7
Robert E. Roberts 21046 Watson Dr. Zachary, LA 70791, 225-939-7527 [email protected] Experience Level 2 Piping Designer Jan. ’15- Present Hunt, Guillot, And Associates Ruston, LA On site at Calumet Refinery in Shreveport, LA Red line P&ID’s for tie point location and new pipe diagram. Draw civil and structural models for new equipment placement in the unit. Draw field sketches for replace in kind and new pipe routing. Build detail design packages complete with P&IDs, piping specs, line lists, valve lists, and indexes. Pull and verify measurements for sketches and piping layout. Design piping and build packages for maintenance and turnaround groups according to unit specs. Turn field sketches into a 3D model using Autodesk CADWORX or Plant 3D program. Convert 3D model to a NAVISWORKS model for client model review. Clean up, issue ISO's for fabrication and list all field material needed to install piping and associated valves. Turn over completed packages to the field planner for review and final approval. Make any changes deemed necessary by field planners or engineers before issuing drawings for construction. Level 2 Piping Designer March ’14-Dec. ‘14 Audubon Engineering Baton Rouge, LA Draw field sketches for replace in kind and new pipe routing. Build detail design packages complete with P&IDs, piping specs, line lists, valve lists, and indexes. Pull and verify measurements for sketches and piping layout. Design piping and build packages for maintenance and turnaround groups according to unit specs. Turn field sketches into a 3D model using Autodesk CADWORX or Plant 3D program.

Robert E Roberts Resume

Embed Size (px)

Citation preview

Page 1: Robert E Roberts Resume

Robert E. Roberts 21046 Watson Dr. Zachary, LA 70791, 225-939-7527 [email protected]

Experience Level 2 Piping Designer

Jan. ’15- Present Hunt, Guillot, And AssociatesRuston, LA On site at Calumet Refinery in Shreveport, LARed line P&ID’s for tie point location and new pipe diagram. Draw civil and structural models for new equipment placement in the unit. Draw field sketches for replace in kind and new pipe routing. Build detail design packages complete with P&IDs, piping specs, line lists, valve lists, and indexes. Pull and verify measurements for sketches and piping layout. Design piping and build packages for maintenance and turnaround groups according to unit specs. Turn field sketches into a 3D model using Autodesk CADWORX or Plant 3D program. Convert 3D model to a NAVISWORKS model for client model review. Clean up, issue ISO's for fabrication and list all field material needed to install piping and associated valves. Turn over completed packages to the field planner for review and final approval. Make any changes deemed necessary by field planners or engineers before issuing drawings for construction.

Level 2 Piping Designer March ’14-Dec. ‘14Audubon Engineering Baton Rouge, LA Draw field sketches for replace in kind and new pipe routing. Build detail design packages complete with P&IDs, piping specs, line lists, valve lists, and indexes. Pull and verify measurements for sketches and piping layout. Design piping and build packages for maintenance and turnaround groups according to unit specs. Turn field sketches into a 3D model using Autodesk CADWORX or Plant 3D program. Convert 3D model to a NAVISWORKS model for client model review. Clean up, issue ISO's for fabrication and list all field material needed to install piping and associated valves. Turn over completed packages to the field planner for review and final approval. Make any changes deemed necessary by field planners or engineers before issuing drawings for construction.

Level 1 Piping Designer April ’13-March ‘14CDI Engineering

Page 2: Robert E Roberts Resume

Baton Rouge, LA Onsite at the ExxonMobil Baton Rouge RefineryDraw field sketches for replace in kind and new pipe routing. Pull and verify measurements for sketches and piping layout. Design piping and build packages for maintenance and turn around groups according to unit specs. Turn field sketches into a 3D model using CADWORX program. Clean up, issue ISO's for fabrication and list all field material needed to install piping and associated valves. Turn over completed packages to the field planner for review and final approval. Make any changes deemed necessary by field planners or engineers before issuing drawings for construction.

Piping Foreman/Pipe Fabricator Oct. '10-April '13 Turner Industries Group Baton Rouge, LA Plan work to be done on a daily, and weekly level. Oversee work being performed for project, maintenance, and turnarounds. Fill out all required paperwork for safety, and quality reports. Assist pipe fitters, boilermakers, and welders with daily task, and ensure these tasks are done safely and in a timely manner. Read drawings, isos, P&IDs to determine proper location, type and size of piping, pumps, instrumentation, and valves. Cut, prep, and fab piping per drawings. Perform hydro-testing and ensure piping is the correct size, length and dimensions per drawings. Keep track of all daily log sheets for productivity reports Cut, prep, and fabricate piping per drawings Ensure proper material is used for each drawing

Work with specialty metals used in drawings Hydrotest piping per specs Install piping in the field and ensuring proper gaskets and bolts are used Install supports for piping in the area piping was installed

Assist welders as needed Design piping according to unit specifications Perform piping layout for new piping in pipe racks. Find best routes for new piping. Draw individual ISO drawings for piping to be fabricated.

