Upload
others
View
9
Download
0
Embed Size (px)
Citation preview
Prepare roof sheeting with Pro-MasterRoofShield UDL™ underlayment andinstall drip edge per roof coveringmanufacturer’s instructions.
Install the shingle starter strip perroof covering manufacturer’sinstructions.
Install kick-out flashing as first pieceof step flashing. Slide diverter uproof plane until starter trough stopsat shingle starter strip (roof panelmust be flat on roof and wall panelflush to wall). Attach the kick-outdiverter to roof only at uppermostedge (at the point marked with ”L” or“R”). Use one appropriate roofing nail.Apply sealant at exterior wall penetrationper wall manufacturer’s requirements.
Consult roofing manufacturer’s Shingle-to-Flashing abutment.Consult wall manufacturer’s Counter Flashing recommendations.
®
Apply roof shingles per the manufacturer’s installation procedures.
Install step flashing compatibleand appropriate for the roofingapplication.
Protect a homeowner’s investment by designing their home to stay dry. Install the Berger Diverter,
a water management strategy that works.