Road Construction Department
AT A GLANCE
25.05.2018
Road Network under RCD (in Km)
Category Total
Length
Single
lane
Intermediate
Lane
2-Lane More
than 2
lane
National Highways4917.19 729.21 819.95 2045.57 1322.47
% 14.83 16.68 41.60 26.89
State Highways4005.56 757.13 570.23 2654.64 23.56
% 18.90 14.24 66.27 0.59
Major District
Roads
11145.28 5717.81 3718.47 1543.26 165.74
% 51.30 33.36 13.85 1.49Total 20068.03 7204.15 5108.65 6243.47 1511.77
Overall % 35.90 25.46 31.11 7.53
Sl. No. Name of SchemeOutlay
(Crores)
Expenditure
(Crores)
1 Training 0.40 0.3338
2 Machine and equipment 0.15 0.1158
3 Bridge 689.7375 681.3333
4 Major Roads 1289.000 1273.1236
5 Major Roads (SC Components) 912.5424 907.4132
6 RIDF (NABARD) Bridge 1236.7100 1231.0644
7 Mukhya Mantri Setu Nirman Yojana 10.0000 5.7825
8 Central Road Fund (Central Share) 197.0000 194.7925
9 Central Road Fund (Sate Share) 0.0001 0.0000
10 ADB Project 1013.3200 1013.3200
11 Indo-Nepal Boder Road 401.0000 396.1544
12 Special Assistance (BRG-Road) 0.0000 0.0000
13 LWE (Central Share) 10.0000 10.0000
14 LWE (State Share) 10.0000 10.0000
Total 5769.86 5723.4337
ACHIEVEMENT 2017-18
% Expenditure – 99.20%
Sl. No. Name of SchemeOutlay
(Crores)
1 Training 0.5000
2 Machine and equipment 0.2000
3 State Plan (Bridge) 375.0702
4 RIDF (NABARD) 1136.7100
5 State Plan (Major Roads) 1000.0000
6 Mukhya Mantri Setu Nirman Yojana 1.5000
7 Central Road Fund (Central Share) 430.8500
8 ADB (Externally Funded Scheme) 1500.00
9 Indo-Nepal Border Road 0.0001
10 Major Roads (SC Component) 944.7296
11 Central Road Fund (State Share) 0.0001
12 LWE (Central Share) 415.0000
13 LWE (State Share) 100.0000
Total 5904.5600
OUTLAY FOR 2018-19
NATIONAL HIGHWAYS
Total length of NHs in Bihar : 4917.19 Kms.
a) Length of NHs with RCD : 2584.92 Kms.
b) Length of NHs with NHAI : 2332.27 Kms.
National Highways
STATUS Good Fair Bad Total
NHs with RCD
Length (Km) 1386.82 794.89 92.10 2273.81
% 61.00 34.96 4.04
41.53 missing link & 150 km
has not been
transferredto NH Wing
NHs with NHAI
Length (Km) 1292.47 799.51 321.05 2413.03
% 53.56 33.13 13.31Note:- NH wise status are included in subsequent slides....
National Highways
Condition of NHs under N. H. Wing RCDSL.No.
NH No. Name of NH Length(In KM)
Condition(In KM) Remarks
Good Fair Bad
1 2CDehri-Akbarpur-Jadunathpur-Jardag Road
92.00 26.00 14.00 52.0040 Km work in progressBad 52 km ProtectedForest and missing link.
2 19UP Bihar - Manjhi-Chapra-Hazipur-Patna
28.70 28.70 0.00 0.00Rehabilitation of MG Setuin progress
328B
New NH-727
Chapwa-Bettiah-Kushinagar
109.80 67.80 23.20 18.80Bad condition in ProtectedForest
5 30AFatuha-Chandi -Harnaut-Saksohra- Barh
71.00 31.00 40.00Work in progress underNHIIP
6 80Mokama -Lakhisarai-Bhagalpur-Kahalgaon-Mirzachouki
1.43 1.43 0.00 W/S work in progress
120.60 88.10 24.00 7.5 Work in progress
16.73 Work in progress
7 81Korha - Katihar-Pranpur-Lava
55.40 34.00 12.04 9.36 Work in progress
Condition of NHs under N. H. Wing RCDSL.No.
NH No. Name of NH Length(In KM)
Condition(In KM) Remarks
Good Fair Bad
8 82 Gaya – Hisua – Rajgir -Biharsharif
95.00 38.00 56.70 0.30 4-laning by BSRDC
9 98 Patna(Anishabad)-Bhusaula-Naubatpr-Bihram-Mahablipur-Arwal-Aurangabad-Hariharganj
154.30 151.80 2.50 0.00 Work in progress under NHIIP
10 99 Dobhi to Gosaidih 11.40 11.40 0.00 0.00 W/S in progress
11 101 Chapra- Baniyapur-Mohammadpur
65.00 65.00 0.00 0.00 W/S in progress
12 103 Hajipur-Jandaha-Mushrigharari
58.51 44.51 14.00 0.00 Work sanctioned in 14 km, and in tender process.
13 104New NH-
227
Chakia- Madhuban-Shivhar- Sitamarhi-Bithamore-Jainagar-Khutauna- Narahiya
219.95 66.63 153.32 0.00 Work in progress
14 105 Darbhanga-Aunsi-Jainagar 53.76 51.76 2.00 Work in progress
15 106 Birpur-Madhepura-Bihpur 136.00 34.03 90.17 3.00 W/S work in progress under NHIIP. 8.80 is missing link in koshiriver.
16 110 Biharsharif-Ekangarsarai-Jehanabad- Arwal
88.96 78.96 10.00 0.00 Work in progress
Condition of NHs under N. H. Wing RCDSL.No.
NH No. Name of NH Length(In KM)
Condition(In KM) Remarks
Good Fair Bad
17 122A
Vishwanathpur Chowk on NH-22 (Old NH No-77) connecting Koili and terminating at Nanpur on NH-527C in The State of Bihar.
31.82 0.00 31.82PR work
sanctioned.
18 131A
Ahmadabad - Manihari -Katihar - Purnea( Extenstion from Katihar to Ahmadabad vide Gazette Notification No- 677 (E) Dt. 05.03.2014 under Section-V)
82.12 77.00 3.12 0.002 km is missing
link.
19 133
The Highway Starting from its Junction with NH-33 (Old NH No-80) in the State of Bihar connecting Godda and terminating at Choupa More on NH-114A in the State of Jharkhand.
10.96 10.76 0.00 0.20W/S work in
progress
20 219 Bhabua-Chand-Dharauli 46.80 46.80 0.00 0.00
SL.No.
NH No. Name of NH Length(In KM)
Condition(In KM) Remarks
Good Fair Bad
21 327A
The Highway starting from Supaul on NH-327 and terminating at Bhaptiahion NH-27 (Old NH No-57) in the State of Bihar.
25.01 25.01 0.00 0.00
22 327EGalgalia-Thakurganj - Bahadurganj -Araria - Raniganj - Bhargawan -Triveniganj - Pipra - Supaul - Bariyahi
227.11 117.06 110.05 0.00 Work in progress in km 0.00 to 39.00, 56.00 to
68.00, 75.00 to 98.00 & 194 to 227.11
23 333Bariyarpur - Kharagpur - Lakshimpur- Jamui - Chakai
141.05 54.24 85.87 0.94W/S work in progress in km
62 to 75 & 117 to 141.05
24 333ABarbigha-Khaira-Jhajha-Katoria-Banka-Dhaka more-Panjwara.
198.93 100.00 98.93 0.00 Work in progress in km 180 to 198.92 & tender invited
in km 62 to 89.18 & km 142 to 144.
25 527APakaharauni-Madhubani-Rampatti-Jhanjarpur.
28.00 27.26 0.74 0.00
26 120Gaya-Daudnagar-Nasariganj-Dumaraon
145.00 111.00 20.00 0.00In tender process in km 103 to 142 & 182 to 201 & work awarded in km 143 to 167. 14 .00 km is missing link.
27 227AUP boarder-Mairawan-Siwan-Chhapawa
Total length – 147 km – Fair – 138 km, Bad – 9 Km
Not transferred to NH Wing
28 727A UP boarder-Rampur Bujurg-MairawanTotal length 4.5 km, -
Not transferred to NH Wing
Total=2315.34 1386.82 794.89 92.10
Road Condition of NHs under NHAISL.
No.NH No. Name of Section
Length
(in Km)
Condition(In KM)Remarks
Good Fair Bad
1 2Naubatpur to UP Bihar Border
and Barachatti, Bihar Section205.760 21.000 167.760 17.00 6 lanning work in progress
2 19 Chhapra- Hajipur 64.000 8.600 55.400 4 lanning work in progress
3 30
Arrah - Patna 50.000 45.00 5.00 Work awarded
Patna - Bakhtiyarpur 51.700 49.000 2.7004 lanning work completed
except service lane & ROB
Mohania- Kochas-Arrah 117.00 117.00
4 28
Bathna Kutti (UP Border) to
Muzaffarpur160.430 90.00 70.43 4 lanning work completed
Muzaffarpur - Musrigharari -
Dalsinghsharai- Barauni106.560 106.56 0.00
5 28APiprakothi to Raxaul
(km 0 to 69.241)69.241 56.371 5.520 7.35 W/S work in progress
6 31
Debour - Rajouli - Nawada -
Biharsharif - Harnout -
Bakhtiarpur
106.900 7.000 37.90 62.00 PR work to be sanctioned
Bakhtiyarpur-Mokama-
Barauni(Zero Mile)-Begusarai-
Khagaria
115.400 54.00 61.40 0.00 Work in progress
Khagraia- Purnea 140.000 84.00 56.000 0.00
Purnea - Dalkola Kishanganj-
West Bengal Boarder41.000 36.00 3.00 2.00 4 lanning completed
7 57 Muzaffarpur-Purnea 310.000 261.00 49.00 0.00
Road Condition of NHs under NHAISL.
No.NH No. Name of Section
Length
(in Km)
Condition(In KM)Remarks
Good Fair Bad
8 77
Hazipur -
Ramdayalu(Muzaffarpur)
Section
48.200 46.30 1.90 0.00
4 lanning substantially
completed except
ROB, Muz. Bypass
Muzaffarpur - Sonbarsa Section 82.700 82.70 0.00 0.00
9 80 Hathidah - Munger 68.000 63.000 5.000 0.00
10 82Biharsharif- Barbigha- Sarmera -
Mokama bypass Junction55.000 0.000 42.500 12.50
Work awarded for 2
lane with paved
shoulder
11 83 Patna - Gaya-Dobhi Section125.000 12.000 113.00 0.00 Work awarded
12 84 Arrah - Buxar 74.000 12.00 62.00 0.00 Work awarded
13 85 Chapra - Gopalganj 94.000 90.00 3.50 0.50 Work in progress
14 102Chapra - Rawaghat-
Muzaffarpur75.000 75.00 0.00 0.00 Work in progress
15 57A Forbisganj-Jogbani 9.000 0.000 8.000 1.00 Work in progress
16 133B Sabhaganj- Manihari Approach 7.500 0.000 0.000 0.00 LA work in progress
17 333BMunger at NH-33 old NH-80
Khagaria NH-3118.359
Approach of Rail-cum
– Road Bridge
18 527C Manjhalui-Charut Section 64.200 64.20 DPR work in progress
19 107Maheshkhunt-Sonbarsa-Saharsa-
Madhepur-Murliganj-Purnea180.00 93.00 49.50 37.50
After handing over to
NHAI estimate for
repair has been sent
Total= 2438.95 1292.471 799.51 321.05
Approval status of In-principle declared NH
No. of Roads - 34 nos.
