Page 1: River Road Meeting 7-22-04

River Road AreaRiver Road AreaSewer ImprovementsSewer Improvements

Neighborhood Advisory Committee

July 22, 2004

Page 2: River Road Meeting 7-22-04

Today’s MeetingToday’s Meeting

• Program Review

• River Road Projects• EQ Basin/Pump Station - Brookford Park• Sewer installation• Force main installation

• Next Meeting Date

Page 3: River Road Meeting 7-22-04

Program ReviewProgram Review

• 4 Sanitary Sewer Overflows in River Road Area

• Must be eliminated by November of 2006• Stiff penalties for missed deadlines

Page 4: River Road Meeting 7-22-04

Proposed River Road Proposed River Road Area ProjectsArea Projects• Underground Equalization Basin – River Road

Park

• Underground Pump Station – River Road Park

• New Force Main Sewer – Brookford Drive

• New Relief Sewer– Beverly and River Road

• Beverly Pump Station – West of Trail

Page 5: River Road Meeting 7-22-04

Project SchedulesProject Schedules

• Projects will be built concurrently

• Construction bids – October/November 2004

• Break Ground – Spring 2005

• Completed by November 2006

Page 6: River Road Meeting 7-22-04

Equalization BasinEqualization Basin

• Underground facility

• 3 million gallon storage capacity

• 120 ft. x 240 ft.

• 17 ft. deep

• To be located at River Road Park ball diamond site• Tanks from old Toledo Water Plant currently

located there

Page 7: River Road Meeting 7-22-04

Equalization BasinEqualization Basin

Page 8: River Road Meeting 7-22-04

Equalization Basin Equalization Basin Issues & DiscussionIssues & Discussion• Construction Access Road

• From River Road to site (between playgrounds)• Reduces amount of construction equipment entering

site from Brookford

• Grading• Part of Treatment Plant project

• Fill to reorient sledding hill• Fill to shift baseball diamond to west• Fill to improve park-like setting

Page 9: River Road Meeting 7-22-04

Issues and DiscussionIssues and DiscussionContinuedContinued• Baseball diamond

• Will be lost for one season due to construction• Options for replacement of the field

• Outfield

• Parking

• Bleachers

• Maintenance building• City reviewing options

Page 10: River Road Meeting 7-22-04

River Road Park River Road Park Pump StationPump Station• Located next to

Equalization Basin• Bulk of facility

underground• Electrical panel above

ground

Page 11: River Road Meeting 7-22-04

Force Main SewerForce Main Sewer

• New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin

• To be located on south side of Brookford

• Shouldn’t disturb street – except for crossings at OLPH and Island Avenue

• Traffic maintained• Will work with committee to minimize disruption

Page 12: River Road Meeting 7-22-04

New Relief SewersNew Relief Sewers

• From River Road, Midland or Hemlock down River Road to Brookford

• New water line will be installed at same time• Should help resolve water pressure problems

• Preferred sewer location is in east lane of River Road

Page 13: River Road Meeting 7-22-04

New Relief SewersNew Relief Sewers

• On Beverly from Brookford to Medford

• Both relief sewer lines should help reduce basement flooding in area

• Traffic control

Page 14: River Road Meeting 7-22-04

Beverly Pump StationBeverly Pump Station

• Underground – with electrical panel(s) above ground

• Will pump waste from Beverly sewer to new EQ basin

Page 15: River Road Meeting 7-22-04

CommentComment

• Questions

• Discussion

Page 16: River Road Meeting 7-22-04

Future MeetingsFuture Meetings

• Next meeting date?

• Best time and location?