S + T M a in p $ li + + E Subject: DR +DCP Mid Tx/LA. The DRL Mancill, SMIEE, P assistance of W nclude: (2) Eagl project: $8M, (3 $5M, a new cont iquid handling p +DCP NG +Noble En East Medit • DRL membe Delivery Man Machinery, C Safety Assess Structure PRM deepwater d • Geote • Detaile Modul • HSE / Q ongoin • Hull & with BW • Moori • Major RL Enginee stream team of Jason PCIC, IAS, James illiam Donovan eford inlet liqu ) NGL meter sta trol room projec roject, a 300MM GL Project ergy Lev terranean rs include Chris nager, with Vince Colby Hafner and sment and Don MP for this gia evelopment offs chnical survey is ed design under e Engineering Co QA audits of inte ng. Marine System WO. ng analysis and Equipment RFP ering Statu DRL has becom Jarrell, P.E., and s Bond, and Alla (Engineering M id handling pro ations: $12M, (2 ct: $5M, and sev MSCFD compress The majority of viathan FPS Lyttle as Hull e Page – Lead d Dana Garber o Reed for the Fix nt 2000 Mmscfd shore Israel. s underway at si rway with Topsid ontractor Aker, egration yards a s engg progress design finalized 's under review. us Q4 201 me DCP Midstre d colleague Pro an Clement (Ass Manager), Clayto ojects: $30M, a 2) large propane veral smaller but sor station, and f the work has be has just comm station now, mile pipeline group has m engineering, pipeline cont procurement The other ma facility in Mic compliance w that he is lead SO, on xed d te. de Oslo. are ing . . 14 eam’s “go – to oject Managers istant PM) are c on Pertell (Proj truck unloading e terminal proje t critical project several other O& een on NGL met missioned the B which is set to as well represe managed to d construction, a trol valve insta to dealing with jor area that Da chigan. He is in with DOT regulat ding or consultin o” partner for 3 David Papst, Da currently manag . Controls) & E g terminal: $14 ects in Marysvill s. 2015 project &M and Busines ter stations in W Bearkat station i commission in ents the largest ate ($8M). All and commission llation. He han Right of Way. avid has been inv nvolved in a la tions by next sum ng on. 3 rd party Projec avid Byrnes, P.E ging (16) project Ed Vettel (Proj. 4M, (2) DCS upg le, MI: $12M, an s include: an inl ss Development West Texas and L in October and January. The Bi standalone pro lan Clement is ning of 7 differ ndles everything volved with is DC rge undertaking mmer as well as ct Management E., Patrick Ewart ts totaling $88M Controls). Ma grades projects n Amine Contac et knock out pla t Projects. Louisiana. David is working on t ig Lake project i oject that the H s actively supp rent meter stat g from drawing CP’s Marysville N g to bring the s a handful of ot services in t, P.E., Mike MM with the jor projects and a MCC ctor project: ant, another Byrnes, P.E., the Big Lake involves a 4 ouston NGL porting the tions and a g review to NGL storage facility into her projects

S DR L Engineering Status Q4 201 4 DCP Midstream rddrl-engineering.com/images/site-content/news/news-1.pdf · • HSE / Q ongoin ... PCSB Boko echnology that ... ms. The propos is

Embed Size (px)

Citation preview

Page 1: S DR L Engineering Status Q4 201 4 DCP Midstream rddrl-engineering.com/images/site-content/news/news-1.pdf · • HSE / Q ongoin ... PCSB Boko echnology that ... ms. The propos is

 S +TMainp$

li

+

 

+E  

Subject: DR

+DCP  MidTx/LA.  The DRL Mancill, SMIEE, Passistance  of Wnclude:  (2)  Eaglproject: $8M,  (3$5M, a new cont

iquid handling p

+DCP  ‐ NG

+Noble EnEast Medit

• DRL membeDelivery ManMachinery, CSafety AssessStructure PRMdeepwater d

 • Geote• DetaileModul• HSE / Qongoin• Hull &with BW• Moori• Major 

RL Enginee

stream  ‐ team of  Jason PCIC, IAS, Jamesilliam  Donovan eford  inlet  liqu) NGL meter statrol room projec

roject, a 300MM

GL Project 

ergy  ‐ Levterranean 

rs include Chris nager, with VinceColby Hafner andsment  and Don MP ‐ for this giaevelopment offs

chnical survey ised design undere Engineering CoQA audits of inteng.  Marine SystemWO. ng analysis and Equipment RFP

ering Statu

DRL  has  becom

Jarrell, P.E., ands Bond, and Alla(Engineering Mid  handling  proations: $12M,  (2ct: $5M, and sev

MSCFD compress

The majority of

viathan FPS 

Lyttle as Hull e Page – Lead d Dana Garber oReed for the Fixnt 2000 Mmscfdshore Israel. 

s underway at sirway with Topsidontractor Aker, egration yards a

s engg progress

design finalized's under review.

us ‐ Q4 201

me  DCP Midstre

d  colleague Proan Clement (AssManager),  Claytoojects:  $30M,  a 2)  large propaneveral smaller but

sor station, and 

f the work has be

has  just commstation now, mile pipeline group  has  mengineering, pipeline  contprocurement 