Length - 1943 Km
Status of DPR:
• Presentation for Alignment & Feasibility for 15 roads
under NH In-Principle has been done in MoRT&H.
• DPR preparation in all 34 roads (1943 Km) is under
process. It is likely to be submitted within a month.
• Out of 34 roads, 13 roads of length 577 Km are in PM
Package & 1 road of length 92 Km is in Bharatmala.
Item NHAI RCD Total
Total Cost (Rs. Cr.) 30200 24500 54700
Total No of Works 24 58 82
Awarded works No. 14 32 46
Amount (Cr.) 11234 8115 19349
In Bidding /
Sanction stage
No. 04 9 13
Amount (Cr.) 4526 5500 10026
Total amount of works Awarded /
In Bidding / in Sanction (Cr.)
15760 13615 29375
In DPR stage 6 No.
(15260cr)
17 No.
(10885cr)
23 No.
(26145cr)
Abstract of PM Package
Details of PM PackageProjects under RCD
Sl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
EAP ZONE :-
1 Km 0.0 km
69.6 of NH-
30A (Fatua –
Harnaut – Barh
section)
71.8 683.83 Start Date - 06.08.2016 & completion date – 05.08.2019.
46 km/71 km DBM has been done.
Physical progress is 65%.
Issues:-
3G of 2.393 Ha submitted by RCD to Ministry.
Work before schedule time.
2 Km 40 to 79.4
of NH 104
(Sheohar –
Sitamarhi
section
39.4 178.85 Start Date – (Lot-I -04.05.2016 & Completion date – (Lot-I
– 03.05.2018
Physical progress 16% (WMM - 4.50 km, DBM 3.20km, /28
km),
Issue:- Termination of contract has been recommended to
MoRT&H.
Work front available :- 85%
Details of PM PackageSl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
EAP ZONE :-
3 Up-gradation (km
79.4 to km 156.5)
of NH 104 of
Sitamarhi –
Jainagar section
77.1 369.77 Start Date 30.06.2016, & Completion date 29.12.2018
Physical progress of Lot II- 13% / 40% (DBM 9.50km /
76km)
Issues:- Slow work by Contractor
Compensation distribution in Madhubani district to be
expedited (Disbursement of Rs. 44.60 cr out of Rs. 72 cr)
Work front available = 87%
4 Up-gradation (km
156.5 to 219.945)
of NH 104 of
Jainagar –
Narahia section
63.45 553.3 Start Date – 12.05.2016) & Completion date –
12.05.2019).
Physical progress 18% / 40% (DBM 9.20km / 56.5km.)
Issues:-
Slow work by Contractor
Issue:- Compensation distribution in Madhubani district to
be expedited
Work front available:- 80%
Details of PM PackageSl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
EAP ZONE :-
5 Up-gradation of (km
0-106) Birpur –
Bihpur section of
NH-106
106.29 780.77 Start Date – 03.10.2016 & completion date –
02.10.2019.
Progress is 11% / 20%. (DBM – 4.50 km/106km)
Issues :-
Revised 3G from Madhepura and Supaul district
submitted to MoRT&H.
6 Four Laning of (km
0.00 to Km 92.935)
on NH-82. (Gaya –
Hisua – Rajgir –
Nalanda – Biharshrif
section) JICA Loan
Assistance
(BSRDCL)
92.935 1408.9 Date of commencement is 25.10.2016 & Completion
date is 24.10.2019
Progress – 23%, (DBM 18km/93km)
Issues:-
Revised Cost Estimate submitted to MoRT&H.
Total= 450.975 3975.42
Details of PM PackageBRIDGE ZONE :-
Sl. No. Project NameLength
(in km)
TPC
(in crore)Present Status
7 Construction and rehabilitation of
MG Setu of NH-195.6 1755 Work in progress. Dismantling of 29 nos. of span
completed. Dismantling of 8 nos. Pier head
completed
8 ROB in Km 12 of NH-103
(Bidupur)1 750 Work awarded/Not Started. L/A under process, 3D
submitted.
9 ROB in Km 132 of NH-19
(Majhanpura)1 Work awarded/Not Started. 70% land available. For
rest 3D submitted.
10 ROB in Km 135 of NH-19
(Simaria)1 Work awarded / Not started.. L/A under process, 3D
approved.
11 ROB in Km 119 of NH-30 (Ara) 1 Work is in progress. Foundation work completed.
12 ROB in Km 11 of NH-
327E(Thakurganj1 Work is in progress. Foundation completed. Forest
clearance under process.
Work awarded / Not started. L/A is in process under
perpetual lease.13 ROB in Km 100 of NH-327E
(Araria)1
14 ROB in Km 31 of NH-81 (Mania,
Katihar)1 Work Started., Foundation under progress. L/A,
Forest clearance under process.
15 ROB in Km 48 of NH-81 (Pranpu) 1 Work is in progress. Foundation completed.
Work Started. Forest clearance under process.16 ROB in Km 46 of NH-131A
(Sarifganj)1
Work awarded/Not Started. Forest clearance under
process.17 ROB in Km 1.11-1.12 of NH-101
(Chapra)1
Total= 15.6 2505
Details of PM Package
PROJECT IN BIDDING / SANCTION STAGE
Sl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
18 Bridge Over river Kosi at
Fulaut on NH-106
1700.00 Sanction Stage
19 4 Lane bridge over river
Ganga parallel to existing
MG Setu Bridge at Patna
on NH-19
3300.00 Sanction / DPR Stage
20 ROB in Km 91 of NH-
28B(Bagha)
62.48 Tender received. Technical Bid under
evaluation.
21 ROB in Km 94 of NH-
28B (Bagha)
68.49 Tender received. Technical Bid under
evaluation.
Total= 0.00 5130.97
Details of PM Package
IN PRINCIPLE NH CATEGORYSl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
22 Panduka Bridge on
river Sone at
Srinagar
2.5 2000.00 Sanction / DPR
Stage
Total= 2.5 2000.00
Details of PM Package
PROJECT ZONE :-
Sl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
23 Widening to 2-lane with
paved shoulder from km
25.00 to km 40.00 ofNH-
28B (Betia – Misraulia
section)
15 88.61 Start Date – 30.09.2016 & completion date –
27.11.2018 DBM completed in 15km.
BC - 11.70 km, Service Road both side GSB - 3
km, WMM - 2.9 km, DBM - 1.65 km, BC - 0.5 km
24 Widening to 2 Lane with
Paved Shoulder from km
65 to 97 of NH-28B
(Parsoni – Bagaha
section)
33 243.1 Start Date – 17.10.2016 & completion date –
11.05.2019
WMM both side (8.5 km) and DBM completed in
3.35 km done. Work progress is about 25%.
25 Construction of
Bhagalpur Bypass of NH-
80
16.675 268 Start Date – 05.11.2015 & completion date –
04.11.2017
Work is in progress. 12.60km DBM, BC – 12.60
Km
Physical progress is 80%.
Issue:- L/A for 155m under process. 3D is to be
submitted.
Details of PM Package
PROJECT ZONE :-
Sl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
26 Widening to 2 Lane with
Paved Shoulder from km.
0.00 to 10.903 of NH-133
(Pirpainti – Barahat
section)
10.9 28.04 Road Work completed and Junction improvement
work to be done.
Issue:- Encroachment in Pirpainti more to be
removed.
27 Widening to 2 Lane with
Paved Shoulder from km.
0.00 to 25.010 of NH-
327A (Supaul Bhaptiyahi
section)
25.01 77.55 Start Date – 27.11.2016 & completion date –
25.06.2018
WMM completed in 24 km and DBM in 24 km
done. Work progress on scheduled time.
28 Widening to four lane
with service lane from
Km. 93.612 to Km.
98.000 of NH-327E
(Araria Town portion)
4.39 64.52 Start Date – 26.01.2016, scheduled completion
date – 30.06.2017. Main carriageway has been
completed & likely to be completed by
30.06.2018. Physical progress is about 82%.
Service lane completed.
29 Widening to 2 Lane with
Paved Shoulder from km.
0.00 to 11.400 of NH-99
(Dobhi to Jharkhand
border)
11.4 45.22 Work is in progress. 10.90 km DBM, BC-10.90
km has been completed.
Physical progress is 90%. Start Date – 16.08.2016
& completion date – 15.02.2018
Details of PM PackagePROJECT ZONE :-
Sl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
30 Widening & strengthening from
km 167 to 180 of NH-80
(Ramjanipur – Pirpainti)
12.9 21.37 Start Date – 01.10.2016 & completion date –
31.12.2017 Physical progress is 80%. 12 km
DBM, BC - 12 km completed.
31 Widening to 2 Lane with Paved
Shoulder from km. 0.00 to 19.04
of NH-81
(Gerabari – Katihar section)
19.04 111.3 Start date 07.08.2017. Completion date –
06.08.2019.
E/W – 16 km, GSB – 7 km completed.
Stage-I Forest clearance obtained.
32 Widening to 2 Lane with Paved
Shoulder from km. 0.00 to 40 of
NH-2C. (Dehri – Akbarpur
section)
40 230.34 Work awarded and GSB completed in 15 km,
PQC – 5.50 km, BC - 3.50 km, WMM - 7 km
Stage-I Forest clearance obtained.
33 NH-333 from km 62 to 75
(Gidhaur - Section)
14 68.506 Work is in progress. Date of completion
15.06.18
Stage-I forest clearance obtained.
34 NH-327E from km 56 to 68
(Bahadurganj – Araria section)
12 56.3 Work under progress. Date of completion
31.03.2018. GSB – 5 Km, WMM – 3 Km,
DBM – 2 km completed.
35 NH-327E from km 75 to 93
(Bahadurganj – Araria section)
18 86.16 Work under progress. Date of completion
30.11.18. GSB – 12 Km, WMM – 5.50 km,
DBM – 4.50 completed.
36 NH-327E:- from km 0 to 39
(Galgalia – Bahadurganj section)
39 146.11 Work under progress. GSB – 15 km, WMM –
13.5 km, DBM – 10 km completed.
Forest clearance for tree cutting under process.
Total= 271.315 1535.13
Details of PM Package
PROJECTS IN BIDDING / SANCTION STAGE
Sl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
37Bhatia – Chakai section
from km 115 to 141 of
NH 333
26.00 100.00 Work awarded. Agreement under process.
