Role of Economic Analysis in Cost-Benefit Analysis . The Role of Investment Appraisal. To stop bad projects – bad policies To prevent good projects from being destroyed To determine if components of projects are consistent To assess the sources and magnitudes of risks - PowerPoint PPT Presentation

Citation preview

Page 1: Role of Economic Analysis in Cost-Benefit Analysis

1

Role of Economic Analysis in

Cost-Benefit Analysis

Page 2: Role of Economic Analysis in Cost-Benefit Analysis

The Role of Investment Appraisal

• To stop bad projects – bad policies• To prevent good projects from being destroyed• To determine if components of projects are consistent• To assess the sources and magnitudes of risks• To determine how to reduce risks and efficiently

share risks

2

Page 3: Role of Economic Analysis in Cost-Benefit Analysis

Questions addressed by an Integrated Investment Appraisal

• Is the project financially viable?• Does the project contribute to the economic growth of the country? i.e.

positive expected economic NPV• Who are beneficiaries of project and by how much?• Who are the interest groups (stakeholders) who could distort the

investment decision or affect the project’s performance?• What are the sources and magnitudes of risk?• What are the risks associated with the benefits accruing to the

stakeholders? Sources of political risks?• Are poverty alleviation goals being addressed?• What are the fiscal impacts?• What is the personality of the project?

3

Page 4: Role of Economic Analysis in Cost-Benefit Analysis

Incrementality of Projects

• One of the important concepts when defining a project is to measure the impact of the project’s cash flows and net benefits and costs on an incremental basis.

• We should carefully identify the benefits and costs that are only associated with the project, and not include any other benefits that would exist “WITHOUT” the project being undertaken.

• It is normal for the benefits and costs to change over time for the “WITHOUT” project case.

• The “WITHOUT” project scenario must be properly defined before using it as the base case from which to measure incremental benefits and costs produced by the “WITH” project case.

• It is an optimized “WITHOUT” project situation that should be compared with the “WITH” project situation to calculate the incremental benefits and costs.

• There is another perspective “before the project” versus “after the project” scenarios. “Before the project” is NOT the appropriate base case from which to measure incremental benefits and costs.

4

Page 5: Role of Economic Analysis in Cost-Benefit Analysis

• Quality of analysis has been shown by the World Bank to be a key determinant of the success of a project’s performance.

• A proper analysis will cause the project to be redesigned so that it is less likely to fail.

• World Bank experience shows that the probability of failure for poorly prepared projects within 3 years of a project’s life is 7 times that of well-prepared projects.

• Poorly prepared projects have 16 times as high a probability of failure within 5 years as compared to well-prepared projects.

Impact of Analysis

5

Page 6: Role of Economic Analysis in Cost-Benefit Analysis

• Stages in Project Appraisal and Approval

A. Idea and Project Definition

B. Pre-Feasibility Study

C. Feasibility and Financing

D. Detailed Design

E. Project Implementation

F. Ex-Post Evaluation

Components of Investment Appraisal

6

Page 7: Role of Economic Analysis in Cost-Benefit Analysis

A. Key Questions at Idea Stage

a. Where is the demand?

b. Is this project consistent with the organization’s expertise, current plans and strategy for the future? Can the project be implemented and operated in a reasonably efficient matter?

7

Page 8: Role of Economic Analysis in Cost-Benefit Analysis

Project Definition

• Project definition is defined broadly to include the scope and specification of the objectives of the project, its output, its different stakeholders, its economic and social benefits, and the data requirements.

• Most of the project’s data requirements are identified in the pre-feasibility and feasibility stages of the project where the project’s variables and parameters are analyzed in detail.

8

Page 9: Role of Economic Analysis in Cost-Benefit Analysis

B. Pre-Feasibility Study

• Examines overall potential of project• Should maintain same quality of information across all

variables• Wherever possible should use secondary informationKey questions:a. Is this project financially and economically feasible

throughout the project’s life?b. What are the key variables?c. What are the sources of risk?d. How can the risk be reduced?

9

Page 10: Role of Economic Analysis in Cost-Benefit Analysis

C. Feasibility Study

• Focus is on improving accuracy of the key variables• Alternatives for reducing risk are examined in detail• Some primary data may be neededKey questions:a. Is project financially attractive to all interested parties

in activity?b. What is level of uncertainty of key variables?c. How is the project financed?d. Can final decision for approval be taken?

10

Page 11: Role of Economic Analysis in Cost-Benefit Analysis

Modules of Pre-Feasibility and Feasibility Studies

The data are generally arranged in what we refer to as “building blocks” because they constitute the foundation for the different types of analyses. Building BlocksA. Demand ModuleB. Technical ModuleC. Environmental Assessment ModuleD. Human Resources and Administrative Support ModuleE. Institutional ModuleAnalysis ModulesF. Financial/Budget ModuleG. Economic ModuleH. Social Appraisal or Distributive and Basic Needs Analysis

11

Page 12: Role of Economic Analysis in Cost-Benefit Analysis

Building Block A: Demand Module

• Study of sources of demand, nature of market, prices and quantities

• Major distinction between domestic versus internationally traded goods and services

• For internationally traded goods, prices are given to the project by world markets– Secondary information most important

• For domestic market, primary research more important Output of Modulea. Forecast of quantities and real prices for life of projectb. Taxes, tariffs, subsidies, public regulations, technological

trendsc. Environmental impacts

12

Page 13: Role of Economic Analysis in Cost-Benefit Analysis

Building Block B: Technical Module

• A study of input requirements for investment and operations and their costs

• In this module, secondary information can be used very effectively

• Need to avoid conflict of interest between supplier of technical information and seller of investment equipment, or contractor for construction

Output of Modulea. Technology and life of projectb. Quantities of inputs by type needed for investment and

operationc. Labor required by type and timed. Input prices and sources of supplye. Environmental impacts

13

Page 14: Role of Economic Analysis in Cost-Benefit Analysis

Building Block C: Environmental Assessment Module• Environmental assessment augments information for the

economic analysis• Identification of environmental impacts and risks• Where possible, quantify the environmental impacts

Key questions:a. What are the likely environmental impacts from undertaking

project?b. What is the cost of reducing the negative impact?c. Evaluation of the environmental impacts and risks with and

without technical measures are taken to reduce these impacts?d. Are there alternative ways of supplying the good or service of

project without incurring these environmental costs? What are the costs of these alternatives?

