16
8/18/2017 Program (Wave) A Paving projects on 2 lane WV and US Routes (Accelerated Construction with Federal Aid Funding) B Paving, slides, and other roadway improvements to local service roads (Pay-as-you-go with DMV Fees, Gas Tax, and Privilege Tax Revenues) C Bridge replacements and interstate reconstruction (GARVEE 1) D Bridge replacements and other roadway improvements (GARVEE 2) E General Obligation Bonds F Turnpike Bond projects X Candidate Projects Project has been authorized for construction County District Project Work Estimated Cost Program (Wave) Barbour 7 Buckhannon - Clarksburg Road Resurfacing $532,313 A Barbour 7 Bills Creek Road PO Paving $239,000 B Barbour 7 Chestnut Ridge Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $125,000 B Barbour 7 Stalnaker Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $600,000 B Barbour 7 Shiloh Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $510,000 B Barbour 7 Expressway Drainage Rehab - Rte 33 MP 23.57 Slip Line $20,000 D Barbour 7 Expressway Drainage Rehab - Rte 33 MP 24.38 Slip Line $320,000 D Barbour 7 JUNIOR W-BEAM Replace $1,945,000 D Barbour 7 US 119 and WV 57 Safety Improvements Corridor based safety and operational improvements $550,000 X Barbour 7 A&O RAILROAD OP Replace $1,500,000 X Barbour 7 LAUREL CK THRU GRD Minor Rehab $40,000 X Barbour 7 Slide Repair Repair slide locations within county $500,000 X Barbour 7 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $451,000 X Barbour 7 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,894,000 X Berkeley 5 Harlen Springs Road PO Paving $295,000 B Berkeley 5 Giles Mill Road PO Paving $330,000 B Berkeley 5 Nestle Quarry Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $425,000 B Berkeley 5 Apple Harvest Road - Glengary REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $600,000 B Berkeley 5 Tuscarora Pike SLIDE REPAIR, DITCHING, GUARDRAIL, REPAIRS, OVERLAY $600,000 B Berkeley 5 Dominion Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, CULVERTS $600,000 B Berkeley 5 JOHNSONTOWN BRG. Major Rehab $241,252 D Berkeley 5 ROCK CLIFF DRIVE Major Rehab $6,000,000 D Berkeley 5 WV 51 Widening Widen WV 51 from I-81 I/C to WV 51/US 11 I/S (Inwood Bypass) $23,500,000 E Berkeley 5 I-81 Widening Widen I-81 $75,000,000 E Berkeley 5 HEDGESVILLE H.S. BRG. Replace $750,000 X Berkeley 5 MIDDLEWAY BRIDGE Replace $5,500,000 X Berkeley 5 Slide Repair Repair slide locations within county $500,000 X Berkeley 5 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,714,000 X Berkeley 5 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,376,000 X Boone 1 Turtle Creek P&L + 1.5" MILL FILL $57,000 B Boone 1 Meadow Fork/Hewett Creek RD/Jones Branch/ Missouri Fork 1.5" OVERLAY $470,000 B Boone 1 BIG PINNACLE BR. ROAD PO SLIP REPAIR $268,255 B Boone 1 Low Gap Road 1.5" OVERLAY $200,000 B Boone 1 BROWNS BRANCH LESS THAN 20 REPLACEMENT $175,000 B Boone 1 WV 3 Seng Creek Bridge Bridge Replacement $1,772,000 C Boone 1 Whiteoak Bridge Bridge Replacement $1,495,000 C Boone 1 WV 17 Safety Improvements Corridor based safety and operational improvements $250,000 X Boone 1 LIEUTENANT DARWIN K. KYLE MEMORIAL BRIDGE Minor Rehab $380,000 X Boone 1 PVT CLYDE WHITMAN "BOBBIE" BENNETT & PFC OLIVER BALL JR MEMORIA Replace $1,000,000 X Boone 1 POND FORK BR NO. 1868.1 Minor Rehab $375,000 X Boone 1 Slide Repair Repair slide locations within county $500,000 X Boone 1 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,328,000 X Roads to Prosperity Highway Program Road.Jobs.Hope. Project List - Authorized and Candidate Page 1 of 16

Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

  • Upload
    buimien

  • View
    230

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

8/18/2017

Program (Wave)A Paving projects on 2 lane WV and US Routes (Accelerated Construction with Federal Aid Funding)B Paving, slides, and other roadway improvements to local service roads (Pay-as-you-go with DMV Fees, Gas Tax, and Privilege Tax Revenues)C Bridge replacements and interstate reconstruction (GARVEE 1)D Bridge replacements and other roadway improvements (GARVEE 2)E General Obligation BondsF Turnpike Bond projectsX Candidate Projects

Project has been authorized for construction

County District Project Work Estimated Cost Program (Wave)Barbour 7 Buckhannon - Clarksburg Road Resurfacing $532,313 ABarbour 7 Bills Creek Road PO Paving $239,000 BBarbour 7 Chestnut Ridge Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $125,000 BBarbour 7 Stalnaker Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $600,000 BBarbour 7 Shiloh Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $510,000 BBarbour 7 Expressway Drainage Rehab - Rte 33 MP 23.57 Slip Line $20,000 DBarbour 7 Expressway Drainage Rehab - Rte 33 MP 24.38 Slip Line $320,000 DBarbour 7 JUNIOR W-BEAM Replace $1,945,000 DBarbour 7 US 119 and WV 57 Safety Improvements Corridor based safety and operational improvements $550,000 XBarbour 7 A&O RAILROAD OP Replace $1,500,000 XBarbour 7 LAUREL CK THRU GRD Minor Rehab $40,000 XBarbour 7 Slide Repair Repair slide locations within county $500,000 XBarbour 7 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $451,000 XBarbour 7 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,894,000 XBerkeley 5 Harlen Springs Road PO Paving $295,000 BBerkeley 5 Giles Mill Road PO Paving $330,000 BBerkeley 5 Nestle Quarry Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $425,000 BBerkeley 5 Apple Harvest Road - Glengary REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $600,000 BBerkeley 5 Tuscarora Pike SLIDE REPAIR, DITCHING, GUARDRAIL, REPAIRS, OVERLAY $600,000 BBerkeley 5 Dominion Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, CULVERTS $600,000 BBerkeley 5 JOHNSONTOWN BRG. Major Rehab $241,252 DBerkeley 5 ROCK CLIFF DRIVE Major Rehab $6,000,000 DBerkeley 5 WV 51 Widening Widen WV 51 from I-81 I/C to WV 51/US 11 I/S (Inwood Bypass) $23,500,000 EBerkeley 5 I-81 Widening Widen I-81 $75,000,000 EBerkeley 5 HEDGESVILLE H.S. BRG. Replace $750,000 XBerkeley 5 MIDDLEWAY BRIDGE Replace $5,500,000 XBerkeley 5 Slide Repair Repair slide locations within county $500,000 XBerkeley 5 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,714,000 XBerkeley 5 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,376,000 XBoone 1 Turtle Creek P&L + 1.5" MILL FILL $57,000 BBoone 1 Meadow Fork/Hewett Creek RD/Jones Branch/ Missouri Fork 1.5" OVERLAY $470,000 BBoone 1 BIG PINNACLE BR. ROAD PO SLIP REPAIR $268,255 BBoone 1 Low Gap Road 1.5" OVERLAY $200,000 BBoone 1 BROWNS BRANCH LESS THAN 20 REPLACEMENT $175,000 BBoone 1 WV 3 Seng Creek Bridge Bridge Replacement $1,772,000 CBoone 1 Whiteoak Bridge Bridge Replacement $1,495,000 CBoone 1 WV 17 Safety Improvements Corridor based safety and operational improvements $250,000 XBoone 1 LIEUTENANT DARWIN K. KYLE MEMORIAL BRIDGE Minor Rehab $380,000 XBoone 1 PVT CLYDE WHITMAN "BOBBIE" BENNETT & PFC OLIVER BALL JR MEMORIAL BRIDGEReplace $1,000,000 XBoone 1 POND FORK BR NO. 1868.1 Minor Rehab $375,000 XBoone 1 Slide Repair Repair slide locations within county $500,000 XBoone 1 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,328,000 X

Roads to Prosperity Highway ProgramRoad.Jobs.Hope.

Project List - Authorized and Candidate

Page 1 of 16

Page 2: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Boone 1 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,395,000 XBraxton 7 Flatwoods-Diana Road Resurfacing $428,261 ABraxton 7 Chapel Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $350,000 BBraxton 7 Exchange Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $500,000 BBraxton 7 I-79 Servia - Frametown Interstate Pavement Rehabilitation $18,044,000 CBraxton 7 I-79 Corridor L - Sutton Interstate Pavement Rehabilitation $14,048,000 CBraxton 7 I-79 Flatwoods Interstate Pavement Rehabilitation $23,205,000 CBraxton 7 Expressway Drainage Rehab - Rte 79 Replace $130,000 DBraxton 7 MATCH LINE BRIDGE Deck $1,870,000 DBraxton 7 TAGUE W-BEAM Deck $1,850,000 DBraxton 7 WV Slide Repair slide along WV 15 at MP 5.70 $900,000 DBraxton 7 BURNSVILLE T-BEAM Minor Rehab $75,000 XBraxton 7 LT FK HOLLY RV TR Replace $657,000 XBraxton 7 Slide Repair Repair slide locations within county $500,000 XBraxton 7 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,653,000 XBraxton 7 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,164,000 XBraxton 7 Chapel Road Slide Repair(Multiple Sites) $450,000 BBraxton 7 Copen Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $500,000 BBrooke 6 WV 88 - Pennsylvania Line Resurfacing $129,000 ABrooke 6 Mechling Hill Slide Repair Slip $175,000 BBrooke 6 Eldersville Road - Harmon Creek Road CT resurfacing, guardrail, drainage, etc. $625,000 BBrooke 6 Harmon Creek Bridge Deck & Rehab $2,970,000 DBrooke 6 WV 27, WV 67, and WV 88 Safety Improvements Corridor based safety and operational improvements $450,000 XBrooke 6 US 22 Mainline Minor Rehab $4,882,680 XBrooke 6 Slide Repair Repair slide locations within county $500,000 XBrooke 6 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,416,000 XBrooke 6 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $598,000 XBrooke 6 WV 2/WV 27 I/S Improvements Improve turning radius at WV 2/WV 27 I/S to accommodate truck traffic $2,500,000 XCabell 2 McComas Road Resurfacing $747,000 ACabell 2 Millersport to Green Bottom Resurfacing $1,070,000 ACabell 2 Little Fudges Creek PO Paving $170,000 BCabell 2 Grapevine Road PO Paving $100,000 BCabell 2 Irving Road PO Paving $20,000 BCabell 2 RUSSELL CREEK +1 RESURFACING/REHABILITATE BRIDGE $400,000 BCabell 2 CAMP BRANCH PO RESURFACING $170,000 BCabell 2 GUYAN RIVER ROAD PO RESURFACING $130,000 BCabell 2 UNION RIDGE PO RESURFACING $365,000 BCabell 2 GREEN VALLEY SLIP CONTRACT SLIDE REPAIR $175,000 BCabell 2 UNION RIDGE ROAD SLIDE CONTRACT SLIDE REPAIR $260,000 BCabell 2 MELISSA CONTRACT SLIDE REPAIR $60,000 BCabell 2 WEST MUD RIVER ROAD SLIDES CONTRACT SLIDE REPAIR $580,000 BCabell 2 SWAMP BRANCH CULVERT CULVERT REPLACEMENT $200,000 BCabell 2 ROACH ROAD CULVERT CULVERT REPLACEMENT $200,000 BCabell 2 Expressway Drainage Rehab - US 52 Slip Line $100,000 D