38Araria – Raniganj – JBC
Canaal section from km
112 to 136 of NH 327E
24.00 100.00 Technical Bid under evaluation.
39Gaya to Goh section NH
120
43.00 125.00 Technical Bid under evaluation.
40Nasriganj to Bikramganj
section of NH-120
20.00 100.00 Technical Bid under evaluation.
41 Varuna Bridge –
Mushrigharari section of
NH 103
14.45 70.00 Sanction / DPR Stage
Total= 127.45 495.00
Details of PM Package
New NH Category
Sl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
42Bhabhua to UP Border section
of NH 219
36 300.00 Sanction / DPR Stage
43Bikramganj – Dumraon section
of NH 120
50 250.00 Sanction / DPR Stage
44
Barbigha–Shekhpura – Jamui –
Jhaja – Simultalla – Banka –
Panjwara section of NH 333A
197 1500.00 Sanction / DPR Stage
45Bariyarpur – Jamui Bhatia
section of NH 333
100 500.00 Sanction / DPR Stage
46JBC Canal section to Supaul of
NH 327E
47 200.00 DPR sent to MoRT&H
Total= 430 2750.00
G . Total= 1871.84 22244.02
Details of PM PackageIn Principle NH Category
Sl.
No.Project Name
Length
(in km)
TPC
(in crore)Present Status
47 Buxar – Chausa - Mohania 64
5850.00
Sanction / DPR Stage
48 Hajipur – Mahnar - Bachwara 75 Sanction / DPR Stage
49Govidpur – Fatehpur – Narhat
- Sirdalla
50 Sanction / DPR Stage
50 Belaganj – Rajgir 75 Sanction / DPR Stage
51Bhagalpur – Dhaka more
Hansdiha
62 Sanction / DPR Stage
52Chatarwa – Dhanha – Bansi –
Padrauna
46 Sanction / DPR Stage
53Chharatpur – Japla –
Navinagar – Barun
34 Sanction / DPR Stage
54 Rosera - Darbhanga 55 Sanction / DPR Stage
55 Mehsi – Jhapaha vide Tetaria 50 Sanction / DPR Stage
56Siwan-Maharajganj-Janta
Bazar
35 Sanction / DPR Stage
57 Shrawan-Chakai 18 Sanction / DPR Stage
58Saraigarh(327A)- Lalganj-
Ganpatganj
10 Sanction / DPR Stage
Total= 574 5850
Details of PM Package
PROJECTS UNDER NHAI
Sl. No. Project NameLength
(in km)
TPC
(in crore)Present Status
59 2L with PS
Biharsharif -
Barbigha –Mokama 54.76 399.54
Work started on 06th Oct. 2017
Schedule completion date 06.10.2019
Work front available – 45.1km
Physical progress- 13.18%, Financial progress – 16.1%
3A/3D -56.84Ha, 3G-56.22Ha60 4 – laning of Patna –
Koilwar Section of
NH 30
33 761.2
Land available – 43.59%
3D-165.6Ha, 3G-165.6Ha61 4 – laning of Koilwar
– Bhojpur Section of
NH – 30 & NH – 84
44 1050.44
Total land available- 52.92%
Work started on 04th July 2017
Schedule completion date 02.01.2020
Physical progress- 13%, Financial progress – 6%
3A/3D/3G done -198.93Ha
62 4 laning of Bhojpur –
Buxar section of NH
– 84 48 867.77
Total land available – 58.68%
Appointed date - 18.04.2018
3A/3D/3G done -193.9Ha
Physical & Financial progress – 0.0%
Details of PM PackagePROJECTS UNDER NHAI
Sl. No. Project NameLength
(in km)
TPC
(in crore)Present Status
63 4- laning of
Bakhtiyarpur –
Mokama Section of
NH-31
45 1167.45
Work started on 14.06.2017
Schedule completion date 10.12.2019
Work is under progress.
3A-239.4Ha, 3D-235Ha, 3G-234.7Ha
64 4 lane of Simaria –
Khagaria on NH – 31
NHDP Phase – III
60 1062.58Work started on 05.10.2016,
Schedule completion date- 03.04.2019
Physical progress- 20.50%, Land required – 1 Ha
65 2 – laning with PS of
Gopalganj – Chhapra
Section NH-85 94 854.8
Work started on 07.12.2015, Scheduled completion date –
06.12.17
Anticipated completion date- 31.08.18
Physical progress – 71.62%
3A-190.906 Ha/3D – 174.5Ha/3G-136Ha
66 2 – laning with PS of
Chhapra – Rewaghat –
Muzaffarpur, NH-10273 516.13
Work started on 05.04.2016
Scheduled completion date- 04.04.2018, Likely completion date
– 30.06.18
Physical progress – 97.98%
67 4 laning of Forbesganj
– Jogbani Section of
NH – 57A
9 322.09Work started on 18.04.2016
Schedule Date of Completion- 17.04.2018
Physical progress- 20.70%, Financial 18.22%, LA pending.
68 4 laning of Patna –
Gaya – Dobhi Section
of NH – 83 with JICA
ODA loan assistance
127 1496.86
Work started on 10.04.2015
Schedule Date of Completion - 09.04.2018
Physical progress- 6.73% , E/W – 39.93 Km, GSB – 27.27 Km,
WMM – 26.81 km, DBM - 17.50 km completd.
3A/3D/3G done -707Ha
Details of PM PackagePROJECTS UNDER NHAI
Sl. No. Project NameLength
(in km)
TPC
(in crore)Present Status
69 New 4 – laned bridge across river
Ganga at Mokama on NH – 319 800
Appointed date to be fixed.
3A-58.68Ha/3D-44.12Ha/3G -43.38Ha70 Bridge at Munger (approach road
to be constructed and balance
amount to be released)
18.69 935
Appointed date to be fixed.
3A/3D-65.4Ha/3G -23.6Ha
71
&
72
Development to 2-laned with PS of
Maheshkhut- Saharsa- Purnia
section of NH- 107 (in two
packages)
171 1000Appointed date to be fixed.
3A/3D-197.6Ha/3G-13.5Ha.
73 Bridge on river Ganga connecting
Manihari in Bihar to Sahibganj in
Jharkhand (NH-131B & 131 A)
21.885 1954.77 Bid received. LOA issued on 06.12.17
74 Development of Manjholi –
choraut Section of NH-527 C65 700
Bid received and under evaluation
3A-212Ha/3D-108Ha/3G -0.0Ha
75 Construction of 2nd
Elevated
Flyove parallel (LCW) in
Kishanganj town on NH-31
3.18 196.948 LOA issued to BRPNNL by NHAI.
76 4 – laning of Narenpur – Purnea
Section of NH – 133A 49 1674.73
SFC pending for want of availability of
required land. 3A-141Ha/3D-101Ha/3G
done - 0.0Ha
77 4/6 laning of Patna Ring Road65 1500
DPR preparation under process by
consultant.
Details of PM Package
PROJECTS UNDER NHAI
Sl. No. Project NameLength
(in km)
TPC
(in crore)Present Status
78 4 – laning of Munger – Mirzachowki
Section
120 1800
DPR finalization under process.
3A under process.
Land to be acquired– 668.9Ha in
123 village
79 Roads connecting Raxaul and Sonbarsa
(Parallel to indo – Nepal Border) 90 1800
DPR of Raxaul Sonbarsa dropped
Chakia- Bargainia Connectivity
50 1000
DPR of Chakia Bairgania
completed
3a published.
3A under process.
80 Ramupr – Khajuriya-Kesariya end of
NH – 722
58 160
DPR in 3 packages done
Final DPR under approval.
CALA nomination received
3a under process.
Details of PM Package
PROJECTS UNDER NHAI
Sl. No. Project NameLength
(in km)
TPC
(in crore)Present Status
81 Uchhait Bhagawati Sthaan (Umgaon) -
Basopatti-Benipatti-Rahika-
Madhubani-Rampatti-Awam-Laufa-
Bheja-New proposed bridge over river
Kosi-Mehsi- Tarasthaan- Bangaon-
Bariyahi – Saharsa – connecting NH-
327A (22 kms out of 180km are parts of
National Highways No. 527A, 327E &
107.
160 5000
Draft DPR for entire stretch in
4 packages submitted by DPR
consultant in NHAI HQ.
82 Ram-Janki Marg as already declared
recently part of which falls in Bihar
from UP Bihar Border to Siwan –
Madhubani-Sitamarhi-Indo-Nepal –
Border200 4000
Final DPR done in two
packages
1st package of Siwan -
Masharakh and 2nd Package
Mashrakh - Chakia under
approval.
Tender for 2nd package is to be
done in July, 2018.
Total= 1668.52 31020.34
Rehabilitation of M.G. SetuProgress till date :
• Dismantling of Median – Span 1–37 & 39 completed and Span 40 in
progress.
• Dismantling of Foot Path and Hand Rail – Span 1-37, 39-41 completed
& Span 42 in progress.
• Dismantling of Segment – Span 1-29 completed, Span 30-31 in
progress.
• Dismantling of Pier Head – Pier No. 1-6, 8 & 26 completed and Pier No.
7-25 in progress.
• Shifting of debris material for Span 1-28 completed & Span 29 in
progress.
• Modification of Pier Cap – Pier No. 2-3 completed & Pier No. 4-6 in
progress.
• Weathering Steel – 5326.00 MT of material has been manufactured at
ESSAR.
• Weathering Steel – 2647.457 MT of material dispatched to Texmaco,
Kolkata and 2289 MT of weathering dispatched to Atmatsco, Bhilai.
• Fabrication work still not started.
ISSUESIssues related to MoRTH
1) Approval & Sanction of DPR for construction of 4-lane bridge
parallel to existing Vikramshila Setu and declaration of Bhagalpur
Navgachia as new NH.
2) Bidding of Phulaut Bridge over river Koshi on NH-106 to be done.
3) New bridge parallel to MG Setu, Patna be sanctioned soon.
4) Work of MG Setu is very slow. Erection work be started soon.
5) Munger – Bhagalpur – Mirzachouki Section of NH-80 has been
entrusted to NHAI & DPR on Green field alignment is under
process. Maintenance of existing NH-80 be done by MoRTH as
this stretch is very important & lifeline of this area. Estimates
submitted for different stretches should be approved at the earliest.
6) Revision of estimate of NH-82 Gaya – Biharsharif is pending.
7) Balance portion of NH-30, from Mithapur to Anisabad in Patna be
taken over by NHAI for maintenance.
8) Approval of LA proposal of 155 m in Bhagalpur bypass and
proposal of RE wall to be approved.
ISSUESIssues related to MoRTH
9) Elevated corridor at Rajgir on NH-82 may be considered for
approval.
10) Annual Action Plan (2018-19) submitted by State Govt. needs
approval of MORT&H.
11) 14 nos. of PR works to be tendered - pending for clarity on
DLP.
12) LA & Supervision charges –
(i) Administrative Cost for LA to be reduced to 2.5%
(ii) Undisbursed amount of compensation may be permitted
to deposit in LARR Authority.
(iii) Supervision charges for electrical utility shifting to be
reduced to 2.5%.
