10
RIDING REDISTRIBUTION PROCESS

RIDING REDISTRIBUTION PROCESS

  • Upload
    bart

  • View
    52

  • Download
    0

Embed Size (px)

DESCRIPTION

RIDING REDISTRIBUTION PROCESS. Projected Number of Seats. New formula: An increase of 30 seats to be allocated between: Ontario (15), Alberta (6), BC (6) and QC (3) For a new total of 338 seats 92% of ridings affected by last riding redistribution . Projected Timeline. - PowerPoint PPT Presentation

Citation preview

Page 1: RIDING REDISTRIBUTION PROCESS

RIDING REDISTRIBUTION PROCESS

Page 2: RIDING REDISTRIBUTION PROCESS

Projected Number of Seats New formula: An increase of 30 seats to be

allocated between:◦ Ontario (15), Alberta (6), BC (6) and QC (3)◦ For a new total of 338 seats

92% of ridings affected by last riding redistribution

Page 3: RIDING REDISTRIBUTION PROCESS

Projected Timeline Spring 2012: Establish boundary

commissions- Completed Spring/Summer 2012: Proposals and public

hearings Fall 2012: Initial reports Spring 2013: Objections (Committee/MPs) Sept 2013: Proclamation of draft

Representation order, 7 month waiting period

Page 4: RIDING REDISTRIBUTION PROCESS

What We Are Doing Maps National Working Group

◦ Identify groups of interest◦ Process affecting the actual riding association ◦ Initial feedback letter

Ask MPs to speak on our behalf when the process is in the House

Page 5: RIDING REDISTRIBUTION PROCESS

Ottawa Valley

Page 6: RIDING REDISTRIBUTION PROCESS

Toronto

Page 7: RIDING REDISTRIBUTION PROCESS

Southern Ontario

Page 8: RIDING REDISTRIBUTION PROCESS

Southwestern

Page 9: RIDING REDISTRIBUTION PROCESS

Northern

Page 10: RIDING REDISTRIBUTION PROCESS

Contact information Mailing Address130 King Street West

36th Floor, Suite 3670P.O. Box 368Toronto, OntarioM5X 2A2

E-mail [email protected] Telephone (toll-free) 1-855-747-7224