  The other mafacility  in Miccompliance wthat he is lead

SO, 

on xed d 

te. de Oslo. are 

ing 

14 

eam’s  “go  –  to

oject Managers istant PM) are con  Pertell  (Projtruck  unloadinge terminal projet critical project

several other O&

een on NGL met

missioned  the Bwhich  is set  to as well represemanaged  to  dconstruction,  atrol  valve  instato dealing with 

jor area that Dachigan.  He  is  in

with DOT regulatding or consultin

o”  partner  for  3

David Papst, Dacurrently manag.  Controls) &  Eg  terminal:  $14ects  in Marysvills.  2015 project

&M and Busines

ter stations in W

Bearkat station  icommission  in 

ents the  largest ate  ($8M).  Alland  commissionllation.  He  hanRight of Way.

avid has been invnvolved  in  a  lations by next sumng on. 

3rd  party  Projec

avid Byrnes, P.Eging (16) projectEd  Vettel  (Proj. 4M,  (2) DCS  upgle, MI: $12M, ans include: an inl

ss Development

West Texas and L

in October and January. The Bistand‐alone prolan  Clement  isning  of  7  differndles  everything

volved with is DCrge  undertakingmmer as well as

ct Management 

E., Patrick Ewartts totaling $88MControls).    Magrades  projects n Amine Contacet knock out pla

t Projects. 

Louisiana. David 

is working on  tig Lake project  ioject that the Hs  actively  supprent  meter  statg  from  drawing

CP’s Marysville Ng  to  bring  the s a handful of ot

  services  in 

t, P.E., Mike MM with the jor  projects and  a MCC ctor project: ant, another 

Byrnes, P.E., 

the Big Lake involves a 4 ouston NGL porting  the tions  and  a g  review  to 

NGL storage facility  into her projects 

Page 2: S DR L Engineering Status Q4 201 4 DCP Midstream rddrl-engineering.com/images/site-content/news/news-1.pdf · • HSE / Q ongoin ... PCSB Boko echnology that ... ms. The propos is

CO DtTsSMo

 +Dt 

 

 +Dd 

   D+wfwoaidscdatrwtmver

Cardon Onshore &

Dave has been thhis  Onshore  anThe  project  incslugcatcher  in  tSeveral WHP plaMexico and the gof Houston and O

+Hess – HaDRL Team includo complete civil

+Husky EnDRL  (Nigel  Hill development fol

DRL Malay+Murphy Oiwe were engageurther develop water Kikeh Spaoffshore Sabah. analyses  on  attrdentified  in study.   The conditions togetdeep water subsa  space  constraiechnical  challeecovery  initiativwide  range  of hese  problemmodeling studiesvendor co‐ordinaexpansion  conceecommenced in

Gas  Fie& Offshore 

he Repsol E&C Mnd  Offshore  Gacludes  the  fouthe  World  at  2tforms are in fagas plant modulOK. 

awkeye Gades Ken Butler (Ps before the win

nergy – Maand  Dave)  are lowing the awar

ysia ‐ KL Opil  IOR ‐ Duringed by Murphy Ostudy work  forr and FPSO devDRL performed ractive  options our  2013 maturing  s

her with the limsea trees and drined  spar pose enges  to  increves. DRL has pefunctions  to  h

ms  including; s, flow assurancation  and  poweept  comparisonsn Q4. 

eld  – 

Manager for s  Facilities. 

urth  largest 23,000  bbl. brication in le came out 

as TreatingPM), Greg Chittunter comes in at 

adura Sourto  recommencrd of the Lease C

perations g 1H 2014 

Oil  in KL  to   the deep velopment a series of previously screening subsurface itations of ry trees on significant eased  oil rformed a help  solve 

process e analysis, er  system s.   Studies 

g & Comprum (Packages Le‐50 deg F and p

r Gas FPSOce  PMT  supportContract to Bum

Ikram

ession Plaead), Robert Whpermafrost. 

1‐‐‐‐‐‐‐DGS

O ‐ Indonest  to  Husky‐CNOi Armarda , Mala

m, Arief, Ian, Danial, R

nt, North eat (Piping) and

10 compressors24,000 HP Cat drivers 5 inlet gas comp2 Refrig comp  ‐3 flash gas Station Capacity2,000 bbl FingerDew point controGen Sets 2 x 1.5 Site 20 acres 

sia OOC  of  this aysia.   

Ron, Ridz, Dave, Chris

Dakota d Barry Plummer

pressors aerial ‐ screw 

y 50 Mmscf/d r design slug catol / propane refMW each 

s, James and Jim (and

r (EE Design). Pr

tcher – 6 fingers frigeration   

d Joey)

roject racing 

160 ft long 

Page 3: S DR L Engineering Status Q4 201 4 DCP Midstream rddrl-engineering.com/images/site-content/news/news-1.pdf · • HSE / Q ongoin ... PCSB Boko echnology that ... ms. The propos is

+ndop

 +ptcc

  +tdin 

+teEr

rin

in

 +inrwCct

 

+

+TML Kinabanew  productiondevelopment  proptions.  DRL alsproject. We are c

+ENQ Tj Barproject in Q1, DRo  the  PMT  as  fconductor  suppoconductors and t

+Tender Deso the Malaysiandevelopment to ncluding layouts

+PCSB Bokoechnology that employed to devEngineering  initieductions.  

ecycling  projectnstallation weig

nitiatives that do

+Lunch  andnitiative  which elevant  technolwith the commeCost Estimation.curriculum over his area.  