ISSUESIssues related to NHAI
1) Work for Dumariaghat Bridge on NH-28 near Gopalganj to be restarted.
2) Repair and maintenance of Ara- Mohania Section of NH-30.
3) DPR of New Bridge parallel to J.P. Setu, Patna over proposed Patna Ring
Road be finalized soon to start bidding process.
4) DPR of Indo Nepal Border road under Bharatmala.
5) Four Laning of Ara – Sasaram Road. DPR to be finalized soon.
6) Elevated road on Patna – Koilwar section of NH-30 (Shivala - Bihta) to
be started.
7) Balance length of Patna - Koilwar to be reviewed early and work to be
started.
8) Proper maintenance of NH-19, NH-83 & NH-80.
9) Condition of NH-107 to be improved and progress of work to be expedited.
10) Feasibility of Extension of Patna – Buxar to Gazipur be expedited.
11) DPR for Patna Ring Road to be finalized and early steps for construction to be
taken in the portion where land is available.
12) DPR of roads under Bharatmala Pariyojna to be expedited.
13) Proposal & DPR for additional bridge parallel to Dumari Ghat bridge on NH-
107 be prepared soon.
14) Chapra Bypass & Sumerpatti Bridge on NH-19 to be completed on priority.
State Highways
State Highways
STATUS Good Fair Bad Total
Length (Km) 3508.91 300.53 195.56 4005.56
%(Length wise)
87.60 7.50 4.90
Note:- SH wise status are included in subsequent slides....
State HighwaysS. No. SH No. Stretch of State Highway
Length
(Km)
Condition of the Road (in Km)Remarks
GOOD FAIR BAD
1 1 Sadikpur- Pabhera Masaurhi 38.20 5.00 33.20 0.00 2 lane–proposed under CRF
2 2 Bihta - Pali - Arwal 37.70 34.70 3.00 0.00 2 lane OPRMC3 4 Daniawan - Hilsa - Ekangarsarai -
Islampur - Khijarsarai - Gaya78.50 78.50 0.00 0.00 2 lane
CMBD/OPRMC4 8 Hisua - Nawada - Lakhisarai 93.35 93.35 0.00 0.00 2 lane OPRMC5 12 Ara - Piro - Bikram - Nokha -
Sasaram 94.85 94.85 0.00 0.00 2 lane OPRMC
6 13 Buxar - Chausa 12.80 12.80 0.00 0.00 2 lane CMBD7 14 Chausa - Ramnagar - Mohania -
Bhabhua48.74 48.74 0.00 0.00 2 lane
CMBD/OPRMC8 15 Dehri - Nasriganj - Vikramganj -
Dinara44.00 44.00 0.00 0.00 2 lane CMBD
9 16 Dehri - Tilauthu - Akbarpur -Banjari
9.28 9.28 0.00 0.00 2 lane OPRMC
10 17 Sasaram - Kargahar - Kochas -Chausa
63.05 63.05 0.00 0.00 2 laneCMBD/OPRMC
11 18 Shekhpura - Lakhisarai - Jamui 45.31 45.31 0.00 0.00 2 lane OPRMC
12 19 Bhagalpur - Dhakamore -Barahat - Hansdiha
61.32 61.32 0.00 0.00 2 lane CMBD/OPRMC
13 22 Dakamore - Katoria - Belhar -Tarapur - Sultanganj
97.67 97.67 0.00 0.00 2 lane CMBD/OPRMC
S. No. SH No. Stretch of State HighwayLength
(Km)
Condition of the Road (in Km)Remarks
GOOD FAIR BAD
14 25 Bhagalpur - Amarpur - Banka -Katoria
44.30 41.30 3.00 0.00 2 lane OPRMC1.5 lane CMBD
15 47 Sarfara - Barharia - Siwan -Mairwa – Guthani
35.10 23.00 12.10 0.00 2 lane OPRMC
16 49 Hajipur - Mahua - Tajpur -Samastipur
62.95 62.95 0.00 0.00 2 lane OPRMC
17 50 Musari - Gharari - Pandasarai -Mabbi - Laheria Sarai
62.35 62.35 0.00 0.00 2 lane OPRMC
18 51 Darbhanga - Sakari - Jhanjharpur - Khutauna - Laukaha
32.70 32.70 0.00 0.00 2 lane OPRMC
19 52 Sitamarhi - Pupari - Benipatti -Rahika - Madhubani - Rampatti -Jhanjharpur
77.09 77.09 0.00 0.00 2 lane OPRMC1.5 lane CMBD
20 53 Chapra - Salempur 10.00 10.00 0.00 0.00 2 lane OPRMC21 54 Bettiah - Areraj - Motihari -
Dhaka - Belwaghat - Masaudha -Sheohar - Sitamarhi
121.65 105.25 16.40 0.00 2 lane / IRQPsanctioned
22 55 Begusarai - Manjhaul - Rosera -Samastipur
77.50 77.50 0.00 0.00 2 lane CMBD/ OPRMC
23 56 Darbhanga - Benipur - Biraul -Kusheshwar Asthan
64.00 64.00 0.00 0.00 2 lane OPRMC
24 57 Saharsa - Purnea 2.34 2.34 0.00 0.00 2 lane OPRMC
S. No. SH No. Stretch of State HighwayLength
(Km)
Condition of the Road (in Km)Remarks
GOOD FAIR BAD
25 58 Udakishunganj - Chousa – LauaLagam Vijayghat
35.10 27.40 7.70 14.40 Existing Single lane Tendered for 2 lane with paved shoulder
26 59 Sonbarsa - Saurbazar - Baijnathpur 24.00 24.00 0.00 0.00 2 lane OPRMC27 60 Purnea - Araria - Forbesganj 35.17 35.17 0.00 0.00 Single / 1.5 lane/2
lane OPRMC28 62 Purnea - Katihar 1.75 1.75 0.00 0.00 2 lane OPRMC29 64 Bagaha - Balmikinagar 28.80 28.80 0.00 0.00 2 lane OPRMC30 65 Purnea - Dhamdaha - Rupauli -
Chandpur63.46 63.46 0.00 0.00 2 lane OPRMC
31 66 Saharsa - Bangaon - Supaul -Singheshwar Asthan
27.77 27.77 0.00 0.00 2 lane OPRMC
32 67 Kudra - Chenari - Shivsagar 40.20 40.20 0.00 0.00 2 lane OPRMC33 68 Sheoganj - Rafiganj - Goh -
Upahara - Deokund- Baidarabad83.05 83.05 0.00 0.00 2 lane BSRDCL
34 69 Dumaria - Imamganj - Sherghati -Karmain - Mathurapur - Guraru -Ahiapur - Tekari - Mau - Kurtha -Kinjar - Pali - Rani Talab
152.80 152.80 0.00 0.00 2 lane BSRDC
35 70 Gaya - Fatehpur - Sirdala - Rajauli 79.30 72.30 7.00 0.00 2 lane 36 71 Jehanabad - Ghoshi - Islampur -
Rajgir - Giriyak, Parwatipur 87.76 85.20 2.56 0.00 2 lane
37 73 Siwan - Basantpur - Masharakh -Taraiya - Amnour - Sonho- Parsa -Shitalpur
52.00 52.00 0.00 0.00 2 lane
S. No. SH No. Stretch of State HighwayLength
(Km)
Condition of the Road (in
Km) Remarks
GOOD FAIR BAD
38 74 Hajipur - Vaishali - Deoria -Sahebganj - Kesaria - Khajuria -Areraj
121.13 121.13 0.00 0.00 2 lane
39 75 Darbhanga - Kamtaul - Basaitha -Madhwapur
47.00 0.00 47.00 0.00 2 lane
40 77 Kursela - Pothia - Falka - Mirganj -Sarsi - Kala Balua - Raniganj -Saifganj - Farbesganj
102.88 102.88 0.00 0.00 2 lane
41 78 Bihta - Naubatpur - Neva - Dumari - Beldarichak - Kansari - Daniawan & Chand - Noorsarai - Bhagan Bigaha -Rahui - Bind - Gopalbad -Sarmera
122.26 38.07 0.00 84.19 2 laning work in progress
42 80 Bhabhua - Adhaura 53.00 53.00 0.00 0.00
43 81 Sakkadi - Chandi - Sandesh - Sahar - Bihar - Danwar - Nasriganj
86.80 75.40 11.40 0.00 BSRDC - work in progress
44 82 Kadirganj - Roh - Kauakol - Khaira -Sono
65.83 65.83 0.00 0.00 Tendered for 2 lane with paved shoulder
45 83 Bagi - Bardiha - Barbigha 40.05 40.05 0.00 0.00 Under BSRDC
46 84 Ghogha - Sanhaula - Dhoraiya -Panjwara - Barahat
42.80 24.50 18.30 0.00 Tendered for 2 lane with paved shoulder
47 85 Akbarpur - Shahkund - Amarpur 29.40 18.00 11.40 0.00 Tendered for 2 lane with paved shoulder
48 86 Saraiya - Jaitpur - Motipur 28.18 28.18 0.00 0.00 under BSRDC
S. No. SH No. Stretch of State HighwayLength
(Km)
Condition of the Road (in Km)Remarks
GOOD FAIR BAD
49 87 Runnisaidpur - Nanpur -Pupri - Sursand - Parihar -Bhiswa
67.49 45.24 15.00 7.25 Under construction
by BSRDC
50 88 NH-103 (Baruna Pul) -Rasiyari
120.34 42.23 20.13 57.98 - do-
51 89 Siwan - Siswan 31.27 29.71 1.56 0.00 Under BSRDC52 90 Mohammadpur - Rajpatti -
Mashrakh - Khaira - Chapra41.71 41.71 0.00 0.00 Under BSRDC
53 91 Balua - Jadia - Mirganj -Murliganj - Udakishunganj
101.70 95.20 0.00 6.50 Under construction by BSRDC
54 92 Saraigarh - Parwaha 75.79 60.35 1.10 14.34 NH declared. Bad portion is missing link
55 93 Hajipur - Bachhwara 70.00 68.50 1.50 0.00 Single/2 lane CMBD/OPRMC
56 95 Mansi - Hardi Chaughra 78.09 60.13 2.98 14.98 Alignment under process with 14.98 Km missing link.
57 96 Manjhi - Barauli 60.00 20.25 39.75 0.00 Single lane
S. No. SH No. Stretch of State HighwayLength
(Km)
Condition of the Road (in Km)Remarks
GOOD FAIR BAD
58 97 Bishanpur -Ghoghrahachatti
47.70 47.70 0.00 0.00
59 98 Katihar - Balrampur 65.10 64.10 1.00 0.00
60 99 Baisi - Bahadurganj 77.10 77.10 0.00 0.00
61 100 Bandhuganj - Rohini 45.00 34.10 0.00 10.90 Single/1.5 lane
CMBD62 101 Amba - Gaya 85.90 83.90 2.00 0.00 Single lane63 102 Bihia - Bihta 52.75 52.75 0.00 0.00 Tendered64 103 Manjhway - Govindpur 45.37 45.37 0.00 0.00
65 104 Dighwara - Semri 69.68 27.23 42.45 0.00 Single lane/CMBD
66 105 Bettia - Lauria Road 68.20 68.20 0.00 0.00
67 106 Didarganj–Fatuha-Bakhtiyarpur
37.15 37.15 0.00 0.00 2 lane CMBD
Total 4005.56 3508.91 300.53 195.56
Major District Roads
Length maintained under OPRMC - 6167.16 Km
Length under different ongoing schemes - 4246.15 Km(under CMBD, CRF, NABARD, Plan etc.)
