2.0 Estimate Provisions and Stage of Works Name of the work : #REF! Description of items Specification Stretches 1 - varying 304 km 0/2-4 2 - - - km 0/2-4 2.1 This is the first inspection. 2.2 Not furnished by field officers Sl. No. Thick in mm Width in mts Forming of Embankment using Carted earth 2 row 1000mm dia Np3 pipe culvert Progress of Work since last QC inspection : Deviations made if Any :

RKT 0.2-0.4 of Peddapalli

Embed Size (px)

DESCRIPTION

report

Citation preview

Page 1: RKT 0.2-0.4 of Peddapalli

2.0 Estimate Provisions and Stage of Works

Name of the work : #REF!

Description of items Specification Stretches

1

- varying 304 km 0/2-4 Completed

2 - - - km 0/2-4 Completed

2.1 This is the first inspection.

2.2 Not furnished by field officers

Sl. No.

Thick in mm

Width in mts

Stage of Work

Forming of Embankment using Carted earth

2 row 1000mm dia Np3 pipe culvert

Progress of Work since last QC inspection :

Deviations made if Any :

Page 2: RKT 0.2-0.4 of Peddapalli

3.0 : Jurisdiction

3.1 Field Officers :

3.1.1 Circle : (R&B) Kadapa S E: Sri J.Chandrasekhar Reddy

3.1.2 Division : (R&B) Rajampeta EE: Sri J. Narashimuhulu Naidu

3.1.3 Sub Division : (R&B) Rayachoti D E E : Sri N.Raja Kumar

3.1.4 Section : (R&B) Rayachoti A E E : Sri T.Jagadeshwara Reddy

3.1.5 Officers Present: AEE

3.2 Quality Control Officers :

3.2.1 Circle : C E : Sri T.Babu Raj

3.2.2 Circle : (R&B) I&Q C ,Kadapa S E: Sri K.Naga Raja

3.2.3 Division : (R&B) Q C Kadapa E E: Sri T.Premananda Reddy.

3.2.4 Sub Division : (R&B) Q C Kadapa D E E : Sri K.Krishna Moorthy

3.2.5 Section : (R&B) Q C Kadapa A E E : Sri Ch.Srinivasulu

3.2.5 Officers Present: D E E / A E E

4.0 Accounts and Executive Instructions

4.1 Stage of Accounts : Materials procured by contractors

4.2 Executive Instructions : ----

4.2.1 Existing Crust Perticulars : ----

4.2.2 Spreading Permission details : ----

4.3 Any other items need mentioning ----

(R&B) Q C & member COT ,Hyderabad

Page 3: RKT 0.2-0.4 of Peddapalli

Observations

Sl No. Items Observed As per estimate Remarks

culvert in km 0/2-4

1 Hume Pipes -

Assist.Exe.Engineer(R&B) Dy.Exe.Engineer(R&B)

QC Section, Kadapa QC Sub Division, Kadapa

2 rows of 4 pipes of dia 1000 mm

2 rows of 4 pipes of dia 1000 mm