BHA180 2 1.95m 0.77m 1.50m NatG 31/01/20177:05:47 PM
Floor ?596 GPO ?
Laminar Flow Cabinet 1800W Model 2 1.80m 0.75m 1.50m 30/01/20177:11:30 PM
Floor ?610 GPO ?
Student Bench Custom 1.40m 8.35m 0.90m NatG 240$Centre supported lab bench (no edge legs) with 900w drop down section to provide flexibility of use. 16 gaspoints on benchtop. 1 double GPO perstudent on pedestal. 300sq shelf ontop of pedestal. 1 pedestal per four students.
31/1/20174:37:34 pm
Floor ?624 GPO ?
Prepared by ARINA HayballTeaching Laboratory: Wet PC2 1/02/2017: Page 6 of 33B311 Pc2 Laboratory - Equipment List
Underbench mobile Custom 0.35m 0.34m 0.85m 240$Rollout for storage and a surface for note taking. Two separate compartment for microscopes and separate transparent doors. Ensure stability of use.
31/1/20174:37:45 pm
Floor ?625 ?
Wall bench Custom 0.35m 0.34m 0.95m 240$Cantilevered Bench for equipment. Reticulate on wall or if glazing behind use pedestals. allow 1 double GPO per 1.2m. 2 data points each 3.0mCoved rear spashback upturn. Underbench: 25% drawers 25% cupboards 50% open (for trolley). Height to suit trolley
31/1/20174:38:40 pm
Floor ?626 GPO ?
GROUP 3 PC2 LABORATORY
Water baths Lauda AL25 24 0.53m 0.34m 0.36m 22/12/201610:38:08 AM
Bench ?349 GPO ?
Balances BEL M254Ai 6 0.20m 0.32m 0.33m4 dec place
30/01/20177:02:35 PM
Mobile ?513 GPO ?
Balances AND FS-30KB 8 0.31m 0.37m 0.43m1 dec place
30/01/20177:02:20 PM
Mobile ?514 GPO ?
Busen burner and insulated slab MET-APP 96 0.22m 0.23m 0.14m NatG 30/01/20177:02:14 PM
Mobile ?522 ?
Camera + tripod, connected to AV Canon HD CMOS PRO 1 0.37m 0.38m 0.57m 22/12/201610:37:17 AM
Bench ?523 GPO ?
Centrifuge Clements Orbital 400 4 0.45m 0.48m 0.31m 22/12/201610:37:12 AM
Bench ?525 GPO ?
Compound Microscope Olympus CX23 96 0.20m 0.26m 0.38m 30/01/20177:02:08 PM
Mobile ?529 GPO ?
Demonstration Microscope Olympus CX41 20 0.20m 0.40m 0.45m 30/01/20176:51:28 PM
Bench ?531 GPO ?
Dissecting Microscope Nikon C-DS 96 0.20m 0.24m 0.40m 22/12/201611:30:55 AM
Mobile ?532 GPO ?
GelDoc Fisher Biotec 2 0.45m 0.49m 0.80m 22/12/20164:37:46 PM
Bench ?540 GPO ?
Incubator (15-30 degree C) Thermoline TRIL-200-DL, 5-45 degs 2 0.55m 0.65m 1.63m~1500H Model REquested
30/01/20176:55:14 PM
Floor ?543 GPO ?
Microcentrifuge Eppendorf Centrifuge 5424 8 0.24m 0.32m 0.23m 30/01/20177:12:27 PM
Mobile ?546 GPO ?
Microcentrifuge Sigma 1-14 10 0.22m 0.25m 0.15m 22/12/20164:37:54 PM
Mobile ?547 GPO ?
Microplate reader Multiscan FC (Thermo) 2 0.29m 0.40m 0.22m 20/12/20164:02:15 PM
Bench ?548 GPO ?
Microscope with Camera for Projection Olympus BX41, Canon Legria HF S21 1 0.30m 0.50m 0.73m 22/12/20164:37:55 PM
Bench ?549 GPO ?
Microwave oven Panasonic 3 0.60m 0.41m 0.35m 22/12/20164:39:36 PM
Bench ?550 GPO ?
Orbital Shaker Bio-line 4 0.40m 0.34m 0.36m 20/12/20164:02:15 PM
Bench ?553 GPO ?
PCR machine Bio-Rad 6 0.25m 0.46m 0.24m 22/12/201610:37:40 AM
Bench ?556 GPO ?
Phase Contract Microscope Olympus BX41 4 0.30m 0.50m 0.45m 22/12/201610:37:42 AM
Bench ?557 GPO ?
Transilluminator (Gel Doc System) Biorad EZ Gel Doc System 2 0.43m 0.28m 0.38m 22/12/201610:37:50 AM
Bench ?561 GPO ?
UV-vis spectrophotometer Shimadzu UVmini-1240 15 0.42m 0.38m 0.28m 22/12/201611:49:33 AM
Bench ?563 GPO ?
Balances KERN PCB 350-3 4 0.16m 0.25m 0.11m3 decimal place
30/01/20177:02:19 PM
Mobile ?597 GPO ?
Balances Shimadzi TX3202L 96 0.20m 0.28m 0.08m 30/01/20177:02:17 PM
Mobile ?598 GPO ?
Blender Breville CG-2 4 30/01/20177:02:16 PM
Mobile ?599 GPO ?
Bunsen Burner Portable Integra (Fireboy ECO) 20 30/01/20177:02:12 PM
Mobile ?600 ?
Calibration Weights 4 30/01/20177:02:10 PM
Mobile ?601 ?
Cell Differential Counter 48 30/01/20177:03:03 PM
Mobile ?602 GPO ?
Demonstration Microscope - W/AV +Tablet Screen
Olympus CX41 4 0.20m 0.40m 0.45m 30/01/20177:04:13 PM
Bench ?603 GPO ?
