Permit No Task No Tag ID
Permit
Descriptio
n
17511 62244CC-49 MECH, CR01, FRH 9nos
MECH
<Extension of Permit No.13259 => 15775> To carry out welding and erection of
structures, bridges, pipes, pipe loops, pipe supports on sleepers/structure/pipe
stands including pipe pulling, cutting, grinding, preheating, fit-up, air blowing,
drilling, Bolt tightening, loading /offloading of materials and equipment,
scaffolding & structural erection (assembly, bolting & alignment) For CC-49 [24
hrs ,300 Persons]
15822 57241CC-16, CC-19 ASSET, CC-19
SCAFFOLDING
ERECTION, MODIFICATION & DISMANTLING OF SCAFFOLDING FOR
(SCAFFOLDING TOWERS, SCAFFOLDING BRIDGES, SCAFFOLDING PLATFORMS,
ASSET PROTECTION, HEAT/ REST SHELTERS & OTHER PIPING / STRUCTURAL
ACTIVITIES) FOR CC-19 [24 HRS, 300 PERSONS]
15379 59081
CC-11 MECH, CC-13 MECH, CC-18
MECH, CC-30 MECH, CC-31
MECH, CR01, CR02D MECH, FRH
9nos MECH
<Extension of Permit No.13118> To carry out welding and assembling,
preassembling & erection of structures, bridges, pipes, pipe loops, pipe supports
on sleepers/structure/pipe stands including pipe pulling, cutting, grinding,
preheating, fit-up, air blowing, drilling, Bolt tightening, loading /offloading of
materials and equipment, scaffolding & structural erection (assembly, bolting &
alignment) For CC-18 [24 hrs, 300 Persons]
19264 64490Berth-1 Manifold, CC-18, CC-18
Civil
<Extension of Permit No.17529> Site layout and marking, Earthworks
(excavation, backfilling, grading/leveling, removal of excavated, waste and
excess materials), rebar works, formworks, concrete pouring works, concrete
curing works, scaffolding works, painting/coating on concrete surface, loading &
unloading of material, electrical works (temporary power supplies) for CC-18 [24
hrs , 100 Persons]
19639 64754Berth-1 Manifold, CC-08, CC-20,
CC-20 Civil
<Extension of Permit No.17424>
Earthworks(excavation,backfilling,grading/leveling,removal of excavated,waste
and excess materials),Removal of armor rock,f,rebar works,formworks,concrete
pouring works,concrete curing works,scaffolding works,painting/coating on
concrete surface,lifting works,installation/provision of temporary
facilities(ablution blocks,rest shelters&drinking water stations),electrical
works(temporary power supplies)for CC-20[24 H,100 P]
20286 64500
CC-11 MECH, CC-13 MECH, CC-18
CATHODE PROTECTION, CC-18
MECH, CC-19 CATHODE
PROTECTION, CC-19 Cathodic
Protection, CC-19 MECH, CC-30
MECH, CC-31 MECH, CCA, CR01,
CR02D MECH, FRH 9nos MECH
<Extension of Permit No.18516> TO CARRY OUT INSTALLATION OF SACRIFICIAL
ANODES FOR CATHODE PROTECTION, DRILLING, EXCAVATION, BACKFILLING,
CABLE LAYING & TERMINATION, CAD WELD DYE (MOLD), OTHER GENERAL
ELECTRICAL AND SCAFFOLDING WORKS for the Drilling and Installation of
Anode/CP Works for PB-CC19 FOUNDATION GRID LINE 2 & 3[24 HRS, 100
PERSONS]
20305 65410Berth-1 Manifold, CC-08, CC-11,
CC-19 CIVIL, CR-02D
<Extension of Permit No.18386> Site layout and marking, Earthworks
(excavation, backfilling, grading/leveling, removal of excavated, waste and
excess materials), rebar works, formworks, concrete pouring works, concrete
curing works, scaffolding works, painting/coating on concrete surface, loading &
unloading of material, electrical works (temporary power supplies) for CC-19 [24
hrs , 100 Persons]
21311 66773RAMP CR02C, Temporary
Construction Ramp
<Extension of Permit No.13990 => 16021 => 17558 => 19633>
cutting/grading/levelling and compaction of existing ground, removal of
unusable excav material, lifting work for loading / unloading of construction
