24
Ritesh Kumar Singh, Senior Associate Tetra Tech

Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Ritesh Kumar Singh, Senior Associate Tetra Tech

Page 2: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

AMI and Smart Grid Pilots

www.smartenergy-india.com

Page 3: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Smart Grid Projects in US

Page 4: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Smart Grid Projects other parts of world

Page 5: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Singapore : Intelligent Energy Systems (IES)

Lead

Organization

Energy Market Authority

Location Jalan Bahar

Category AMI

Purpose Evaluate new applications and

technologies around smart grid

Budget $30 million

Ref: www.ema.gov.sg/page/135/id:83/

Page 6: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Singapore : Intelligent Energy Systems (IES)

• 4500 consumers from residential, commercial and industrial segments

• Extends to Nanyang Technological University (NTU) campus, the

CleanTech Park at Jalan Bahar and the Punggol Eco-Precinct

• SP PowerGrid and SP Services, are therefore key partners with EMA

• Phase I (2010-2012) : Focus on implementation of enabling infrastructure;

AMI and Communication system. Next Generation National Broadband

Network and other communication platforms.

• Phase II (2012-2013) : Focus on Smart Grid Applications

Page 7: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Singapore: Components of IES

Page 8: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Lead

Organization

Korea Smart Grid Institute (KSGI)

Location Seoul

Category Integrated Systems

Purpose Construction of test bed that allows

testing of most advanced

technologies and R&D results as

well as development of business

models

Budget $53.6 million

Ref: Korea Smart Grid Institute :

www.smartgrid.or.kr/10eng3-1.php

Korea : Jeju Smart Grid Test Bed

Page 9: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

• The program consists of a fully integrated Smart Grid System for 6000

households; wind farms and four distribution lines are included in the pilot

program. This demonstrates the extent of Korea’s commitment towards an

environmentally viable future.

• Korea plans to slash overall energy consumption by 3% and cut down total

electric energy consumption by 10% before 2030. The government also plans

to reduce greenhouse gas emissions by 41 million tons by this time. The

government has announced that it will undertake a nation-wide Smart Grid

implementation by 2030.

• On January of 2010, Korea has taken a significant step forward in its efforts to

grab a foothold in the global smart grid sector, inking a tentative deal with

Illinois to jointly develop and test technologies for smart grid.

• Under the plan, technologies that are developed through this partnership and

are deemed viable for commercialization will be rolled out both in Illinois as

well as in Korean cities. The two sides agreed to launch a business model for a

smart grid on Jeju-do Island and apply it in Seoul and Chicago later on.

Page 10: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Jeju Test Bed Vision

Page 11: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other
Page 12: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Jeju Progress Schedule

About 10 consortiums, 168 companies in five areas are participating in testing

technologies and developing business models

Page 13: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Lead

Organization

Tianjin Electric Power Company

Location Tianjin

Category Integrated Systems

Purpose Develop Eco-City

Started in April’2010

Budget $54.6 million

Ref: www.eco-city.gov.cn

Sino-Singapore Tianjin Eco-city

Page 14: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Sino-Singapore Tianjin Eco-city

• Project Started in April 2010

• smart power supply network will be formed with 220kV and

110kV transmission network, 10~35kV distribution lines and

380V/220V low voltage distribution networks

• The renewable generation will take 24.62% of the total generation

to meet the planning requirements of the Eco-city

• Distributed power generation with grid energy storage and

diversified access

• Self healing and flexible distribution

• Intelligent end use:

• Information collection

• Two way interactive marketing

• Intelligent home building

• Electric charging and discharging system

• Distributed power generation with grid energy storage and

diversified access

• Self healing and flexible distribution

• Intelligent end use:

• Information collection

• Two way interactive marketing

• Intelligent home building

• Electric charging and discharging system

Page 15: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Lead

Organization

Thunder Bay Hydro

Location Ontario

Category AMI

Purpose Electricity conservation and peak

shifting

Budget $10million

Ref: www.tbhydro.on.ca/market/smart-

meter installation.htm

Canada: Ontario Smart Grid Project

Page 16: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Canada: Ontario Smart Grid Project

