Roam Single Wall Mount for use with Microsoft Surface Hub 2 on V.I.A.®
If you have a problem, question, or request, callyour local dealer, or Steelcase Line 1 at888.STEELCASE (888.783.3522)for immediate action by people who want to help you.
(Outside the U.S.A., Canada, Mexico, Puerto Rico, and the U.S. Virgin Islands, call: 1.616.247.2500)Or visit our website: www.steelcase.com© 2019 Steelcase Inc. Grand Rapids, MI 49501 U.S.A.
Printed in U.S.A.
®
Page 1 of 101379119001 Rev A
WARNINGCRUSH HAZARD! FALURE TO PROPERLYSECURE MONITOR COULDRESULT IN PERSONAL INJURY
Read the entire assembly direction before beginning installation.
Hardware is to be specified/verified by thebuilding’s Engineer of Record (EOR) orlocal building official/Authority HavingJurisdiction (AHJ).
2x 2
3
4
1/8" & 1/2"Diameter
9"
Tools required when field-installing cutouts in skin
2x
Tools required when skin have factory-installed cutouts
®
Page 2 of 101379119001 Rev A
SECTION 1: Manual installation and cutting for all cut-outs. If holes are factory-cut, go to Section 2.
1. Rules for locating a place for the Roam Single Wall Mount on V.I.A. skins:
• Mounting holes must be a minimum of 6.0” from edges of V.I.A. skins to accommodate the weight of the monitor, and up to PW = 46” (1168 mm) minimum to accommodate power and communication brackets.• The skin must be a minimum of PH = 36” (915 mm) and PW = 36” (915 mm).• Up to 2 Roam Single Wall Mounts may be placed on one skin. If more than 2 are desired, the V.I.A. Structural Beam (FEBSTR) is required.• The Roam Single Wall Mount may be used on various types of V.I.A. skins: - Steel - Laminate (HPL & LPL) - Veneer - Top, bottom, intermediate and monolithic skins• The Roam Single Wall Mount SHALL NOT be used on V.I.A. Markerboard skins.• Power and data outlets may be concealed as shown in these instructions or you can use outlets in locations of your choice provided it is specified/verified by the building’s Engineer of Record (EOR) or local building official/Authority Having Jurisdiction (AHJ).
2. Locate cutouts on skin and ensure that rules in Step 1 are not violated.
3. Depending on your choice of cut-outs, see the following Assembly Directions:
• 939501822 (Field cutting for Modular Power & Data holes in skin) • 939502312 (Modular Power) • 939502313 (Modular Data) • 939502315 (Hardwire Power and Data)
CAUTIONLayout all holes, cutouts and monitor edges BEFORE cutting or drilling. Ensure that power and data brackets will accommodate harness pass-though’s and harness bend radii.
®
Page 3 of 101379119001 Rev A
C
A
4mm
(1)
B
G
Components required when field-installing holes in skin:
#2
2-1/2"(63.5mm)
(4)
(4)
(1)
(1)
Hardware Package
E
4mm HEX
25 mm(1")
(4)
(4)(2 gray &2 yellow)
F
D
1/4-20 x
M6x1.0x25
®
Page 4 of 101379119001 Rev A
61"
(1550mm)
FLOOR
FLOOR
61"
(1550mm)
A
B
4
NOTE: The nail location should be a minimum of 9" (229 mm) from the top edge of the skin, at least 26" (660 mm) from the bottom of the skin, and must be able to accommodate the power brackets and pass-through. To accommodate the power & communication brackets. It is best to locate the nail 22.7" (576 mm) from either side of the skin.
4. Tap nail in at top of center keyhole, and alignedwith the horizontal markings. Hang the wall mountbracket on the nail.
®
Page 5 of 101379119001 Rev A
1/2"DIAMETERDRILL BIT
1/2"DIAMETERDRILL BIT
x8
6a6a
6b
9" Long Level
8
5. Mark the location of the cut-outs for the power and data.Cut per assembly direction 939501822 (Field cuttingModular Power & Data holes in skin).
6. Level part 'B' and mark slots.7. Mark cut-out for power & communication per diagrams on following page.8. Drill 1/2" diameter holes at each marked slot.
B
®
Page 6 of 101379119001 Rev A
7. Hole and cut-out patterns for concealed power and data:
(419.1)16.500 (Ø13.21)
.520
(21.3).839
(27.3)1.075
2x (470.68) 18.531
(370.5)14.587
(182.25)7.175
(188.25)7.411
(419.1)16.500 (Ø13.21)
.520
2x (470.68) 18.531
(27.3)1.075
(21.3).839
(370.5)14.587
(182.25)7.175
(188.25)7.411
(419.1)16.500
(Ø13.21).520
(27.3)1.075
(21.3).839
2x (470.68) 18.531
(370.5)14.587
(182.25)7.175
(188.25)7.411
(470.68)18.531
(27.3)1.075
(Ø13.21).520
(419.1)16.500
(182.25)7.175
2x (71.25±.25) 18.531±.009
2x (35.625±.13) 1.403±.005
2x (38.73±.25) 1.525±.009
2x (19.365±.13) .762±.005
2x (50.97±.25) 2.007±.009
8x (R5±.13) .197±.005
4x (R5±.13) .197±.005
(100.3±.5)3.949±.019
(50.15±.25)1.974±.009
(50.05±.25)1.970±.009
(100.1±.5)3.941±.019
(41.655±.13)1.640±.005
(48.385±.13)1.905±.005
(71.37±.25)2.810±.009
(35.69±.25)1.405±.009
(83.31±.25)3.280±.009
(96.77±.25)3.810±.009
2x (Ø3.81±.13) .150±.005
2x (Ø2.54±.13) .100±.005
4x (R5±.13) .197±.005
(35.63±.25)1.403±.009
(17.815±.13).701±.005 4x (R5±.13)
.197±.005
(44.65±.13)1.758±.005
(89.3±.25)3.516±.009
(44.45±.25)1.750±.009
(22.225±.13).875±.005
Seepage 3
Seepage 3
Seepage 3
Seepage 3
Modular CommunicationHardwire Single for
Communication Modular Power
Hardwire Double forCommunication or Shared
Power/Communication
®
Page 7 of 101379119001 Rev A
a
d
Installing thetoggle bolt anchor
b
NOTE: DO NOT STRESS ORPULL LEGS AT AN ANGLE TOAVOID PREMATURE BREAKOFF.
c
C
D
D
D
C
C
1
NOTE: If there is a horizontal structural member (FERHI) covering the two lower holes, use two wood or particleboard screws (not provided in the hardware kit) in the un-used lower slots.
B
SECTION 2:When skin has factory-installed holes:
®
Page 8 of 101379119001 Rev A
40 in-lbs(4.52 Nm)
FE
4mm HEX
25 mm(1")
(4)
4mm
(1)
G
2
G FE
(4)(2 gray &2 yellow)
YELLOW
GRAY
M6x1.0x25
®
Page 9 of 101379119001 Rev A
NOTE: After step 3 has been completed, lift up on the monitor to ensure pucks are engaged and secured into the pockets.
4
3
5
If cablemanagementis required.
®
Page 10 of 101379119001 Rev A
Removal of Monitor
1. Unplug monitor as shown.
2. Lift up on top latch (2a) andslide in either direction (2b) tohold latch in place. This actionwill move the tabs out of theway for removal.
3. Lift monitor up and out.
OR
3
2a2b
1