1
www.arup.com T +44(0)121 213 3000 F +44(0)121 213 3001 Solihull, West Midlands B90 8AE The Arup Campus, Blythe Gate, Blythe Valley Park Feasibility Study High Speed 2 Sheet 25 of 33 Plan and Profile Rail 209742-00 HS2-ARP-00-DR-RW-05025 3.0 As Shown / / 22 12 11 CO For Coordination 2.0 MP CL / / 05 01 12 CO MP CL 3.0 Post Consultation Route J :\ 209000 \ 209742 - 00 \ 4 I n t e r n a l Pr o j ec t Da t a \ 4 - 10 Po s t Con s u lt a ti on Dr a wi ng s \ 0_ Dr a wi ng s \ HS2 - ARP- 00 - DR- RW - 05025 . dgn Approved Approved 80 100 1 0 0 100 100 10 0 10 0 10 0 10 0 100 100 100 100 100 100 100 100 100 100 10 0 100 10 0 10 0 100 100 1 0 0 100 100 100 100 100 100 100 100 1 00 10 0 100 100 100 1 00 1 0 0 100 100 100 100 100 10 0 100 1 0 0 1 0 0 100 100 10 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 10 0 10 0 1 00 100 100 100 100 1 00 10 0 100 10 0 100 100 10 0 100 1 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 1 0 0 100 100 100 100 100 10 0 100 120 1 20 120 120 120 120 140 140 140 153 + 0 0 0 154 + 000 1 55 + 000 15 6 + 0 00 157 + 00 0 158 + 000 1 5 9 + 0 0 0 160 + 000 160 + 706 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 170.0 170.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 170.0 170.0 Chainage 153 + 600 153 + 700 153 + 800 153 + 900 154 + 000 154 + 100 154 + 200 154 + 300 154 + 400 154 + 500 154 + 600 154 + 700 154 + 800 154 + 900 155 + 000 155 + 100 155 + 200 155 + 300 155 + 400 155 + 500 155 + 600 155 + 700 155 + 800 155 + 900 156 + 000 156 + 100 156 + 200 156 + 300 156 + 400 156 + 500 156 + 600 156 + 700 156 + 800 156 + 900 157 + 000 157 + 100 157 + 200 157 + 300 157 + 400 157 + 500 157 + 600 157 + 700 157 + 800 157 + 900 158 + 000 158 + 100 158 + 200 158 + 300 158 + 400 158 + 500 158 + 600 158 + 700 158 + 800 158 + 900 159 + 000 159 + 100 159 + 200 159 + 300 159 + 400 159 + 500 159 + 600 159 + 700 159 + 800 159 + 900 160 + 000 Horizontal Alignment R=8220.0 L=2715.5 L = 350 . 0 L=4657.2 L = 3 2 0 . 3 R=4509.1 L=1282.0 Vertical Alignment L = 3611 . 7 G = 0 . 00 % L=402.0 R=-56000.0 L = 645 . 5 G = 0 . 72 % L=424.6 R=56000.0 L = 1785 . 6 G = - 0 . 04 % Existing Level 93 . 8 93 . 1 91 . 8 90 . 8 85 . 9 85 . 1 85 . 1 84 . 9 85 . 8 91 . 3 91 . 3 90 . 4 89 . 7 87 . 1 85 . 7 85 . 0 87 . 0 92 . 5 97 . 8 98 . 6 98 . 8 99 . 3 98 . 4 96 . 3 94 . 8 87 . 7 90 . 1 88 . 8 87 . 0 85 . 7 87 . 0 92 . 9 98 . 4 98 . 1 96 . 8 95 . 4 97 . 7 96 . 3 96 . 5 98 . 0 99 . 6 99 . 6 99 . 7 100 . 0 101 . 6 101 . 4 99 . 6 97 . 3 99 . 6 102 . 0 100 . 4 100 . 0 100 . 2 101 . 1 101 . 5 101 . 7 102 . 0 104 . 6 106 . 3 106 . 9 104 . 5 102 . 2 100 . 9 100 . 5 100 . 5 Proposed Level 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 90 . 8 91 . 1 91 . 5 92 . 1 92 . 8 93 . 5 94 . 2 95 . 0 95 . 7 96 . 4 97 . 1 97 . 7 98 . 1 98 . 3 98 . 3 98 . 3 98 . 2 98 . 2 98 . 1 98 . 1 98 . 1 98 . 0 98 . 0 97 . 9 97 . 9 97 . 9 97 . 8 97 . 8 97 . 7 97 . 7 97 . 7 97 . 6 + 4 . 9 + 5 . 7 + 5 . 7 + 5 . 9 + 5 . 0 + 0 . 4 + 1 . 1 + 3 . 7 + 5 . 1 + 5 . 8 + 3 . 8 + 3 . 1 + 0 . 7 + 2 . 0 + 3 . 8 + 5 . 1 + 3 . 8 + 1 . 0 Cut and Fill - 3 . 0 - 2 . 3 - 1 . 0 - 0 . 