37
ROSS Portfolio

Ross Usie Portfolio

Embed Size (px)

DESCRIPTION

These are some of the projects I've done in my 4 years at the University of Louisiana at Lafayette.

Citation preview

Page 1: Ross Usie Portfolio

ROSSPortfolio

Page 2: Ross Usie Portfolio
Page 3: Ross Usie Portfolio

Product Design Transit Design  AnimationExhibits Design

Contents

Page 4: Ross Usie Portfolio
Page 5: Ross Usie Portfolio

A furniture piece able to adapt to the user and its environment

Page 6: Ross Usie Portfolio

*Limited to ONE sitting position

*

Page 7: Ross Usie Portfolio

Given the restraints of a recycled material, I built a full scale model out of cardboard.

Page 8: Ross Usie Portfolio

1 2

3 4

1

2

3

4

Page 9: Ross Usie Portfolio

All wooden model shown

Page 10: Ross Usie Portfolio
Page 11: Ross Usie Portfolio

Design a CNG Para-Transit Vehicle to be implemented into the Lafayette Transit System

Existing Lafayette Bus

Page 12: Ross Usie Portfolio

Maintenance ADA Factors

InteriorSafetyAerodynamicsLow Floor

Areas of Focus

Group Effort

Page 13: Ross Usie Portfolio

Mr. Joseph Perkins/LTS driver for 25 years

“..lack of personal storage”

Driver Area

“..too many buttons..”

“..uncomfortable dials..”

“I find that sometimes my vision is blocked from unneeded obstacles.”

“The meters are sometimes hard to read and understand.”

Page 14: Ross Usie Portfolio
Page 15: Ross Usie Portfolio
Page 16: Ross Usie Portfolio

Bus Shelter

Page 17: Ross Usie Portfolio

Public transportation shelter able to adapt to the clients specifications

Page 18: Ross Usie Portfolio

The Lafayette MPO approached 3 of the Industrial Design Students to redesign the existing public transportation bus stop/shelter. They wanted something visually appealing, cheap, and easy to build.

Page 19: Ross Usie Portfolio

The existing bus shelters that the city has previously purchased cost approximately $4,000-$6,000. We were able to almost cut that price in half; to $2,700.

Page 20: Ross Usie Portfolio
Page 21: Ross Usie Portfolio
Page 22: Ross Usie Portfolio

They then wanted a quick turn-around to manufacture it. We then had to create construction documents on how to build our shelter. We met/worked a with structural engineer to make sure it could with-stand Hurricane force winds that can be frequent in Louisiana.

Page 23: Ross Usie Portfolio
Page 24: Ross Usie Portfolio

A mobile storage device able to adapt to the users organizational needs

Page 25: Ross Usie Portfolio

Unorganized packing method Difficult to find one item Unorganized means of unpacking at location

Page 26: Ross Usie Portfolio
Page 27: Ross Usie Portfolio

Structured ExteriorNo Structure

VS

Page 28: Ross Usie Portfolio

Hangs in closet at hotel

Page 29: Ross Usie Portfolio
Page 30: Ross Usie Portfolio
Page 31: Ross Usie Portfolio

…Lagniappe (extra)

Page 32: Ross Usie Portfolio

Animation Internship

In the Summer of 2009, I had the opportunity to intern for the Walt Disney Company as an Animation Academy Instructor atDisneyQuest in Downtown Disney in Orlando Florida.- I was in charge of 270 guests a day in a creative environment

DisneyQuest

Page 33: Ross Usie Portfolio
Page 34: Ross Usie Portfolio

I was able to intern for the University of Louisiana’s Student Union to design the window display for the Spring 2010 season.-only items from the store could be used

Merchandising University Bookstore/ Fall 2010

Page 35: Ross Usie Portfolio

Exhibit DesignDuring the Southern District Conference inNew Orleans in 2009, I was one of 3 students to help design and build the exhibit that displayed the students work from the University of Louisiana.

Page 36: Ross Usie Portfolio
Page 37: Ross Usie Portfolio

THANK