Length proposed under different schemes - 471.00 Km
Road length not covered under any scheme- 260.97 Km
11145.28 Km
• Length of roads (110 nos) notified for transfer
to RCD but yet to be upgraded as per IRC Standard - 1141.30 Km
Good
(Km)
Fair
(Km)
Bad
(Km)
Total
Length (Km) 8562.95 1120.59 1461.74 11145.28
% 76.83 10.05 13.12
Output & Performance based Road
Maintenance Contract (OPRMC) at a Glance
DescriptionInitial Status as
per AA
Current
StatusRemarks
Road network
length9064 Km 8039 Km
Deletion for widening/
strengthening/ transferred to NH
No. of packages 76 74Chhapra (40) rescinded and
Hajipur (41) under litigation
AA Amount 2579.17 Crore 2579.17 Crore --
Agreement
Amount2409.63 Crore 2386.68 Crore --
Date of Start Dec’2013 --
Contract Period 5 Years ( Upto Dec’2018) --
Expenditure upto
April’20182116.57 Crore 89 %
PM (Periodic
Maintenance)
Status upto
April’2018
6230 km out of 6807 km 92 %
Public Grievance Status( since 04.04.2015 till date)
Description Total Complaints Disposed PendingPercentage
Disposal
RCD (excluding
OPRMC)5744 5547 197 97%
OPRMC 887 887 0 100 %
Others
(Related to other
departments)
25277 13514 11763 53 %
Measures taken for effective monitoring of OPRMC
Public Awareness for Complains/Suggestion
Through Hoardings
Print & Electronic Media
Online Monitoring system for Inspection & Reporting by field
officers.
GPS installed on all Road Ambulances and monitored by Vehicle
Tracking System.
Call Recording and SMS integrated into RMPGRS. Voice
recording for improving quality of Grievance Handling.
Special Inspection Drive for proof checking of performances of
Divisions and Contractors.
Video evidencing of OPRMC roads on random basis.
Special Inspection Drive (under OPRMC) Special Independent Inspection Drive conducted to ascertain
ground status of every km of 8039 km of roads in 2017.
Reports were received online.
Major findings:
i. 7509 Kms of OPRMC road crust were found maintained out
of 8039 Kms. (93.4% of road length)
ii. Total 568 pots were found in rest 530 Kms of the stretch. [@
1.07 pots/Km]
iii. In 75 % road stretch, shoulder condition was found
satisfactory.
iv. Other parameters such as Road safety, Drain clearance/
Culvert maintenance requires more attention.
Contractors and Work Divisions identified where performance of
OPRMC was found unsatisfactory, department has initiated
action against such Contractors and Engineers.
Next phase of OPRMC (Phase-II)
Salient Features:
Next phase to start in DEC’ 2018 . Maintenance period 7 years.
To include all roads of RCD : Length approx 14000 km.
Maintenance plan prepared road wise.
DPR preparation under process.
Package size-150-200 km ; Costing 80-120 cr approx.
Maintenance cost – Rs. 7.55 Lakh per Km per year
Total cost of maintenance per year – Rs. 1030 crores
Periodic Renewal every four (4) years on each road.
Administrative Approval to be obtained division wise.
Emphasis on Road Safety in IR & MI.
• Total 100 schemes sanctioned out of which 81 schemes have
been completed and 19 schemes are in progress.
• Total accrual till 01.04.2018 - 1168.59 Cr
• Total amount of schemes sanctioned till date - 1760.11 Cr
• Amount released till 01.04.2018 - 734.15 Cr
• Amount utilized till 01.04.2018 - 692.05 Cr
Central Road Fund
Status of ROB
• Under Tripartite Agreement between Railway, State Govt. and
IRCON, IRCON has taken up construction of 34 ROBs, out of
which 30 have been completed and 4 are under progress.
• State Government has conveyed its consent for construction of
47 ROBs. Railway is preparing GAD and DPR for construction
of ROBs.
• Railway has provided another list of 48 level crossings and
requested consent of State Government for 50% cost share.
Feasibility Report of these level crossing is under process in
RCD.
• Tripartite MOU to be signed among GoB, Railways and
MORT&H
• TOTAL PROJECTS SANCTIONED : 326nos. (RIDF-XIV to XXIII)
Bridge Projects : 258 nos.
Road Projects : 68nos.
• TOTAL PROJECTS COMPLETED : 164nos.
Bridge Projects : 138 nos.
Road Projects : 26 nos.
• PROJECTS SUBMITTED TO NABARD IN 2018-19 UNDER RIDF-XXIV
No. of Road Schemes : 13 + 30 = 43 nos (724 Km)
Estimated Cost : 780 + 1238 = 2018.00 Cr.
No. of Bridge Schemes : 1 no. (9.09 Cr)
Status of Approval: Approval awaited from NABARD
Status of Projects funded under RIDF
Indo-Nepal Border Road Project
Total Length - 552.293 Km
Cost of construction shared by GoI - 1702.00 Cr.
Share of State Govt. - 3262.383 Cr.
[LA 2233.13 Cr + 121 nos Bridges 983.81 Cr]
Original amount of A/A - 2552.8630 Cr
1st Revised A/A amount - 3935.1304 Cr
Note:- Rs. 983.81 crores for construction 121 bridges sanctioned
under NABARD of State Plan
Status of Execution : Total Contract - 8 nos,
Under litigation – 4 nos.
Under progress – 4 nos. (1 package substantially
completed in Araria)
81.58 Km Black Top Road completed.
Land to be acquired 103.163 Km.
Indo-Nepal Border Road Project
District
To b
e A
cqu
ired
(Mau
za) To be
Acquired
(Acre) Acq
uir
ed
(Mau
za)
Acquired
(Acre)
Amt.
deposited
with DLAO
Balance Mauza/ Area to
be Acquired Balance Amt.
with DLAO
(6-15)Mauza
(Nos)
(2-4)
Area
(Acre)
(3-5)1 2 3 4 5 6 7 8 9
1 Bettiah 94 803.803 61 315.5125 301.5048 33 488.29 237.551
2 Motihari 47 570.350 40 402.0165 269.3009 7 168.33 57.829
3 Sitamarhi 61 558.510 52 508.2574 587.7244 9 50.25 408.203
4 Madhubani 17 103.374 17 103.3740 124.5700 0 0.00 82.880
5 Supaul 7 42.007 5 26.1077 106.5959 2 15.90 85.184
6 Araria 64 455.962 11 163.0300 591.6122 53 292.93 325.470
7 Kishanganj 65 349.180 56 293.9420 218.4985 9 55.24 127.069
8 Kishanganj
(Araria
Portion)
10 47.700 10 47.7000 28.9715 0 0.00 12.022
Total 365 2930.886 252 1859.9401 2228.7782 113 1070.95 1336.2059
Status of LA :
Total amount required for LA deposited to DLAOs.
ROAD CONNECTIVITY PROJECT FOR LEFT WING EXTREMISM AFFECTED AREAS
(RCPLWEA) UNDER PMGSY
Approved Schemes by MoRD
Sl. No. Districts. No. of Road Length as per DPR
(Km)
1. Aurangabad 6 197.262
2. Gaya 11 155.69
3. Jamui 5 83.141
4. Banka 7 102.10
5. Muzaffarpur 23 326.723
Total 52 864.916
Sl. No. Districts. No. of Bridge Length as per
DPR (mtr.)
1 Muzaffarpur 1 148.80
Schemes yet to be Approved by MoRD
Sl. No. Districts. No. of Bridge
1. Aurangabad 8
2. Gaya 3
3. Jamui 0
4. Banka 15
5. Muzaffarpur 15
Total 41
Schemes yet to be Approved by MoRD Sl.
no.
District Name of Road Length of Road
(in Km)
1 2 3 4
1 Muzaffarpur Basghatta Chowk to Pupri via Pahsoul, Jajuaar 11.25
2 Muzaffarpur Aurai - Jale Road 10.00
3 Muzaffarpur Turki (NH-77) to Saraiya (NH-102) 21.90
4 Banka English more - Punasia via Jethaur Nath Road 12.70
5 Gaya Belaganj (NH-83) to Panchanpur via Singhaul Road 15.00
6 Gaya NH-83 to Tikari via Belhari Road 13.00
7 Gaya Gaya - Nalanda Road to Bairaka via Harli (Near
Mayapur) Saraia, Budhgharaia, Pale, Hudrahi, Gharaia,
Kobva Road
20.00
8 Gaya Chakand - Presheela - Kujapi Road 8.50
9 Jamui Baisakitand (NH- 333) – Simultala (NH- 333 A) Road 20.00
10 Aurgangabad Obra - Bel - Barahi Road 14.00
11 Aurgangabad Beri - Kalali to Bhadwa via Pirthu, Bishambharpur,
Karwa, Kharaukhar, Gothani Road
14.00
12 Aurgangabad Dihara to Obra Road 12.00
13 Aurgangabad Deo More to Kataki via Maharana Pratap College Deo
Road via Goujraya
13.00
14 Banka Shambhuganj-Asharganj Road 8.30
Grand Total:- 193.65
Status of Tender
Sl.
No.
Districts. No. of
Road
Length as per
DPR (Km)
Status of tender
1. Aurangabad 6 197.262 Tender invited & Tech Bid Opened.
2. Gaya 11 155.69 Tender invited Tech Bid opened for
9 Roads
3. Jamui 5 83.141 Tender invited
4. Banka 7 102.10 Tender invited & Tech Bid Opened
for 6 Roads
5. Muzaffarpur 23 326.723 Tender invited for 4 Roads & rest 19
Roads tender is in process.
Total 52 864.916
Sl.
No.
Districts. Name of Bridge Length as per
DPR (mtr.)
Status of tender
1 Muzaffarpur HL RCC Bridge in 26th Km over River Bagmati
148.80 Tender invited .
Status of Mega Projects implemented by
Bihar Rajya Pul Nirman Nigam Ltd.
Name of Project
Construction of Bridge over river Ganga between Arrah (NH-
30) and Chhapra (NH-19) via Babura –Doriganj in dist of
Bhojpur and Saran of Bihar.
Description of ProjectRCC High Level Bridge, Bridge length 4 Km, width 4 lane with
footpath (20.50 mt), Approach Road 16km.
Administrative ApprovalRs. 676.00 Cr. Vide RCD Letter No 7414(S) Dated 31.03,2010
(Revise Estimate for Rs. 886.00 Cr. Submitted to RCD)
Agreement Amount Rs. 625.78 Cr.
