2.0 Estimate Provisions and Stage of Works
Name of the work : #REF!
Description of items Specification Stretches
1
- varying 304 km 0/2-4 Completed
2 - - - km 0/2-4 Completed
2.1 This is the first inspection.
2.2 Not furnished by field officers
Sl. No.
Thick in mm
Width in mts
Stage of Work
Forming of Embankment using Carted earth
2 row 1000mm dia Np3 pipe culvert
Progress of Work since last QC inspection :
Deviations made if Any :
3.0 : Jurisdiction
3.1 Field Officers :
3.1.1 Circle : (R&B) Kadapa S E: Sri J.Chandrasekhar Reddy
3.1.2 Division : (R&B) Rajampeta EE: Sri J. Narashimuhulu Naidu
3.1.3 Sub Division : (R&B) Rayachoti D E E : Sri N.Raja Kumar
3.1.4 Section : (R&B) Rayachoti A E E : Sri T.Jagadeshwara Reddy
3.1.5 Officers Present: AEE
3.2 Quality Control Officers :
3.2.1 Circle : C E : Sri T.Babu Raj
3.2.2 Circle : (R&B) I&Q C ,Kadapa S E: Sri K.Naga Raja
3.2.3 Division : (R&B) Q C Kadapa E E: Sri T.Premananda Reddy.
3.2.4 Sub Division : (R&B) Q C Kadapa D E E : Sri K.Krishna Moorthy
3.2.5 Section : (R&B) Q C Kadapa A E E : Sri Ch.Srinivasulu
3.2.5 Officers Present: D E E / A E E
4.0 Accounts and Executive Instructions
4.1 Stage of Accounts : Materials procured by contractors
4.2 Executive Instructions : ----
4.2.1 Existing Crust Perticulars : ----
4.2.2 Spreading Permission details : ----
4.3 Any other items need mentioning ----
(R&B) Q C & member COT ,Hyderabad
Observations
Sl No. Items Observed As per estimate Remarks
culvert in km 0/2-4
1 Hume Pipes -
Assist.Exe.Engineer(R&B) Dy.Exe.Engineer(R&B)
QC Section, Kadapa QC Sub Division, Kadapa
2 rows of 4 pipes of dia 1000 mm
2 rows of 4 pipes of dia 1000 mm