S13 Louisville Bridge Rehabilitation LTC2013

Embed Size (px)

Citation preview

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    1/96

    Zinc Rich Paintin a

    Pigeon Rich Environment

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    2/96

    Achieving Bridge Rehabwithout

    Going to Rehab

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    3/96

    RehabilitationLouisville Bridge

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    4/96

    RehabilitationLea Joyner Bridge

    US 80 / Ouachita River

    Monroe/West Monroe

    Ouachita ParishDistrict 05

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    5/96

    (1) 160-ft Bascule Span (two 80-ft leaves)

    (9) 40-ft Concrete Deck Girder Approach Spans

    (6) 100-ft Deck Truss Spans

    (2) 20-ft Steel Girder Spans (over counterweights)

    Bridge Type:

    Year Built:

    Total Length:

    Roadway:

    ADT:

    Movable / Bascule

    1936

    1170 ft

    (4) - 10 ft lanes & sidewalks

    40,000

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    6/96

    South Elevation

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    7/96

    West Bascule Leaf

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    8/96

    South Elevation

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    9/96

    Approach Spans

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    10/96

    Rehabilitation

    Phase 1

    Phase 2

    S.P. 001-09-0074

    S.P. 001-09-0075

    Lea Joyner Bridge

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    11/96

    Phase 1

    Phase 2

    Designer: Huval & Associates, Inc.

    Modjeski & Masters, Inc.

    LA DOTD Bridge Design Section

    Contractor: Kiewit Louisiana Co.

    Designer: LA DOTD Bridge Design Section

    Contractor: PCL Civil Constructors, Inc.

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    12/96

    Scope of Work:

    Structural

    Electrical

    Mechanical

    Architectural

    Phase 1 Phase 2

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    13/96

    Structural

    Electrical

    Mechanical

    Architectural

    Phase 1 Phase 2

    40% 60%

    Cost

    $ 9.8 M

    $ 0.9 M

    $ 3.0 M

    $ 0.9 M60% 40%

    $ 14.6 M

    $ 17.3 M

    Temp. Signs, Barricades, DMS units

    Site Lab

    Mobilization

    Cleaning, Clearing & Grubbing

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    14/96

    Structural

    Concrete

    Cracked Caps and Girder Ends

    End Wall Repairs & Added Girder Supports

    Major Spalls / Caps & Deck Undersides

    Jammed Fascia Joints

    Timber Fender System (Partial Replacement)

    Deck & Sidewalk Joint Seals

    Added Seismic Lateral Restraints

    Steel Members (Replace, Strengthen, or Repair)

    Steel Connections, Splices, Stiffeners

    Deficient Rivets High Strength Bolts Clean & Paint Structural Steel

    New Steel Grid Floor / Conc. Lane Lines

    Deck Epoxy Overlay

    Added Steel Curb Rail / New Conc. Curb

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    15/96

    Failed End Wall

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    16/96

    Cracked Bent Cap

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    17/96

    Repaired Bent Cap

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    18/96

    Repaired Bent Cap

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    19/96

    Cracked Girder Bearing

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    20/96

    Jammed Fascia Joint

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    21/96

    Cliff Swallow Nests

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    22/96

    Steel Overhang Gusset

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    23/96

    Deck Truss Stringers

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    24/96

    Deck Truss Stringers

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    25/96

    Deck Truss Stringers

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    26/96

    Deck Truss Stringers

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    27/96

    Deck Truss Bottom Chords

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    28/96

    Floor Beam Bottom Chords

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    29/96

    Floor Beam Bottom Chords

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    30/96

    Floor Beam Bottom Chords

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    31/96

    Floor Beam Bottom Chords

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    32/96

    Rivet Replacement w/ Bolts

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    33/96

    Machinery Truss

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    34/96

    Machinery Truss

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    35/96

    Machinery Truss

    Trunnion Truss

    Machinery Support Beams

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    36/96

    Machinery Support Beam

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    37/96

    Machinery Truss

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    38/96

    Machinery Truss

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    39/96

    Machinery Truss

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    40/96

    Load Transfer

    Dead Load

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    41/96

    Stress Transfer

    Dead Load

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    42/96

    Load Transfer

    Dead Load

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    43/96

    Stairs

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    44/96

    Spalled Curb

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    45/96

    Removed Curb

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    46/96

    Removed Curb

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    47/96

    Removable Sidewalk Panel

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    48/96

    Added Curb Rail

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    49/96

    Old Grid Floor

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    50/96

    New Grid Floor

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    51/96

    New Grid Floor

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    52/96

    New Grid Floor

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    53/96

    Bicycle Detour

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    54/96

    Balancing Act

    Stringers

    1936: Timber Risers + Timber Planks + Asphalt

    1950: Steel Risers + Steel Grid Floor

    Main

    SupportTrunnion

    CWT

    Rotation

    Point

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    55/96

    Balancing Act

    Stringers

    2012: New Steel Grid Floor, Added Conc. + Curb Rail

    Main

    SupportTrunnion

    CWT

    Rotation

    Point

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    56/96

    Electrical (New)

    Electrical System (230 V 480 V)

    Control System and Switchboard Drive Motors and Brakes

    Conduit and Wiring

    House Lighting

    Traffic Signals and Gates

    Navigational Lighting

    Generator

    Submarine Cables

    Walkway Lighting

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    57/96

    Old Generator

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    58/96

    New Generator

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    59/96

    New Disconnect Boxes

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    60/96

    New Breaker Box

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    61/96

    New Breaker

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    62/96

    New Transfer Switch

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    63/96

    Old Walkway Lighting

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    64/96

    Old Walkway Lighting

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    65/96

    New Walkway Lighting

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    66/96

    New Walkway Lighting

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    67/96

    New Walkway Lighting

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    68/96

    New Walkway Lighting

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    69/96

    Mechanical

    New Gears

    New Machinery Houses Live Load Shoes / Clean & Adjust

    Center Span Locks / Clean & Adjust

    Clean & Paint Machinery and Machinery Houses

    Temporary Operating System Bascule Span Balancing

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    70/96

    Center Span Locks

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    71/96

    Center Span Locks

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    72/96

    Center Span Locks

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    73/96

    Center Span Locks

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    74/96

    Center Span Locks

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    75/96

    New Gears

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    76/96

    New Gears

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    77/96

    New Gears

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    78/96

    Gear Removal System

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    79/96

    Temp. Operating System

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    80/96

    Temp. Operating System

    Architectural

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    81/96

    Architectural

    (4) Houses / Refurbished

    New Doors and Windows Roof and Gutter Repair

    New Stairway Hatches

    New Louvers and Exhaust Piping

    Removed Sinks, Toilets, Piping, Valves

    Class 2A Concrete Special Finish

    Added Lea Joyner Plaques

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    82/96

    House (Before)

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    83/96

    House (After)

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    84/96

    House (After)

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    85/96

    House & Lighting (Before)

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    86/96

    House, Curb Rail & Lights

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    87/96

    Steel and Concrete Color

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    88/96

    Steel and Concrete Color

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    89/96

    Steel and Concrete Color

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    90/96

    Approaches (Before)

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    91/96

    Approaches (After)

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    92/96

    Old Plaques

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    93/96

    New Plaques

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    94/96

    South Elevation (Before)

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    95/96

    Feb. 16, 2013

  • 7/29/2019 S13 Louisville Bridge Rehabilitation LTC2013

    96/96