Date of Start 05.07.2010
Date of Completion (as per EOT) 31.05.2017
Date of Completion Bridge Inaugurated on 11.06.2017 and opened for Light Traffic.
Heavy Vehicles allowed since last week of August 2017.
Contractor SDB-SPS(JV)
Supervision Consultant AECOM-TES (JV)
Physical Progress Issues
Foundation Sub Structure Super Structure Approach 1-Land Acquisition for 2.5
Km Green Field connectivity
with NH-30
2-L.A. Issue in second lane
of road in Bhojpur Distt &
Guide Bund in Saran Distt
100% 100% 100% 75%
Bridge over river Ganga between Arrah (NH-30) and Chhapra (NH-19)
Name of ProjectConstruction of Northern Approach (Sonpur Side) of Rail–
cum–Road Bridge over river Ganga near Digha Ghat Patna.
Description of Project
RCC / Composite Elevated structure with Approach Road.
Length : 2.56 Km (1st Phase) + 3.142 Km (2nd Phase) = Total
5.703 Km.
Administrative Approval Rs. 244.99 Cr. Vide RCD Letter No 7175 (S) Dated 05.08.15
Agreement Amount Rs. 75.49 Cr. (1st Phase)
Date of Start 12.12.2015
Date of Completion (1st
Phase)
(as per agreement)
11.12.2016
Expected Date of
Completion
1st Phase Inaugurated on 11.06.2017 and Traffic opened
2nd Phase to be completed by June 2019
Contractor M/s S.P. Singla Construction Pvt. Ltd.
Remarks2nd Phase : Tender Awarded., Work and Land Acquisition in
Progress.
Physical Progress (1st Phase) Issues
Foundation Sub Structure Super Structure Approach L.A. for 2nd phase in
Saran Distt.100% 100% 100% 100%
Northern Approach (Sonpur Side) of Rail–cum–Road Bridge over river
Ganga near Digha Ghat Patna.
Name of Project
Construction of Flyover (2x2 lane, carriageway 5.5 m wide) from
Mithapur ROB to Chiraiyatand Flyover via Station Road
And
Extension of Chiraiyatand Flyover (1x2 Lane, Carriageway 7.5 m
wide) up to Gandhi Maidan in Exhibition Road
Description of Project RCC / Composite Fly Over.
Administrative Approval Rs. 167.85 Cr. Vide RCD Letter No 100 (S) Dated 08.02.13
Agreement Amount Rs. 97.01 Cr.
Date of Start 28.06.2013
Date of Completion (as per
EOT)30.06.2017
Date of Completion Inaugurated on 26.12.2017 & Traffic opened .
Contractor M/S S.P. Singla Construction Pvt. Ltd.
Supervision ConsultantSTUP in Association with Transtek. (Agreement closed in Dec.-
2017)
Physical Progress Issues
Foundation Sub Structure Super Structure Approach
-100% 100% 100% 100%
Mithapur ROB to Chiraiyatand Flyover via Station Road
Name of Project
Construction of High Level Bridge on Sone River Connecting
Daudnagar and Nasriganj including Approach Roads in District
Aurangabad and Rohtas, Bihar
Description of Project
RCC HL Bridge, Bridge Length -2.9 KM. Width - 4 Lane,
Minor Bridge - 4 Nos.,Trumpet Interchange -1 No., Hume Pipe Culvert
-23 Nos., Vehicular Underpass-5 Nos., Approach - 8.00 Km.
Administrative Approval Rs. 1006.56 Cr. Vide RCD Letter No 10100 (S) Dated 15.12.16
Agreement Amount Rs. 432.69 Cr.
Date of Start 04.03.2014
Date of Completion (as per
EOT)31.03.2018
Expected Date of
Completion
31.12.2018
(Bridge shall be completed by Dec.- 2018 & Traffic can be
opened through Barun – Daudnagar Road in Daudnagar Side
and RWD Road in Nasriganj Side)
Contractor Hindustan Construction Co.
Supervision ConsultantSTUP in Association with Transtek (Agreement closed in Dec.-
2017)
Physical Progress Issues
Foundation Sub Structure Super Structure Approach L.A.in Aurangabad
and Rohtas Distt.100% 100% 95% 30%
Bridge over river Sone connecting Daudnagar and Nasriganj
Bridge over river Sone connecting Daudnagar and Nasriganj
Name of Project
Construction of 13.00 Km (Approx) long extended portion of
Approach road of Baluaha Ghat Kosi Bridge between Baluahaghat
to Gandaul upto Biraul (Hanti Kothi) in Saharsa/Darbhanga.
Description of ProjectMajor Bridge 2 Nos, Minor Bridge 11 Nos, Box Culvert 21 Nos,
Approach Road 11.61 Km with Guide Bund
Administrative Approval Rs. 404.00 Cr. Vide RCD Letter No 1704 (S) Dated 24.10.16
Agreement Amount Rs. 231.15 Cr.
Date of Start 12.03.2013
Date of Completion (as per
EOT)30.06.2017
Expected Date of
Completion31.12.2018
Contractor Gammon India Ltd.
Supervision Consultant AECOM India Pvt Ltd.
Physical Progress Issues
Foundation Sub Structure Super Structure Approach L.A. in Darbhanga and
Saharsa Distt.100% 100% 98% 76%
Extended portion of Approach road of Baluaha Ghat Kosi Bridge between
Baluahaghat to Gandaul upto Biraul (Hanti Kothi) in Saharsa/Darbhanga.
Name of Project
Construction of 2x2 Lane Bridge with footpath across river
Ganga between Sultanganj (Bhagalpur District) and Aguwani
Ghat (Khagaria District) including navigational span of cable
stayed and approaches (Connecting NH31 and NH80) in the
state of Bihar on EPC mode
Description of ProjectRCC HL Bridge, Bridge length – 3.160 Km, width – 8.5mX2, Footpath
– 2X1.5m, Approach – 4Km Sultanganj Side & 16Km Aguani Side.
Administrative Approval Rs. 1710.77 Cr. Vide RCD Letter No 8797 (S) Dated 14.11.13
Agreement Amount Rs. 859.00 Cr.
Date of Start 02.05.2015
Date of Completion( as per
Agreement)01.11.2019
EPC Contractor M/S S.P. Singla Construction Pvt. Ltd.
Supervision Consultant Studio De Miranda in JV with Rodic Consultant Pvt Ltd
Physical Progress Issues
Foundation Sub Structure Super Structure Approach L.A. in Khagaria and
Bhagalpur Distt.88.26% 43.00% 8.40 -
Bridge over river Ganga between Sultanganj (Bhagalpur
District) and Aguwani Ghat (Khagaria District)
Name of ProjectConstruction of H.L P.S.C cast in situ bridge over river Gandak in
between Sattarghat and Faizullahpur in District Motihari (Bihar)
Description of ProjectRCC HL Bridge, Bridge Length – 1.440 Km, Width – 12m,
Approach-9.071 Km.
Administrative Approval Rs. 263.48 Cr. Vide RCD Letter No 4156 (S) Dated 13.04.12
Agreement Amount Rs. 209.18 Cr.
Date of Start 20.10.2012
Date of Completion (as per
EOT)30.06.2018
Expected Date of
Completion30.06.2019
Contractor Vasishta Construction Pvt Ltd. Hydrabad
Supervision Consultant VKS Infratech, New Delhi
Physical Progress Issues
Foundation Sub Structure Super Structure Approach LA Issue in East
Champaran and
Gopalganj Distt95% 76% 49% 54%
Bridge over river Gandak in between Sattarghat and
Faizullahpur in District Motihari (Bihar)
Name of Project
Construction of High Level Bridge across river
Gandak at Bangra ghat including 19 Km. length of
Approach Road connecting Muzaffarpur & Saran
District of North Bihar
Description of ProjectRCC HL Bridge, Bridge Length – 1.506 Km, Width – 14.80 m,
Length of Guide Bund – 2.225 Km, Approach Road -19 Km,
Administrative Approval Rs. 508.98 Cr. Vide RCD Letter No 8795 (S) Dated 14.11.13
Agreement Amount Rs. 299.51 Cr.
Date of Start 11.04.2014
Date of Completion (as per
EOT)09.04.2019
Expected Date of
Completion09.04.2019
Contractor M/s S.P. Singla Construction Pvt. Ltd.
Supervision Consultant AECOM-VIS (JV)
Physical Progress Issues
Foundation Sub Structure Super Structure Approach LA Issue in
Mujaffarpur, Gopalganj
& Saran Distt.87.20% 64.10% 29.24% 21.60%
P-03
Bridge across river Gandak at Bangra Ghat
Name of Project
Construction of “Lohia Path Chakra” with Swap and grade
separated U-Turn based multi sectional interchange,
multiple Underpasses, Flyover, elevated section using U-
Girders & extra dosed cable stayed structures at Bailey
Road, Patna
Description of ProjectExtra Dosed Cable Stayed Bridge at Daroga Rai Path
Integral Spine Beam Bridge Near Lalit Bhawan Junction
Extra Dosed Cable Stayed Bridge Near BPSC Office
Administrative Approval Rs. 391.48 Cr. Vide RCD Letter No 7192 (S) Dated 05.08.15
Agreement Amount Rs. 381.60 Cr.
Date of Start 19.02.2015
Date of Completion (as per
Agreement)18.12.2017
Expected Date of
Completion (as per EOT)31.03.2019
Contractor M/S S.P. Singla Construction Pvt. Ltd.
Concept, Design &
Supervision
Foundation for Innovation & Technology Transfer, IIT,
Delhi
Physical Progress
Foundation Sub Structure Super Structure Approach
69% 17% - -
R-05 Underpass water proofing work in progress 0+320 to 0+360 (Circular Road)
R-05 Underpass Crash Barrier reinforcement binding work is in progress 0+120 to 0+140 (Near Lalit Bhawan)
Lohia Path Chakra
Bihar Rajya Pul Nirman Nigam Ltd
Mukhya Mantri Setu Nirman Yojna
Total Sanctioned
Schemes
Completed
Schemes Ongoing Schemes
NosAmount in
Cr.Nos
Amount in
Cr.Nos
Amount in
Cr.
1157 2688.54 1132 2605.21 25 83.33
Status of Mega Projects implemented by
Bihar State Road Development Corporation
ADB ASSISTED COMPLETED PROJECTS
BSHP PHASE-I (2009-12)
SH
No.Name of Road
Length
(km)Status
68 SHIVGUNJ-BAIDRABAD 83.051 Substantially Completed
69 DUMARIA-RANI TALAB 152.80 Substantially Completed
70 GAYA-RAJAULI 58.23 Completed
71 JEHANABAD-SHAHPUR 85.20 Completed
73 SIWAN-SHITALPUR 88.00 Completed
74 HAJIPUR - ARERAJ 87.06 Completed
75 DARBHANGA– MADHWAPUR 46.75 Completed
76 ARARIA – BHAPTIYAHI 121.00 Completed
77 KURSELA - FORBESGANJ 102.93 Completed
• Substantially Completed – SH-68: 2 Br. Superstructures remaining, SH-69: Approach Road in km 8 & 22 and
Superstruture work in Km 10 & 119 remaining.