Cabell 2 I-64 Widening-Barboursville to East Mall Road including Mall Road O/PBridge

Construct 2 miles of additional lane in both directions for an 8-lane section between I/Cs$65,000,000 E

Cabell 2 I-64 Widening-29th Street to Barboursville Construct 2 miles of additional lane in both directions for an 6-lane section between I/Cs $50,000,000 ECabell 2 US 60 Widening Widen US 60 from Merritt Creek I/S to West Mall Road $25,000,000 ECabell 2 Culloden I/C Construct new I-64 I/C at Culloden & roadway improvements to US 60 $50,000,000 ECabell 2 US 60 Improvements at 5th and 8th Ave I/S's Safety improvements include roadway widening, drainage repair, shoulder work $1,050,000 XCabell 2 COL JUSTICE M CHAMBERS BRIDGE Replace $8,525,000 XCabell 2 GIMLET HOLLOW OP WB Minor Rehab $3,187,360 XCabell 2 GIMLET HOLLOW OP EB Minor Rehab $3,187,360 XCabell 2 E. HUNTINGTON EXIT RAMP Minor Rehab $0 XCabell 2 MILLER ROAD OP EB Replace $1,715,440 XCabell 2 MILLER ROAD OP WB Replace $1,715,440 XCabell 2 Slide Repair Repair slide locations within county $500,000 XCabell 2 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $5,689,000 XCabell 2 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,168,000 XCabell & Putnam 1 I-64 Milton to US 35 Interstate Pavement Rehabilitation $58,620,000 C

Page 2 of 16

Page 3: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Cabell 2WV 2 Assessment and Improvements

Assessement of WV 2 from Huntington to Cabell County line. Improvements to include: roadway widening, intersection enhancements, and truck pull-out lanes

$10,000,000X

Cabell 2 8th Street Corridor Improvements Improvements include: ADA compliant sidewalks, traffic calming $1,500,000 XCabell, Logan, Lincoln 2 WV 10 Operational and Safety Improvements Construct roadway improvements along WV 10 between US 119 and I-64 $15,000,000 XCalhoun 3 Sassafras - Gilmer Resurfacing Resurfacing $1,177,000 ACalhoun 3 Stinson Road PO Paving $150,000 BCalhoun 3 Back Fork Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $180,000 BCalhoun 3 Milo Road Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $250,000 BCalhoun 3 Little White Oak Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $125,000 BCalhoun 3 LEVI BAR BRIDGE (SSTT) Replace $2,000,000 XCalhoun 3 Slide Repair Repair slide locations within county $500,000 XCalhoun 3 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $0 XCalhoun 3 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,355,000 XClay 1 Bickmore - Hartland Br Resurfacing $1,117,027 AClay 1 Queen Shoalds Road Site 1 PO SLIP REPAIR $82,445 BClay 1 Queen Shoals Road Site 2 PO SLIP REPAIR $662,767 BClay 1 Falling Rock Road 1" MILL 2" FILL $324,000 BClay 1 DUNDON WIDEN RD. 1.5" OVERLAY $425,000 BClay 1 LOWER SYCAMORE 1.5" OVERLAY $360,000 BClay 1 GROVES CREEK RD. 1.5" OVERLAY $278,000 BClay 1 WILSON RIDGE RD. 2" OVERLAY $100,000 BClay 1 WV 16 1.5" MILL FILL $530,000 BClay 1 Slide Repair Repair slide locations within county $500,000 XClay 1 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $875,000 XClay 1 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,447,000 XDoddridge 4 Smithburg Street PO Paving $32,000 BDoddridge 4 Piggin Run Slide Repair - Soil Nail PO Contract $125,000 BDoddridge 4 Arnolds Creek Slide Repair - Soil Nail PO Contract $120,000 BDoddridge 4 Snowbird Road Slip Repair and Guardrail - PSE $90,000 BDoddridge 4 Miletus Road Slip Repair and Guardrail - PSE $90,000 BDoddridge 4 Broad Road Slip Repair resurfacing - PSE $85,000 BDoddridge 4 Pike Fork Bridge Bridge Replacement $1,184,000 CDoddridge 4 WV 23 Safety Improvements Corridor based safety and operational improvements $350,000 XDoddridge 4 WEST UNION PRECAST Replace $998,000 XDoddridge 4 Slide Repair Repair slide locations within county $500,000 XDoddridge 4 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,920,000 XDoddridge 4 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $989,000 XFayette 9 Quinnimont - Laurel Creek Rd Resurfacing $1,240,000 AFayette 9 Redstar Shortcut PO Paving $210,000 BFayette 9 Lansing-Edmond Road Purchase Order Paving $560,000 BFayette 9 McKendree Road Repair embankment w./ steel pile by contract $830,000 BFayette 9 W. Maple Ave (Fayetteville) Replace drainage structure with box culvert by contract $480,000 BFayette 9 Halstead St (Oak Hill) Widen roadway, construct drainage system $910,000 BFayette 9 Loop Creek Bridge Bridge Replacement $656,000 CFayette 9 Dunloup Creek Bridge Bridge Replacement $1,400,000 CFayette 9 SMITHERS CREEK BRIDGE Replace $2,095,000 FFayette 9 BIG CREEK BRIDGE Replace $702,196 FFayette 9 LAUREL BRIDGE Replace $1,336,000 FFayette 9 Slide Repair Repair slide locations within county $500,000 FFayette 9 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,164,000 FFayette 9 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,589,000 FFayette 9 Earl M Vickers Bridge Deck Rehabilitation $4,400,000 FFayette 9 SGT. SCOTT ANGEL MEMORIAL BRIDGE Deck $632,000 XFayette 9 MOSSY INTERCHANGE BRIDGE Replace $1,264,000 XFayette 9 MAHAN BRIDGE Replace $936,000 XFayette 9 US 19 Corridor Safety Improvements Safety improvements at US 19 I/S in Fayette County $10,550,000 FFayette 9 Gatewood Road Add 4-foot shoulders, other safety improvements $8,820,000 FFayette 9 US 60 Improvements Shoulder widening; pulloffs for scenic touring and/or slow moving traffic $510,000 FFayette 9 WV 61 Add min. shoulders, safety-related signage and markings $1,551,000 XGilmer 7 Normantown-Glenville Road Resurfacing $352,000 AGilmer 7 Normantown-Gassaway PO Paving $186,000 B

Page 3 of 16

Page 4: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Gilmer 7 Briery Lick Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $265,000 BGilmer 7 Indian Fork Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $460,000 BGilmer 7 Little Bull Run Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $315,000 BGilmer 7 Stumptown Bridge Bridge Replacement $2,066,000 CGilmer 7 US 33 and WV 5 Safety Improvements Corridor based safety and operational improvements $1,000,000 XGilmer 7 SHOCK PONY TRUSS Replace $1,097,000 XGilmer 7 Slide Repair Repair slide locations within county $500,000 XGilmer 7 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $41,000 XGilmer 7 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,172,000 XGrant 5 Bayard Cemetary Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY $300,000 BGrant 5 Knobley Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS, GUARDRAIL $400,000 BGrant 5 Jordan Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS, GUARDRAIL $400,000 BGrant 5 WV 42 Safety Improvements Corridor based safety and operational improvements $500,000 XGrant 5 PATTERSON CRK BRG Replace $3,000,000 XGrant 5 MEDLEY BRIDGE Replace $2,250,000 XGrant 5 MAYSVILLE SPRING Replace $1,500,000 XGrant 5 Slide Repair Repair slide locations within county $500,000 XGrant 5 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,088,000 XGrant 5 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,239,000 XGreenbrier 9 Neola - Pocahontas Resurfacing $682,000 AGreenbrier 9 Fairview Road + 1 Purchase Order Paving $900,000 BGreenbrier 9 Blue Sulphur Springs Road Reconstruct embankment failure w./ steel by contract $415,000 BGreenbrier 9 Vago Road + 1 Purchase Order Paving $726,000 BGreenbrier 9 Clintonville-Alta Road Purchase Order Paving (Skid Resistant Course) $1,100,000 BGreenbrier 9 I-64 White Sulphur Interstate Pavement Rehabilitation $10,524,000 CGreenbrier 9 Reese Bridge Bridge Replacement $1,000,000 CGreenbrier 9 Expressway Drainage Rehab- Harts Run-White Sulphur Springs Rd Slip line $430,000 DGreenbrier 9 Expressway Drainage Rehab- Sam Black Church-Alta Rd Slip line $590,000 DGreenbrier 9 ANTHONY CREEK BRIDGE Deck and C&P Superstructure $840,000 DGreenbrier 9 CULVERSON CREEK BRIDGE Replacement $800,000 DGreenbrier 9 WV 92 Safety Improvements Corridor based safety and operational improvements $500,000 FGreenbrier 9 CLIFFORD FAMILY MEMORIAL BRIDGE Replace $1,246,000 FGreenbrier 9 Slide Repair Repair slide locations within county $500,000 FGreenbrier 9 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $7,355,000 FGreenbrier 9 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,074,000 FGreenbrier 9 Caldwell Bridge Replacement $1,700,000 FGreenbrier 9 311 BRIDGE Replace $1,885,000 XGreenbrier 9 3RD BRIDGE NORTH FORK CHERRY RIVER Replace $1,505,000 XHampshire 5 McKee Hollow - Augusta Resurfacing $489,542 AHampshire 5 Slanesville - Bloomey Pike Rd #2 Resurfacing $1,189,724 AHampshire 5 Cold Stream Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY $450,000 BHampshire 5 Green Springs Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY $310,000 BHampshire 5 Grassy Lick Road INTERSECTION IMPROVEMENT- Improve Radius, Box Extension, Turn Lane $550,000 BHampshire 5 Mill Branch Bridge Bridge Replacement $1,600,000 CHampshire 5 Sedan Bridge Major Rehab $1,000,000 DHampshire 5 WV 28,WV 29, US 50, US 220 Safety Improvements Corridor based safety and operational improvements $1,600,000 XHampshire 5 SEDAN BRG. Major Rehab $1,000,000 XHampshire 5 GASTON ROAD BRIDGE Replace $2,500,000 XHampshire 5 Slide Repair Repair slide locations within county $500,000 XHampshire 5 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $0 XHampshire 5 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,167,000 XHancock 6 Quaker State Road - Newell Resurfacing $321,170 AHancock 6 WV 8 - Pennsylvania State Line CT resurfacing, guardrail, drainage, etc. $1,630,000 BHancock 6 New Cumberland Relocate and widen WV-2 through New Cumberland $11,000,000 EHancock 6 Upper Kings Creek Bridge Replace $486,000 XHancock 6 Slide Repair Repair slide locations within county $500,000 XHancock 6 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,276,000 XHancock 6 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $711,000 XHancock 6 Chester Traffic Signal System Renovate existing traffic signal system $1,500,000 XHancok 6 Frankfort Road - Hardin Run Road CT resurfacing, guardrail, drainage, etc. $625,000 BHardy 5 Wardensville-Hampshire Co. Line Resurfacing $487,762 A