• Installation of 49000 meters by 2010

• Two way Communications

• Remote connect/disconnect

• Tamper / diagnostic alerts

• Two way Communications

• Remote connect/disconnect

• Tamper / diagnostic alerts

Page 17: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Lead

Organization

Acae Distribuzione

Location Rome

Category AMI

Purpose Energy Efficiency, network

operation control and online status

of HV and LV lines

Budget $10million

Ref: www.oracle.com/corporate/press/

017884-EN

Italy: smart metering in Rome

Page 18: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Italy: smart metering in Rome

• Landis+Gyr and Acea Distribuzione, the largest municipal utility in Italy,

have completed one of Europe’s largest smart metering rollouts in

Rome.

• The implementation of the integrated AMM (Advanced Metering

Management ) system began in 2004 with the objective of improving

energy efficiency in Italy’s capital.

• The system includes high accuracy bi-directional meters and smart grid

applications such as network operation control, and the ability to

monitor low and medium voltage line status automatically.

• The system has been designed to be extended to gas and water meters.

The same system is also being implemented in other utilities in Italy and

abroad, including EPCG, the national electricity distribution company in

Montenegro, as either full-scale or pilot applications .

Page 19: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

US: Center Point Energy

Lead

Organization

CenterPoint Energy

Location Houston

Category AMI

Purpose reduce peak loads, overall

electricity use, and operations and

maintenance costs while increasing

distribution system reliability

Budget $200million

Ref: http://www.smartgrid.gov/project/

centerpoint_energy_smart_grid_pr

oject

Page 20: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

US: Center Point Energy

• CenterPoint Energy Houston Electric’s (CPE) Smart Grid project involves

deployment of a fully integrated advanced metering system and Web portal access

to over 2.2 million customers, along with installation of advanced monitoring and

distribution automation equipment.

• The project aims to reduce peak loads, overall electricity use, and operations and

maintenance costs while increasing distribution system reliability.

• The project implements secure communications to: (1) allow smart meter

customers to view their electricity consumption data whenever they want through

the Smart Meter Texas (SMT) data exchange, and (2) allow CPE to effectively

visualize and operate the distribution system.

• As a transmission and distribution service provider, CPE provides metering data to

retail energy providers (REPs) through the SMT data exchange.

• The project also deploys a more advanced distribution management system and

automated feeder switching, that reduces operational costs and improves service

reliability.

Page 21: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Lead

Organization

Duke Energy Business Services

Location Charlotte, North Carolina

Category Storage Demonstration

Purpose Demonstrate energy and power

storage technologies

Budget $22million

Ref: http://www.smartgrid.gov/project/

duke_energy_business_services_no

trees_wind_storage_demonstratio

n_project

US: Smart Grid Storage Demonstration

Page 22: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

US: Smart Grid Storage Demonstration

• Deploy a wind energy storage demonstration project at the Notrees Wind

power Project in western Texas. The project which started in 2010, will

demonstrate how energy storage and power storage technologies can

help wind power systems address intermittency issues by building a 20

megawatt (MW) hybrid-energy storage system capable of optimizing the

flow of energy

• Congestion reduced

• Energy dispatch optimized

• Energy costs reduced

• Energy efficiency and grid reliability improved

• Carbon emissions decreased

• Wind energy knowledge advanced

Page 23: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

• http://www.oe.energy.gov/

• US government-sponsored Smart Grid projects: http://www.smartgrid.gov/

• Smart Grid Interoperability: http://www.gridwiseac.org

• NIST Smart Grid collaboration Site: http://collaborate.nist.gov/twiki-

sggrid/bin/view/SmartGrid/WebHome

• http://www.sgiclearinghouse.org

• http://my.epri.com

• http://smartgrid.epri.com/

Resource websites

Page 24: Ritesh Kumar Singh, Senior Associate Tetra Tech · Ritesh Kumar Singh, Senior Associate Tetra Tech. AMI and Smart Grid Pilots . Smart Grid Projects in US. Smart Grid Projects other

Thank You

I can be reached at:

[email protected]

+91-9999981284