5 - 0 . 5 - 1 . 7 - 7 . 0 - 7 . 8 - 8 . 0 - 8 . 5 - 7 . 6 - 5 . 5 - 4 . 0 - 2 . 1 - 7 . 6 - 7 . 3 - 5 . 7 - 3 . 9 - 5 . 6 - 3 . 5 - 3 . 0 - 3 . 8 - 4 . 6 - 3 . 9 - 3 . 3 - 2 . 9 - 3 . 9 - 3 . 3 - 1 . 3 - 1 . 3 - 3 . 8 - 2 . 2 - 1 . 9 - 2 . 1 - 3 . 0 - 3 . 5 - 3 . 7 - 4 . 1 - 6 . 7 - 8 . 4 - 9 . 1 - 6 . 7 - 4 . 5 - 3 . 2 - 2 . 8 - 2 . 9 Design Speed 400km/h 320km/h 315km/h Ch . 156818 . 109 T P. 90 . 784 Ch . 157220 . 109 T P. 92 . 227 Ch . 157865 . 609 T P. 96 . 861 Ch . 158290 . 209 T P. 98 . 300 New HS2 Viaduct over Flood Plain 120m New HS2 Viaduct over M42 155m Multi-Storey Carpark Existing Roundabout Enlarged Possible Hollywell Brook Diversion to accommodate new Interchange Station Roundabout to Be Locally Widened and Signalised Existing Link Roads Removed Raised Station Concourse Existing A45 Raised Approximately 3m Not Widened Segregated Lane E x i s t i ng A 452 Wi d e n e d t o D u a l 3 - L a n e a nd R e - a li gn e d E x i s ti ng R ound a bou t E n l a r g e d a nd S i gn a li s e d New A45 Bridge over HS2 New HS2 Viaduct over Flood Plain N e wH S 2 V i a du c t ov e r d i v e r t e d H o l l y w e ll B r ook Possible Diddington Lane Closure Possible Diddington Lane Closure Road to remain as Agricultural Access New Possible Permanent Yorkminster Drive Diversion New Possible Permanent Coleshill Heath Road Diversion over HS2 Existing Roads and Roundabouts Removed New HS2 Viaduct over M42 Local Access Only People Mover to the NEC / Airport New HS2 Viaduct over Flood Plain New Possible Permanent Track Diversion over HS2 New Possible Permanent Meriden Road and Diddington Lane Diversion over HS2 Possible Meriden Road Closure New Coleshill Heath Road Bridge over HS2 Viaduct over Flood Plain 500m New HS2 Viaduct over diverted Hollywell Brook, 50m New Possible Permanent Diddington Lane Diversion over HS2 New Possible Permanent Track Diversion over HS2 New Possible Permanent Link between B4438 and A446 New Possible Permanent Link between B4438 and A446 New A45 Bridge over HS2 Possible Meriden Road Closure New Possible Permanent Track Diversion New Birmingham Interchange Station For Station Drawing refer to HS2-ARP-00-DR-RW-05303 New Birmingham Interchange Station P e o p l e M o v e r D e p o t ( 100 x 300 m ) Plan Scale 1:10000 Profile Scale H 1:10000 V 1:1000 N F o r Con ti nu a ti o n Re f e r T o HS 2 - ARP - DR- RW - 0 50 26 F o r Con ti nu a t i on Re f e r T o HS 2 - ARP - DR- RW - 05024 Legend National Parks Flood Risk Zones Special Areas of Conservation Special Protection Areas National Nature Reserves Parks and Gardens Scheduled Ancient Monuments Historical Battlefields Listed buildings Area of Outstanding Natural Beauty RAMSAR World Heritage Site SSSI A1 A 9 B C D E F G H I J K L M N O P Drawing No Drawing Status Discipline Scale at A1 Job No Issue Drawing Title Issue Date By Chkd Appd Job Title Client 10 8 7 6 5 4 2 1 3 ' Arup ' Crown copyright and database rights 2011 Ordnance Survey 10049190 0.04 0.02 0.03 0 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur) Railway Embankment Highway Embankment Highway Cutting Railway Cutting