materials, installation of precast VBU and TTS structure. Painting works,
excavation works, concreting works, formwork, rebar works, erection and
dismantling of temporary scaffolding working platforms for TTS Post for Installing
Temporary Construction Ramp at North of Aysha St
21589 65666
2 INCH IA MECH BERTH-2, 2"
INSTRUMENT AIRLINE MECH,
2INCH IA MECH B3, berth-2
nitrogen line, Berth-5 IA 2" line,
BERTH-5 NITROGEN LINE, CC54,
CR02A, CR03, CR03 MECH
Transportation, unloading and erection of 2” pipe including pipe supports,
cutting, grinding, fit-up, welding of pipe joints, supports, cleaning of pipe joints,
touchup paint work included. Air blowing of pipe included for fit- up. Drilling of
pipe supports also included. Tie-in activities including cold cutting of pipes, fitup
and welding of joints, installation of isolation valves and blind. for Tie-In(s) and
Routing of Nitrogen Pipeline 2 Dia at Berth 2 [24 hrs, 100 persons]
23056 68813CC-49 MECh, CR01, FRH 9nos
MECH
To carry out welding and erection of structures, bridges, pipes, pipe loops, pipe
supports on sleepers/structure/pipe stands including pipe pulling, cutting,
grinding, preheating, fit-up, air blowing, drilling, Bolt tightening, loading
/offloading of materials and equipment, scaffolding & structural erection
(assembly, bolting & alignment) For CC-49 [24 hrs ,300 Persons]
23682 69485
Berth-1 Manifold, CC-08, CC-11,
CC-27 CIVIL, CC-29 CIVIL, CC-30
CIVIL, CC-31 CIVIL, CC-34 CIVIL,
CC-36 CIVIL, CC-40 CIVIL, CR-02D
EARTHWORKS (EXCAVATION, BACKFILLING, GRADING/LEVELING, REMOVAL OF
EXCAVATED, WASTE AND EXCESS MATERIALS), REBAR WORKS, FORM WORKS,
CONCRETE POURING WORKS, CONCRETE CURING WORKS, SCAFFOLDING
WORKS, PAINTING/COATING ON CONCRETE SURFACE, LIFTING WORKS,
INSTALLATION/PROVISION OF TEMPORARY FACILITIES (ABLUTION BLOCKS, REST
SHELTERS AND DRINKING WATER STATIONS), ELECTRICAL WORKS (TEMPORARY
POWER SUPPLIES) FOR CC-29 [24 HOURS, 500 PERSONS]
Permit
StatusStart Date
27/09/2012 10:30
<Extension of Permit No.13259 => 15775> To carry out welding and erection of
structures, bridges, pipes, pipe loops, pipe supports on sleepers/structure/pipe
stands including pipe pulling, cutting, grinding, preheating, fit-up, air blowing,
drilling, Bolt tightening, loading /offloading of materials and equipment,
scaffolding & structural erection (assembly, bolting & alignment) For CC-49 [24
hrs ,300 Persons]
Live 26/12/2012 14:02
ERECTION, MODIFICATION & DISMANTLING OF SCAFFOLDING FOR
(SCAFFOLDING TOWERS, SCAFFOLDING BRIDGES, SCAFFOLDING PLATFORMS,
ASSET PROTECTION, HEAT/ REST SHELTERS & OTHER PIPING / STRUCTURAL
ACTIVITIES) FOR CC-19 [24 HRS, 300 PERSONS]
Live 15/10/2012 21:04
<Extension of Permit No.13118> To carry out welding and assembling,
preassembling & erection of structures, bridges, pipes, pipe loops, pipe supports
on sleepers/structure/pipe stands including pipe pulling, cutting, grinding,
preheating, fit-up, air blowing, drilling, Bolt tightening, loading /offloading of
materials and equipment, scaffolding & structural erection (assembly, bolting &
alignment) For CC-18 [24 hrs, 300 Persons]
Live
19/03/2013 21:30
<Extension of Permit No.17529> Site layout and marking, Earthworks
(excavation, backfilling, grading/leveling, removal of excavated, waste and
excess materials), rebar works, formworks, concrete pouring works, concrete
curing works, scaffolding works, painting/coating on concrete surface, loading &
unloading of material, electrical works (temporary power supplies) for CC-18 [24
hrs , 100 Persons]
Live 11/3/2013 14:49
<Extension of Permit No.17424>