Digital Venier Calipers 96 30/01/20177:04:53 PM
Mobile ?604 ?
Electrophoresis Gel Tank Fisher Biotec 24 0.18m 0.28m 0.09m 30/01/20177:05:29 PM
Mobile ?605 ?
Prepared by ARINA HayballTeaching Laboratory: Wet PC2 1/02/2017: Page 7 of 33B311 Pc2 Laboratory - Equipment List
Electrophoresis power pack Fisher Biotec 10 0.22m 0.24m 0.10m 31/1/20174:48:06 pm
?606 ?
Gel Tanks Bio-Rad 10 30/01/20177:07:03 PM
Mobile ?607 ?
Hot Plate IEC2090.001 15 0.18m 0.20m 0.13m 30/01/20177:08:01 PM
Mobile ?608 ?
Kettle - Electric 4 30/01/20177:10:40 PM
Mobile ?609 ?
Lamp (IKEA) IKEA 48 30/01/20177:12:04 PM
Mobile ?611 GPO ?
Micropipettes Nichipet EX Invitro, 1000ul 50 30/01/20177:13:56 PM
Mobile ?612 GPO ?
Micropipettes Nichipet EX Invitro, 100ul 50 30/01/20177:14:05 PM
Mobile ?613 GPO ?
Nanodrop Scientific thermofisher 3 0.20m 0.32m 0.34m 30/01/20177:14:43 PM
Mobile ?614 ?
Power Pack Bio-Rad 10 30/01/20177:15:07 PM
Mobile ?615 ?
Pumpette (pipette) Acumax PipetteHelp 100 0.07m 0.20m 0.20m 31/1/20174:48:08 pm
Mobile ?616 GPO ?
Venier Calipers - analogue 48 30/01/20177:16:33 PM
Mobile ?617 ?
Venier Calipers - digital 48 30/01/20177:16:53 PM
Mobile ?618 ?
Vortex Mixer ZX3 Advanced Vortex Mix 20 0.16m 0.17m 0.10m 30/01/20177:19:44 PM
Mobile ?619 GPO ?
Blank
Prepared by ARINA HayballPreparation: Wet PC2 Work Zones 1/02/2017: Page 8 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: 22±ºC
ACOUSTIC
B311 LABORATORY
DDA Hearing Augmentation
SECURITYOpen door alarms
Yes
SAFETY SERVICES AND DETECTION
POWER
PC2 Lab AC
HYDRAULIC
Fume Cupboard. Refer to Equipment Schedule to QTY.
Safety Cabinets - Refer to Equipment Schedule
Lab GradeLIGHTING
Reticulated 240v 10A power with 15A and 3 phase to suit installed equipment
No Safety Shower Floor wastes.Nominal 15m max travel to safety shower.
to code
TELEPHONE AND DATA
Telephony at wet workstation
Phone Line for emergency response, to Curtin Security and Health & Safety requirements.
H+CRO (Type 2)
Safety ShowerSink
RELATIONSHIPS AND GENERAL DESCRIPTION
DIRECT: PC2/PC1 Laboratory, Bags and Handwash.Within PC2 zone
LAB SERVICES CAir NatG RO Water
Curtin University
Staff access only. 8 wet workstations with 2 position available in Biohaz hoods
WINDOWS User openable: Yes
Internal Glazing: BlindsYes
Space for technicians to prepare laboratory experiments.PC2 labs within the PC2 zone to be compartmentalised with wall to Underside of slab. Entry via PC2/PC1 Teaching Laboratory andrestricted entry via Student Informal Area.
ARCHITECTURAL
Ceiling
Wall (allor low)
Acoustic control Architect selection Cleanable
Architect selectionScrubbable surface
?Height
Floor
Coved integral to floorSkirt
PREPARATION: WET PC2 WORK ZONES B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Provide gases to workstation benches. one outlet per person.Provide Compressed Air Tap - 1 outletProvide Nominated gas to relevant equipment identified in equipment list.Provide RO Water outlet, 1 Tap.
Type: dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY
AUDIO VISUAL
Phone, WiFi, Data, Intercom sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching:
Drying racks over sink
900x900 whiteboardDrying racks
First AidHand towel
Soap dispenser (over HB)Spill Kit (wall)
FixedAdjustable wall shelvingLab Grade non staining benchtops
Lab laminate ShelvingOver workstation shelving
Powdercoat metal framed benches
All benches at a wall to have a small coved upturn at rear for cleaning and spill containment. Bench colour dark to allow for stainidentification.
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:
Fixed
Wall(high)
DesirableRequire:Within the restrictions of Laboratory finish detail to provide a good acoustic environment
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
TempFail
Door
Architect selectionScrubbable surface
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Arch SelectionLaboratory GradeNon Slip
Non Staining to chemicals and diesResilient and scrubbableResistant to intermittent flooding
Wet Cleanable
REF # 003 REF # 003
(See also room list on next page for detailed equipment list.)
110 Preparation Area
1000w clear min Proximityair pressure sensorHold Open
Glass Auto SlidingConnecting doorExternal
General accessStaff access
Door location Door type Clear width Hardware Locking
Where possible retain existing windows. Provide glazing into the lab including goor and side panel
Primary doors to be autosliding glass with card reader activation.Doors to be hands free activated. Replacement Door to external area to have monitoring for air pressure change.