Page 4 of 16

Page 5: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Hardy 5 South Fork Road PO Paving $189,000 BHardy 5 CR 14 Kimsey Run Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS $350,000 BHardy 5 Old RT 29 REPAIRS, WIDENING, CULVERTS, DITCHING/SHOULDERS, TREE CANOPY $400,000 BHardy 5 upper cove road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $320,000 BHardy 5 South Fork Culvert CULVERT INSTALLATION (BORE&JACK) $150,000 BHardy 5 TRUMBO FORD BRG. Deck $1,300,000 DHardy 5 HARNESS FORD BRG. Major Rehab $1,600,000 XHardy 5 BAKER RUN BRG. Replace $2,500,000 XHardy 5 Slide Repair Repair slide locations within county $500,000 XHardy 5 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,021,000 XHardy 5 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,738,000 XHarrison 4 Lumperport Road Resurfacing $449,944 AHarrison 4 Bennetts Run Road PO Paving $210,000 BHarrison 4 Shaws Run Slide Repair - Soil Nail PO Contract $77,500 BHarrison 4 Mt Clare Road Paving, Culverts, Guardrail - PSE $925,000 BHarrison 4 Factory Street Paving, Culverts, Guardrail, ADA ramps - PSE $175,000 BHarrison 4 E Main St Paving, Culverts, Guardrail, ADA ramps - PSE $675,000 BHarrison 4 Sycamore Road Paving, Slip Repair, Culverts, Guardrail - PSE $900,000 BHarrison 4 Expressway Drainage Rehab - US 50 Install Concrete Invert $550,000 DHarrison 4 Expressway Drainage Rehab - I-79 MP 114.13 Install Concrete Invert $450,000 DHarrison 4 US Navy Petty Officer 1st Class Kevin S Rux Memorial Bridge Deck $1,500,000 DHarrison 4 CAMDEN STREET BRIDGE Superstructure Replacement $1,200,000 DHarrison 4 I-79/US 50 Interchange Construct split diamond interchange per draft Harrison County 2025 Transportation Plan report $30,000,000 EHarrison 4 US 19 Safety Improvements Corridor based safety and operational improvements $600,000 XHarrison 4 BRIDGEPORT HILL OVERPASS Deck $2,873,563 XHarrison 4 BRISTOL BRIDGE Minor Rehab $2,630,214 XHarrison 4 BRISTOL BRIDGE Replace $3,795,420 XHarrison 4 QUIET DELL BRIDGE Replace $1,124,000 XHarrison 4 H. Laban White Memorial Bridge Replace $1,992,000 XHarrison 4 NORTHVIEW OVERPASS Replace $1,977,000 XHarrison 4 MAIN STREET ARCH Replace $1,089,000 XHarrison 4 LAURA LEE ARCH Replace $832,000 XHarrison 4 VIRGINIA AVENUE BRIDGE Replace $698,000 XHarrison 4 DISTRICT FOUR BRIDGE Replace $428,000 XHarrison 4 Slide Repair Repair slide locations within county $500,000 XHarrison 4 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,184,000 XHarrison 4 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,784,000 XJackson 3 Mt. Alto - Millwood Resurfacing $1,239,000 AJackson 3 Little Sandy Road PO Paving $335,000 BJackson 3 Shinn Lane PO Paving $225,000 BJackson 3 Fisher Ridge Rehabilitation Resurface by POC. Slip repair at MP 5.75 by POC. Drainage, ditches, and shoulders by DF $850,000 BJackson 3 Aplin Ridge Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $725,000 BJackson 3 Jim Ridge Slip Repair Pile wall slip repair and overlay by POC. $185,000 BJackson 3 Liverpool Rd Slip Repairs Slip repairs at MP 0.51 and 1.64 with soil nails and at MP 4.27 with pile wall by POC, resurface, and drainage. $380,000 BJackson 3 I-77 Kenna - Fairplain Interstate Pavement Rehabilitation $7,806,000 CJackson 3 I-77 Silverton Interstate Pavement Rehabilitation $19,320,000 CJackson 3 I-77 Medina Interstate Pavement Rehabilitation $10,139,000 CJackson 3 Sandyville Bridge Bridge Replacement $2,280,000 CJackson 3 Expressway Drainage Rehab - I-77 Pond Creek Replace inlets; bore and jack pipe $150,000 DJackson 3 Expressway Drainage Rehab - I-77 Medina Replace NB drainage with 30" bore and jack pipe; add wingwalls $250,000 DJackson 3 Expressway Drainage Rehab - I-77 Wilding Replace drainage structure w/ bore & jackpipe $350,000 DJackson 3 SANDY CREEK N (CSWB) Major Rehab $1,756,871 XJackson 3 James P. Spano, Jr. Memorial Bridge (CSWB) Minor Rehab $545,000 XJackson 3 U.S. Army S/SGT Delmer R. Jones Memorial Bridge (CSWB) Minor Rehab $350,000 XJackson 3 RIPLEY LANES BRIDGE (SCTB) Replace $1,500,000 XJackson 3 HARRY RIPLEY MEMORIAL BRIDGE (SSTT) Replace $1,320,000 XJackson 3 Slide Repair Repair slide locations within county $500,000 XJackson 3 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $5,540,000 XJackson 3 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,115,000 XJefferson 5 River Road PO Paving $150,000 BJefferson 5 Halltown Road PO Paving $120,000 B

Page 5 of 16

Page 6: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Jefferson 5 Paynes Ford Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $375,000 BJefferson 5 Blair Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $250,000 BJefferson 5 Scrabble Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $800,000 BJefferson 5 Ed Welsh - Shirleys Lane REPAIRS, WIDENING, CULVERTS, DITCHING/SHOULDERS, TREE CANOPY $849,500 BJefferson 5 Burkhart Lane Drainage Upgrades CULVERT INSTALLATION, REPAIRS, OVERLAY $200,000 BJefferson 5 Beaver Run Road WIDENING, REPAIRS, GUARDRAIL, CULVERTS, DITCHING/SHOULDERS $400,000 BJefferson 5 Expressway Drainage Rehab - US 340 Bore and Jack replacement culvert $300,000 DJefferson 5 US 340 Operational Improvements at Harpers Ferry Construct turning lanes; climbing lane, etc. $11,000,000 EJefferson 5 US 340 Widening Charles Town - VA Line Construct 4-lane highway between Charles Town to Rippon $40,000,000 EJefferson 5 WV 230 Safety Improvements Corridor based safety and operational improvements $200,000 XJefferson 5 Slide Repair Repair slide locations within county $500,000 XJefferson 5 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,315,000 XJefferson 5 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,969,000 XJefferson 5 Cranes Lane/Mildred Street I/S Improve intersection by additional capacity and safety improvements $5,900,000 X

