RHODE ISLAND TROLLEY TRAIL From Charles Armentrout Dr to Farragut St Kidus Debasu Transportation Engineer, Office of Highway Development MDOT State Highway Administration [email protected]

RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

RHODE ISLAND TROLLEYTRAIL

From Charles Armentrout Dr to Farragut St

Kidus Debasu

Transportation Engineer, Office of Highway Development

MDOT State Highway Administration

[email protected]

Page 2: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Topics

Project Purpose and Need

Project Limits

Project Schedule and Path

Current Design

Current status and Next steps

Public Meeting and Outreach

Page 3: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Purpose and Need

-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing Rhode Island Trolley Trail and the Anacostia Tributary Trail system.

-While the primary aim of this project is to improve the connectivity amongst the existing

trail systems it will also further enhance connectivity between neighboring towns.

Page 4: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Project Limits

Existing Rhode

Island Trolley

Trail

Proposed

10’ SUP

Anacostia

Tributary

Trail System

Proposed ADA

Compliant

Sidewalk

Page 5: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Milestones to Date

Project was requested by the City of Hyattsville.

Early 2016

Surveys Started

Mar. 2017

Design initiation

Aug. 2017

Line Grade and Typical

Mar. 2018

Official 30% Design Completion Meeting

Aug. 2018

Page 6: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Project Schedule

Right of Way (ROW) needs and estimate prepared

Dec .2018

Agreement signature

(anticipated)

Spring. 2019

ROW cleared

(agreement dependent)

Spring. 2020

Project Advertised to Prospective Bidders

(ROW dependent)

Fall. 2019

Construction Start

(ROW dependent)

Spring. 2020

Page 7: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Existing Condition

Existing Condition :-

• 4-Lane high way, two lanes on each direction.

• Intersection of Charles Armentrout Dr with Rhode Island Ave

• Adjacent to North Bound lane is the CSX trainline.

Page 8: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Existing Bicycle and Pedestrian Facilities

Bus Stop #1 Bus Stop

#3Bus Stop

#2

Bus Stop #5

Bus Stop #4

Existing SidewalkSouth Bound

Existing SidewalkNorth Bound

Existing Shared Use Path

Existing Rhode Island Trolley Trail

Page 9: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Proposed Bicycle and Pedestrian Facilities

Bus Stop (removed) Bus Stop

#3

Bus Stop #2

Bus Stop #5

Bus Stop #4

Proposed Sidewalk

Proposed Shared Use Path

Page 10: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Current Design

• Proposed:-

• Resurfacing on Charles Armentrout Dr. to increase separation between vehicular traffic and the existing Shared Use Path.

• Construct a Shared Use Path from Charles Armentrout to Farragut Street NB side.

• Construct ADA Compliant Sidewalk from 41st St. up until Braxton Pl.

• A road diet on US 1 is proposed to accommodate these improvements.

Grinding and

Resurfacing

Page 11: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Existing Typical Section

Page 12: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Proposed Design Typical Section(Road Diet)

Page 13: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Traffic Analysis

• Road Diet Analysis

• Traffic analysis was completed by MDOT SHA.

• Traffic analysis numbers predict future traffic conditions with a road diet will be comparable to the existing traffic condition.

• Traffic signals will be optimized throughout the corridor to minimize exasperating vehicular traffic operations.

No Road No Road Road

Diet

Build Diet Build Diet(Optimiz

ed)

US 1 at E E E F E

41st Pl/Charles 66.6 67.4 74.1 88.3 77.5

Armentrout Dr

US 1 at B B C C C

Crittenden St/ 13.9 14.1 32.4 30 28.2

42nd

St

US 1 at A A A A A

Farragut St 3.8 3.7 6.7 5.2 4.9

US 1 at A A A A A

Gallatin St 4.3 4.2 3.6 3.6 3

2040 PM

Intersection

2040 AM

Page 14: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Proposed Design Bus Turnouts

Page 15: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Bus Turnout Design

Existing Proposed

Bus Turnout by

42nd PlBus Stop by

42nd Pl

Page 16: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Bus Turnout Design

Existing Proposed

Bus Stop by

District Court

Bus Turnout by

District Court

Page 17: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Other Road Diet treatments Left turn lanes

• Increasing Storage on left turn onto Crittenden St.

Page 18: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Other Road Diet treatments Provisions for stalled vehicles

• Removing Median at US 1 north of 43rd Ave.• Restricting Left Turn from 43rd Ave onto US 1.

Prince George’s County District Court

43

rdA

ve

Page 19: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

ROW (Right of Way) Information

Prince George's County District Court

Page 20: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Current Status and Next Steps

• Design has reached 30% design completion.

• Additional Right of way (ROW) will be required for Storm Water Management.

• The extent of right of way need will be finalized after supplemental metes and bounds surveys are complete. Anticipated to be done by the end of October.

• Coordination with CSX transportation will be required to ensure smooth ROW transaction.

• Estimated construction date would be based on right of way.

Page 21: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Public Meeting and Outreach

• A mandatory referral in partnership with the city of Hyattsville and M-NCPPC(Maryland-National Capital Park and Planning Commission) will be scheduled prior to the end of the year.

• A public meeting will be coordinated with City officials subsequent to the Mandatory referral.

Page 22: RHODE ISLAND TROLLEY TRAIL€¦ · Purpose and Need-The project aims to construct a shared use path for both pedestrians and bicyclist that connects to two trails namely, the Existing

Questions

Need information /Have QuestionsUS 1 from Chapman Avenue to Farragut Street Bicycle Retrofit

(Rhode Island Trolley Trail)

Kidus Debasu- MDOT SHA

Project Manager

Phone: 410-545-8824

Email: [email protected]