Shift Mechanic

June '10-0ct. '10 KPAQ Industries

St. Francisville, LA Shift coverage for the paper machine, pulp mill, wood yard, powerhouse and winders. Perform preventative maintenance in the pulp mill and wood yard areas. Troubleshoot and perform repairs on equipment used in the operation of the pulp mill and wood yard.

Page 3: Robert E Roberts Resume

Perform daily mechanical work in these areas on pneumatic and hydraulic systems, including removal, installation and alignment of pumps, motors, agitators and blowers. Shift coverage for the paper machine, pulp mill, wood yard, powerhouse, and winders. Troubleshoot problems with pneumatic and hydraulic systems of machinery to ensure continued operation.Perform repairs on the equipment when needed. Perform preventative maintenance on all systems as needed.

Maintenance Foreman Feb. '10-May '10 Turner Industries Group Baton Rouge LA Perform commissioning work on new equipment for start-up operations at new facility. Assist millwrights in pump replacement, and alignment. Rework faulty pneumatic and hydraulic systems to start up facility.

Pulp Mill Maintenance Tech/Shift Mechanic Oct. '09-Feb.'10 Renew Paper St. Francisville, LA Perform preventative maintenance in the pulp mill and wood yard areas. Troubleshoot and perform repairs on equipment used in the operation of the pulp mill and wood yard. Perform daily mechanical work in these areas on pneumatic and hydraulic systems, including removal, installation and alignment of pumps, motors, agitators and blowers. Shift coverage for the paper machine, pulp mill, wood yard, powerhouse, and winders. Troubleshoot problems with pneumatic and hydraulic systems of machinery to ensure continued operation. Perform repairs on the equipment when needed. Perform preventative maintenance on all systems as needed.

Piping Foreman Oct. '06-June '09 Turner Industries Group Baton Rouge, LA Plan work to be done on a daily, and weekly level. Oversee work being performed for project, maintenance, and turnarounds. Fill out all required paperwork for safety, and quality reports. Assist pipe fitters, boilermakers, and welders with daily task, and ensure these tasks are done safely and in a timely manner. Read drawings, isos, P&IDs to determine proper location, type and size of piping, pumps, instrumentation, and valves. Cut, prep, and fab piping per drawings. Perform hydro-testing and ensure piping is the correct size, length and dimensions per drawings. Keep track of all daily log sheets for productivity reports

Assistant Operator

April' OO-June '06

Page 4: Robert E Roberts Resume

Georgia Pacific Zachary, LA Operate high speed sheeting and packaging equipment. Perform size changes, order changes and quality checks. Enter these into computer. Perform light maintenance on the equipment. Operate Palletizing equipment. Operate various size fork trucks.

Pipe Fitter Helper/Pipe Fitter Aug '94-April 'OOPala Interstate, Brown and Root, Retech Mechanical Read Prints, figure and cut pipe lengths, prep and fab piping per drawings. Perform hydro-testing. Install piping on location per drawings and P&IDs

Education

Zachary High Zachary, LAGraduated May 1988 Nationally certified pipe fitter through National Center for Construction, Education, and Research. (NCCER Plus) Nov. '07 TWIC Card Nov. '08 Fresh Air Certified Total Safety

References

Brett Adams Supervisor, Turner Industries Group 9442 Hidden Trail Dr. Denham Springs, LA 70726

225-270-9386

Derek Nichols Operator, Turner Industries Group 2927 Vernon Rd. Zachary, LA 70791

225-921-5879

Page 5: Robert E Roberts Resume

Todd Ballard Supervisor, Pala Interstate 16475 Pride-Baywood Rd.Pride, LA 70770 225-939-4181

Employment References Larry Gomez Central Fabrication Shop Manager Syngenta

225-642-1592

Chad Richard Central Fabrication Shop Forman Syngenta 225-642-1288

225-788-2848

Frank "Butch" Turner Level II Pipe Designer CDI Engineering 225-977-0582 225-938-9093