+Upcoming

alu CPP Fea  and  processinroposals  have  pso evaluated altcontracting 6 ad

ram Phase 1RL are now provfacilities  lead.   Torted  platform topsides and wil

sign Basis an Oil and Gas sebe used as parts and weight est

r  ‐ The Bokor Pis being develovelop concept diatives  and  ben

t with  facilities ht limits for bot

o not impact fun

  learn  highhas  been  effeclogies  has  takenencement of a st   Jim Scott will the next 12 mo

g Events ‐ 

asibility Screg  facilities  to  aproved  uneconoternative water ditional personn

1 & 2 PMT  ‐viding PMT suppThe  execution  pslated  for  Mal be installed by

nd Undiscloctor to prepare  of the Client's Pimates for CPP a

hase 3 Redevelo

ped by the Enhaesign and layounchmark  the  pr

both  onshore h lift and floato

nctionality or thr

hlights ‐  KL'sctive  at  sharingn  a  leap  forwartructured progralead  the  team  tonths to develop

eening Studyan  existing  fieldomic,  and  DRL injection  technonel into TML. 

 Following on fro

port to the Clientphase  assignmenrch  next  year. y drill rig making 

osed New toa Basis of DesigPSC tender propand WHP platfor

opment Project 

anced Oil Recovts within specifioject.  DRL  achi

 +Twinproductextractiseparatproject separataggregathen de

 +In  tCaspi

and  offshore  inver.  Current FE

roughput.  

s  post  'lunch  a

g  knowledge  in‐rd  in  sophisticatam on Benchmathrough a compp and hone DRL

 DRL Frida@ Ed1284HouRSVP*Hot

y  ‐ Talisman's K

d,  plus  the  intrwas  awarded ologies  to ensur

om our support 

t project team innt  started  in AuThe  complete weight, geomet

o Market Clgn and provide Cposal. DRL quickrms. The propos

is an EOR projec

very Centre (EOied weight targeeved  and  impr

nza Pasca  ‐ Ition,  offshore ion from 105 mmte FSO's.  DRL (leto revise the cote  propane  andation  and  reviewevelop the agree

the  pipe  foan:  DRL  are  pn  the  Caspian  SED design weigh

and  learn' 

‐house  on tion  in Q4 arking and prehensive L's skills  in 

Engineering Hay December 1ddie V’s Prime48 Queensburyston, TX 77024P by Decembetel accommod

Kinabalu Redeve

roduction  of  wa  10  week  sture selection of o

to UK Enquest's 

n the form of Teugust with  loadWHP  comprisi

try and T&I desig

ient ‐ In SepteCost and Scheduly turned arounsal is currently w

ct using Immisci

RC,  joint venturets, preliminary roved  upon  top

In 2012, DRL pe

Papua  New  Gumscfd of feed ged by Ian Johnsooncept for  incred  butane  produw  and  optimizeed concept to Pr

or  year  endpoised  to  perfo

Sea.  The  projecthts are pushing 

Holiday Bash in19th, 6 pm e Seafood and y Lane, Suite 24 er 12th @ NikiLdations availab

elopment Projec

water  injection  fudy  project  to optimal water  in

 marginal field d

echnical Lead Ja  out  of  the  180ing  subsea  temgn issues highly 

ember we were a

ule estimates fod a design brief 

with the regulato

ble Water Altern

re between Petrcost estimate a

psides  weight  ta

rformed a conc

uinea,  comprisias plus LPG andon) is expectingeased LPG plantucts,  include  pre  the  LPG  extrare‐FEED level.  

d  –  Petronorm  a  Value  En

t  development these envelopes

n Houston 

Steaks 200 

Luetchford@drble upon reque

ct comprises the

facilities.   Earlieevaluate  three njection  techno

development Tan

mes Doel, who 0 MT WHP  topsmplate,  stabilizasensitive.   

approached by a

or a greenfield, oto define the d

or for evaluation

nating Gas Injec

ronas and Shell)and schedule, ideargets  and  iden

ept design for o

ng  platform  in condensate stog award soon of t throughput, prrovision  for  3rdction  technolog

nas  Magtymngineering  stud

faces  challenges and require w

rl‐engineering.est.

e addition of 

er  proposed alternative logy  for  the 

njong Baram 

is seconded side  for  the tion  frame, 

a newcomer 

offshore gas evelopment .   

ction (IWAG) 

).  DRL were entify Value ntified  VE  $ 

offshore LPG 

stalled  LPG orage in two a follow‐up roduction of d  party  gas gy.  DRL will 

mguly  in y  for  a  gas 

es  from  low eight saving 