Run 16 plan based on 20 weeks cryo operationand Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015
today, 16 Feb…• 19 Jan, Begin cool-down to 4.5K
• 25 Jan, Beam in Yellow
• 22 26 Jan, Beam in Blue
• 29 Jan, Feb 3, First Collisions
• 5 7 Feb, Begin 10 week √s=200 GeV/n AuAu physics run• 15 18 April, End 10 week √s=200 GeV/n AuAu physics run
• 16 19 April, Begin 1.4 week √s=20 GeV/n dAu physics run• 26 29 April, End 1.4 week √s=20 GeV/n dAu physics run
• 29 April, Begin 1.4 week √s=39 GeV/n dAu physics run• 9 May, End 1.4 week √s=39 GeV/n dAu physics run
• 12 May, Begin 0.9 week √s=62 GeV/n dAu physics run• 18 May, End 0.9 week √s=62 GeV/n dAu physics run
• 21 May, Begin 0.9 week √s=200 GeV/n dAu physics run• 27 May, End 0.9 week √s=200 GeV/n dAu physics run
• 29 May, Begin 5 day E=40 GeV/n Au CEC physics run• 3 June, End 5 day E=40 GeV/n Au CEC physics run
• 3 June, begin cryo warm-up• 7 June, cryo warm-up complete, 20.0 cryo weeks of operation
See http://www.rhichome.bnl.gov/AP/RHIC2016/ for the Run Coordinator’s detailed plan
dAu setup time as per Chuyu 1/6/16 email
Actual physics time for each energy is TBD
dAu schedule as proposed by PHENIX, scaled to 4.7 total physics weeks
Schedule in Orange text not updated yet
From Fischer et. al., RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015
PHENIX goals: 10 weeks, 1.8 nb-1 with 12 billion MB events recorded within |z|< 10 cm vertex, request dynamic β* squeeze.STAR goals: 13 weeks 10nb-1 sampled for MTD and 2 billion MB events recorded for HFT
SCHEDULE FOR WEEK FROM MONDAY FEB. 15TH – SUNDAY FEB. 21st
MONDAY:- PHYSICS RUNNING
TUESDAY:- PHYSICS RUNNING UNTIL 4 pm- MACHINE DEV. 4 PM to 7 PM (REMOVE BLUE PROTECTION
BUMP)- PHYSICS RUNNING FROM 7 PM ON
WEDNESDAY:- PHYSICS RUNNING UNTIL 7:45 AM- SCHEDULED MAINTENANCE 8 AM TO 4 PM- 4 PM RECOVER RHIC AND PHYSICS RUNNING
THURSDAY:- PHYSICS RUNNING UNTIL 11 AM- BEAM DEV. 11 AM TO 3 PM (BETA SQUEEZE FOR IP8)- PHYSICS RUNNING 4 PM ON
FRIDAY THROUGH WEEKEND:- PHYSICS RUNNING
Archive
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
-60 -40 -20 0 20 40 60 80 100 120 140 160 180 200
MW
Days since beginning of Run
RHIC Operations FY14-16CAD Power 14
CAD Power 15
CAD Power 16
as of 20 Jan
http://www.bnl.gov/cad/esfd
Scheduling Physicist: Christie
AGS-Booster-Tandem/Linac/EBIS Startup
RHIC Cryo scrub & Cooldown to 45 deg K
RHIC Cryo Cooldown/Warm-up
RHIC Cryo Operation
RHIC Cryo off
AGS polarized proton studies
RHIC STAR & PHENIX
• RHIC Research with √s = 200 GeV/n AuAu
• RHIC Research with √s = 20,39,62,200 GeV/n dAu
CeC POP Experiment E=40 GeV/n Au
Contingency
NSRL (NASA Radiobiology)
NSRL (NASA-Langley)
BLIP (Isotopes)
BLIP (Other)
Shutdown (RHIC)
C-A Operations-FY16
Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
FY 2015
14 Jan 16
setup with beams
Sep
concurrent with RHIC
ramp up luminosity
setup as required
16 weeks
10 weeks4.7 physics wks
.4 weeks
12 Oct20 Nov
15C 4 April
4 Jan
16A
5.5 weeks
13 May
30 June
19 Jan
planned
20 weeks
7 Jun
16B
27 May
TBD
31 Jul
15 Apr 22 Jan 5 days
1 Apr
21 Mar
19 Oct 20 Oct
3 Jun
Run 16 RHIC Machine/Experiments MeetingFebruary 9, 2016
Agenda:
• Run 16 Schedule (Christie)• AuAu Run Plan Update (Gu)• STAR (Xu)• PHENIX (Jouan)• Overview of the Dynamic Beta Squeeze (Robert-Demolaize)• Other
READYTALK LOGIN INFOAudio LoginToll-Free (US & Canada): 866.740.1260 Toll: 303.248.0285 Access Code: 8304505
ReadyTalk link https://core.readytalk.com/interface/guest.jsp?host=readytalk&an=8667401260&ac=8304505