1000w clear min ProximityGlass Auto SlidingConnecting doorExternal
General accessStaff access
Authorised AccessCertifying Notices (if applicable)CorrosiveEnclosed footwearFlammable GasFlammable LiquidLab coats
Room Name/Numberto CodeToxinType of room
1000w clear min Proximity
air pressure sensorHold Open
Glass Auto SlidingConnecting doorExternal
General accessStaff access
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballPreparation: Wet PC2 Work Zones 1/02/2017: Page 9 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
PREPARATION: WET PC2 WORK ZONES CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Preparation: Wet PC2 Work Zones 1 room(s) of this type total UFA: 87.7 sq mREF # 003 REF # 003
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
110Preparation Area
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
PREPARATION AREA 110GROUP 1 PREPARATION AREA
Fume Cupboard 1800W Model 1 1.80m 0.75m 1.50m Y 30/01/20174:10:38 PM
Floor ?001 GPO ?
RO Store and polishing unit 60L 1 0.75m 0.60m 0.71m C, ROMilli Q or similar
22/12/201610:57:58 AM
Floor ?131 GPO ?
Glasswasher Miele PG 8593 + UG 30-60/60-85 2 0.60m 0.60m 0.84m RO, Cunderbench Model, RO water to client consideration
22/12/201610:58:25 AM
Floor ?499 GPO ?
Dangerous Goods Cabinet - S4 drug UB Model - 30L 1 0.52m 0.47m 0.70m 1/02/20179:57:51 AM
Floor ?504 ?
Dangerous Goods Cabinet - Corrosives UB Model - 40L 3 0.60m 0.47m 0.77m 1/02/20179:56:04 AM
Floor ?505 ?
Prepared by ARINA HayballPreparation: Wet PC2 Work Zones 1/02/2017: Page 10 of 33B311 Pc2 Laboratory - Equipment List
Biohazard hoods ClydeAPAC BHA120 1 1.51m 0.77m 1.50m NatG 31/01/20177:05:49 PM
Floor ?508 GPO ?
Biohazard Cabinet ClydeAPAC BHA180 1 1.95m 0.77m 1.50m 31/01/20177:06:06 PM
Floor ?509 GPO ?
Dangerous Goods Cabinet - Flammable 250L Model 1 1.10m 0.47m 1.76m Duct 1/2/20179:15:02 am
Floor ?526 ?
Biohazard Hoods ClydeAPAC BHA180 1 1.95m 0.77m 1.50m NatG 31/01/20177:14:52 PM
Floor ?632 GPO ?
GROUP 2 PREPARATION AREA
Ice machine Hozhizaki FM-170AKE+B301SA 1 0.56m 0.82m 1.80m 1.00kW5.8A / 19Astart
CUser Group to confirm requirement
30/01/20176:34:54 PM
Floor ?107 GPO ?
Glass Drying Oven 1 0.77m 0.40m 1.04m 400$Relocate from Existing (Room 105)
30/01/20175:54:21 PM
Floor ?066 GPO ?
Autoclave (Steriliser) 1 0.59m 0.90m 1.70mExisting (Room 112) - retain and reinstall in new prep room.
22/12/201610:56:41 AM
Floor ?567 GPO ?
GROUP 3 PREPARATION AREA
Vortex mixers Ratek VM1 2 0.13m 0.15m 0.15m 20/12/20164:12:10 PM
Bench ?165 GPO ?
Hotplate IEC 2090.001 1 0.18m 0.20m 0.13m 1.00kW5.8A / 19Astart
22/12/201610:55:36 AM
Floor ?023 GPO ?
Microwave Oven Panasonic 1 0.60m 0.41m 0.36m 22/12/201610:55:04 AM
Bench ?170 GPO ?
Incubator (15-30 deg) Thermoline Science (refrigerator incubator) 1 0.95m 0.70m 0.60m 22/12/201610:54:13 AM
Bench ?148 GPO ?
Phase Contrast Microscope Olympus BX41 1 0.30m 0.50m 0.45m 20/12/20164:12:10 PM
Bench ?303 GPO ?
Vortex mixers ZX3 Advanced vortex mix 1 0.16m 0.17m 0.10m 20/12/20164:12:10 PM
Bench ?347 GPO ?
Water baths Lauda AL25 2 0.53m 0.34m 0.36m 20/12/20164:12:10 PM
Bench ?348 GPO ?
Electrophoresis power pack Fisher Biotec 1 0.22m 0.24m 0.10m 20/12/20164:12:10 PM
Bench ?500 GPO ?
Electrophoresis gel tank Fisher Biotec 1 0.18m 0.28m 0.90m 20/12/20164:12:10 PM
Bench ?501 GPO ?
Dissecting Microscope Nikon C-DS 2 0.20m 0.24m 0.40m 20/12/20164:12:10 PM
Bench ?502 GPO ?
Compound Microscope Olympus CH20 2 0.24m 0.32m 0.45m 30/01/20175:53:55 PM
Bench ?503 GPO ?
Busen burner and insulated slab MET-APP 2 0.22m 0.23m 0.14m NatG 20/12/20164:12:10 PM
Bench ?506 ?
Bunsen Burner Integra (Fireboy ECO) 2 NatGportable model
22/12/201610:56:47 AM
Bench ?507 ?
Balances Shimadzu TX3202L 2 0.22m 0.28m 0.08m2 dec place
22/12/201610:56:48 AM
Bench ?510 GPO ?
Balances BEL M254Ai 1 0.20m 0.32m 0.33m4 dec place
30/01/20176:27:05 PM
Bench ?511 GPO ?
Balances Ohaus Pioneer Series PA212C 1 0.20m 0.32m 0.29manalytical
22/12/201610:56:54 AM
Bench ?512 GPO ?
centrifuge Orbital 400 1 0.46m 0.48m 0.32m 30/01/20174:05:48 PM
Floor ?569 GPO ?
PCR Machine Bio-Rad 1 0.25m 0.46m 0.24m 20/12/20164:12:10 PM
?572 GPO ?
Freezer (-20C) Skope VF1500 3 Door 1 1.71m 0.71m 2.20m1500L Capacityhttp://www.skope.com.au/refrigeration/chillers-and-freezers/display/top-mount/vf1500-3-door-ice-freezer/flypage-skope-refrig.tpl/
30/01/20175:55:55 PM
Floor ?573 Backup ?
