CT2 Meeting 5-6 March 2013 Hamburg

UHAM Plans 2013-2014

Kerstin Jochumsen

Plans 2013/2014

2013April: Poseidon cruise, Med. outflow, ADCP test arrayone 150 kHz and two 75 kHz instruments+ Anderaa Current Meters (RCM 11)

Summer: Charter cruise for servicing DS-2 – probably canceledExchange 75 kHz at DS-2 with 150 kHz instrument? Wait for 75 kHz ADCP solutionHedinn/Steingrimur could you service DS-2?

Who will help Laura deploy the Reykjanes Rige Moorings?

August: Meteor cruise, upwelling filaments off Namibia (new project)3 ADCPs needed for moorings until May 2014

Plans 2013/2014

Extension of Denmark Strait Array towards the Greenland Shelf

Plans 2013/2014

Two additional ADCP moorings on the shallower Greenland side of the Strait, one additional RCM mooring on the Icelandic side-> Input needed on the design of the frames (Svein)

Plans 2013/2014

2014May: Meteor cruise off Namibia, recovery of ADCP moorings

Summer: Poseidon cruise for servicing DS-2, deployment of extra DS moorings with trawl resistant frames (design of frames still open)

2015 (not yet proposed)Recovery cruise for DS moorings neededNew mixing array experiment?

Plans 2013/2014

Poseidon cruise in 2014

Plans 2013/2014

ADCP deployment planning…..

Exchange of DS-2 75 kHz ADCP with 150 kHz depending on RDI

SN currently frequency Apr 2013 Aug 2013 2014 2015

7955 HH 150 kHz Poseidon test DS-2 or Namibia DS-2 DS-2

16430 DS-2 75 kHz DS-2 HH

13287 HH 75 kHz Poseidon test Namibia DS-3

13288 HH 75 kHz Poseidon test Namibia DS-4

13486 Faroe 75 kHz recovery May Namibia

8552 Faroe 75 kHz recovery May

13175 Flemish Pass 75 kHz ? ? ? ?