Earthworks(excavation,backfilling,grading/leveling,removal of excavated,waste
and excess materials),Removal of armor rock,f,rebar works,formworks,concrete
pouring works,concrete curing works,scaffolding works,painting/coating on
concrete surface,lifting works,installation/provision of temporary
facilities(ablution blocks,rest shelters&drinking water stations),electrical
works(temporary power supplies)for CC-20[24 H,100 P]
Live
<Extension of Permit No.18516> TO CARRY OUT INSTALLATION OF SACRIFICIAL
ANODES FOR CATHODE PROTECTION, DRILLING, EXCAVATION, BACKFILLING,
CABLE LAYING & TERMINATION, CAD WELD DYE (MOLD), OTHER GENERAL
ELECTRICAL AND SCAFFOLDING WORKS for the Drilling and Installation of
Anode/CP Works for PB-CC19 FOUNDATION GRID LINE 2 & 3[24 HRS, 100
PERSONS]
Live 11/4/2013 14:49
14/04/2013 12:25
<Extension of Permit No.18386> Site layout and marking, Earthworks
(excavation, backfilling, grading/leveling, removal of excavated, waste and
excess materials), rebar works, formworks, concrete pouring works, concrete
curing works, scaffolding works, painting/coating on concrete surface, loading &
unloading of material, electrical works (temporary power supplies) for CC-19 [24
hrs , 100 Persons]
Live
5/6/2013 14:55
<Extension of Permit No.13990 => 16021 => 17558 => 19633>
cutting/grading/levelling and compaction of existing ground, removal of
unusable excav material, lifting work for loading / unloading of construction
materials, installation of precast VBU and TTS structure. Painting works,
excavation works, concreting works, formwork, rebar works, erection and
dismantling of temporary scaffolding working platforms for TTS Post for Installing
Temporary Construction Ramp at North of Aysha St
Live 27/05/2013 13:02
Transportation, unloading and erection of 2” pipe including pipe supports,
cutting, grinding, fit-up, welding of pipe joints, supports, cleaning of pipe joints,
touchup paint work included. Air blowing of pipe included for fit- up. Drilling of
pipe supports also included. Tie-in activities including cold cutting of pipes, fitup
and welding of joints, installation of isolation valves and blind. for Tie-In(s) and
Routing of Nitrogen Pipeline 2 Dia at Berth 2 [24 hrs, 100 persons]
Live
10/9/2013 12:24
To carry out welding and erection of structures, bridges, pipes, pipe loops, pipe
supports on sleepers/structure/pipe stands including pipe pulling, cutting,
grinding, preheating, fit-up, air blowing, drilling, Bolt tightening, loading
/offloading of materials and equipment, scaffolding & structural erection
(assembly, bolting & alignment) For CC-49 [24 hrs ,300 Persons]
Live 18/08/2013 09:46
EARTHWORKS (EXCAVATION, BACKFILLING, GRADING/LEVELING, REMOVAL OF
EXCAVATED, WASTE AND EXCESS MATERIALS), REBAR WORKS, FORM WORKS,
CONCRETE POURING WORKS, CONCRETE CURING WORKS, SCAFFOLDING
WORKS, PAINTING/COATING ON CONCRETE SURFACE, LIFTING WORKS,
INSTALLATION/PROVISION OF TEMPORARY FACILITIES (ABLUTION BLOCKS, REST
SHELTERS AND DRINKING WATER STATIONS), ELECTRICAL WORKS (TEMPORARY
POWER SUPPLIES) FOR CC-29 [24 HOURS, 500 PERSONS]
Live
27/09/2012 10:30
26/12/2012 14:02
15/10/2012 21:04
19/03/2013 21:30
11/3/2013 14:49
11/4/2013 14:49
14/04/2013 12:25
5/6/2013 14:55
27/05/2013 13:02
10/9/2013 12:24
18/08/2013 09:46
Location Infrastructure
Edmedio Ebarle - Logout
English
Locations > Permitboard
Permi
t
Board
(Filter
ed)
Permit No Task No Tag ID
1-Jan
Clipboard
21311 66773RAMP CR02C, Temporary
Construction Ramp
/wEPDwUKL
/wEWNAL19Z
Clear Clipboard
Search Remove Filter Archived PermitsTask List Return
Job
Number
Task No
Permit
No.