Route from Hampton in Arden to Chelmsley Wood - drawing ...assets.dft.gov.uk/publications/hs2-maps-20120110/hs2arp00drrw05025... · Existing Roundabout Enlarged Possible Hollywell

Embed Size (px)

Citation preview

Page 1: Route from Hampton in Arden to Chelmsley Wood - drawing ...assets.dft.gov.uk/publications/hs2-maps-20120110/hs2arp00drrw05025... · Existing Roundabout Enlarged Possible Hollywell

www.arup.com

T +44(0)121 213 3000 F +44(0)121 213 3001

Solihull, West Midlands B90 8AE

The Arup Campus, Blythe Gate, Blythe Valley Park

Feasibility Study

High Speed 2

Sheet 25 of 33

Plan and Profile

Rail

209742-00

HS2-ARP-00-DR-RW-05025 3.0

As Shown

/ /2212 11 CO

For Coordination

2.0 MP CL

/ /05 0112 CO MP CL

3.0

Post Consultation Route

J:\209000\2

09742-0

0\4 Intern

al Project

Data\4-1

0 P

ost

Consultation Dra

win

gs\0

_Dra

win

gs\H

S2-A

RP-0

0-D

R-R

W-0

5025.d

gn

Approved

Approved

80

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100100

100

100

100

100

100

100

100

100

100

100100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

120

120

120

120

120120

140

140

140

153+000

154+000

155+000

156+000

157+000

158+000

159+000

160+000160+706

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

170.0170.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

170.0170.0

Chainage

153+600

153+700

153+800

153+900

154+000

154+100

154+200

154+300

154+400

154+500

154+600

154+700

154+800

154+900

155+000

155+100

155+200

155+300

155+400

155+500

155+600

155+700

155+800

155+900

156+000

156+100

156+200

156+300

156+400

156+500

156+600

156+700

156+800

156+900

157+000

157+100

157+200

157+300

157+400

157+500

157+600

157+700

157+800

157+900

158+000

158+100

158+200

158+300

158+400

158+500

158+600

158+700

158+800

158+900

159+000

159+100

159+200

159+300

159+400

159+500

159+600

159+700

159+800

159+900

160+000

Horizontal Alignment

R=8220.0

L=2715.5L=350.0L=4657.2

L=320.3R=4509.1

L=1282.0

Vertical Alignment L=3611.7

G=0.00%

L=402.0

R=-56000.0

L=645.5G=0.72%

L=424.6

R=56000.0

L=1785.6

G=-0.04%

Existing Level 93.8

93.1

91.8

90.8

85.9

85.1

85.1

84.9

85.8

91.3

91.3

90.4

89.7

87.1

85.7

85.0

87.0

92.5

97.8

98.6

98.8

99.3

98.4

96.3

94.8

87.7

90.1

88.8

87.0

85.7

87.0

92.9

98.4

98.1

96.8

95.4

97.7

96.3

96.5

98.0

99.6

99.6

99.7

100.0

101.6

101.4

99.6

97.3

99.6

102.0

100.4

100.0

100.2

101.1

101.5

101.7

102.0

104.6

106.3

106.9

104.5

102.2

100.9

100.5

100.5

Proposed Level 90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

90.8

91.1

91.5

92.1

92.8

93.5

94.2

95.0

95.7

96.4

97.1

97.7

98.1

98.3

98.3

98.3

98.2

98.2

98.1

98.1

98.1

98.0

98.0

97.9

97.9

97.9

97.8

97.8

97.7

97.7

97.7

97.6

+4.9

+5.7

+5.7

+5.9

+5.0

+0.4

+1.1

+3.7

+5.1

+5.8

+3.8

+3.1

+0.7

+2.0

+3.8

+5.1

+3.8

+1.0

Cut and Fill -3.0

-2.3