Aquarium Pumps 18 30/01/20175:51:15 PM
Storage ?584 ?
Calibration Weights 2 30/01/20175:51:50 PM
Storage ?585 ?
CO2 Q Box John Morris 10 30/01/20175:53:57 PM
Storage ?586 ?
Compound Microscope Nikon Eclipse E100 1 0.24m 0.24m 0.38m 30/01/20175:54:10 PM
Storage ?587 GPO ?
Prepared by ARINA HayballPreparation: Wet PC2 Work Zones 1/02/2017: Page 11 of 33B311 Pc2 Laboratory - Equipment List
Freezer - Laboratory Sparkfree Thermoine TLUF-520, 520L 3 0.64m 0.80m 1.83m520L Capacity
30/01/20175:56:17 PM
Floor ?588 Backup ?
Hanna Water Parameter Hanna Parameter 32 0.44m 0.32m 0.09m 30/01/20175:56:54 PM
Storage ?589 ?
Microcentrifuge Sigma 1-14 1 0.22m 0.25m 0.15m 30/01/20176:24:53 PM
Storage ?590 ?
Nanodrop Scientific Thermofisher 1 0.20m 0.32m 0.34m 30/01/20176:25:40 PM
Storage ?591 ?
Pumpette (pipette) Acumax PipetteHelp 2 0.07m 0.20m 0.20m 30/01/20176:30:13 PM
Storage ?592 GPO ?
Refractometers ATC 32 0.21m 0.08m 0.06m 30/01/20176:27:46 PM
Storage ?593 ?
Vernier Calipers - Analogue 1 30/01/20176:28:41 PM
Storage ?594 ?
Vernier Calipers - Digital 1 30/01/20176:29:10 PM
Storage ?595 ?
Dangerous Goods Cabinet - Corrosives UB Model - 100L 2 0.80m 0.61m 0.77m 1/02/201710:27:02 AM
?633 ?
Blank
Prepared by ARINA HayballTechnical: Prep Store 1/02/2017: Page 12 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: 22±ºC
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
PC2 Lab AC
HYDRAULIC
Lab GradeMotion
LIGHTINGSpecial spark free lighting in front of flammable store to code
Cleaners outlets only.Provide wall duct at 1100AFL and allow for future calbing
to code
TELEPHONE AND DATA
RELATIONSHIPS AND GENERAL DESCRIPTION
PC2 Laboratory, Preparationpart of PC2 containment
LAB SERVICES <no values defined>
Curtin University
WINDOWS User openable: Yes
Internal Glazing: BlindsNo
Space used for the storage of laboratory goods, equipment and consumables.
Consumable storage capacity for a 1 week replenishment cycle.
Limited storage of waste bins internally - waste collection to external courtyard as per existing practices.
ARCHITECTURAL
Ceiling
Wall (allor low)
Cleanable
Scrubbable surface
2700 minHeight
Floor
Coved integral to floorSkirt
TECHNICAL: PREP STORE B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: None dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERYAUDIO VISUAL
None sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching: Rm
adjustable lab laminate shelvingCompactus (manual)
Clincal pull out tray shelvingTrolleys
Fixed
Loose
Adjustable wall shelving
Mixture of height adjustable shelving and proprietary clinical pull out shelving.
FIXTURES/FURNITURE
STANDARD EQUIPMENT
none Floor waste: Yes
Type:
Wall(high)
Lab grade
NoRequire:
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
Fail
<no values defined>
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
CleanableLaboratory GradeNon Slip
Non Staining to chemicals and dies
REF # 004 REF # 004
Potential high floor loading
(See also room list on next page for detailed equipment list.)
109 Prep Store Room
N/ADoor location
Authorised AccessCertifying Notices (if applicable)Flammable LiquidRoom Name/Numberto CodeType of roomWhiteboard at end of compactus
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballTechnical: Prep Store 1/02/2017: Page 13 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
TECHNICAL: PREP STORE CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Technical: Prep Store 1 room(s) of this type total UFA: 39.2 sq mREF # 004 REF # 004
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
Prep Store Room
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
PREP STORE ROOM 109GROUP 1 PREP STORE ROOM
SS Shelving 23/12/201610:08:38 AM
?582 ?
Compactus 23/12/201610:08:38 AM
?583 ?
Blank
Prepared by ARINA HayballTechnical: Flammable Store 1/02/2017: Page 14 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: 22±ºC
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
PC2 Lab ACSpecial AC
HYDRAULIC
Air handling requirements for Chemical Store to Detail Design Assessment
Lab GradeLIGHTING
Special for flammable space (no spark)
to code Ensure Chemical Store room complies with BCA and AS, including fire rating.
TELEPHONE AND DATA
RELATIONSHIPS AND GENERAL DESCRIPTION
Preparationpart of PC2 containment
LAB SERVICES None
Curtin University
casual access by staff
WINDOWS User openable: Yes
Internal Glazing: BlindsNo
Space for storage of flammable liquids and samples in cabinets
ARCHITECTURAL
Ceiling
Wall (allor low)
Cleanable
Scrubbable surface
2700 minHeight
Floor
Coved integral to floorSkirt
TECHNICAL: FLAMMABLE STORE B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: None dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY AUDIO VISUAL
None sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching: Rm
Proprietary Flamm cabinets - 4x240L Fixed
<no values defined>
Provide separation of cabinets to code
FIXTURES/FURNITURE
STANDARD EQUIPMENT
none Floor waste: Yes
Type:
Wall(high)
Lab grade
NoRequire:
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
Fail
<no values defined>
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
CleanableLaboratory GradeNon Slip
Non Staining to chemicals and dies
REF # 005 REF # 005
Bunded space to code for dangerous goods
(See also room list on next page for detailed equipment list.)