Permit
Descriptio
n
Start Date
End Date
Performin
g
Authority
Operating
Authority
Icon
Selection
Permit
Status
Conditions
Activities
Tools
Current
Selections
:
Username
Loading Nodes...
Loading Nodes...Tag ID
I confirm that I am
taking control as the
co-ordinator
Search Remove Filter Archived PermitsTask List Return
66773
None Specified
None Specified
None Specified
Search Cancel Search
Password
Username
Password
Username
Password
Add a
comment
Username
Password
Add a
comment
I confirm that the
work is on hold on
the above mentioned
equipment, that all
personnel have been
informed, and the
work area left in a
safe and tidy
condition.
I confirm that the
work area has been
inspected and that
plant conditions are
acceptable
I confirm that I am
taking control of area
awareness
NoParams
NoParams
Sign CompleteClose
Username
Password
Add a
comment
Start Date
Performin
g
Authority
Number
Of
Workers
Lastname
I confirm that work is
complete on the
above mentioned
equipment, that all
personnel have been
so warned, that all
tools and equipment
have been removed
and the work area
restored to a safe and
tidy condition.
Do you still wish to
archive the permit?
Please be aware that
the following
isolations are
attached to the
permit
Sign CompleteClose
NoParams
None Specified
Cancel
Username
Password
Username
Password
Username
Password
Ref. Indicator
Ref. Indicator
please enter your report below
I have read and fully
understand the above
numbered Permit to
Work and will comply
with the control
conditions specified
and precautions to be
observed
Information Box
I have read and fully
understand the above
numbered Permit to
Work and will comply
with the control
conditions specified
and precautions to be
observed
NoParams
NoParams
REQUIRED DOCUMENTS
Complete
Permit
Handback
Permit
Search
Permit
Board
Reason
For Delay
Accept
Shift Area -
Other
User
Accept
Shift Co-
ordinator -
Other
User
Edit
Permit
Informati
on
O² Result
Lower
Explosive
Limit
Gas Results
Loading Nodes...
Tag ID
Equal To
Equal To
Equal To
% Volume
Flammabl
e
Toxic
MaterialPPM
Lower
Bound
Upper
Bound
Lower
Bound
Upper
Bound
Lower
Bound
Upper
Bound
Toxic
Material
PPM
Copyright © 2004–2013 Rap International Limited
PERMITS
TASKS
ISOLATIONS
*
Chemical ReadingsLoading Nodes...
Instrument ID
Tag ID
% Volume Flammable
Gas Results
Toxic Material
Chemical Readings
Loading Nodes...
Loading Nodes...
O² Result
Lower Explosive Limit
Gas Results
Chemical Readings
Tag ID
Loading Nodes...
Loading Nodes...
Instrument ID
Equal To
None
None
None
There are pending notifications.View
There are no messages at this time.
Hide NotificationClose
Correct
Closure
Refusal
View
Permit
View
Comments
& Refusals
View
Attachmen
t
Task /
Permit
History
Location Infrastructure
Edmedio Ebarle - Logout
English
Locations > Permitboard
Permi
t
Board
(Filter
ed)
Permit No Task No Tag ID
Clipboard
/wEPDwUKL
/wEWNAL19Z
Clear Clipboard
Job
Number
Task No
Permit
No.
Permit
Descriptio
n
Start Date
End Date
Performin
g
Authority
1-Jan
21589 65666
2 INCH IA MECH BERTH-2, 2"
INSTRUMENT AIRLINE MECH,
2INCH IA MECH B3, berth-2
nitrogen line, Berth-5 IA 2" line,
BERTH-5 NITROGEN LINE, CC54,
CR02A, CR03, CR03 MECH
Loading Nodes...