Jefferson 5 WV 51/Summit Point Road I/S Improvements to WV 51/Summit Point Road I/S, W Washington Street including pedestrian improvements $1,700,000 XJefferson 5 WV 9 to Ranson Connect WV 9 muli-use trail with the Ranson/Charles Town $550,000 XKanawha 1 Elk River Road Resurfacing $1,443,523 AKanawha 1 Hampshire Drive PO Paving $215,000 BKanawha 1 Koontz Dr./ Embassy Dr./ Tiffany Rd./ Imperial Dr./ Floradale Dr. 1.5" OVERLAY $138,000 BKanawha 1 Doc Baiiley Rd. 1.5" OVERLAY $177,000 BKanawha 1 King St. 1.5" OVERLAY $99,000 BKanawha 1 Airport Rd. 1.5" OVERLAY $131,000 BKanawha 1 Meadowbrook Dr. 1.5" OVERLAY $35,000 BKanawha 1 Jakes Run Road 1.5" OVERLAY $90,000 BKanawha 1 DUTCH RD. 1.5" OVERLAY $82,000 BKanawha 1 SISSONVILLE ROAD 1.5" MILL FILL $567,000 BKanawha 1 LEATHERWOOD RD. 2" OVERLAY $335,000 BKanawha 1 REAMER HILL RD. 1.5" OVERLAY $436,000 BKanawha 1 MILL CREEK RD. 1.5" OVERLAY $194,000 BKanawha 1 BUFFLICK RD./ WILLS CREEK RD. 1.5" OVERLAY $355,000 BKanawha 1 THREE MILE BLUE CREEK 2" OVERLAY $76,000 BKanawha 1 UPPER PINCH 1.5" OVERLAY $199,000 BKanawha 1 BROOK HILL 1.5" OVERLAY $91,000 BKanawha 1 LEFT FK. BIG FK. ROAD PO SLIP REPAIR $89,698 BKanawha 1 WILLS CREEK ROAD PO SLIP REPAIR $250,350 BKanawha 1 EMMONS PO SLIP REPAIR $150,000 BKanawha 1 EMMONS 1.5" OVERLAY $274,000 BKanawha 1 ROCKCREST RD. SITE 1 PO SLIP REPAIR $219,414 BKanawha 1 ROCKCREST RD. SITE 2 PO SLIP REPAIR $242,756 BKanawha 1 LITTLE CREEK 2" OVERLAY $211,000 BKanawha 1 COOPERS CREEK SITE 1 LESS THAN 20 REPLACEMENT $175,000 BKanawha 1 COOPERS CREEK SITE 2 LESS THAN 20 REPLACEMENT $175,000 BKanawha 1 KANAWHA TWO MILE LESS THAN 20 REPLACEMENT $175,000 BKanawha 1 KELLEYS CREEK ROAD LESS THAN 20 REPLACEMENT $175,000 BKanawha 1 RABEL MOUNTAIN ROAD LESS THAN 20 REPLACEMENT $175,000 BKanawha 1 I-79 Reconstruction Access Road - Willis Creek (starts at MP 14.00) Interstate Pavement Rehabilitation $7,209,000 CKanawha 1 Expressway Drainage Rehab - Greenbrier to Leon Sullivan Slip line $262,000 DKanawha 1 Expressway Drainage Rehab - Montrose Dr-Oakwood Rd Site 1 Repair/replace "flue" pipes & inlets $800,000 DKanawha 1 Expressway Drainage Rehab - Montrose Dr-Oakwood Rd Site 2 Repair/replace "flue" pipes & inlets $800,000 DKanawha 1 Expressway Drainage Rehab - Montrose Dr-Oakwood Rd Site 3 Repair/replace "flue" pipes & inlets $800,000 DKanawha 1 I-64 Danner Road Bridge Deck Replacement $1,300,000 DKanawha 1 I-77 Tom Williams Family Bridge Deck Replacement $2,300,000 DKanawha 1 I-77 Westmoreland OP Deck Replacement $1,500,000 DKanawha 1 i-77 Cora Street OP Deck Replacement $2,100,000 DKanawha 1 WV 622, I-64 to N of WV 62 Widen existing roadway from 3 to 5-lanes, I-64/Cross Lanes I/C to WV 62, Kanawha County - 0.8 mi $30,000,000 EKanawha 1 Jefferson Road Improvements Widen existing roadway to 4-lanes from US 119 to US 60; construct RHL Boulevard $66,000,000 E

Kanawha 1 Oakwood Road Improvements (US 119 improvements from MacCorkle Ave to Jefferson Rd)

Construct new I/C on US 119 at Lucado Road; construct frontage roads (Add lanes, flyovers, I/C's, frontage roads, etc. along US 119) $65,000,000 E

Kanawha 1 US Route 60 (Chelyan to Montgomery) Operational improvements to US 60 between Chelyan and Montgomery, approximately 7 miles $40,000,000 FKanawha 1 I-77 BELLE RAMP OVER PIEDMONT ROAD & RR Minor Rehab $1,110,624 X

Page 6 of 16

Page 7: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Kanawha 1 DUNBAR TOLL BRIDGE Major Rehab $12,000,000 XKanawha 1 TORNADO BRIDGE Major Rehab $750,000 XKanawha 1 JEFFERSON RD. BR. SB Minor Rehab $400,000 XKanawha 1 LOWER FIELDS CK BR 0.70 Minor Rehab $175,000 XKanawha 1 SHADY SADIE'S BRIDGE Replace $1,200,000 XKanawha 1 WHITE OAK DRIVE BRIDGE Replace $600,000 XKanawha 1 ARMY PFC WILLIAM FLOYD HARRISON MEMORIAL BRIDGE Major Rehab $250,000 XKanawha 1 Slide Repair Repair slide locations within county $500,000 XKanawha 1 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $16,187,000 XKanawha 1 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,953,000 XKanawha 1 I-77 Edens Fork - Tuppers Creek Interstate Pavement Rehabilitation $10,780,000 C

Kanawha 1 MacCorkle Avenue Roadway Improvements Reconstruct pavement and Improve various pedestrian, roadway and intersection operations improvements $10,000,000 ELewis 7 Main Street - Weston Resurfacing $498,080 ALewis 7 Sycamore Lick Road PO Paving $252,000 BLewis 7 Left Fork Freemans Creek PO Paving $250,000 BLewis 7 Walkersville Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $330,000 BLewis 7 Churchville Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $250,000 BLewis 7 Dry Fork Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $20,000 BLewis 7 Lifes Run Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $540,000 BLewis 7 Horse Run Rib Arch Bridge Bridge Replacement $1,459,000 CLewis 7 HARDEE'S W-BEAM Deck $2,370,000 DLewis 7 I-79 Exit 99 Interchange Rebuild SB Exit and Install Lighting $16,000,000 ELewis 7 US 19 Safety Improvements Corridor based safety and operational improvements $650,000 XLewis 7 FEAGAN'S GARAGE Deck $191,000 XLewis 7 Slide Repair Repair slide locations within county $500,000 XLewis 7 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,060,000 XLewis 7 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,560,000 XLewis 7 Old US 33 Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $120,000 BLincoln 2 GUYAN RIVER ROAD PO RESURFACING $650,000 BLincoln 2 WV 3 Safety Improvements Corridor based safety and operational improvements $500,000 XLincoln 2 Slide Repair Repair slide locations within county $500,000 XLincoln 2 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $482,000 XLincoln 2 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,853,000 XLogan 2 Sandlick Branch PO Paving $110,000 BLogan 2 Greenville Road PO Paving $130,000 BLogan 2 SMOKEHOUSE ROAD PO RESURFACING $390,000 BLogan 2 PROCTOR BOTTOM ROAD PO RESURFACING $60,000 BLogan 2 WHITE OAK +1 PO RESURFACING $270,000 BLogan 2 BUCK FORK PO RESURFACING $650,000 BLogan 2 RUM CREEK ROAD SLIDE MP 10.95 CONTRACT SLIDE REPAIR $200,000 BLogan 2 RUM CREEK ROAD SLIDE MP 11.20 CONTRACT SLIDE REPAIR $200,000 BLogan 2 LOAN VO TECH BRIDGE DECK REPL. CONTRACT DECK REPLACEMENT $400,000 BLogan 2 Expressway Drainage Rehab - US 119 MP 16.32 Slip Line $150,000 DLogan 2 Expressway Drainage Rehab - US 119 MP 15.95 Slip Line $150,000 DLogan 2 USMC PRIVATE RUDY VARNEY BRIDGE Replace $4,649,000 XLogan 2 U.S. Army Major Thomas McElwain Memorial Bridge Replace $2,200,000 XLogan 2 U.S. ARMY LTC ROBERT "BOB" MARSLENDER BRIDGE Replace $2,016,000 XLogan 2 CORA BEAM SPAN Replace $901,000 XLogan 2 THREE MILE CURVE BRIDGE Minor Rehab $300,000 XLogan 2 N. WHITES ADDITION ARCH Replace $422,000 XLogan 2 Slide Repair Repair slide locations within county $500,000 XLogan 2 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,294,000 XLogan 2 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,221,000 XMarion 4 Middletown Road Resurfacing $376,411 AMarion 4 Plum Run Road PO Paving $200,000 BMarion 4 Plum Run Road +1 1.0" Overlay, #55 Scratch - PO Contract $145,000 BMarion 4 Bridge St Ext. Slide Repair - Soil Nail PO Contract $90,000 BMarion 4 Little Creek / Mt Zion 1.0" Overlay, #55 Scratch - PO Contract $190,000 BMarion 4 Old US 250 West Paving, Slip Repair, Culverts - PSE $950,000 BMarion 4 Bartholomew Road Paving, Slip Repair, Culverts - PSE $485,000 B