113 Flammable Store
900 KeyFree access insideSelf closing and locking
Fire rated - solidGeneral accessDoor location Door type Clear width Hardware Locking
Authorised AccessCertifying Notices (if applicable)Flammable LiquidRoom Name/Numberto CodeType of roomWhiteboard at end of compactus
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballTechnical: Flammable Store 1/02/2017: Page 15 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
TECHNICAL: FLAMMABLE STORE CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Technical: Flammable Store 1 room(s) of this type total UFA: 7.6 sq mREF # 005 REF # 005
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
Flammable Store
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
FLAMMABLE STORE 113GROUP 1 FLAMMABLE STORE
Dangerous Goods Cabinet - Flammable 250L Model 4 1.10m 0.47m 1.76m DuctIn Chemical Store area subject to BCA Assessment
1/2/20179:15:08 am
Floor ?527 ?
Blank
Prepared by ARINA HayballConstant Temp: Cold 1/02/2017: Page 16 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: 4º Max
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
Special AC
HYDRAULIC
Locate compressors away from staff and students4 Degrees Constant
MotionNormal
LIGHTINGSealed WP lightingUV non-presence lighting.Provide a separate lighting circuit for the side access shelving
Connection to existing backup generator required. Primary system failure to be notified by SMS Spider
1 WP double 10A power each side
to code
TELEPHONE AND DATA
none
RELATIONSHIPS AND GENERAL DESCRIPTION
PC2/PC1 Laboratory, Preparation.Within PC2 zone
LAB SERVICES None
Curtin University
Temporary access for staff and students
WINDOWS User openable: Yes
Internal Glazing: BlindsDesirable
Constant temperature space with internal shelving. Directly accessible from the staff and student areas via auto sliding doors.
ARCHITECTURAL
Ceiling
Wall (allor low)
Acoustic control Architect selection Cleanable
Architect selectionScrubbable surface
2400Height
Floor
Coved integral to floorSkirt
CONSTANT TEMP: COLD B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: None dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERYAUDIO VISUAL
None sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching: Rm
Shelving adjustable and cantileveredSS Shelving
Fixed
<no values defined>
max height 1800H shelving 450 centres
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:
Wall(high)
Cool room type construction. Architectural finish suitable on theouter face.
NoRequire:
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
TempFail
Door
Architect selectionScrubbable surface
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Arch SelectionLaboratory GradeNon Slip
Non Staining to chemicals and diesResilient and scrubbableResistant to intermittent flooding
Wet Cleanable
REF # 006 REF # 006
insulated box within the space. Finished floor must be flush withAdjoining surfaces4ºC cold room
(See also room list on next page for detailed equipment list.)
111 Cold Room
1000 clear no access studentsideNone
fail-safe internallyHandle Both Sides
Proximity activationVision panel
Auto slidingSliding
General accessSecure access
Door location Door type Clear width Hardware Locking
Viewing panelSliding access windows to side of Cold room. Configure in two panel sets only with narrow fixed panel between sliding
Primary doors to be auto sliding glass with card reader activation.Secure access to preparation room side.
1000 clear no access studentsideNone
fail-safe internallyHandle Both Sides
Proximity activationVision panel
Auto slidingSliding
General accessSecure access
Room Name/NumberTemperature warningType of room
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballConstant Temp: Cold 1/02/2017: Page 17 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
CONSTANT TEMP: COLD CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Constant Temp: Cold 1 room(s) of this type total UFA: 9.8 sq mREF # 006 REF # 006
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
111Cold Room
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
COLD ROOM 111GROUP 1 COLD ROOM
SS Shelving 22/12/20164:33 PM
?580 ?
Prepared by ARINA HayballConstant Temp: Cold 1/02/2017: Page 18 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control:
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
HYDRAULIC
Locate compressors away from staff and students37ºC Constant Temperature
MotionNormal
LIGHTINGSealed WP lightingUV non-presence lighting.Provide a separate lighting circuit for the side access shelving
Connection to existing backup generator required. Primary system failure to be notified by SMS spider.
4x 10A power in skirting duct (1000AFL) each side
to code
TELEPHONE AND DATA
none
RELATIONSHIPS AND GENERAL DESCRIPTION
PC2 Laboratory, Preparation.Within PC2 zone
LAB SERVICES None
Curtin University
Temporary access for staff and students
WINDOWS User openable: Yes
Internal Glazing: BlindsDesirable
Constant temperature space with internal shelving. Directly accessible from the staff and student areas via auto sliding doors.
ARCHITECTURAL
Ceiling
Wall (allor low)
Acoustic control Architect selection Cleanable
Architect selectionScrubbable surface
<no values defined>Height
Floor
Coved integral to floorSkirt
CONSTANT TEMP: WARM B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: None dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERYAUDIO VISUAL
sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching: Rm
Shelving adjustable and cantileveredSS Shelving
Fixed
<no values defined>
max height 1800H shelving 450 centres
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:
Wall(high)
Cool room type construction. Architectural finish suitable on theouter face.No side access
NoRequire:
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
TempFail
Door
Architect selectionScrubbable surface
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Arch SelectionLaboratory GradeNon Slip
Non Staining to chemicals and diesResilient and scrubbableResistant to intermittent flooding
Wet Cleanable
REF # 007 REF # 007
insulated box within the space. Finished floor must be flush withAdjoining surfaces37ºC warm room
(See also room list on next page for detailed equipment list.)
112 Warm Room
1000 clear no access studentsideNone
fail-safe internallyHandle Both Sides
Proximity activationVision panel
Auto slidingSliding
General accessStaff access
Door location Door type Clear width Hardware Locking
Viewing panel
Primary doors to be auto sliding glass with card reader activation.