Loading Nodes...Tag ID
Search Remove Filter Archived PermitsTask List Return
65666
None Specified
None Specified
Operating
Authority
Icon
Selection
Permit
Status
Conditions
Activities
Tools
Current
Selections
:
Username
Password
Username
Password
I confirm that I am
taking control as the
co-ordinator
I confirm that I am
taking control of area
awareness
None Specified
None Specified
Search Cancel Search
Username
Password
Add a
comment
Username
Password
Add a
comment
Username
I confirm that the
work is on hold on
the above mentioned
equipment, that all
personnel have been
informed, and the
work area left in a
safe and tidy
condition.
I confirm that the
work area has been
inspected and that
plant conditions are
acceptable
I confirm that work is
complete on the
above mentioned
equipment, that all
personnel have been
so warned, that all
tools and equipment
have been removed
and the work area
restored to a safe and
tidy condition.
NoParams
NoParams
Sign CompleteClose
NoParams
Password
Add a
comment
Start Date
Performin
g
Authority
Number
Of
Workers
Lastname
Username
Password
Do you still wish to
archive the permit?
Please be aware that
the following
isolations are
attached to the
permit
I have read and fully
understand the above
numbered Permit to
Work and will comply
with the control
conditions specified
and precautions to be
observed
NoParams
None Specified
Cancel
NoParams
Username
Password
Username
Password
Ref. Indicator
Ref. Indicator
please enter your report below
REQUIRED DOCUMENTS
Complete
Permit
Handback
Permit
Search
Permit
Board
I have read and fully
understand the above
numbered Permit to
Work and will comply
with the control
conditions specified
and precautions to be
observed
Information Box
NoParams
Reason
For Delay
Accept
Shift Area -
Other
User
Accept
Shift Co-
ordinator -
Other
User
Edit
Permit
Informati
on
O² Result
Lower
Explosive
Limit
% Volume
Flammabl
e
Toxic
MaterialPPM
*
Gas Results
Chemical Readings
Loading Nodes...
Loading Nodes...
Tag ID
Instrument ID
Loading Nodes...
Loading Nodes...
Tag ID
Equal To
Equal To
Equal To
None
Lower
Bound
Upper
Bound
Lower
Bound
Upper
Bound
Lower
Bound
Upper
Bound
Toxic
Material
PPM
Copyright © 2004–2013 Rap International Limited
PERMITS
TASKS
ISOLATIONS
There are pending notifications.View
There are no messages at this time.
Hide NotificationClose
Correct
Closure
Refusal
View
Permit
View
Comments
& Refusals
View
Attachmen
t
Task /
Permit
History
Tag ID
% Volume Flammable
Gas Results
Toxic Material
Chemical Readings
O² Result
Lower Explosive Limit
Gas Results
Chemical ReadingsLoading Nodes...
Loading Nodes...
Instrument ID
None
None
Location Infrastructure
Edmedio Ebarle - Logout
English
Locations > Permitboard
Permi
t
Board
(Filter
ed)
Permit No Task No Tag ID
Job
Number
Task No
Clipboard
1-Jan
23056 68813CC-49 MECh, CR01, FRH 9nos
MECH
/wEPDwUKL
/wEWNAL19Z
Clear Clipboard
Search Remove Filter Archived PermitsTask List Return
68813
Permit
No.
Permit
Descriptio
n
Start Date
End Date
Performin
g
Authority
Operating
Authority
Icon
Selection
Permit
Status
Conditions
Activities
Tools
Current
Selections
:
Username
Password
Loading Nodes...
Loading Nodes...Tag ID
I confirm that I am
taking control as the
co-ordinator
68813
None Specified
None Specified
None Specified
Search Cancel Search
Username
Password
Username
Password
Add a
comment
Username
Password
Add a
comment
I confirm that the
work is on hold on
the above mentioned
equipment, that all
personnel have been
informed, and the
work area left in a
safe and tidy
condition.
I confirm that the
work area has been
inspected and that
plant conditions are
acceptable
I confirm that I am
taking control of area
awareness
NoParams
NoParams
Sign CompleteClose
Username
Password
Add a
comment
Start Date
Performin
g
Authority
Number
Of
Workers
Lastname
I confirm that work is
complete on the
above mentioned
equipment, that all
personnel have been
so warned, that all
tools and equipment
have been removed
and the work area
restored to a safe and
tidy condition.
