16
Richard F Boyce Injector UpdateL0-1 Accelerator Structure [email protected] 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC RF Technical Review, November 3, 2004 •L0-1 Design Specifications •Engineering Constraints and Assumptions •Engineering Drawings of New Input Cells –Detail of RT geometry –Dual feed assembly •Fabrication Process •Tuning the New Cells •Tuning the Dual Input High Power RF Circuit •Schedule •Summary and Conclusions

Richard F Boyce Injector UpdateL0-1 Accelerator [email protected] 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

  • View
    221

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20041

L0-1 Design, Manufacturing & TestingR. F. Boyce, SLAC

RF Technical Review, November 3, 2004

•L0-1 Design Specifications•Engineering Constraints and Assumptions•Engineering Drawings of New Input Cells

–Detail of RT geometry–Dual feed assembly

•Fabrication Process•Tuning the New Cells•Tuning the Dual Input High Power RF Circuit•Schedule•Summary and Conclusions

Page 2: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20042

L0-1 RF Design Specifications

Coupler Design For The LCLS Injector L0-1 Structure Zenghai Li, Lynn D. Bentson, David H. Dowell,

Cecile Limborg, John Schmerge, Liling XiaoLCLS Technical Report, in progress

Page 3: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20043

Engineering Constraints and Assumptions

Dual RF Input Feed (eliminates dipole kick)Race Track Design (eliminates quadrupole field)Solenoid has to fit over RF flanges and supportsModify an existing SLAC structure

Cut off two cells and replace with new coupler assembly

Page 4: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20044

A

A SECTION A-A

101.549O

29.1325.842

67.335

0.7874

R 3.0861 R 3.0861

26.21O

13mm.512in

O 71.68mm2.822in

O 71.68mm2.822in

O 101.55mm3.998in

92.08O

83.3O

92.13O

Dual Feed Parts: Race track cell and adjacent cell

SLAC Drawing PF-380-804-09

Page 5: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20045

36.505

8.687

C

C

O 7.126

Constraints on the Dimensions of the Solenoid

Outer radius

LengthInner diameter

Page 6: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20046

Procedure for Cutting Existing StructureIn 1985 Carl Rago shortened structures from 10 feet to 9 ½ feet as shown on SLAC Drawing SA-750-214-02

Cut the structure between the

irises and machine the end back to the iris

Their cuts Our cut

Page 7: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20047

New Coupler Assembly

Mating features will be identical to those used for the 9 ½ foot shortened structures.

Location of braze points for the tuning studs.

Mating surface to braze to the modified structure.

Page 8: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20048

Fabrication Process

Fabricate the parts and cut the existing structure

Cold RF test of parts before brazing dual feed sub assembly

Re-machine parts as required, iterate with cold tests

Braze dual feed subassembly

Cold test brazed subassembly with cut structure

Final braze of subassembly to cut structure

Final RF tests

Page 9: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 20049

Tuning the L0-1 Structure

Proposed design with push-pull studs

NLC design using slide hammer studs

Standard SLAC technique using hydraulic pinch

Page 10: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 200410

H

H

H

H

DETAIL I

Proposed L0-1 Tuning StudsThe studs are brazed to the wall of the cell and captured by a hollow adjusting screw which is turned in or out for the adjustment process.

Stud

Hollow screw

Threaded housing

Braze to copper cell

All tuning parts are stainless steel with silver plated threads

Page 11: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 200411

NLC Standard HDDS Cell Tuning

The tuning stud is attached to a slide

hammer for the adjustment process

Page 12: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 200412

Tuning of a Standard SLAC Structure

A hydraulic press was moved to each cell and pinched it according to a well know process.

This was done as part of a mass production procedure.

Page 13: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 200413

Dual Feed RF High Power RF Circuit

Pumps

Directional Couplers

Supports

Dual input feeds are balanced on the bench and the Directional Coupler signals are recorded and documented for future checks.

Page 14: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 200414

Tolerances on Dual Feed Waveguide and Coupling Holes

Table 1 The tolerance for the four coupler errors is listed. The tolerance is determined by either reducing the amplitude to 1% of its nominal value or the phase to 10% of its nominal value as listed in the last column.

Error Tolerance Defining Criteria Coupler Position < 1° Phase Coupler Iris Size D/D0 < .02 Amplitude RF Feed Amplitude V/V0 < .02 Amplitude RF Feed Phase < 3° Phase

Coupler Design For The LCLS Injector L0-1 Structure Zenghai Li, Lynn D. Bentson, David H. Dowell,

Cecile Limborg, John Schmerge, Liling XiaoLCLS Technical Report, in progress

Page 15: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 200415

LCLS Injector and Linac Schedule

Gun and L0-1 needed for installation:October 2006

Page 16: Richard F Boyce Injector UpdateL0-1 Accelerator Structurerfb@slac.stanford.edu 3 November 2004 1 L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC

Richard F Boyce

Injector UpdateL0-1 Accelerator Structure [email protected]

3 November 200416

Summary and Conclusions

L0-1 accelerator sectionRF design finished

Engineering design in progress

Manufacturing processes are being researched

Completed accelerator section needed for October 2006 installation