Risk Assessment/Analysis Toolsfor Project Managers

State Risk Management Team

Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Page 2: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Training Objectives

1. Knowledge of the principles and techniques of risk analysis.

2. Knowledge of project risk threats & opportunities impact to cost and schedule.

3. Knowledge of entering data to identify & quantify project risk threats and opportunities.

4. Knowledge of generating cost & schedule graphs, risk register and other reports.

5. Ability to determine risk-based cost & schedule and the project contingency amount from risk analysis results.

UPDATE THIS

Page 3: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

What is Risk?

Project Management Institute (PMI) Says:

“An uncertain event or condition that, if it occurs, has a positive or negative effect on the project’s objectives.”

$

S

S

Scope

Schedule

Cost

Page 4: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Assessment

Risk Assessment’s aim is to assess potential impact of various scope, event, and budget risks on the project’s cost and schedule.

Probability of Occurrence

Impact

Initial Risk

Page 5: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Management

Probability of Occurrence

Impact

Initial Risk

Managed Risk

Risk Management’s aim is to identify opportunities and mitigation strategies to reduce both the likelihood of an event occurrence and the potential effect if it occurs.

Page 6: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Qualitative vs Quantitative Risk Analysis

Project Management Handbook, Risk Based Graded Approach Worksheet (Assess riskiness of all project to aide in consultant selection)

Risk Analysis Self Modeling Tool by HDR & SHRP2-R09 Risk Template(total project cost generally under $50 million)

Risk Analysis Workshop and Commercial Risk Modeling Software(total project cost greater than $50 million)

Independent Consultant-led Workshop (complex or major projects with total cost greater than $500 million)

6

What’s in your Tool Box?

Page 7: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

What’s the Risk Based Graded Approach Worksheet?

• PM Handbook – Chapter 19• Initial risk assessment (15 minutes)• Supports consultant selection decision

Page 8: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 9: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

What is the Self-Modeling Risk Tool?

• Worksheet with Macros

• Generally under $50 million

• Less than 24 Risk Events

• Needed to Determine “Project Unknowns” Factor in the LRE (i.e. Contingency)

• 3-Day Workshop Not Necessary

• FDOT & Consultants working on FDOT projects!

Page 10: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

What’s the Purpose of the Self-Modeling Tool?

Traditional• Contingency is intended to

include all risk (known & unknown)

• Little control of cost and schedule

• Reactive

Risk-Based Risk are clearly identified and

quantified

Reasonable control of cost and schedule

Proactive

Threat 1, 2, 3, etc.

Opportunity 1, 2, 3, etc.

Contingency

Page 11: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Range of Cost at Completion

Cost

Time

How Can Cost Risk Analysis Help?

Construction

Open to Traffic

PD&E Design

Letting

Estimate PDC

Estimate Inflated $

As Planned Curve

Better than Planned Curve

Worse than Planned Curve

Range for Completion Date

Source: FHWA

Page 12: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

What are the Outcomesof Risk Management?

• Validation of Project Cost and Schedule

• Managed Risk Response Plan• Identification of high cost and schedule risk

drivers

• Managed District Contingency Box• Reduced Contingency as project evolves

• Understand and Communicate Cash Flow Requirements and Financial Plans

Page 13: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk-based Estimating Process

• Identify Projects

• Project Manager – Estimators Coordination

• Identify Project Risk

• Quantify Project Risk

• Risk Self-Modeling Tool• Enter project parameters

• Enter quantified risk

• Generate cost & schedule graphs

• Generate risk register

• Determine project contingency

Page 14: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

What is needed to Get Started?

• Materials Needed:• Project Information• Long Range Estimate

• Summary by Component • Personnel Needed:

• Project Manager• Estimator• Consultant/Designer• Subject Matter Experts:

• Design• Construction• Other Stakeholders

Page 15: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

How Does It Work?Identify

Assess

Analyze

Response Strategies

Monitor& Control

Plan &Organize

RISK

Plan & Organize

Page 16: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 17: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 18: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 19: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

SHRP2-R09 - Structuring

2-9

Page 20: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

How Does It Work?

Identify

Assess

Analyze

Response Strategies

Monitor& Control

Plan &Organize

RISK

Page 21: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Management Process

•Where to Start?•Start-up Risk List•Lessons Learned •Project Knowledge•Project History•Team Brainstorming

Identify

Page 22: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 23: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Starter List

Page 24: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 25: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

SHRP2-R09 - Risk Identification

Generated by template once risks are categorized 2-18

Page 26: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

How Does It Work?

Identify

Analyze

Response Strategies

Monitor& Control

Plan &Organize

RISKAssess

Page 27: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Assess

Probability

40%

Impact to Schedule

60 Daysx

Impact to Cost

$100,000x

10% 90%

40%

10% 90%

60 D

10% 90%

0.1M

Page 28: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 29: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Assessment

Page 30: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Assessment

Page 31: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Assessment

Page 32: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Assessment

Page 33: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 34: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 35: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Assessment

Page 36: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Assessment

Page 37: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

SHRP2-R09 - Unmitigated Risk Assessment

2-25

Page 38: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

How Does It Work?

