OUR EXPERIENCE Client : Bay of Bengal, East Coast of India Location : 2003 Duration : Oil & Natural Gas Corporation (ONGC) / INTEC SEA Water depth : 20 Meters Scope of work: Pre-Conceptual Study Detailed Design Procurement Support Conceptual Design Follow on Engineering Front End Engineering Design Project Management 1

RNZ Project Experience Offshore

Embed Size (px)

Citation preview

Page 1: RNZ Project Experience Offshore

OUR EXPERIENCE

Client

: Bay of Bengal, East Coast of India Location

: 2003Duration

: Oil & Natural Gas Corporation (ONGC) / INTEC SEA

Water depth : 20 Meters

Scope of work:

Pre-Conceptual Study Detailed Design

Procurement Support

Conceptual Design Follow on Engineering

Front End Engineering Design

Project Management

1

Page 2: RNZ Project Experience Offshore

OUR EXPERIENCE

Client Petronas Carigali Sdn Bhd (PCSB) / Sime Darby Engineering Sdn Bhd / Ramunia Fabricator Sdn Bhd

: Sumandak Field located at offshore Sabah, Malaysia

Location

: March 2005 – October 2007Duration

Weight & Water Depth

:

Platform Name

Water Depth

(M)

Dry Weight (M)

Topside Jacket

SUPG-B 43 8,300 3,000

SUJT-C 37 570 800Scope of work:Pre-Conceptual Study Detailed Design

Procurement SupportConceptual Design Follow on EngineeringFront End Engineering Design

Project Management

:

2

Page 3: RNZ Project Experience Offshore

OUR EXPERIENCE

Client :

320km offshore Terengganu in block PM318, Malaysia

Location

October 2005 – May 2006 Duration

Petronas Carigali Sdn Bhd (PCSB) /Newfield Peninsula Sdn Bhd /Ramunia Fabricator Sdn Bhd

:

:

Weight & Water Depth

:

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

61 2,200 1,200Scope of work :

Pre-Conceptual Study Detailed DesignProcurement Support

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

3

Page 4: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Talisman Malaysia Limited (TML)

: Southern Part of PM3 Commercial Arrangement Area (CAA), Malaysia / Vietnam Border

Location

: March 2005 – July 2005 Duration

Weight & Water Depth

:Water

Depth (M)

Dry Weight (MT)

Topside Jacket

57 350 600Scope of work:

Pre-Conceptual Study Detailed DesignProcurement

Conceptual DesignFront End Engineering Design

Project ManagementFollow on Engineering

4

Page 5: RNZ Project Experience Offshore

OUR EXPERIENCE

Client

: Block PM12 within the existing MASA field, offshore Terengganu, Malaysia

Location

: February 2006 - June 2006Duration

: Petronas Carigali Sdn Bhd (PCSB)

Water Depth : 75 Meters

Scope of work:

Pre-Conceptual Study Detailed DesignProcurement Support

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

5

Page 6: RNZ Project Experience Offshore

OUR EXPERIENCE

Client

: Dulang field, offshore Terengganu, Malaysia

Location

: July 2006 – June 2007Duration

: Petronas Carigali Sdn Bhd (PCSB)

Weight & Water Depth

:Water Depth

Dry Weight

Topside Jacket

70 1,034 N/A

:Scope of work

Pre-Conceptual Study Detailed DesignProcurement Support

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

6

Page 7: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Petronas Carigali Sdn Bhd (PCSB)

185 km offshore Terengganu, Block PM313, Malaysia

Location

July 2006 – October 2010Duration

:

:

Weight & Water Depth

:

Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

TBCP-A 73 14,000 8,760

TBDR-A 73 2,530 5,140

TBFP-A 73 450 542

LHDP-A 71 1,500 3,410

MLDP-A 77 1,520 3,650Scope of workPre-Conceptual Study Detailed Design

Procurement SupportConceptual Design Follow on EngineeringFront End Engineering Design

Project Management

:

7

Page 8: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Petronas Carigali Vietnam Limited (PCVL)

: 155km offshore Vung Tau, in Blocks 01 & 02 S.R. of Vietnam

Location

: February 2007 – May 2007Duration

Weight & Water Depth

:Water

Depth (M)

Dry Weight (MT)

Topside Jacket

50 1,280 N/A

Scope of work :

Pre-Conceptual Study Detailed DesignProcurement Support

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

8

Page 9: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Carigali-PTTEPI Operating Company (CPOC)

: 268km East of Songkhla, ThailandLocation

: July 2007 – March 2008Duration

Weight & WaterDepth

:Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

MD-A 60 760 540

MD-B 60 620 530

MD-C 60 610 510

JK-A 60 870 980

MDD 60 726 510Scope of work:

Procurement SupportPre-Conceptual Study Detailed Design

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

JK-A MD-A

14

Client : Carigali-PTTEPI Operating Company (CPOC)

: 268km East of Songkhla, ThailandLocation

: July 2007 – March 2009Duration

Weight & WaterDepth

:Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

MD-A 60 760 540

MD-B 60 620 530

MD-C 60 610 510

JK-A 60 870 980

MDD 60 726 510Scope of work:

Procurement SupportPre-Conceptual Study Detailed Design

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

9

Page 10: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Petronas Carigali Sdn Bhd (PCSB)

: 55 Km West North of Labuan Offshore, Sabah, Malaysia

Location

: July 2007 – PresentDuration

Weight & Water Depth

:

Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

KNPG-B 60 14,782 11,487

KNJT-C 55 1,319 2,135Scope of work :

Pre-Conceptual Study Detailed DesignProcurement Support

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

10

Page 11: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Mearsk Oil Qatar As (MOQ) / Sime Darby Engineering Sdn Bhd

: Al Shaheen facilities, QatarLocation

: August 2006 – May 2008Duration

Weight & Water Depth

:

Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

BE 61 9,581 7,440

BG 60 9,410 7,320Scope of work :

Pre-Conceptual Study Detailed DesignProcurement Support

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

11

Page 12: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Petronas Carigali Vietnam Limited (PCVL)

: Block 1 & 2, 164km (Topaz) from Vung Tau Port, S.R Vietnam

Location

: October 2007 – September 2010

Duration

Weight & Water Depth

:

Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

TOPAZ 41 1,540 950

Scope of work:

Pre-Conceptual Study Detailed Design

Procurement SupportConceptual Design Follow on EngineeringFront End Engineering Design

Project Management

12

Page 13: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Carigali-PTTEPI Operating Company (CPOC)

CPOC JDA Block B 17 located in the Thailand Malaysia Joint Development Area

Location

Duration

Scope of work

:

Procurement SupportPre-Conceptual Study Detailed Design

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

: February 2007 – April 2008

:

13

Page 14: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Petronas Carigali Sdn Bhd (PCSB) / NATCO, USA

Location

August 2008 – October 2010Duration

:

:

Scope of work

Pre-Conceptual Study Detailed DesignProcurement Support

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

:

185 km offshore Terengganu, Block PM313, Malaysia

14

Page 15: RNZ Project Experience Offshore

OUR EXPERIENCE

: Vietsovpetro

: Block 09-1, Offshore of Socialist Republic of Vietnam, approximately 125km southwest Vung Tau

Location

: October 2009 – April 2010Duration

Weight & Water Depth

Scope of work :

Pre-Conceptual Study Detailed Design

Procurement SupportConceptual Design Follow on EngineeringFront End Engineering Design

Project Management

15

Client

Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

RC1 48 350 N/A

RC3 48 955 N/A

:

Page 16: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Sarawak Shell Berhad

: 50 km Offshore Miri, Sarawak, MalaysiaLocation

: November 2008 – August 2010Duration

Scope of work :

Pre-Conceptual Study Detailed Design

Procurement SupportConceptual Design Follow on EngineeringFront End Engineering Design

Project Management

16

Weight & Water Depth

:

Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

LAILA 76 640 N/A

Page 17: RNZ Project Experience Offshore

OUR EXPERIENCE 17

Scope of work :

Pre-Conceptual Study Detailed DesignProcurement Support

Conceptual Design Follow on EngineeringFront End Engineering Design

Project Management

Weight & Water Depth

: Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

LAM C 35 2,000 800

Client : Dragon Oil Turkmenistan

: 35km of Turkmenistan in the Caspian OffshoreLocation

: April 2010 – PresentDuration

Page 18: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : LAM SON JOINT OPERATING COMPANY

: 120 km East of Vung TauLocation

: September 2010 – January 2011Duration

Scope of work :

Pre-Conceptual Study Detailed Design

Procurement SupportConceptual Design Follow on EngineeringFront End Engineering Design

Project Management

18

Weight & Water Depth Platform Name

Water Depth

(M)

Dry Weight (MT)

Topside Jacket

THANG LONG 70 1,482 3,523

Page 19: RNZ Project Experience Offshore

OUR EXPERIENCE

Client : Pars Oil & Gas Company / PIRE Co.

: 100km South East of Akhtar in the Persian Gulf

Location

: November 2010 – PresentDuration

Scope of work:

Pre-Conceptual Study Detailed Design

Procurement SupportConceptual Design Follow on EngineeringFront End Engineering Design

Project Management

19

Weight & Water Depth

Platform NameWater Depth

(M)

Dry Weight (MT)

Topside Jacket

SPD22 65.60 2,470 1,997

SPD23 64.60 2,470 1,986

SPD24A 66.80 2,380 2,025

SPD24B 67.90 2,380 2,044