5
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator

Route 29 Western Bypass: Background and Timeline

  • Upload
    xerxes

  • View
    39

  • Download
    3

Embed Size (px)

DESCRIPTION

Route 29 Western Bypass: Background and Timeline. May 13, 2014 John Lynch, P.E. Culpeper District Administrator. Study Area. 81. Washington , D.C. 66. 95. Charlottesville. 64. Richmond. 64. 81. 95. 85. 81. 77. Proposed Route 29 Bypass. PROPOSED NORTHERN INTERCHANGE. 6.2 mile, - PowerPoint PPT Presentation

Citation preview

Page 1: Route 29 Western Bypass: Background and Timeline

Route 29 Western Bypass:Background and Timeline

May 13, 2014

John Lynch, P.E.

Culpeper District Administrator

Page 2: Route 29 Western Bypass: Background and Timeline

Richmond

Charlottesville

95857781

64

81

6695

64

81

Study Area

Washington, D.C.

Page 3: Route 29 Western Bypass: Background and Timeline

3

6.2 mile,

4-lane limited-access roadway from Route 29 north of the South Fork Rivanna River to the Route 29/250 Bypass

Proposed Route 29 Bypass

RT 29/ HYDRAULIC RD

RT 29/ RIO RD

RT 29/250INTERCHANGE

RT 29 PROPOSED WESTERN BYPASS

PROPOSED NORTHERN

INTERCHANGE

PROPOSED SOUTHERN

INTERCHANGE

Page 4: Route 29 Western Bypass: Background and Timeline

A TIMELINE OF EVENTS1970s– Charlottesville Area Transportation Study, first concepts of a bypass evaluated

Location Study and EIS started in October 1987Options included:• No Build• Transportat

ion System Management

• Mass Transit

• Expressway Concept

• Seven bypass options

1987

1991: CTB reaffirms selected alternative and phasing of improvements

1998: PEC and Sierra Club brought suit against the Secretary of Transportation and FHWA• Judge orders

VDOT to prepare a Supplemental EIS

• Final EIS approved by FHWA in May 2003

• Record of Decision issued by FHWA in September 2003

1990: CTB approves Alternative 10 Bypass Route and development of North Grounds connection for UVAPhasing includes:1. Widening of

existing Route 29 between Hydraulic Road and the Rivanna River

2. Construction of 3 grade separated interchanges at Route 29 and Hydraulic, Greenbrier and Rio Roads

3. Reservation of RW and construction of Bypass

1997: CTB approved Bypass design features

2011: MPO rescinds the 1996 resolution and amending the MPO TIP and CLRP to allow Bypass construction

1997: MPO adopts TIP without construction funding for the Bypass

1995: CTB rescinded 1990 & 1991 resolutions, eliminating requirement to build interchanges prior to bypass construction

2012: VDOT initiates an EA Reevaluation for Bypass

2014: VDOT informed by FHWA legal counsel that Bypass no longer meets purpose and need

1990

1991

1998

19971995

2011

2003

20142012

Page 5: Route 29 Western Bypass: Background and Timeline

5

Phase Total Allocation

Preliminary Engineering $20,837,745

Right of Way $105,481,038

Construction $118,275,045

Total $244,593,828

Route 29 Bypass Status

• Design-Build Contract awarded in 2012 for $135,988,092• Right of Way

-83 of 122 parcels (68%) have been purchased-VDOT manages 36 rental properties within Bypass• Expenditures to date: $54,096,922