Do you still wish to
archive the permit?
Please be aware that
the following
isolations are
attached to the
permit
Sign CompleteClose
NoParams
None Specified
Cancel
Username
Password
Username
Password
Username
Password
Ref. Indicator
Ref. Indicator
please enter your report below
I have read and fully
understand the above
numbered Permit to
Work and will comply
with the control
conditions specified
and precautions to be
observed
Information Box
I have read and fully
understand the above
numbered Permit to
Work and will comply
with the control
conditions specified
and precautions to be
observed
NoParams
NoParams
REQUIRED DOCUMENTS
Complete
Permit
Handback
Permit
Search
Permit
Board
Reason
For Delay
Accept
Shift Area -
Other
User
Accept
Shift Co-
ordinator -
Other
User
Edit
Permit
Informati
on
O² Result
Lower
Explosive
Limit
Gas Results
Loading Nodes...
Tag ID
Equal To
Equal To
Equal To
% Volume
Flammabl
e
Toxic
MaterialPPM
Lower
Bound
Upper
Bound
Lower
Bound
Upper
Bound
Lower
Bound
Upper
Bound
Toxic
Material
PPM
Copyright © 2004–2013 Rap International Limited
PERMITS
TASKS
ISOLATIONS
*
Chemical ReadingsLoading Nodes...
Instrument ID
Tag ID
% Volume Flammable
Gas Results
Toxic Material
Chemical Readings
Loading Nodes...
Loading Nodes...
O² Result
Lower Explosive Limit
Gas Results
Chemical Readings
Tag ID
Loading Nodes...
Loading Nodes...
Instrument ID
Equal To
None
None
None
There are pending notifications.View
There are no messages at this time.
Hide NotificationClose
Correct
Closure
Refusal
View
Permit
View
Comments
& Refusals
View
Attachmen
t
Task /
Permit
History
Location Infrastructure
Edmedio Ebarle - Logout
English
Locations > Permitboard
Permi
t
Board
(Filter
ed)
Permit No Task No Tag ID
Clipboard
/wEPDwUKL
/wEWNAL19Z
Clear Clipboard
Job
Number
Task No
Permit
No.
Permit
Descriptio
n
Start Date
End Date
1-Jan
23682 69485
Berth-1 Manifold, CC-08, CC-11,
CC-27 CIVIL, CC-29 CIVIL, CC-30
CIVIL, CC-31 CIVIL, CC-34 CIVIL,
CC-36 CIVIL, CC-40 CIVIL, CR-02D
Loading Nodes...
Loading Nodes...Tag ID
Search Remove Filter Archived PermitsTask List Return
69485
None Specified
Performin
g
Authority
Operating
Authority
Icon
Selection
Permit
Status
Conditions
Activities
Tools
Current
Selections
:
Username
Password
Username
Password
I confirm that I am
taking control as the
co-ordinator
I confirm that I am
taking control of area
awareness
None Specified
None Specified
None Specified
Search Cancel Search
Username
Password
Add a
comment
Username
Password
Add a
comment
Username
I confirm that the
work is on hold on
the above mentioned
equipment, that all
personnel have been
informed, and the
work area left in a
safe and tidy
condition.
I confirm that the
work area has been
inspected and that
plant conditions are
acceptable
I confirm that work is
complete on the
above mentioned
equipment, that all
personnel have been
so warned, that all
tools and equipment
have been removed
and the work area
restored to a safe and
tidy condition.
NoParams
NoParams
Sign CompleteClose
NoParams
Password
Add a
comment
Start Date
Performin
g
Authority
Number
Of
Workers
Lastname
Username
Password
Do you still wish to
archive the permit?
