Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Road Reconstruction and Drainage Works — Sections of Toogoom Road
PROJECT SCOPE OF WORKS:
The Project scope is as follows:
• Earthworks and excavation;
• Tree removal (existing vegetation will be retained where possible);
• Stormwater drainage and cross-drainage;
• Driveway replacements;
• Pavement and bitumen surfacing;
• Linemarking and signage;
PROJECT:
This project provides for the reconstruction of a 520m section of Toogoom Road from 563 to 611 Toogoom Road. In addition to the road reconstruction works, drainage works including the reformation of table drains, will be undertaken on the eastern side of a 260m section of Toogoom Road.
The road reconstruction and drainage works are being undertaken as a result of inspections carried out as part of Council’s ongoing asset inspection program which identified that the road was showing signs of pavement failure and distress.
PROJECT ESTIMATE:
$1M
Note: Project milestones are subject to weather and may
change.
The traffic management plan that will be put in place for
the duration of the construction period will be developed
prior to works commencing.
September 2021
INDICATIVE PROJECT MILESTONES
March 2021 Final Design
Sept/Dec 2021 Construction Period
Jan 2022 Project Completion
Ro
ad R
eco
nst
ructi
on
an
d D
rain
age
Wo
rks
— S
ecti
on
of
Too
goo
m R
oad
Ro
ad R
eco
nst
ructi
on
an
d D
rain
age
Wo
rks
— S
ecti
on
of
Too
goo
m R
oad
Ro
ad R
eco
nst
ructi
on
an
d D
rain
age
Wo
rks
— S
ecti
on
of
Too
goo
m R
oad