ADB ASSISTED PROJECTS
SH
No.Name of Road
Length
(km)Completion Date Status
78BIHTA - DANIYAWAN –CHANDI -
SARMERA94.20 30.06.2018 38.07 km Completed
81 SAKKADI - SAHAR - NASARIGANJ 83.25 31.05.2018 75.40 km Completed
89 SIWAN-SISWAN 31.27 - Completed
90MOHAMMADPUR-
KARANKUDARIYA -CHHAPRA64.70 31.05.2018 Completed
91 BIRPUR-UDAKISHANGANJ 100.84 31.03.2019 94.44 km Completed
83 BAGHI - BARBIGHA 37.646 - 36.55 km Completed
86 SARAIYA – MOTIPUR 28.204 16.10.2018 25.62 km Completed
87 RUNNISAIDPUR - BHISHWA 67.755 31.07.2018 47.75 km Completed
88 BARUNA BRIDGE - RASIYARI 120.901 30.09.2019 54.61 km Completed
BSHP PHASE-II (2011-19)
PROJECTS UNDER CONSIDERATION
SH
No.Name of Road
Length
(km)Status
58 UDAKISHANGANJ-BHATGWA ROAD 29.48
Date of Bidding is 07.6.2018
Except SH-105 for which DPR
preparation is in Progress.
82 KADIRGANJ-KHAIRA ROAD 75.10
84 GHOGHA-PANJWARA ROAD 43.35
85 AKBARNAGAR-AMARPUR ROAD 29.304
102 BEHEA-JAGDISHPUR –PIRO BIHTA ROAD 54.519
105 BETTIAH-NARKATIAGANJ-BIKHNA THORI ROAD 71.6
(SH-78, BIHTA - DANIYAWAN – CHANDI - SARMERA)
PACKAGE-1 PACKAGE-2
CONTRACTOR M/s BSCPL Infrastructure
Ltd., Hyderabad
M/s BSCPL Infrastructure
Ltd., Hyderabad
CONTRACT LENGTH 46.70 km 47.5 km
CONTRACT AMOUNT 393.34 Cr. 287.16 Cr.
DATE OF COMMENCEMENT 29.08.2015 12.09.2015
DATE OF COMPLETION 30.06.2018 30.06.2018
FINANCIAL PROGRESS 26.86% 31.02%
WORK COMPLETION8.85 km (upto DBM) – by
Previous Contractor
14.75 km (upto DBM) – by
Previous Contractor
PHYSICAL PROGRESS 26.26 % 33.40 %
EMBANKMENT 14.903km 13.567 km
SUB – GRADE 12.225 km 10.246 km
GSB 10.862km 10.897 km
WMM 10.277km 10.232km
DBM 6.8 7.665
BC - -
(SH-78, BIHTA - DANIYAWAN – CHANDI - SARMERA)
PPP ON-GOING GREENFIELD BRIDGE ACROSS GANGA
CONNECTING BAKHTIYARPUR TO TAJPUR
CONCESSIONAIRE M/s Navayuga Jahnavi Toll Bridge Pvt. Ltd.
CONCESSION PERIOD 30 Years including 4.5 years Const. period
MAIN BRIDGE LENGTH 5.525 km
APPROACH ROAD 45.745 km
APPOINTED DATE 30.11.2011
COMPLETION DATE 31.07.2019
VGF GoI 277.50 Cr.
VGF GoB 307.50 Cr.
FINANCIAL PROGRESS (w.r.t Total Fin Pkg.) Rs. 870.38 Cr. (54.41 %)
PHYSICAL PROGRESS (w.r.t EPC) Rs. 720.81 Cr. (49.71%)
FEATURESMajor Bridges – 03, ROB – 02, Grade Separator-03,
VUP- 16, Service Road (km)-10.05, Toll Plaza- 01
MAIN BRIDGE:
Foundation Piles – 270/272 (Nos.), Pile Caps – 41/46 (Nos.), Sub-structure- 30.3/46 (Nos.),
Segment Casting- 338/1722 (Nos.), Super-Structure launching Span – 1/45 (Nos.).
HIGHWAY : Road Embankment – 21.6/45.75 (km).
GREENFIELD BRIDGE BAKHTIYARPUR TO TAJPUR
MAJOR BRIDGE :- 01 completed out of 4 Nos.
ROBs :- 02 ( 1 no. in progress up to Sub
structure).
GRADE SEPARATOR : 03 ( 1 no. in progress
up to Sub structure).
VUPs :- 10 ( 4 no. completed, 1 in progress, 5
nos. not started due to LA).
PUPs : 6 ( 3 no. completed, 1 is going to start, 2
nos. not started due to LA).
GREENFIELD BRIDGE BAKHTIYARPUR TO TAJPUR
EPC ON-GOING PROJECTSELEVATED CORRIDOR PROJECT PATNA (L-12.27 km)
ELEVATED CORRIDOR PROJECT PATNA (L-12.27 km)
ADMINISTRATIVE APPROVAL 1231.06 Crores. (including NHAI Leftover)
AGREEMENT AMOUNT (WORK) Rs. 877.45 Crores.
NAME OF THE CONTRACTOR M/s Gammon Engineers & Contractors Pvt. Ltd.
AUTHORITY ENGINEER M/s AECOM-Rodic Consultants Pvt. Ltd. (JV)
MAJOR CROSSINGS Bailey Road, Ashok Rajpath
CONNECTIVITY With NH-30, NH-98, Ganga Path & NH-19
AGREEMENT DATE 11.10.2013
APPOINTED DATE 21.10.2013
COMPLETION DATE 31.10.2018
FINANCIAL PROGRESS 834.65 Crores
PHYSICAL PROGRESS:
Pile – 3046/3046 (Nos.), Pile Cap – 682/683 (Nos.), Pier – 680/683 (Nos.), Pier Cap – 675/683 (Nos.),
I-Girder Casting – 3800/4074 (span), I- Girder Erection – 3766/4074 (span), Deck Slab – 665/679
(span)
ELEVATED CORRIDOR PROJECT PATNA (L-12.27 km)
CONSTRUCTION OF SOUTH SIDE APPROACH ROAD, 2 LANE WITH PAVED SHOULDER OF DIGHA RAIL-
CUM-ROAD BRIDGE FROM AIIMS TO DIGHA
(NHAI LEFTOVER PORTION) TOTAL LENGTH 10.69 KM
CONSTRUCTION OF SOUTH SIDE APPROACH ROAD, 2 LANE WITH PAVED SHOULDER OF DIGHA RAIL-
CUM-ROAD BRIDGE FROM AIIMS TO DIGHA
(NHAI LEFTOVER PORTION) TOTAL LENGTH 10.69 KM
ADMINISTRATIVE APPROVAL 1231.06 Crores. (including NHAI Leftover)
AGREEMENT AMOUNT (WORK) Rs. 157.14 Crores.
NAME OF THE CONTRACTOR M/s Gammon Engineers & Contractors Pvt. Ltd.
AUTHORITY ENGINEER M/s AECOM-Rodic Consultants Pvt. Ltd. (JV)
MAJOR CROSSINGS Bailey Road, Ashok Rajpath
CONNECTIVITY Bankipur-Danapur Road & South Side of ROB
AGREEMENT DATE 20.10.2016
COMPLETION DATE 19.04.2018
FINANCIAL PROGRESS 115.19 Crores
PHYSICAL PROGRESS:
Earthwork – 9067/ 9205 (m), Granular Sub-Base – 9067 / 9205 (m), WMM – 9067 /9205 (m), DBM –
8120 / 9205 (m), BC– 8120 / 9205 (m)
Flyover:-
Pile – 14 / 16 (Nos.), Pile Cap – 14 /16 (Nos.), Pier – 14 /16(Nos.)
J.P.Setu connectivity work already completed.
CONSTRUCTION OF SOUTH SIDE APPROACH ROAD, 2 LANE WITH PAVED SHOULDER OF DIGHA RAIL-
CUM-ROAD BRIDGE FROM AIIMS TO DIGHA
(NHAI LEFTOVER PORTION) TOTAL LENGTH 10.69 KM
GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA
(Length- 21.5 km)
ADMINISTRATIVE APPROVAL Rs. 3390 Crore
AGREEMENT AMOUNT Rs.1777.3715 Crore
NAME OF THE CONTRACTOR M/s Navayuga Engineering Co. Ltd.
AGREEMENT DATE 23.08.2013
APPOINTED DATE 09.09.2013
MODIFIED COMPLETION DATE EOT under process for 31.12.2019
FINANCIAL PROGRESS 24.64% (Rs. 455.70 Crores ) up to March 18
FEATURES
Length of Elevated Structure – 11.70 km, Embankment length – 8.8 km, Service Road – 8.2
km., Vehicular Underpass – 13, Grade Separator interchange – 01, ROB – 01, Culverts – 13,
FOB – 08 (both side), Toll Plaza – 02, Pedestrian Walkways- 05 km. (river side), Truck
laybys – 01, Bus laybys / Shelter – 16, Re-creation area – 07, Toll Plaza - 07 (including
connecting road), Connecting Road – 07 (LCT Ghat, A.N. Sinha Institute, PMCH, Krishna
Ghat, Kangan Ghat, Gaighat, Patna Ghat)
PHYSICAL PROGRESS
Pile- 397/762, Pile Cap- 74/163, Pier – 71/163, Pier Cap- 71/163, Segment Casting-
694/2431, Launching of Segment- 31. Earth work- 2 Km (in progress)/8.8 km
GANGA PATH (Length- 20.5 km)
Near Kurji Ghat-LCT Ghat Jack-up Barge
Collectrate Ghat Near LCT Ghat
GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA
SIX LANE BIHAR NEW GANGA BRIDGE PROJECT
(Bridge Length -9.76 km, Approach Length- 13 km)
Length of the Project : 22.76 Km. includes 9.76 Km. long Main Bridge
• Start Point : Kachchi Dargah at NH-30 in Patna District
• End Point : Bidupur at NH-103 in Vaishali District
Total Project Cost : INR 4988.4 Cr.
• ADB Assistance : INR 3000.00 Cr.
• Balance Amount (GOB ) : INR 1988.4 Cr.
Name of Civil Contractor : M/s Daewoo & L&T (JV)
Name of Authority Engineer : AECOM & RODIC (JV)
A/A for the Project : Rs. 4291.80 Cr. on 29.07.2015
A/A for Land Acquisition : Rs. 696.60 Cr. on 26.05.2015
Contract Amount
NGO
Agreement Date / Appointment Date
Completion Period / Date of Completion
:
:
Rs.3115.00 Crores
CITIZEN foundation
:10.02.2016 / 16.01.2017
: 4 years / 15.01.2021
Features :-
Major junctions – 06, Grade Separator – 01, 2-lane loop- 04, RAMPS – 08, Flyover- 02, Viaduct
– 06, Rotary – 02, Toll Plaza – 01, Truck lay-byes, Bus-byes and Bus-Shelter, Museum, Traffic
Aid Posts, Vehicle Rescue Posts, Telecom System, Intelligent Traffic System , Weigh-in-motion
Bridge
PHYSICAL PROGRESS of Main Ganga Bridge
Well Curb- 32/67 no. , Well Steining 716.55/3088.5 M, Well Sinking 485.96/3390 M
LA Status :- 243.12 acre out of 313 acre land acquired and balance is under process.
