Rossendale WAN High Level Design
Technical Overview
Rossendale are implementing a brand new primary tier 3 data centre in Wakefield and are
placing core services within this Data Centre. As a result of this a new network infrastructure
is required to connect the remote sites to the data centre.
Rossendale will use a mixture of on premises solutions, infrastructure as a service, and
disaster recovery as a service along with a variety of cloud options. Rossendale currently
has a mixture of public, private and hybrid cloud product offerings. The new core network will
need to ling existing services such as PSN via a VPN from the node4 Derby data centre to
Wakefield.
RBC envisages an MPLS IP Layer 3 network with presentation into each of the sites listed
and the data centre. A primary Fibre Ethernet circuit is required along with an appropriate
backup circuit / method. Consideration should be given to how the backup circuit can be
provided diversely, but cost effectively, to the primary. Respondents should describe their
design and detail how resiliency and diversity have been achieved. Details of how failover
between the primary and backup circuits will occur, along with failover times, should beprovided.
The main site will require a 1Gbps connection into the MPLS cloud. Other sites will require a
100Mbs bearer with options for 30/40/50/Mbps of bandwidth. The data centre will require a
minimum of 1Gbps of bandwidth. The term of the circuits is 3 years plus the option to extend
for a further two years. Respondents must detail how circuit bandwidth would be increased if
RBC did not implement the full bearer bandwidth on day one.
Rossendale will require uncontended bandwidth with class of service (CoS) to support VoIP,
virtual desktops, and other corporate traffic should be provided. Respondents should provide
details of the CoS options and details of the associated Service Level Targets. RBC would
An integrated network that can enable IP communication across all the Rossendalecouncil and partner sites as well as the primary Rossendale data centre hosted in
Wakefield. Provide high speed connectivity between all connected sites and the data centre to
transfer files, regular business documents, VoIP, SIP, Internet and virtual desktopinfrastructure traffic.
Expansion capability to add additional UK sites in the future utilising the existinginfrastructure.
Provide high availability and resiliency across all sites and the network, allowingautomatic failover when a circuit goes down.
Full managed & monitored service for all network sites, devices, routers, switches etc. Provide connectivity to Tier-1 Internet transit providers such as Telecity Manchester and
Global Switch/Telehouse London which provides a high degree of resiliency. Provide 1Gbps and 10Gbps circuits between the POPs, connectivity is diversely routed.
This result in a higher resilient network infrastructure which, in the event of a corenetwork failure, and provide sub-second failover for services delivered over MPLS.