Revisiting Software Development Effort Estimation Based on Early Phase Development Activities
MSR 2013
Masateru Tsunoda, Koji Toda, Kyohei Fushida, Yasutaka Kamei, Meiyappan Nagappan, Naoyasu Ubayashi
(Kinki University, Japan; Fukuoka Institute of Technology, Japan;NTT DATA Corporation, Japan; Kyushu University, Japan;Queen's University, Canada)
2
Effort is estimated using software size Total effort is estimated based on software size to
decide staffing and schedule. High accuracy is needed to avoid project failure.
Linear regression is one of common methods to build the model [1]. Size is settled by a method such as function point analysis.
[1] L. Briand, T. Langley, and I. Wieczorek, “A replicated assessment and comparison of common software cost modeling techniques,” In Proc. of International Conference on Software Engineering (ICSE), pp. 377–386, Limerick, Ireland, June 2000.
effort (estimated) = 1.5 + 0.069×size
Estimated effort = 4 person-month
2 developers 2 months×
3
Estimation using early phase activity Practitioners use the ratio of early phase activities to
the whole phase.
Which shows higher estimation accuracy?
early phase effort
total effort (estimated)
Ratio of effort before design phase (estimation timing) is 33% (on avg.).
Req. analysis Design TestingCodingPlanning
Req. analysis Design TestingCodingPlanning
effort (estimated) = 1.5 + 0.069×size
effort (estimated) = 3×early phase effort
effort (estimated) = 3×early phase effort
Estimation timing
4
What should be clarified? RQ1: When a model using software size or early
phase effort is built, which shows higher accuracy? Collecting data requires effort, so some organizations do
not have detailed data.
RQ2: When other variables are added to the models on RQ1, which model shows higher accuracy?
Softwaresize
Totaleffort
Model Early phaseeffort
Totaleffort
Model
ProgrammingLanguage
Add (RQ2)
ProgrammingLanguage
Add (RQ2)
5
What should be clarified? (contd.) RQ3: When both software size and early phase effort
are used, is estimation accuracy improved?Does multicollinearity arise by using them?
Softwaresize
Totaleffort
Model
Early phaseeffort
6
Built models using ISBSG dataset 118 projects (data point) in ISBSG dataset
Collected from organizations in 20 countries by ISBSG.
Definition of early phase effort Planning effort Planning-and-analysis effort
Built model FP (software size): baseline planning effort planning-and-analysis effort planning effort, FP planning-and-analysis effort, FP
Req. analysisPlanning
Req. analysisPlanning
Softwaresize
Early phaseeffort
Early phaseeffort
Softwaresize
7
How to compare estimation accuracy Evaluated accuracies by differences in balanced
relative error (BRE) from the baseline (FP model).
effort = a x FP (baseline) average BRE = 100%
effort = b x planning effort average BRE = 50%
Difference of average BRE = 100% - 50% = 50%improved
Estimated effort 50 hour
Actual effort 100 hour
BRE = |100-50| / 50 = 100%
Example of BRE
8
Early phase effort improves accuracy Accuracy of a model using early phase effort is
higher than software size. Built models without other variables.
Multicollinearity did not arise when using both early phase effort and FP.
0% 50% 100%
Planning-and-analysiseffort, FP
Planning effort, FP
Planning-and-analysiseffort
Planning effort Median BRE
Average BRE
Size (FP) and early phase effort > Size(Ans. to RQ3: When other variables are not used)
Difference
9
Other variables did not work well Adding other variables improved accuracy of FP
model. But it did not improve accuracy of other models.
Other variables: development type, platform type, language type
Set baseline as FP with the variables, and compared other models without the variables.
effort = a x FP+ c x platform type + … (baseline)Avg. BRE = 100%
effort = b x planning effort Avg. BRE = 50%
Difference of average BRE = 100% - 50% = 50%improved
10
Accuracy of a model using planning-and-analysis effort is higher, but planning effort is not than software size (Ans. to RQ2).
Using both early phase effort and software size improves accuracy, and multicollinearity does not arise. (Ans. to RQ3)
Early phase effort is still effective
-10% 10% 30% 50% 70%
Planning-and-analysis effort, FP
Planning effort, FP
Planning-and-analysis effort
Planning effort Median BRE
Average BRE
Size and early phase effort> Size
Difference
11
How to build estimation model? Preferable to build a model that only uses early
phase effort as an explanatory variable. If an organization does not collect data in detail
It might not be preferable to use variables which we used as additional variables. In organizations that collect other data in detail
Using both early phase effort and software size improves the accuracy without multicollinearity. If software size is settled precisely by a method such as
function point analysis