1000 clear no access studentsideNone
fail-safe internallyHandle Both Sides
Proximity activationVision panel
Auto slidingSliding
General accessStaff access
Room Name/NumberTemperature warningType of room
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballConstant Temp: Warm 1/02/2017: Page 19 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
CONSTANT TEMP: WARM CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Constant Temp: Warm 1 room(s) of this type total UFA: 7.1 sq mREF # 007 REF # 007
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
112Warm Room
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
WARM ROOM 112GROUP 1 WARM ROOM
SS Shelving 22/12/20164:33:17 PM
?581 ?
Blank
Prepared by ARINA HayballHandwash 1/02/2017: Page 20 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: Normal
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
Lab AC
HYDRAULIC
PC2 containment Mechanical Ventilation
Lab GradeLIGHTING
Lighting to be integral to ceiling. No suspended lighting to be incorporated.
H+C water for handwash
to code
TELEPHONE AND DATA
Allow for proximity swipe points each side of entry door from bagwash (2 per doors) for student attendance counts
Cold WaterHot Water
RELATIONSHIPS AND GENERAL DESCRIPTION
DIRECT: Collaborative Classroom, PC2 Laboratory, Bags Store.Within PC2 zone
LAB SERVICES <no values defined>
Curtin University
up to 96 student to pass through within a 5-10 period
WINDOWS User openable: Yes
Internal Glazing: BlindsYes
Space inside the PC2 contaimment for handwashing.
ARCHITECTURAL
Ceiling
Wall (allor low)
Cleanable
Scrubbable surface
2700 minHeight
Floor
Coved integral to floorSkirt
HANDWASH B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY
AUDIO VISUAL
sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching:
Hand Paper DispenserPaper Towel Bin
Sanitiser dispenserSoap dispenser
SS Handwash Trough Fixed
Disposable gown collection unit for 100 gownsUint for 2x240 litre disposable gown disposal bins
Provide at least 5.5 lineal meters of handwash trough, or L500lm per 9 students.Provide an integrated solution for washing and disposables and waste.
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:
Wall(high)
NoRequire:
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
<no values defined>
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Laboratory GradeNon Slip
REF # 008 REF # 008
Part of the PC2 containment areaProvide 500mm of SS sink length per 9 student seats in the PC2laboratory
Cleanable space without nooks and crannies. The spaces will bedetailed as PC2 with penetrations sealed and any abutting surfaceseither easily removable or fuly sealed. Where sealing is not
(See also room list on next page for detailed equipment list.)
105 Handwash
1200w min Proximityhold open (electronic)auto slidingGeneral accessDoor location Door type Clear width Hardware Locking
Provide vision glazing into inform space and collaboration space
Proximity
450x600h pinboardA4 paper document holderAuthorised AccessCertifying Notices (if applicable)CorrosiveEnclosed footwearFlammable Gas
Flammable LiquidLab coats (Yes/No sliding panel)No drinkNo FoodNo Photograph (Yes/No Sliding panel)Room Name/NumberSafety Glasses (Yes/No sliding panel)
to CodeToxinType of room
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballHandwash 1/02/2017: Page 21 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
HANDWASH CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Handwash 1 room(s) of this type total UFA: 17.1 sq mREF # 008 REF # 008
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
105Handwash
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
HANDWASH 105GROUP 1 HANDWASH
Wash trough and accessories Hands free tapware 11 0.50m 0.40m CSS Handwash trough and hands free tapware
20/12/20164:14:05 PM
Wall ?482 11off ?
Blank
Prepared by ARINA HayballStudent Informal Area 1/02/2017: Page 22 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical): 0Temperature Control: 22±ºC
ACOUSTIC
B311 LABORATORY
DDA Hearing Augmentation
SECURITYAbility to restrict after hours access.
Yes
SAFETY SERVICES AND DETECTION
POWER
Normal AC
HYDRAULIC
NormalLIGHTING
Relocate demolished services cupboard, location to Detailed Design.TELEPHONE AND DATA
Phone Line for emergency response, to Curtin Security and Health & Safety requirements.
RELATIONSHIPS AND GENERAL DESCRIPTION
HIGH: PC2 Laboratory,
LAB SERVICES None
Curtin University
Staff and students for private or group discussion.
WINDOWS User openable: Yes
Internal Glazing: BlindsNo
Space for self directed study for students.Provide suitable spaces for top of the hour loading.Airport lounge style with power for charging (USB or GPO) with a mixture of seating types from banquette seating, airport loungebenches, group rooms, round tables and booths.
ARCHITECTURAL
Ceiling
Wall (allor low)
Acoustic control Architect selection
Architect selection
<no values defined>Height
Floor
Arch SelectionSkirt
STUDENT INFORMAL AREA B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: Normal dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY
AUDIO VISUALLED monitors to 3P Group Rooms.Interactive AV fitout media wall or equivalent to Warm Room wall facing informal area.
WiFi sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching: Rm
Pallet lifter
3P DesksLong Tables / Setdown Tables
Lounge/Sofa Fixed
<no values defined>
Double sided glass display to wall separating PC2 Laboratory.
Provide up to 60 learning seats of various types from hard to soft surfaces, at a rate of 1 seat per 2.5 sqm UFA.
Provide 6 x 3P rooms.
FIXTURES/FURNITURE
STANDARD EQUIPMENT
none Floor waste: Yes
Type:
Loose
Wall(high)
NoRequire:
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
Temp
Architect selection
LEGEND: Empty square indicates not applicable or none
0.2
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Arch SelectionCleanableNon Slip
Sealed
REF # 009 REF # 009
Provide retractable brownout screening to wall between PC2/PC1Laboratory.
(See also room list on next page for detailed equipment list.)