Page 7 of 16

Page 8: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Marion 4 PFC Norville Clinton Shock Veterans Memorial Bridge Replace approach Slab $243,317 BMarion 4 Expressway Drainage Rehab - I-79 MP 133.80 Install Liner $700,000 DMarion 4 I-79 Widening -US 250 South Fairmont to Pleasant Valley Construct approx. 3 miles of additional lane in both directions $60,000,000 EMarion 4 JAMISON #9 BRIDGE Replace $1,384,000 XMarion 4 PRICKETT CREEK W-BEAM Replace $721,000 XMarion 4 MONONGAH PRE-CAST Replace $968,000 XMarion 4 PINE GROVE ARCH Replace $753,000 XMarion 4 Slide Repair Repair slide locations within county $500,000 XMarion 4 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,338,000 XMarion 4 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,242,000 XMarshall 6 Mozart Road Resurfacing +9 PO resurfacing (1.5" mill/fill) $410,000 BMarshall 6 McDonald Upper Plaza Bridge Replacement and Widening $16,194,000 CMarshall 6 Expressway Drainage Repair - WV 2 MP 16.90 Slip lining $38,500 DMarshall 6 Expressway Drainage Repair - WV 2 MP 16.96 Slip lining $38,500 DMarshall 6 Expressway Drainage Repair - WV 2 MP 17.02 Slip lining $38,500 DMarshall 6 WV 2 Widening - Kent to Franklin Widen WV 2 to 4-lanes $30,000,000 EMarshall 6 WV 88 Safety Improvements Corridor based safety and operational improvements $150,000 XMarshall 6 Kausooth Bridge Replace $1,136,000 XMarshall 6 Slide Repair Repair slide locations within county $500,000 XMarshall 6 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $6,084,000 XMarshall 6 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,351,000 XMarshall 6 US 250/1st Street I/S Improve turning radius at the intersection of 1st Street and US 250 in Moundsville $850,000 XMason 1 Old River Elwell - Salt Creek Rd Resurfacing $973,546 AMason 1 Pleasant Ridge Road PO Paving $182,000 BMason 1 Horselick PO Paving $171,000 BMason 1 Millstone PO Paving $240,000 BMason 1 TICKVILLE BRIDGE Replace $1,875,000 DMason 1 LEON PIN & LINK BRIDGE Deck $700,000 XMason 1 US ARMY CORPORAL JOHN L. GIBBS MEMORIAL BRIDGE Minor Rehab $275,000 XMason 1 PFC KENNETH W. BRIGHT MEMORIAL BRIDGE Major Rehab $625,000 XMason 1 LETART CONCRETE T-BEAM Replace $1,100,000 XMason 1 QUENTIN H. WICKLINE MEMORIAL BRIDGE Major Rehab $1,100,000 XMason 1 CAPEHART BRIDGE Replace $870,000 XMason 1 Slide Repair Repair slide locations within county $500,000 XMason 1 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $5,706,000 XMason 1 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,926,000 XMcdowell 10 Pageton - Elkhorn Road Resurfacing $570,843 AMcDowell 10 War Branch PO Pave; District will ditch, replace culverts, etc $104,000 BMcDowell 10 Atwell Branch Road +1 PO Pave; District will ditch, replace culverts, etc $225,000 BMcDowell 10 Wolf Pen Branch PO Pave; District will ditch, replace culverts, etc $63,000 BMcDowell 10 Splendor Valley PO Pave; District will ditch, replace culverts, etc $72,000 BMcDowell 10 Anawalt Ridge Road Box Culvert & PO Pave $250,000 BMcDowell 10 Twin Branch Loop Road Box Culvert & PO Pave $585,000 BMcDowell 10 Collins Ridge Road PO Pave; District will ditch, replace culverts, etc $270,000 BMcDowell 10 Coon Branch Road PO Pave; District will ditch, replace culverts, etc $330,000 BMcdowell 10 Green B & Margie Blankenship Bridge Replacement $2,400,000 CMcdowell 10 NEWHALL BOX BEAM Replace $700,000 DMcdowell 10 Save A Lot Bridge Replace $1,339,375 DMcdowell 10 SUPERIOR BRIDGE Replace $2,088,000 FMcdowell 10 BARTLEY BRIDGE Minor Rehab $439,394 FMcdowell 10 RAYSAL ARCH Replace $394,502 FMcdowell 10 COALWOOD SLAB Replace $205,824 FMcdowell 10 WEST HOWARD STREET BRIDGE Replace $1,600,000 FMcdowell 10 AVONDALE BRIDGE Replace $1,600,000 FMcdowell 10 TWIN BRANCH TRUSS NO. 2 Replace $1,200,000 FMcdowell 10 TWIN BRANCH PONY TRUSS No. 1 Replace $1,600,000 FMcdowell 10 NEWHALL ARCH No. 1 Replace $750,000 FMcdowell 10 Slide Repair Repair slide locations within county $500,000 FMcDowell 10 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $8,037,000 FMcDowell 10 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,510,000 FMcdowell 10 LANDGRAFF BRIDGE Replace $1,031,400 X

Page 8 of 16

Page 9: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Mcdowell 10 MCDOWELL STREET BRIDGE Minor Rehab $188,100 XMcdowell 10 KIMBALL SLAB Replace $500,000 XMcdowell 10 BIG CREEK ARCH Replace $600,000 XMcdowell 10 NEWHALL ARCH No. 2 Replace $650,000 XMcdowell 10 Lex Hill Road Bridge Replace $3,050,000 XMercer 10 Littlesburg - New Hope Road Resurfacing $357,930 AMercer 10 Old Gardner Road PO Paving $80,000 BMercer 10 Mount Olive PO Paving $115,000 BMercer 10 Greasy Ridge Road PO Paving $220,000 BMercer 10 Halls Ridge Road PO Paving $105,000 BMercer 10 Twelvemile Road PO Pave; District will ditch, replace culverts, etc $155,000 BMercer 10 Old Princeton - Oakvale Road +17 PO Pave; District will ditch, replace culverts, etc $225,000 BMercer 10 Goodwin Chapel Road Relaign Road to avoid slide area, PO Pave $285,000 BMercer 10 Eads Mill Road PO Pave; District will ditch, replace culverts, etc $190,000 B

Mercer 10 Harmon School Road PO Pave; District will ditch, replace culverts, etc $155,000 B

Mercer 10 Industrial Park Road PO Pave; District will ditch, replace culverts, etc $170,000 BMercer 10 Simmons River Road PO Pave; District will ditch, replace culverts, etc $240,000 BMercer 10 Big Spring Branch Road +1 PO Pave; District will ditch, replace culverts, etc $130,000 BMercer 10 Oxley Hollow PO Pave; District will ditch, replace culverts, etc $80,000 BMercer 10 Red Oak Ridge PO Pave; District will ditch, replace culverts, etc $85,000 BMercer 10 Maynard Road PO Pave; District will ditch, replace culverts, etc $70,000 BMercer 10 Old Lerona Road +3 PO Pave; District will ditch, replace culverts, etc $110,000 BMercer 10 Ceres School Road PO Pave; District will ditch, replace culverts, etc $135,000 BMercer 10 I-77 Bluefield Interstate Pavement Rehabilitation $35,500,000 CMercer 10 East River Bridge - Ingleside Rock Slide Repair $1,881,000 CMercer 10 WV 10 and WV 123 Safety Improvements Corridor based safety and operational improvements $500,000 F

Mercer10

King Coal Highway-WV 123 Airport Road (Mercer Co.) to John Nash Blvd Construct 3.8 miles of four lane road$50,000,000 F

Mercer 10 PRINCETON OVERHEAD Replace $5,693,784 FMercer 10 MONTCALM BRIDGE Replace $3,150,000 FMercer 10 Slide Repair Repair slide locations within county $500,000 FMercer 10 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $7,617,000 FMercer 10 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,961,000 FMercer 10 GRASSY BRANCH BRIDGE Replace $5,100,000 XMercer 10 AMBROSE LANE BRIDGE Major Rehab $275,000 XMineral 5 Waxler Rd SLIDE REPAIR, DITCHING, CULVERTS, REPAIRS, OVERLAY $650,000 BMineral 5 NEW CREEK BRG Replace $2,500,000 XMineral 5 Slide Repair Repair slide locations within county $500,000 XMineral 5 US 50, WV 28, and WV 46 Safety Improvements Corridor based safety and operational improvements $1,400,000 XMineral 5 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,285,000 XMineral 5 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,477,000 X

Mingo 2 Duncan Forkroad PO Paving $105,000 BMingo 2 Dans Branch PO Paving $75,000 BMingo 2 Beech Fork Road PO Paving $330,000 BMingo 2 Falls Branch PO Paving $120,000 BMingo 2 RIGHT FORK GILBERT CREEK PO RESURFACING $70,000 BMingo 2 MITCHELL BRANCH ROAD PO RESURFACING $105,000 BMingo 2 KIRK-DINGESS ROAD SLIDE MP 4.50 CONTRACT SLIDE REPAIR $60,000 BMingo 2 KIRK-DINGESS ROAD SLIDE MP 0.27 PO SLIDE REPAIR $100,000 BMingo 2 Big Rock Bridge +1 Bridge Replacement $2,894,000 CMingo 2 King Coal Highway-Horsepen Mountain to Gilbert Creek Construct 4-lane highway including Gilbert Creek Connector $40,000,000 EMingo 2 U.S. ARMY SGT. C. N. LACKEY MEMORIAL BRIDGE Replace $1,100,000 XMingo 2 WILLIAMSON RR OP Replace $950,000 XMingo 2 Slide Repair Repair slide locations within county $500,000 XMingo 2 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $8,029,000 XMingo 2 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,265,000 X

