i Royal York Open House-Summary Report – December 2, 2013 i Royal York Station Easier Access Project Public Open House December 2, 2013 6:30 pm – 8:30 pm Consultation Summary Report Prepared by Lito Romano December 13, 2013 The Old Mill- Balmoral Room 21 Old Mill Road

Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

i Royal York Open House-Summary Report – December 2, 2013

i

Royal York Station Easier Access Project

Public Open House

December 2, 2013 6:30 pm – 8:30 pm

Consultation Summary Report

Prepared by Lito Romano

December 13, 2013

The Old Mill- Balmoral Room

21 Old Mill Road

Page 2: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

ii Royal York Open House-Summary Report – December 2, 2013

(This page intentionally left blank.)

Page 3: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

i Royal York Open House-Summary Report – December 2, 2013

i

Table of Contents

1 INTRODUCTION ..............................................................................................................................1

1.1 BACKGROUND ........................................................................................................................................................ 1

1.2 CONSULTATION PROCESS ................................................................................................................................. 1

1.3 EVENT DETAILS .................................................................................................................................................... 1

2.0 SUMMARY OF ALL QUESTIONS AND COMMENTS ............................................................. 2

2.1 TEMPORARY LOSS OF PUBLIC PARKING ....................................................................................................... 2

2.2 STATION PRIORITIES FOR THE EASIER ACCESS PROGRAM .................................................................. 2

2.3 OPERATIONAL CHALLENGES DURING CONSTRUCTION ........................................................................... 2

2.4 DESIGN AND CONSTRUCTION ................................................................................................................................. 3

2.5 ADDITIONAL COMMENTS ................................................................................................................................... 3

2.6 NON PROJECT RELATED QUESTIONS AND COMMENTS ....................................................................................... 4

3.0 NEXT STEPS ................................................................................................................................. 4

Page 4: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

ii Royal York Open House-Summary Report – December 2, 2013

(This page intentionally left blank.)

Page 5: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

1 Royal York Open House-Summary Report – December 2, 2013

1 Introduction

1.1 Background Since March 1990, the Commission has set a goal of making all TTC service and facilities

accessible. To date 31 of 69 stations across the network have been made accessible with

the Easier Access Program. By 2025, TTC expects to have all stations accessible, including

Woodbine. Funding for the program is included in TTC’s 5-year capital program which was

approved by City Council on December 8, 2009.

The Easier Access Project at Woodbine Station will include three new elevators, sliding

doors, accessible fare gate and new signage. To minimize disruption in the community, this

work will be coordinated with other required upgrades at the station including, repaving of

the bus loop.

Construction is expected to begin in late 2014 and be completed in 2017.

1.2 Consultation Process On December 2, 2013, the community was invited to the first open house where TTC presented

the preliminary plans for the project, including the preliminary schedule, construction impacts

and adjustment to bus operations (See Appendix-Presentation Panels)

1.3 Event Details Date: December 2, 2013

Venue: The Old Mill- Balmoral Room 21 Old Mill Road

Time: 6:30 pm - 8:30 pm

Attendees: 20

The event was promoted as follows:

November 13, 2013 - 4100 Event Notices were distributed via Canada Post to an area

bound by Dundas Ave W., Kingsway , Leland Ave and Mimico Creek

October 18, 2013 – Event Notice posted on the TTC project website - www.ttc.ca

November 28, 2013 - Colour ad placed in the south and central editions of the Etobicoke

Guardian

Event promoted through the councillor office

Personal visits to property owners immediately adjacent to the site

Meeting with the Chair of the Kingsway BIA sharing details of the project and

encouraging their members to attend the event

Page 6: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

2 Royal York Open House-Summary Report – December 2, 2013

2.0 Summary of all Questions and Comments The following is a high-level summary of the feedback received at the meeting. Comments were

recorded by TTC staff who were available throughout the evening to answer questions from

participants.

2.1 Temporary loss of Public Parking

Businesses were concerned about the temporary loss of 34 parking spots at the adjacent

Toronto Parking Authority (TPA) lot. The parking spots will be restored following

construction.

o TTC advised that these spots will be used for the contractor’s staging as well as

for the excavation. Two elevators between the concourse level and the platform

are located immediately below the parking lot. Representatives from TPA were

available to address questions.

Residents who use the short term parking lot behind Shoppers Drugmart were pleased

to learn that these spots would not be impacted by construction.

Parking in this area is critical for business owners, particularly those west of Royal York

Road where there are limited public spots.

2.2 Station Priorities for the Easier Access Program What were the criteria for establishing priority stations for the Easier Access Program?

o A number of factors were considered in consultation with TTC’s Advisory

Committee on Accessible Transit (ACAT) including, ridership levels, proportion of

ridership by seniors and disabled people, geographic location and transfers

between transportation modes.

