Upload
vuongdieu
View
228
Download
5
Embed Size (px)
Citation preview
River Morphology and River RestorationConclusions of DANUBEPARKS Work Package 3
and
Possible Future Perspectives for a Follow-up Project
Georg FrankDANUBEPARKS Workshop
River Morphology and RestorationOrth, 26th/27th May 2011
Task Force Meeting WP3Bratislava, January 2010
Task Force Meeting WP3
Bratislava, January 2010
Task Force Meeting WP3
Ingolstadt, November 2010
Task Force Meeting WP3
Ingolstadt, November 2010
Cross-border Restoration Concept Romania - Ukraine
Strategy Conservation and NavigationDanube River´s Morphologyand Revitalization
riverban
k
groyn
Dan
ub
eD
anu
be
Adaption of croynes
Hungary (Duna-Drava National Park)
Removement of Checkdams in small Side arms,
Slovakia (BROZ)
Removement of Checkdams
Hungary (Duna-Drava National Park)
1. What are our joint conclusions of WP3?
2. Is river restoration high priority for your PA in a follow-up?
3. Shall we again inlcude the navigation issue?
4. What are your exptectations for a follow-up? (Wich levels of cooperation do we need: capacity building, strategies, implementation?)
5. How can we build up on the results on DANUBEPARKS I?
LIFE07 NAT/SK/000707 Conservation of Endangered Bird SpeciesPopulations in Natural Habitats of the Danube Inland Delta
1. What are your conclusions of WP3?
2. Is river restoration high priority for your PA in a follow-up?
3. Shall we again inlcude the navigation issue?
4. What are your exptectations for a follow-up? (Wich levels of cooperation do we need: capacity building, strategies, implementation?)
5. How can we build up on the results on DANUBEPARKS I?