102 Student Informal Area
1500w1800w
NoneProximity
slidingConnecting doorGeneral access
Door location Door type Clear width Locking
display wall blind (refer lab PDS)
Ability to restrict access to B311 South. Door to 3P Group Rooms to have cardex access.
1500w1800w
NoneProximity
slidingConnecting doorGeneral access
Room Name/Number
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballStudent Informal Area 1/02/2017: Page 23 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
STUDENT INFORMAL AREA CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Student Informal Area 1 room(s) of this type total UFA: 141.6 sq mREF # 009 REF # 009
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
102Student Informal Area
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
STUDENT INFORMAL AREA 102GROUP 1 STUDENT INFORMAL AREA
Miscellaneous furniture and seating 240$ 31/1/20174:54:08 pm
?620 GPO ?
Table and chairs to group rooms 240$ 31/1/20174:54:20 pm
?631 GPO ?
Blank
Prepared by ARINA HayballStaff Area 1/02/2017: Page 24 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: Normal
ACOUSTIC
B311 LABORATORY
DDA Hearing Augmentation
SECURITYStaff access only.
Yes
SAFETY SERVICES AND DETECTION
POWER
Normal AC
HYDRAULIC
NormalLIGHTING
Provide GPO provisions suitable for staff use
Staff hydration provisions. Zip Hydrotap or Similar
to code
TELEPHONE AND DATA
Cold WaterFiltered Water H+C
RELATIONSHIPS AND GENERAL DESCRIPTION
Student Informal Area
LAB SERVICES <no values defined>
Curtin University
WINDOWS User openable: Yes
Internal Glazing: BlindsDesirable
Space separate from the PC2 zone for staff use only and for small capacity confidential staff conversations.
Provisions for staff hydration, day (temporary) storage of staff bags and posessions.
Provide short term temporary seating for up to 3 staff for respite.
ARCHITECTURAL
Ceiling
Wall (allor low)
<no values defined>
<no values defined>
<no values defined>Height
Floor
<no values defined>Skirt
STAFF AREA B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: Normal dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY
AUDIO VISUAL
sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching:
Bag Pidgeon HolesMDF bench
Sink
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:Wall
(high)
DesirableRequire:Acoustic insulation to preserve speech privacy within rooms
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
<no values defined>
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
<no values defined>
REF # 010 REF # 010
(See also room list on next page for detailed equipment list.)
106 Staff Area
870 proximityAcoustic SealSlidingStaff accessDoor location Door type Clear width Hardware Locking
Room Name/Number
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballStaff Area 1/02/2017: Page 25 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
STAFF AREA CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Staff Area 1 room(s) of this type total UFA: 11.9 sq mREF # 010 REF # 010
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
Staff Area
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
STAFF AREA 106GROUP 1 STAFF AREA
Hot and chilled Water (Zip Hydrotap or similar) 1 C, H 31/1/20174:50:04 pm
?577 ?
Sink in benchtop standard kitchenette style 1 C, H 31/1/20174:51:34 pm
?627 ?
Bench and drawers/cupboards 1 240$C600w 2 x dbl GPO
31/1/20174:52:45 pm
?630 GPO ?
GROUP 2 STAFF AREA
Underbench fridge 1 C600deep
31/1/20174:49:39 pm
?628 GPO ?
Prepared by ARINA HayballStaff Area 1/02/2017: Page 26 of 33B311 Pc2 Laboratory - Equipment List
Hot desk - furniture 1 240$C750 deep for 3 persons 2 GPO per person
31/1/20174:50:57 pm
?629 GPO ?
Blank
Prepared by ARINA HayballBagstore 1/02/2017: Page 27 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control: Normal
ACOUSTIC
B311 LABORATORY
DDA Hearing Augmentation
SECURITYCCTV surveillance to cover all corners of room and bag storage shelves
Yes
SAFETY SERVICES AND DETECTION
POWER
Normal AC
HYDRAULIC
NormalMotion
LIGHTING
power for cleaning only
to code
TELEPHONE AND DATA
None
RELATIONSHIPS AND GENERAL DESCRIPTION
DIRECT: Informal Learning Area, Handwash
LAB SERVICES None
Curtin University
WINDOWS User openable: Yes
Internal Glazing: BlindsDesirable
Space outside the PC2 containment for the setdown of student bags.
ARCHITECTURAL
Ceiling
Wall (allor low)
Acoustic control
Architect selection
2700minHeight
Floor
Arch SelectionSkirt
BAGSTORE B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY
AUDIO VISUAL
None sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching: Rm
Clean Gown Tray (96 gowns)
bag storage
provide bag storage for 96 students. Pigeon hole style storage
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:
Loose
Wall(high)
No requirement ofr lab finishes at this point
NoRequire:Provide acoustic treatment to assist reduction of noise in bad store.
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
Architect selection
LEGEND: Empty square indicates not applicable or none
0.1
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Arch Selection
REF # 011 REF # 011
transition space where student must store bags or other personaleffects.
(See also room list on next page for detailed equipment list.)
104 Bag Room
1200w min Proximityhold openauto slidingConnecting doorGeneral access
Door location Door type Clear width Hardware Locking
Proximity card access, hold open switch in Bag room side leading to informal area, hold open switch in Teaching Laboratory side leadingto Bag room.
1200w min Proximityauto slidingConnecting doorGeneral access
450x600h pinboardA4 paper document holderRoom Name/NumberType of room
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballBagstore 1/02/2017: Page 28 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
BAGSTORE CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Bagstore 1 room(s) of this type total UFA: 12.2 sq mREF # 011 REF # 011
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
104Bag Room
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
BAG ROOM 104GROUP 1 BAG ROOM
Bag Storage Type (pidgeon hole, lockers) TBA 22/12/20164:34:28 PM
?575 ?