Page 9 of 16

Page 10: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Mingo/Wayne 2 MARROWBONE CRREK +1 PO RESURFACING $490,000 BMonogalia 4 Airport Exit Bridge Major Rehab $2,000,000 DMonongalia 4 Uffington Road Resurfacing $371,000 AMonongalia 4 Maidsville Road Resurfacing $414,000 AMonongalia 4 Van Voorhis Road +1 Resurfacing $247,000 AMonongalia 4 Blacksville - Pentress Road Resurfacing $605,000 AMonongalia 4 Mon/Fayette Expressway PO Paving $195,842 BMonongalia 4 East Van Voorhis PO Paving $50,000 BMonongalia 4 Irwin Street PO Paving $23,000 BMonongalia 4 Dughill Road PO Paving $135,000 BMonongalia 4 St Leo Road 1.0" Overlay, #55 Scratch - PO Contract $400,000 BMonongalia 4 Osage Rd Slide Repair - Soil Nail PO Contract $127,500 BMonongalia 4 Riley Thomas Road Slide Repair - Soil Nail PO Contract $100,000 BMonongalia 4 Valley View 1.0" Overlay, #55 Scratch - PO Contract $35,000 BMonongalia 4 Bakers Ridge Paving, Ditching - PSE $120,000 BMonongalia 4 Laurel Point +2, Cassville MT Morris, Boyles Run Road Paving, Ditching - PSE $210,000 BMonongalia 4 Statler Run Paving, Slip Repairs, - PSE $650,000 BMonongalia 4 Zeb Haught +1, Lawrence Road Paving, Slip Repair, - PSE $465,000 BMonongalia 4 Lemley Store +1, Ragtown Road Paving, Ditching - PSE $515,000 BMonongalia 4 I-79 Blue Horizon Drive - Pennsylvania State Line Interstate Pavement Rehabilitation $16,928,000 CMonongalia 4 Arnetsville Bridge Bridge Replacement $1,583,000 CMonongalia 4 US 119 Mileground - Donna Ave to CR 857 (Airport to Easton) - 0.59 mile $15,000,000 EMonongalia 4 Greenbag Road Improvements Improve I/S & Widen (Kingwood Pike to White Park) $16,000,000 EMonongalia 4 West Run Improvements Improve I/S & widen - jct CR 67 - jct US 119 $13,000,000 EMonongalia 4 VanVoorhis Road Improvements Widen, Improve drainage, add sidewalk - jct CR 67/1 to jct CR 60 $11,000,000 EMonongalia 4 Beeachhurst Ave Spot Improvements Improve I/S & widen - 6th to 8th St $8,000,000 EMonongalia 4 I-79 Star City I/C Improvements Construct Directional Ramps and Improve Chaplin Hill Road $40,000,000 EMonongalia 4 US 119 Mileground - Cheat Rd - Donna Ave (existing roundabout to Airport) - widen $27,000,000 EMonongalia 4 I-79 Access to Morgantown Construction new connector from I-79 to Morgantown; location to be determined $100,000,000 EMonongalia 4 PENTRESS BRIDGE Replace $2,055,680 XMonongalia 4 BULA SLAB Replace $549,000 XMonongalia 4 JERE SLAB Replace $449,000 XMonongalia 4 WALNUT STREET BRIDGE Deck $335,000 XMonongalia 4 SMITHTOWN W-BEAM Replace $1,207,000 XMonongalia 4 Slide Repair Repair slide locations within county $500,000 XMonongalia 4 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $9,302,000 XMonongalia 4 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,145,000 XMonongalia 4 Dents Run/WV 100 I/S Improvement Intersection improvement at Dents Run/WV 100 (Main Street Granville) $250,000 XMonongalia/ Preston 4 Buzard Run Road +3, Snake Hill, Dry Run Paving, Ditching - PSE $757,575 BMonroe 9 Flat Mountain Road Purchase Order Paving $350,000 BMonroe 9 Rich Creek Valley Road Purchase Order Paving $310,000 BMonroe 9 Pine Grove Road Purchase Order Paving $963,000 BMonroe 9 RED SULPHUR BRIDGE Deck $544,000 FMonroe 9 Slide Repair Repair slide locations within county $500,000 FMonroe 9 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,392,000 FMonroe 9 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,965,000 FMonroe 9 US 219, WV 3, WV 12 Safety Improvements Corridor based safety and operational improvements $1,600,000 XMorgan 5 Legions St - Burnt Factory Resurfacing $1,159,676 AMorgan 5 Waugh Road PO Paving $85,500 BMorgan 5 Cold Run Valley -DRAINAGE BOX CULVERT, DITCHING/SHOULDERS, REPAIRS, CULVERTS, OVERLAY $450,000 BMorgan 5 Johnson Mill Road REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $400,000 BMorgan 5 Fairview Drive REPAIRS,2" OVERLAY, DITCHING/SHOULDERS, TREE CANOPY, CULVERTS $300,000 BMorgan 5 Fairview Drive Connector Construct 2-lane connector road between US 522 and Fairview Drive near Hospital in Berkeley Springs $6,000,000 EMorgan 5 US 522 (Bypass at Berkeley Springs) Reconstruct US 522 in Morgan County to 4-lane highway around Berkeley Springs $40,000,000 EMorgan 5 WV 9 Safety Improvements Corridor based safety and operational improvements $700,000 XMorgan 5 SPOHR'S CROSSROADS Replace $761,600 XMorgan 5 LARGENT BRG. Replace $5,500,000 XMorgan 5 PALLET FACTORY BR. Replace $2,250,000 XMorgan 5 NEW HOPE BRIDGE Replace $3,000,000 XMorgan 5 Slide Repair Repair slide locations within county $500,000 XMorgan 5 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,087,000 X

Page 10 of 16

Page 11: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Morgan 5 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,202,000 XNicholas 9 Glen Oaks +1 PO Paving $310,000 BNicholas 9 Summersville Airport Road Purchase Order Paving $320,000 BNicholas 9 Anthony Creek Road Purchase Order Paving $310,000 BNicholas 9 Nile Road Purchase Order Paving $330,000 BNicholas 9 Cranberry Road + 1 Purchase Order Paving $340,000 BNicholas 9 Expressway Drainage - Summersville Lake-Summersville Rd Slip line $115,000 DNicholas 9 BIRCH RIVER BRIDGE Replace $1,066,000 FNicholas 9 Slide Repair Repair slide locations within county $500,000 FNicholas 9 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,241,000 FNicholas 9 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,867,000 FNicholas 9 WV 55 and WV 129 Safety Improvements Corridor based safety and operational improvements $500,000 XNicholas 9 POWELLS CREEK BRIDGE Replace $1,182,000 XNicholas 9 Marlinton Road Roadway embankment repair with soil nails $250,000 BNicholas/Fayette 9 Twenty Mile Creek Road + 1 Purchase Order Paving $340,000 BOhio 6 Fairmont Pike Slip Repairs PO slip repairs (Disforce block walls) $1,300,000 BOhio 6 Short Creek Bridge Bridge Replacement $4,412,000 COhio 6 Chapel Road Bridge Deck & Rehab $2,520,000 DOhio 6 Spruce Street Bridge Deck & Rehab $1,610,000 DOhio 6 I-70 Bridge Rehabilitation/Renovation Major Rehab and Replace $172,500,000 EOhio 6 WV 88 Safety Improvements Corridor based safety and operational improvements $300,000 XOhio 6 Elm Grove I-470 Bridge (Westbound) Major Rehab $3,200,000 XOhio 6 Elby's Bridge EB Minor Rehab $2,067,520 XOhio 6 Mine Bridge Replace $2,496,000 XOhio 6 Scott Lumber Bridge Minor Rehab $40,000 XOhio 6 Middle Creek Bridge Replace $67,000 XOhio 6 Dam Bridge Replace $1,069,000 XOhio 6 Slide Repair Repair slide locations within county $500,000 XOhio 6 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,011,000 XOhio 6 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $525,000 XPendelton 8 BRUSHY RUN BRIDGE Replace $1,700,000 DPendelton 8 JUDY GAP BRIDGE Replace $6,000,000 XPendelton 8 CIRCLEVILLE BRIDGE Replace $5,500,000 XPendelton 8 Slide Repair Repair slide locations within county $500,000 XPendleton 8 Snowy Mountain - Cave Resurfacing $287,314 APendleton 8 Brushy Run Road PO Paving $177,000 BPendleton 8 Jake Hill Road 1.5" Overlay $195,000 BPendleton 8 Black Thorn Road 1.5" Overlay $475,000 BPendleton 8 Sugar Grove Road 1.5" Overlay $400,000 BPendleton 8 WV 33 Climbing Lane Construct climbing lane on US 33 $16,000,000 EPendleton 8 US 33 and US 220 Safety Improvements Corridor based safety and operational improvements $1,700,000 XPendleton 8 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $0 XPendleton 8 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,147,000 XPleasants 3 Cow Creek Resurfacing Resurface, drainage, guardrail, and markings by Contract $800,000 BPleasants 3 Schultz Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $350,000 BPleasants 3 Federal Ridge Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $400,000 BPleasants 3 OLD HI CARPENTER BRIDGE - H (SSTT) Major Rehab $1,300,000 XPleasants 3 Slide Repair Repair slide locations within county $500,000 XPleasants 3 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,780,000 XPleasants 3 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $499,000 XPocahontas 8 Sharps Knob - Slatyfork Resurfacing $949,034 APocahontas 8 Thornwood Road PO Paving $90,000 BPocahontas 8 Gum Road 2" Overlay $95,000 BPocahontas 8 Back River Road 1.5 Overlay $70,000 BPocahontas 8 Sheets Road +3 2" Overlay $523,000 BPocahontas 8 Cass - Durbin 2" Overlay $385,000 BPocahontas 8 Beverage Road - Clover Lick 1.5" Overlay $230,000 BPocahontas 8 Hill Country Road 1.5" Overlay $200,000 BPocahontas 8 Greenbank Road +2 1.5" Overlay $160,000 BPocahontas 8 US 219, US 250, WV 92 Safety Improvements Corridor based safety and operational improvements $1,600,000 XPocahontas 8 DOUTHAT CREEK BRIDGE Replace $5,000,000 X

Page 11 of 16

Page 12: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Pocahontas 8 Slide Repair Repair slide locations within county $500,000 XPocahontas 8 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,302,000 XPocahontas 8 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,975,000 XPreston 4 Kingwood - Albright Road Resurfacing $393,432 APreston 4 Brandonville Resurfacing $271,417 APreston 4 Number 4 Church Road PO Paving $135,000 BPreston 4 Manheim Road PO Paving $60,000 BPreston 4 Shower Bath Rd Slide Repair - Soil Nail PO Contract $90,000 BPreston 4 Stemple Ridge 1.0" Overlay, #55 Scratch - PO Contract $525,000 BPreston 4 Manheim Road 1.0" Overlay, #55 Scratch - PO Contract $120,000 BPreston 4 Green's Run Paving, Ditching, Guardrail - PSE $270,000 BPreston 4 Hazelton-Maryland Paving, Ditching, Guardrail - PSE $485,000 BPreston 4 Expressway Drainage Rehab - I-68 MP 21.50 Replace Concrete Invert $800,000 DPreston 4 Expressway Drainage Rehab - I-68 MP 19.11 Replace Concrete Invert $650,000 DPreston 4 US 50, WV 7, WV 26, WV 92 Safety Improvements Corridor based safety and operational improvements $2,200,000 XPreston 4 HAZELTON OVERPASS Minor Rehab $498,000 XPreston 4 BULL RUN TRUSS Replace $5,822,000 XPreston 4 RUTHBELLE SLAB Replace $659,000 XPreston 4 ROCKVILLE TRUSS Replace $772,000 XPreston 4 Slide Repair Repair slide locations within county $500,000 XPreston 4 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,255,000 XPreston 4 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,307,000 XPutnam 1 Hurricane Creek Road DF/PO Slip Repair $344,830 BPutnam 1 18 MILE CREEK RD. PO SLIP REPAIR $141,153 BPutnam 1 18 MILE CREEK RD. 2" OVERLAY $220,000 BPutnam 1 MIDDLE TRACE 1.5" OVERLAY $178,000 BPutnam 1 MIDDLE TRACE LOW WATER CROSSING $200,000 BPutnam 1 POCA RIVER ROAD LESS THAN 20 REPLACEMENT $175,000 BPutnam 1 I-64 Widening Widen I-64 from US 35 to Nitro including new bridge across Kanawha River $170,000,000 EPutnam 1 HURRICANE BR 2657 Major Rehab $425,000 XPutnam 1 PFC MICHAEL J. SLATER MEMORIAL BRIDGE Replace $1,200,000 XPutnam 1 HURRICANE CR BR. NO.854 Major Rehab $1,000,000 XPutnam 1 Slide Repair Repair slide locations within county $500,000 XPutnam 1 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,366,000 XPutnam 1 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,087,000 X