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
-60 -40 -20 0 20 40 60 80 100 120 140 160 180 200
MW
Days since beginning of Run
RHIC Cryo Operations FY14-16RHIC Cryo 14
RHIC Cryo 15
RHIC Cryo 16
as of 20 Jan
Balanced Billing for the lab +$683K (ahead) Sep through Dec 2015
d-Au : 5 weeks, 4 energies• “Five to seven weeks of running to perform a small
system beam energy scan (PAC) »
Our optimized choice for 5 weeks: • 20 GeV 1.5 week 9M (BUP: 7M)• 39 GeV 1.5 week 110M (110M)• 62 GeV 1. week 160M (230M)• 200 GeV 1. week 1.6 B (2.4B)Allowing a complete energy scan in the same detectionconditions, and keeping BUP and PAC goals of measuring the excitation function of 2-particle correlations and V2, and possibly - the first BES measurement of V3 in small systems at RHIC.19/01/2016 PHENIX RC RHIC machine-experiment 12
From 1/19/2016 D. Jouan presentation
From Fischer et. al., RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015
----- 11.0----- 5.0----- 1.5
Chuyu’s latest projections
Who’s Who for 2016
RHIC 100 x 100 GeV AuAu:Run Coordinator: Xiaofeng Gu, [email protected] , 631-344-4724
RHIC dAu Energy Scan: Run Coordinator: Chuyu Liu, [email protected] , 631-344-4431
RHIC CeC POP Experiment:Run Coordinator: TBD
Scheduling Physicist: Bill Christie, [email protected], 631-344-7137 (x4643 after 29 Jan)
Assistant Scheduling Physicists through 29 Jan:Yousef Makdisi, [email protected], 631-344-4932Phil Pile, [email protected], 631-344-4643
AGS Liaison: Haixin Huang, [email protected] , 631-344-5446
0
5
10
15
20
25
30
35
40
45
50
1-O
ct-1
01-
Dec
-10
1-Fe
b-11
1-Ap
r-11
1-Ju
n-11
1-Au
g-11
1-O
ct-1
11-
Dec
-11
1-Fe
b-12
1-Ap
r-12
1-Ju
n-12
1-Au
g-12
1-O
ct-1
21-
Dec
-12
1-Fe
b-13
1-Ap
r-13
1-Ju
n-13
1-Au
g-13
1-O
ct-1
31-
Dec
-13
1-Fe
b-14
1-Ap
r-14
1-Ju
n-14
1-Au
g-14
1-O
ct-1
41-
Dec
-14
1-Fe
b-15
1-Ap
r-15
1-Ju
n-15
1-Au
g-15
1-O
ct-1
51-
Dec
-15
Dai
ly A
vera
ge P
ower
(MW
)
Date
BNL Energy Use FY 2011-16RHIC Cryo RHIC other AGS-Exp
Booster AGS-Mach Tandem
CAD Bldg less SMD NSRL Site Base
BNL Peak-Avas of 20 Jan 2016
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
1-O
ct-0
11-
Apr-0
21-
Oct
-02
1-Ap
r-03
1-O
ct-0
31-
Apr-0
41-
Oct
-04
1-Ap
r-05
1-O
ct-0
51-
Apr-0
61-
Oct
-06
1-Ap
r-07
1-O
ct-0
71-
Apr-0
81-
Oct
-08
1-Ap
r-09
1-O
ct-0
91-
Apr-1
01-
Oct
-10
1-Ap
r-11
1-O
ct-1
11-
Apr-1
21-
Oct
-12
1-Ap
r-13
1-O
ct-1
31-
Apr-1
41-
Oct
-14
1-Ap
r-15
1-O
ct-1
5
Dai
ly A
vera
ge P
ower
(MW
)
Date
C-AD Energy Use FY 2002-16as of 20 Jan 2016
0.0
2.0
4.0
6.0
8.0
10.0
12.0
1-O
ct-0
11-
Apr-0
21-
Oct
-02
1-Ap
r-03
1-O
ct-0
31-
Apr-0
41-
Oct
-04
1-Ap
r-05
1-O
ct-0
51-
Apr-0
61-
Oct
-06
1-Ap
r-07
1-O
ct-0
71-
Apr-0
81-
Oct
-08
1-Ap
r-09
1-O
ct-0
91-
Apr-1
01-
Oct
-10
1-Ap
r-11
1-O
ct-1
11-
Apr-1
21-
Oct
-12
1-Ap
r-13
1-O
ct-1
31-
Apr-1
41-
Oct
-14
1-Ap
r-15
1-O
ct-1
5
Dai
ly A
vera
ge P
ower
(MW
)
Date
C-AD Cryo Energy Use FY 2002-16as of 20 Jan 2016
Who’s Who for 2016
RHIC 100 x 100 GeV AuAu:Run Coordinator: Xiaofeng Gu, [email protected] , 631-344-5446 (office)
RHIC dAu Energy Scan: Run Coordinator: Chuyu Liu, [email protected] , 631-344-4431 (office)
Scheduling Physicist: Bill Christie, [email protected], 631-344-7137Assistants through 29 Jan:Yousef Makdisi, [email protected], 631-344-4932(office)Phil Pile, [email protected], 631-344-4643 (office), 631-834-2005 (cell)
AGS Liaison: Haixin Huang, [email protected] , 631-344-5446 (office)
19
PHENIX Proposal for Run-16
We present a plan assuming 10 week so Au+Au @ 200 GeVThe optimum for PHENIX is to run Option A and Option B both