Ruby Way – Overlook Court Drainage and Erosion Control ProjectProject Number 01.01.01.0158
Action Priority Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public and PrivatParcels
Implementers City of South Lake Tahoe
Primary Contact Stan Hill ([email protected])
Stage Implementation
Duration 2015 - 2022
Stormwater Management Program Reduce Stormwater Pollution From: Roads and Highways, Forest Roads, Public andPrivate Parcels
Water quality and erosion control project that will address surface runo� conditions. Existing siteconditions include an undersized storm drain collection and conveyance system that isoverwhelmed during high intensity storms. Project work will include adding in additional stormdrain inlets, adding subsurface storm drain pipes to replace an existing steep rock-linedconveyance channel, and constructing a series of linear storm drain detention basins that will alsoallow in�ltration of stormwater. Project improvements will redirect urban stormwater runo� intoa new subsurface conveyance systems; thereby, removing overland surface �ow that is impactingprivate and public property.
Key Accomplishments
Accomplishments to be provided upon completion of project
Threshold Categories
No Threshold Categories provided
Eroding channel discharging sediment onto Ruby Way: 2/8/2016
Location Expenditures
Expenditures by Funding Source to Date: $193,954 (Estimated Cost: $1,663,000)
City of South Lake Tahoe Gene... (CSLT): $2,500 Proposition 1 (SWRCB): $191,454
98.7%
Project Fact Sheet Data as of 12/26/
Photos
Before
Sediment discharge to Ruby WayLocalized �ooding during Storm Event 11-10-08 Runo� into adjacent property