Putnam 1CR 33 and CR 34/40 I/S Improvement Construct intersection improvement at Great Teays Blvd/Hillsdale Circle/Teays Valley Road Intersection

$1,500,000 XRaleigh 10 Beckley - Skelton Road Resurfacing $1,538,000 ARaleigh 10 Range Road PO Paving $135,000 BRaleigh 10 Old Crow Road PO Paving $175,000 BRaleigh 10 Mt. Tabor Road PO Pave; District will ditch, replace culverts, etc $335,000 BRaleigh 10 Old Eccles Road PO Pave; District will ditch, replace culverts, etc $355,000 BRaleigh 10 Leevale to Dorothy Road Full Contract Resurface, Drainage, Guardrail $725,000 BRaleigh 10 Horse Creek Road Box Culvert & PO Pave $550,000 BRaleigh 10 Rural Acres +27 PO Pave; District will ditch, replace culverts, etc $370,000 BRaleigh 10 Farley Branch Road +1 PO Pave; District will ditch, replace culverts, etc $230,000 BRaleigh 10 Blue Jay Six Road +1 PO Pave; District will ditch, replace culverts, etc $450,000 BRaleigh 10 Expressway Drainage Rehab-Prince Hill Road Slip line $330,000 DRaleigh 10 Expressway Drainage Rehab - I-64 MP 123.60 Remove&replace pipe $500,000 DRaleigh 10 Expressway Drainage Rehab - I-64 MP 129.10 Remove&replace pipe $500,000 DRaleigh 10 Expressway Drainage Rehab - I-64 MP 135.30 Remove&replace pipe $45,000 DRaleigh 10 SPRAGUE OVERHEAD Replace $2,000,000 DRaleigh 10 I-64 Widening at Beckley Widen I-64 at Beckley $60,000,000 ERaleigh 10 WV 99, WV 307 Safety Improvements Corridor based safety and operational improvements $400,000 FRaleigh 10 PINEY CREEK BRIDGE Replace $800,000 FRaleigh 10 Slide Repair Repair slide locations within county $500,000 FRaleigh 10 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,042,000 FRaleigh 10 Zway Segment 8 Beaver - S Eisenhower Drive Construct Zway Segment 8 $16,500,000 FRaleigh 10 ZwayShady Springs to Beaver Widen and Realign Segment 1 $35,000,000 FRaleigh 10 BEAVER ARCH Replace $750,000 XRaleigh 10 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $7,184,000 X

Page 12 of 16

Page 13: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Raleigh, Summers 10 New River Parkway- I-64 near Sandstone, WV to Fall Branch Construct 3.3 miles of two lane road and new bridge across New River $75,000,000 ERandolph 8 Cheat Mtn Rd Phase 2 Resurfacing $618,231 ARandolph 8 Laurel Fork - Rich Mountain Resurfacing $219,715 ARandolph 8 Isner Creek Road PO Paving $75,000 BRandolph 8 Pennington Road PO Paving $145,000 BRandolph 8 Sully Road 2" Base 2 1' Wearing 1 $405,247 BRandolph 8 Conley Road 1.5" Overlay $70,000 BRandolph 8 Chenoweth Creek - Kelly Mountain 2" Overlay $280,000 BRandolph 8 Georgetown Road 1.5" Overlay $375,000 BRandolph 8 Roaring Creek Structure Replace 20' Span with 40' Bridge with Detour $415,095 BRandolph 8 Country Club Road +2 1.5" Overlay $250,000 BRandolph 8 Expressway Drainage Rehab - Corr H MP 30.23 Slip line $64,143 DRandolph 8 Expressway Drainage Rehab - Corr H MP 31.53 Slip line $91,903 DRandolph 8 Expressway Drainage Rehab - Corr H MP 32.32 Slip line $79,188 DRandolph 8 Expressway Drainage Rehab - Corr H MP 36.76 Slip line $198,485 DRandolph 8 Expressway Drainage Rehab - Corr H MP 40.50 Slip line $416,950 DRandolph 8 US 250 Safety Improvements Corridor based safety and operational improvements $300,000 XRandolph 8 GILMAN BRIDGE Replace $4,000,000 XRandolph 8 HUTTONSVILLE C C BRIDGE Replace $1,800,000 XRandolph 8 VALLEY HEAD ARCH Replace $1,200,000 XRandolph 8 ASPHALT PLANT BRIDGE Replace $1,000,000 XRandolph 8 Slide Repair Repair slide locations within county $500,000 XRandolph 8 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $6,518,000 XRandolph 8 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,951,000 XRandolph 8 Cravensdale Bridge Replace current under 20 Structure $295,000 BRitchie 3 Tanner Road PO Paving $175,000 BRitchie 3 North Penn Ave Resurfacing Mill and resurface roadway and guardrail by POC. $100,000 BRitchie 3 Cairo - Cisco Road Resurfacing Resurface, drainage, guardrail, and markings by Contract $900,000 BRitchie 3 DYE BRIDGE (SCDA) Replace $1,300,000 DRitchie 3 WV 16, WV 31, WV 74 Safety Improvements Corridor based safety and operational improvements $1,500,000 XRitchie 3 WILSON BRIDGE (SSWB) Major Rehab $1,100,000 XRitchie 3 CAIRO PONY TRUSS (SSPT) Major Rehab $1,300,000 XRitchie 3 Slide Repair Repair slide locations within county $500,000 XRitchie 3 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,132,000 XRitchie 3 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,340,000 XRoane 3 Cotton - Amma Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $400,000 BRoane 3 Johnson Creek Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $390,000 BRoane 3 Linden Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $340,000 BRoane 3 Speed Road Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $235,000 BRoane 3 Vandale Fork Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $350,000 BRoane 3 Expressway Drainage Rehab - Amma Slip line; replace gutters/inletsl $276,000 DRoane 3 CICERONE BRIDGE (CSWB) Major Rehab $2,000,000 DRoane 3 Scott Miller Hill - US 33 Relocation Relocate US 33 to a new two-lane road from CR 3 to CR 5/12 in Roane County $42,000,000 ERoane 3 US 119, WV 36 Safety Improvements Corridor based safety and operational improvements $1,000,000 XRoane 3 COL RUBY BRADLEY BRIDGE (SCTB) Replace $5,250,000 XRoane 3 REEDY BRIDGE (CSWB) Replace $2,400,000 XRoane 3 S. MARKET STREET BRIDGE (SCTB) Replace $350,000 XRoane 3 Slide Repair Repair slide locations within county $500,000 XRoane 3 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,498,000 XRoane 3 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,903,000 XSummers 9 Willowwood - Talcott Rd Resurfacing $1,040,000 ASummers 9 Willowwood Road PO Paving $638,000 BSummers 9 Meadow Creek Road Repair embankment w./ steel pile by contract $270,000 BSummers 9 Indian Ridge Road Purchase Order Paving $745,000 BSummers 9 Expressway Drainage Rehab - I-64 MP 146.80 Remove&replace pipe $90,000 DSummers 9 WV 12 Safety Improvements Corridor based safety and operational improvements $200,000 FSummers 9 BRADSHAW CREEK BRIDGE Replace $1,167,000 FSummers 9 Slide Repair Repair slide locations within county $500,000 FSummers 9 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $976,000 FSummers 9 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,803,000 FSummers 9 INDIAN CREEK BRIDGE Replace $1,241,000 X

Page 13 of 16

Page 14: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Summers 9 INDIAN CREEK BRIDGE Replace $723,000 XTaylor 4 Riverside Drive Resurfacing $350,320 ATaylor 4 Old 50 West PO Paving $97,500 BTaylor 4 Wickmire Road PO Paving $87,500 BTaylor 4 Meadland Road 1.0" Overlay, #55 Scratch - PO Contract $100,000 BTaylor 4 Lost Run Rd Slide Repair - Soil Nail PO Contract $100,000 BTaylor 4 Paul E Malone Road 1.0" Overlay, #55 Scratch - PO Contract $165,000 BTaylor 4 Old 50 East Paving, Slip Repair, Culverts, Guardrail - PSE $110,000 BTaylor 4 Corbin Branch Road 1.0" Overlay, #55 Scratch - PO Contract $225,000 BTaylor 4 US 50, US 119, US 250 Safety Improvements Corridor based safety and operational improvements $1,000,000 XTaylor 4 NORTH SIMPSON GIRDER Replace $554,000 XTaylor 4 Slide Repair Repair slide locations within county $500,000 XTaylor 4 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $0 XTaylor 4 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,340,000 XTucker 8 WV 72 - Canaan Valley Resurfacing $381,967 ATucker 8 Clover Run Road PO Paving $156,000 BTucker 8 Douglas Road 1.5" Overlay $130,000 BTucker 8 Hobson Road 1.5" Overlay $130,000 BTucker 8 River Road +1 2" Overlay $225,000 BTucker 8 Shavers Fork Road +1 1.5" Overlay $300,000 BTucker 8 Cortland Road +1 1.5" Overlay $170,000 BTucker 8 Corridor H - US 219 Connector to WV 72 I/C Construct 4 lane Corridor H $90,000,000 ETucker 8 US 210, WV 32, WV 72 Safety Improvements Corridor based safety and operational improvements $1,500,000 XTucker 8 Slide Repair Repair slide locations within county $500,000 XTucker 8 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $4,265,000 XTucker 8 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,220,000 XTyler 6 WV 180 - Hickman Run Road Resurfacing $1,162,562 ATyler 6 Rush Fork Road +2 PO Paving $150,000 BTyler 6 Clark Ridge Road PO Paving $165,000 BTyler 6 Rock Run Road PO Paving $180,000 BTyler 6 WV 18 Safety Improvements Corridor based safety and operational improvements $600,000 XTyler 6 Underwood Bridge Replace $847,000 XTyler 6 Leasure Chapel Bridge Replace $671,000 XTyler 6 Slide Repair Repair slide locations within county $500,000 XTyler 6 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,417,000 XTyler 6 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $954,000 XUpshur 7 Diana - Rock Cave Road Resurfacing $328,754 AUpshur 7 Hall Road PO Paving $325,000 BUpshur 7 Cutright Run Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $200,000 BUpshur 7 Alton Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $240,000 BUpshur 7 Little Sand Run Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $900,000 BUpshur 7 Ivy Shortcut Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $50,000 BUpshur 7 White Oak Arch Bridge Replacement $515,000 CUpshur 7 Expressway Drainage Rehab - Rte 33 MP 21.83 Slip Line $215,000 DUpshur 7 Expressway Drainage Rehab - Rte 3/9 MP 2.02 Open cut $30,000 DUpshur 7 Expressway Drainage Rehab - Rte 33 MP 19.07 Slip Line $25,000 DUpshur 7 Expressway Drainage Rehab - Rte 33 MP 21.38 Slip Line $145,000 DUpshur 7 Expressway Drainage Rehab - Rte 33 MP 19.71 Slip Line $20,000 DUpshur 7 Expressway Drainage Rehab - Rte 33 MP 11.11 Slip Line $55,000 DUpshur 7 Expressway Drainage Rehab - Rte 33/14 MP 11.11 Open Cut $40,000 DUpshur 7 Expressway Drainage Rehab - Rte 3/9 MP 11.11 Open cut $30,000 DUpshur 7 WV 20 Safety Improvements Corridor based safety and operational improvements $550,000 XUpshur 7 SGT BILLY W RAPP USA MEM Replace $883,000 XUpshur 7 Staff Sergeant Lesley Wayne Reed U.S. Army Memorial Bridge Replace $1,310,000 XUpshur 7 MIDDLE FORK RV TR Replace $796,000 XUpshur 7 Slide Repair Repair slide locations within county $500,000 XUpshur 7 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,567,000 XUpshur 7 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,623,000 X