-1.0

-0.5

-0.5

-1.7

-7.0

-7.8

-8.0

-8.5

-7.6

-5.5

-4.0

-2.1

-7.6

-7.3

-5.7

-3.9

-5.6

-3.5

-3.0

-3.8

-4.6

-3.9

-3.3

-2.9

-3.9

-3.3

-1.3

-1.3

-3.8

-2.2

-1.9

-2.1

-3.0

-3.5

-3.7

-4.1

-6.7

-8.4

-9.1

-6.7

-4.5

-3.2

-2.8

-2.9

Design Speed 400km/h320km/h315km/h

Ch.1

56818.1

09

TP.9

0.7

84

Ch.1

57220.1

09

TP.9

2.2

27

Ch.1

57865.6

09

TP.9

6.8

61

Ch.1

58290.2

09

TP.9

8.3

00

New HS2 Viaduct over Flood Plain 120m

New HS2 Viaductover M42 155m

Multi-StoreyCarpark

Existing RoundaboutEnlarged

Possible Hollywell Brook Diversion to

accommodate new Interchange Station

Roundabout to Be LocallyWidened and Signalised

Existing LinkRoads Removed

Raised StationConcourse

Existing A45 Raised Approximately 3mNot Widened

Segregated Lane

Existing A452 Widened to

Dual 3-Lane and Re-aligned

Existing RoundaboutEnlarged and Signalised

New A45 Bridgeover HS2

New HS2 Viaduct over Flood Plain

New HS2 Viaduct over

diverted Hollywell Brook

Possible DiddingtonLane Closure

Possible DiddingtonLane Closure

Road to remain asAgricultural Access

New Possible PermanentYorkminster DriveDiversion

New Possible PermanentColeshill Heath RoadDiversion over HS2

Existing Roads andRoundabouts Removed

New HS2 Viaduct over M42

Local Access Only

People Mover to

the NEC / Airport

New HS2 Viaduct over Flood Plain

New Possible PermanentTrack Diversion over HS2

New Possible Permanent Meriden Roadand Diddington Lane Diversionover HS2

Possible MeridenRoad Closure

New Coleshill Heath Road Bridge over HS2 Viaduct over Flood Plain 500m

New HS2 Viaduct over diverted Hollywell Brook, 50m

New Possible Permanent Diddington Lane Diversionover HS2

New PossiblePermanentTrack Diversionover HS2

New Possible Permanent Link between B4438 and A446

New Possible PermanentLink between B4438 and A446

New A45 Bridgeover HS2

Possible MeridenRoad Closure

New Possible PermanentTrack Diversion

New Birmingham Interchange StationFor Station Drawing refer toHS2-ARP-00-DR-RW-05303

New Birmingham Interchange Station

People Mover Depot (100 x 300m)

PlanScale 1:10000

ProfileScale H 1:10000 V 1:1000

N

For

Continuation R

efer

To H

S2-A

RP-D

R-R

W-0

5026

For C

ontin

uatio

n R

efer T

o H

S2-A

RP-D

R-R

W-0

5024

Legend National Parks

Flood Risk Zones

Special Areas of Conservation

Special Protection Areas

National Nature Reserves

Parks and Gardens

Scheduled Ancient Monuments

Historical Battlefields

Listed buildings

Area of Outstanding Natural Beauty

RAMSAR

World Heritage Site

SSSI

A1 A

9

B C D E F G H I J K L M N O P

Drawing No

Drawing Status

Discipline

Scale at A1

Job No

Issue

Drawing Title

Issue Date By Chkd Appd

Job TitleClient

10

8

7

6

5

4

2

1

3

' Arup

' Crown copyright and database rights 2011 Ordnance Survey 10049190

0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)

Railway

Embankment

Highway

Embankment

Highway

Cutting

Railway

Cutting