Identify

Assess

Response Strategies

Monitor& Control

Plan &Organize

RISKAnalyze

Page 39: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 40: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Analysis

Page 41: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 42: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 43: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Analysis

Page 44: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

SHRP2-R09 - Unmitigated Project Performance

Project Schedule Performance (Base vs. Unmitigated)

Note: Base performance results from Step 12-34

Page 45: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

SHRP2 Risk Management Template

HELP Step 07 - Unmitigated Risk Ranking Plots

<==BACK FWD==>HOME

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50

CR-1

PD-8

Mean Severity ($M)

Ris

k

Opportunities - Unmitigated

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70

SC-6PR-1RR-1RR-3RR-8RR-2CR-2CR-4

PD-13PR-2

PD-11CR-3

PD-12PD-14

PD-4SC-3SC-5

PD-16RR-7PD-5PD-6CR-5EP-2RR-6PD-1

PD-15CR-9PR-8PL-2CR-7

Mean Severity ($M)

Ris

k

Threats - Unmitigated

SHRP2-R09 - Unmitigated Risk Ranking Plots

2-36

Page 46: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

How Does It Work?

Identify

Assess

AnalyzeMonitor& Control

Plan &Organize

RISK

Response Strategies

Page 47: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Mitigation StrategiesRisk Management Process

Page 48: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Response StrategiesThreats

Risk Factors that Increase Cost or Schedule

Opportunities

Risk Factors that Reduce Cost or Schedule

Avoid: Change the project scope to eliminate the impact of a risk.

Exploit: To make a proactive decision to take action to show that an opportunity is realized.

Transfer: Move a risk to another party who is more capable at handling the risk (such as the developer or insurance company).

Share: Assigning ownership of the opportunity to a third-party who is best able to capture the benefit for the project.

Mitigate: The project team may seek to lessen the impact of a specific risk item, which may involve the consumption of additional time and/or money. Mitigation usually requires positive action and has a cost.

Enhance: Take action to increase the probability and/or impact of the opportunity for the benefit of the project; seeking to facilitate or strengthen the cause of the opportunity, and proactively targeting and reinforcing its trigger conditions.

Accept: To take no action when a response may be too costly to be effective or when the risks are uncontrollable and no practical action may be taken to specifically address it. In active acceptance, the project team sets up a contingency reserve fund to account for the residual expected value of the remaining risks.

Page 49: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Response Strategies

Page 50: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Risk Response Strategies

Page 51: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 52: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 53: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 54: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

SHRP2-R09 - Mitigated Project Performance

Project Schedule Performance (Unmitigated vs. Mitigated)

2-51

Page 55: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

How Does It Work?

Identify

Assess

Analyze

Response Strategies

Plan &Organize

RISKMonitor & Control

Page 56: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Monitor & Control

The Risk Register is the single most powerful Control Tool

Incorporate it in your Progress Reports!

Page 57: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka
Page 58: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

SHRP2 Risk Management Template

HELP Step 10 - Mitigated Risk RegisterNOTE: Risks and opportunities are sorted by total severity, though the

order should be identical whether using raw severity or percent of total

severity

Risk

Label

Risk Description Risk

Type

Mean

Cost

Impact

(CY $M)

Mean

Duration

Impact

(months)

Mean

Disruption

Impact

(M-Hr)

Mean

Change to

Critical

Path

Schedule

Mean

Severity

(YOE $M)

Percent

of Total

Mean

Severity

Risk

Ranking

based on

Mean

Severity

Retire

Risk ?

RR-8 QDOT helps City pay for water and sewer-line relocation Threat 0.91 0.00 0.00 0.00 0.95 0.16 1 No

PR-1 Uncertainty in construction-cost inflation rate Threat 0.58 0.00 0.00 0.00 0.62 0.10 2 No

RR-1 Uncertainty in ROW inflation rate Threat 0.58 0.00 0.00 0.00 0.60 0.10 3 No

PD-13 Change in environmental documentation. Threat 0.13 1.00 0.00 1.00 0.38 0.06 4 No

PR-2 Uncertain Design/Build contracting market conditions at time of bid Threat 0.30 0.25 0.00 0.25 0.38 0.06 5 No

SC-6 Provide new lighting throughout project. Threat 0.29 0.00 0.00 0.00 0.31 0.05 6 No

RR-3 Unwilling sellers Threat 0.29 0.00 0.00 0.00 0.30 0.05 7 No

RR-2 Accelerating pace of development in interchange area Threat 0.16 0.38 0.00 0.37 0.26 0.04 8 No

PD-12 Structures impacted by Main Street realignment are eligible for Historic Register. Threat 0.13 0.31 0.00 0.31 0.21 0.03 9 No

<===BACK FWD===>HOME

SHRP2-R09 - Mitigated Risk Register

Page 59: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

SHRP2 Risk Management Template

HELP Step 12 - Mitigated Risk Ranking Plots

<===BACK FWD===>HOME

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

RR-8PR-1RR-1

PD-13PR-2SC-6RR-3RR-2

PD-12CR-4

PD-11PD-14

PD-4CR-3CR-2SC-3SC-5

PD-16RR-7PD-5PD-6CR-5EP-2RR-6PD-1

PD-15CR-9PR-8PL-2CR-7

Mean Severity ($M)

Ris

k

Threats - Residual

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50

CR-1

PD-8

Mean Severity ($M)

Ris

k

Opportunities - Residual

SHRP2-R09 - Mitigated Risk Ranking Plots

2-53

Page 60: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

• Production Support Office Web Site• Project Management Handbook Chapter 19

• Program Management Office SharePoint Site• Cost Risk Analysis Tools CRA Tools

60

Where can I find the tools?

Page 61: Risk Assessment/Analysis Tools for Project · PDF fileRisk Assessment/Analysis Tools for Project Managers State Risk Management Team Greg Davis, Tim Brock, Rob Quigley, and Frank Chupka

Questions?

State Risk Management Team

Greg DavisTim Brock

Rob QuigleyFrank ChupkaKurt Lieblong