14

Page 15: Role of Economic Analysis in Cost-Benefit Analysis

Building Block D: Human Resources and Administrative Support Module

• What are managerial and labor needs of the project?

• Does organization have the ability to get the managerial skills needed?

• Is timing of project consistent with quantity and quality of management?

• What are wage rates for labor skills required?• Manpower requirements by category are

reconciled with availabilities and project timing.

15

Page 16: Role of Economic Analysis in Cost-Benefit Analysis

Building Block E: Institutional Module

• This module deals with the adequacy of the institution responsible for managing the different stages or phases of the project.

• Insufficient attention to the institutional aspects creates serious problems during the implementation and operations phases of the project.

Key questions:a. Is the entity that is supposed to manage the project properly

organized and its management adequately equipped to handle the project?

b. Are the capabilities and facilities being properly utilized?c. Is there a need for changes in the policy and institutional set up

outside this entity? What changes may be needed in policies of the local, regional and central governments?

16

Page 17: Role of Economic Analysis in Cost-Benefit Analysis

Analysis Module F: Financial ModuleWhat is done:• Integration of financial and technical variables from demand

module, technical module, and management module• Construct cash flow profile of project• Identify key variables for doing economic and social analysisKey questions:a. What is relative certainty of financial variables?b. What are sources and costs of financing?c. What are minimum cash flow requirements for each of the

stakeholders?d. What can be adjusted to satisfy each of the stakeholders?

17

Page 18: Role of Economic Analysis in Cost-Benefit Analysis

Analysis Module G: Economic ModuleWhat is done:• Examines the project using the whole country as the

accounting entity• Evaluation of externalities including environmentalKey questions:a. What are differences between financial and economic values

for a variable?b. What causes these differences?c. With what degrees of certainty do we know values of these

differences?d. What is the expected value of economic net benefits?e. What is the probability of positive economic feasibility?

18

Page 19: Role of Economic Analysis in Cost-Benefit Analysis

Analysis Module H: Stakeholders and Basic Needs Analysis What is done:• Identification and quantification of extra-economic impacts of project• Income, cost, and fiscal impacts on various stakeholders• Poverty alleviation and political necessities• Basic Needs: Evaluate the impact of project on achieving basic needs

objectives– Basic needs will vary from country to country

Key Questions:a. In what ways does project generate beneficial and cost impacts on stakeholders?b. What stakeholders could the project impact?c. Who benefit and who pay the costs?d. What are the basic needs of the society that are relevant in the country?e. What impact will the project have on basic needs?f. What alternative ways are there to generate desirable social impacts?g. Is project relatively cost effective in generation of desirable social impacts?

19

Page 20: Role of Economic Analysis in Cost-Benefit Analysis

Integrated Projects• Integrated projects can get very complex and need to be approached

cautiously to avoid costly errors. • It is possible for the bundled project to be financially and economically

viable even though some of the components are not.• Dropping the components that generate negative returns will maximize the

project’s benefits.• Defining and understanding the objectives of the project is particularly

important when analyzing integrated projects.• Ultimately, the ‘bundle’ that succeeds the most in accomplishing the desired

objectives should be undertaken.• If the objective of the project is to maximize the wealth of people in country,

then the component or bundle that yields the highest economic NPV should be undertaken.

20

Page 21: Role of Economic Analysis in Cost-Benefit Analysis

ECONOMIC VALUE

FINANCIAL VALUE

TAX IMPACT

NET BENEFITS TO CONSUMERS

NET LABOUR BENEFITS

=

+

+

ECONOMIC VALUE

FINANCIAL

VALUETAX IMPACT

NET BENEFITS TO CONSUMERS

NET LABOUR BENEFITS

=+

21

Page 22: Role of Economic Analysis in Cost-Benefit Analysis

General Relationship

NPVECOeco. dr= NPVFIN

eco. dr+ PVEXTeco. dr

- Holds when all benefits and costs are discounted using same discount rate.

22

Page 23: Role of Economic Analysis in Cost-Benefit Analysis

• Critical in analysis to evaluate financial outcome of project from the point of view of each interested party

• Conventional analysis considers:a. Point of view of ownerb. Point of view of all investors combined (Banker’s point of view or total investment point of view)c. Point of view of economy

Other Perspectives• Point of view of government budget• Point of view of suppliers of inputs• Point of view of downstream processors• Point of view of competitors

Alternative Points of View

Page 24: Role of Economic Analysis in Cost-Benefit Analysis

24

Analyses of Investment Decisions from Alternative Points of View

Viewpoint:

Banker (Total Investment)

Owner

Government Budget Office

Country

Financial

(I)

Yes

Yes

Yes

No

Economic

(II)

No/Yes

No/Yes

No/Yes

Yes

Stakeholder

(III)

Yes

Yes

Yes

Yes

Basic Needs

(IV)

No

No

No

Yes