3
ROUSHAN KUMAR SINGH GET – General Electric India, Pune. Permanent Address: VILL. MANGURAHI, POST. ETAHAT, DISTIC. AURANGABD, BIHAR. E-Mail: [email protected] Contact No.: 9970041306 Profile: Worked in the capacity of GET Assembly COE – Manufacturing team at GE-MMF Pune facility.Started career as a get & subsequently grown up to the level of a Light Assembly –Manufacturing Resource, having shouldered diversified responsibilities in Assembly, Testing In-Plant logistics pertaining to different Product lines of Measurement & Control business for Oil and Gas Products. Experience: Company Career Progression Year General Electric India Industrial Pvt. Ltd. ,Pune GET 26 th OCT. 2013-26 th OCT.2015 Work profile : Worked in end to end assembly cycles of ultrasonic flowmeters, Bagged experience to handle short cycle projects of Ultrasonic flowmeters(USM), Skid (First Piece Qualification), calibration Test Benches. Worked on products of Gas and Moisture as Moisture Analyzer. Supported in assembly & testing of Calibration Test Benches, as well. Worked independently in calibration of Ultrasonic flowmeters at FCRI - Palakkad, Kerala. Worked to calibrate USM in air and water along with liquid custody transfer meters. Worked in installation, commissioning and performance qualification of Air flow loop. Completed internal FAT (factory Acceptance Test) and Interacted with customers (viz. Reliance Industries, BPCL, HPCL etc.) and Third party Inspectors forCustomer –Factory Acceptance test. Have worked closely with quality assurance and warehouse team, for incoming inspection (of flowcells with CMM- Faro Arm) and kitting of materials. Supported in Oracle transactions. Acquired hands on experience of Mechanical & Electrical assemblies of Mark VIe Control Panels. Supported inBentley Nevada – VMS, MMS panels, DTA assemblies. Done mounting of stuffs, electrical wiring, and component labeling, routing & finishing of control assemblies. Submitted complete project summary to the management and maintained product register. Worked as a team member for High Risk Operations at Ranjangaon Site.

roushan singh

Embed Size (px)

Citation preview

Page 1: roushan singh

ROUSHAN KUMAR SINGHGET – General Electric India, Pune.

Permanent Address: VILL. MANGURAHI, POST. ETAHAT, DISTIC. AURANGABD, BIHAR.E-Mail: [email protected] No.: 9970041306

Profile: Worked in the capacity of GET Assembly COE – Manufacturing team at GE-MMF Pune facility.Started career as a get & subsequently grown up to the level of a Light Assembly –Manufacturing Resource, having shouldered diversified responsibilities in Assembly, Testing In-Plant logistics pertaining to different Product lines of Measurement & Control business for Oil and Gas Products.

Experience:

Company Career Progression

Year

General Electric India Industrial Pvt. Ltd. ,Pune

GET 26th OCT. 2013-26th

OCT.2015

Work profile : Worked in end to end assembly cycles of ultrasonic flowmeters, Bagged experience to

handle short cycle projects of Ultrasonic flowmeters(USM), Skid (First Piece Qualification), calibration Test Benches.

Worked on products of Gas and Moisture as Moisture Analyzer. Supported in assembly & testing of Calibration Test Benches, as well.

Worked independently in calibration of Ultrasonic flowmeters at FCRI - Palakkad, Kerala. Worked to calibrate USM in air and water along with liquid custody transfer meters.

Worked in installation, commissioning and performance qualification of Air flow loop.

Completed internal FAT (factory Acceptance Test) and Interacted with customers (viz. Reliance Industries, BPCL, HPCL etc.) and Third party Inspectors forCustomer –Factory Acceptance test.

Have worked closely with quality assurance and warehouse team, for incoming inspection (of flowcells with CMM- Faro Arm) and kitting of materials. Supported in Oracle transactions.

Acquired hands on experience of Mechanical & Electrical assemblies of Mark VIe Control Panels. Supported inBentley Nevada – VMS, MMS panels, DTA assemblies.

Done mounting of stuffs, electrical wiring, and component labeling, routing & finishing of control assemblies.

Submitted complete project summary to the management and maintained product register.

Worked as a team member for High Risk Operations at Ranjangaon Site. Identifying small improvements in manufacturing process & implements them with

Kaizens to reduce the production cycle time and pro-actively participated in 5S on the shop floor.

Identifying unsafe conditions on assembly station & initiated actions to eliminate them. Supported for smooth transition of Light Assembly Operations from Ranjangaon site to

Chakan-MMF Site.

Educational Qualification:

Sr.No. Examination Board/ University

Aggregate %

Year Of Passing

Page 2: roushan singh

1. B.TECH (ICE) INSTRUMENTATION & CONTROL ENGINEERING.

DR. MGR UNIVERSITY CHENNAI

69.50% 2009-2013

2. HSC BSEB 66% 2008-20093. SSC BSEB 69% 2006-2007

Achievements:

Recognition for exceptional contributions in Assembly & Calibration in Q4-2014, for MS projects, meeting customer timelines. Awarded for Expertise in Air Flow loop setup and Courage to take initiative.

For depicting technical expertise & rigor for productionising the Air Flow Loop facility. This will enable supply chain to functionally test Gas & Liquid transducers, in this in house facility. Furthermore, this will reduce the execution lead time for Measurement Solutions - Flow orders. Awarded for Rigor in Calibration of Reliance Project on time.

Team Award for the fantastic execution of Q2 Reliance Skid project. Awarded for hard work and involvement in Q2 2015. Won prizes in safety Quizzes, Crossword and Poster Making Competitions at GE.

Skills and Abilities:

         Oracle ERP functionalities          Quick learner and good interpersonal skills

         Assembly and testing of different products          Microsoft applications skills

         Assembly line production procedures        C programming

Personal Information : DOB: 6th June. 1992. Gender: Male Nationality: Indian Languages Proficiency:

English Hindi (Mother Tongue)

Safety- Prepared SRA(Safety Risk Assessment)- Prepared HRO Procedures- Participated in various find and fix activities- Won prize for poster presentation on USE OF PPE Quality -Generated different Work Instructions-Participated and Faced Quality Audits for AS9100-Performed Why-Why Analysis-Faced different customers for Factory Acceptance Test Delivery - Worked on Assembly processes to reduce cycle time- Was awarded for meeting customer timelines- Worked on different kiazens and 5S techniques to reduce cost meet the delivery timeCost- Worked on ideas to use local suppliers inplace of imported .- Done series calibration of UFM to save cost and meet customer timeline.

Page 3: roushan singh

Declaration: I hereby declare that the above written particulars are true to the best of my knowledge.

Place: Pune

Date: 27/10/2015 ROUSHAN KUMAR SINGH