1
CERTIFICATION AUDIT REPORT NUMBER 1st SURVEILLANCE AUDIT REPORT NUMBER 2nd SURVEILLANCE AUDIT REPORT NUMBER CERTIFICATE BQC CERTIFICATION BODY CERTIFIES THAT THE COMPANY WITH SCOPE OF CERTIFICATION HAS DEVELOPED AND IMPLEMENTS A QUALITY MANAGEMENT SYSTEM THAT FULLY MEETS THE REQUIREMENTS OF If the surveillance audits are not conducted according to the above deadlines, the certification of the Organization will be withdrawn and the Certificate has to be returned, since it remains a property of BQC. The Audit Report Numbers are filled in annually after the successful completion of the Surveillance Audits and attest the continuous Conformity of the certified organization to the above Standard and the Validation of the Certificate for each designated period. CERTIFICATE’S REGISTRATION NUMBER RUK CONSTRUCTION COMPANY PO Box 276510, Riyadh 11314, Saudi Arabia Execution of Water Pipe Lines Construction ΕΝ ISO 9001:2015 4270 5764 ____ 100CN1712524270-1 CERTIFICATION MANAGER 1st SURVEILLANCE AUDIT UNTIL 2nd SURVEILLANCE AUDIT UNTIL 12/04/2018 12/04/2019 ATHENS, 05/04/2018 BQC | Certification Body | 96, D. Gounari str. & Kifissias Av., GR 15125, Μaroussi, Athens | Τ +30 2112213726 | info @bqc.gr | www. bqc .gr Certificate Validation Period from 12/04/2017 to 11/04/2018 Certificate Validation Period from 12/04/2018 to 11/04/2019 Certificate Validation Period from 12/04/2019 to 11/04/2020

S936. RUK Construction Company 9001 - ruk-sa.com · certification audit report number 1st surveillance audit report number 2nd surveillance audit report number certificate bqc certification

  • Upload
    lykiet

  • View
    223

  • Download
    0

Embed Size (px)

Citation preview

Page 1: S936. RUK Construction Company 9001 - ruk-sa.com · certification audit report number 1st surveillance audit report number 2nd surveillance audit report number certificate bqc certification

CERTIFICATION AUDIT REPORT NUMBER

1st SURVEILLANCE AUDIT REPORT NUMBER

2nd SURVEILLANCE AUDIT REPORT NUMBER

C E R T I F I C A T E

BQC CERTIFICATION BODYCERTIFIES THAT THE COMPANY

WITH SCOPE OF CERTIFICATION

HAS DEVELOPED AND IMPLEMENTSA QUALITY MANAGEMENT

SYSTEM THAT FULLY MEETS THE REQUIREMENTS OF

If the surveillance audits are not conducted according to the above deadlines, the certification of the Organization will be withdrawn and the Certificate has to be returned, since it remains a property of BQC.

The Audit Report Numbers are filled in annually after the successful completion of the Surveillance Audits and attest the continuous Conformity of the certified organization to the above Standard and the Validation of the Certificate for each designated period.

CERTIFICATE’S REGISTRATION NUMBER

RUK CONSTRUCTION COMPANY

PO Box 276510, Riyadh 11314, Saudi Arabia

Execution of Water Pipe Lines Construction

ΕΝ ISO 9001:2015

4270

5764

____

100CN1712524270-1

CERTIFICATION MANAGER

1st SURVEILLANCE AUDIT UNTIL2nd SURVEILLANCE AUDIT UNTIL

12/04/201812/04/2019

ATHENS, 05/04/2018

BQC | Certification Body | 96, D. Gounari str. & Kifissias Av., GR 15125, Μaroussi, Athens | Τ +302112213726 | [email protected] | www.bqc.gr

Certificate Validation Period from 12/04/2017 to 11/04/2018

Certificate Validation Period from 12/04/2018 to 11/04/2019

Certificate Validation Period from 12/04/2019 to 11/04/2020