Resident requested that TTC place Old Mill station, higher on the priority list, given the

number of seniors in the area.

2.3 Operational Challenges during Construction Will the sidewalk at the northwest corner of Royal York and Bloor be able to

accommodate the onslaught of passengers when TTC installs the temporary bus stop?

Passengers who would normally get off at the station will be getting off at this location

while the loop is closed for approximately 20 months.

o TTC has reviewed this and determined that the sidewalk is sufficiently wide to

accommodate transit riders. A temporary shelter is being explored at this

location.

Participants commented that, interlining the buses (running continuous service) along

Royal York while the loop is being resurfaced was “ingenious”. Riders who travel

through the station on the Royal York Bus will not be required to transfer at the station.

Routes 48 and 73 north bound will be seamless, as will the 15 and 76 southbound.

Page 7: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

3 Royal York Open House-Summary Report – December 2, 2013

Request for four temporary bus shelters in front of the station.

o TTC advised that there is limited space for bus shelter however anyone waiting

for a bus at the station entrance can seek shelter within the station.

o TTC will explore the possibility of a temporary shelter at the northwest corner of

Royal York Road and Bloor Street to accommodate southbound-transit users.

o

Q. What are the work hours during construction?

A. TTC indicated that

o the contractor was bound by City of Toronto by-laws

o Work is permitted between 7 am and 7pm during the week and on Saturdays

from 9 am to 7 pm.

2.4 Design and Construction

Q. Will TTC consider installing public washrooms at the station?

A. Public washrooms are available at terminal stations. There are no plans to install

washrooms at Royal York Station.

Q. What are TTC’s plans to handle the extra volume of passengers when Humbertown

Plaza and the buildings north of Humbertown are developed? Are there plans to expand

the station to accommodate the added density? Plans for multi-story building are

currently before the OMB.

A. TTC has neither plans nor space to expand the station, other than widening the north

driveway to provide additional bus layover space. The bus terminal and the station have

sufficient capacity to absorb the added density from the Humbertown site.

Q. Will there be disabled parking spots when the TPA lot is restored?

A. TTC will work with TPA to add two disabled parking spots. The spots will be located as

close as possible to the station entrance.

Q. Can the acoustic fence at the north end of the TPA parking lot be taller to avoid people

throwing debris onto private property?

A. TTC will work with the neighbour and TPA to explore this further

Q. Is there a public art component for this Station?

A. Public art for this project is still under review

2.5 Additional Comments

Access to the drop-off lane on Royal York is hampered by taxis that park very close to

this lane making it difficult to make a turn. Can taxis be set further back in order to

Page 8: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

4 Royal York Open House-Summary Report – December 2, 2013

provide easier access to anyone wishing to use the drop off lane? Will this be rectified as

part of the bus loop repaving?

o The bus loop repaving will not impact this area but the concern has been relayed

onto the City of Toronto Transportation Division for consideration, as this falls

within their purview.

2.6 Non Project related Questions and Comments

Comments:

Some residents were concerned about maintenance around the parking lot and

scattered debris. These issues were noted by TPA staff that were present.

3.0 Next Steps

Construction is scheduled to begin in late 2014. TTC will continue to meet with residents and

stakeholders to keep them abreast of developments on the project. A second public open house

will be arranged in 2014, prior to construction to share more details on the schedule and

staging of the project.

Page 9: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

5 Royal York Open House-Summary Report – December 2, 2013

Appendix 1

Event Flyer

Page 10: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

6 Royal York Open House-Summary Report – December 2, 2013

Appendix 2 - Newspaper Ad

Page 11: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

7 Royal York Open House-Summary Report – December 2, 2013

Appendix 3 Royal York Public Open House - Photos

Page 12: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

8 Royal York Open House-Summary Report – December 2, 2013

Page 13: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

9 Royal York Open House-Summary Report – December 2, 2013

Page 14: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

10 Royal York Open House-Summary Report – December 2, 2013

Appendix 4 Presentation Panels

Page 15: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

1Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York StationEasier Access Project

Public Open HouseThe Old Mill – Balmoral RoomDecember 2, 2013

Page 16: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

2Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Easier Access – Program Wide•All69stationstobeaccessibleby2025•31stationscompleted-almosthalfwaythere•WorkingwithAdvisoryCommitteeonAccessibleTransitoneffectivedesign

•Lookforelevators,slidingdoors,fare-gatesandotherfeaturesthatwillimprovemobilityforalltransit riders

Page 17: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

3Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Easier Access Project Background•Threestationscurrentlyunderconstruction:

•Pape(2013year-endcompletion) •Dufferin(2014completion) •LawrenceWest(2014completion)

Royal York Station •Constructionstart–late2014 •Scheduledcompletion–2017

Page 18: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

4Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York StationScopeofWork

Easy Access•Threeelevators•Accessiblefaregate•Improvedsignage•Slidingdoors•CCTV

BusLoopResurfacing•Waterproblemsinthestationandwornbusroadsurface•Busroadwayexpandedatnorthendtoaccommodate

added bus capacity

Page 19: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

5Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York Station

Royal YorkTorontoStationParking

Authority

rk R

dYo

Ro

yal

Ent

ranc

e Required forConstruction

New Paving Will

ing

do

n B

lvd

Lane

Co

nstr

uctio

n A

cces

s

Construction Access

Existing Fence

AerialViewExtended Paving

Page 20: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

6Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York Station

Existing Paid Area

EasierAccessFare Gate

ExistingBooth

Existing Stair

Existing Bus Platform

Existing Bus Platform

Existing Bus Platform

Existing Escalator

Easier Access Path Elevator E1to Concourse

Concourse

Platform

Station

EASTBOUND TRAIN WESTBOUND TRAIN

Elevator E2

Elevator E1

Elevator E3

New Sliding Door

New Sliding Door

New Sliding Door

New Sliding Door

StreetLevel

Page 21: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

7Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York Station

Easier Access Path

GlassPanel

Easier Access

Path

Exis

ting

Reta

il

Elevator E1to Street Level

Elevator E2to Platform

Elevator E3to Platform

GlassPanel

Concourse

Platform

Station

EASTBOUND TRAIN WESTBOUND TRAIN

Elevator E2

Elevator E1

Elevator E3

Cross Section

ConcourseLevel

Page 22: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

8Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York Station

Easier Access Path

GlassPanel

Easier Access

Path

Exis

ting

Reta

il

Elevator E1to Street Level

Elevator E2to Platform

Elevator E3to Platform

GlassPanel

Cross Section

Concourse

Platform

End ofPlatform

Station Elevator E1

Elevator E3Elevator E2

ElevatorCrossSection

Page 23: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

9Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York StationElevator E2to Concourse

Elevator E3to Concourse

Eastbound Platform

Westbound Platform

Tracks

PlatformLevel

Page 24: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

10Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

TTCCommitment•Providedetailedinformationpriortoconstruction•Provideclear,accurateandtimelyconstructioninformation

•Supportthecommunityduringconstruction•Listenandrespondtoissues•CommunityLiaisontorespondtoallquestionsandadvocateforthecommunity

•Meetwithstakeholders:businesses,residentsandtheKingswayBIAforspecificenquiries

•Postregularupdatesonadedicatedprojectpageatprojects.ttc.ca

Page 25: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

11Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

ImpactsandMitigation•34parkingspotsrequiredfromTorontoParkingAuthority(TPA)lottocompleteconstruction

•Busloopwillbeclosedfor20monthsduringresurfacingandelevatorconstruction

•TemporarybusstopsaddedonRoyalYorkRoad •Routesaffected:15Evans,48Rathburn,73RoyalYork,

76RoyalYorkSouth•Uptofivetreestoberemovedfromnorthsideof

TPA parking lot•TreeswillbereplantedinaccordancewithCityofTorontorequirements

Page 26: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

12Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York Station

Royal YorkStation

Bloor Street West

Roy

al Y

ork

Roa

d

Cliv

eden

Ave

Hum

ber

vale

Blv

d

Els

field

Rd

Bre

ntw

ood

Rd

S

Bre

ntw

ood

Rd

N

Will

ing

don

Blv

d

Jack

son

AveBirchview Blvd

White Oak Blvd

Varley Ln

15, 76 TemporaryBus Stop

48, 73 TemporaryBus Stop

TransitChanges

Page 27: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

13Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

Royal York Station

Royal YorkStation

Ro

yal Y

ork

Ro

ad

Will

ing

do

n B

lvd

Fivetreestoberemoved

Page 28: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

14Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

ScheduleDec 2/13 Design Public Open House

2014 PreconstructionPublicOpenHouse

2014 Startconstruction

2017 Completeconstruction

Page 29: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

15Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013

ContactUsWeb: projects.ttc.caEmail: [email protected]: 416-397-8699TTY: 416-397-0831Fax: 416-338-0251Mail: LitoRomano TTCCommunityLiaisonOfficer 5160YongeStreet,13thFloor Toronto,ONM2N6L9

Thankyouforyourparticipation!

Page 30: Royal York Station Easier Access Project Public … › PDF › Transit_expansion_PDFs › Royal_York...2 Royal York Open House-Summary Report – December 2, 2013 2.0 Summary of all

16Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013