Blank
Prepared by ARINA HayballGas Storage 1/02/2017: Page 29 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control:
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
HYDRAULIC
LIGHTING
TELEPHONE AND DATA
RELATIONSHIPS AND GENERAL DESCRIPTION
LAB SERVICES <no values defined>
Curtin University
WINDOWS User openable: Yes
Internal Glazing: Blinds
Space external of building for the storage of gas cylinders, to replace existing alcove demolished at south of Room 158.
Provide storage of up to 4 Cylinders.
ARCHITECTURAL
Ceiling
Wall (allor low)
<no values defined>
<no values defined>
<no values defined>Height
Floor
<no values defined>Skirt
GAS STORAGE B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY
AUDIO VISUAL
sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching:
<no values defined>
FIXTURES/FURNITURE
STANDARD EQUIPMENT
none Floor waste: Yes
Type:Wall(high)
Require:
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
<no values defined>
LEGEND: Empty square indicates not applicable or none
Primary / exampleroom of this RDS
refer next page forfull list.
rev
<no values defined>
REF # 013 REF # 013
Wall: Wire mesh, metal pailing fence, or similar to Architectualaesthetic selection.
Roof: Roof cover required(See also room list on next page for detailed equipment list.)
115 Gas Store
Door location
Wire mesh or metal pailing or similar to architectural aesthetic selection. Manual Sliding. Lock.
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballGas Storage 1/02/2017: Page 30 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
GAS STORAGE CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Gas Storage 1 room(s) of this type total UFA: sq mREF # 013 REF # 013
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
115Gas Store
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
GAS STOREGROUP 1 GAS STORE
4 cylinder mounting rack 31/1/20174:23:58 pm
?622 ?
Prepared by ARINA HayballGas Storage 1/02/2017: Page 31 of 33B311 Pc2 Laboratory - Equipment List
MECHANICAL SERVICES Yes
Contaminant Vent # Fume Cpbd (typical):Temperature Control:
ACOUSTIC
B311 LABORATORY
DDA Hearing AugmentationSECURITY
Yes
SAFETY SERVICES AND DETECTION
POWER
HYDRAULIC
LIGHTINGexternal lighting to door
waterproof powerpointTELEPHONE AND DATA
Washdown tapWaste drain
RELATIONSHIPS AND GENERAL DESCRIPTION
LAB SERVICES <no values defined>
Curtin University
WINDOWS User openable: Yes
Internal Glazing: BlindsNo
External wire enclosure for the accommodation of up to 10 x 240L PC2 waste bins, accessible to refuse collection contractors.
ARCHITECTURAL
Ceiling
Wall (allor low)
Architect selection
Cleanable
<no values defined>Height
Floor
Contain washdown within spaceSkirt
WASTE STORAGE B311 Pc2 Laboratory -Equipment List
Cable Reticulation From floor Under bench duct under bench duct with bench GPO pedestals Wall Wall duct (bench height) wall duct at wall benches
DOOR INFORMATION
PTD=Paper Towel Dispenser, TPD=Toilet Paper
DispenserCAir - Compressed Air, CG - Carbogen O2 -
Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G -
Natural Gas, RO - reverse Osmosis Pol - Polished H - Hot
Type: dblYes
EPG PowerYes
No Fail PlantsnglOutlets: 3 ø 15A
JOINERY
AUDIO VISUAL
sngl dbl trplVoice / Data:
REFERENCE AND NOTES
Switching:
<no values defined>
FIXTURES/FURNITURE
STANDARD EQUIPMENT
required Floor waste: Yes
Type:
Wall(high)
NoRequire:
ENTRY DOOR HAZARD AND SPECIALIST SIGNAGE BMS
<no values defined>
LEGEND: Empty square indicates not applicable or none
Primary / exampleroom of this RDS
refer next page forfull list.
rev
Non SlipSealed
REF # 012 REF # 012
Wall: Generally wire mesh, metal pailing or similar to architecturalaesthetic selection.Roof: RequiredMaximise screening from general campus areas.
Maintain sufficient access for vehicles into existing external areaand trolleys/deliveries via existing ramp.
(See also room list on next page for detailed equipment list.)
114 Bin Enclosure
maximum Keygate lockTop Hung Siding or other clearaccess style
General accessDoor location Door type Clear width Hardware Locking
wire mesh door, metal pailing or similar, manual sliding, lock.
Occupants
FOR COMMENT1/02/20
17
0.2draft Issue
Version
REVISIONS
Prepared by ARINA HayballWaste Storage 1/02/2017: Page 32 of 33B311 Pc2 Laboratory - Equipment List
Sheet 2: Plans
Sheet 3: Room List with Equipment and Key Fixtures (PRELIMINARY)
DEPT
H
WID
TH
HEIG
HT
KW
MEC
H.EX
HAUS
T
RETI
CULA
TED
GAS
ES
ITEM
WASTE STORAGE CAir - Compressed Air, CG - Carbogen O2 - Oxygen, N2 - Nitrogen C02 - Carbon Dioxide Nat G - Natural GasRO - reverse Osmosis Pol - Polished H - Hot water C - Cold Water 3ø - 3 Phase
# AMPS
VOLT
S
WAT
ER
chan
ge fr
ompr
evio
us is
sue
Waste Storage 1 room(s) of this type total UFA: sq mREF # 012 REF # 012
NUM
BER
CONNECTED SERVICESLOCATION ELECTRICALTYPE
MO
DEL
MO
UNTI
NG
Drai
n
114Bin Enclosure
Equi
pmen
t ID
POW
ERTY
PE
DATA
kW
BIN ENCLOSUREGROUP 1 BIN ENCLOSURE
No equipment 31/1/20174:48:12 pm
?621 ?
Prepared by ARINA HayballWaste Storage 1/02/2017: Page 33 of 33B311 Pc2 Laboratory - Equipment List