SIX LANE BIHAR NEW GANGA BRIDGE PROJECT
(Bridge Length -9.76 km, Approach Length- 13 km)
SIX LANE BIHAR NEW GANGA BRIDGE PROJECT
(Bridge Length -9.76 km, Approach Length- 13 km)
Length – : 92.93 Km.
Project Sanctioned Amount- : INR 1408.85 Cr.
JICA Finance Portion (Project cost and
Consultancy cost)
: INR 1216.16 Cr.
Balance Amount to be Budgeted by
MoRTH, GoI (R&R, LA, Utility shifting &
Local Taxes.)
: INR 192.69 Cr.
Name of Civil Contractor : Gayatri Projects Ltd., Hyderabad
Date of Agreement : 20.10.2016
Amount of Agreement : INR 925.874 Crore
Date of Commencement : 20.10.2016
Date of Completion : 19.10.2019 ( 3 years)
STATUS : Work in progress
Financial Progress : 24.75 %
Up to date Physical Progress : 23.00 %
Unencumbered Length : 50.00 Km
C & G -27.28/ 50, Embankment – 21.58/50, Sub-grade – 19.36/50, GSB –
16.85/50, WMM- 16.16 /50, DBM- 15.40/50, BC (Overlay) -5.9/50(all in km)
H.P Culvert – 54/105, 5 in progress, Box Culvert – 62/118, 15 in progress ,
Minor Bridge- 17/33 , 4 in progress, major Bridge – All 6 are in progress, ROB-
out of 4 nos. 1 in Progress.
4-LANING OF NH-82 (GAYA - HISUA - RAJGIR -NALANDA -
BIHARSHARIF SECTION) under JICA
4-LANING OF NH-82 (GAYA - HISUA - RAJGIR -NALANDA -
BIHARSHARIF SECTION)
IMPROVEMENT OF MAJOR DISTRICT ROADs
DetailsTotal
(km)
Single Lane
(Km)
Intermediate
Lane (Km)
BLOCK TO DISTRICT
HEADQUARTER CONNECTIVITY491.28 456.74 34.54
SUB-DIVISION TO DISTRICT
HEADQUARTER CONNECTIVITY114.08 38.49 75.59
TOTAL LENGTH (KM) 605.36 495.23 110.13
IMPROVEMENT OF MAJOR DISTRICT ROADsSUB-DIVISION TO DISTRICT HEADQUARTER CONNECTIVITY
S. No. DistrictSub-
division Name of Road
Length (in Km)
1 2 3 4 5
1 Supaul NirmaliNH-57 (Bhutha Chowk) to Nirmali –Madhepur PWD road via West Kosi
Embankment 6.05
2 SamastipurDalsinghsa
raiSamastipur-Dalsinghsarai Road 22.90
3 Samastipur Patori Samastipur-Sarairanjan-Patori Road 12.25
4East
ChamparanPakridayal Pakridyal-Sirha-Madhuban-Minapur Road 29.00
5 Saran MahrauraChapra - Marhowra Road
(km 8.8236 to 26.3)17.48
6 SiwanMaharajga
njMaharajganj-Tarwara Road 10.40
7 Begusarai Bakhri
Manjhaul Bakhari Roadkm 0 to 3.7, 4.3 to 16
15.40
Manjhaul Bakhari Roadkm 3.7 to 4.3
0.60
Total 114.08
IMPROVEMENT OF MAJOR DISTRICT ROADsBlocks to District Headquarters Connectivity
S. No. District Block Name Road providing connectivityTotal Length
(in Km)1 2 3 4 5
1
Araria
KursakataAraria Kursakanta Kuwari Sikti Road(up to Kuwari) km 0 to 28
28.0
2 SiktiAraria Kursakanta Kuwari Sikti Road (up to Kuwari) km 29 p to 35p
6.5
3 Palasi Araria Jokihat Palasi Road 18.54
SaharsaNauhatta Panchgachia Nauhatta Road 8.5
5 Sattar Katiya Panchgachia Nauhatta Road 5.06 Patharghat Sour Bazar Pattarghat Road 10.37 Darbhanga Hayaghat Jatmalpur-Hayaghat-Hathauri Road 10.0
8Samastipur
VidyapatinagarVidyapatinagar-Kakarghati-Sarairanjan-NH-103 Road
21.5
9 Ujiyarpur Ujiarpur-Samastipur Road 12.010
West Champaran
Nautan Nautan-Bettiah Road 12.011 Bairia Bairia-Bettiah Road 10.012 Bhaitaha Bhaitana to Chautarwa via Dhanha-Ratwal Bridge 25.013 Gaunaha Narkatiaganj-Gaunaha Road 20.014
East Champaran
Kalyanpur Pipra-Kalyanpur Road 12.015 Tetaria Pakridyal-Sirha-Madhuban-Minapur road 29.0
16 PenharaKrishnanagar NH-104 to Fenhara block head quarter (RWD) road in k.m. 0 to 11.10
11.1
17 Bankatwa Chhouradono-Bankatwa Road 11.018 Adapur Narirgir-Champapur-Adapur road 15.0
IMPROVEMENT OF MAJOR DISTRICT ROADsBlocks to District Headquarters Connectivity
S. No. District Block Name Road providing connectivityTotal
Length (in Km)
1 2 3 4 519 Saran Lahladpur Sikatia - Paigambarpur Road 15.220 Siwan Darauli Mairwa Darauli Road (0.00 - 19.00) 19.0
21 Lakhisarai PipariaPipariya-Walipur Main Road 2.1Walipur-Lakhisarai Road 7.7
22
Begusarai
Mansur Chak
Dalsinghsarai Kaidrabad Malti Road km 7 to 25,26.662 to 29.00, 29.970 to 30.00, 32.314 to 33.000, 33.867 to 34.00
22.2
Dalsinghsarai Kaidrabad Malti Road km 25.00 to 26.662, 29.00 to 29.970, 30.00 to 32.00, 32.00 to 32.314, 33.00 to 33.867, 34.00 to 36.00
7.8
23 Navkothi Pahsra-Bagras Road 8.0
24 DhandariNH-31 to Katarmala via Nurjummapur-Dhandhari Block Road
8.0
25Bhagalpur
IsmailpurIsmailpur-Chotti Parbatta Road 9.3Naugachhiya-Mahadeopur Ghhat Road 11.9
26 Kharik Kharik-Chorhar Road 6.827
NawadaKashichak Sarkatti More -Subhanpur Road 16.7
28 Meskaur Manjhwey-Meskaur-Tetariya Road 10.0
IMPROVEMENT OF MAJOR DISTRICT ROADs
Blocks to District Headquarters Connectivity
S. No. District Block Name Road providing connectivityTotal
Length (in Km)
1 2 3 4 5
29 Gaya Gurua Gaya-Chekri via Baijudham Road 10.8
30 Bhojpur TarariNonar-Karath-Tarari-Bihta Road (km 13.0 to 22.0)
4.1
31
Rohtas
Dinara Dinara-Baraw Road 23.3
32 SuryapuraDhangai-Suryapura-Kalyani Road (km 3 to 7 (P)
4.5
33 Thilauthu Sasaram-Thilarathu Road 17.4
34 ArwalSonbhadra Bansi
SuryapurKarpi-Sherpur-Banshi Road 9.0
35 Nalanda KatrisaraiSoiba Belchhi Paroha Manpur Katrisarai Road
12.0
Total 491.3
• At present 74 nos. Quality Control Laboratories functional under
RCD divisions and circles.
• 4 Flying Squad teams at HQ level to ensure Quality Assurance
through surprise inspection in addition to attended complaints (if
any).
– No. of schemes inspected in 2017-18 - 369 nos.
– No. of schemes inspected in 2018-19 till date - 48 nos.
• Before releasing the allotment to any schemes, its update quality
control reports are verified.
• Quality Control Report are being uploaded on Departmental
Website.
Quality Assurance
• Special Inspection Drive of SHs & MDRs Roads to
ensure Quality Control as Third Party Independent
Quality Monitor.
• Total 550 nos. of schemes taken for inspection [Road
– 455 nos. ( 4700 km), Bridges - 90 nos. & Buildings –
5 nos.]
• 40 teams comprising one SE/EE and one AE are carrying
out Inspection in their designated Road Division.
• Daily online entry of Inspection data through PMIS is being
done by each team after field inspection.
Quality Assurance
Road Safety under RCD Roads
(a) Black Spot:
Road Category No. of identified
black spots
Status Report
Rectified Under
Rectification
NHNHAI 94 38 56
RCD 7 4 3
SH 9 5 4
MDR 14 10 4
(b) Activities under RCD for Road Safety:
(i) Road Safety Audit done (SH)
Design Stage Construction
Stage
Operational
Stage
Total
414 Km 525 Km 922 Km 1861 Km
Road Safety under RCD Roads
(b) Activities under RCD for Road Safety:
(ii) Road Safety Audit of SHs under process with CRRI,
New Delhi - 2200 Km
(iii) Capacity Building of Engineers on the subject “Road
Safety Audit and other Road Safety related aspects”
- 175 Engineers.
(iv) Mandatory Provision of Road Safety Audit in new
projects (5 km or above) at DPR stage.
(v) Social awakening in children and students through
arranging workshops in schools situated besides
RCD roads – 119 schools.
(vi) Provision of Zebra Crossing and Rumble Strips near
schools on SHs and construction of Foot over
Bridges / Under Pass as required.
New Proposed Initiatives
1. Provision of Street Lights in Urban stretches for Road Safety.
2. Policy for development of way side amenities.
3. Land pooling policy for Ring Road / Bypass Roads
4. Planning for development of road infrastructure in Patna
Metropolitan area.
5. Policy for extraction of soil from public water bodies for
utilization in road embankment.
6. Online Project Monitoring System (PMIS).
7. Comprehensive financial management system.
8. Bihar Road Research Institute (BRRI).
9. Revenue generation methodology developed through
providing accessibility to Petrol Pump, Hospital & other
commercial institutes.
Issue for Consideration
• Existing limit on BOS (Bank of Sanction) i.e (3 times of
allocation) may be relaxed by Finance Department for
taking up new road projects in following categories:-
Road transferred from other department required
improvement as per IRC Standards ~1000 Kms.
2 Laning of remaining State Highways ~600 Kms
Replacement of narrow & old bridges
Roads/bridges in compliance of directions received
during Nishchay Yatra.
Road connectivity to all blocks with 2 lane road.
Land acquisition within defined time frame to make
available 100% encumbrance free land to avoid cost
over run.