Please be aware that
the following
isolations are
attached to the
permit
I have read and fully
understand the above
numbered Permit to
Work and will comply
with the control
conditions specified
and precautions to be
observed
NoParams
None Specified
Cancel
NoParams
Username
Password
Username
Password
Ref. Indicator
Ref. Indicator
please enter your report below
REQUIRED DOCUMENTS
Complete
Permit
Handback
Permit
Search
Permit
Board
I have read and fully
understand the above
numbered Permit to
Work and will comply
with the control
conditions specified
and precautions to be
observed
Information Box
NoParams
Reason
For Delay
Accept
Shift Area -
Other
User
Accept
Shift Co-
ordinator -
Other
User
Edit
Permit
Informati
on
O² Result
Lower
Explosive
Limit
% Volume
Flammabl
e
Toxic
MaterialPPM
*
Gas Results
Chemical Readings
Loading Nodes...
Loading Nodes...
Tag ID
Instrument ID
Tag ID
Loading Nodes...
Loading Nodes...
Equal To
Equal To
Equal To
None
Lower
Bound
Upper
Bound
Lower
Bound
Upper
Bound
Lower
Bound
Upper
Bound
Toxic
Material
PPM
Copyright © 2004–2013 Rap International Limited
PERMITS
TASKS
ISOLATIONS
There are pending notifications.View
There are no messages at this time.
Hide NotificationClose
Correct
Closure
Refusal
View
Permit
View
Comments
& Refusals
View
Attachmen
t
Task /
Permit
History
Gas Results
Chemical ReadingsLoading Nodes...
Loading Nodes...
Tag ID
% Volume Flammable
Gas Results
Toxic Material
Chemical Readings
O² Result
Lower Explosive Limit
Instrument ID
None
None
Permit
Descriptio
n
Permit
StatusStart Date
<Extension of Permit No.13990
=> 16021 => 17558 => 19633>
cutting/grading/levelling and
compaction of existing ground,
removal of unusable excav
material, lifting work for loading
/ unloading of construction
materials, installation of precast
VBU and TTS structure. Painting
works, excavation works,
concreting works, formwork,
rebar works, erection and
dismantling of temporary
scaffolding working platforms for
TTS Post for Installing Temporary
Construction Ramp at North of
Aysha St
Live 27/05/2013 13:02
None Specified
None Specified
None Specified
Permit
Descriptio
n
Permit
StatusStart Date
Transportation, unloading and
erection of 2” pipe including pipe
supports, cutting, grinding, fit-up,
welding of pipe joints, supports,
cleaning of pipe joints, touchup
paint work included. Air blowing
of pipe included for fit- up.
Drilling of pipe supports also
included. Tie-in activities
including cold cutting of pipes,
fitup and welding of joints,
installation of isolation valves
and blind. for Tie-In(s) and
Routing of Nitrogen Pipeline 2
Dia at Berth 2 [24 hrs, 100
persons]
Live 5/6/2013 14:55
None Specified
None Specified
None Specified
None Specified
Permit
Descriptio
n
Permit
StatusStart Date
To carry out welding and
erection of structures, bridges,
pipes, pipe loops, pipe supports
on sleepers/structure/pipe
stands including pipe pulling,
cutting, grinding, preheating, fit-
up, air blowing, drilling, Bolt
tightening, loading /offloading of
materials and equipment,
scaffolding & structural erection
(assembly, bolting & alignment)
For CC-49 [24 hrs ,300 Persons]
Live 18/08/2013 09:46
None Specified
None Specified
None Specified
Permit
Descriptio
n
Permit
StatusStart Date
EARTHWORKS (EXCAVATION,
BACKFILLING,
GRADING/LEVELING, REMOVAL
OF EXCAVATED, WASTE AND
EXCESS MATERIALS), REBAR
WORKS, FORM WORKS,
CONCRETE POURING WORKS,
CONCRETE CURING WORKS,
SCAFFOLDING WORKS,
PAINTING/COATING ON
CONCRETE SURFACE, LIFTING
WORKS,
INSTALLATION/PROVISION OF
TEMPORARY FACILITIES
(ABLUTION BLOCKS, REST
SHELTERS AND DRINKING WATER
STATIONS), ELECTRICAL WORKS
(TEMPORARY POWER SUPPLIES)
FOR CC-29 [24 HOURS, 500
PERSONS]
Live 10/9/2013 12:24
None Specified
None Specified
None Specified
None Specified
Comment
sIcons
Comment
sIcons
Comment
sIcons
Comment
sIcons