Various 10 WV 10 - Man to US 19 Operational improvements to approximately 69 miles of existing facility in Logan, Wyoming & Mercer Counties$15,500,000 E

Wayne 2 Cedar Run - Whites Creek Resurfacing $484,000 A

Page 14 of 16

Page 15: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Wayne 2 RIGHT FORK WILSON CREEK PO RESURFACING $325,000 BWayne 2 RIGHT FORK MILL CREEK PO RESURFACING $190,000 BWayne 2 JENNIES CREEK PO RESURFACING $350,000 BWayne 2 BUFFALO CREEK +3 PO RESURFACING $1,250,000 BWayne 2 WEBB ROAD SLIDE CONTRACT SLIDE REPAIR $250,000 BWayne 2 RICE BRANCH CULVERT CULVERT REPLACEMENT $200,000 BWayne 2 BUFFALO CREEK CULVERT CULVERT REPLACEMENT $200,000 BWayne 2 WHITES CREEK CULVERT CULVERT REPLACEMENT $200,000 BWayne 2 BOWEN BRANCH BRIDGE DECK REPL. CONTRACT DECK REPLACEMENT $400,000 BWayne 2 Expressway Drainage Rehab - I-64 Slip Line $175,000 D

Wayne 2 Tolsia Highway-Pritchard to I-64Construct 4-lane highway from Pritchard Intermodal Facility in previously graded areas & utilize existing US 52 & widen remaining areas $150,000,000 E

Wayne 2 WV 75 Safety Improvements Corridor based safety and operational improvements $200,000 XWayne 2 U.S. Army PFC Ernest D. Marcum Bridge Replace $1,425,380 XWayne 2 BELOW DAM BRIDGE Deck $225,000 XWayne 2 ECHO BEAM SPAN Replace $615,000 XWayne 2 Slide Repair Repair slide locations within county $500,000 XWayne 2 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $6,246,000 XWayne 2 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,436,000 X

Wayne 2Spring Valley Road Improvements Widen Spring Valley Road to 3 lanes and improve sight distances from Piedmont Road to the VA Medical Center $5,000,000

XWebster 7 Webster Road Resurfacing $510,304 AWebster 7 Bergoo Road Slide Slide Repair $180,000 BWebster 7 Replete Road Widen w/ 4" Base 1, Resurface w/ 1.5" Wearing, Drainage & Guardrail $1,170,000 BWebster 7 Diana Deck Girder Bridge Replacement $1,300,000 CWebster 7 CHERRY FALLS Deck $272,000 XWebster 7 BERGOO ROAD ARCH Replace $1,440,000 XWebster 7 JERRY HALL ARCH Replace $1,150,000 XWebster 7 Slide Repair Repair slide locations within county $500,000 XWebster 7 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $0 XWebster 7 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,345,000 XWetzel 6 Short Line Road Resurfacing $1,736,004 AWetzel 6 WV 20 Slip Repair +3 PO slip repairs (Disforce Soil Nails) $550,000 BWetzel 6 Smithfield - Bates Run Road CT resurfacing, guardrail, drainage, etc. $1,700,000 BWetzel 6 Proctor Bridge Bridge Replacement $6,432,000 CWetzel 6 WV 2 Widening Widen to four lanes from Proctor to Kent $80,000,000 EWetzel 6 WV 7 Safety Improvements Corridor based safety and operational improvements $700,000 XWetzel 6 Renners Bridge Replace $1,194,000 XWetzel 6 Van Camp Bridge Minor Rehab $107,000 XWetzel 6 Galmish Bridge Minor Rehab $83,000 XWetzel 6 Wade Bridge Replace $591,000 XWetzel 6 Slide Repair Repair slide locations within county $500,000 XWetzel 6 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,458,000 XWetzel 6 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,243,000 XWirt 3 Enterprise Road Slip Repair Pile wall slip repair and overlay by POC. $200,000 BWirt 3 Windy Ridge Slip Repair Slip repair with soil nails by POC $260,000 BWirt 3 Ballard Run Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $100,000 BWirt 3 WV 5, WV 14, WV 47 Safety Improvements Corridor based safety and operational improvements $800,000 XWirt 3 CRESTON BRIDGE (CSPG) Replace $5,000,000 XWirt 3 TUCKER CREEK BRIDGE (CSWB) Replace $1,500,000 XWirt 3 ROUNDBOTTOM BRIDGE Replace $800,000 XWirt 3 Slide Repair Repair slide locations within county $500,000 XWirt 3 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $0 XWirt 3 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $883,000 XWood 3 Deerwalk Highway Resurfacing $918,000 AWood 3 Kesterson Road PO Paving $190,000 BWood 3 Mt. Pleasant Estates Rehabilitation Rehabilitate pavement with slab replacement, overlay, and drainage improvements. $470,000 BWood 3 Community Acres Rehabilitation Rehabilitate roadway with slab replacement and drainage improvements by contract. $580,000 BWood 3 Spider Ridge Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $350,000 BWood 3 Love Hill Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $300,000 BWood 3 Pond Creek Resurfacing Resurface by POC. Drainage, ditches, shoulders by D.F. $375,000 B

Page 15 of 16

Page 16: Roads to Prosperity Project List - Office of the Governorgovernor.wv.gov/AnalyticsReports/Roads to Prosperity Project List.pdf · B Paving, slides, and other roadway ... Project has

Wood 3 River Hill Road Resurfacing Resurface by POC. Ditches, shoulders by D.F. $90,000 BWood 3 Expressway Drainage Rehab - I-77 Williamstown Replace median inlets; bore and jack pipe $325,000 DWood 3 RACE TRACK BRIDGE (CSWB) Replace $1,300,000 DWood 3 WV 2 Widening Reconstruct to 5-lane highway from Wood CR 3/8 to 0.3 miles north I/S WV SR 31 (2.0 miles) $36,000,000 E

Wood 3 WV 14 Widening Pettyville-DowntownReconstruct and widen WV 14 to four lanes from the Parkersburg City boundary south to the newly relocated WV 14 four-lane highway $15,000,000 E

Wood 3 WV 31 Safety Improvements Corridor based safety and operational improvements $300,000 XWood 3 US 50 I/C N (CSPG) Major Rehab $976,536 XWood 3 US 50 I/C S (CSPG) Major Rehab $976,536 XWood 3 KITES RUN BRIDGE (CSWB) Major Rehab $1,000,000 XWood 3 POND CREEK GIRDER (CSPG) Replace $2,500,000 XWood 3 BIG RUN BRIDGE (CSWB) Replace $1,400,000 XWood 3 Slide Repair Repair slide locations within county $500,000 XWood 3 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $8,108,000 XWood 3 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $2,174,000 XWood 3 US 50 Turn Lane Construct Right Turn Lane along US 50 EB to access I-77 SB $1,600,000 XWood 3 Expressway Drainage Rehab (DISTRICTWIDE) - Inlet/Grate Repair Replace 200 inlets grates; 20 inlet mods; 20 inlet replacements $290,000 DWyoming 10 Campus - Logan Road Resurfacing $603,291 AWyoming 10 Stephenson-Keystone PO Paving $160,000 BWyoming 10 Laurel Branch Road PO Pave; District will ditch, replace culverts, etc $55,000 BWyoming 10 Coon Branch PO Pave; District will ditch, replace culverts, etc $100,000 BWyoming 10 Apple Avenue +5 PO Pave; District will ditch, replace culverts, etc $180,000 BWyoming 10 Little Huff Creek Road PO Pave; District will ditch, replace culverts, etc $395,000 BWyoming 10 Clear Fork Road PO Pave; District will ditch, replace culverts, etc $350,000 BWyoming 10 Stephenson - Keystone Road PO Pave; District will ditch, replace culverts, etc $395,000 BWyoming 10 WV 85, WV 971 Safety Improvements Corridor based safety and operational improvements $400,000 FWyoming 10 Coalfields Expressway Paving Pave Coalfields Expressway grade and drain project $55,000,000 FWyoming 10 Coalfields Expressway-WV 16 to Welch Construct four lane highway $110,000,000 FWyoming 10 SLAB FORK BRIDGE Rehab $850,000 FWyoming 10 SSG GENE ARDEN VANCE JR MEMORIAL BRIDGE Replace $800,000 FWyoming 10 CHARLES V. STEWART MEMORIAL BRIDGE Replace $225,000 FWyoming 10 NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $3,745,000 FWyoming 10 Non-NHS Pavement Reconstruction and Rehabilitation Reconstruct and Rehabilitate $1,762,000 FWyoming 10 PINEVILLE BRIDGE Replace $963,870 XWyoming 10 JESSE BRIDGE Replace $1,150,000 XWyoming 10 Slide Repair Repair slide locations within county $500,000 X

Page 16 of 16