17
RULES OF ATTRACTION AND THE ART OF SEDUCTION Main Drivers for Industrial Projects and What To Do To Persuade Investors Catalina Valencia Senior Consultant Global Location Strategies

RULES OF ATTRACTION AND THE ART OF SEDUCTIONcdn2.areadevelopment.com/static_pdfs/consultants...RULES OF ATTRACTION AND THE ART OF SEDUCTION Main Drivers for Industrial Projects and

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

  • RULES OF

    ATTRACTION AND

    THE ART OF

    SEDUCTIONMain Drivers for Industrial Projects and What To Do To Persuade Investors

    Catalina ValenciaSenior Consultant

    Global Location Strategies

  • 2|

    Drivers for capital intensive projects

    Common denominator

    What communities can do to attract them

  • 3|

    Global Location StrategiesGLS +40

    Years of experience

    $3.6BCapital investment

    4,000Jobs created

    70Countries

  • 4|

    Top Investment ProjectsSoutheast

    Source: SB&D Investments 100; Top 100 development projects in the South in 2015

    $43 $19 $10 $8 $3 $2 $2 $1.6 $1.6 $0.7Billion USD

    ~85%Capital intensive

    ~73%Without oil & gas

  • 5|

    Capital Intensive vs. Labor Intensive

    CapitalIntensive

    Labor Intensive

    Sit

    e &

    B

    uild

    ing

    250 acres50 min.

    50 acres15 min.

    300K sq. ft. 100K sq. ft.

    Cap

    ital

    Inve

    stm

    en

    t

    $300MM $65MM

    80% 75%

    Em

    plo

    yees

    200 300

    35% 30%

  • 6|

    Capital Intensive vs. Labor Intensive

    CapitalIntensive

    Labor Intensive

    Uti

    litie

    s

    20 MW166.4 MM kwh

    10 MW83.22 MM kwh

    1,080,000 MCF 270,000 MCF

    365 MG 62 MG

    329 MG 57 MG

    Log

    isti

    cs

    Usually No

    10 Miles 10 Miles

    Possible No

  • 7|

    Capital Intensive Project Drivers High

    Low – Moderate

    More technically trained

    More

    Intensive

    Longer

    Utilities

    Logistics

    Permitting/ Zoning

  • 8|

    Capital IntensiveProject Drivers

    Logistics

    Deep-water port or barge terminal

    RailColocation of supply

    chain partners

    Heavy truck movement Airport runwayx

    Intermodal

    Utilities

    Heavy utility dependency

    Other industrial gases –e.g. oxygen, nitrogen

    Raw water

    Direct discharge

    Pipelines

  • 9|

    Capital IntensiveProject Drivers

    Permitting/ Zoning

    Air quality attainment

    Waste disposal for hazardous/ non-

    hazardous materials

    Availability of credits, if non-attainment

    NPDES permit

    Tall buildings with stacks

    Steam plumes of visible water vapor

    Heavy-industrial zoning or no zoning

    Chemicals storage permitting

  • 10|

    Conditional Criteria2015 –Case Study 1

    25%

    15%

    15%

    20%

    10%

    15%

    Workforce

    Logistics/ Supply Chain

    Utilities

    Environmental/ Permitting/

    Zoning

    Schedule

    Site Prep/ Site Characteristics

    100 MW

    550 MCF/hr.

    5 MGD

    3.6 MGD

    700People

    Utilities + Logistics:31% of Criteria

    Weight

  • 11|

    Cost Impact2015 –Case Study 1

    39%

    11%

    31%

    14%

    2%2% 1% -1%

    Outbound Freight

    Inbound Freight

    Utility Costs

    Labor Costs

    Property Taxes

    Lease

    Sales & Use Tax

    Incentives

    100 MW

    550 MCF/hr.

    5 MGD

    3.6 MGD

    700People

    Utilities + Logistics:81% of operational

    costs

  • 12|

    Conditional Criteria2015 –Case Study 2

    $300MM

    20MW

    125MCF/hr.

    1MGD

    200People

    10%

    15%

    10%

    15%20%

    5%

    25%

    Workforce

    Logistics/ Supply Chain

    Utilities

    Environmental/ Permitting/

    ZoningSchedule

    Other

    Site Prep/ Site Characteristics

    Utilities + Logistics:25% of Criteria

    Weight

  • 13|

    Cost Impact2015 –Case Study 2

    $300MM

    20MW

    125MCF/hr.

    1MGD

    200People

    32%

    29%

    18%

    12%

    12%

    5%1% 0.4%

    Inbound Freight

    Natural Gas/ Steam

    Labor

    Other/ RM VAT

    Electricity

    Lease

    Industrial Water

    Industrial Wastewater

    Utilities + Logistics:86% of operational

    costs

  • 14|

    Capital Intensive ProjectsCommon Denominator

    Infrastructure

    Utilities Logistics

  • 15|

    What communities can do to attract capital intensive projects? Get control

    Characterize

    Understand capacities & limitations

    Consider non-traditional needs

  • 16|

    What communities can do to attract capital intensive projects?

    Think outside of…your town, your county,your state…

  • 17|

    Takeaways

    Finding the right site

    Big challenge

    Site readiness

    Priority

    Infrastructure

    Common denominator

    Big or small

    Opportunities for all